NICKEL SULPHIDE DRILLING AT EAST LAVERTON ‐ UPDATE
HIGHLIGHTS:
- First hole of high impact drilling program completed at Cambridge
- 500 metres of RC and diamond drilling completed to date
- Prospective high MgO zone on the eastern margin of Cambridge confirmed at depth
- Down‐hole electromagnetic (DHEM) survey will test for EM targets, laterally and at depth
DRILLING UPDATE
St George Mining Limited (ASX: SGQ) ('St George Mining' or 'the Company') is pleased to provide the first update from its 2015 nickel sulphide drilling campaign at the Company's 100% owned East Laverton Property in Western Australia.
The first planned hole was completed at the Cambridge nickel prospect, and was drilled to a depth of 500 metres. This hole is labelled CAMDD001 and comprised 84 metres of RC (reverse circulation) drilling and 416 metres of NQ2 diamond core drilling. RC drilling is used to provide the pre‐collar for the diamond drilling.
Cambridge is a large NW trending ultramafic dunite body with dimensions of 4km x 2km. Previous exploration by St George and BHP Billiton Nickel West has identified a high MgO area on the eastern side of the body. This highly prospective area was initially identified by RC drilling that encountered the top of this high MgO zone. The current diamond drill hole was planned to test these high MgO facies rocks at a deeper level and to define the geometry of this zone.
The geological logging, processing and analysis of CAMDD001 is ongoing. The provisional XRF analysis of the drill core from CAMDD001 indicates that extensive sequences of high MgO ultramafic have been encountered.
Of particular interest is a 132m interval (from 92m to 224m) with corresponding elevated Ni and MgO levels. The average values for this interval were 0.35% Ni and 35% MgO, with the highest nickel value of 0.56% Ni at 133m. The interval also recorded elevated sulphur values up to 2% S.
Komatiite ultramafic units with this geochemical composition are prospective environments for the presence of high grade and/or disseminated nickel sulphide mineralisation. Further analysis of the drilling data collected on this hole is ongoing.
The high MgO zone at Cambridge has similarities to the central dunite‐lens at the Perseverance nickel sulphide deposit at Leinster, which is hosted on the basal contact of a large ultramafic dunite body (3km x 1km). Perseverance is one of the largest high grade nickel sulphide deposits in the world and contains more than 1.4 million tonnes of contained nickel.
ASX / MEDIA RELEASE

The preliminary results from CAMDD001 are encouraging, and the technical team has recommended a second drill hole be completed at Cambridge to test for the southern extension of the prospective high MgO zone, along the eastern margin of the Cambridge dunite body.
From a logistical perspective, it is most efficient that this hole be drilled now while the drill rig is at Cambridge. The drilling of this second hole, with a target depth of 350m, has commenced. Both holes at Cambridge will be cased with PVC pipe so that down‐hole electromagnetic (DHEM) surveys can be completed. The results of the DHEM surveys will be important in identifying any EM conductors both laterally and at depth.

Figure 1 – the drill rig at Cambridge
DRILLING OF EM CONDUCTORS STARTS THIS WEEK
The second hole at Cambridge is scheduled to be completed on Wednesday, 17 June 2015. Following completion of that hole, drilling of the high value EM conductors at the Aphrodite and Desert Dragon nickel sulphide prospects will commence.
St George will be drilling EM conductors that have excellent potential to represent massive nickel sulphide deposits. The first EM conductor to be drilled will be the strong Aphrodite 4 EM conductor.


John Prineas, Executive Chairman of St George Mining, said:
"The drilling at Cambridge is very valuable in setting up new targets for what could be a very large prize there.
"The most exciting phase of our drilling program will start towards the end of this week.
"We will commence drilling a suite of EM conductors, any one of which could deliver an immediate and very high value outcome."
XRF ANALYSIS
References to XRF results relate to analysis using a hand‐held Olympus Innov‐X Spectrum Analyser. This portable device provides immediate analysis of modal mineralogy of drill samples. The device is unable to reliably detect precious metals in samples but is considered to be more reliable for base metal assessment.
Unless otherwise stated, values determined by XRF analysis are based on one spot reading per one metre of drill core. As such, results from XRF analysis are stated as indicative only and are preliminary to subsequent confirmation by geochemical analysis at Intertek Genalysis Laboratories.
