Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

ST GEORGE MINING LIMITED Capital/Financing Update 2018

Dec 19, 2018

65782_rns_2018-12-19_66d14284-e77d-4cdf-bfa6-25c1e828663e.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

ASX / MEDIA RELEASE

==> picture [107 x 49] intentionally omitted <==

20 December 2018

STRONG RESULTS CONTINUE AT MT ALEXANDER

HIGHLIGHTS:

  • Extensional drilling expands the footprint of mineralisation:

  • A further five drill holes have been completed at the Cathedrals Belt with all intersecting massive sulphide mineralisation or prospective ultramafics

  • Drilling has expanded the known zones of mineralisation at Investigators and Stricklands

  • Mineralisation remains open in all directions

  • Downhole EM (DHEM) surveys identify strong conductors for drill testing:

  • DHEM surveys on recently completed drill holes are continuing

  • Interim results indicate strong off-hole conductors for follow-up drill testing

  • Very strong conductor identified along strike of the massive sulphides in MAD126 and MAD127 – conductor MAD124: X1 with modelled conductivity of 153,000 Siemens

  • Assays Confirm High-Grade PGEs:

  • Final assays for MAD126 and MAD127 confirm thick high-grade PGEs:

    • MAD126 – 5.25m @ 3.10g/t total PGEs (Pd, 2.52g/t; Pt, 0.58g/t) from 184m

    • MAD127 – 8.49m @ 3.61g/t total PGEs (Pd, 2.96g/t; Pt, 0.65g/t) from 183.9m

  • Over 80% of the PGEs are palladium which is currently trading at an all-time high market price

Emerging Western Australian nickel company St George Mining Limited (ASX: SGQ ) (“ St George ” or “ the Company ”) is pleased to announce further outstanding exploration results at the Mt Alexander Project, located near Leonora in the north Eastern Goldfields.

Further drilling has been completed at the Investigators and Stricklands Prospects located within the 4.5km stretch of the Cathedrals Belt where high-grade nickel-copper sulphide discoveries have been made by St George.

All five drill holes completed since our previous exploration update have intersected massive sulphide mineralisation or prospective ultramafics, confirming extensions to the known zones of mineralisation – see below for further details. The high-grade sulphide mineral system remains open in all directions.

DHEM surveys are continuing on the completed drill holes and have already identified strong off-hole EM responses which remain untested by drilling. Of particular encouragement is a very strong off-hole conductor identified from the DHEM survey in MAD124.

The conductor, MAD124: X1, is located up-dip from the massive sulphides in MAD126 and MAD127. It is modelled with conductivity of 153,000 Siemens and is consistent with a massive sulphide source. MAD124: X1 is an extension of the complex, multiple strong conductors on the MAD111 Line, and has been prioritised for drill testing early in 2019.

Further results from the DHEM surveys are expected shortly.

1

ASX / MEDIA RELEASE

==> picture [119 x 55] intentionally omitted <==

Assays for Platinum Group Elements (PGEs) have now been received for MAD126 and MAD127, the best ever intercepts at the Investigators Prospect. The assays confirm high-grade PGE values – see Table 1 below – which we expect will add substantial value to any potential economic mining operation.

Preliminary metallurgical testwork achieved PGE values in nickel concentrate of 13.5g/t, suggesting the potential for very high payabilities for PGE smelter credits – see our ASX Release of 20 October 2016 Strong Metallurgical and Exploration Results at Mt Alexander.

St George Mining Executive Chairman, John Prineas said:

“The latest drilling has continued to expand the envelope of nickel-copper sulphide mineralisation within the Cathedrals Belt.

“New zones of mineralisation have been identified in the northerly down-dip direction at both Investigators and Stricklands.

“Infill and extensional drilling along the east-west strike of the mineralised corridor has also identified further sulphide mineralisation, increasing the potential scale of the discoveries and giving confidence that ongoing drilling could identify additional nickel-copper massive sulphides.

“The DHEM surveys are providing outstanding new drill targets. With an enviable 100% success record of testing EM conductors in the Cathedrals Belt, we believe these new targets are associated with massive sulphide mineralisation and look forward to drill testing in early 2019.“

EXTENSIONAL DRILLING CONTINUES TO DELIVER SUCCESS

Drilling and DHEM surveys continue to be used concurrently to scope out the scale of the discoveries along the 4.5km stretch of the Cathedrals Belt that has been drilled to date.

Step-out drill holes were completed at both Investigators and Stricklands, and successfully identified further areas of the nickel-copper sulphide mineralisation. Details of these drill holes are summarised below.

MAD138:

MAD138 was completed to a downhole depth of 230m to test for an extension of the mineralised ultramafic approximately 60m east of MAD62 at Investigators.

The drill hole intersected mafic rocks between 137.05m to 140m and transitioned to an ultramafic unit between 140m to 141.97m. The remainder of the drill hole intersected mostly granites.

Nickel-copper sulphide mineralisation was observed in the ultramafic interval with disseminated and blebby sulphides increasing with depth. A 5cm thick band of massive sulphide occurs at the base of the ultramafic unit.

The results in MAD138 confirm the extension of the mineralised ultramafic to the east of the MAD112 Line at Investigators towards the Stricklands Prospect. The footprint of sulphide mineralisation remains open to the north and to the east of MAD138.

MAD139:

MAD139 was completed to a downhole depth of 201.2m to test for the DHEM conductor identified from MAD122 on the MAD60 Line at Investigators.

The target EM plate was modelled with conductivity of 14,000 Siemens, consistent with a massive sulphide source. The target was predicted to be intersected at 180m downhole.

2

ASX / MEDIA RELEASE

==> picture [119 x 55] intentionally omitted <==

The drill hole intersected thick mafic and ultramafic units with sulphide mineralisation as follows:

Interval MAD139 - Geological Logging
139.2m to
167.8m
Mafic unit with no sulphides observed
167.8m to
172.8m
Ultramafic with weak sulphide mineralisation
172.8m to Ultramafic with disseminated and blebby sulphides increasing with depth (1-
175.45m 5% sulphides); 3cm thick massive sulphides at basal contact

The style of mineralisation intersected by MAD139 does not fully explain the strong EM conductor for this target, suggesting potential for further sulphide mineralisation proximal to this hole.

A DHEM survey will be carried out in MAD139 this week to assist in determining the extent of the sulphide mineralisation around this hole.

MAD140:

MAD140 was completed to a downhole depth of 350.1m as a large step-out towards the north on the MAD62 Line at Investigators.

