CORPORATE DETAILS

ASX Code: SLZ

DIRECTORS

STEVEN GROVES MANAGING DIRECTOR

JEREMY KING CHAIRMAN

11th February 2021

DAVID LEES NON-EXECUTIVE DIRECTOR

BROAD ZONES OF VEINING AND SULPHIDE MINERALISATION AT THE TUCKLAN PROJECT, LACHLAN FOLD BELT, NSW

CONTACT

Suite 2, Level 1, 1 Altona Street West Perth WA 6005 www.sultanresources.com.au

[email protected]

  • First phase of maiden RC/Diamond drill program of 1,554.3m completed in 6 holes

  • Zones of veining, alteration and sulphide mineralisation up to 136m thick intersected:

  • Multiple vein sets

  • Pyrite, pyrrhotite, sphalerite, galena and chalcopyrite all identified

  • Veining and sulphides coincident with strong I.P. chargeability high, confirming the presence of a sulphide bearing hydrothermal system

  • Assay results expected end-March due to laboratory backlog

  • Results from soil geochemistry to the east of the drilling have been received and are being interpreted

Sultan Resources Limited (ASX: SLZ) ( Sultan or Company ) is pleased to announce that it has completed the first phase of its maiden drill program at its 100% owned Tucklan Gold project in the east Lachlan fold belt, NSW. Core from the initial phase has been logged, and intervals for assay analysis have been dispatched. The Company commenced drill-testing of Induced Polarisation (IP) anomalies beneath strong gold and copper surface geochemistry at the Tucklan project in December 2020 (see ASX Announcement 07/12/2020).

Drilling Program - Tucklan

The initial phase of the maiden drill programme at Tucklan comprised 6 RC percussion holes, including two with diamond drilling tails, for a total of 1,544.3m (Figure 1, Appendix 1). Three holes reached their target depth of ~350m and three holes did not reach planned depth due to excessive ground water. Should assay results warrant, Sultan will return to Tucklan to complete the unfinished holes with diamond tails and drill additional holes into any significant mineralisation plus drill test additional soil geochemical targets. The basement geology at Tucklan has been interpretated as Ordovician Tucklan Formation and Silurian Dungeree Volcanics of the Rockley - Gulgong Volcanic Belt, within the Macquarie Arc. The host rocks are considered to have potential to contain multiple styles of mineralisation including porphyry Cu-Au, epithermal Au and McPhillamy’s-style bulk tonnage Au.

ASX ANNOUNCEMENT – 11[TH] FEBRUARY 2021

==> picture [453 x 388] intentionally omitted <==

Figure 1: Drill collar locations over IP Chargeability pseudo image with Soil Au >7.2ppb contour (black outline)

Geological Observations

Logging of the drill chips and core has been very encouraging and revealed broad zones of hydrothermally altered volcaniclastics and coherent volcanic facies that contain multiple generations of veining and sulphide mineralisation in some holes. In particular, hole TRC0001, which tested a strong IP chargeability ‘bullseye’ target, intersected a 136m down hole zone (172m to 308m) of moderate to intense, multi-generational vein sets and associated disseminated, stringer and vein-hosted sulphide mineralisation within volcaniclastic sediments (Figures 2 - 5). Sulphide mineralisation was visually estimated to be at least 1.5% throughout the interval and dominated by pyrite and pyrrhotite though significant sphalerite (Zn-sulphide), galena (Pb-sulphide) and chalcopyrite (Cu-sulphide) were all noted in some veins. Numerous vein sets have been identified and include:

  • Quartz Sulphide Veins

  • Quartz + Pyrrhotite veinlets

  • Quartz + Pyrite veins with chlorite halos

  • Pyrite/pyrrhotite veinlets

  • Quartz-Carbonate-Sulphide veins

  • Quartz + Carbonate + Pyrrhotite/pyrite

  • Quartz-Carbonate-Base Metals Veins

  • Quartz + Carbonate veins with Sphalerite + Galena + Pyrrhotite + Pyrite ± Chalcopyrite

page 2

ASX ANNOUNCEMENT – 11[TH] FEBRUARY 2021

The style of veining, sulphides and alteration is not interpreted to be typical of an epithermal gold system and could represent a similar style of mineralisation to the McPhillamy’s Gold Deposit located in a similar geological setting ~130km to the south. The occurrence and volume of pyrite and pyrrhotite are considered sufficient to be responsible for the strong IP chargeability response targeted by TRC0001.

