AI assistant
Sunray Engineering Group Limited — Interim / Quarterly Report 2021
Nov 12, 2021
51506_rns_2021-11-12_2e7cad5a-bcea-4621-ae4b-92260847cf9d.pdf
Interim / Quarterly Report
Open in viewerOpens in your device viewer
==> picture [333 x 72] intentionally omitted <==
==> picture [174 x 63] intentionally omitted <==
CHARACTERISTICS OF GEM OF THE STOCK EXCHANGE OF HONG KONG LIMITED (THE “STOCK EXCHANGE”)
GEM has been positioned as a market designed to accommodate small and mid-sized companies to which a higher investment risk may be attached than other companies listed on the Stock Exchange. Prospective investors should be aware of the potential risks of investing in such companies and should make the decision to invest only after due and careful consideration.
Given that the companies listed on GEM are generally small and mid-sized companies, there is a risk that securities traded on GEM may be more susceptible to high market volatility than securities traded on the Main Board of the Stock Exchange and no assurance is given that there will be a liquid market in the securities traded on GEM.
Hong Kong Exchanges and Clearing Limited and the Stock Exchange take no responsibility for the contents of this report, make no representation as to its accuracy or completeness and expressly disclaim any liability whatsoever for any loss howsoever arising from or in reliance upon the whole or any part of the contents of this report.
This report, for which the directors (collectively the “Directors” and individually a “Director”) of Sunray Engineering Group Limited (the “Company”) collectively and individually accept full responsibility, includes particulars given in compliance with the Rules Governing the Listing of Securities on GEM of the Stock Exchange (the “GEM Listing Rules”) for the purpose of giving information with regard to the Company. The Directors, having made all reasonable enquiries, confirm that, to the best of their knowledge and belief, the information contained in this report is accurate and complete in all material respects and not misleading or deceptive, and there are no other matters the omission of which would make any statement herein or this report misleading.
CONTENTS
| CONTENTS | |
|---|---|
| Corporate Information | 2 |
| Financial Highlights | 3 |
| Unaudited Condensed Consolidated Statement of | |
| Profit or Loss and Other Comprehensive Income | 4 |
| Unaudited Condensed Consolidated Statement | |
| of Financial Position | 5 |
| Unaudited Condensed Consolidated Statement | |
| of Changes in Equity | 6 |
| Unaudited Condensed Consolidated Statement | |
| of Cash Flows | 7 |
| Notes to the Unaudited Condensed Consolidated | |
| Financial Statements | 9 |
| Management Discussion and Analysis | 22 |
| Other Information | 31 |
CORPORATE INFORMATION
BOARD OF DIRECTORS
Executive Directors
Mr. Lam Ka Wing (Chairman and Chief Executive Officer) Ms. Wong Pui Yee Edith
Independent non-executive Directors
Mr. Ng Kwun Wan Ms. Cho Mei Ting Mr. Ho Ka Kit
AUDIT COMMITTEE
Mr. Ng Kwun Wan (Chairman) Ms. Cho Mei Ting Mr. Ho Ka Kit
REMUNERATION COMMITTEE
Ms. Cho Mei Ting (Chairlady) Mr. Ho Ka Kit Mr. Ng Kwun Wan
NOMINATION COMMITTEE
Mr. Ho Ka Kit (Chairman) Ms. Cho Mei Ting Mr. Ng Kwun Wan
COMPANY SECRETARY
Mr. Lo Kai Yeung Kenneth (Member of the HKICPA)
COMPLIANCE OFFICER
Ms. Wong Pui Yee Edith
AUTHORISED REPRESENTATIVES
Mr. Lam Ka Wing Mr. Lo Kai Yeung Kenneth
PRINCIPAL BANKER
Bank of China (Hong Kong) Limited Bank of China Tower 1 Garden Road Central Hong Kong
China Construction Bank (Asia) Corporation Limited CCB Tower 3 Connaught Road Central Central Hong Kong
AUDITOR
Deloitte Touche Tohmatsu
Certified Public Accountants Registered Public Interest Entity Auditor 35/F, One Pacific Place 88 Queensway Hong Kong
LEGAL ADVISERS AS TO HONG KONG LAW
Hastings & Co. 5/F, Gloucester Tower The Landmark 11 Pedder Street Central Hong Kong
COMPLIANCE ADVISER
Alpha Financial Group Limited Room A, 17/F Fortune House 61 Connaught Road Central Central Hong Kong
HONG KONG BRANCH SHARE REGISTRAR AND TRANSFER OFFICE
Tricor Investor Services Limited Level 54, Hopewell Centre 183 Queen’s Road East Hong Kong
CAYMAN ISLANDS PRINCIPAL SHARE REGISTRAR AND TRANSFER OFFICE
Ocorian Trust (Cayman) Limited P.O. Box 1350 Clifton House 75 Fort Street Grand Cayman KY1-1108 Cayman Islands
CAYMAN ISLANDS REGISTERED OFFICE
P.O. Box 1350 Clifton House 75 Fort Street Grand Cayman KY1-1108 Cayman Islands
PRINCIPAL PLACE OF BUSINESS IN HONG KONG
Unit 803–804, 8/F. Laford Centre 838 Lai Chi Kok Road Cheung Sha Wan Kowloon, Hong Kong
WEBSITE
www.sunray.com.hk
STOCK CODE
08616
2
SUNRAY ENGINEERING GROUP LIMITED | 2021 INTERIM REPORT
FINANCIAL HIGHLIGHTS
HIGHLIGHTS
-
The revenue of the Group amounted to approximately HK$90.2 million for the six months ended 30 September 2021, representing an increase of approximately 32.6% as compared to that of approximately HK$68.0 million for the six months ended 30 September 2020.
-
The gross profit amounted to approximately HK$30.0 million for the six months ended 30 September 2021, representing an increase of approximately 11.9% as compared to that of approximately HK$26.8 million for the six months ended 30 September 2020.
-
The net profit increased from approximately HK$3.8 million for the six months ended 30 September 2020 to approximately HK$7.6 million for the six months ended 30 September 2021.
-
Basic and diluted earnings per share was HK$0.76 cents for the six months ended 30 September 2021 (six months ended 30 September 2020: HK$0.39 cents).
-
The Board does not recommend the payment of any dividend for the six months ended 30 September 2021 (six months ended 30 September 2020: Nil).
