Quarterly Report for period ended 30 September 2018

QUARTERLY REPORT

COMPANY DETAILS

ABN: 94 088 488 724

PRINCIPAL AND

REGISTERED OFFICE Level 2 23 Ventnor Avenue West Perth WA 6005

T (08) 9214 9700 F (08) 9214 9701

W www.strikeresources.com.au E [email protected]

ASX CODE SRK

SECURITIES ON ISSUE 145,334,268 listed shares

BOARD OF DIRECTORS

Farooq Khan (Chairman) William Johnson (Managing Director)

Malcolm Richmond (Non-Executive Director)

Matthew Hammond (Non-Executive Director) Victor Ho

(Director)

COMPANY SECRETARY Victor Ho [email protected]

FOR FURTHER INFORMATION

William Johnson Managing Director [email protected]

31 October 2018

QUARTERLY ACTIVITIES

Strike Resources Limited (Strike) presents its Quarterly Report for the quarter ended 30 September 2018.

As at 30 September 2018, Strike had net assets of ~$4.73 million (comprising ~$2.03 million gross cash, ~$2.06 million investments1 and ~$0.668 million in other assets less provisions/accruals/trade creditors of ~$0.028 million).

Burke Graphite Project (Queensland)

Metallurgical test work has continued this quarter on samples of graphite material from the Burke Graphite Project, to examine the potential suitability of the Burke Project graphite for use in electric vehicle (EV) batteries.

The results of this test work are expected in the December 2018 quarter.

Apurimac Iron Project (Peru)

In early 2018, the Peru Government signaled its intention to undertake a study into building a 570km multi-railway, which would connect Strike's Apurimac Iron Ore Project to a multi-user port on the west coast of Peru. The tender for the study was recently won by an international consortium and Strike expects that the study will take approximately 12 months to complete.

The development of this railway would provide significantly improved development options for the Apurimac Project. The Company has been in discussions with local communities during the quarter regarding the recommencement of exploration activities on the project, subject to the progress of the Peru Government's railway study.

In addition, the Company has held preliminary discussions with the owners of a significant neighboring iron ore deposit, regarding possible joint commercial development of the companies' respective projects.

About Strike Resources Limited (ASX:SRK)

Strike Resources is an ASX listed resource company and owns the high-grade Apurimac Magnetite Iron Ore Project and Cusco Magnetite Iron Ore Project in Peru and is currently developing its Burke Graphite Project in Queensland and lithium exploration tenements in Western Australia.

1 Investments comprise liquid investments in a diversified portfolio of various ASX 200 listed resource stocks

PROJECTS

Apurimac Iron Ore Project, Peru

Between 2006 and 2014, Strike's primary focus was on the development of its Apurimac Magnetite Iron Ore Project in Peru, recognised as one of the highest grade, large scale magnetite projects in the world with the potential to support the establishment of a significant iron ore operation.

Adverse market conditions however led Strike in 2014 to suspend all development activities on this and its other iron ore projects in Peru.2

In early 2018 the Ministry of Transport and Communications in Peru (MOTC) announced that it is to undertake a formal study to build a multi-user railway from the inland city of Andahuaylas in southern Peru, to the mineral export Port of San Juan de Marcona on the west coast of Peru (the Andahuaylas Railway).3

Figure 1: Route of proposed Andahuaylas Railway connecting Strike's Apurimac Project to Port of San Juan de Marcona

Following a competitive tender process, the MOTC recently awarded the study to a consortium comprising local Peru subsidiaries of international companies Dohwa Engineering Co. Ltd. (Korea), Geodata Engineering S.P.A. (Italy) and Genera Consulting S.A.C..4 Whilst no specific guidance has been given by the consortium, Strike expects the study to take approximately 12 months to complete.

Strike's Apurimac Project is located only 20km from the city of Andahuaylas. The proposed railway (approximately 570km in length) would provide a direct link from the Project to an established mineral export port, significantly improving the Project's development prospects. The preliminary railway route proposed by the MOTC (refer Figure 1) almost exactly mirrors the railway route proposed by SKM for Strike in 2008.

Strike understands that the primary motivation behind the MOTC Andahuaylas Railway initiative is to provide economic stimulation to the relatively poorer regions of Ica, Arequipa, Ayacucho and Apurimac. The Apurimac Region in particular is positioned well inland and has historically suffered from lack of good transport infrastructure connecting it to the coastal areas and the Peru capital, Lima.