==> picture [453 x 184] intentionally omitted <==

Figure 2: IP Chargeability Section 724300mE with TRC0001 (175m window) and surface Au in soils. The red bar on the hole trace represents the interval of veining and sulphide mineralisation and is coincident with the strong IP response.

==> picture [453 x 332] intentionally omitted <==

Figure 3: Section of core from TRC0001 from 194.6m to 203.6m showing intensity and vein styles with alteration in volcaniclastic sediments.

page 3

ASX ANNOUNCEMENT – 11[TH] FEBRUARY 2021

==> picture [213 x 220] intentionally omitted <==

==> picture [231 x 221] intentionally omitted <==

Figure 4: Close up examples of veining and sulphide mineralisation from hole TRC0001

==> picture [454 x 220] intentionally omitted <==

Figure 5: Close up examples of veining and sulphide mineralisation from hole TRC0001

Discussion

From the initial exploration groundwork, the Tucklan prospect was originally considered prospective as an epithermal gold target with some potential for Au-rich VMS mineralisation possible. Characteristics such as a structurally-related magnetic low associated with prominent K-radiometric anomalism, extensive Au+pathfinder element soil geochemistry and coincident IP response elevated Tucklan to a drill-ready status. Field mapping had identified outcropping gold-mineralised rock displaying disseminated sulphides and adularia alteration indicative of a potential epithermal system (see ASX Announcement 02/06/2020). Although three of the 6 initial holes failed to reach their target depth, one hole, TRC0001 did pierce a strong IP ‘bullseye’ anomaly and revealed an impressive array of sulphide rich vein sets hosted in volcaniclastic sediments of a mineralisation type that is reminiscent of the McPhillamy’s Gold Deposit (ASX: RRL).

The McPhillamy’s Gold Project is a bulk tonnage gold deposit containing a total resource of 70Mt @ 1.0g/t for 2.29Moz (see Appendix 2, regisresources.com.au/General/reserves-and-resources.html). McPhillamys is interpreted as an orogenic gold deposit hosted in a shear zone within Silurian dacitic volcaniclastics[1] . Gold mineralisation is associated with a hydrothermal alteration assemblage of

page 4

ASX ANNOUNCEMENT – 11[TH] FEBRUARY 2021

quartz+carbonate(ankerite)+white mica (phengite) +pyrite+/-chalcopyrite+/-pyrrhotite+/-chalcocite+/biotite. Elevated gold grades over 1 g/t are associated with very coarse euhedral pyrite, white mica, quartz and carbonate[1] . McPhillamy’s is marked at the surface by coincident Au+As+Cu+Mo+Pb+Bi soil anomalies within a potassium radiometric anomaly. Pole-dipole IP has revealed a 55mv/v chargeability anomaly coincident with the mineralised shear zone.

Many of the characteristics associated with gold mineralisation at McPhillamy’s can be observed in the core from TRC0001. Table 1, below, provides a comparison of the key features. Although the gold content of veining and alteration intersected in TRC0001 is not yet known, the extensive surface geochemical gold anomaly and presence of gold to over 1g/t in altered pyritic volcanic rocks at surface (see ASX Announcement 02/06/2020) indicates that a gold-fertile hydrothermal system has been operating at Tucklan. The discovery of a McPhillamy’s-style gold system at Tucklan could be a companytransformative event for Sultan.

Assay results are expected towards the end of the March quarter due to the increased exploration activity in NSW and resultant sample backlog at the laboratory.