The mineralised ultramafic at Investigators is interpreted to dip towards the north at an angle of approximately 30 degrees, suggesting the potential for continuity of mineralisation at depth towards the north. Drilling along the MAD60, MAD111 and MAD112 Lines at Investigators has already identified additional massive sulphide mineralisation in the down dip direction.

MAD140 intersected sequences of broken ground – namely between 156.10m to 195m and 222.25m to 235.6m – suggesting the presence of a shear zone. A residual ultramafic/mafic unit was intersected between 234.9m to 235.6m. No sulphides were observed.

The presence of the shear zone in this area suggests that any proximal sulphide mineralisation may have undergone structural modification, and may occur on either side of the shear zone. A DHEM survey will be completed in MAD140 this week to investigate for any potential sulphide mineralisation around the drill hole.

The results in MAD140, together with the results in MAD138, confirm the extension of the mineralised ultramafic between the MAD111 and MAD112 lines – an area that includes the new MAD62 line – and opens up a significant area of potentially mineralised ultramafic.

MAD141:

MAD141 was completed to a downhole depth of 125m to test for an extension of the mineralised ultramafic approximately 70m to the east of the MAD112 Line at Investigators.

The drill hole intersected ultramafic rocks between 68.39m to 80.30m.

A 6m thick interval of sulphide mineralisation was observed between 74.30m to 80.30m that comprised 1-5% sulphides with a massive sulphide pentlandite veinlet (0.5cm) observed near the basal contact.

Significantly the results from MAD141 open the potential for further mineralisation in the eastern portion of Investigators and possibly towards Stricklands, some 330m to the east.

A DHEM survey will be completed in MAD141 this week to investigate for any further sulphide mineralisation proximal to the drill hole.

3

ASX / MEDIA RELEASE

==> picture [119 x 55] intentionally omitted <==

Figure 1 is a plan view map of Investigators set against SAMSON EM (electromagnetic) data.

The map highlights the successful drilling completed at Investigators across the very large conductive signature that spans the 1.5km east-west strike of the prospect area.

==> picture [483 x 380] intentionally omitted <==

Figure 1 - plan view of Investigators Prospect with drill hole collar locations over the large SAMSON total field EM anomalies (red/pink colours). SAMSON EM image is shown in Channel 18 (44ms). Step-out drilling (blue collars) is continuing to extend mineralisation in all directions.

MAD142:

MAD142 was completed to a downhole depth of 91.2m as an infill test at the eastern section of Stricklands.

The drill hole intersected predominately banded mafics with abundant disseminated sulphides (pyritepyrrhotite).

Ultramafics were intersected between a downhole depth of 53.60m and 59.04m, and contain what is interpreted to be disseminated magmatic nickel-copper sulphides.

4

ASX / MEDIA RELEASE

==> picture [119 x 55] intentionally omitted <==

Interval
MAD142 - Geological Logging
22.65m to
44.40m
Mafic with minor pyrite present towards the end of interval
44.40mto
53.60m
Mafic, potentially Proterozoic dyke. No sulphides observed
53.60m to
59.04m
Ultramafic with disseminated sulphides (<1%Ni)
59.04m to
62.27m
Mafic with coarse disseminated pyrite and pyrrhotite (5-10% sulphides)
62.27m to
63.35m
Mafic with coarse disseminated pyrite and pyrrhotite (10% sulphides)
63.35m to
64.55m
Granite, no sulphides observed
64.55m to
67.80m
Mafic with coarse disseminated pyrite and pyrrhotite (10% sulphides)

MAD143:

MAD143 was completed to a downhole depth of 100m to test down-dip from the thick interval of sulphide mineralisation intersected by MAD88 at Stricklands.

MAD88 intersected a total of 11.6m of nickel-copper sulphide mineralisation based on an aggregation of the following mineralised intervals which returned assays of:

  • 1.78m @ 0.36%Ni, 0.38%Cu, 0.02%Co and 0.59g/t total PGEs from 56m to 57.78m

  • 3.92m @ 2.10%Ni, 0.93%Cu, 0.09%Co and 2.09g/t total PGEs from 57.78m to 61.7m

  • 3.55m @ 0.51%Ni, 0.33%Cu, 0.03%Co and 0.77g/t total PGEs from 66m to 69.55m

  • 1.31m@ 3.59%Ni, 0.47%Cu, 0.18%Co and 2.26g/t total PGEs from 69.55m to 70.86m

  • 1.05m @ 0.63%Ni, 0.30%Cu, 0.04%Co and 0.47%g/t total PGEs from 72.25m to 73.3m

MAD143 successfully intersected sulphide mineralisation down plunge from the MAD88 significant intersection as summarised in the geological logging below:

Interval
MAD143 - Geological Logging
42.10m to
51.60m
Mafic with patchy disseminated pyrite
51.60m to
51.90m
Granite. No sulphides observed
51.90m to
62.78m
Ultramafic with disseminated sulphides (<1%Ni)
62.78m to
70.47m
Mafic, no sulphides, carbonate veinlets observed
70.47m to
74.22m
Ultramafic with coarse disseminated pyrite and pyrrhotite (5% sulphides) and
10cm thick semi-massive sulphides at 72.4m
74.22m to
74.49m
Granite, no sulphides observed
74.49m to
75.70m
Ultramafic, no sulphides observed
75.70m to
93.49m
Mafic with patchy pyrite sulphides

5

ASX / MEDIA RELEASE

==> picture [119 x 55] intentionally omitted <==

A DHEM survey will be completed in MAD143 this week to assist in determining if there is additional mineralisation around the drill hole.

The rock sequences encountered in MAD143 are similar to those in MAD142 which was drilled approximately 200m to the north-east, suggesting that there is a large area in the northern part of the Stricklands Prospect that is prospective for additional mineralisation and remains largely undrilled.

==> picture [483 x 381] intentionally omitted <==

Figure 2 – a plan view of the Stricklands Prospect showing multiple intersections of sulphide mineralisation and prospective ultramafic over a +400m strike. The map is set against SAMSON EM data in Channel 18 (44ms) and highlights the large SAMSON total field EM anomaly (white/red colours). Mineralisation remains open in all directions.

DRILL PROGRAMME

Table 1 contains laboratory assay results for MAD126 and MAD127 including the assays for PGEs and Au that were received this week.