2 Refer Strike's ASX Announcements dated 28 February 2014: Legal Injunction and Suspension of Operations in Peru, 13 March 2014 Lifting of Injunction and Strategic Review and14 April 2014: Exit from Peru

3 Refer Strike's ASX Announcement dated 8 February 2018: Peru Government Plans Railway Linking Strike's Apurimac Iron Ore Project to Port

4 Refer Strike's ASX Announcement dated 24 October 2018: Peru Govt Awards Tender for Railway Study

The scale of Strike's Apurimac Project, if it proceeds through the Andahuaylas Railway, is likely to provide for very significant economic benefits to the Apurimac Province in terms of both direct investment and job creation. Other mineral projects in the Apurimac and Cusco Regions are also likely to directly benefit from the Andahuaylas Railway.

A railway has always been considered as the best infrastructure solution for the Apurimac Project, given the high-grade nature of the iron ore deposit. A railway connecting the Project to a Port will provide Strike the ability to attract premium pricing for high-grade lump and fines products, compared to a concentrate product delivered through an alternative slurry pipeline. In addition, a railway will allow for capital and processing costs at the mine to be substantially reduced, given the considerably simplified process to produce lump and fines products from Strike's high grade ore compared to producing a slurry concentrate.

The exceptionally high-grade 57% Fe at Apurimac is almost twice as high as magnetite deposits developed in Australia; ore bodies are coarse-grained and relatively soft, resulting in potentially cheaper processing costs once in production:

  • JORC Indicated and Inferred Mineral Resource at the main Opaban I/III concessions of 269Mt of iron ore at 57.3% Fe (142 Mt Indicated Resource at 57.84% Fe and 127 Mt Inferred Resource at 56.7% Fe).
  • Mineralisation predominantly high-grade, coarse-grained magnetite providing comparatively high mass recoveries (>60%) at coarse grind size (>500 microns).
  • Excellent exploration potential within current concessions with several targets containing ironstones grading >60% Fe in similar geological settings to the main Opaban concessions.

A Pre-Feasibility Study completed in 20085 and updated in 20106 on the Apurimac Project indicated clear potential for development of a world class iron ore project:

  • The 2008 Pre-Feasibility Study undertaken by Snowden Mining Industry Consultants and SKM utilised a proposed slurry pipeline configuration but considered a range of infrastructure options including a railway. The concentrate pipeline was the preferred transport solution (under the study) as the additional capital cost of building a railway compared to a slurry pipeline outweighed the operational and other benefits of a railway. For further details, refer to Strike's ASX Announcement dated 23 July 2008: Prefeasibility Results Confirm World Class Prospects in Peru.
  • Further infrastructure studies were undertaken by Ausenco Sandwell and SRK Consulting in 2010, including a more detailed technical and costing study on building and operating a dedicated railway. The purpose of these studies was to further compare the economics of the slurry pipeline versus railway infrastructure solutions at various production levels. For further details, refer to Strike's ASX Announcement dated 23 November 2010: Apurimac Project Update and Strike's December 2010 Quarterly Report.

Since the completion of the studies referred to above, Strike has continued to evaluate its development options for the Project. With falling iron ore prices and a global investment climate in recent years not supportive of large scale iron-ore related infrastructure projects, Strike has acted to minimise its Projectrelated costs until market conditions improved.

With spot prices for iron ore strengthening from the lows of approximately US$40 per tonne in December 2015 to approximately US$65/t today (with a 12 month trading range of approximately US$60/t to 80/t)7 , the timing of the MOTC Andahuaylas Railway initiative, being co-incident with strengthening iron ore prices, is considered by Strike to be extremely positive for the Project.

The Company is highly encouraged by the prospect of the Andahuaylas Railway, particularly given the recent award of the tender for the railway study. Strike is planning to re-start project activity in Peru, subject to the development timetable of the railway.

5 Refer Strike's ASX Announcement dated 23 July 2008: Prefeasibility Results Confirm World Class Prospects in Peru

6 Refer Strike's ASX Announcement dated 23 November 2010: Apurimac Project Update and Strike's December 2010 Quarterly Report

7 Source: https://www.marketindex.com.au/iron-ore (Industry standard NYMEX traded 62% Fe, CFR China)

Cusco Iron Ore Project, Peru

The Cusco Project lies approximately 150km to the south - east of Apurimac and forms a potential secondary development target for Strike in Peru with an initial Inferred Resource estimate of 104Mt at 32.6% Fe.

Like Apurimac, iron ore mineralisation at the project is coarse-grained and dominated by magnetite, with high grades recorded. Preliminary metallurgical tests indicate a concentrate grade of >65% Fe could be produced from this ore using conventional grinding and magnetic separation processes.