Table 1: Geological comparison between the McPhillamy’s Gold Deposit and observations from TRC0001

McPhillamy's Tucklan(TRC0001)
Host Rocks Late Silurian felsic volcaniclastics,
volcanics, minor shales (Mumbil Shelf -
Anson Formation
Late Silurian Dungaree volcanics felsic
volcaniclastics, shale and slate
Proximity to Faults Located in fault splay of Godolphin Fault Located in fault splay of Mudgee Fault
Radiometrics Potassium (K) radiometric anomaly Potassium (K) radiometric anomaly
IP +50 mv/v coincident with mineralised
shear zone
+ 50 mv/v bullseye anomaly
Magnetics Magnetic low Local magnetic low
Hydrothermal Alteration sericite/illite + k-feldspar + quartz ±
chlorite ± calcite ± siderite ± dolomite ±
albite ± barite
visual observations only- sericite + rare
weak k-feldspar as vein halos + quartz ±
chlorite ± calcite ± siderite
Ore Style
Mineralogy
Base Metal
Zones
Stratiform and recrystallised pyrite ±
sphalerite ± galena ± biotite ±
tetrahedrite/tennantite hosted in the
overlyingsiltstones ± shales
Recrystallised pyrite ± sphalerite ± galena
±pyrrhotite ± biotite hosted siltstones and
sandstones
Gold Rich
Stratigraphic
Footwall
Stringer pyrite ± chalcopyrite ± pyrrhotite
± gold, gold telluride, bismuth telluride, ±
arsenopyrite best developed in the
coarser volcaniclastic units as shear fabric
controlled stringers

Yet to be determined
Pyrite zones Pyrite ± chalcopyrite ± pyrrhotite ±
arsenopyrite

Future Work Program - Tucklan

Once assay results are received, the Company will decide if the drill program will continue with the addition of diamond tails to the holes affected by water and the completion of a further holes including possible air-core drilling. Results from recently received soil geochemistry is being interpreted and drill

page 5

ASX ANNOUNCEMENT – 11[TH] FEBRUARY 2021

targeting will also be considered. IP surveying and soil geochemistry to close off the open-ended anomalous zone are ongoing.

==> picture [417 x 585] intentionally omitted <==

----- Start of picture text -----

.
----- End of picture text -----

Figure 6: Location Map – Sultan Resources NSW Tenements over the prospective Macquarie Arc sequence

This announcement is authorised by Steve Groves, Managing Director

page 6

ASX ANNOUNCEMENT – 11[TH] FEBRUARY 2021

For further information contact: Managing Director Steve Groves [email protected]

Refences:

  1. French T, Duerden P, Bigelow J, Simmons H, Flitcroft P, 2015: THE MCPHILLAMYS GOLD DEPOSIT, KINGS PLAINS, NSW. DISCOVERY HISTORY AND GEOLOGY OF THE MCPHILLAMYS GOLD DEPOSIT, LACHLAN FOLD BELT, NSW.

Competent Persons Statement

The information in this report that relates to Exploration Targets and Exploration Results is based on historical exploration information compiled by Mr Steven Groves, who is a Competent Person and a Member of the Australian Institute of Geoscientists. Mr Groves is Managing Director and a full-time employee of Sultan Resources Limited. Mr Groves has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for the reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Groves consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

Disclaimer

In relying on the above mentioned ASX announcements and pursuant to ASX Listing Rule 5.23.2, the Company confirms that it is not aware of any new information or data that materially affects the information included in the abovementioned announcements.

About Sultan Resources

Sultan Resources is an Australian focused exploration company with a portfolio of quality assets in emerging discovery terranes currently targeted by successful explorers such as Newcrest Mining, Alkane Resources, Gold Road Resources, and Sandfire Resources. Sultan’s tenement portfolio includes prospective targets for porphyry Au-Cu, structurally-hosted gold, Nickel, Cobalt and base metals and include tenements located in the highly prospective Lachlan Fold Belt of Central NSW as well as projects located within the southern terrane region of the Yilgarn Craton in south and south eastern Western Australia. Sultan’s board and management strategy is for a methodical approach to exploration across the prospects in order to discover gold and base metals that may be delineated via modern exploration techniques and exploited for the benefit of the company and its shareholders.