The XRF data is useful in assisting in the interpretation of the geological character of the rocks being encountered during drilling. The data may not be representative of the actual metal content in that sample.

Figure 2 – XRF analysis underway on the drill core from CAMDD001
ASX / MEDIA RELEASE

For further information, please contact:
John Prineas Executive Chairman St George Mining Limited (+61) 411 421 253 [email protected] Colin Hay Professional Public Relations (+61) 08 9388 0944 mob 0404 683 355 [email protected]
Competent Person Statement:
The information in this report that relates to Exploration Targets, Exploration Results, Mineral Resources or Ore Reserves is based on information compiled by Mr Timothy Hronsky, a Competent Person who is a Member of The Australasian Institute of Mining and Metallurgy. Mr Hronsky is employed by Essential Risk Solutions Ltd which has been retained by St George Mining Limited to provide technical advice on mineral projects.
Mr Hronsky has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Mr Hronsky consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.
The following section is provided for compliance with requirements for the reporting of exploration results under the JORC Code, 2012 Edition.
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections)
| Criteria | JORC Code explanation | Commentary | ||||
|---|---|---|---|---|---|---|
| Samplingtechniques | Natureandqualityofsampling(egcutchannels, random chips, or specific specialised | This ASX Release dated 15 June 2015 reports on interim explorationresults from the Company's 2015 nickel sulphide drilling campaign. | ||||
| industrystandardmeasurementtoolsappropriatetothemineralsunderinvestigation,suchasdownholegammasondes, or handheld XRF instruments, etc). | Drilling is being undertaken by DDH1 Drilling Pty Ltd using a Sandvik1200 Multipurpose truck mounted drill rig. This rig has capability fordiamond core, reverse circulation (RC) and mud rotary drilling. | |||||
| These examples should not be taken as limitingthe broad meaning of sampling. | The initial drilling program is planned to include diamond core holeswith RC pre‐collars. The actual holes to be completed will be subjectto ongoing management of the drilling program based on groundconditions and exploration results. | |||||
| Diamond Core Sampling: The core is removed from the drill rig andlaid out for initial analysis in the field. The core is measured andmarked up at 1m intervals against the drillers blocks, which arethemselves checked against the drillers log books where required.The visible structural features on the core are measured against thecore‐orientation lines. | ||||||
| Onsite XRF analysis is conducted using a hand‐held Olympus Innov‐XSpectrum Analyser. The XRF analysis is used to systematically reviewdiamond drill core, with a single reading taken every metre, exceptin the case of core loss. These results are only used for onsiteinterpretation and preliminary base metal assessment subject tofinal geochemical analysis by laboratory assays. | ||||||
| The sections of the core that are selected for assaying are markedup and recorded on a "cut‐sheet" which provides a control on theintervals that will be cut and sampled at a duly certified assaylaboratory, Intertek Genalysis. Core is prepared for analysis at 1mintervals or at lesser intervals of geological significance. Core is cutin half lengthways and then numbered samples are taken as per the"cut‐sheet". | ||||||
| Diamond core provides high quality samples that are logged forlithological, structural, geotechnical, density and other attributes.Sampling is carried out under QAQC procedures as per industry bestpractice. | ||||||
| RC Sampling: All samples from the RC drilling are taken as 1msamples. Samples are sent to Intertek Genalysis for assaying. | ||||||
| Appropriate QAQC samples (standards, blanks and duplicates) wereinserted into the sequences as per industry best practice. | ||||||
| In this program the multi‐purpose diamond and RC drill rig did nothave an industry standard splitter attached to facilitate collection ofsamples.RCsamplesweretakenmanuallyinthemostrepresentative way. Should any sample return any values that areanomalous, then a portable riffle splitter will be utilised to selectanother representative sample for assaying from the bulk sample ofRC chips retained by the Company. | ||||||
| Onsite XRF analysis is conducted on the fines from RC chips using ahand‐held Olympus Innov‐X Spectrum Analyser. These results areonly used for onsite interpretation and preliminary base metalassessment subject to final geochemical analysis by laboratoryassays. | ||||||
