Quarterly Report / Q2 December FY21
(3 months to 31 December 2020)
----- End of picture text -----

==> picture [170 x 55] intentionally omitted <==

Highlights Q2 December FY21[1]

Safety

  • TRIFR[2] safety performance was 3.3 as at 31 December 2020 (30 September 2020: 3.1), with corresponding LTIFR[3] at 31 December 2020 of 0.39 (30 September 2020: 0.2)

  • No COVID-19 transmissions on any site with ongoing high vigilance and comprehensive protocols in place

Operations

  • Gold production of 89,670 ounces (Q1 Sep FY21: 72,990 ounces)

  • All-In Sustaining Cost (AISC) of A$1,517 per ounce (Q1 Sep FY21: A$1,711 per ounce)

  • Operational cash contribution in Q2 Dec FY21 of A$83 million (Q1 Sep FY21: A$27 million)

Finance

  • Total cash at bank of A$118 million (Q1 Sep FY21: A$93 million), after investments and other financing of $18 million, exploration expenditure of A$9 million, growth capex of A$8 million and income tax payments of A$7 million

  • Total debt of A$102 million (Q1 Sep FY21: A$105 million)

  • Average realised gold price in Q2 Dec FY21 of A$2,126 per ounce (Q1 Sep FY21: A$2,171 per ounce), with 59,485 ounces delivered into hedge contracts in the quarter

Outlook

  • FY21 guidance is maintained with consolidated gold production of between 370,000 to 410,000 ounces at an AISC of between A$1,360 and A$1,510 per ounce

Building Brilliance Program

  • Late in the first quarter of FY21, Building Brilliance at St Barbara was launched . This is an integrated company-wide program to create sustainable value through improving operational performance and reduce costs to deliver A$80 to A$120 million of annual cash contribution by FY23. The program is delivering early benefits that will be reflected in the results reported in the second half of FY21.

Production Summary

Q2 Dec
FY20
Q3 Mar
FY20
Q4 Jun
FY20
Q1 Sep
FY21
Q2 Dec
FY21
1H
FY21
Group TRIFR2 4.2 3.2 3.0 3.1 3.3 3.3
Gold Production
koz

94
92 109 73 90 163
All-In Sustaining Cost
A$/oz

1,364
1,405 1,301 1,711 1,517 1,605
Gold Sold
koz

97
99 104 66 99 166
Realised Gold Price
A$/oz

1,960
2,123 2,412 2,171 2,126 2,144
  • 1 This report uses certain Non-IFRS measures as set out on the last page of this report. Unless otherwise noted, information in this report that relates to Mineral Resources or Ore Reserves is extracted from the report titled ‘Ore Reserves and Mineral Resources Statements 30 June 2020’ released to the ASX on 24 August 2020. This report has not been audited.

  • 2 Total Recordable Injury Frequency Rate per million hours worked (12 month average)

3 Lost Time Injury Frequency Rate per million hours worked (12 month average) Investor Relations Mr David Cotterell Manager Investor Relations +61 3 8660 1959 ASX: SBM Media Relations Mr Ben Wilson GRACosway +61 407 966 083 ADR: STBMY Authorised by Ms Sarah Standish Company Secretary 27 January 2021

St Barbara Limited Level 10, 432 St Kilda Road, Melbourne VIC 3004 T +61 3 8660 1900 F +61 3 8660 1999 ACN 009 165 066 Locked Bag 9, Collins Street East, Melbourne VIC 8003 W www.stbarbara.com.au

==> picture [378 x 37] intentionally omitted <==

Leonora Province Plan

  • An internal review of the Leonora Province was completed in December 2020, which assessed the current resource and mineral inventory base contained within the regional tenement package, together with historical stockpiles. A strategic action plan is now being developed to define options and opportunities. A number of initial scopes of work are now advanced and in the planning phase include:

  • Review of all the geological models and data sets

  • Planning a structural review of the region to refine targeting opportunities

  • Review of the metallurgical test work at Harbour Lights. Harbour Lights hosts a historical resource and is open at depth and along strike.

  • The review highlighted low grade stockpiles within the Leonora tenements, some of which were trucked and milled in December 2020 and January 2021. Work is commencing on stockpiles at Braemore Sands and also the larger bulk stockpiles at Tower Hill. Further desktop assessment of an ore sorting trial is planned to understand the potential and costs associated with upgrading this material prior to trialling a bulk sample program.

  • In addition to the province plan work a number of supporting projects are planned to evaluate opportunities associated with:

  • Determining a cut-off grade strategy for Gwalia

  • Fully understanding the practical and theoretical throughput capacity of the Leonora mill to determine the processing cost ranges that can be achieved with incremental increased capacity. The objective is to ensure the viability of the lower grade resources from multiple options that are currently available, including further cash positive tolling arrangements

  • Drilling of the Gwalia Shallows (already commenced) to bring these areas into Measured and Indicated resources. The revised cut-off grade and mill throughput capacity is expected to complement this work. This will form part of the strategy to “Fill the Mill”

  • Understanding of the mineral field endowment and field grade. This is a key piece of work to evaluate and develop an overall strategic plan for the Leonora Province, and fill the mill with St Barbara owned ore as an aspiration.

  • These initial projects have commenced, while an overall holistic strategy is being developed as information and data becomes available. This includes a revision of the exploration drilling programs currently planned to support the conversion of resources in the Leonora region.

Building Brilliance at St Barbara

The Building Brilliance Program was launched late in Q1 September FY21 and has been gaining momentum during the December FY21 quarter. Building Brilliance initiatives are beginning to drive improvements in operational efficiency and unit cost within all our operations. Progress in delivering the targeted A$80 to A$120 million of annualised cash contribution will be reported in future quarterly reports.

  • Atlantic:

  • Mill de-bottlenecking : Improved gravity circuit capacity and grinding efficiency driving >5% increase in throughput

  • Maintenance efficiency : Improved shutdown planning on track to deliver 30% reduction in mill shut downtime

  • Spend control : Rigorous review process implemented for all discretionary spend.

  • Leonora:

  • Development efficiency and drilling speed : Roll-out of tele-remote operations and full digital automation for underground equipment driving increases in fleet utilisation

  • Spend control : Reviewing and challenging all third party spend at Gwalia operations to identify savings, including the mine production contract.

  • Simberi:

  • Mining fleet productivity : Plans established to improve availability through: workforce capability uplift; review of maintenance and spares strategy completed with critical spares ordered; sourcing additional truck capacity (contractor and second hand market)

  • Mill recovery : Implemented review of planning processes to better delineate/identify sulphide transitional material with improved mine to mill reconciliation with mining for value lens

  • Spend control : Negotiation of key contracts to achieve immediate savings.

