Clarification of In Situ Value Estimate
The Company refers to its market announcement released earlier today where it provided a JORC Inferred Resource estimate of 172 million tonnes (grading 62.28% Fe) for its Apurimac Project area and where it was stated:
- Based upon an iron ore price of approximately A$55 per tonne, the in situ value of 172 million tonnes of iron ore at this grade is approximately equal to A$9.5 Billion
The Company notes that:
-
(1) The quoted in ground value does not take into account further evaluation and test work that will be undertaken to determine the economic recoverability of the mineral resource;
-
(2) Pre-feasibility studies in relation to:
-
(a) ore body modelling and preliminary mine production;
-
(b) flow sheet design, plant engineering and mineralogy;
-
(c) transportation;
-
(d) port infrastructure,
-
are expected to commence shortly with full engineering/project feasibility studies to follow thereafter; pending completion of such studies, the final costs of mining, processing and transportation and port infrastructure development is yet to be established.
For further information:
Shanker Madan Managing Director T | (08) 9214 9700 E | [email protected]
==> picture [51 x 50] intentionally omitted <==
STRIKE RESOURCES LIMITED
A.B.N. 94 088 488 724
Level 14, 221 St Georges Terrace, Perth WA 6000 T | (08) 9214 9700 F | (08) 9322 1515
ASX Code: SRK