Whilst no detailed work has been undertaken on a railway route between Strike's Apurimac and Cusco Projects, it is clear that if the Andahuaylas Railway proceeds, a 'spur line' from Andahuaylas to Strike's Cusco Project would (subject to technical and commercial feasibility) be a very sensible consideration, given the proximity of several other major mining projects nearby Strike's Cusco Project which would also benefit from such a rail link.

Burke Graphite Project, Queensland

Strike's Burke Graphite Project (in which Strike holds a ~70% interest) is located in the Cloncurry region in North Central Queensland, where there is access to well-developed transport infrastructure to an airport at Mt Isa (~122km) and a port in Townsville (~783km).

Figure 2 - Burke Graphite Project Tenement Location in North Central Queensland

A Mineral Resource Estimate (MRE) for the Project has defined a maiden Inferred Mineral Resource of 8 :

  • 6.3 million tonnes @ 16.0% Total Graphitic Carbon (TGC) for 1,000,000 tonnes of contained graphite;
  • Within the mineralisation envelope there is included higher grade material of 2.3 million tonnes @ 20.6% TGC (with a TGC cut-off grade of 18%) for 464,000 tonnes of contained graphite which will be investigated further.

These grades place the Burke deposit as one of the highest-grade deposits of graphite in the world held by an Australian listed company.

Based upon the MRE for the Project referred to above, the following Chart illustrates the TGC grades of published Total JORC Resource/Reserves of selected ASX Listed Graphite Projects relative to the Burke Project.

Figure 3 - Selected TGC% of Published Total JORC Resource/Reserve* vs. Maiden Burke Mineral Resource Estimates

In addition to the high-grade nature of the deposit, the Burke Graphite Project:

  • Comprises natural graphite that has been demonstrated to be able to be processed by standard flotation technology to international bench mark product categories. The flotation tests conducted by Independent Metallurgical Operations Pty Ltd (IMO) have confirmed that a concentrate of purity in excess of 95% and up to 99% TGC can be produced using a standard flotation process.
  • Contains graphite from which Graphene Nano Platelets (GNP) have been successfully extracted direct from the Burke Graphite deposit via Electrochemical Exfoliation (ECE). The ECE process is relatively low cost and environmentally friendly compared to other processes, yet it can produce very high purity Graphene products. The ECE process is however not applicable to the vast majority of worldwide graphite deposits as it requires a TGC of over 20% and accordingly the Burke Deposit has potentially significant processing advantages over other graphite deposits.
  • Is located in the relatively safe and mining friendly jurisdiction of Queensland, Australia with welldeveloped transport infrastructure and logistics nearby; and
  • Is potentially amenable to low cost open-pit mining.

8 Refer Grade Tonnage Data in Table 2 of CSA Global's Burke Graphite Project MRE Technical Summary dated 9 November 2017 (attached as Annexure A of Strike's ASX Announcement dated 13 November 2017: Maiden Mineral Resource Estimate Confirms Burke Project as One of the World's Highest Grade Natural Graphite Deposits).

Ground EM Survey Results

A ground Electro Magnetic (EM) survey was completed during the quarter, covering the south-eastern corner of Burke tenement EPM 25443 (North) (drilled by Strike in 20179 ) and the Corella tenement EPM 25696 (South) (located ~20 km south of EPM 25443).10

The EM survey identified the Corella Prospect as a significant target area for additional high grade mineralisation as well as identifying new zones of increased conductivity adjacent to previously drilled graphite mineralisation at the Burke Prospect.

The Corella Prospect (north east corner of EPM 25696 (South)) EM survey was carried out over outcropping and sub-cropping Geological Survey of Queensland mapped Graphitic Schists - the "Milo beds" - within the Corella Formation. Graphite grading 5 -10% TGC is widespread throughout the outcropping Milo beds and the EM survey was carried out to identify higher-grade areas of mineralisation and identify future drill targets. The survey highlighted an area of approximately 1000m x 500m (refer Figure 4) within which conductive features similar to those corresponding to high-grade graphite occurring at the Burke EPM 2543 tenement were identified.

Figure 4 - EM Survey - Corella Prospect, Burke Graphite Project

9 Refer Strike's ASX announcements dated 13 June 2017: Extended Intersections of High-Grade Graphite Encountered at Burke Graphite Project and 21 June 2017: Further High-Grade Intersection Encountered at Burke Graphite Project

10 Refer Strike's ASX Announcement dated 26 June 2018: Burke Graphite Project – New Target Area Identified From Ground Electro-Magnetic Surveys

The conductive features identified at the Corella Prospect appear to be shallow to flat-lying and occur in areas of outcropping and sub-cropping graphite that have rock chips (from previous sampling by Strike) of up to 14.85% TGC11.