St Barbara Limited Quarterly Report / Q2 December FY21

Page 2 of 19

==> picture [378 x 37] intentionally omitted <==

Comment on the Quarter from Managing Director and Chief Executive Officer

Mr Craig Jetson, Managing Director and CEO, said, “The second quarter of FY21 was a step-up from the first three months, with a steady production profile and lower All-in-Sustaining Costs. The operational cash contribution of A$83 million was a strong result and reflects our improved cost profile as we deliver on Building Brilliance.

I was pleased to detail St Barbara’s strategy at the investor presentation in mid-December. Our strategy provides a path to grow production +40% from 382 koz to 520-570 koz and reduce recurring annual costs by A$45 million. This will be delivered in two uplifts. The first is to deliver Building Brilliance in operations and extend mine life. The business is already reducing costs with a dual focus on near-mine exploration and mine plan optimisation.

Next, via Uplift 2, we will execute our brownfield expansion projects. Delivery of the Simberi Sulphide Feasibility Study, Atlantic project pipeline and filling the mill at Leonora are key to extracting maximum value from our existing footprint and commitment to these regions.

We have assembled a team with extensive operational and technical experience to deliver our strategy. Working to a detailed plan to deliver A$80 – A$120 million annual cash contribution by FY23, we are singularly focused on creating enduring value for St Barbara as we actively address and solve historical challenges and constraints.”

Quarterly briefing and audio webcast

Craig Jetson, Managing Director & CEO, will brief analysts and investors on the Q2 December FY21 Quarterly Report at 11:00 am Australian Eastern Daylight Time (UTC + 11 hours) on Wednesday 27 January 2021.

Analysts and institutional investors

    • Analysts and institutional investors can register for the briefing at https://s1.c conf.com/diamondpass/10011728 js875f.html

Shareholders and media

An audio webcast will be available live and after the event on St Barbara’s website at stbarbara.com.au/investors/webcast/ or by clicking here. The audio webcast is ‘listen only’ and does not enable questions.

St Barbara Limited Quarterly Report / Q2 December FY21

Page 3 of 19

==> picture [378 x 37] intentionally omitted <==

Overview

Group Safety Performance

Total Recordable Injury Frequency Rate

==> picture [239 x 80] intentionally omitted <==

----- Start of picture text -----

4.2
3.2 3.0 3.1 3.3
FY20 FY20 FY20 FY21 FY21
Q2 Dec Q3 Mar Q4 Jun Q1 Sep Q2 Dec
----- End of picture text -----

==> picture [228 x 197] intentionally omitted <==

----- Start of picture text -----

Consolidated Quarterly Operational Cash
Contribution
126
(A$M)
86 46 83
66
36 33
27
29 55
17
28
36
25
33
22 25
12 14
-23
FY20 FY20 FY20 FY21 FY21
Q2 Dec Q3 Mar Q4 Jun Q1 Sep Q2 Dec
Atlantic Leonora Simberi
----- End of picture text -----

Consolidated Gold Production

Quarterly AISC

==> picture [201 x 28] intentionally omitted <==

----- Start of picture text -----

1,711
1,517
1,364 1,405 1,301
----- End of picture text -----

Combined Quarterly Gold Production (koz)

FY21 Production Indicative Quarterly Guidance Profile

==> picture [227 x 158] intentionally omitted <==

----- Start of picture text -----

109
94 92 90
29
73
29 26 27
51 27
42 40 42
23
23 26 28 23 21
FY20 FY20 FY20 FY21 FY21
Q2 Dec Q3 Mar Q4 Jun Q1 Sep Q2 Dec
Atlantic Leonora Simberi
----- End of picture text -----

==> picture [216 x 160] intentionally omitted <==

----- Start of picture text -----

30%
28%
23%
19%
FY21 FY21 FY21 FY21
Q1 Sep Q2 Dec Q3 Mar Q4 Jun
Actual Indicative % of annual production (koz)
----- End of picture text -----

Figures displayed to nearest thousand ounces. Reported ounces in associated table.

St Barbara Limited Quarterly Report / Q2 December FY21

Page 4 of 19

==> picture [378 x 37] intentionally omitted <==

Consolidated Gold Production & Guidance

Production Summary
Consolidated
Q3 Mar
FY20
Q4 Jun
FY20
Year
FY20
Q1 Sep
FY21
Q2 Dec
FY21
1H
FY21
Guidance
FY21
St Barbara’s financial year is
1 July to 30 June
Qtr to
31 Mar 2020
Qtr to
30 Jun 2020
Year to
30 Jun 2020
Qtr to
30 Sep 2020
Qtr to
31 Dec 2020
6 months to
31 Dec 2020
Year to
30 June 2021
Production
Atlantic
oz
Gwalia
oz
Simberi
oz
Consolidated
oz
Mined Grade
Atlantic
g/t
Gwalia
g/t
Simberi
g/t
Total Cash Op. Costs
Atlantic
A$/oz
Gwalia
A$/oz
Simberi
A$/oz
Consolidated
A$/oz
All-In Sustaining Cost
Atlantic
A$/oz
Gwalia
A$/oz
Simberi
A$/oz
Consolidated
A$/oz

26,032

39,684

25,831
29,209
51,297
28,106
106,663
171,156
104,068
27,226
22,625
23,139
26,693
42,198
20,779
53,919
64,823
43,918
100 to 115 koz
175 to 190 koz
95 to 105 koz

91,547

0.91

8.1

1.05

773

1,117

1,459
108,612
0.88
7.0
1.07
675
1,041
1,360
381,887
0.93
7.7
1.06
713
1,071
1,482
72,990
0.95
8.1
1.19
669
1,560
1,481
89,670
0.91
8.3
1.49
736
1,037
1,817
162,660
0.93
8.2
1.32
703
1,220
1,640
370 to 410 koz
Milled grade
1.33
8.3
1.25
n/a
n/a
n/a

1,116

951

1,556

1,629
1,025
988
1,389
1,467
1,083
928
1,485
1,631
1,203
1,008
2,592
1,678
1,128
999
1,573
2,070
1,162
1,002
1,933
1,863
n/a
955 to 1,1001
1,435 to 1,560
1,665 to 1,8402