| Down‐hole electromagnetic (DHEM) survey: A DHEM survey isplanned for each diamond hole. The DHEM survey is designed andmanaged by Newexco Services Pty Ltd, with field work contracted to |
| Criteria | JORC Code explanation | Commentary | |||||
|---|---|---|---|---|---|---|---|
| Bushgum Holdings Pty Ltd. | |||||||
| Key specifications of the DHEM survey are: | |||||||
| System: Atlantis (analogue) | |||||||
| Components:A, U, V | |||||||
| Component direction: | |||||||
| Ba – Parallel to hole axis, positive up hole.Bu – Perpendicular to hole axis: toward 12 o' clock whenlooking down hole.Bv – Perpendicular to hole axis: toward 9 o' clock whenlooking down hole. | |||||||
| Include reference to measures taken to ensuresamplerepresentivityandtheappropriatecalibrationofanymeasurementtoolsorsystems used. | DiamondCoreSampling:Fordiamondcoresamples,certifiedsample standards were added as every 25th sample. Core recoverycalculations are made through a reconciliation of the actual coreand the driller's records. Downhole surveys of dip and azimuthwere conducted using a single shot camera every 30m to detectdeviations of the hole from the planned dip and azimuth. The drill‐hole collar locations were recorded using a hand held GPS, whichhas an accuracy of +/‐ 5m. At a later date the drill‐hole collar will besurveyed to a greater degree of accuracy. | ||||||
| RC Sampling: For RC drill samples, geological logging of RC chips iscompleted at site with representative chips being stored in drill chiptrays. Downhole surveys of dip and azimuth follow the sameprotocol as for diamond core holes. | |||||||
| DHEM Survey: For the DHEM survey, the polarity of each componentis checked to ensure the system was set up using the correctcomponentorientations.Theholepositioniscorrectedfortrajectory using orientation survey data. | |||||||
| that are Material to the Public Report.In cases where 'industry standard' work hasmaywarrantdisclosureof | Aspects of the determination of mineralisation | Diamond Core Sampling: Core is drilled with HQ and NQ2 size andsampled as half core to produce a bulk sample for analysis. Intervalsvary from 0.3 – 1m maximum and are selected with an emphasis on | |||||
| been done this would be relatively simple (eg'reverse circulation drilling was used to obtain1 m samples from which 3 kg was pulverised toproduce a 30 g charge for fire assay'). In othercases more explanation may be required, suchas where there is coarse gold that has inherentsampling problems. Unusual commodities ormineralisation types (eg submarine nodules)detailedinformation. | geological control.Assays are completed at Intertek Genalysis Laboratories in Perth.Samples are sent to Intertek where they are crushed to 6 mm andthen pulverised to 75 microns. A 30 g charge of the sample is fireassayed for gold, platinum and palladium. The detection range forgold is 1 – 2000 ppbAu, and 0.5 – 2000 ppb for platinum andpalladium. This is believed to be an appropriate detection level forthese elements within this specific mineral environment. However,should Au, Pt or Pd levels reported exceed these levels an additionalassay method will be used to re‐test samples. | ||||||
| All other metals will be analysed using an acid digest and an ICPfinish. The sample is digested with nitric, hydrochloric, hydrofluoricand perchloric acids to effect as near to total solubility of the sampleas possible. The solution containing samples of interest, includingthose that need further review, will then be presented to an ICP‐OESfor the further quantification of the selected elements. | |||||||
| RC Sampling: A 1m composite sample is taken from the bulk sampleof RC chips that may weigh in excess of 40 kg. Assay preparation byIntetrtekfollows the same protocol as for diamond core sampling. | |||||||
| Drillingtechniques | Drill type (eg core, reverse circulation, open‐hole hammer, rotary air blast, auger, Bangka, | Diamond Core Sampling: The collars of the diamond holes weredrilled using RC drilling down through the regolith to the point of |
| Criteria | JORC Code explanation | Commentary | |||||
|---|---|---|---|---|---|---|---|
| sonic, etc) and details (eg core diameter, tripleor standard tube, depth of diamond tails, face‐sampling bit or other type, whether core is | refusal or to a level considered geologically significant to change tocore. The hole was then continued using HQ diamond core until thedrillers determined that a change to NQ2 coring was required. | ||||||