In addition to identifying the new potential at Corella, the EM survey identified minor structural offsets, together with new zones of increased conductivity at the previously drilled Burke Prospect.

Figure 5 - EM Survey - Burke Prospect, Burke Graphite Project

The EM survey over the south-eastern corner of Burke EPM 2543 (North) was carried out over outcropping and sub-cropping Geological Survey of Queensland mapped Graphitic Schists of the Corella Formation. The survey highlighted the high-grade graphite identified in Strike's maiden drilling programme8 and identified minor structural offsets, together with new zones of increased conductivity (refer Figure 5). In addition, the survey verified the width and dip of the drill intersected high-grade graphite.

Further metallurgical test work has commenced on samples of graphite material taken from the Burke Project to examine the potential suitability of Burke graphite for use in electric vehicle (EV) batteries. Results of this test work are expected in 2QFY19.

11 Refer Strike's ASX announcement dated 21 April 2017: Jumbo Flake Graphite Confirmed at Burke Graphite Project, Queensland

Lithium and Gold Exploration Tenements, Western Australia

The North Pilbara hosts a number of lithium and tantalum prospects associated with pegmatites that are related to the Sisters Supersuite of monzogranites and other high end intrusives that intruded the Archeaen greenstone terrain of the East Pilbara approximately 3 billion years ago.

Lithium and tantalum mineralisation occurs either within the pegmatite veins or within alluvials draining the elevated areas containing the pegmatite veins.

Strike holds two exploration licences, EL 45-4799 and EL 45-4800 in the North-West Pilbara totalling ~31,000 hectares that exist within the extent of the known lithium and tantalum mineral fields in the region, adjacent to licences that have outcropping lithium and tantalum elevated pegmatite occurrences.

Given the widespread cover of thin wind-blown sands and tertiary laterites/duricrusts, the potential of subcropping and shallow buried lithium and tantalum rich pegmatites and alluvial deposits is considered a strong possibility.

Strike's North-West Pilbara tenements are also favourably located close to the Mt York Lithium-Gold Project and other gold deposits and to adjoining tenements held by Kairos Minerals Limited and De Grey Mining Limited, in an area of significant activity based upon reported Novo/Artemis discoveries in the Pilbara (refer Figure 6).

Figure 6 – Strike's North-West Pilbara Tenements (EL 45/4799 and EL 45/4800)

Strike also holds the Paulsens East tenement, which is located ~7km east of the Paulsens Gold Mine operated by Northern Star Resources Ltd (ASX:NST) (which has mined over 700k ounces at an average grade of 7.63 g/t Au12) has been held by Strike for many years for its deposit of high grade hematite. Strike has historically conducted extensive drilling on the tenement for iron ore.

A review by Strike of the historical data within the tenement for other mineralisation has indicated the presence of a historical gold occurrence, hosted within conglomerate rocks on a faulted contact between the Fortescue Group and Ashburton Basin sediments. Strike notes the potential of the Paulsens area, given the geological setting with mineralised conglomerates is similar to the Novo/Artemis gold discoveries, with these discoveries having opened up fresh geological models for gold prospectivity compared with traditional paradigms.

Strike also notes that the Paulsens East tenement directly abuts the southern boundary of Chalice Gold Mines Limited's (ASX:CHN) West Pilbara Project tenements, with Novo Resources' tenements nearby to the southeast (refer Figure 7).

Figure 7 – Strike's Paulsens East Tenement (Retention Licence RL 47/7)

Strike is currently evaluating all of its Pilbara tenements and planning further exploration activities to determine their prospectivity for lithium, tantalum, rare earths and gold.

For further details, please refer to Strike's ASX announcement dated 20 November 2017 Gold Potential of Strikes Pilbara Tenements.

12 Source: Northern Star Resources Ltd company website: http://www.nsrltd.com/

Quarterly Report for period ended 30 September 2018

LIST OF MINERAL CONCESSIONS

The following mineral concessions were held as at the end of the quarter and currently:

Apurimac Iron Ore Project (Peru) (Strike – 100%)