SUNRAY ENGINEERING GROUP LIMITED | 2021 INTERIM REPORT 3
UNAUDITED CONDENSED CONSOLIDATED STATEMENT OF PROFIT OR LOSS AND OTHER COMPREHENSIVE INCOME
For the six months ended 30 September 2021
The board of Directors (the “Board”) of the Company is pleased to announce the unaudited condensed consolidated financial results of the Company and its subsidiaries (collectively the “Group”) for the three months and six months ended 30 September 2021, together with the comparative figures for the corresponding period in 2020, as follows:
==> picture [484 x 74] intentionally omitted <==
----- Start of picture text -----
Three months ended Six months ended
30 September 30 September
Notes 2021 2020 2021 2020
HK$’000 HK$’000 HK$’000 HK$’000
(Unaudited) (Unaudited) (Unaudited) (Unaudited)
----- End of picture text -----
| Revenue 3 Cost of sales and services Gross profit Other income 5 Other gains and losses 6 Impairment losses, net of reversal Selling and distribution costs Administrative expenses Finance costs 7 Listing expenses Profit before taxation 8 Income tax expense 9 Profit and total comprehensive income for the period Profit and total comprehensive income for the period attributable to: — Owners of the Company Earnings per share Basic and diluted (HK cents) 10 |
41,370 (26,334) 15,036 309 (103) 16 (1,983) (7,915) (112) — 5,248 (832) 4,416 4,416 0.44 |
34,819 (21,151) 13,668 769 238 15 (1,549) (8,785) (34) — 4,322 (1,466) 2,856 2,856 0.29 |
90,168 (60,167) 30,001 351 99 16 (4,782) (16,130) (149) — 9,406 (1,802) 7,604 7,604 0.76 |
67,962 (41,163) 26,799 1,151 (16) 15 (2,926) (18,257) (56) (926) 5,784 (2,026) 3,758 3,758 0.39 |
|---|---|---|---|---|
4 SUNRAY ENGINEERING GROUP LIMITED | 2021 INTERIM REPORT
UNAUDITED CONDENSED CONSOLIDATED STATEMENT OF FINANCIAL POSITION
As at 30 September 2021
==> picture [484 x 67] intentionally omitted <==
----- Start of picture text -----
As at As at
30 September 31 March
Notes 2021 2021
HK$’000 HK$’000
(Unaudited) (Audited)
----- End of picture text -----
| Non-current assets Property and equipment 12 Right-of-use assets 12 Rental deposits Current assets Inventories Trade and other receivables 13 Contract assets 14 Tax recoverable Pledged bank deposit Bank balances and cash Current liabilities Trade and other payables 15 Contract liabilities 14 Bank borrowings 16 Lease liabilities Taxation payables Net current assets Total assets less current liabilities Non-current liabilities Lease liabilities Deferred tax liabilities Net assets Capital and reserves Share capital 17 Reserves Total equity |
48,552 3,200 414 52,166 26,263 17,585 112,196 272 821 35,903 193,040 23,764 14,680 21,269 1,836 2,680 64,229 128,811 180,977 1,477 698 2,175 178,802 10,000 168,802 178,802 |
4,096 4,079 414 8,589 9,457 26,606 116,640 1,064 818 57,777 212,362 31,515 11,608 — 2,263 1,739 47,125 165,237 173,826 1,930 698 2,628 171,198 10,000 161,198 171,198 |
|---|---|---|
SUNRAY ENGINEERING GROUP LIMITED | 2021 INTERIM REPORT 5
UNAUDITED CONDENSED CONSOLIDATED STATEMENT OF CHANGES IN EQUITY
For the six months ended 30 September 2021
==> picture [484 x 58] intentionally omitted <==
----- Start of picture text -----
Share Share Legal Other Capital Retained
capital premium reserve reserve contribution profits Total
HK$’000 HK$’000 HK$’000 HK$’000 HK$’000 HK$’000 HK$’000
(Note)
----- End of picture text -----
| At 31 March 2020 (audited) | — | — | 24 | 49 | 36,724 | 86,704 | 123,501 |
|---|---|---|---|---|---|---|---|
| Capitalisation issue (note 17) | 7,500 | (7,500) | — | — | — | — | — |
| Issue of shares upon share offer (note 17) | 2,500 | 38,555 | — | — | — | — | 41,055 |
| Dividend recognised as distribution | — | — | — | — | — | (5,800) | (5,800) |
| Profit and total comprehensive income | |||||||
| for the period | — | — | — | — | — | 3,758 | 3,758 |
| At 30 September 2020 (unaudited) | 10,000 | 31,055 | 24 | 49 | 36,724 | 84,662 | 162,514 |
| At 31 March 2021 (audited) | 10,000 | 31,055 | 24 | 49 | 36,724 | 93,346 | 171,198 |
| Profit and total comprehensive income | |||||||
| for the period | — | — | — | — | — | 7,604 | 7,604 |
| At 30 September 2021 (unaudited) | 10,000 | 31,055 | 24 | 49 | 36,724 | 100,950 | 178,802 |
Note: In accordance with Article 377 of the Commercial Code of Macau Special Administrative Region, the subsidiaries registered in Macau are required to transfer part of their profits of the accounting period of not less than 25% to legal reserve, until the amount reaches an amount equal to half of the respective share capital.
6 SUNRAY ENGINEERING GROUP LIMITED | 2021 INTERIM REPORT
UNAUDITED CONDENSED CONSOLIDATED STATEMENT OF CASH FLOWS
For the six months ended 30 September 2021
==> picture [484 x 61] intentionally omitted <==
----- Start of picture text -----
Six months ended 30 September
2021 2020
HK$’000 HK$’000
(Unaudited) (Unaudited)
----- End of picture text -----
| Operating activities Profit before taxation Adjustments for: (Gain) loss on disposal of property and equipment Loss arising from early termination of a lease contract Depreciation Bank interest income Impairment losses, net of reversal Finance costs Operating cash flows before movements in working capital Decrease in trade and other receivables Decrease (increase) in contract assets Increase in inventories Decrease in trade and other payables Increase in contract liabilities Cash generated from (used in) operations Income tax paid Net cash generated from (used in) operating activities Investing activities Proceeds from disposal of property and equipment Interest received Purchase of property and equipment Payments for rental deposits Placement of a pledged bank deposit Net cash used in investing activities |
9,406 (45) 11 2,406 (5) (16) 149 11,906 9,075 4,406 (16,806) (7,751) 3,072 3,902 (69) 3,833 1,100 5 (46,617) — (3) (45,515) |
5,784 309 — 1,788 (55) (15) 56 7,867 10,245 (9,582) (1,232) (21,286) 1,328 (12,660) — (12,660) 660 55 (1,119) (356) (12) (772) |
|---|---|---|
SUNRAY ENGINEERING GROUP LIMITED | 2021 INTERIM REPORT 7
UNAUDITED CONDENSED CONSOLIDATED STATEMENT OF CASH FLOWS
For the six months ended 30 September 2021
==> picture [484 x 61] intentionally omitted <==
----- Start of picture text -----
Six months ended 30 September
2021 2020
HK$’000 HK$’000
(Unaudited) (Unaudited)
----- End of picture text -----
| Financing activities Proceeds from issuance of share capital Proceeds from bank borrowings Issue costs paid Repayment of bank borrowings Payments of lease liabilities Interest paid Dividend paid Net cash generated from financing activities Net (decrease) increase in cash and cash equivalents Cash and cash equivalents at beginning of the period Cash and cash equivalents at end of the period, represented by bank balances and cash |
— 21,500 — (231) (1,312) (149) — 19,808 (21,874) 57,777 35,903 |
60,000 — (15,736) — (981) (56) (5,800) 37,427 23,995 39,920 63,915 |
|---|---|---|
8 SUNRAY ENGINEERING GROUP LIMITED | 2021 INTERIM REPORT
NOTES TO THE UNAUDITED CONDENSED CONSOLIDATED FINANCIAL STATEMENTS
For the six months ended 30 September 2021
1. GENERAL
The Company was incorporated and registered as an exempted company with limited liability in the Cayman Islands under the Companies Law Chapter 22 of the Cayman Islands on 12 February 2019. The address of the Company’s registered office is P.O. Box 1350, Clifton House, 75 Fort Street, Grand Cayman KY1-1108, Cayman Islands and the Company’s principal place of business is Unit 803[–] 804, 8/F., Laford Centre, 838 Lai Chi Kok Road, Cheung Sha Wan, Kowloon, Hong Kong.
Upon completion of a group reorganisation (the “Group Reorganisation”) on 29 March 2019, the Company has become the holding company now comprising the Group. Details of the Group Reorganisation are set out in the Company’s prospectus dated 31 March 2020 (the “Prospectus”) in connection with the initial listing of shares of the Company on GEM of the Stock Exchange (the “Listing”). Since 23 April 2020 (the “Listing Date”), the Company has been listed on GEM of the Stock Exchange.
The Company is an investment holding company. The Company and its subsidiaries are principally engaged in provision of building protection works and supply of building protection products. The Company’s immediate and ultimate holding company is Ultra Success Industries Limited (“Ultra Success”), a limited liability company incorporated in the British Virgin Islands (“BVI”). The ultimate controlling shareholder of the Group is Mr. Lam Ka Wing (“Mr. Lam”).
The unaudited condensed consolidated financial statements are presented in HK$, which is also the functional currency of the Company.
The condensed consolidated financial statements for the six months ended 30 September 2021 (the “Interim Financial Statements”) are unaudited but were reviewed by the audit committee of the Company (the “Audit Committee”) and approved for issue by the Board on 12 November 2021.
2. BASIS OF PREPARATION
The Interim Financial Statements have been prepared in accordance with Hong Kong Accounting Standard (“HKAS”) 34 — Interim Financial Reporting issued by the Hong Kong Institute of Certified Public Accountants (the “HKICPA”) as well as with the applicable disclosure requirements of the GEM Listing Rules. The Interim Financial Statements do not include all of the information required for full set of financial statements prepared in accordance with the Hong Kong Financial Reporting Standards (“HKFRSs”) and should be read in conjunction with the Company’s consolidated financial statements for the year ended 31 March 2021 (the “2021 Annual Report”).
The accounting policies and methods of computation applied in the preparation of the Interim Financial Statements are consistent with those applied in the preparation of the 2021 Annual Report except for the adoption of new or revised standards, amendments and interpretations issued by the HKICPA mandatory for annual accounting periods beginning on or after 1 April 2021. The adoption of these new or revised standards, amendments and interpretations in the current accounting period had no significant change in accounting policies and no significant effect on the financial results of the Group. In addition, the Group has not early adopted any new standard, interpretation or amendment that has been issued but is not yet effective for the current accounting period.
SUNRAY ENGINEERING GROUP LIMITED | 2021 INTERIM REPORT 9
NOTES TO THE UNAUDITED CONDENSED CONSOLIDATED FINANCIAL STATEMENTS
For the six months ended 30 September 2021
2. BASIS OF PREPARATION (CONTINUED)
The Interim Financial Statements have been prepared on the historical cost basis.