1,405
1,301 1,369 1,711 1,517 1,605 1,360 to 1,510
Group Exploration Actual
Q1 Sep FY21
**A$M **
Actual
Q2 Dec FY21
**A$M **
Actual
1H FY21
**A$M **
Guidance
FY21
**A$M **
Australia:
Leonora Region
Pinjin WA, Lake Wells WA, Back Creek NSW
Tabar Island Group, Papua New Guinea
Nova Scotia, Canada
2.2
1.3
1.1
1.5
1.9
3.7
1.3
1.8
4.1
5.0
2.4
3.3
8 - 9
10 - 11
2- 3
10 - 12
Consolidated 6.1 8.7 14.8 30 - 35
Group Capex Actual
Q1 Sep FY21
Actual
Q2 Dec FY21
Actual
1H FY21
Guidance
FY21
Sustaining
Growth
Sustaining
Growth
Sustaining
Growth
Sustaining
Growth
A$M
A$M
A$M
A$M
A$M
A$M
A$M
A$M
Atlantic
Gwalia
Simberi
6
1
19
6
2
1
5
2
18
5
3
1
11
3
37
11
5
2
15 - 20
15 - 20
70 - 80
30 - 32
12 - 15
4 - 5
Consolidated 27
8
26
8
53
16
97 - 115
49 - 57

1 C$880 to C$1,010 per ounce @ AUD/CAD 0.92 2 US$1,185 to US$1,305 per ounce @ AUD/USD 0.71

St Barbara Limited Quarterly Report / Q2 December FY21

Page 5 of 19

==> picture [378 x 37] intentionally omitted <==

Atlantic Gold, Nova Scotia, Canada

AISC

==> picture [228 x 258] intentionally omitted <==

----- Start of picture text -----

(A$/oz)
1,008 999
823 951 988
Milled grade
(g/t Au)
1.5 1.2 1.4 1.3 1.2
Reserve grade
Production 1.1 g/t Au 30 June 2020
(koz)
29 29 27
26 27
FY20 FY20 FY20 FY21 FY21
Q2 Dec Q3 Mar Q4 Jun Q1 Sep Q2 Dec
Operations
----- End of picture text -----

  • Production for Q2 Dec FY21 was 26,693 ounces (Q1 Sep FY21: 27,226 ounces) reflecting slightly lower mill grades and marginally lower recovery.

  • The average milled grade was slightly lower at 1.24 g/t Au (Q1 Sep FY21: 1.29 g/t Au), with mill throughput higher at 714 kt (Q1 Sep FY21: 698 kt).

  • Gold recovery of 94% in Q2 Dec FY21 was consistent with the previous quarter (Q1 Sep FY21: 94%), with higher gravity circuit recovery helping offset the relining of two carbon-inleach tanks in December.

  • AISC of A$999 per ounce for Q2 Dec FY21 was slightly lower than the previous quarter (Q1 Sep FY21: A$1,008 per ounce).

  • During the quarter sustaining capital expenditure amounted to A$5 million (Q1 Sep FY21: A$6 million), mainly on the next lift for the tailings storage facility.

Atlantic Gold growth projects

  • COVID-19 restrictions have slowed some stakeholder engagement related to permitting of the Atlantic growth projects. The Federal permitting agencies have reopened and are accepting submissions, however, the legislated requirement for public consultations has been interrupted due to COVID-19. Engagement with First Nations groups has largely recommenced with good progress at Fifteen Mile Stream. Impacts from COVID-19 on the progression of the Atlantic projects are being closely monitored with a mitigation action plan developed to minimise these impacts. Organisation changes have been made at Atlantic Gold with the appointment of a General Manager Community Engagement and Permitting focussing on First Nations Engagement, Government Engagement and driving permitting.

  • Beaver Dam: It is anticipated that the updated Federal Environmental Impact Statement (EIS), responding to the second round of information requests, will be submitted in Q3 Mar FY21 with approval of the EIS anticipated in Q2 Dec FY22. The Feasibility Studies relating to mining, plant design, and haul road along with the associated site investigations remain on schedule for completion in Q4 FY21. This includes the execution planning for subsequent project phases.

  • Fifteen Mile Stream: Site investigative studies and First Nations engagement are advancing sufficiently to allow for the EIS submission in Q3 Mar FY21. Various Building Brilliance initiatives are being reviewed and developed for incorporation into the project with the Feasibility Study on track for completion in Q4 Jun FY21.

  • Cochrane Hill: The Nova Scotia Government recently advised the deferral of a decision to designate Archibald Lake as a protected wilderness area. Whilst awaiting further clarification around this decision, work continued during the period with respect to several trade-off studies along with further environmental investigations in support of the planned EIS and Feasibility Study for this project.

Outlook

  • FY21 guidance is unchanged and comprises:

  • Production between 100,000 and 115,000 ounces

  • AISC between A$955 and A$1,100 per ounce[1]

  • Sustaining capex of A$15 to A$20 million

  • Growth capex of A$15 to A$20 million.

1 C$880 to C$1,010 per ounce @ AUD/CAD 0.92

St Barbara Limited Quarterly Report / Q2 December FY21

Page 6 of 19

==> picture [378 x 37] intentionally omitted <==

Gwalia, Leonora, WA

==> picture [224 x 278] intentionally omitted <==

----- Start of picture text -----

AISC
(A$/oz)
2,592
1,556 1,389 1,573
1,471
Mined grade
(g/t Au)
8.0 8.1 8.1 8.3
7.0
Reserve grade
Production 6.3 g/t Au 30 June 2020
(koz)
51
42 42
40
23
FY20 FY20 FY20 FY21 FY21
Q2 Dec Q3 Mar Q4 Jun Q1 Sep Q2 Dec
----- End of picture text -----

Gwalia total material moved (kt)

==> picture [226 x 138] intentionally omitted <==

----- Start of picture text -----

275
267 17
249 241
44
99 187
89 6 84
102
231
165 149 157
85
FY20 FY20 FY20 FY21 FY21
Q2 Dec Q3 Mar Q4 Jun Q1 Sep Q2 Dec
Ore mined Development waste Raisebore waste
----- End of picture text -----

Operations

  • AISC of A$1,573 per ounce in Q2 Dec FY21 was significantly lower than the previous quarter (Q1 Sep FY21: A$2,592 per ounce), largely as a result of increased production.

  • A paste reticulation blockage in October delayed paste filling of stopes by ~11 days, negatively impacting stope tonnages in the quarter. As part of the decline rehabilitation program a 4 day shutdown was conducted in November, which limited activities underground. A final 4 day shutdown in January will complete the decline rehabilitation program.

  • Stope long hole drilling was impacted by some hole cleaning, delaying some firings. A review of drill & blast practices has been completed, looking at opening up the strike length and the ring designs, with external technical expertise assisting.

  • The underground Wi-Fi network has been completed, which now enables long hole drilling from the surface during shift change. The Auto Drill features on the Sandvik rigs have also been commissioned. Together these initiatives are delivering an additional 30 to 40 drill metres per day, ramping up further as operations become accustomed to using the technology.