Hole ID GDA94
East
GDA94
North
Dip Azi Depth
(m)
From
(m)
To (m) Width
(m)
Ni% Cu% Co% Total
**PGEsg/t **
Au
**g/t **
MAD126 231445 680517 -90 0 210 184 201.86 7.86 5.70 2.11 0.18 2.65 0.15
185 190.25 5.25 6.95 2.67 0.23 3.10 0.15
MAD127 231440 6806515 -90 0 205 183.9 192.39 8.49 5.78 2.64 0.18 3.61 0.19
Including 184.42 200.81 6.39 6.48 2.77 0.21 3.68 0.17

Table 1 – assays received for MAD126 and MAD127 at the Investigators Prospect

6

ASX / MEDIA RELEASE

==> picture [119 x 55] intentionally omitted <==

Table 2 contains details of the drill holes for the current programme at Mt Alexander, which has now concluded for 2018. Drillng will resume on or about 22 January 2019.

Based on the intersection angle of the drilling with the modelled ultramafic unit, downhole widths are interpreted to be close to true widths.

Nickel and copper values expressed as XRF readings are based on portable XRF analysis. They are preliminary in nature and a conclusive determination of the nickel, copper, cobalt and PGE values of the sulphide mineralisation will be confirmed when laboratory assays are available.

Average XRF readings in massive sulphide intervals are based on at least four readings per metre and are not length and density weighted. Metal content for intervals of disseminated sulphides are not accurately determined by portable XRF analysis and estimates for this style of mineralisation are based on geological logging.

Hole ID GDA94_51 East GDA94_51
North
Hole
Depth
(m)
Dip Azi Target
Depth
(m)
Target
MAD108 231218 6806453 250 -76 33 205 Test MAD98: X1
plate
MAD109 231422 6806421 160 -80 73 135 Test MAD100:X3
plate
MAD110 231422 6806421 170 -77 338 155 Test MAD100:X2
plate
MAD111 231482 6806487 210 -81 210 185 Test MAD100: X1
plate
MAD112 232000 6806555 140 -58 174 110 Test MAD101: X1
plate
MAD113 233696 6807050 200 -70 185 180 Test MAD102: X1
plate
MAD114 231218 6806453 250 -78 30 205 Test MAD108
plate
MAD115 230784 6806322 150 -68 290 110 Test west of $M in
MAD37/34
MAD116 231482 6806487 240 -76 315 190 Test MAD111:X1
plate
MAD117 232000 6806555 140 -60 180 110 Test MAD112 Plate
MAD118 231482 6806487 220 -78 301 190 Test MAD111:X1
plate
MAD119 231200 6806700 350 -75 180 280 Deep step-out
MAD60 Section
MAD120b 231450 6806570 240 -80 185 190 MAD111:X1 plate -
north dip extent
MAD121 231400 6806700 320 -75 180 260 Deep step-out
MAD111 Section
MAD122 231175 6806450 200 -75 180 160 Test 50 west of
MAD60 $M

7

ASX / MEDIA RELEASE

==> picture [119 x 55] intentionally omitted <==

MAD123 231482 6806488 220 -75 311 180 Test MAD116:X1
plate
MAD124 231483 6806486 220 -79 290 190 Test MAD116:X2
plate
MAD125 231447 6806570 210 -73 186 180 Test MAD120b:X1
plate
MAD126 6806517 210 -90 0 185 Test MAD120b:X1
plate
231445
MAD127 231440 6806515 210 -90 0 185 S-SW extension of
$M in MAD126
MAD128 6806505 200 -90 0 187 Up dip continuity
of $M in MAD126
231452
MAD129 231220 6806350 130 -75 180 90 Infill MAD38 to
MAD60 $M
MAD130 6806400 150 -75 180 90 West of MAD60
Line
231100
MAD131 231625 6806400 130 -75 180 120 Infill MAD31 and
MAD47 $M
MAD132 6806509 210 -90 0 190 10m SW extension
of $M in MAD127
231432
MAD133 231450 6806519 205 -90 0 185 20m SW extension
of $M in MAD127
MAD134 6806523 215 -90 0 190 NW extension of
$M in MAD127
231440
MAD135 231232 6806581 270 -85 180 240 MAD119:X1
conductor
MAD136 6806400 160 -90 0 145 NE extension of
MAD60 $M
231234
MAD137 231220 6806395 160 -90 0 145 SW extension of
MAD60 $M
MAD138 6806520 230 -75 180 160 60m east of
MAD62
231650
MAD139 231171 6806450 201.2 -85 197 180 DHEM plate from
MAD122
MAD140 6806700 350.1 -75 180 270 Deep hole MAD62
section
231600
MAD141 232070 6806485 125 -80 180 105 East extension of
$M in MAD117
MAD142 6806670 91.2 -70 180 55 Infill MAD62 and
MAD104
232700
MAD143 232560 6806620 100 -70 180 80 Test down dip
MAD88

Table 2 – drill holes for the drill programme at Mt Alexander completed in H2 2018.

8

ASX / MEDIA RELEASE

==> picture [119 x 55] intentionally omitted <==

About the Mt Alexander Project:

The Mt Alexander Project is located 120km south-southwest of the Agnew-Wiluna Belt, which hosts numerous world-class nickel deposits. The Project comprises five granted exploration licences – E29/638, E29/548, E29/962, E29/954 and E29/972.

The Cathedrals, Stricklands and Investigators nickel-copper-cobalt-PGE discoveries are located on E29/638, which is held in joint venture by St George Mining Limited (75%) and Western Areas Limited (25%). St George is the Manager of the Project, with Western Areas retaining a 25% non-contributing interest in the Project (in regard to E29/638 only) until there is a decision to mine.

For further information, please contact:

John Prineas Peter Klinger Executive Chairman Media and Investor Relations St George Mining Limited Cannings Purple +61 (0) 411 421 253 +61 (0) 411 251 540 [email protected] [email protected]

Competent Person Statement:

The information in this report that relates to Exploration Targets, Exploration Results, Mineral Resources or Ore Reserves is based on information compiled by Mr Benjamin Pollard, a Competent Person who is a Member of The Australasian Institute of Mining and Metallurgy. Mr Pollard is a director of Cadre Geology and Mining Pty Ltd which has been retained by St George Mining Limited to provide technical advice on mineral projects.

Mr Pollard has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Pollard consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

9

The following sections are provided for compliance with requirements for the reporting of exploration results under the JORC Code, 2012 Edition.