Name Concession Area(Ha) Province Code Title File No
(1) Opaban I 999 Andahuaylas 5006349X01 No 8625-94/RPM Dec 16, 1994 20001465
(2) Opaban III 990 Andahuaylas 5006351X01 No 8623-94/RPM Dec 16, 1994 20001464
(3) Ferrum 1 965 Andahuaylas 010298304 No 00228-2005-INACC/J Jan 19, 2005 11053798
(4) Ferrum 4 1,000 Andahuaylas/Aymaraes 010298604 No 00230-2005-INACC/J Jan 19, 2005 11053810
(5) Ferrum 8 900 Andahuaylas 010299004 No 00232-2005-INACC/J Jan 19, 2005 11053827
(6) Cristoforo 22 379 Andahuaylas 010165602 RP2849-2007-INGEMMET/PCD/PM Dec 13, 2007 11067786
(7) Ferrum 31 327 Andahuaylas 010552807 RP 1266-2008-INGEMMET/PCD/PM May 12, 2008 11076509
(8) Ferrum 37 695 Andahuaylas 010621507 RP 1164-2008-INGEMMET/PCD/PM May 12, 2008 11076534
(9) Wanka 01 100 Andahuaylas 010208110 RP 3445-2010-INGEMMET/PCD/PM Oct 18,2010 11102187
(10) Sillaccassa 1 700 Andahuaylas 010212508 RP 5088-2008-INGEMMET/PCD/PM Nov 19, 2008 11084877
(11) Sillaccassa 2 400 Andahuaylas 010212608 RP 3183-2008-INGEMMET/PCD/PM Sept 8, 2008 11081449

Cusco Iron Ore Project (Peru) (Strike – 100%)

Area
(Ha) Province Code Title File No.
907 Chumbivilcas 05006521X01 No 7078-95-RPM Dec 29, 1995 20001742
1,000 Chumbivilcas 05006522X01 No 0686-95-RPM Mar 31, 1995 20001743
1,000 Chumbivilcas 05006524X01 No 7886-94/RPM Nov 25, 1994 20001746

Pilbara Tenements (Western Australia) (Strike – 100%)

Tenement No Status Grant Date Expiry Date Area (blocks/Ha) Area (km²)
EL 45/4799 Granted 4/7/2017 3/7/2022 26 blocks ~83
EL 45/4800 Granted 10/8/2017 9/8/2022 70 blocks ~225

Paulsens East Tenement (Western Australia) (Strike – 100%)

Tenement No. Status Grant Date Expiry Date Area (blocks/Ha) Area (km²)
Retention Licence RL 47/7 Granted 4/12/2014 4/12/2019 ~381 Ha ~3.81

Burke Graphite Project (Queensland) (Strike – ~70%)

Tenement No Status Grant Date Expiry Date Area (blocks/Ha) Area (km²)
Burke EPM 25443 Granted 4/9/2014 3/9/2019 5 sub-blocks ~16
Corella EPM 25696 Granted 2/4/2015 1/4/2020 11 sub-blocks ~36

JORC MINERAL RESOURCES

The following JORC Code compliant (2004 and 2012) Mineral Resources estimates are as at the end of the quarter and currently:

Apurimac Iron Ore Project (Peru) (Strike – 100%)

The Apurimac Project has a JORC Code (2012 Edition) compliant Mineral Resource of 269.4 Mt, consisting of:

  • a 142.2 Mt Indicated Mineral Resource at 57.8% Fe; and
  • a 127.2 Mt Inferred Mineral Resource at 56.7% Fe.
Category Concession Density t/m3 Mt Fe% SiO2% Al2O3% P% S%
Indicated Opaban 1 4 133.71 57.57 9.46 2.54 0.04 0.12
Indicated Opaban 3 4 8.53 62.08 4.58 1.37 0.07 0.25
Inferred Opaban 1 4 127.19 56.7 9.66 2.7 0.04 0.2
Total Indicated and Inferred 269.4 57.3 9.4 2.56 0.04 0.16

The information in this JORC Resource table was prepared and first disclosed under the 2004 JORC Code (in Strike's ASX announcement dated 11 February 2010: Peruvian Apurimac Iron Ore Project Resource Increased to 269 Million Tonnes) and has subsequently been upgraded to comply with the 2012 JORC Code and disclosed in Strike's ASX Announcement dated 19 January 2015: Apurimac Mineral Resources Updated to JORC 2012 Standard.

Cusco Iron Ore Project (Peru) (Strike – 100%)

The Cusco Project has a JORC Code (2004 Edition) compliant Mineral Resource of 104.4 Mt Inferred Mineral Resource at 32.62% Fe.

Category Concession Density t/m3 Mt Fe% SiO2% Al2O3% P% S%
Inferred Santo Tomas 4 104.4 32.62 0.53 3.19 0.035 0.53

The information in this JORC Resource table was prepared and first disclosed under the 2004 JORC Code (in Strike's ASX announcement dated 17 June 2011: Cusco Project – Resource Estimate). It has not been updated since to comply with the 2012 JORC Code on the basis that the information has not materially changed since it was last reported.