  • The Sandvik AutoMine system is also now running on the WiFi network, with improved bogging rates and the ability to run multiple loaders with one operator from surface. The next step is remote operating the new 422i development jumbo from surface to allow development drilling over shift change, which is expected to give a further lift in development advance rates. All of these initiatives are part of the Building Brilliance program

  • Third party ore processed in Q2 Dec FY21 was 84 kt, with discussions also progressing on longer term contracts for third party ore.

  • At the end of the quarter a new toll processing agreement (TPA) was entered into with Linden Gold Alliance (LGA). The TPA also includes a financing facility for the development of the Second Fortune Project. Under the TPA, LGA will deliver a minimum of 300 kt (and up to 390 kt) over a 22 month period, with ore scheduled for processing from April 2021.

  • This TPA delivers the majority of the toll processing arrangements outlined in Building Brilliance Uplift 1 on slide 28 of the Investor Briefing dated 15 December 2020. However, additional suitable one-off toll milling arrangements with third parties are also being considered.

Outlook

  • Gwalia gold production for Q2 Dec FY21 was 42,198 ounces (Q1 Sep FY21: 22,625 ounces). Average mined grade for the quarter was 8.3 g/t Au (Q1 Sep FY21: 8.1 g/t Au).

  • FY21 guidance is unchanged and comprises:

    • Production between 175,000 and 190,000 ounces
  • Q2 Dec FY21 mined volume was substantially higher at 157 kt compared to the previous quarter (Q1 Sep FY21: 85 kt), reflecting a return to higher volumes of stope ore.

  • Ore milled in the quarter was 177 kt (Q1 Sep FY21: 97 kt), with recovery remaining consistent at 97%.

  • AISC between A$1,435 and A$1,560 per ounce

  • Sustaining capex of A$70 to A$80 million

  • Growth capex of A$30 to A$32 million

St Barbara Limited Quarterly Report / Q2 December FY21

Page 7 of 19

==> picture [378 x 37] intentionally omitted <==

Simberi, Papua New Guinea

==> picture [222 x 279] intentionally omitted <==

----- Start of picture text -----

AISC
(A$/oz)
2,070
1,851
1,678
1,629 1,467
Milled grade
(g/t Au)
1.31 1.30 1.30
1.08 1.12
Reserve grade
1.2 g/t Au 30 June 2020
Production
(koz)
28
26
23 23
21
FY20 FY20 FY20 FY21 FY21
Q2 Dec Q3 Mar Q4 Jun Q1 Sep Q2 Dec
----- End of picture text -----

Operations

  • Simberi gold production for Q2 Dec FY21 was 20,779 ounces (Q1 Sep FY21: 23,139 ounces).

  • Production was lower than the previous quarter due to substantially lower mill recovery at 63% (due to processing transitional ore – see below) (Q1 Sep FY21: 79%), offsetting higher milled tonnes of 796 kt (Q1 Sep FY21 703 kt). Milled grade was unchanged at 1.30 g/t Au (Q1 Sep FY21: 1.30 g/t Au).

  • Total material movement was lower at 2,435kt (Q1 Sep FY21: 2,537kt), due to lower truck fleet availability. A fleet improvement program is in progress, which includes purchasing additional fleet.

  • Mining focused primarily on East and West Botlu, Pigibo, Sorowar South and commencement of Samat open pits during the quarter.

  • During the December quarter, the remaining 1,200 metres of original belt on the aerial Rope conveyor were replaced. This has improved availability and together with higher availability of the processing circuit resulted in higher mill throughput this quarter compared to the previous quarter.

manage negative reconciliation from mining, resulting in less available oxide ore.

  • Negative reconciliation in the Samat pit reduced the availability of higher grade oxide ore. Further grade control drilling and a review of the grade control model is in progress.

  • AISC for Q2 Dec FY21 increased ~23% to A$2,070 per ounce (Q1 Sep FY21: A$1,678 per ounce), primarily due to higher mining costs and ~11% lower production.

  • Simberi has continued to operate through COVID-19 with no positive cases reported on the Island. We continue to monitor and protect our workforce and local community with COVID-19 management protocols.

Simberi Sulphide Project Update

  • The Feasibility Study is progressing to plan and will be completed at the end of January 2021 for internal review, and for subsequent consideration by the Board in March 2021.

  • The study anticipates one-year to obtain relevant permits and approvals, and a two-year construction period. The current mine plan anticipates processing oxides into FY24.

  • The Company has engaged with the Papua New Guinea (PNG) Conservation and Environmental Protection Authority (CEPA) regarding a variation to the existing environmental permit. Through engagement with CEPA the delivery of the Environmental and Social Impact Assessment remains on track for submission in March 2021, with the approval timeline expected to take up to 12 months.

  • During the quarter the Company provided an update to various government departments (CEPA, Mineral Resources Authority) and stakeholders (New Ireland Provincial Governor, Member for Namatani) on the project status and plan moving forward. The update was well received.

Outlook

  • FY21 guidance is unchanged and comprises:

    • Production between 95,000 and 105,000 ounces

    • AISC between A$1,665 and A$1,840 per ounce[1]

    • Sustaining capex of A$12 to A$15 million

    • Growth capex of A$4 to A$5 million related to the feasibility study.

  • Recovery was lower than planned due to a higher proportion of transitional ore being processed. Transitional high grade ore usage was increased to

1 US$1,185 to US$1,305 per ounce @ AUD/USD 0.71

St Barbara Limited Quarterly Report / Q2 December FY21

Page 8 of 19

==> picture [378 x 37] intentionally omitted <==

Exploration Activities

  • Exploration activity for Q2 Dec FY21 is presented in the following order:

  • Australia

  • Canada

  • PNG

and is summarised in the table below:

Exploration Activity Summary Exploration Activity Summary
Australia
Gwalia Near Mine (WA)
20 UG Diamond holes for 4,636 m
Leonora Regional (WA)
46 RC holes for 7,367 m

26 Aircore holes for 1,533 m
Pinjin (WA)
No field activity
Lake Wells (WA)
260 Aircore holes for 15,727 m

1.5 Diamond holes for 452 m
Back Creek (NSW)
No field activity
Horn Island (QLD)
12 Diamond holes for 4,489 m
Drummartin JV (VIC)
11 Aircore holes for 1,008 m
Canada
Moose River Corridor
No field activity
Touquoy Camp
10 Diamond holes for 1,680 m

32 RC holes for 3,376 m
NE Regional
2 Diamond holes for 313 m
SW Regional
212 IFRC holes for 5,142 m
PNG
Simberi
11 Diamond holes for 849 m

17 RC holes for 905 m
Tatau
No field activity

Australia

Figure 1.0 Gwalia and surrounding Leonora tenements

Pinjin Project, WA (Figure 2.0)

  • No field activities occurred during the quarter. Final assays from the 5 hole RC program completed in the previous quarter were returned. Follow up drilling is planned in Q4 June FY21.