Appendix 1: Collar Details of Drilled Holes

HoleID EASTING
NORTHING

RL
AZI
DIP

DEPTH
TRC0001
725403
6442147 470
281

-60

352.1
TRC0002
725546
6442058 463
270

-60

348
TRC0003
724993
6442500 462
215

-60

174
TRC0004
725196
6442751 452
225

-60

180
TRC0005
725046
6442596 452
225

-60

162
TRC0006
724982
6442413 471
233

-60

328.2

page 7

ASX ANNOUNCEMENT – 11[TH] FEBRUARY 2021

Appendix 2: Details of Resources or Reserves referred to in this document

==> picture [453 x 60] intentionally omitted <==

regisresources.com.au/General/reserves-and-resources.html

page 8

Appendix 1: JORC Code, 2012 Edition Table 1 – Sultan Resources Ltd – Section 1 Sampling Techniques and Data

21 (Criteria in this section apply to all succeeding sections.)

  • Criteria JORC Code explanation SamplingNature & quality of sampling (e.g. cut channels, random chips, or specific techniques specialised industry standard measurement tools appropriate to the minerals under investigation, such as down hole gamma sondes, or handheld XRF instruments, etc.). These examples should not be taken as limiting the broad meaning of sampling.

  • Include reference to measures taken to ensure sample representivity & the appropriate calibration of any measurement tools or systems used.

  • Aspects of the determination of mineralisation that are Material to the Public Report.

  • In cases where ‘industry standard’ work has been done this would be relatively simple (e.g. ‘reverse circulation drilling was used to obtain 1 m samples from which 3 kg was pulverised to produce a 30 g charge for fire assay’). In other cases more explanation may be required, such as where there is coarse gold that has inherent sampling problems. Unusual commodities or mineralisation types (e.g. submarine nodules) may warrant disclosure of detailed information.

Commentary

Rock sampling program

  • Rock chip samples were taken in the during field inspection of the Tucklan gold target

  • Rock samples were collected from surface outcrop and float

  • Outcrop samples are resistant portions of the local geology and are considered to be in situ. Float samples are interpreted to have been sourced from local area..

  • Samples weighing up to several kilograms were collected

  • soil sampling program

  • All soil sample points were located using a hand-held GPS with +/-5m accuracy utilising MGA zone 55 (GDA94) coordinate system. Surface organic matter was removed from the sample site using a hand pick and shovel and a 25cm x 25cm x 25cm deep hole was dug using a mattock, with a sample of primarily B soil horizon collected. The soil sample was screened using a 3mm mesh aluminium sieve and a 200-250 gram sub sample of -3mm fraction was retained in a labelled soil geochemical bag for analysis. Soil sample IDs and locations are stored digitally in a register which also notes sample content and conditions. External certified reference material / standards, blanks and duplicates are submitted every 50th, 51st and 52nd sample respectively for QAQC purposes.

Drilling Drill type (eg core, reverse circulation, open-hole hammer, rotary air blast, • All 6 drill holes commenced with Reverse Circulation drilling using a track
techniques auger, Bangka, sonic, etc.) & details (e.g. core diameter, triple or standard mounted drill rig –
tube, depth of diamond tails, face-sampling bit or other type, whether core is
oriented & if so, by what method, etc.).
• RC Hole Depths are as follows:
HoleID
RC - DEPTH
TRC0001
174