Section 1 Sampling Techniques and Data

(Criteria in this section apply to all succeeding sections)

Criteria JORC Code explanation Commentary
Sampling
techniques
Nature and quality of sampling (eg cut channels,
random chips, or specific specialised industry
standard measurement tools appropriate to the
minerals under investigation, such as down hole
gamma sondes, or handheld XRF instruments,
etc.). These examples should not be taken as
limiting the broad meaning of sampling.
The sections of the core that are selected for assaying are marked up
and then recorded on a sample sheet for cutting and sampling at the
certified assay laboratory. Samples of HQ or NQ2 core are cut just to
the right of the orientation line where available using a diamond core
saw, with half core sampled lengthways for assay.
Include reference to measures taken to ensure
sample representivity and the appropriate
calibration of any measurement tools or
systems used.
Wherever possible the same side of the drill core is sampled to ensure
sample is representative. Appropriate QAQC samples are inserted
into the sequences as per industry best practice.
Aspects of the determination of mineralisation
that are Material to the Public Report.
In cases where ‘industry standard’ work has
been done this would be relatively simple (eg
‘reverse circulation drilling was used to obtain 1
m samples from which 3 kg was pulverised to
produce a 30 g charge for fire assay’). In other
cases more explanation may be required, such
as where there is coarse gold that has inherent
sampling problems. Unusual commodities or
mineralisation types (eg submarine nodules)
may warrant disclosure of detailed information.
Diamond core (both HQ and NQ2) is half-core sampled to geological
boundaries no more than 1.5m and no less than 10cm. Samples less
than 3kg are crushed to 10mm, dried and then pulverised to 75µm.
Samples greater than 3kg are first crushed to 10mm then finely
crushed to 3mm and input into the rotary splitters to produce a
consistent output weight for pulverisation.
Pulverisation produces a 40g charge for fire assay. Elements
determined from fire assay are gold (Au), platinum (Pt) and palladium
(Pd) with a 1ppb detection limit. To determine other PGE
concentrations (Rh, Ru, Os, Ir) a 25g charge for nickel sulphide collect
fire assay is used with a 1ppb detection limit.
Other elements will be analysed using an acid digest and an ICP finish.
These elements are: Ag, Al, As, Bi, Ca, Cd, Co, Cr, Fe, K, Li, Mg, Mn,
Mo, Nb, Ni, P, Pb, S, Sb, Sn, Te, Ti, V, W, Zn. The sample is digested
with nitric, hydrochloric, hydrofluoric and perchloric acids to effect as
near to total solubility of the sample as possible. The sample is then
analysed using ICP-AES or ICP-MS.
LOI (Loss on Ignition) will be completed on selected samples to
determine the percentage of volatiles released during heating of
samples to 1000°C.
Drilling
techniques
Drill type (eg core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic,
etc) and details (eg core diameter, triple or
standard tube, depth of diamond tails, face-
sampling bit or other type, whether core is
oriented and if so, by what method, etc).
Diamond drilling is completed using HQ sized coring equipment
through the weathered zone (mostly saprock) with 3m barrels, and
then HQ or NQ2 in fresh rock with 3m or 6m barrels as required. The
core is oriented using ACT II electric core orientation.
Drill sample
recovery
Method of recording and assessing core and
chip sample recoveries and results assessed.
Diamond core recoveries are recorded during drilling and reconciled
during the core processing and geological logging. The core length
recovered is measured for each run and recorded which is used to
calculate core recovery as a percentage.
Measures taken to maximise sample recovery
and ensure representative nature of the
samples.
Measures taken to maximise core recovery include using appropriate
core diameter and shorter barrel length through the weathered zone,
which at Cathedrals and Investigators is mostly <20m and Stricklands
<40m depth. Primary locations for core loss in fresh rock are on
geological contacts and structural zones, and drill techniques are
adjusted accordingly, and if possible these zones are predicted from
the geological modelling.

1

Criteria JORC Code explanation Commentary
Whether a relationship exists between sample
recovery and grade and whether sample bias
may have occurred due to preferential loss/gain
of fine/coarse material.
No sample recovery issues have yet been identified that would
impact on potential sample bias in the competent fresh rocks that
host the mineralised sulphide intervals.
Logging Whether core and chip samples have been
geologically and geotechnically logged to a level
of detail to support appropriate Mineral
Resource estimation, mining studies and
metallurgical studies.
Geological logging is completed for all drill holes with lithology,
alteration, mineralisation, structure and veining recorded. The
logging is recorded digitally and imported in the St George Mining
central database.
Whether logging is qualitative or quantitative in
nature. Core (or costean, channel, etc.)
photography.
Logging is both qualitative and quantitative depending on the field
being captured. Core is photographed with one tray per photo and
stored digitally.
The total length and percentage of the relevant
intersections logged.
All drill holes are geologically logged in full.
Sub-sampling
techniques and
sample
preparation
If core, whether cut or sawn and whether
quarter, half or all core taken.
The HQ and NQ2 core is cut in half length ways just to the right of the
orientation line where available using a diamond core saw. All
samples are collected from the same side of the core where
practicable.
If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet or
dry.
Reverse circulation holes have been rotary cone split, and wetness
recorded during drilling.
For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
The entire sample is pulverised to 75µm using LM5 pulverising mills.
Samples are dried, crushed and pulverized to produce a homogenous
representative sub-sample for analysis. A grind quality target of 90%
passing 75µm is used.
Quality control procedures adopted for all sub-
sampling stages to maximise representivity of
samples.
Quality control procedures include submission of Certified Reference
Materials (standards), duplicates and blanks with each sample batch.
QAQC results are routinely reviewed to identify and resolve any
issues.
Measures taken to ensure that the sampling is
representative of the in situ material collected,
including for instance results for field
duplicate/second-half sampling.
Duplicate samples are selected during sampling. Samples comprise
two quarter core samples, or for RC comprise a one meter sample
equally split into two bags and taken at set meter intervals.
Whether sample sizes are appropriate to the
grain size of the material being sampled.
The sample sizes are considered to be appropriate for base metal
sulphide mineralisation and associated geology.
Quality of
assay data and
laboratory
tests
The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or
total.
Diamond core samples are analysed for Au, Pt and Pd using a 40g lead
collection fire assay; for Rh, Ru, Os, Ir using a 25g nickel sulphide
collection fire assay; and for Ag, Al, As, Bi, Ca, Cd, Co, Cr, Fe, K, Li, Mg,
Mn, Mo, Nb, Ni, P, Pb, S, Sb, Sn, Te, Ti, V, W, Zn using a four acid digest
and ICP-AES or MS finish. The assay method and detection limits are
appropriate for analysis of the elements required.
For geophysical tools, spectrometers, handheld
XRF instruments, etc, the parameters used in
determining the analysis including instrument
make and model, reading times, calibrations
factors applied and their derivation, etc.
A handheld XRF instrument (Olympus Innov-X Spectrum Analyser) is
used to systematically analyse the drill core and RC sample piles
onsite. One reading is taken per meter, however for any core samples
with matrix or massive sulphide mineralisation then multiple samples
are taken at set intervals per meter. The instruments are serviced and
calibrated at least once a year. Field calibration of the XRF instrument
using standards is periodically performed (usually daily).
The handheld XRF results are only used for preliminary assessment
and reporting of element compositions, prior to the receipt of assay
results from the certified laboratory.