Accounting estimates and assumptions are used in the preparation of financial statements. Although these estimates are based on management’s best knowledge and judgment of current events and actions, actual results may ultimately be different from those estimates and assumptions. In preparing the Interim Financial Statements, the significant judgments made by management in applying the Group’s accounting policies and the key sources of estimation uncertainty were the same as those that applied in the 2021 Annual Report.
3. REVENUE
Revenue represents the fair value of amounts received and receivable from provision of building protection works and supply of building protection products.
An analysis of the Group’s revenue is as follows:
==> picture [460 x 74] intentionally omitted <==
----- Start of picture text -----
Three months ended Six months ended
30 September 30 September
2021 2020 2021 2020
HK$’000 HK$’000 HK$’000 HK$’000
(Unaudited) (Unaudited) (Unaudited) (Unaudited)
----- End of picture text -----
| Contract revenue from provision of building protection works, recognised over time: Residential buildings Community facilities (Note) Commercial buildings Contract revenue from supply of building protection products, recognised at a point in time |
2,903 14,130 5,600 22,633 18,737 41,370 |
9,530 6,616 4,972 21,118 13,701 34,819 |
9,488 23,667 21,175 54,330 35,838 90,168 |
19,318 10,198 12,029 41,545 26,417 67,962 |
|---|---|---|---|---|
Note: Community facilities include hospitals, police offices, museums, sports centres and other community facilities.
All the Group’s provision of building protection works are made directly with customers which are mainly construction companies and contractors in Hong Kong. The duration of building protection works normally varies from 1 to 4 years. The Group’s customers of building protection products are mainly located in Hong Kong and Macau.
10 SUNRAY ENGINEERING GROUP LIMITED | 2021 INTERIM REPORT
NOTES TO THE UNAUDITED CONDENSED CONSOLIDATED FINANCIAL STATEMENTS
For the six months ended 30 September 2021
4. SEGMENT INFORMATION
Operating segments are identified on the basis of internal reports about components of the Group that are regularly reviewed by the chief operating decision maker (the “CODM”), being Mr. Lam, in order for CODM to allocate resources and assess performance. No operating segments identified by the CODM have been aggregated in arriving at the reporting segments of the Group.
Specifically, the Group’s reporting and operating segments under HKFRS 8 “Operating Segments” are as follows:
-
Provision of building protection works; and
-
Supply of building protection products.
The CODM makes decisions according to the operating results of each segment. No analysis of segment assets and segment liabilities is presented as the CODM does not regularly review such information for the purposes of resources allocation and performance assessment. Therefore, only segment revenue and segment results are presented.
Segment revenue and results
The following is an analysis of the Group’s revenue and results by operating segments:
For the six months ended 30 September 2021 (unaudited)
==> picture [460 x 72] intentionally omitted <==
----- Start of picture text -----
Provision Supply of
of building building
protection protection
works products Total
HK$’000 HK$’000 HK$’000
----- End of picture text -----
| Segment revenue — external Segment results Other income Other gains and losses Impairment losses, net of reversal Selling and distribution costs Administrative expenses Finance costs Listing expenses Profit before taxation |
54,330 12,945 |
35,838 17,056 |
90,168 30,001 351 99 16 (4,782) (16,130) (149) — 9,406 |
|---|---|---|---|
SUNRAY ENGINEERING GROUP LIMITED | 2021 INTERIM REPORT 11
NOTES TO THE UNAUDITED CONDENSED CONSOLIDATED FINANCIAL STATEMENTS
For the six months ended 30 September 2021
4. SEGMENT INFORMATION (CONTINUED)
Segment revenue and results (Continued)
For the six months ended 30 September 2020 (unaudited)
==> picture [460 x 64] intentionally omitted <==
----- Start of picture text -----
Provision Supply of
of building building
protection protection
works products Total
HK$’000 HK$’000 HK$’000
----- End of picture text -----
| Segment revenue—external Segment results Other income Other gains and losses Impairment losses, net of reversal Selling and distribution costs Administrative expenses Finance costs Listing expenses Profit before taxation |
41,545 15,385 |
26,417 11,414 |
67,962 26,799 1,151 (16) 15 (2,926) (18,257) (56) (926) 5,784 |
|---|---|---|---|
Segment results represent the profit before tax earned by each segment without allocation of other income, other gains and losses, impairment losses, net of reversal, selling and distribution costs, administrative expenses, finance costs and listing expenses. This is the measure reported to the CODM for the purposes of resources allocation and assessment of segment performance.
Geographical information
The Group’s operations are located in Hong Kong and Macau. Analysis of the Group’s revenue by geographical location is detailed below:
| Three months ended 30 September |
Three months ended 30 September |
Six months ended 30 September |
Six months ended 30 September |
|
|---|---|---|---|---|
| 2021 | 2020 | 2021 | 2020 | |
| HK$’000 | HK$’000 | HK$’000 | HK$’000 | |
| (Unaudited) | (Unaudited) | (Unaudited) | (Unaudited) | |
| Hong Kong Macau |
37,896 3,474 41,370 |
33,128 1,691 34,819 |
80,853 9,315 90,168 |
61,994 5,968 67,962 |
The Group’s non-current assets, excluding financial assets, are substantially situated in Hong Kong.
12 SUNRAY ENGINEERING GROUP LIMITED | 2021 INTERIM REPORT
NOTES TO THE UNAUDITED CONDENSED CONSOLIDATED FINANCIAL STATEMENTS
For the six months ended 30 September 2021
5. OTHER INCOME
| Three months ended 30 September |
Three months ended 30 September |
Six months ended 30 September |
Six months ended 30 September |
|
|---|---|---|---|---|
| 2021 HK$’000 (Unaudited) |
2020 HK$’000 (Unaudited) |
2021 HK$’000 (Unaudited) |
2020 HK$’000 (Unaudited) |
|
| Rental income | 300 | — | 300 | — |
| Bank interest income | 3 | 16 | 5 | 21 |
| Government subsidies (Note) | — | 698 | — | 983 |
| Sundry income | 6 | 55 | 46 | 147 |
| 309 | 769 | 351 | 1,151 |
Note: The government subsidies recognised during the six months ended 30 September 2020 are mainly related to the Employment Support Scheme in respect of COVID-19-related subsidies from Hong Kong Government.
6. OTHER GAINS AND LOSSES
| Three months ended 30 September |
Three months ended 30 September |
Six months ended 30 September |
Six months ended 30 September |
|
|---|---|---|---|---|
| 2021 | 2020 | 2021 | 2020 | |
| HK$’000 | HK$’000 | HK$’000 | HK$’000 | |
| (Unaudited) | (Unaudited) | (Unaudited) | (Unaudited) | |
| Net exchange gain (loss) Gain (loss) on disposal of property and equipment Loss arising from early termination of a lease contract |
(64) (28) (11) (103) |
271 (33) — 238 |
65 45 (11) 99 |
293 (309) — (16) |
7. FINANCE COSTS
| Three months ended 30 September |
Three months ended 30 September |
Six months ended 30 September |
Six months ended 30 September |
|
|---|---|---|---|---|
| 2021 | 2020 | 2021 | 2020 | |
| HK$’000 | HK$’000 | HK$’000 | HK$’000 | |
| (Unaudited) | (Unaudited) | (Unaudited) | (Unaudited) | |
| Bank borrowings Interest expenses on lease liabilities |
79 33 112 |
— 34 34 |
79 70 149 |
— 56 56 |
13
SUNRAY ENGINEERING GROUP LIMITED | 2021 INTERIM REPORT
NOTES TO THE UNAUDITED CONDENSED CONSOLIDATED FINANCIAL STATEMENTS
For the six months ended 30 September 2021
8. PROFIT BEFORE TAXATION
==> picture [460 x 74] intentionally omitted <==
----- Start of picture text -----
Three months ended Six months ended
30 September 30 September
2021 2020 2021 2020
HK$’000 HK$’000 HK$’000 HK$’000
(Unaudited) (Unaudited) (Unaudited) (Unaudited)
----- End of picture text -----
==> picture [460 x 183] intentionally omitted <==
----- Start of picture text -----
||||||
|---|---|---|---|---|
|Profit before taxation has been arrived|
|at after charging:|
|Directors’ emoluments|2,147|2,823|4,796|4,731|
|Other staff costs|6,392|4,684|13,234|10,975|
|Retirement benefit schemes contributions|
|for other staff|232|185|468|373|
|Total staff costs|8,771|7,692|18,498|16,079|
|Auditor’s remuneration|150|150|300|300|
|Cost of inventories recognised as an expense|13,784|12,643|33,840|24,279|
|Depreciation of property and equipment|756|322|1,106|738|
|Depreciation of right-of-use assets|635|562|1,300|1,050|
----- End of picture text -----
9. INCOME TAX EXPENSE
==> picture [460 x 98] intentionally omitted <==
----- Start of picture text -----
||||||
|---|---|---|---|---|
|Three months ended|Six months ended|
|30 September|30 September|
|2021|2020|2021|2020|
|HK$’000|HK$’000|HK$’000|HK$’000|
|(Unaudited)|(Unaudited)|(Unaudited)|(Unaudited)|
|Hong Kong Profits Tax|832|1,466|1,802|2,026|
----- End of picture text -----
The Group is subject to income tax on an entity basis on profits arising in or derived from the jurisdictions in which members of the Group are domiciled and operate.