| oriented and if so, by what method, etc). | The core is oriented and marked by the drillers. The core is orientedusing ACT Mk II electric core orientation. | ||||||
| RC Sampling: The RC drilling uses a 140 mm diameter face hammertool. High capacity air compressors on the drill rig are used toensure a continuously sealed and high pressure system duringdrilling to maximise the recovery of the drill cuttings, and to ensurechips remain dry to the maximum extent possible. | |||||||
| Drill samplerecovery | Method of recording and assessing core andchip sample recoveries and results assessed. | Diamond Core Sampling: Diamond core recoveries/core loss arerecorded during drilling and reconciled during the core processingand geological logging. No significant sample recovery problems arethought to have occurred in any holes drilled to date. There hasbeen a notable and consistent competency encountered in the rocksduring drilling. | |||||
| RC Sampling: RC samples are visually checked for recovery, moistureand contamination. Geological logging is completed at site withrepresentative RC chips stored in chip trays. | |||||||
| Measures taken to maximise sample recoveryand ensure representative nature of thesamples. | Diamond Core Sampling: Depths are checked against the depth onthe core blocks and rod counts are routinely carried out by thedrillers. Core loss was recorded by St George geologists andsampling intervals were not carried through core loss. | ||||||
| RC Sampling: Samples are normally collected using a cone and rifflesplitter. However, in this program, the multi‐purpose diamond andRC drill rig did not have an industry standard splitter attached. RCsamples were taken manually in the most representative way. If anysample returns any values that are anomalous, then a portable rifflesplitter will be utilised to select another representative sample forassaying from the bulk sample of RC chips retained by the Company. | |||||||
| Whether a relationship exists between samplerecovery and grade and whether sample biasmayhaveoccurredduetopreferentialloss/gain of fine/coarse material. | To date, no detailed analysis to determine the relationship betweensample recovery and grade has been undertaken for this drillprogram. This analysis will be conducted following any economicdiscovery. | ||||||
| The use of diamond drilling capturing whole rock cores reduceserrors associated with varying size fraction loss of the sample. Verycompetent rocks have been recovered to date. | |||||||
| Thenatureofmagmaticsulphidedistributionhostedbythecompetent and consistent rocks hosting any mineralised intervalsare considered to significantly reduce any possible issue of samplebias due to material loss or gain. | |||||||
| Logging | Whether core and chip samples have beengeologically and geotechnically logged to alevel of detail to support appropriate MineralResourceestimation,miningstudiesandmetallurgical studies. | Geological logging is carried out on all diamond core and RC drillholes with lithology, alteration, mineralisation, structure and veiningrecorded. | |||||
| Whether logging is qualitative or quantitativeinnature.Core(orcostean,channel,etc)photography. | Logging of diamond core and RC samples recorded lithology,mineralogy,mineralisation,structures(coreonly),weathering,colour and other noticeable features. Core was photographed inboth dry and wet form. | ||||||
| The total length and percentage of the relevantintersections logged. | All drill holes were geologically logged in full and detailed litho‐geochemical information was collected by the field XRF unit. Thedata relating to the elements analysed is used to determine furtherinformation regarding the detailed rock composition. |
| Criteria | JORC Code explanation | Commentary | |||||
|---|---|---|---|---|---|---|---|
| Sub‐samplingtechniques andsamplepreparation | If core, whether cut or sawn and whetherquarter, half or all core taken. | The HQ and NQ2 core will be cut in half length ways at site using anautomatic core saw. All samples will be collected from the same sideof the core. The half‐core samples will be submitted to Intertek foranalysis. | |||||
| If non‐core, whether riffled, tube sampled,rotary split, etc and whether sampled wet ordry. | RC samples were taken manually in the most representative way asthe multipurpose drill rig did not have a riffle splitter to facilitatecollection of samples. If any sample returns any values that aredeemed anomalous, then a portable riffle splitter will be utilised toselect another representative sample for assaying from the bulksample of RC chips retained by the Company. RC samples arecollected in dry form. | ||||||