2

Criteria JORC Code explanation Commentary
Nature of quality control procedures adopted
(eg standards, blanks, duplicates, external
laboratory checks) and whether acceptable
levels of accuracy (i.e. lack of bias) and precision
have been established.
Laboratory QAQC involves the use of internal lab standards using
certified reference material (CRMs), blanks and pulp duplicates as
part of in house procedures. The Company also submits a suite of
CRMs, blanks and selects appropriate samples for duplicates.
Sample preparation checks for fineness are performed by the
laboratory to ensure the grind size of 90% passing 75µm is being
attained.
Verification of
sampling and
assaying
The verification of significant intersections by
either independent or alternative company
personnel.
Significant intersections are verified by the Exploration Manager of St
George Mining.
The use of twinned holes. No twin holes are currently planned for the upcoming drill program.
Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
Primary data is captured onto a laptop using acQuire software and
includes geological logging, sample data and QA/QC information. This
data, together with the assay data, is entered into the St George
Mining central SQL database which is managed by external
consultants.
Discuss any adjustment to assay data. No adjustments or calibrations will be made to any primary assay data
reported.
Location of
data points
Accuracy and quality of surveys used to locate
drill holes (collar and down-hole surveys),
trenches, mine workings and other locations
used in Mineral Resource estimation.
Drill holes have been located and pegged using a DGPS system with
an expected accuracy of +/-0.05mmm for easting, northing and
elevation.
Downhole surveys are conducted using a single shot camera
approximately every 30m during drilling to record and monitor
deviations of the hole from the planned dip and azimuth. Post-drilling
downhole gyroscopic surveys will be conducted, which provide more
accurate survey results.
Specification of the grid system used. The grid system used at the Mt Alexander project is GDA94 (MGA),
zone 51.
Quality and adequacy of topographic control. Elevation data has been acquired using DGPS surveying at individual
collar locations and entered into the central database. A topographic
surface has been created using this elevation data.
Data spacing
and
distribution
Data spacing for reporting of Exploration
Results.
The diamond drill program is testing modelled EM conductors and
geological
criteria
for
massive
nickel-copper-PGE
sulphide
mineralisation. The spacing and distribution of the planned drill holes
is appropriate to test the defined targets.
Whether the data spacing and distribution is
sufficient to establish the degree of geological
and grade continuity appropriate for the
Mineral Resource and Ore Reserve estimation
procedure(s) and classifications applied.
The completed drilling at Cathedrals, Stricklands and Investigators is
not sufficient to establish the degree of geological and grade
continuity to support the definition of Mineral Resource and Reserves
and the classifications applied under the 2012 JORC code.
Whether sample compositing has been applied. No compositing has been applied to the exploration results.
Orientation of
data in relation
to geological
structure
Whether the orientation of sampling achieves
unbiased sampling of possible structures and
the extent to which this is known, considering
the deposit type.
Drill holes are planned as perpendicular as possible to the target EM
plates and geological units to approximate true width. Most of the
ultramafic units in the Cathedrals Belt dip shallow to the north (and
occasionally south) and where possible drill holes are planned to
intersect perpendicular to this dip. The orientation of key structures
may be locally variable.

3

Criteria JORC Code explanation Commentary
If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to have
introduced a sampling bias, this should be
assessed and reported if material.
No orientation based sampling bias has been identified in the data to
date.
Sample
security
The measures taken to ensure sample security. Chain of custody is managed by St George Mining. Core samples are
stored in the secure facilities at Bureau Veritas laboratory in Perth.
Transportation of core is managed by St George contractors and
Bureau Veritas and actively track monitored.
Audits or
reviews
The results of any audits or reviews of sampling
techniques and data.
No audits or reviews have been conducted at this stage.

Section 2 Reporting of Exploration Results

Criteria JORC Code explanation Commentary
Mineral
Tenement and
Land Status
Type, name/reference number, location and
ownership including agreements or material
issues with third parties including joint ventures,
partnerships, overriding royalties, native title
interests, historical sites, wilderness or national
park and environmental settings.
The security of the tenure held at the time of
reporting along with any known impediments to
obtaining a licence to operate in the area.
The Mt Alexander Project is comprised of five granted Exploration
Licences (E29/638, E29/548, E29/954, E29/962 and E29/972).
Tenement E29/638 is held in Joint Venture between St George (75%
interest) and Western Areas (25% interest). E29/638 and E29/548 are
also subject to a royalty in favour of a third party that is outlined in
the ASX Release dated 17 December 2015 (as regards E29/638) and
the ASX release dated 18 September 2015 (as regards E29/548).
No environmentally sensitive sites have been identified on the
tenements. A registered Heritage site known as Willsmore 1 (DAA
identification 3087) straddles tenements E29/548 and E29/638. All
four tenements are in good standing with no known impediments..
Exploration
Done by Other
Parties
Acknowledgment and appraisal of exploration
by other parties.
Exploration on tenements E29/638 and E29/962 has been largely for
komatiite-hosted nickel sulphides in the Mt Alexander Greenstone
Belt. Exploration in the northern section of E29/638 (Cathedrals Belt)
and also limited exploration on E29/548 has been for komatiite-
hosted Ni-Cu sulphides in granite terrane. No historic exploration has
been identified on E29/954 or E29/972.
High grade nickel-copper-PGE sulphides were discovered at the Mt
Alexander Project in 2008. Drilling was completed to test co-incident
electromagnetic (EM) and magnetic anomalies associated with
nickel-PGE enriched gossans in the northern section of current
tenement E29/638. The drilling identified high grade nickel-copper
mineralisation in granite-hosted ultramafic units and the discovery
was named the Cathedrals Prospect.
Geology Deposit type, geological setting and style of
mineralisation
The Mt Alexander Project is at the northern end of a western
bifurcation of the Mt Ida Greenstones. The greenstones are bound to
the west by the Ida Fault, a significant Craton-scale structure that
marks the boundary between the Kalgoorlie Terrane (and Eastern
Goldfields Superterrane) to the east and the Youanmi Terrane to the
west.
The Mt Alexander Project is prospective for further high-grade
komatiite-hosted nickel-copper-PGE mineralisation (both greenstone
and granite hosted) and also precious metal mineralisation (i.e.
orogenic gold) that is typified elsewhere in the Yilgarn Craton.
Drill hole
information
A summary of all information material to the
understanding of the exploration results
including
tabulation
of
the
following
information for all Material drill holes:
• Easting and northing of the drill hole collar
•Elevation or RL (Reduced Level – elevation
above sea level in meters) of the drill hole collar
Drill hole collar locations are shown in the maps and tables included
in the body of the relevant ASX release.