On 21 March 2018, the Hong Kong Legislative Council passed The Inland Revenue (Amendment) (No. 7) Bill 2017 (the “Bill”) which introduces the two-tiered profits tax rates regime. The Bill was signed into law on 28 March 2018 and was gazetted on the following day. Under the two-tiered profits tax rates regime, the first HK$2,000,000 of profits of qualifying group entity will be taxed at 8.25%, and profits above HK$2,000,000 of that qualifying group entity will be taxed at 16.5%. Accordingly, Hong Kong Profits Tax of the qualifying entity is calculated in accordance with the two-tiered profits tax rates regime. The profits of other group entities in Hong Kong not qualifying for the two-tiered profits tax rates regime continue to be taxed at the flat rate of 16.5%.
No provision for Macau Complementary Tax is made as the Group has no estimated assessable profits exceeding Macau Pataca 600,000 for both periods.
14 SUNRAY ENGINEERING GROUP LIMITED | 2021 INTERIM REPORT
NOTES TO THE UNAUDITED CONDENSED CONSOLIDATED FINANCIAL STATEMENTS
For the six months ended 30 September 2021
10. EARNINGS PER SHARE
The calculation of basic earnings per share attributable to owners of the Company is based on the following data:
| Three months ended 30 September |
Three months ended 30 September |
Six months ended 30 September |
Six months ended 30 September |
|
|---|---|---|---|---|
| 2021 | 2020 | 2021 | 2020 | |
| HK$’000 | HK$’000 | HK$’000 | HK$’000 | |
| (Unaudited) | (Unaudited) | (Unaudited) | (Unaudited) | |
| Earnings: Earnings for the purpose of calculating basic earnings per share (profit for the period attributable to owners of the Company) |
4,416 | 2,856 | 7,604 | 3,758 |
| ’000 | ’000 | |||
| Number of shares: Weighted average number of ordinary shares for the purpose of calculating basic earnings per share (Note) |
1,000,000 | 1,000,000 | 1,000,000 | 969,945 |
Note: The weighted average number of ordinary shares for the purpose of calculating basic earnings per share during the six months ended 30 September 2020 includes (i) 1 ordinary share in issue upon incorporation; (ii) 749,999,999 new ordinary shares issued pursuant to the capitalisation issue as set out in note 16 to the unaudited condensed consolidated financial statements, as if all these shares had been in issue throughout the six months ended 30 September 2020, and (iii) 219,945,355 shares, representing the weighted average of 250,000,000 new ordinary shares issued upon completion of the Listing.
There were no potential ordinary shares in issue during both periods and, therefore, diluted earnings per share are same as the basic earnings per share.
11. DIVIDENDS
The Board does not recommend the payment of any dividend for the six months ended 30 September 2021 (six months ended 30 September 2020: Nil).
SUNRAY ENGINEERING GROUP LIMITED | 2021 INTERIM REPORT 15
NOTES TO THE UNAUDITED CONDENSED CONSOLIDATED FINANCIAL STATEMENTS
For the six months ended 30 September 2021
12. PROPERTY AND EQUIPMENT AND RIGHT-OF-USE ASSETS
During the six months ended 30 September 2021, the Group acquired items of property and equipment with a cost of approximately HK$46,617,000, including a property at approximately HK$45,258,000 as its self-owned premises (six months ended 30 September 2020: HK$1,119,000).
In addition, the Group disposed of certain property and equipment with an aggregate carrying amount of approximately HK$1,055,000 (six months ended 30 September 2020: HK$969,000) for proceeds of approximately HK$1,100,000 (six months ended 30 September 2020: HK$660,000), resulting in a gain on disposal of approximately HK$45,000 (six months ended 30 September 2020: loss on disposal of approximately HK$309,000).
During the six months ended 30 September 2021, the Group entered into two lease contracts and recognised right-of-use assets and lease liabilities of approximately HK$1,196,000 (six months ended 30 September 2020: HK$2,524,000). The Group early terminated a lease contract resulting in a loss of approximately HK$11,000 during the six months ended 30 September 2021.
13. TRADE AND OTHER RECEIVABLES
| As at | As at | |
|---|---|---|
| 30 September 2021 |
31 March 2021 |
|
| HK$’000 | HK$’000 | |
| (Unaudited) | (Audited) | |
| Trade receivables Less: Allowance for impairment Other receivables Prepayment and deposits Less: Rental and other deposits classified as non-current portion Current portion |
15,461 (63) 15,398 419 2,182 17,999 (414) 17,585 |
25,466 (117) 25,349 404 1,267 27,020 (414) 26,606 |
Trade receivables
Trade receivables represent the amounts receivable, after deduction of retention receivables. For provision of building protection works, the trade receivables usually fall due within 14 to 30 days after the work is certified. For supply of building protection products, the Group normally allows a credit period ranging from 15 to 30 days to its customers.
16 SUNRAY ENGINEERING GROUP LIMITED | 2021 INTERIM REPORT
NOTES TO THE UNAUDITED CONDENSED CONSOLIDATED FINANCIAL STATEMENTS
For the six months ended 30 September 2021
13. TRADE AND OTHER RECEIVABLES (CONTINUED)
Trade receivables (Continued)
The following is an ageing analysis of trade receivables, net of loss allowances, presented based on the approval dates of work certified or dates of invoices at the end of the reporting period:
| As at | As at | |
|---|---|---|
| 30 September 2021 |
31 March 2021 |
|
| HK$’000 | HK$’000 | |
| (Unaudited) | (Audited) | |
| 0 to 30 days 31 to 90 days 91 to 180 days 181 to 365 days Over 365 days |
6,793 4,994 824 262 2,525 15,398 |
15,240 6,736 560 681 2,132 25,349 |
Before accepting any new customer, the Group assesses the potential customer’s credit quality and defines credit limits by customers. Recoverability of the trade receivables is reviewed by the management of the Group regularly.
In addition, the management of the Group is of the opinion that no event of default occurred for trade receivables past due over 90 days as the balances are still considered fully recoverable based on the management’s historical experience on the settlement pattern from these customers.
The Group applies the simplified approach to provide for expected credit loss (“ECL”) prescribed by HKFRS 9. There has been no change in the estimation techniques or significant assumptions made during the six months ended 30 September 2021 in assessing the loss allowances for the trade receivables.
For the other receivables including rental and other deposits, allowance for impairment was insignificant and thus negligible to be made since the management of the Group considers the probability of default is minimal after assessing the counterparties’ financial background and creditability.
SUNRAY ENGINEERING GROUP LIMITED | 2021 INTERIM REPORT 17
NOTES TO THE UNAUDITED CONDENSED CONSOLIDATED FINANCIAL STATEMENTS
For the six months ended 30 September 2021
14. CONTRACT ASSETS/LIABILITIES
| As at | As at | |
|---|---|---|
| 30 September 2021 HK$’000 (Unaudited) |
31 March 2021 HK$’000 (Audited) |
|
| Analysed for reporting purposes, on a net basis | ||
| for each respective contract: | ||
| Contract assets | 112,196 | 116,640 |
| Contract liabilities | (14,680) | (11,608) |
As at 30 September 2021, included in carrying amount of contract assets are retention receivables of HK$21,816,000 (31 March 2021: HK$19,788,000), net of loss allowance of HK$97,000 (31 March 2021: HK$89,000).
Retention receivables represent the money retained by the Group’s customers to secure the due performance of the contracts. The customers normally withhold 10% of the certified amount payable to the Group as retention money (accumulated up to maximum 5% of contract sum), 50% of which is normally recoverable upon completion of respective project and the remaining 50% is recoverable after the completion of defect liability period of the relevant contracts or in accordance with the terms specified in the relevant contracts, ranging from 1 to 2 years from the date of completion of respective projects. The amount is unsecured and interest-free.