| For all sample types, the nature, quality andappropriateness of the sample preparationtechnique. | Diamond Core Sampling: Diamond core was drilled with HQ andNQ2 size and sampled as complete half core to produce a bulksamplefor analysis. Intervals selected varied from 0.3 – 1m(maximum) with a strong geological control (as is possible indiamond core) to ensure grades are representative, i.e. remove anybias through projecting assay grades beyond appropriate geologicalboundaries. | ||||||
| Assay preparation procedures ensure the entire sample is pulverisedto 75 microns before the sub‐sample is taken. This removes thepotentialforthesignificantsub‐samplingbiasthatcanbeintroduced at this stage. | |||||||
| RC Sampling: Sample preparation for RC chips is the same as fordiamond core. | |||||||
| Quality control procedures adopted for all sub‐sampling stages to maximise representivity ofsamples. | Diamond Core Sampling: Drill core is cut in half lengthways and thetotalhalf‐coresubmittedasthesample. Thismeetsindustrystandards where 50% of the total sample taken from the diamondcore is submitted. | ||||||
| RC Sampling: Field QC procedures maximise representivity of RCsamples and involve the use of certified reference material as assaystandards, along with blanks, duplicates and barren washes. | |||||||
| Measures taken to ensure that the sampling isrepresentative of the in situ material collected,including for instance results for fieldduplicate/second‐half sampling. | Diamond Core Sampling: The retention of the remaining half‐core isan important control as it allows assay values to be determinedagainst the actual geology; and where required a quarter coresample may be submitted for assurance. No resampling of quartercore or duplicates has been done at this stage of the project. | ||||||
| RC Sampling: Field duplicates were taken on 1m composites for RCsamples. | |||||||
| Whether sample sizes are appropriate to thegrain size of the material being sampled. | The sample sizes are considered to be appropriate to correctlyrepresent the sulphide mineralisation at the East Laverton Propertybased on: the style of mineralisation (massive and disseminatedsulphides), the thickness and consistency of the intersections andthe sampling methodology. | ||||||
| Quality ofassay data andlaboratorytests | The nature, quality and appropriateness of theassaying and laboratory procedures used andwhether the technique is considered partial ortotal. | For both diamond core and RC sampling, a 30 gram sample will befire assayed for gold, platinum and palladium. The detection rangefor gold is 1 – 2000 ppbAu, and 0.5 – 2000 ppb for platinum andpalladium. This is believed to be an appropriate detection level forthelevelsoftheseelementswithinthisspecificmineralenvironment. However, should Au, Pt or Pd levels reported exceedthese levels; an alternative assay method will be selected. | |||||
| All other metals will be analysed using an acid digest and an ICPfinish. The sample is digested with nitric, hydrochloric, hydrofluoricand perchloric acids to effect as near to total solubility of the sampleas possible. The solution containing samples of interest, includingthose that need further review, will then be presented to an ICP‐OESfor the further quantification of the selected elements. |
| Criteria | JORC Code explanation | Commentary | |||||
|---|---|---|---|---|---|---|---|
| For geophysical tools, spectrometers, handheldXRF instruments, etc, the parameters used indetermining the analysis including instrumentmake and model, reading times, calibrationsfactors applied and their derivation, etc. | A handheld XRF instrument (Olympus Innov‐X Spectrum Analyser) isused to systematically analyse the drill core and RC chips onsite.Reading time was 60 seconds. The instruments are serviced andcalibratedatleastoncea year.FieldcalibrationoftheXRFinstrument using standards is undertaken each day. | ||||||
| For the DHEM survey, specifications and quality control measuresare noted above. | |||||||
| Nature of quality control procedures adopted(egstandards,blanks,duplicates,externallaboratorychecks)andwhetheracceptablelevels of accuracy (ie lack of bias) and precisionhave been established. | Laboratory QAQC involves the use of internal lab standards usingcertified reference material, blanks, splits and replicates as part of inhouse procedures. The Company will also submit an independentsuite of CRMs, blanks and field duplicates (see above). | ||||||