4

Criteria JORC Code explanation Commentary
• Dip and azimuth of the hole
• Down hole length and interception depth
• Hole length
Data
aggregation
methods
In reporting Exploration Results, weighting
averaging
techniques,
maximum
and/or
minimum grade truncations (e.g. cutting of high
grades) and cut-off grades are usually Material
and should be stated.
Reported assay intersections are length and density weighted.
Significant intersections are determined using both qualitative (i.e.
geological logging) and quantitative (i.e. lower cut-off) methods.
For massive sulphide intersections, the nominal lower cut-off is 2%
for either nickel or copper. For disseminated, blebby and matrix
sulphide intersections the nominal lower cut-off for nickel is 0.3%.
Where aggregated intercepts incorporate short
lengths of high grade results and longer lengths
of low grade results, the procedure used for such
aggregation should be stated and some typical
examples of such aggregations should be shown
in detail.
Any high-grade sulphide intervals internal to broader zones of
sulphide mineralisation are reported as_included_intervals.
Any disseminated, matrix, brecciated or stringer sulphides with
(usually) >1% nickel or copper on contact with massive sulphide
mineralisation are grouped with the massive sulphides for calculating
significant intersections and the massive sulphide mineralisation is
reported as an_including_intersection.
The assumptions used for any reporting of
metal equivalent values should be clearly
stated.
No metal equivalent values have yet been used for reporting
exploration results.
Relationship
between
mineralisation
widths and
intercept
lengths
These relationships are particularly important in
the reporting of exploration results.
If the geometry of the mineralisation with
respect to the drill hole angle is known, its
nature should be reported. If it is not known and
only the down hole lengths are reported, there
should be a clear statement to this effect (e.g.
down hole length, true width not known).
Assay intersections are reported as down hole lengths. Drill holes are
planned as perpendicular as possible to intersect the target EM plates
and geological targets so downhole lengths are usually interpreted to
be near true width.
Diagrams Appropriate maps and sections (with scales) and
tabulations of intercepts should be included for
any significant discovery being reported. These
should include, but not be limited to a plane
view of drill hole collar locations and
appropriate sectional views.
A prospect location map, cross section and long section are shown
in the body of relevant ASX Releases.
Balanced
Reporting
Where
comprehensive
reporting
of
all
Exploration
Results
is
not
practical,
representative reporting of both low and high
grades and/or widths should be practiced to
avoid misleading reporting Exploration Results.
The exploration results reported are representative of the
mineralisation style with grades and/or widths reported in a
consistent manner.
Other
substantive
exploration
data
Other exploration data, if meaningful and
material, should be reported including (but not
limited to): geological observation; geophysical
survey results; geochemical survey results; bulk
samples – size and method of treatment;
metallurgical
test
results;
bulk
density,
groundwater,
geotechnical
and
rock
characteristics;
potential
deleterious
or
contaminating substances.
All material or meaningful data collected has been reported.
Appendix A contains details of significant intersections at the
Investigators and Stricklands Prospects announced by the Company.
Further Work The nature and scale of planned further work
(e.g. tests for lateral extensions or depth
extensions or large – scale step – out drilling).
Diagrams clearly highlighting the areas of
possible
extensions,
including
the
main
geological interpretations and future drilling
areas, provided this information is not
commercially sensitive.
Further exploration in the Cathedrals Belt is currently being planned
based on results from the recent drill program. Further exploration is
also warranted north of the Cathedrals Belt on E29/548, and also in
the Mt Alexander greenstone belt to the south.