The retention receivables, net of loss allowance, included in contract assets are to be settled, based on the expiry of the defect liability period of the relevant contracts or in accordance with the terms specified in the relevant contracts, at the end of the reporting period as follows:
| As at | As at | |
|---|---|---|
| 30 September 2021 |
31 March 2021 |
|
| HK$’000 | HK$’000 | |
| (Unaudited) | (Audited) | |
| Within one year After one year |
2,005 19,811 21,816 |
1,915 17,873 19,788 |
At the end of the reporting period, contract liabilities represent advanced payments from customers for unsatisfied performance obligations and are recognised as revenue when the Group performs its obligations under the contracts which are expected to be satisfied within one year.
The Group applies the simplified approach to provide for ECL prescribed by HKFRS 9. There has been no change in the estimation techniques or significant assumptions made during the six months ended 30 September 2021 in assessing the loss allowances for the contract assets.
18 SUNRAY ENGINEERING GROUP LIMITED | 2021 INTERIM REPORT
NOTES TO THE UNAUDITED CONDENSED CONSOLIDATED FINANCIAL STATEMENTS
For the six months ended 30 September 2021
15. TRADE AND OTHER PAYABLES
| As at | As at | |
|---|---|---|
| 30 September 2021 |
31 March 2021 |
|
| HK$’000 | HK$’000 | |
| (Unaudited) | (Audited) | |
| Trade payables Retention payables Accrued expenses Accrued staff costs Other payables |
11,007 4,744 2,647 5,165 201 23,764 |
19,479 4,339 2,484 5,213 — 31,515 |
The following is an ageing analysis of trade payables based on the invoice date at the end of the reporting period:
| As at | As at | |
|---|---|---|
| 30 September 2021 |
31 March 2021 |
|
| HK$’000 | HK$’000 | |
| (Unaudited) | (Audited) | |
| Within 30 days 31 to 90 days Over 90 days |
5,568 2,471 2,968 11,007 |
14,194 2,241 3,044 19,479 |
The credit period of trade payables ranges from 30 to 90 days.
Retention payables to sub-contractors of contract works are interest-free and payable by the Group after the expiry of maintenance period of the relevant contracts or in accordance with the terms specified in the relevant contracts for a period of generally 12 months after completion of the relevant works.
The retention payables are to be settled, based on the expiry of maintenance period, at the end of each reporting period as follows:
| As at | As at | |
|---|---|---|
| 30 September 2021 |
31 March 2021 |
|
| HK$’000 | HK$’000 | |
| (Unaudited) | (Audited) | |
| Within one year After one year |
1,595 3,149 4,744 |
1,570 2,769 4,339 |
SUNRAY ENGINEERING GROUP LIMITED | 2021 INTERIM REPORT 19
NOTES TO THE UNAUDITED CONDENSED CONSOLIDATED FINANCIAL STATEMENTS
For the six months ended 30 September 2021
16. BANK BORROWINGS
| As at | As at | |
|---|---|---|
| 30 September 2021 HK$’000 (Unaudited) |
31 March 2021 HK$’000 (Audited) |
|
| Current: | ||
| Bank borrowings subject to a repayment on demand clause, | ||
| secured | 21,269 | — |
17. SHARE CAPITAL
==> picture [460 x 32] intentionally omitted <==
----- Start of picture text -----
Number of Amount
shares HK$’000
----- End of picture text -----
| Ordinary shares of HK$0.01 each Authorised: At 31 March 2021 (audited) and 30 September 2021 (unaudited) Issued and fully paid: At 1 April 2020 Capitalisation issue (Note i) Issue of shares upon share offer (Note ii) At 31 March 2021 (audited) and 30 September 2021 (unaudited) |
1,560,000,000 1 749,999,999 250,000,000 1,000,000,000 |
15,600 —* 7,500 2,500 10,000 |
|---|---|---|
- Less than HK$1,000
Notes:
-
(i) The Company capitalised an amount of HK$7,499,999.99 standing to the credit of the share premium account of the Company towards paying in full at par a total of 749,999,999 shares for allotment and issue to the shareholders of the Company on 23 April 2020 (the “Capitalisation Issue”). Such shares rank pari passu in all respects with then existing issued shares of the Company.
-
(ii) On 23 April 2020, the Company issued a total of 250,000,000 new shares of par value of HK$0.01 each at offer price of HK$0.24 per share, by way of the public offer and placing. Of the gross total proceeds of HK$60,000,000, HK$2,500,000 representing the par value was credited to the Company’s share capital, and HK$57,500,000 before reduction of issue costs of HK$18,945,000, was credited to the share premium account.
20 SUNRAY ENGINEERING GROUP LIMITED | 2021 INTERIM REPORT
NOTES TO THE UNAUDITED CONDENSED CONSOLIDATED FINANCIAL STATEMENTS
For the six months ended 30 September 2021
18. RELATED PARTY TRANSACTIONS
In addition to the transactions and balances disclosed elsewhere in the condensed consolidated financial statements, the Group had entered into the following related party transactions:
| Six months ended 30 September | Six months ended 30 September | |
|---|---|---|
| Name of related party Nature of transactions |
2021 HK$’000 (Unaudited) |
2020 HK$’000 (Unaudited) |
| Red Fame Limited (Note i) Interest expenses on lease liabilities |
— | 17 |
| Lease liabilities (Note ii) | — | 787 |
Notes:
- (i) The related company is controlled by the directors of the Company, Mr. Lam and Ms. Wong Pui Yee Edith (“Mrs. Lam”).
(ii) A new lease contract for the use of directors’ quarter with the related company was entered into and also early terminated during the year ended 31 March 2021.
SUNRAY ENGINEERING GROUP LIMITED | 2021 INTERIM REPORT 21
MANAGEMENT DISCUSSION AND ANALYSIS
BUSINESS REVIEW
The Group is a Hong Kong-based building protection solution provider and its solutions integrate the provision of building protection works; and the supply of building protection products. Building protection works generally refer to the selection and use of appropriate building protection products in a building for protection against water, thermal, acoustic and fire.
The Group’s building protection works focus on waterproofing works; and are complemented by flooring works and joint sealant works.
The supply of building protection products refers to identifying, sourcing, promoting and distributing suitable building protection products to the Group’s customers to meet their varying needs and requirements. The building protection products supplied by us include waterproofing products, tiling products, flooring and other products.
FINANCIAL REVIEW
Revenue
The table below sets forth a breakdown of the Group’s revenue by the type of services for the period indicated:
| Six months ended 30 September | Six months ended 30 September | Six months ended 30 September | Six months ended 30 September | |
|---|---|---|---|---|
| 2021 HK$’000 % |
2020 HK$’000 % |
|||
| Provision of building protection works | 54,330 | 60.3 | 41,545 | 61.1 |
| Supply of building protection products | 35,838 | 39.7 | 26,417 | 38.9 |
| 90,168 | 100.0 | 67,962 | 100.0 |
The Group’s revenue increased from approximately HK$68.0 million for the six months ended 30 September 2020 to approximately HK$90.2 million for the six months ended 30 September 2021, representing an increase of approximately HK$22.2 million, or 32.6%. Such increase in revenue was primarily due to the increase in revenue generated from both the provision of building protection works and the supply of building protection products.
Provision of building protection works
Revenue recognised:
| Six months ended 30 September | Six months ended 30 September | |
|---|---|---|
| 2021 | 2020 | |
| HK$’000 | HK$’000 | |
| Public sector projects Private sector projects Total |
25,376 28,954 54,330 |
21,521 20,024 41,545 |
22 SUNRAY ENGINEERING GROUP LIMITED | 2021 INTERIM REPORT
MANAGEMENT DISCUSSION AND ANALYSIS
Number of projects by the range of amounts of recognised revenue:
| Six months ended 30 September | Six months ended 30 September | Six months ended 30 September | ||
|---|---|---|---|---|
| 2021 | 2020 | |||
| HK$1,000,000 or above HK$100,000 to below HK$1,000,000 Below HK$100,000 Total |
15 36 216 267 |
11 53 171 235 |
The revenue recognised from the provision of building protection works increased from approximately HK$41.5 million for the six months ended 30 September 2020 to approximately HK$54.3 million for the six months ended 30 September 2021. Such increase was mainly attributable to the increase in number of projects awarded to the Group and the increase in revenue derived from relatively large projects during the six months ended 30 September 2021.
Supply of building protection products
Revenue by types of building protection products
The following table sets forth the breakdown of the Group’s revenue by types of building protection products for the period indicated:
| Six months ended 30 September | Six months ended 30 September | Six months ended 30 September | Six months ended 30 September | |
|---|---|---|---|---|
| 2021 | 2020 | |||
| HK$’000 | % | HK$’000 | % | |
| Waterproofing products Tiling products Flooring and other products Total revenue from supply of building protection products |
20,212 12,785 2,841 35,838 |
56.4 35.7 7.9 100.0 |
18,368 7,003 1,046 26,417 |
69.5 26.5 4.0 100.0 |
The revenue recognised from the supply of building protection products increased from approximately HK$26.4 million for the six months ended 30 September 2020 to approximately HK$35.8 million for the six months ended 30 September 2021. Such increase was mainly attributable to the increase in demand from customers in Hong Kong for waterproofing and tiling products.
