Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

STRIKE ENERGY LIMITED Capital/Financing Update 2012

Jul 1, 2012

65876_rns_2012-07-01_d74d8046-11d9-41bf-8c70-c1d744cd4669.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

==> picture [595 x 132] intentionally omitted <==

----- Start of picture text -----

Strike Energy Limited ABN 59 078 012 745 2 July 2012
----- End of picture text -----

==> picture [174 x 705] intentionally omitted <==

----- Start of picture text -----

OUR STRENGTHS
• Quality Assets
• Experienced Team
• Major Growth Potential
Strike Energy Limited
Ground Floor, 10 Ord Street
West Perth WA 6005
T: 61 8 6103 0999
F: 61 8 6103 0990
E: [email protected]
www.strikeenergy.com.au
----- End of picture text -----

The Company Announcement Officer ASX Ltd

via electronic lodgement

EAGLE FORD SHALE UPDATE

Strike Energy is pleased to advise that the Bigham 1H production test well is drilling ahead at 11,478 feet (3,498 metres) as at 1 July 2012. The well is being drilled to a total vertical depth of 12,200 feet (~3,700 metres) prior to drilling a 5,000 foot (~1,500 metre) horizontal section.

Production results from the Bigham 1H well will be an important milestone in the confirmation of the productivity and value of the Eagle Ford Shale within Strike’s lease area.

Yours faithfully

==> picture [141 x 40] intentionally omitted <==

DAVID WRENCH Managing Director

Further information:

Strike Energy Limited

David Wrench – Managing Director T: +61 2 8261 1000