Burke Graphite Project (Australia) (Strike – 100%)

The Burke Graphite Project has a JORC Code (2012 Edition) compliant Mineral Resources Estimate (MRE).

Category Weathering State Mt TGC (%) Contained Graphite (Mt) Density (t/m)
Oxide 0.5 14.0 0.1 2.5
Inferred Fresh 5.8 16.2 0.9 2.4
Inferred Total Oxide + Fresh 6.3 16.0 1.0 2.4

Note: The Mineral Resource was estimated within constraining wireframe solids defined above a nominal 5% TGC cut-off. The Mineral Resource is reported from all blocks within these wireframe solids. Differences may occur due to rounding.

Refer also Grade Tonnage Data in Table 2 of CSA Global Pty Ltd's Burke Graphite Project MRE Technical Summary dated 9 November 2017 (attached as Annexure A of Strike's ASX Announcement dated 13 November 2017: Maiden Mineral Resource Estimate Confirms Burke Project as One of the World's Highest Grade Natural Graphite Deposits).

Quarterly Report for period ended 30 September 2018

JORC CODE COMPETENT PERSON'S STATEMENTS

JORC Code (2012) Competent Person Statement - Apurimac Project Mineral Resources

The information in this document that relates to Mineral Resources in relation to the Apurimac Iron Ore Project (Peru) is extracted from the following ASX market announcement made by the Strike Resources Limited on:

19 January 2015: Apurimac Mineral Resources Updated to JORC 2012 Standard

The information in the original announcement that relates to Mineral Resources and other Exploration Results (as applicable) in relation to the Apurimac Iron Ore Project (Peru) is based on, and fairly represents, information and supporting documentation prepared by Mr Ken Hellsten, B.Sc. (Geology), who is a Fellow of The Australasian Institute of Mining and Metallurgy (AusIMM). Mr Hellsten was a principal consultant to Strike Resources Limited and was also formerly the Managing Director of Strike Resources Limited (between 24 March 2010 and 19 January 2013). Mr Hellsten has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the "Australasian Code for Reporting of Mineral Resources and Ore Reserves" (JORC Code). The Company confirms that it is not aware of any new information or data that materially affects the information included in the original market announcement. The Company confirms that the form and context in which the Competent Person's findings are presented have not been materially modified from the original market announcement.

JORC Code (2004) Competent Person Statement – Cusco Project Mineral Resources

The information in this document that relates to Mineral Resources and other Exploration Results (as applicable) in relation to the Cusco Iron Ore Project (Peru) is based on, and fairly represents, information and supporting documentation prepared by Mr Ken Hellsten, B.Sc. (Geology), who is a Fellow of The Australasian Institute of Mining and Metallurgy (AusIMM). Mr Hellsten was a principal consultant to Strike Resources Limited and was also formerly the Managing Director of Strike Resources Limited (between 24 March 2010 and 19 January 2013). Mr Hellsten has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the JORC Code. Mr Hellsten approves and consents to the inclusion in this document of the matters based on this information in the form and context in which it appears.

JORC Code (2012) Competent Person Statement - Burke Graphite Project Mineral Resources

The information in this announcement that relates to Mineral Resources is extracted from the following ASX market announcement made by the Strike Resources Limited on:

13 November 2017: Maiden Mineral Resource Estimate Confirms Burke Project as One of the World's Highest Grade Natural Graphite Deposits

The information in the original announcement (including the CSA Global MRE Technical Summary in Annexure A) that relates to in-situ Mineral Resources for the Burke Graphite Project is based on information compiled by Mr Grant Louw under the direction and supervision of Dr Andrew Scogings, who are both fulltime employees of CSA Global Pty Ltd. Dr Scogings takes overall responsibility for this information. Dr Scogings is a Member of the Australian Institute of Geoscientists (AIG) and the Australasian Institute of Mining and Metallurgy (AusIMM) and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the "Australasian Code for Reporting of Mineral Resources and Ore Reserves" (JORC Code). The Company confirms that it is not aware of any new information or data that materially affects the information included in the original market announcement. The Company confirms that the form and context in which the Competent Person's findings are presented have not been materially modified from the original market announcement.