| Verification ofsampling andassaying | The verification of significant intersections byeitherindependentoralternativecompanypersonnel. | Significant intersections in diamond core are verified by theCompany's Technical Director and Consulting Field Geologist. | |||||
| The use of twinned holes. | No twinned holes have been completed in this drilling programme. | ||||||
| Documentation of primary data, data entryprocedures, data verification, data storage(physical and electronic) protocols. | Geological data was collected using handwritten log sheets andimported in the field onto a laptop detailing geology (weathering,structure, alteration, mineralisation), sampling quality and intervals,sample numbers, QA/QC and survey data. This data, together withthe assay data received from the laboratory and subsequent surveydata was entered into the Company's database. | ||||||
| Discuss any adjustment to assay data. | No adjustments or calibrations will be made to any primary assaydata collected for the purpose of reporting assay grades andmineralised intervals. For the geological analysis, standards andrecognised factors may be used to calculate the oxide form assayedelements, or to calculate volatile free mineral levels in rocks. | ||||||
| Location ofdata points | Accuracy and quality of surveys used to locatedrillholes(collaranddown‐holesurveys),trenches, mine workings and other locationsused in Mineral Resource estimation. | Drill hole collar locations are determined using a handheld GPS withan accuracy of +/‐ 5m. Drill hole collars will be preserved andsurveyed to a greater of accuracy after the drilling programme. | |||||
| Down hole surveys of dip and azimuth were conducted using asingle shot camera every 30m to detect deviations of the hole fromthe planned dip and azimuths. | |||||||
| Specification of the grid system used. | The grid system used is GDA94, MGA Zone 51. | ||||||
| Quality and adequacy of topographic control. | Best estimated RLs were assigned during drilling and are to becorrected at a later stage. | ||||||
| Data spacinganddistribution | Data spacing for reporting of ExplorationResults. | The drill programme is targeting EM conductors and other highquality targets for massive nickel sulphide mineralisation. Thespacing and distribution of holes is not relevant to this programme. | |||||
| Whether the data spacing and distribution issufficient to establish the degree of geologicalandgradecontinuityappropriatefortheMineral Resource and Ore Reserve estimationprocedure(s) and classifications applied. | Drilling is at the exploration stage. Mineralisation at the EastLaverton Property has not yet demonstrated to be sufficient in bothgeologicalandgradecontinuityappropriatefortheMineralResourceandOreReserveestimationprocedure(s)andclassifications to be applied. | ||||||
| Whether sample compositing has been applied. | Samples are taken at one metre lengths (diamond core), andadjusted where necessary to reflect local variations in geology orwhere visible mineralised zones are encountered, in order topreserve the samples are representative. | ||||||
| Orientation ofdata in relationto geologicalstructure | Whether the orientation of sampling achievesunbiased sampling of possible structures andthe extent to which this is known, consideringthe deposit type. | The diamond core holes are drilled towards 060 at an angle of ‐60degrees to intersect the modelled mineralised zones at a nearperpendicular orientation unless otherwise stated. However, theorientation of key structures may be locally variable and anyrelationship to mineralisation at has yet to be identified. |
| Criteria | JORC Code explanation | Commentary | ||||
|---|---|---|---|---|---|---|
| If the relationship between the drillingorientation and the orientation of keymineralised structures is considered to haveintroduced a sampling bias, this should beassessed and reported if material. | No orientation based sampling bias has been identified in the datato date. | |||||
| Samplesecurity | The measures taken to ensure sample security. | Chain of Custody is managed by the Company until samples pass toa duly certified assay laboratory for subsampling and assaying. Thecut‐core trays and RC sample bags are stored on secure sites anddelivered to the assay laboratory by the Company or a competentagent. When in transit, they are kept in locked premises. Transportlogs have been set up to track the progress of samples. The chain ofcustody passes upon delivery of the samples to the assay laboratory.For diamond core, a predetermined "cut sheet" serves as a trackingtool and provides a further control for any subsequent checks. | ||||