Cost of Sales and Services
Cost of sales and services increased from approximately HK$41.2 million for the six months ended 30 September 2020 to approximately HK$60.2 million for the six months ended 30 September 2021, representing an increase of approximately HK$19.0 million, or 46.1%. Such increase in cost of sales and services was mainly due to the increase in material costs and direct staff costs.
SUNRAY ENGINEERING GROUP LIMITED | 2021 INTERIM REPORT 23
MANAGEMENT DISCUSSION AND ANALYSIS
Gross Profit and Gross Profit Margin
Gross profit increased from approximately HK$26.8 million for the six months ended 30 September 2020 to approximately HK$30.0 million for the six months ended 30 September 2021, representing an increase of approximately HK$3.2 million, or 11.9%. Gross profit margin decreased from approximately 39.4% for the six months ended 30 September 2020 to approximately 33.3% for the six months ended 30 September 2021. Such decrease in gross profit margin was mainly due to (i) the increase in number of workers hired by the Group for relatively large projects; (ii) the increase in overall construction costs; and (iii) some of the Group’s building protection work projects on hand with higher gross profit margin were at their ending phase, with revenue already recognised in prior years.
Other Income, Gains and Losses
Other income decreased from approximately HK$1.2 million for the six months ended 30 September 2020 to approximately HK$351,000 for the six months ended 30 September 2021, which was mainly attributable to the decrease in subsidy received from the Hong Kong government under the Employment Support Scheme launched in May 2020. Other losses, on a net basis, amounted to approximately HK$16,000 for the six months ended 30 September 2020, and other gains, on a net basis, amounted to approximately HK$99,000 for the six months ended 30 September 2021. Such change in other gains and losses was mainly attributable to the combined effect of the decrease in exchange gain and the gain on disposal of property and equipment for the six months ended 30 September 2021.
Selling and Distribution Costs
Selling and distribution costs increased from approximately HK$2.9 million for the six months ended 30 September 2020 to approximately HK$4.8 million for the six months ended 30 September 2021, representing an increase of approximately HK$1.9 million, or 65.5%. Such increase in selling and distribution costs was mainly attributable to the increase in transportation and storage cost.
Administrative Expenses
Administrative expenses decreased from approximately HK$18.3 million for the six months ended 30 September 2020 to approximately HK$16.1 million for the six months ended 30 September 2021, representing a decrease of approximately HK$2.2 million, or 12.0%. Such decrease in administrative expenses was mainly attributable to the decrease in professional fee for the six months ended 30 September 2021.
Listing Expenses
Listing expenses decreased from approximately HK$926,000 for the six months ended 30 September 2020 to nil for the six months ended 30 September 2021.
Finance Costs
Finance costs for the six months ended 30 September 2021 amounted to approximately HK$149,000 which was derived from the lease liabilities and bank borrowings.
Income Tax Expenses
Income tax expenses decreased from approximately HK$2.0 million for the six months ended 30 September 2020 to approximately HK$1.8 million for the six months ended 30 September 2021. Such decrease was attributable to the decrease in administrative expenses which are of non-deductible in nature.
24 SUNRAY ENGINEERING GROUP LIMITED | 2021 INTERIM REPORT
MANAGEMENT DISCUSSION AND ANALYSIS
Profit and Total Comprehensive Income for the Period
As a result of the foregoing, profit and total comprehensive income increased from approximately HK$3.8 million for the six months ended 30 September 2020 to approximately HK$7.6 million for the six months ended 30 September 2021.
DIVIDEND
The Board does not recommend the payment of any dividend for the six months ended 30 September 2021 (six months ended 30 September 2020: Nil).
LIQUIDITY AND FINANCIAL RESOURCES
As at 30 September 2021, the Group had total assets of approximately HK$245.2 million (31 March 2021: approximately HK$221.0 million), including net cash and cash equivalents of approximately HK$36.7 million (31 March 2021: approximately HK$58.6 million). As at 30 September 2021, the Group’s current assets amounted to approximately HK$193.0 million (31 March 2021: approximately HK$212.4 million) and the Group’s current liabilities amounted to approximately HK$64.2 million (31 March 2021: approximately HK$47.1 million).
The Group’s gearing ratio (dividing the total interest-bearing borrowings and lease liabilities by equity attributable to equity holders of the Company at the end of the reporting period) was approximately 13.7% as at 30 September 2021 (31 March 2021: approximately 2.4%). Such increase was mainly due to the increase in bank borrowings for the acquisition of property during the six months ended 30 September 2021.
As at 30 September 2021, the Group had net current assets of approximately HK$128.8 million (31 March 2021: approximately HK$165.2 million). As at 30 September 2021, the Group’s current ratio was approximately 3.0 times (31 March 2021: approximately 4.5 times) which was calculated based on the total current assets at the end of the reporting period divided by total current liabilities at the end of the reporting period.
TREASURY POLICY
The Group has adopted a prudent financial management approach towards its treasury policy and thus maintained a healthy liquidity position throughout the reporting period. The management of the Group regularly reviews the recoverable amounts of contract assets and trade receivables by performing ongoing credit assessments and monitoring prompt recovery and if necessary to make adequate impairment losses for irrecoverable amounts. In order to achieve better cost control and minimise the cost of funds, the Group’s treasury activities are centralised and cash is generally deposited with leading licensed banks in Hong Kong and denominated in Hong Kong dollars.
FOREIGN CURRENCY FLUCTUATION
The revenue of the Group is mainly denominated in Hong Kong dollars. However, some of our waterproofing products are sourced from overseas countries and the Mainland China and settled in currencies including Euro, US Dollars, Hong Kong dollars and Renminbi. Therefore, the Group is subject to risks associated with foreign exchange rate fluctuations, particularly the Hong Kong dollars against Renminbi or Euro. The Group currently has no foreign currency hedging policy and the management will monitor the foreign exchange exposure by closely monitoring the movements of foreign currency rates. The Group will consider hedging significant foreign currency exposure should the need arise.
SUNRAY ENGINEERING GROUP LIMITED | 2021 INTERIM REPORT 25
MANAGEMENT DISCUSSION AND ANALYSIS
CAPITAL STRUCTURE
As at 30 September 2021 and 31 March 2021, the share capital of the Group comprised only ordinary shares. The capital structure of the Group is solely equity attributable to equity holders of the Group, in which comprises share capital and reserves.
MATERIAL ACQUISITIONS AND DISPOSAL OF SUBSIDIARIES, ASSOCIATES AND JOINT VENTURES
During the six months ended 30 September 2021, the Company did not have any significant acquisition or disposal of subsidiaries, associates or joint ventures.
CAPITAL EXPENDITURE
Save for the acquisition of property as disclosed elsewhere in this report, during the six months ended 30 September 2021, the Group had no significant capital expenditure.
SIGNIFICANT INVESTMENT HELD
As at 30 September 2021, the Group did not have any significant investment held (31 March 2021: Nil).
CHARGES ON ASSETS
Save for the mortgaged property acquired as disclosed elsewhere in this report, as at 30 September 2021, the Group had no charges on assets (31 March 2021: Nil).
CONTINGENT LIABILITIES
As at 30 September 2021, the Group did not have any contingent liabilities (31 March 2021: Nil).
CAPITAL COMMITMENTS
As at 30 September 2021, the Group had no significant capital commitments (31 March 2021: Nil).
PERFORMANCE GUARANTEE
As at 30 September 2021 and 31 March 2021, a performance bond of HK$755,000 was given by a bank in favour of a Group’s customer as security for the due performance and observance of the Group’s obligations under the contract for building protection works entered into between the Group and such customer.
The performance guarantee was secured by a pledged deposit in the sum of HK$0.8 million placed by Sunray Engineering (HK) Company Limited with the bank.
FUTURE PLANS FOR MATERIAL INVESTMENTS AND CAPITAL ASSETS
Save as disclosed in the Prospectus and in this report, the Group did not have any other plan for material investments and capital assets as at 30 September 2021.
26 SUNRAY ENGINEERING GROUP LIMITED | 2021 INTERIM REPORT
MANAGEMENT DISCUSSION AND ANALYSIS
EMPLOYEES AND REMUNERATION POLICIES
As at 30 September 2021, the Group had 82 employees excluding the Directors. Total staff costs incurred excluding Directors’ remuneration during the six months ended 30 September 2021 were approximately HK$13.7 million (six months ended 30 September 2020: approximately HK$11.3 million). The remuneration package offered to the Group’s employees includes salary, commission and discretionary bonus. The Group’s remuneration policies are in line with the prevailing market practices and the staff remuneration is determined on the basis of the performance and experience of each individual employee.