Lake Wells Gold Project, WA (Figure 2.0)

Gwalia Exploration, Leonora WA (Figure 1.0)

  • Gwalia near mine: An underground diamond drill program testing Gwalia Shallows mineralisation between 350 and 600 mbs was carried out with 20 holes completed during the quarter for 4,636 m. To date, 38 holes have been completed for 8,806 m, to test the Shallows. An additional phase of Gwalia Shallows underground drilling, comprising 8 holes for 2,500 metres, is planned to assist with resource estimation work and will commence early in Q3 Mar FY21.

  • Leonora regional: A 46 hole RC drill program for 7,367 m was completed testing 5 targets (Jasper Hills, Beaumaris, Falklands Trend, Backgammon and Royal Arthur Bore). A 26 hole Aircore drill program for 1,533 m was completed at Ascension. Assay results for both programs will be reported in Q3 Mar FY21.

  • A 338 hole, 19,853 m Aircore drill program testing five targets commenced in September and was completed in December 2020. Anomalous bedrock gold assay results will be followed up by a 19 hole RC drill program in Q3 Mar FY21. A 3 hole diamond drill program commenced in December 2020 and to date 1.5 holes have been completed for 452 m.

Back Creek, NSW (Figure 2.0)

  • Subject to access, diamond drilling at the North East target in EL8530 testing an induced polarisation (IP) chargeability anomaly and the South West target in EL8214 testing a gold in bedrock anomaly is planned to commence in Q3 Mar FY21.

Horn Island, QLD (Figure 2.0)

  • A diamond drill program of 13 holes for 4,591 m that commenced in late September 2020 was completed testing

St Barbara Limited Quarterly Report / Q2 December FY21

Page 9 of 19

==> picture [378 x 37] intentionally omitted <==

two main chargeability anomalies including one surrounding and extending approximately 600 m northwest from the current Alice Queen Limited (ASX: AQX) inferred resource and a second located further to the northwest. All assay results are expected to be received in the Q3 Mar FY21.

Subject to results, additional drill programs will commence in Q3 Mar FY21, with up to an additional 3,700 m of drilling planned for HLS, HLS-Gap and Touquoy West Scheelite Closure.

SW Regional

Drummartin, VIC (Figure 2.0)

  • An aircore drill program of up to 118 holes for 18,025 m planned to test four gravity targets commenced in December 2020. To date 11 holes have been completed for 1,008 m. Subject to access, drilling is expected to recommence in Q3 Mar FY21.

==> picture [242 x 213] intentionally omitted <==

  • Interface RC (IFRC) drilling program continued until earlyDecember 2020. 212 IFRC holes were completed for 5,142 m testing six targets (Moses Lake A, Green Harbour A, C, D and E, plus Pleasantfield C). To date, the overall drill program comprises 424 IFRC holes for 10,662 m testing nine targets. Drilling is expected to recommence early in Q3 Mar FY21. Exploration Licence 52645 at Pleasant River Barrens was surrendered.

NE Regional

  • Two diamond holes for 313 m were completed at Cameron Dam. Subject to access, an additional 16 diamond holes for 2,550 m and 10 IFRC holes for 200 m will be completed in Q3 Mar FY21 testing four targets (Cameron Dam, Little Meander, Lake Catcha and Harrigan Cove).

Figure 2.0 Australia and Papua New Guinea Project Locations

Canada

Atlantic Gold, Nova Scotia (Figure 3.0)

Moose River Corridor

Figure 3.0 Nova Scotia Project Locations

  • Subject to access, a program of 58 drill holes for 3,595 m (41 IFRC holes for 1,435 m, 14 RC holes for 1,560 m and 3 diamond holes for 600m) testing three Caribou targets is expected to commence in early Q3 Mar FY21.

PNG

Simberi, Tatau & Tabar Islands (Figure 4.0)

Touquoy Camp

  • 10 diamond drill holes for 1,680 m and 20 RC holes for 2,088 m were completed in Q2 Dec FY21 testing a 1,100 m strike length of the Higgins-Lawlers-Stillwater (HLS) target located 2 km South West of Touquoy Mine. An additional 12 RC drill holes for 1,288 m were completed testing an 800 m strike length of the Higgins-Lawlers-Stillwater-Gap (HLS-Gap) target located in between the HLS target and the Touquoy Mine.

  • Diamond and RC drilling of five oxide targets on Simberi Island (ML136) to define potential additional inferred resources continued through Q2 Dec FY21. 17 RC holes for 905 m and 11 diamond drill holes 849.2 m was completed. To date, 40 RC holes for 2,080 m and 18 diamond holes for 1,340 m has been completed at Pigibo North, Andora, Monun South and NW Sorowar. Drilling is expected to continue through part of Q3 Mar FY21.

St Barbara Limited Quarterly Report / Q2 December FY21

Page 10 of 19

==> picture [378 x 37] intentionally omitted <==

==> picture [222 x 295] intentionally omitted <==

Equity Investments

At the date of this report, St Barbara holds the following At the date of this report, St Barbara holds the following
investments in Australian explorers1:
Catalyst Metals Limited (ASX:CYL) 14%
Duketon Mining Limited (ASX:DKM) 12%
Peel Mining Limited (ASX:PEX) 13%
  • During the quarter St Barbara participated in the new capital raise by Catalyst Metals (ASX: CYL) investing $3.2 million.

Figure 4.0 Tabar Islands Location Map, Papua New Guinea

Group Exploration Expenditure (unaudited)

  • Expenditure on mineral exploration is shown below:
Australia
Canada – Moose
River Corridor
Canada – Regional

PNG*
Q1
Sep FY21
3.5
0.1
1.4
1.1
Q2
Dec FY21
1H
FY21
A$ million
5.6
9.1
0.1
0.2
1.7
3.1
1.3
2.4
6.1 8.7
14.8
  • These items are expensed

1 Shareholdings as notified by St Barbara in substantial holder notices St Barbara Limited Quarterly Report / Q2 December FY21

Page 11 of 19

==> picture [378 x 37] intentionally omitted <==

Health, Safety, Environment and Community

SBM COVID-19 Management Framework

  • Total Recordable Injury Frequency Rate (TRIFR)[1] safety performance was 3.3 as at 31 December 2020 compared to 3.1 at 30 September 2020. The corresponding Lost Time Injury Frequency Rate (LTIFR)[2] at 31 December 2020 was 0.39 (30 September 2020: 0.2).

  • There have been:

  • Six recordable injuries for the quarter, most of low severity, with one lost time injury and the injured worker has now returned to light duties.