The information in this announcement that relates to metallurgical test work is extracted from the following ASX market announcements made by the Strike Resources Limited on:

The information in the original announcements that relates to metallurgical test work is based on, and fairly represents, information and supporting documentation prepared by Mr Peter Adamini, BSc (Mineral Science and Chemistry), who is a Member of The Australasian Institute of Mining and Metallurgy (AusIMM). Mr Adamini is a full-time employee of Independent Metallurgical Operations Pty Ltd, who has been engaged by Strike Resources Limited to provide metallurgical consulting services. The Company confirms that it is not aware of any new information or data that materially affects the information included in the original market announcements. The Company confirms that the form and context in which the Competent Person's findings are presented have not been materially modified from the original market announcements.

The information in this announcement that relates to Exploration Results in relation to the ground Electro-Magnetic (EM) survey and other Exploration Results is extracted from the following ASX market announcements made by the Strike Resources Limited on:

The information in the original announcements that relates to Exploration Results in relation to the ground Electro-Magnetic (EM) survey and other Exploration Results is based on, and fairly represents, information and supporting documentation prepared by Mr Peter Smith, BSc (Geophysics) (Sydney) AIG ASEG, who is a Member of The Australasian Institute of Geoscientists (AIG). Mr Smith is a consultant to Strike Resources Limited. Mr Smith has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the "Australasian Code for Reporting of Mineral Resources and Ore Reserves" (JORC Code). The Company confirms that it is not aware of any new information or data that materially affects the information included in the original market announcements. The Company confirms that the form and context in which the Competent Person's findings are presented have not been materially modified from the original market announcements.

The Strike ASX market announcements referred to above may be viewed and downloaded from the Company's website: www.strikeresources.com.au or the ASX website: www.asx.com.au under ASX code "SRK".

FORWARD LOOKING STATEMENTS

This document contains "forward-looking statements" and "forward-looking information", including statements and forecasts which include without limitation, expectations regarding future performance, costs, production levels or rates, mineral reserves and resources, the financial position of Strike, industry growth and other trend projections. Often, but not always, forward-looking information can be identified by the use of words such as "plans", "expects", "is expected", "is expecting", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates", or "believes", or variations (including negative variations) of such words and phrases, or state that certain actions, events or results "may", "could", "would", "might", or "will" be taken, occur or be achieved. Such information is based on assumptions and judgements of management regarding future events and results. The purpose of forward-looking information is to provide the audience with information about management's expectations and plans. Readers are cautioned that forward-looking information involves known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of Strike and/or its subsidiaries to be materially different from any future results, performance or achievements expressed or implied by the forward-looking information. Such factors include, among others, changes in market conditions, future prices of minerals/commodities, the actual results of current production, development and/or exploration activities, changes in project parameters as plans continue to be refined, variations in grade or recovery rates, plant and/or equipment failure and the possibility of cost overruns.

+Rule 5.5

Appendix 5B

Mining Exploration Entity and Oil and Gas Exploration Entity Quarterly Report

Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/13, 01/09/16

Name of entity

STRIKE RESOURCES LIMITED AND ITS CONTROLLED ENTITIES

ABN

94 088 488 724

Quarter Ended (current quarter)

94 088 488 724 30 September 2018
Consolidated statement of cash flows Current QuarterSep-2018$A' 000 Year to Date3 months$A' 000
1. Cash flows from operating activities
1.1 Receipts from customers - -
1.2 Payments for(a) exploration & evaluation(b) development(c) production(d) staff costs(e) administration and corporate costs (43)--(108)(124) (43)--(108)(124)
1.31.41.51.61.71.8 Dividends received (see note 3)Interest receivedInterest and other costs of finance paidIncome taxes paidResearch and development refundsOther (provide details if material) 3021--114- 3021--114-
1.9 Net cash from / (used in) operating activities (110) (110)
Current Quarter Year to Date
Consolidated statement of cash flows Sep-2018 3 months
$A' 000 $A' 000
2. Cash flows from investing activities
2.1 Payments to acquire:
(a)property, plant and equipment - -
(b)tenements (see item 10) - -
(c)investments (1,080) (1,080)
(d)other non-current assets - -
2.2 Proceeds from the disposal of:
(a)property, plant and equipment - -
(b)tenements (see item 10) - -
(c)investments 867 867
(d)other non-current assets - -
2.3 Cash flows from loans to other entities - -
2.4 Dividends received (see note 3) - -
2.5 Other (provide details if material) - -
2.6 Net cash from / (used in) investing activities (214) (214)
3. Cash flows from financing activities
3.1 Proceeds from issues of shares - -
3.2 Proceeds from issue of convertible notes - -
3.3 Proceeds from exercise of share options - -
3.4 Transaction costs related to issues of shares, convertible notes oroptions - -
3.5 Proceeds from borrowings - -
3.6 Repayment of borrowings - -
3.7 Transaction costs related to loans and borrowings - -
3.8 Dividends paid - -
3.9 Other (provide details if material) - -
3.10 Net cash from / (used in) financing activities - -
4. Net increase / (decrease) in cash and cash equivalents forthe period
4.1 Cash and cash equivalents at beginning of period 2,368 2,368
4.2 Net cash from / (used in) operating activities (item 1.9 above) (110) (110)
4.3 Net cash from / (used in) investing activities (item 2.6 above) (214) (214)
4.4 Net cash from / (used in) financing activities (item 3.10 above) - -
4.5 Effect of movement in exchange rates on cash held - -
4.6 Cash and cash equivalents at end of period 2,044 2,044
5. Reconciliation of cash and cash equivalentsat the end of the quarter (as shown in the consolidated statement ofcash flows) to the related items in the accounts CurrentQuarter$A' 000 PreviousQuarter$A' 000
5.1 Bank balances 1,019 343
5.2 Call deposits 1,025 2,025
5.3 Bank overdrafts - -
5.4 Other (provide details) - -
5.5 Cash and cash equivalents at end of quarter (shouldequal item 4.6 above) 2,044 2,368
6. Payments to directors of the entity and their associates Current Quarter$A' 000
6.1 Aggregate amount of payments to these parties included in item 1.2 108
6.2 Aggregate amount of cash flow from loans to these parties included in item 2.3 -