SIGNIFICANT EVENT AFTER THE REPORTING PERIOD
Save as disclosed elsewhere in this report, after 30 September 2021 and up to the date of this report, there was no significant event relevant to the business or financial performance of the Group that comes to the attention of the Directors.
COMPARISON OF BUSINESS OBJECTIVES WITH ACTUAL IMPLEMENTATION PROGRESS
The following is a comparison of the Group’s business strategies as set out in the section headed “Business Objectives, Future Plans and Use of Proceeds” in the Prospectus with the Group’s actual implementation progress up to 30 September 2021:
==> picture [486 x 45] intentionally omitted <==
----- Start of picture text -----
Business strategies up to
30 September 2021 as set out Actual implementation progress
in the Prospectus up to 30 September 2021
----- End of picture text -----
| Acquire additional machinery and | The Group has acquired twelve spraying units and two spraying machines |
|---|---|
| equipment for building | for the use in construction sites. |
| protection works | |
| The Group is in negotiation with the potential suppliers on the purchase | |
| of more spraying machines which would be better suited for carrying out | |
| the waterproof works projects recently secured by the Group. | |
| Expand workforce | The Group has recruited one quantity surveyor manager, one quantity |
| surveyor, one project manager and two foremen to support our increasing | |
| number of building protection projects, particularly the provision of | |
| waterproofing works for a sports park in Kai Tak and a logistics centre | |
| at the airport in Hong Kong. | |
| Strengthen the Group’s financial position | The Group has secured several sizeable pipeline projects as disclosed |
| for payment of upfront cost | in the Prospectus and has fully utilised such proceeds mainly for the |
| procurement of building protection materials. | |
| Expand the Group’s building protection | The Group has recruited one sales representative to promote our own- |
| product mix and continue to develop | brand “DP ChemTech” and “DP” products. |
| its own-brand “DP ChemTech” and | |
| “DP” products | The Group has engaged testing centre to conduct laboratory tests and |
| certifications on its new waterproofing products. |
SUNRAY ENGINEERING GROUP LIMITED | 2021 INTERIM REPORT 27
MANAGEMENT DISCUSSION AND ANALYSIS
USE OF PROCEEDS
The Company’s shares were successfully listed on GEM of the Stock Exchange on 23 April 2020. The net proceeds after deducting the underwriting commission and related listing expenses payable by the Company (the “Net Proceeds”) were approximately HK$21.6 million.
The table below sets forth the breakdown of the intended use and the timeline for utilisation of the Net Proceeds as at the date of this report:
==> picture [484 x 63] intentionally omitted <==
----- Start of picture text -----
Amount Remaining
Intended Approximate utilised as at balance as at
use of Net percentage of the date of the date of
Proceeds Net Proceeds this report this report Expected timetable
HK$’000 % HK$’000 HK$’000
----- End of picture text -----
| Acquire additional machinery and equipment for building protection works Expand workforce Strengthen the Group’s financial position for payment of upfront cost Expand the Group’s building protection product mix and continue to develop its own-brand “DP ChemTech” and “DP” products |
2,110 6,280 6,700 6,510 21,600 |
9.8 29.1 31.0 30.1 100.0 |
1,384 5,284 6,700 928 14,296 |
726 From Listing Date to 31 March 2022 996 From Listing Date to 31 March 2023 — — 5,582 From Listing Date to 31 March 2023 7,304 |
|---|---|---|---|---|
As disclosed in the 2021 Annual Report, there was a delay in the planned use of the unutilised Net Proceeds in relation to the purchase of additional machinery and equipment for 12 months, and such unutilised Net Proceeds are expected to be fully utilised by 31 March 2022. Save as the above-mentioned adjustments, there was no change in the intended use of the Net Proceeds and the expected timetable as previously disclosed in the Prospectus.
The implementation plans for business strategies and the use of net proceeds as stated in the Prospectus were based on the best estimation and assumption of future market conditions made by the Group at the time of preparing the Prospectus. The Group implemented its business strategies and applied the Net Proceeds based on the actual developments of the Group’s business and industry, as well as market conditions.
PROSPECTS
The impacts of COVID-19 epidemic (the “Epidemic”) have caused pressure worldwide and dampened the development of various industries, with no exception for the construction industry. Due to the sudden and rapid spread of the Epidemic, a series of enhanced precautionary and control measures have been undertaken by the governments across the world including Hong Kong and Macau. The significant reduction of social and business activities and the subsequent quarantine measures have adversely affected the economy in Hong Kong, including the slowdown in the progress of construction projects. As a result, some of the Group’s building protection works in the construction sites have been held up or delayed, such influences might continue until the Epidemic is contained and this would affect the operational and financial performance of the Group.
28
SUNRAY ENGINEERING GROUP LIMITED | 2021 INTERIM REPORT
MANAGEMENT DISCUSSION AND ANALYSIS
The Group estimates that the degree of COVID-19 impact would be dependent on the outcome of various preventive measures and the duration of the Epidemic. The Group is closely monitoring the market development and continuously evaluating the financial impact of the COVID-19 situation. Given the unpredictability of future development of COVID-19, the impacts to the Group could not be reasonably and accurately estimated at this stage. However, for the time being, the Group’s building protection work projects on hand are in steady progress and the Group did not experience any shortages or difficulties in the supply of building protection products.
Since the outbreak of the Epidemic in early 2020, the Group has implemented measures, including frequent workspace cleaning with disinfectant, ensuring the wearing of surgical masks of all staff at work, and conducting body temperature test to protect the health and safety of the employees. The Group will continue to closely monitor the development of the Epidemic and will take necessary actions to control costs and drive efficiency to maintain profitability and competitiveness in the market.
Going forward, the Group will continue to strengthen its market position by expanding its workforce and competing for more building protection work projects in Hong Kong. The Directors remain confident in the prospect of the Group and are committed in creating long-term and sustainable value for the Company and its shareholders.
ENVIRONMENT POLICIES AND PERFORMANCE
The Group is committed to enhancing environmental protection to minimise the impact of its activities on the environment. It is the policy of the Group to promote clean operation and strive to make the most efficient use of resources in its operations, and minimising wastes and emission.
As a building protection solution provider, the Group will continue to monitor its business operations in order to ensure that it does not have any significant adverse effect on the environment and that the Group’s environment protection measures are adequate to ensure compliance with all applicable laws or regulations in Hong Kong.
As at the date of this report, no prosecution, penalty or punishment has been imposed upon the Group for the violation of any applicable environmental laws or regulations.
PRINCIPAL RISKS AND UNCERTAINTIES
There are certain risks that could adversely affect the Group’s operations and financial results. The major uncertainties may include:
-
(i) the Group derives revenue from projects and purchase orders of a non-recurrent nature, where there is no guarantee that customers will provide the Group with new business or that the Group will secure new contracts;
-
(ii) the Group determines the contract price based on estimated time and costs involved in the project. An underestimation or ineffective cost management may adversely affect the Group’s financial results;
-
(iii) the outbreak of COVID-19 worldwide may significantly and adversely impact the Group’s business operation and financial performance;
-
(iv) the timing of the Group’s payment to suppliers may not match the receipt of payment from customers;
SUNRAY ENGINEERING GROUP LIMITED | 2021 INTERIM REPORT 29
MANAGEMENT DISCUSSION AND ANALYSIS
-
(v) the Group relies on its major subcontractors to help complete the building protection works projects. Any material surges of their charges or any substandard work by subcontractors will affect the Group to a large extent;
-
(vi) the Group relies on independent third party suppliers for production of all its own-brand building protection products; and
-
(vii) the Group relies on brand owners and manufacturers for the supply of building protection products to satisfy its business operation needs. Failure to secure a steady supply of these products to the Group may adversely affect its results of business operations.
Save as disclosed above, principal risks and uncertainties affecting the Group as disclosed in the Prospectus remain substantially unchanged since the Listing Date and up to the date of this report. For details and other risks and uncertainties faced by the Group, please refer to the section headed “Risk Factors” in the Prospectus.
The Group will continue to use its best effort to ensure it has sufficiently mitigated the risks present in its operations and financial position as efficiently and effectively as possible.
30 SUNRAY ENGINEERING GROUP LIMITED | 2021 INTERIM REPORT
OTHER INFORMATION
DIRECTORS’ INTERESTS IN COMPETING BUSINESS
During the six months ended 30 September 2021 and up to the date of this report, none of the Directors, the controlling shareholders and the substantial shareholders of the Company or their respective close associates (as defined under the GEM Listing Rules) had any business or interests in a business that competes or may compete, either directly or indirectly, with the business of the Group and any other conflicts of interest which any such person has or may have with the Group.