  • No COVID-19 transmissions with ongoing protocols including screening, hygiene and physical distancing in place.

  • Focus over the quarter has been on contractor management, COVID-19 management and Line of Fire prevention across all sites.

  • COVID-19 management remains unchanged and focus is high.

  • Atlantic Gold has received official notification from Nova Scotia Environment (NSE) of legal proceedings in relation to 32 environmental incidents, which were self-reported by the Company to NSE. Atlantic Gold has been proactively working with NSE to address these matters. Full and thorough remediation work was conducted at the time of the incidents, all of which were reported, with an ongoing focus on mitigation. The main incidents raised by the NSE relate to instances where significant rainfall events have caused water, containing silty road materials, to run-off secondary access driveways, causing and overwhelm the existing storm water management system to overflow. There is no connection with or impact on current mining activities, including the tailings processing and management facility. Any consequences resulting from these charges are likely to have an immaterial financial impact.

COVID-19 Management

  • St Barbara continues to diligently apply our COVID-19 Protocols including ongoing screening, increased hygiene, personal protective equipment (masks) and non-essential personnel working remotely where risks remain high.

  • In PNG, all fly-in fly-out (FIFO) workers complete thorough screening and quarantine before coming onto site and all local workers are screened on a daily basis. Leonora continues to apply screening for all FIFO personnel from Perth and daily screening while on site. Atlantic continues to screen all personnel on a daily basis including any visitors and contractors.

Community

  • During the quarter:

  • Leonora Shooting Stars school engagement program for girls won a Special Commendation award at the Department of Mines, Industry Regulation and Safety Community Partnership Resource Sector Awards

  • March 2020 marked 15 years of St Barbara’s ownership of the Gwalia mine. Celebrations for this important milestone, rescheduled from earlier in the year due to COVID-19 restrictions, took place in late November with the Leonora community.

  • In PNG, members of the Tabar community produced their first chocolate bar under the joint effort of St Barbara, Simberi Mining Area Association (SMAA) and Simberi Mining Services (SMS). St Barbara reintroduced cocoa farming under a sustainable development program upon purchasing the mine in 2012.

  • Atlantic Gold held key stakeholder meetings with First Nations groups (KMKNO, PLFN and Paqtnkek Chiefs/Councils) as part of the engagement and permitting process for our growth projects.

  • We continued to build on the breadth and depth of experience in the business to enhance Traditional Owner and First Nations engagement capacity, an important component of the Community and Social Performance Strategy.

Sustainability

  • During the quarter:

    • The Group’s submission to the Carbon Disclosure Project (CDP) scored a ‘C’ for Climate Change, with the highest recognition being ‘A’. CDP is a not-for-profit charity that runs the global disclosure system for investors, companies, cities, states and regions to
  • 1 Total Recordable Injury Frequency Rate per million hours worked (12 month average).

  • 2 Lost Time Injury Frequency Rate per million hours worked (12 month average).

St Barbara Limited Quarterly Report / Q2 December FY21

Page 12 of 19

==> picture [378 x 37] intentionally omitted <==

manage their environmental impacts. The CDP Climate Change incorporates 15 criteria. The world’s economy looks to CDP as the gold standard of environmental reporting with the richest and most comprehensive dataset on corporate and city action.

  • This year St Barbara submitted data to the Bloomberg Gender Equality Index joining a number of global companies that support transparent reporting of gender statistics. The index incorporates 74 metrics within five pillars:

  • Female leadership & talent pipeline

  • Equal pay & gender pay parity

  • Inclusive culture

  • Sexual harassment policies

  • Pro-women brand

St Barbara Limited Quarterly Report / Q2 December FY21

Page 13 of 19

==> picture [378 x 37] intentionally omitted <==

Finance (unaudited)

  • 99,461 ounces of gold were sold in Q2 Dec FY21, at an average realised gold price of A$2,126 per ounce (Q1 Sep FY20: 66,460 ounces at A$2,171 per ounce), with 59,485 ounces delivered into hedge contracts in the quarter.

  • Total cash at bank at 31 December 2020 was A$118 million[1] (30 September 2020: A$93 million), after investments and other financing of A$18 million, exploration expenditure of A$9 million, growth capex of A$8 million and income tax payments of A$7 million.

  • During the quarter the Company signed a debt facility agreement with Linden Gold Alliance in support of a toll processing agreement at Gwalia. The debt facility is a A$16 million term loan to fund the redevelopment of the Second Fortune Project, with the first draw down in December 2020 amounting to A$9.1 million. The debt facility includes loan covenants and security and is at a commercial interest rate for this type of facility.

  • Total debt owing under the Company’s syndicated facility at 31 December 2020 was A$102 million (30 September 2020: A$105 million). The Australian tranche of the syndicated facility of A$200 million remains undrawn.

  • The Company generated an operational cash contribution in Q2 Dec FY21 of A$83 million (Q1 Sep FY21: A$27 million).

  • Cash movements are summarised in the following table:


Cash movements are summarised in the follo

Cash movements are summarised in the follo
wing table:
Cash movements & balance A$M Q2 Dec Q3 Mar Q4 Jun Q1 Sep Q2 Dec
(unaudited) FY20 FY20 FY20 FY21 FY21
Operating cash flow2 Atlantic 25 36 46 17 33
Leonora 12 28 55 (23) 36
Simberi 29 22 25 33 14
Operational cash contribution 66 86 126 27 83
Growth capital - Atlantic (10) (2) (2) (1) (2)
Leonora (1) (7) (8) (6) (5)
Simberi (4) (1) (1) (1) (1)
Project costs (2) (2) (3) (2) (7)
Corporate costs3 (6) (7) (7) (7) (7)
Corporate royalties (1) (2) (3) (1) (3)
Exploration4 (10) (6) (4) (6) (9)
Investments 3 - - (61) (3)
Income tax payments (24) (1) (6) (2) (7)
Working capital movement (2) 3 (5) (27) 2
Cash flows before finance costs 9 61 87 (87) 41
Net interest income/(expense) (3) (1) (2) (2) (1)
Other financing5 (3) (1) - (1) (15)
Syndicate facility draw down (repayment) - 200 - (200) -
Dividends paid - (18) - (22) -
Net movement for period 3 241 85 (312) 25
Cash balance at start of quarter 76 79 320 405 93
Cash balance at end of quarter 79 320 405 93 118
  • 1 Financial information unaudited. Balance comprises A$118 M cash.

2 Net of sustaining capex.

3 Cash corporate costs in Q1 Sep FY21 include payment of short term incentives for employees (inc. key management personnel) accrued at 30 June 2020. 4 Includes Gwalia deep drilling.