ASX ANNOUNCEMENT – 11[TH] FEBRUARY 2021

Criteria JORC Code explanation Commentary
TRC0002
348
TRC0003
174
TRC0004
180
TRC0005
162
TRC0006
168
• Diamond tails were added to TRC0001 and TRC0006 using truck mounted UDR
1000 drill rig
• TRC0006 – Drilled from 168 – 173.4m (5.4m) HQ3 before casing off, reducing
to NQ2 and drilling from 173.4 to 328.1m (154.7m) NQ2
• TRC0001 – Drilled from 174 – 179.6m (5.6m) HQ3 before casing off, reducing
to NQ2 and drilling from 179.6 to 352.10m (172.5m) NQ2
• Both single shot and final multishot survey data was completed with a Axis
Champgyro
• Core orientation was completed using Boart Longyear Truecore orientation
system
Drill sample Method of recording & assessing core & chip sample recoveries & results • The RC rig was fitted with a cone splitter with adjustable ports at the bottom
recovery assessed. of the cyclone. At the end of each 1m, the sample is dropped into the cone
Measures taken to maximise sample recovery & ensure representative
nature of the samples.
splitter with the sample bag attached to the right side port. The samples were
collected on 2m composites, with the sample bag removed every 2m of
drilling. Field duplicates were collected every 50 samples with a second
Whether a relationship exists between sample recovery & grade & whether sample bag attached to the left side port.
sample bias may have occurred due to preferential loss/gain of fine/coarse
material. • Rock chips were collected on 1m intervals from the excess sample bags, these
samples were sieved and washed and collected into plastic chip trays.
• Drill hole data, samples and geology logging is recorded on a purpose
designed logging excel spreadsheet and stored on the company online storage
site.
• Diamond core was extracted from the inner tube and placed into plastic core
trays at the drill rig. Core was transported to a core facility for processing and
sampling. Recoverywas assessed between core blocks and visual examination

page 10

ASX ANNOUNCEMENT – 11[TH] FEBRUARY 2021

Criteria JORC Code explanation Commentary
of the core in the trays. Orientation was completed by reconstructing the core
in it’s original position using v rails and the orientation marks placed on the
core by the drillers and marking the orientation line up and down the section.
• Core was cut using an automatic Almonte core saw.
• Sampling was composited on 2m per sample of half core for the NQ2 core and
1m samples of half core for the HQ3 core N/A
Logging Whether core & chip samples have been geologically & geotechnically Reverse Circulation and Diamond Drilling logging
logged to a level of detail to support appropriate Mineral Resource
estimation, mining studies & metallurgical studies.
• At this point, both drill chips and diamond core have been reviewed by
experienced geologists, final detailed geologically logging recorded on the
Whether logging is qualitative or quantitative in nature. Core (or costean, excel spreadsheet logging system is yet to take place.
channel, etc.) photography. • All core has been meter marked, Recovery and RQD completed, Orientated,
The total length & percentage of the relevant intersections logged. alpha and beta measurements on structures and vein sets, core photography
and sampling has been completed and recorded on the company logging and
sampling excel spreadsheet
• The description is qualitative and includes lithology, alteration and
mineralisation
Sub-sampling
If core, whether cut or sawn & whether quarter, half or all core taken.
Rock and soil sampling program
techniques &
sample
preparation
If non-core, whether riffled, tube sampled, rotary split, etc.& whether
sampled wet or dry.
• The sample preparation for both rock and soils follows industry best practise
involving oven drying, crushing and pulverisation
For all sample types, the nature, quality & appropriateness of the sample Reverse Circulation and Diamond Drilling sampling
preparation technique. • The sample preparation for both RC and DD follows industry best practise
Quality control procedures adopted for all sub-sampling stages to maximise involving oven drying, crushing and pulverisation
representivity of samples.
• All diamond core is half core, with half being sent for analysis and half being
Measures taken to ensure that the sampling is representative of the in situ
material collected, including for instance results for field duplicate/second-
kept.
half sampling. • All Reverse Circulation drilling was sampled using a cone splitter on the
Whether sample sizes are appropriate to the grain size of the material being
sampled.
bottom of the rig cyclone. The right port collects the original sample, with the
left port used for duplicates. The level of the splitter is frequently checked by
the companyrepresentative at the rigand cleaned as required with