5

Hole ID GDA94
East
GDA94
North
Dip Azimuth Depth
(m)
From
(m)
To (m) Width
(m)
Ni% Cu% Co% Total
PGEs
**g/t **
Au
g/t
Ag
g/t
MAD29 231559.5 6806419.6 -60 160 201.6 104.00 105 1 0.36 0.18 0.01 1.02 0.12 1.50
MAD31 231559.4 6806416.5 -63 133 160 108.00 111.67 3.67 0.56 0.28 0.02 1.22 0.16 1.98
MAD31 111.67 113.24 1.57 6.26 2.71 0.18 4.91 0.19 8.10
Including 112.08 113.09 1.01 7.98 3.13 0.22 5.90 0.14 9.06
MAD32 232040.2 6806403 -73 220 92.7 44 51.6 7.6 0.44 0.19 0.02 0.59 0.03 0.88
MAD32 51.6 53.52 1.92 4.58 1.52 0.14 3.83 0.12 4.43
Including 52.75 53.52 0.77 7.82 2.50 0.24 6.31 0.13 6.82
MAD33 232038.2 6806412 -57 330 129.7 87.45 96.48 9.03 0.43 0.14 0.02 0.44 0.03 1.08
MAD33 96.48 97.49 1.01 5.81 2.33 0.22 4.32 0.12 7.30
MAD34 230769 6806330 -70 25 152.5 94 96.1 2.1 0.52 0.25 0.02 0.57 0.07 2.04
MAD34 96.1 98.89 2.79 1.63 0.53 0.05 1.24 0.11 3.62
Including 98.7 98.89 0.19 7.34 1.53 0.22 3.27 0.05 24.00
MAD37 230772.7 6806327 -84 335 156 110 122 12 0.41 0.13 0.02 0.35 0.04 1.22
MAD37 122 123.27 1.27 5.63 2.16 0.17 3.86 0.10 6.83
Including 122.55 123.27 0.72 7.93 2.75 0.23 4.81 0.07 9.00
And, Including 123.27 123.6 0.33 0.81 0.69 0.03 2.33 0.14 2.50
MAD38 231205.1 6806248 -70 90 65.5 25.4 28.14 2.74 3.77 1.48 0.10 3.85 0.17 5.49
Including 26.3 26.4 0.1 12.80 5.54 0.25 11.52 0.38 36.50
And, Including 27.6 28.14 0.54 8.59 3.43 0.24 6.73 0.14 10.00
MAD40 231575.7 6806427 -68 160 142.3 105.35 106.79 1.44 0.46 0.16 0.02 0.60 0.07 1.32
MAD40 106.79 108.75 1.96 5.09 2.11 0.16 3.46 0.39 6.04
Including 107.75 108.75 1 7.88 3.11 0.24 5.04 0.53 8.00
MAD43 231528.9 6806508 -70 160 180 149.7 157.22 7.52 0.43 0.20 0.02 0.55 0.05 1.13
MAD43 157.22 157.9 0.68 7.09 2.73 0.23 3.54 0.14 9.50
MAD43 170.43 170.53 0.1 4.25 0.98 0.13 2.91 0.11 6.00
MAD43 171.1 171.25 0.15 1.88 1.27 0.06 1.65 0.11 6.50
MAD44 231482.4 6806488 -70 180 180 155.66 156.11 0.45 5.59 1.27 0.18 4.28 0.24 11.70
Including 155.84 156.11 0.27 8.49 1.67 0.27 5.24 0.20 16.50
MAD45 231004.9 6806368 -81 355 229 174 178.23 4.23 0.39 0.13 0.02 0.35 0.04 0.85
MAD45 178.23 180.14 1.91 3.60 1.04 0.11 2.56 0.19 2.71
Including 178.87 179.08 0.21 5.44 0.51 0.17 2.55 0.09 2.50
And, Including 179.76 180.14 0.38 7.10 2.84 0.21 5.42 0.21 7.00
MAD47 231659.8 6806394 -70 175 142.1 42.2 43 0.8 1.77 2.85 0.05 4.31 0.21 8.34
Including 42.2 42.35 0.15 0.92 6.85 0.02 5.35 0.24 21.00
And, Including 42.9 43 0.1 7.54 7.02 0.28 10.04 0.33 14.00
MAD47 231659.8 6806394 -70 175 142.1 43.95 44.2 0.25 1.65 0.74 0.03 2.71 0.13 2.50
MAD48 231559.7 6806410 -70 181 127.1 89.35 91.98 2.63 0.58 0.33 0.02 0.97 0.10 4.36
MAD48 91.98 92.89 0.91 7.23 2.42 0.20 4.51 0.18 8.00
MAD60 231225.2 6806451 -70 178 190 156 157.9 1.9 0.60 0.28 0.02 1.49 0.29 2.63
MAD60 157.9 163.2 5.3 4.95 2.75 0.16 4.55 0.25 8.95
Including 159.38 162.38 3 6.40 3.55 0.21 5.25 0.17 12.18
And, Including 162.9 163.2 0.3 5.93 3.54 0.20 4.36 0.12 11.00
MAD61 231249.4 6806423 -70 180 160.1 133 135.6 2.6 0.37 0.17 0.01 0.48 0.04 0.65
MAD61 135.94 136.18 0.24 0.73 0.61 0.02 1.64 0.14 2.50

6

MAD62 231587.4 6806445 -70 0 220 195.84 197.25 1.41 0.82 0.31 0.04 0.92 0.07 1.28
MAD62 197.25 197.56 0.31 6.07 2.81 0.23 2.94 0.03 6.50
MAD63 230796.9 6806312 -75 355 128.1 106 110.33 4.33 0.81 0.35 0.03 1.26 0.17 2.66
MAD63 110.33 110.62 0.29 7.73 2.57 0.24 3.26 0.04 5.50
MAD63 110.62 110.77 0.15 0.82 1.05 0.03 6.13 0.08 3.50
MAD72 231242.1 6806418 -75 180 154.7 131.3 135.79 4.49 0.38 0.09 0.02 0.28 0.02 0.55
MAD72 135.79 136 0.21 5.90 0.32 0.19 1.08 0.01 3.00
MAD72 136 136.71 0.71 0.53 0.15 0.02 0.40 0.03 7.00
MAD72 136.71 136.96 0.25 6.23 7.48 0.21 2.52 0.01 18.00
MAD108 231218 6806453 -76 33 250 199 207.4 8.4 2.00 0.96 0.06 2.59 0.24 4.31
206.03 207.4 1.37 6.83 2.88 0.21 5.58 0.26 8.98
MAD112 232000 6806453 -58 174 140 116 119.55 3.55 4.67 2.27 0.20 2.94 0.16 7.14
MAD126 231445 680517 -90 0 210 184 201.86 7.86 5.70 2.11 0.18 2.65 0.15
185 190.25 5.25 6.95 2.67 0.23 3.10 0.15
MAD127 231440 6806515 -90 0 205 183.9 192.39 8.49 5.78 2.64 0.18 3.61 0.19
Including 184.42 200.81 6.39 6.48 2.77 0.21 3.68 0.17