  • 5 Includes Linden Gold Alliance gold loan draw down ($9M) and net foreign exchange losses ($6M) related to USD and CAD Group cash balances.

St Barbara Limited Quarterly Report / Q2 December FY21

Page 14 of 19

==> picture [378 x 37] intentionally omitted <==

  • Hedging in place at the date of this report comprises:
Financial
Year
Volume
ounces
Price $/oz Type Delivery Delivery
schedule
Announced
FY21 2,138 C$1,759 Forward Feb 2021 - 24 Feb 20201
Mar 21 to
Dec 22
78,010 C$ 2,050 European call
options
Apr 2021 to Dec 2022 Monthly 24 Feb 20201

Corporate

Corporate
Share Capital
Issued shares
Opening balance 30 September 2020
Issued2
Closing balance 31 December 2020
Unlisted employee rights
Opening balance 30 September 2020
Issued2
Exercised as shares
Lapsed3
Closing balance 31 December 2020
Comprises rights:
30 June 2021
30 June 2022
30 June 2023
Closing balance 31 December 2020
ASX:SBM
705,357,181
933
705,358,114
ASX:SBMAK
2,189,017
1,995,257
Nil
-309,968
3,874,306
676,869
1,368,733
1,828,704
3,874,306

1 These forward contracts and European call options replaced previous forward contacts priced at C$1,550/oz.

2 ASX Appendix 3G 27 Nov 2020 rights issued to eligible employees under St Barbara Ltd Rights Plan; ASX Appendix 2A 27 Nov 2020 shares issued in accordance with the St Barbara Tax Exempt Share Plan.

3 ASX Appendix 3G 27 Nov 2020 rights lapsed of departed employees

St Barbara Limited Quarterly Report / Q2 December FY21

Page 15 of 19

==> picture [378 x 37] intentionally omitted <==

Corporate Directory

Shareholder Enquiries

St Barbara Limited ABN 36 009 165 066

Computershare Investor Services Pty Ltd

Board of Directors

Tim Netscher ...................................... Non-Executive Chairman Craig Jetson ...................................... Managing Director & CEO Steven Dean ......................................... Non-Executive Director Kerry Gleeson ....................................... Non-Executive Director Stef Loader ........................................... Non-Executive Director David Moroney .................................... Non-Executive Director

GPO Box 2975

Melbourne Victoria 3001 Australia Telephone (within Australia) 1300 653 935 Telephone (international) +61 3 9415 4356 Facsimile +61 3 9473 2500 www.investorcentre.com/au

Investor Relations

Company Secretary

David Cotterell, Manager Investor Relations +61 3 8660 1959

Sarah Standish ............ General Counsel & Company Secretary

Substantial Shareholders

Executives

Craig Jetson ...................................... Managing Director & CEO Garth Campbell-Cowan ......................... Chief Financial Officer Val Madsen .......................Executive General Manager People Evan Spencer ........................................ Chief Operating Officer

% of Holdings1
Van Eck Associates Corporation 10.9%
L1 Capital Pty Ltd 5.0%
Vanguard Group 5.0%

Registered Office

Level 10, 432 St Kilda Road

Melbourne Victoria 3004 Australia Telephone +61 3 8660 1900 Facsimile +61 3 8660 1999 Email [email protected] Website www.stbarbara.com.au

Scheduled Future Reporting

Scheduled Future Reporting
Date Report
17 February Half Year Financial Results
28 April Q3 March FY21 Quarterly Report

Dates are tentative and subject to change

Australian Securities Exchange (ASX) Listing code “SBM”

American Depositary Receipts (ADR OTC code “STBMY”) through BNY Mellon,

www.adrbnymellon.com/dr_profile.jsp?cusip=852278100

Financial figures are in Australian dollars (unless otherwise noted).

Financial year commences 1 July and ends 30 June.

Q1 Sep FY21 = quarter to 30 Sep 2020

Q2 Dec FY21 = quarter to 31 Dec 2020

Q3 Mar FY21 = quarter to 31 Mar 2021 Q4 Jun FY21 = quarter to 30 Jun 2021

1 As notified by the substantial shareholders to 25 January 2021

St Barbara Limited Quarterly Report / Q2 December FY21

Page 16 of 19

==> picture [378 x 37] intentionally omitted <==

Appendix

Site Gold Production

Site Gold Production
Production Summary Atlantic Gold, NS Gwalia, WA
Q2
Dec
FY20
Q3
Mar
FY20
Q4
Jun
FY20
Q1
Sep
FY21
Q2
Dec
FY21
1H
FY21
Q2
Dec
FY20
Q3
Mar
FY20
Q4
Jun
FY20
Q1
Sep
FY21
Q2
Dec
FY21
1H
FY21
Ore mined
kt
Waste mined
kt
Grade
g/t
Ore milled1
kt
Grade1
g/t
Recovery
%
1,124
1,006
1,127
1,077

975
728
906
1,137

1.02
0.91
0.88
0.95

637
693
681
698

1.51
1.24
1.41
1.29

94
94
95
94
854
1,087
0.91
714
1.24
94
1,931
2,224
0.93
1,411
1.27
94
165
149
231
85
99
89
44
102
8.0
8.1
7.0
8.1
184
179
244
97
7.3
7.1
6.8
7.5
97
97
97
97
157
84
8.3
177
7.6
97
242
186
8.2
274
7.6
97
Gold production
oz
Gold sold
oz
Realised gold price
A$/oz
29,067
26,032
29,209
27,226
29,051
29,563
30,620
22,789

1,846
1,998
2,350
1,844
26,693
29,294
1,966
53,919
52,083
1,913
42,022 39,684
51,297 22,625
43,098 42,268 51,025
16,490
1,914
2,019
2,358
1,914
42,198
47,846
2,022
64,823
64,336
1,994
All-In Sustaining Cost
A$/oz produced
Mining
Processing
Site services
Stripping & ore inventory adj
264
274
253
266
320
365
315
302
114
126
138
121
(67)
(38)
(81)
(52)
280
302
139
(29)
273
302
130
(40)
651
743
719
1,047
183
166
168
224
116
150
99
214
11
(6)
(9)
35
735
101
117
11
844
144
151
19
By-product credits
Third party refining &
transport
Royalties
631
727
625
637
(1)
(1)
(2)
(1)
2
2
3
2
37
45
49
31
692
(2)
3
43
665
(1)
2
37
961
1,053
977
1,520
(2)
(2)
(2)
(3)
1
2
2
1
56
64
64
42
964
(3)
2
74
1,159
(3)
2
63
Total cash operating costs
less operatingdevelopment *
669
773
675
669
-
-
-
-
736
-
703
-
1,016
1,117
1,041
1,560
(118)
(190)
(191)
(356)
1,037
(215)
1,220
(264)
Adjusted cash operating cost
Corporate and administration
Corporate royalty

