Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

STREAMPLAY STUDIO LIMITED Investor Presentation 2010

Sep 2, 2010

65841_rns_2010-09-02_eac9e36b-5259-4ac2-b7f5-9bdee3ff80ac.pdf

Investor Presentation

Open in viewer

Opens in your device viewer

Stockbroker PresentationDocument

Synergy of projects in Australia, Egypt, Eritrea

ASX ‐ "GIP"FSE – "GIX"

StockbrokerPresentations ‐ September 2010

Company Directors & Management

IanGandel, Non‐Executive Chairman LLB, BEc, FCPA, FAICD

  • Highly successful businessman with extensive experience in retail management and retail property
  • Involvedin resource industry sine 1994
  • Substantial holdings in a number of ASX resource companies

Robert John(Jack) Telford, Executive Director & Chief Executive Officer A.W.A.I.T (Chem) M.R.A.C.I

  • More than35 years senior management experience in technology related companies including;
  • 15years as CEO in complex inorganic and organic chemical manufacturing business; and
  • 17years direct international resource involvement with private & public companies at the CEO level.
  • Past Chairmanand major shareholder of Inovax Ltd.

JonStarink, Executive Director BSc (Hons), BChemE(Hons), MAppISc, FIEAust, MRAC1, MTMS, CPEng, CChem

  • More than30 years experience in the mining industry as Executive and Non‐Executive Director.
  • Engineering design and project management; mining exploration management; science and engineering research & development and process innovation..

JohnDamian Kenny, Non‐executive Director B Com (Hons), LLB

  • More than25 years experience in the natural resource industry.
  • Acorporate and resources lawyer, with a specialised interest in venture capital, initial public offerings and mergers and acquisitions.
  • Extensiveexperience in public equity fundraisings and the pricing of equity, debt and derivative securities.

JohnStuart Ferguson Dunlop, Non‐Exec Director BE, MEng Sc, P Cert Arb, CP, FAusIMM, FIMMM, M SME, MCIMM, MMICA

  • 35years of international surface and underground mining experience.
  • Mining engineer having involvement from design, construction, and on‐going production of a number of major resource projects. Was previously senior executive with BHP's (now BHP Billiton) Minerals Division, before becoming General Manager for Aztec Mining Co (taken over by Normandy Mining Ltd).

Dr JohnMorrison Chisholm, Chief Geologist BSc (Hons), Phd, FAusIMM, F.AIG

  • Geologist with wide experience in exploration geology and exploration management.
  • Workedwith various international mining companies.
  • Fellow of Australian Institute of Geoscientists, Fellow of the Australasian Institute of Mining and Metallurgy with Chartered Practising status in Geology.

Projects

Egypt

Abu Dabbab & Nuweibi – Tantalum, Tin, Feldspar WadiAllaqi – Copper, Nickel, Gold

Eritrea

Adobha exploration results encouraging on 3 x 100km2 PLs Granting of 2,100km2 EL and 3 x 100km2 PLs

Australia

Heemskirk Tasmanian – Tin Indicated and Inferred 7.3Mt at 0.69% Sn Drilling programme in progress August‐September 2010

Project Locations in Nubian‐Arabian Shield

Project Locations - Egypt

CORE ASSET – AbuDabbab – Tantalum, Tin, Feldspar

AbuDabbab ‐ Tenure

  • Located 16 km north of Company's 98 Mt Nuweibi tantalum deposit
  • Tenement 20 km2 area
  • Licence tenure of 30 years with option to extend 30 years
  • Operates in specifically granted Free Trade Zone

Abu Dabbab Resources&Reserves (JORC)

Resources

ldiTPttanamenoeux ()i%Tn
dMeasreu /@15.2M290ttg 0.143
ddIitncae /17.3M@250ttg 0.078
fdInerre /@12.0M200ttg 0.03
lTtoa /44.5M@250ttg 0.09

OreReserves (included in Resources)

ldiTPttanaumenoxe ()i%Tn
Proven /[email protected] 0.331
bblProae /[email protected] 0.084
lTtoa /30.24M@255ttg 0.109

Abu Dabbab Tantalum Deposit

Cross Sectionthrough: Abu Dabbab Tantalum‐Tin Deposit

AbuDabbab open pit strip ratio 0.83 : 1.0

BankableFeasibility Study complete:

Mill feed rate of 2Mtpa

Tantalum production (as Ta 2O5) >650,000 lb/year

Tin production of 1,530 tpa

Feldspar production >1.5 Mtpa*

* Stage 2of development

CORE ASSET - Nuweibi Tantalum Deposit

Nuweibi – Tenure &Resources

  • Located 16 km south of Abu Dabbab
  • Tenement 10 km2 area
  • Resource open to the east, to the west and at depth
  • Licence tenure of 30 years with option to extend 30 years

Resources (JORC)

lidTPttanamenoeux
didItncae /@48M147ttg
fdInerre /0@1385Mttg
lTtoa /98@3M14ttg

Cross Section through: Nuweibi Tantalum Deposit

GIPPSLAND LIMITED

Feldspar Production

  • Use – ceramic tile production
  • Potential for 1.5 Mtpa ceramic grade feldspar production
  • Highly successful feldspar testwork completed in Italian ceramic tile plants
  • Sale of 80% of material mined ‐ 20% waste only!
  • Substantial potential feldspar revenue

Feldspar and Ceramic Tile Comparison

Abu Dabbab &Nuweibi Project Summary

  • World scale assets
  • Total resource 142.5 million tonnes
  • 2 Mtpa Abu Dabbab BFS completed
  • Anticipated to be the World's largest tantalum producer
  • Environmental permitting completed to World Bank standards
  • Substantial additional revenue potential from feldspar
  • Significant scope for increased production
  • Total Project mine life > 50 years

Eritrea– Gold, VMS targets

Eritrea– Multiple gold and VMS targets

Eritrea– High Priority Targets

Anomaly E26

  • Widespread copper mineralisation in bedrock with values up to 10.63% Cu
  • Large area of discontinuous copper mineralisation (390m x 520m)
  • Mineralisation open to the east and north
  • Copper bearing samples analysed up to 1.15 g/t Au

Anomaly E21

  • Copper mineralisation identified over 1.7 km strike length
  • High lead values (up to 0.97%) indicate favourable lithology for VMS deposits

Heemskirk Tasmania - Tin

GIPPSLAND LIMITED

HeemskirkDrilling August September '10

Drilling Highlights

  • Near surface Queen Hill deposit confirmed continuity of high grade tin over potentially mineable widths.
  • Best results include 21 m @ 0.8% tin from 86m, including 3m @ 1.9% tin.
  • High grade mineralization extends further west.
  • Mineralization is in the form of cassiterite.

FourHigh Potential Projects

Egypt Abu Dabbab tantalum, tin, feldspar

Egypt Wadi Allaqi gold, copper, nickel

Eritrea gold, copper ‐ VMS

Tasmaina tin

Competent Person Statement

In accordance with Listing Rule 5.6 of the Australian Stock Exchange Limited, the geological information in this report that relates to Exploration Results, Mineral Resources and Ore Reserves is based on data compiled by Dr John Chisholm, a Fellow of The Australasian Institute of Mining and Metallurgy. Dr Chisholm has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Dr Chisholm consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.