page 11

ASX ANNOUNCEMENT – 11[TH] FEBRUARY 2021

Criteria JORC Code explanation Commentary Commentary
compressed air, wet samples have been collected, these samples are noted in
the company sampling and logging excel spreadsheet.
External certified reference material / standards, blanks submitted every
50th, 51st sample respectively for QAQC purposes for diamond drilling
samples.
External certified reference material / standards, blanks and duplicates are
submitted every 50th, 51st and 52nd sample respectively for QAQC purposes
for reverse circulation samples.
Both Reverse Circulation and Diamond drill core sampling are appropriate for the
rock types intersected and follows industry best practice
Quality of The nature, quality & appropriateness of the assaying & laboratory Reverse Circulation and Diamond drill samples are analysed for 48 elements
assay data & procedures used & whether the technique is considered partial or total. including Ag, Al, As, Ba, Be, Bi, Ca, Cd, Ce, Co, Cr, Cs, Cu, Fe, Ga, Be, Hf, In, K,
laboratory For geophysical tools, spectrometers, handheld XRF instruments, etc., the La, Li, Mg, Mn, Mo, Na, Nb, Ni, P, Pb, Rb, Re, S, Sb, Sc, Se, Sn, Sr, Ta, Te, Th,
tests parameters used in determining the analysis including instrument make & Ti, Tl, U, V, W, Y Zn and Zr using method ME-MS61 (four acid ICP-MS). Gold
model, reading times, calibrations factors applied & their derivation, etc. will be analysed separately using ALS method Au-AA22, with a lower
Nature of quality control procedures adopted (e.g. standards, blanks,
duplicates, external laboratory checks) & whether acceptable levels of
detection limit of 0.001 ppm.
Soil Samples were analysed for 53 elements including Au, Ag, Al, As, B, Ba,
accuracy (i.e. lack of bias) & precision have been established. Be, Bi, Ca, Cd, Ce, Co, Cr, Cs, Cu, Fe, Ga, Ge, Hf, Hg, In, K, La, Li, Mg, Mn, Mo,
Na, Nb, Ni, P, Pb, Pd, Pt, Rb, Re, S, Sb, Sc, Se, Sn, Sr, Ta, Te, Th, Ti, Tl, U, V, W,
Y, Zn & Zr using method AuME-ST44.
External certified reference material / standards, blanks and duplicates are
submitted every 50th, 51st and 52nd sample respectively for QAQC
purposes.
Verification The verification of significant intersections by either independent or All data are verified by at least two experienced geologists.
of sampling
& assaying
alternative company personnel.
The use of twinned holes.
Data are stored in a digital database and interrogated using the ioGasTM
geochemical software suite.
Documentation of primary data, data entry procedures, data verification,
data storage (physical & electronic) protocols.
Discuss any adjustment to assay data.

page 12

ASX ANNOUNCEMENT – 11[TH] FEBRUARY 2021

Criteria JORC Code explanation Commentary Commentary
Location of Accuracy & quality of surveys used to locate drill holes (collar & down-hole
A handheld GPS was used to locate each sample point. Accuracy of +/- 5m is
data points surveys), trenches, mine workings & other locations used in Mineral considered reasonable
Resource estimation.
MGA94, Zone 55
Specification of the grid system used. Elevation were in AHD (MGA94, Zone 55)
Quality & adequacy of topographic control.
Data spacing Data spacing for reporting of Exploration Results. Soil samples from the are collected across a grid spaced at
& distribution
Whether the data spacing & distribution is sufficient to establish the degree

Tucklan 100m x 100m sample spacing
of geological & grade continuity appropriate for the Mineral Resource & These spacings are considered reasonable to provide sufficient
Ore Reserve estimation procedure(s)&classifications applied. geochemical coverage over the target types sought.
Whether sample compositing has been applied. For Reverse Circulation drill chips, 2m composite samples were collected,
this is considered sufficient for the commodities under exploration
HQ3 diamond core has been sampled on 1m intervals
NQ2 diamond core has been samples on 2m composite intervals.
The sample spacing and compositing is considered reasonable to provide
sufficient geochemical results for the target types sought.
Orientation of
Whether the orientation of sampling achieves unbiased sampling of possible
Drilling was designed to intersect the recorded regional faults at as close as
data in structures & the extent to which this is known, considering the deposit type. reasonable possible to perpendicular
relation to
geological
If the relationship between the drilling orientation & the orientation of key
mineralised structures is considered to have introduced a sampling bias, this
structure should be assessed & reported if material.
Sample The measures taken to ensure sample security. All geochemical samples are selected by geologists in the field and delivered to
security the lab by Sultan Resources contract field staff,
Audits or The results of any audits or reviews of sampling techniques & data. Not applicable
reviews

page 13

ASX ANNOUNCEMENT – 11[TH] FEBRUARY 2021

(Criteria listed in the preceding section also apply to this section.)