Table of Significant Intersections at Investigators

7

Hole ID GDA94
East
GDA94
North
Dip Azimuth Depth
(m)
From
(m)
To
(m)
Width
(m)
Ni% Cu% Co% Total
PGEs
**g/t **
Au
g/t
Ag
g/t
MAD20 232740.4 6806665.6 -75 185 100.1 44.20 53.5 9.32 0.29 0.12 0.02 0.27 0.03 0.29
MAD20 53.52 54.5 0.93 2.50 0.68 0.16 1.10 0.03 1.54
MAD22 232525.9 6806526.9 -60 40 138.9 41.9 49.9 7.95 0.55 0.30 0.02 0.58 0.06 1.48
MAD22 49.85 52.6 2.78 1.62 2.51 0.07 1.88 0.17 8.44
Including 52.4 52.6 0.23 0.90 13.10 0.04 3.94 0.16 43
MAD22 232525.9 6806526.9 -60 40 138.9 52.63 53.7 1.09 0.46 0.27 0.02 0.98 0.07 1
MAD23 232470.3 6806468.9 -60 355 124.3 53.7 57.5 3.75 0.81 0.36 0.04 0.73 0.03 1.35
Including 55.55 57.1 1.5 1.29 0.57 0.06 1.11 0.03 2
MAD23 232470.3 6806468.9 -60 355 124.3 57.45 57.7 0.25 4.18 3.40 0.18 4.29 0.11 9
MAD26 232495.1 6806535.0 -60 75 105.1 49.3 52.3 2.95 0.55 0.37 0.03 0.57 0.07 1.82
MAD26 53.9 58.2 4.3 4.26 2.02 0.19 3.21 0.10 6.11
MAD26 58.2 61 2.8 0.48 0.40 0.02 0.56 0.06 2.25
MAD27 232540.0 6806571.5 -60 90 148 59.9 60.1 0.2 0.14 0.40 NA 0.31 0.14 16
MAD27 60.1 71.3 11.15 0.52 0.63 0.03 1.69 0.21 5.37
MAD27 71.25 73.3 2 4.17 3.11 0.21 3.35 0.19 9.25
MAD49 232466.0 6806486.0 -65 0 85 31.8 50.7 18.86 0.42 0.16 0.02 0.36 0.03 0.75
MAD49 50.66 54 3.36 2.09 1.18 0.09 1.82 0.14 4.28
Including 52 52.2 0.23 4.37 2.40 0.17 3.31 0.13 12
And, Including 53.51 54 0.51 4.0 3.13 0.18 2.09 0.06 12
MAD50 232499.1 6806509.0 -70 0 117.7 32.4 34 1.6 0.50 0.45 0.02 0.69 0.09 2.38
MAD50 36 38 2 0.54 0.15 0.02 0.73 0.07 0.94
MAD52 232737.9 6806663.8 -65 203 140 55.12 58.2 3.04 1.54 0.65 0.11 0.77 0.04 2.49
MAD52 57.1 58.2 1.06 2.31 0.91 0.17 0.63 0.02 2.84
MAD70 232758.3 6806664 -72 180 87.8 53 54.1 1.08 0.68 0.58 0.05 0.61 0.04 2.44
MAD70 54.08 54.9 0.83 2.25 0.82 0.17 1.09 0.02 3.5
MAD71 232468.4 6806500 -65 0 250.2 37.45 54.9 17.45 3.01 1.31 0.13 1.68 0.06 3.86
MAD71 39.3 44.6 5.3 4.39 1.45 0.21 2.09 0.04 3.8
MAD71 50.6 52.6 2.02 5.05 2.01 0.21 3.31 0.07 6.99
MAD71 54.4 54.9 0.5 3.68 3.90 0.17 2.68 0.07 14.5
MAD77 232446 6806501 -70 0 110 36 43.2 7.2 0.32 0.21 0.02 0.43 0.06 1.46
MAD77 43.2 47.3 4.1 1.23 1.42 0.05 2.47 0.13 7.09
MAD78 232467.2 6806522 -70 0 121.1 65.6 71 5.4 1.46 0.91 0.06 1.55 0.14 3.77
MAD80 232446.1 6806517 -70 0 160 65.3 67.1 1.8 0.49 1.01 0.02 2.36 0.27 20.3
MAD81 232460.6 232460.6 -90 0 60.8 41.9 51.1 9.15 1.76 1.17 0.07 2.11 0.17 4.16
MAD81 47.55 48.8 1.29 2.79 1.30 0.12 2.37 0.08 4.58
MAD81 50.49 51.1 0.56 4.38 1.89 0.21 1.82 0.32 7.5
MAD82 232479.6 6806505 -85 0 61.3 52.27 52.5 0.25 3.78 1.25 0.18 2.68 0.09 5.5
MAD83 232479.6 6806515 -85 0 63 36 41.3 5.31 0.43 0.24 0.02 0.38 0.04 1
MAD83 41.31 41.4 0.11 4.22 2.03 0.15 7.68 0.47 10
MAD83 42 43.7 1.73 0.46 0.22 0.02 0.41 0.04 0.5
MAD83 50.5 52.3 1.84 0.54 0.30 0.03 0.46 0.04 1
MAD83 52.34 52.6 0.26 3.76 2.05 0.18 2.31 0.11 7
MAD84 232479.6 6806525 -85 0 62.5 38.63 38.8 0.2 4.57 0.67 0.18 2.51 0.05 4
MAD84 49.6 51.2 1.64 0.46 0.21 0.02 0.39 0.06 1.01
MAD84 51.24 51.5 0.25 4.3 1.42 0.19 2.66 0.15 5
MAD85 232471 6806535 -75 180 81 43.8 53.6 9.75 3.46 1.76 0.16 2.26 0.15 4.92
MAD88 232540 6806570 -60 105 84.2 56 57.8 1.78 0.36 0.38 0.02 0.59 0.08 2.56
MAD88 57.78 61.7 3.92 2.10 0.93 0.09 2.09 0.11 3.06
MAD88 66 69.6 3.55 0.51 0.33 0.03 0.77 0.04 1.15
MAD88 69.55 70.9 1.31 3.59 0.47 0.18 2.26 0.03 1.19
MAD88 72.25 73.3 1.05 0.63 0.30 0.04 0.47 0.04 1.00
MAD91 232540 6806565 -60 165 80.3 42.9 47 4.1 0.38 0.16 0.02 0.49 0.04 0.76
MAD92 232540 6806572 -75 165 80.5 52.7 53.3 0.57 1.37 0.70 0.07 1.15 0.03 9.00
MAD93 232462.5 6806525 -74 0 101.4 66.18 69.3 3.16 3.41 1.21 0.15 3.30 0.12 4.99
Including 67.67 69.3 1.67 5.18 1.24 0.23 5.10 0.12 4.73
MAD93 232462.5 6806525 -74 0 101.4 69.34 75 5.66 0.46 0.26 0.02 0.57 0.06 1.32

8

MAD95 232425 6806506 -80 180 70 34 37 3 0.70 0.31 0.04 0.44 0.05 1.00
MAD95 41 48.3 7.27 0.37 0.19 0.02 0.38 0.03 0.88
MAD95 48.27 49.3 1 4.36 1.17 0.20 6.33 0.21 3.47
MAD104 232648 6806653 -71 228 91 67.2 73.5 6.25 2.36 1 0.15 1.25 0.04 2.87
Including 70.11 73.5 3.34 3.01 1.12 0.2 1.41 0.05 2.93
MAD105 232423 6806503 -80 230 69.8 35.6 41.5 5.9 1.8 0.81 0.08 1.73 0.09 2.11
MAD105 41.5 48 6.5 0.45 0.17 0.03 0.31 0.03 0.47
MAD106 232422 6806528 -80 220 95.1 59 63.9 4.85 0.63 0.31 0.03 0.68 0.05 1.26
MAD106 63.85 65.3 1.45 4.12 0.99 0.19 3.05 0.08 2.59

Table of Significant Intersections at Stricklands

9