| Audits orreviews | The results of any audits or reviews of samplingtechniques and data. | Sampling techniques and procedures are regularly reviewedinternally, as is data. To date, no external audits have beencompleted on the drilling programme. |
Section 2 Reporting of Exploration Results
(Criteria listed in section 1 will also apply to this section where relevant)
| Criteria | JORC Code explanation | Commentary | ||||
|---|---|---|---|---|---|---|
| MineralTenement andLand Status | Type, name/reference number, location andownership including agreements or materialissueswiththirdpartiesincludingjoint | Phase 1 of the 2015 nickel sulphide drilling programme will testprospects located within Exploration Licences E39/1066, E39/1461,E39/1492, E39/1467, E39/1229, E39/1667 and E39/1520. | ||||
| ventures,partnerships,overridingroyalties,native title interests, historical sites, wildernessor national park and environmental settings. | Each tenement is 100% owned by Desert Fox Resources Pty Ltd, awholly owned subsidiary of St George Mining. Certain tenementsare subject to a 2% Net Smelter Royalty in favour of a third party. | |||||
| The security of the tenure held at the time ofreporting along with any known impediments | None of the tenements are the subject of a native title claim. Noenvironmentally sensitive sites have been identified at any of thetenements. | |||||
| to obtaining a licence to operate in the area. | The tenements are in good standing and no known impedimentsexist. | |||||
| ExplorationDone by OtherParties | Acknowledgment and appraisal of explorationby other parties. | In 2012, BHP Billiton Nickel West Pty Ltd (Nickel West) completed areconnaissance RC (reverse circulation) drilling program at the EastLavertonPropertyaspartoftheProjectDragonfarm‐inarrangement between Nickel West and the Company. That farm‐inarrangement has been terminated. The drilling program comprised35 RC holes for 8,560m drilled. | ||||
| The results from the Nickel West drilling program were reported bythe Company in its ASX Release dated 25 October 2012 "Drill Resultsat Project Dragon". Drilling intersected primary nickel sulphidemineralisation and established the presence of fertile, high MgOultramafic sequences at the East Laverton Property. | ||||||
| PriortotheProjectDragondrillingprogram,therewasnosystematic exploration for nickel sulphides at the East LavertonProperty. Historical exploration in the region was dominated byshallowRABandaircoredrilling,muchofwhichhadbeenincompletely sampled, assayed, and logged. This early work wasfocused on gold rather than nickel sulphide exploration. | ||||||
| Geology | Deposit type, geological setting and style ofmineralisation | The Company's East Laverton Property located in the NE corner ofthe Eastern Goldfields Province of the Archean Yilgarn Craton ofWestern Australia. |
| Criteria | JORC Code explanation | Commentary | ||||||
|---|---|---|---|---|---|---|---|---|
| The project area is proximally located to the Burtville‐Yarmanaterraneboundaryandthepaleo‐cratonicmarginalsettingisconsistentwiththeextensivekomatiitesandcarbonatitemagmatism found on the property. | ||||||||
| The area is largely covered by Permian glaciogene sediments(Patterson Formation), which area is subsequently overlain by athinner veneer of more recent sediments and aeolian sands. As aresult the geological knowledge of the belt has previously beenlargely inferred from gravity and magnetic data and locally verifieddrill‐holemulti‐elementbyinformationandsoilgeochemicalsurveys. | ||||||||
| The drilling at the East Laverton Property has confirmed extensivestrike lengths of high‐MgO olivine‐rich rocks across three majorultramafic belts. Ultramafic rocks of this composition are known tohost high grade nickel sulphides. | ||||||||
| Drill holeinformation | A summary of all information material to theunderstandingoftheexplorationresultsincludingtabulationofthefollowinginformation for all Material drill holes:• Easting and northing of the drill hole collar•Elevation or RL (Reduced Level – elevationabove sea level in meters) of the drill hole collar• Dip and azimuth of the hole• Down hole length and interception depth• Hole length | Information regarding exploration results from Project Dragon canbe found in the Company's ASX Release dated 25 October 2012"Drill Results at Project Dragon" which is available to view onwww.stgm.com.au. | ||||||