INTERESTS AND SHORT POSITIONS OF DIRECTORS AND CHIEF EXECUTIVE IN THE SHARES, UNDERLYING SHARES AND DEBENTURES OF THE COMPANY AND ITS ASSOCIATED CORPORATION
As at 30 September 2021, the interests or short positions of each of the Directors and the chief executive of the Company in the shares, underlying shares or debentures of the Company or any associated corporation (within the meaning of Part XV of the Securities and Futures Ordinance (Chapter 571 of Laws of Hong Kong) (“SFO”)) which (a) would have to be notified to the Company and the Stock Exchange pursuant to Divisions 7 and 8 of Part XV of the SFO (including interests and short positions which such Directors and chief executive of the Company were taken or deemed to have under such provisions of the SFO); or (b) would be required, pursuant to Section 352 of the SFO, to be recorded in the register referred to therein; or (c) would be required, pursuant to Rule 5.46 to 5.67 of the GEM Listing Rules relating to securities transactions by directors to be notified to the Company and the Stock Exchange, were as follows:
Long positions in the shares of the Company (the “Shares”)
==> picture [484 x 69] intentionally omitted <==
----- Start of picture text -----
||||||
|---|---|---|---|---|
|Number of|Percentage of|
|Name of Directors|Nature of interest/holding capacity|Shares held|shareholding|
|Mr. Lam|[(1)]|Interest in a controlled corporation|750,000,000|75%|
|Mrs. Lam|[(2)]|Interest of spouse|750,000,000|75%|
----- End of picture text -----
Notes:
-
These Shares are registered in the name of Ultra Success, a company which is wholly-owned by Mr. Lam. Under the SFO, Mr. Lam is deemed to be interested in all the Shares registered in the name of Ultra Success.
-
These Shares represent the Shares held indirectly by Mr. Lam, the spouse of Mrs. Lam, as ultimate beneficial owner.
Long positions in the shares of associated corporation
==> picture [484 x 69] intentionally omitted <==
----- Start of picture text -----
||||||
|---|---|---|---|---|
|Number of|
|Name of associated|Nature of interest/|ordinary|Percentage of|
|Name of Director|corporation|holding capacity|share held|shareholding|
|Mr. Lam|Ultra Success|Beneficial owner|1|100%|
----- End of picture text -----
SUNRAY ENGINEERING GROUP LIMITED | 2021 INTERIM REPORT 31
OTHER INFORMATION
Save as disclosed above, as at 30 September 2021, none of the Directors or the chief executive of the Company had any interests or short positions in the shares, underlying shares or debentures of the Company or its associated corporations (within the meaning of Part XV of the SFO) which were required (i) to be notified to the Company and the Stock Exchange pursuant to Divisions 7 and 8 of Part XV of the SFO (including interests and/or short positions which they were taken or deemed to have under such provisions of the SFO); or (ii) pursuant to section 352 of the SFO, to be recorded into the register required to be kept therein; or (iii) pursuant to Rules 5.46 to 5.67 of the GEM Listing Rules relating to securities transactions by directors to be notified to the Company and the Stock Exchange.
INTERESTS AND SHORT POSITIONS OF THE SUBSTANTIAL SHAREHOLDERS AND OTHER PERSONS IN THE SHARES, UNDERLYING SHARES AND DEBENTURES OF THE COMPANY AND ITS ASSOCIATED CORPORATION
As at 30 September 2021, so far as it is known to the Directors, the following persons (not being a Director or chief executive of the Company) had or were deemed to have interests in shares or underlying shares of the Company which (i) were recorded in the register required to be kept by the Company under Section 336 of the SFO, or (ii) which would fall to be disclosed under the provisions of Divisions 2 and 3 of Part XV of the SFO and the GEM Listing Rules, or (iii) who were deemed to be, directly or indirectly, interested in 5% or more of the nominal value of any class of share capital carrying rights to vote in all circumstances at general meetings of any member of the Group.
Long position in the Shares
==> picture [484 x 57] intentionally omitted <==
----- Start of picture text -----
|||||
|---|---|---|---|
|Number of|Percentage of|
|Name of shareholder|Nature of interest/holding capacity|Shares held|shareholding|
|Ultra Success|Beneficial owner|750,000,000 (Note)|75%|
----- End of picture text -----
Note: Ultra Success is a company incorporated in the BVI and is wholly-owned by Mr. Lam. Mr. Lam is deemed to be interested in all Shares held by Ultra Success for the purpose of SFO. Mrs. Lam, the spouse of Mr. Lam, is also deemed to be interested in all the Shares held by Mr. Lam under the SFO.
Save as disclosed above, as at 30 September 2021, the Directors have not been notified by any person who had interests or short positions in the Shares or underlying Shares or debentures of the Company as recorded in the register required to be kept pursuant to Section 336 of the SFO, or which would fall to be disclosed under the provisions of Divisions 2 and 3 of Part XV of the SFO.
SHARE OPTION SCHEME
A share option scheme (the “Share Option Scheme”) has been conditionally adopted by the Company on 18 March 2020 and became effective on the Listing Date. The terms of the Share Option Scheme are in accordance with the provisions of Chapter 23 of the GEM Listing Rules.
There were no outstanding options as at 30 September 2021. No options had been granted, agreed to be granted, exercised or cancelled or lapsed under the Share Option Scheme since the Listing Date and up to the date of this report.
32 SUNRAY ENGINEERING GROUP LIMITED | 2021 INTERIM REPORT
OTHER INFORMATION
PURCHASE, SALE OR REDEMPTION OF LISTED SECURITIES
Neither the Company nor any of its subsidiaries had purchased, sold or redeemed any of the Company’s listed securities during the six months ended 30 September 2021.
CORPORATE GOVERNANCE
The Directors recognise the importance of good corporate governance in management and internal procedures to promote and ensure accountability. The Company’s corporate governance practices are based on principles and code provisions of the Corporate Governance Code as set out in Appendix 15 to the GEM Listing Rules (the “CG Code”). Since the Listing Date and up to the date of this report, the Company’s corporate governance practices have been complied, except for the following code provision A.2.1 of the CG Code.
Chairman and Chief Executive Officer
Under code provision A.2.1 of the CG Code, the roles of chairman and chief executive officer should be separate and should not be performed by the same individual. During the six months ended 30 September 2021, Mr. Lam was the chairman of the Board and the chief executive officer of the Group. In view of the fact that Mr. Lam has been operating and managing the Group since its establishment, the Directors believe that it is in the best interest of the Group to have Mr. Lam taking up both roles for effective management and business development. Therefore, the Board considers that deviation from code provision A.2.1 of the CG Code is appropriate in such circumstance.
SECURITIES TRANSACTIONS BY DIRECTORS
The Company has adopted a Code of Ethics and Securities Transactions on terms no less exacting than the required standard of dealings set out in Rules 5.48 to 5.67 of the GEM Listing Rules as its own code of conduct regarding securities transactions by Directors. Having made specific enquiry of all Directors, all Directors confirmed that they had complied with the required standard of dealings and the Code regarding securities transactions during the six months ended 30 September 2021 and up to the date of this report.
INTERESTS OF THE COMPLIANCE ADVISER
As notified by compliance adviser of the Company, Alpha Financial Group Limited (the “Compliance Adviser”), as at 30 September 2021, save for the compliance adviser’s agreement entered into between the Company and the Compliance Adviser dated 18 March 2020, neither the Compliance Adviser nor any of its directors, employees or close associates (as defined under the GEM Listing Rules) had any interests in the Group which is required to be notified to the Company pursuant to Rule 6A.32 of the GEM Listing Rules.
SUNRAY ENGINEERING GROUP LIMITED | 2021 INTERIM REPORT 33
OTHER INFORMATION
AUDIT COMMITTEE
The Company established the Audit Committee on 18 March 2020 with written terms of reference in compliance with the GEM Listing Rules. The Audit Committee is responsible for reviewing and providing supervision over the Group’s financial reporting process, risk management and internal control system, and providing advice to the Board.
This report and the Interim Financial Statements have been reviewed by the Audit Committee. The Audit Committee is of the opinion that the unaudited condensed consolidated financial statements of the Group for the six months ended 30 September 2021 have been prepared in compliance with the applicable accounting standards and the GEM Listing Rules and that adequate disclosure have been made.
By Order of the Board Sunray Engineering Group Limited Lam Ka Wing Chairman
Hong Kong, 12 November 2021
34
SUNRAY ENGINEERING GROUP LIMITED | 2021 INTERIM REPORT