6.3 Include below any explanation necessary to understand the transactions included in items 6.1 and 6.2 6.1 includes directors' fees, salaries and superannuation for Executive and Non-Executive Directors

7. Payments to related entities of the entity and their associates Current Quarter$A' 000
7.1 Aggregate amount of payments to these parties included in item 1.2 -
7.2 Aggregate amount of cash flow from loans to these parties included in item 2.3 -

7.3 Include below any explanation necessary to understand the transactions included in items 7.1 and 7.2

Nil

8. Financing facilities availableAdd notes as necessary for an understanding of the position Total facility amountat quarter end$A' 000 Amount drawnat quarter end$A' 000
8.1 Loan facilities - -
8.2 Credit standby arrangements - -
8.3 Other (please specify) - -

8.4 Include below a description of each facility above, including the lender, interest rate and whether it is secured or unsecured. If any additional facilities have been entered into or are proposed to be entered into after quarter end, include details of those facilities as well.

Nil

9. Estimated cash outflows for next quarter
$A' 000
9.1 Exploration and evaluation 50
9.2 Development -
9.3 Production -
9.4 Staff costs 141
9.5 Administration and corporate costs 90
9.6 Other (provide details if material) -
9.7 Total estimated cash outflows 281
10. Changes in tenements(items 2.1(b) and 2.2(b)above) Tenementreference andlocation Nature ofinterest Interest at beginningof quarter Interest at end ofquarter
10.1 Interests in mining tenementsand petroleum tenementslapsed, relinquished orreduced Refer Quarterly Activities Report
10.2 Interests in mining tenementsand petroleum tenementsacquired or increased Refer Quarterly Activities Report

Compliance statement

    1. This statement has been prepared in accordance with accounting standards and policies which comply with Listing Rule 19.11A.
    1. This statement gives a true and fair view of the matters disclosed.

William Johnson Managing Director

31 October 2018

See Chapter 19 of ASX Listing Rules for defined terms

Notes

1. The Company and its controlled entities currently holds the following listed share investments:

30-Sep-18
Company No Shares Last Bid Price Market Value
BHP Billiton Limited (ASX:BHP) 15,000 $34.60 $519,000
Woodside Petroleum Limited (ASX:WPL) 7,500 $38.55 $289,125
South32 Limited (ASX:S32) 130,000 $3.91 $508,300
Mineral Resources Limited (ASX:MIN) 15,000 $15.80 $237,000
Viva Energy Group Limited (ASX:VEA) 100,000 $2.27 $227,000
Regis Resources Limited (ASX:RRL) 60,000 $3.72 $223,200
Galileo Mining Limited (ASX:GAL) 250,000 $0.22 $55,000
Other listed shares various various $8,160
$2,066,785

The above investments are regarded as liquid assets to supplement the Company's cash reserves.

    1. The quarterly report provides a basis for informing the market how the entity's activities have been financed for the past quarter and the effect on its cash position. An entity that wishes to disclose additional information is encouraged to do so, in a note or notes included in or attached to this report.
    1. If this quarterly report has been prepared in accordance with Australian Accounting Standards, the definitions in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash Flows apply to this report. If this quarterly report has been prepared in accordance with other accounting standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report.
    1. Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities, depending on the accounting policy of the entity.