| Dataaggregationmethods | InreportingExplorationResults,weightingaveragingtechniques,maximumand/orminimum grade truncations (e.g. cutting ofhigh grades) and cut‐off grades are usuallyMaterial and should be stated. | No top‐cuts have been applied. A nominal 0.15% Ni lower cut‐off isapplied unless otherwise indicated. | ||||||
| Where aggregated intercepts incorporate shortlengthsofhighgraderesultsandlongerlengths of low grade results, the procedureused for such aggregation should be stated andsome typical examples of such aggregationsshould be shown in detail. | High grade massive sulphide intervals internal to broader zones ofsulphide mineralisation are reported as included intervals. | |||||||
| The assumptions used for any reporting ofmetal equivalent values should be clearlystated. | No metal equivalent values are used for reporting explorationresults. | |||||||
| Relationshipbetween | These relationships are particularly importantin the reporting of exploration results. | The geometry of the mineralisation is not yet known due toinsufficient deep drilling in the targeted area. | ||||||
| mineralisationwidths andinterceptlengths | If the geometry of the mineralisation withrespect to the drill hole angle is known, itsnature should be reported. If it is not knownand only the down hole lengths are reported,there should be a clear statement to this effect(e.g.'downholelength,truewidthnotknown'). | |||||||
| Diagrams | Appropriate maps and sections (with scales)andtabulationsofinterceptsshouldbeincluded for any significant discovery beingreported. These should include, but not belimited to a plane view of drill hole collarlocations and appropriate sectional views. | Maps will be included with any announcement of any significantdiscovery, following review of assay results from the drillingprogramme. |
| Criteria | JORC Code explanation | Commentary | ||||
|---|---|---|---|---|---|---|
| BalancedReporting | WherecomprehensivereportingofallExplorationResultsisnotpractical, | A balanced report on the interim exploration results is contained inthe body of the ASX Release. | ||||
| representative reporting of both low and highgrades and/or widths should be practiced toavoidmisleadingreportingofExplorationResults. | A comprehensive report on recent drilling at the East LavertonProperty can be found in the following ASX Releases that areavailable on our website at www.stgm.com.au: | |||||
| 3 September 2014 'Nickel Sulphide Drilling – Update on Phase 1' | ||||||
| 11 February 2015 'St George Extends Nickel Sulphide Zone'. | ||||||
| Othersubstantiveexplorationdata | Otherexplorationdata,ifmeaningfulandmaterial, should be reported including (but notlimited to): geological observation; geophysicalsurvey results; geochemical survey results; bulksamples–sizeandmethodoftreatment;metallurgicaltestresults;bulkdensity,groundwater,geotechnicalandrockcharacteristics;potentialdeleteriousorcontaminating substances. | All meaningful and material information has been included in thebody of the text. No metallurgical or mineralogical assessmentshave been completed. | ||||
| Further Work | The nature and scale of planned further work(e.g.testsforlateralextensionsordepthextensions or large – scale step – out drilling). | A discussion of further exploration work is contained in the body ofthe ASX Release. | ||||
| Diagramsclearlyhighlightingtheareasofpossibleextensions,includingthemaingeological interpretations and future drillingareas,providedthisinformationisnotcommercially sensitive. |
| HOLE ID | NORTHING(m) | EASTING(m) | DIP(deg) | AZM(deg) | DEPTH(m) | FROM(m) | TO(m) | WIDTH(m) | Ni(%) | Cu(ppm) | Pt+Pd(ppb) |
|---|---|---|---|---|---|---|---|---|---|---|---|
| DRAC35 | 6739401 | 527150 | ‐60 | 250 | 244 | 100 | 118 | 18 | 0.40 | 342 | 197 |
| 100 | 104 | 4 | 0.57 | 366 | 294 | ||||||
| 112 | 114 | 2 | 0.51 | 584 | 281 | ||||||
| DRAC38 | 6733696 | 530786 | ‐60 | 250 | 298 | 108 | 138 | 30 | 0.31 | 10 | 31 |
| 132 | 138 | 6 | 0.48 | 40 | 48 | ||||||
| 132 | 134 | 2 | 0.62 | 92 | 53 | ||||||
| DDNRC002 | 6742718 | 523717 | ‐60 | 59 | 246 | 53 | 60 | 7 | 0.54 | ||
| 53 | 55 | 2 | 1.08 |
Table 1 to 2012 JORC Section – Significant intersections in DRAC35, DRAC38 and DDNRC002.
These historical holes are the first identification of nickel sulphides at the East Laverton Property. For further details on DRAC35 and DRAC38, see the ASX Release dated 25 October 2012 "Drill Results at Project Dragon". For further details on DDNRC002, see the ASX Release dated 11 April 2013 "St George Provides Exploration Update". These ASX Releases are available to view on the Company's website at www.stgm.om.au