Criteria JORC Code explanation Commentary Commentary
Mineral Type, reference name/number, location & ownership including agreements . The licences include EL8734, EL8704 and EL8735, which together cover a total area
tenement & or material issues with third parties such as joint ventures, partnerships, of approximately 326 km2 within the Lachlan Fold Belt of central NSW.
land tenure
status
overriding royalties, native title interests, historical sites, wilderness or
national park & environmental settings.
All licences are in good standing
The security of the tenure held at the time of reporting along with any known
impediments to obtaining a licence to operate in the area.
Exploration Acknowledgment & appraisal of exploration by other parties. Previous exploration over EL8734 has been limited. Work reported was generally
done by other generative in nature and at a reconnaissance level.
parties
Geology Deposit type, geological setting & style of mineralisation. The Project lies 45km northeast of the Boda Cu-Au porphyry discovery within the Late
Ordovician – Early Silurian Tucklan Formation, Rockley - Gulgong Volcanic Belt,
Macquarie Arc. The Tucklan Formation is considered to be synchronous with Phase 4
volcanism in the Macquarie Arc which is associated in time and space with the largest
porphyry Au-Cu deposits. It is associated with historical gold workings that include
numerous prospecting pits, plus a shallow shaft and adit. These form part of the
overlooked & extensive Tucklan gold field.
The Lachlan Orogen is approximately 700 km wide and 1000 km long and has disputed
complex evolutionary history. The Macquarie Arc is part of the eastern sub-province of
the Lachlan Orogen and is the host to numerous porphyry Au–Cu deposits. It consists
mainly of subduction-related Ordovician intermediate and mafic volcanic, volcaniclastic
and associated intrusive rocks and was accreted to Gondwana in the Early Silurian, and
underwent rifting and burial in the Middle to Late Silurian.
It consists of four structural belts, namely, the western (Junee-Narromine), the central
(Molong), the eastern (Rockley-Gulgong) Belt, and southern (Kiandra) volcanic belts.
These belts have most likely been formed by rifting and dismemberment of a single arc,
which developed along the boundary between the Australian and proto-Pacific plates
during the Ordovician and was subsequently dismembered during the Silurian.
An entirely intra-oceanic setting is postulated for the Macquarie Arc (Crawford et al.,
2007),with fourphases of arc-type magmatism,the earliest in the EarlyOrdovician,

page 14

ASX ANNOUNCEMENT – 11[TH] FEBRUARY 2021

Criteria
JORC Code explanation
Commentary Commentary Commentary Commentary Commentary Commentary Commentary
and culminating in the Late Ordovician to Early Silurian. The four phases of volcanism
in the Macquarie Arc relate to distinct groups of porphyritic intrusions that vary from
monzodiorite-diorite through monzonite-granodiorite compositions and correspond
with porphyry copper-gold and epithermal gold-silver mineralisation
Lithology
Based on the work discussed in this document, the rocks at Tucklan are classified to be
of trachy-andesite to alkali basaltic volcano-sedimentary origin.
Drill hole
Information
A summary of all information material to the understanding of the
exploration results including a tabulation of the following information for all
Material drill holes:
o Easting & northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above sea level in metres) of
the drill hole collar
o dip & azimuth of the hole
o down hole length & interception depth
o hole length.
If the exclusion of this information is justified on the basis that the
information is not Material & this exclusion does not detract from the
understanding of the report, the Competent Person should clearly explain
why this is the case.
• Eastings, Northings and RL were collected using a handheld
of +/- 5m is considered reasonable
• MGA94, Zone 55
Elevation were in AHD(MGA94,Zone 55)
GPS locate each drill collar. Accuracy
Total DEPTH
352.1
348
174
180
162
328.2
HoleID EASTIN
G
NORTHING RL AZI DIP Total DEPTH
TRC0001 725403 6442147 470 281 -60 352.1
TRC0002 725546 6442058 463 270 -60 348
TRC0003 724993 6442500 462 215 -60 174
TRC0004 725196 6442751 452 225 -60 180
TRC0005 725046 6442596 452 225 -60 162
TRC0006 724982 6442413 471 233 -60 328.2
Data
aggregation
methods
In reporting Exploration Results, weighting averaging techniques, maximum
and/or minimum grade truncations (e.g. cutting of high grades)&cut-off
grades are usually Material & should be stated.
Where aggregate intercepts incorporate short lengths of high grade results
& longer lengths of low grade results, the procedure used for such
aggregation should be stated & some typical examples of such aggregations
should be shown in detail.
The assumptions used for any reporting of metal equivalent values should be
clearly stated.
• N/A

