12 November 2009
TANTALUM PROJECT CONFERENCE LEAFLET
The Directors of Gippsland Limited [ASX: GIP, DB: GIX] advise that the following leaflet relating to the Company's Abu Dabbab - Nuweibi Tantalum Project will be distributed at upcoming national and international resource industry conferences.
RJ (Jack) Telford Director, Chief Executive Officer
For further information, please contact:
Jack Telford Gippsland Limited Tel: +61 8 9340 6000 Email: [email protected] Web: www.gippslandltd.com

Abu Dabbab – Nuweibi Tantalum Project Non-conflict tantalum for several decades
| Location: | Red Sea Coast –Egypt | |||
|---|---|---|---|---|
| Resources: | Abu Dabbab*44.5 million tonnes -Nuweibi*98 million tonnes - | |||
| TotalResource: | 142.5 million tonnes* | |||
| Ore Reserves: | million tonnes*30.24 | |||
| Production: | Based upon an initial mill feed of 2 million tonnes per year | |||
| Tantalum (Ta2O5) | 650,000 pounds per year | World's largest tantalum miner | ||
| Tinmetal | 1,530 tonnesper year | Significant additional revenue | ||
| Feldspar | 1.5 million tonnes per year | Significant additional revenue | ||
| Process waste | 0.5 million tonnesper year | 80% of all ore mined to be sold |
Gippsland Limited is an Australian based company listed on the Australian Stock Exchange (ASX: GIP), and also trades of the Frankfurt Deutsche Börse (DB: GIX). Through its subsidiary Tantalum Egypt JSC, it holds a controlling interest in the Abu Dabbab and Nuweibi tantalum-tin-feldspar projects via 30 year Mining Licences which can be extended for a further 30 years.
The 44.5 million tonne Abu Dabbab project is forecast to become the world's largest tantalum mine with an expected mine life in excess of 20 years. The nearby 98 million tonne Nuweibi deposit will extend this project life significantly.
The Abu Dabbab project is exceptional in that approximately 80% of all ore mined is expected to be sold, either in the form of tantalum, tin metal or feldspar. The contribution of by-products to revenue is expected to ensure the project sets a new global standard for low net cash cost of production for its tantalum products. Shipment of the Abu Dabbab tantalum product will not be constrained by IMO Class 7 (Radioactivity) regulations.
Gippsland Directors consider the Abu Dabbab project to be the world's most advanced new tantalum project, which is unique as it has the JORC Code compliant Resource base to sustain long-term, low-cost, non-conflict tantalum production for several decades.

| Table 1:Abu Dabbab Mineral Resources (100g/t Ta2O5cut-off) | |||||
|---|---|---|---|---|---|
| Category | Million Tonnes | Ta2O5(g/t) | Sn (%) | ||
| Measured Resource | 15.2 | 290 | 0.143% | ||
| Indicated Resource | 17.3 | 250 | 0.078% | ||
| Inferred Resource | 12 | 200 | 0.03% | ||
| Total Resource | 44.5 | 250 | 0.09% | ||
| Table 2:Abu Dabbab Ore Reserves(100g/t Ta2O5cut-off) | |||||
| Category | Million tonnes | Ta2O5(g/t) | Sn (%) | ||
| Proved Ore Reserve | 15.20 | 260 | 0.133 | ||
| Probable Ore Reserve | 15.04 | 250 | 0.084 | ||
| Total Proved & Probable Ore Reserve | 30.24 | 255 | 0.109 | ||
| Table 3:Nuweibi Mineral Resources (100g/t Ta2O5cut-off) | |||||
| Category | Million Tonnes | Ta2O5(g/t) | Nb2O5(g/t) | ||
| Indicated Resource | 48 | 147 | 90 | ||
| Inferred Resource | 50 | 138 | 95 | ||
| Total Resource | 98 | 143 | 93 |
* Abu Dabbab & Nuweibi JORC Compliant Mineral Resources and Ore Reserves as at 01-09-2008
NB: Numbers in Tables 1, 2 & 3 may not correlate exactly due to rounding. In accordance with Listing Rule 5.6 of the Australian Stock Exchange Limited, the geological information in this report that relates to Exploration Results, Mineral Resources and Ore Reserves is based on data compiled by Dr John Chisholm, a Fellow of The Australasian Institute of Mining and Metallurgy. Dr Chisholm has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves". Dr Chisholm consents to the inclusion in the report of the matters based on his information in the form and contest in which it appears.
Typical Mineral Resources Project Development Timetable
| Year | Milestone | Abu Dabbab Status | Make your own tantalum projectdevelopment timetable comparison |
|---|---|---|---|
| 1 | Project acquisition, tenement approvals | Completed | |
| 1 | Geological studies, mapping | Completed | |
| 2 | Initial geological exploration | Completed | |
| 3 | Drilling programme | Completed | |
| 3 | Inferred Mineral Resources | Completed62.0 Mt | |
| 4 | Scoping Study | Completed | |
| 4 | Drilling Programme | Completed | |
| 4 | Indicated Mineral Resources | Completed65.3 Mt | |
| 5 | Drilling Programme | Completed | |
| 5 | Measured Mineral Resources | Completed15.2 Mt | |
| 5 | Pre-Feasibility Study | Completed | |
| 7 | Detailed Metallurgical Studies | Completed | |
| 8 | Definitive Feasibility Study | Completed | |
| 8 | Proven & Probable Ore Reserves | Completed30.24 Mt | |
| 8 | Environmental Impact Assessment (EIA) | Completed | |
| 9 | Project Finance | In progress | |
| 9 | Detailed engineering design | Scheduled 2010 | |
| 10 | Construction | Scheduled 2010 | |
| 11 | CommissioningScheduled 2012 |
For further information, please refer to:
| Jack Telford | Cellphone: +61 418 911 928 | |
|---|---|---|
| Director, CEO | E-mail: | [email protected] |
| Gippsland Limited | Website: | www.gippslandltd.com |