page 15

ASX ANNOUNCEMENT – 11[TH] FEBRUARY 2021

Criteria JORC Code explanation Commentary Commentary
Relationship These relationships are particularly important in the reporting of N/A
between Exploration Results.
mineralisatio
n widths &
If the geometry of the mineralisation with respect to the drill hole angle is
known, its nature should be reported.
intercept
lengths
If it is not known & only the down hole lengths are reported, there should be
a clear statement to this effect (e.g.‘down hole length, true width not
known’).
Diagrams Appropriate maps & sections (with scales)&tabulations of intercepts should See maps and figures accompanying this ASX release.
be included for any significant discovery being reported These should
include, but not be limited to a plan view of drill hole collar locations &
appropriate sectional views.
Balanced Where comprehensive reporting of all Exploration Results is not practicable,
Reference has been made to anomalous levels of geochemical pathfinder elements in
reporting representative reporting of both low & high grades and/or widths should be the document. This interpretation has been determined by experienced geologists
practiced to avoid misleading reporting of Exploration Results. retained by Sultan Resources using the ioGasTMgeochemical software. It is impractical
to present every result for all 53 elements across the sample population in this
document. A map showing the distribution of anomalous Cu has been included for
reference.
Other Other exploration data, if meaningful & material, should be reported The Induced Polarisation (IP) survey method is often used to determine the location
substantive including (but not limited to): geological observations; geophysical survey of disseminated sulphides. Rocks containing sulphide minerals can be more readily
exploration results; geochemical survey results; bulk samples – size&method of charged than barren ground. An external current is applied, and charge separation can
data treatment; metallurgical test results; bulk density, groundwater, occur on sulphide grain boundaries. When the transmitted current is switched off the
geotechnical & rock characteristics; potential deleterious or contaminating decay of the current can be measured.
substances. The IP survey was completed by Fender Geophysics. The oversight of the survey and
auditing (QAQC) and processing of data acquired was conducted by Alan Ortel, an
experienced geophysict.
The IP survey array used was Dipole-Dipole with a 100m receiver dipole size and a
100m transmitter dipole size. The transmitter dipole was moved at 100m intervals,
achieving a 100m station spacing. All seven (7) lines are orientated North-South and
spaced at 200m intervals. The transmitter used is a GDD-Tx4, 5kVA transmitter system
and the receiver used in a GDD-Rx32. The survey was collected with a frequency of
0.25Hz.

page 16

ASX ANNOUNCEMENT – 11[TH] FEBRUARY 2021

Criteria JORC Code explanation Commentary Commentary
The transmitter and receiver electrode positions are located to hand-held GPS
accuracy, generally +-3m (UTM projection GDA94 Zone 55).
Other Geophysical data including publicly available magnetic and radiometric surveys
have been referred to in interpreting the Tucklan Gold Target. All data are available
from the NSW Department of Planning, Industry and Environment MinView website:
https://minview.geoscience.nsw.gov.au
Further work The nature & scale of planned further work (e.g. tests for lateral extensions The focus on future work will be to ultimately generate targets for drilling. Work to
or depth extensions or large-scale step-out drilling). enable this will include further soil sampling programs coupled with IP geophysics to
Diagrams clearly highlighting the areas of possible extensions, including the locate bodies of disseminated sulphides beneath the surface. If sufficient
main geological interpretations & future drilling areas, provided this encouragement is gained from this work, then deeper RC or diamond drilling is
information is not commercially sensitive. anticipated.

page 17