Rehabilitation
Operating development
Capitalised mine development

Sustaining capital expenditure
-
-
-
-
58
73
64
90
-
-
-
-
5
6
5
13
-
-
-
-
-
-
-
-
91
99
244
236
-
75
-
13
-
-
175
-
82
-
13
-
-
205
898
927
850
1,204
58
73
64
90
33
39
54
44
5
6
5
12
110
182
193
379
340
308
178
827
27
21
45
36
822
75
59
8
191
342
76
956
82
54
9
256
511
64
All-In Sustaining Cost (AISC) 823
951
988
1,008
999 1,002 1,471
1,556
1,389
2,592
1,573 1,933
  • These items only relevant to Gwalia

1 Includes Gwalia mineralised waste

St Barbara Limited Quarterly Report / Q2 December FY21

Page 17 of 19

==> picture [378 x 37] intentionally omitted <==

Production Summary Simberi, PNG
Q2 Dec
FY20
Q3 Mar
FY20
Q4 Jun
FY20
Q1 Sep
FY21
Q2 Dec
FY21
1H
FY21
Ore mined
kt
Waste mined
kt
Grade
g/t
Ore milled
kt
Grade
g/t
Recovery
%

697
721
967
767

2,491
2,077
1,692
1,769

1.03
1.05
1.07
1.19

811
858
788
703

1.08
1.12
1.31
1.30

83
84
85
79
576
1,859
1.49
796
1.30
63
1,343
3,628
1.32
1,499
1.30
70
Gold production
oz
Gold sold
oz
Realised gold price
A$/oz

23,070
25,831
28,106
23,139

25,057
26,876
22,738
27,181

2,170
2,427
2,616
2,601
20,779
22,321
2,559
43,918
49,502
2,582
All-In Sustaining Cost
A$/oz produced
Mining
Processing
Site services
Stripping & ore inventory adj
616
513
444
526
681
576
543
597
348
310
333
330
-
-
-
(3)
760
652
362
-
637
623
345
(1)
By-product credits
Third party refining & transport
Royalties
1,645
1,399
1,320
1,450
(12)
(11)
(24)
(56)

12
8
11
11
59
63
53
76
1,774
(33)
7
69
1,603
(45)
9
73
Total cash operating costs
less operatingdevelopment *
1,704
1,459
1,360
1,481
-
-
-
-
1,817
-
1,640
-
Adjusted cash operating cost
Corporate and administration
Corporate royalty

Rehabilitation
Operating development
Capitalised mine development

Sustaining capital expenditure
-
-
-
-
58
73
64
90
-
-
-
-
33
29
23
31
-
-
-
-
-
-
-
-
56
68
20
76
-
75
-
35
-
-
143
-
82
-
33
-
-
108
All-In Sustaining Cost (AISC) 1,851
1,629
1,467
1,678
2,070 1,863
  • These items only relevant to Gwalia

St Barbara Limited Quarterly Report / Q2 December FY21

Page 18 of 19

==> picture [378 x 37] intentionally omitted <==

Disclaimer

  • This report has been prepared by St Barbara Limited (“Company”). The material contained in this report is for information purposes only. This release is not an offer or invitation for subscription or purchase of, or a recommendation in relation to, securities in the Company and neither this release nor anything contained in it shall form the basis of any contract or commitment.

  • This report contains forward-looking statements that are subject to risk factors associated with exploring for, developing, mining, processing and the sale of gold. Forward-looking statements include those containing such words as anticipate, estimates, forecasts, indicative, should, will, would, expects, plans or similar expressions. Such forward-looking statements are not guarantees of future performance and involve known and unknown risks, uncertainties, assumptions and other important factors, many of which are beyond the control of the Company, and which could cause actual results or trends to differ materially from those expressed in this report. Actual results may vary from the information in this report. The Company does not make, and this report should not be relied upon as, any representation or warranty as to the accuracy, or reasonableness, of such statements or assumptions. Investors are cautioned not to place undue reliance on such statements.

  • This report has been prepared by the Company based on information available to it, including information from third parties, and has not been independently verified. No representation or warranty, express or implied, is made as to the fairness, accuracy or completeness of the information or opinions contained in this report.

  • The Company estimates its reserves and resources in accordance with the Australasian Code for Reporting of Identified Mineral Resources and Ore Reserves 2012 Edition (“JORC Code”), which governs such disclosures by companies listed on the Australian Securities Exchange.

Non-IFRS Measures

  • The Company supplements its financial information reporting determined under International Financial Reporting Standards (IFRS) with certain non-IFRS financial measures, including Cash Operating Costs and All-In Sustaining Cost. We believe that these measures provide additional meaningful information to assist management, investors and analysts in understanding the financial results and assessing our prospects for future performance.

  • All-In Sustaining Cost (AISC) is based on Cash Operating Costs, and adds items relevant to sustaining production. It includes some, but not all, of the components identified in World Gold Council’s Guidance Note on Non-GAAP Metrics - All-In Sustaining Costs and All-In Costs (June 2013).

  • AISC is calculated on gold production in the quarter.

  • For underground mines, amortisation of operating development is adjusted from “Total Cash Operating Costs” in order to avoid duplication with cash expended on operating development in the period contained within the “Mine & Operating Development” line item.

  • Rehabilitation is calculated as the amortisation of the rehabilitation provision on a straight-line basis over the estimated life of mine.

  • Cash Contribution is cash flow from operations before finance costs, refer reconciliation of cash movement earlier in this quarterly report.

  • Cash Operating Costs are calculated according to common mining industry practice using The Gold Institute (USA) Production Cost Standard (1999 revision).

Competent Persons Statement

Exploration Results

  • The information in this report that relates to Exploration Results is based on information compiled by Dr Roger Mustard, who is a Member of The Australasian Institute of Mining and Metallurgy. Dr Mustard is a full-time employee of St Barbara and has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Dr Mustard consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

Mineral Resource and Ore Reserve Estimates

  • The information in this report that relates to Mineral Resources or Ore Reserves is extracted from the report titled ‘Ore Reserves and Mineral Resources Statements 30 June 2020’ released to the Australian Securities Exchange (ASX) on 24 August 2020 and available to view at www.stbarbara.com.au and for which Competent Persons’ consents were obtained. Each Competent Person’s consent remain in place for subsequent releases by the Company of the same information in the same form and context, until the consent is withdrawn or replaced by a subsequent report and accompanying consent.

  • The Company confirms that it is not aware of any new information or data that materially affects the information included in the original ASX announcements released on 24 August 2020 and, in the case of estimates of Mineral Resources or Ore Reserves, that all material assumptions and technical parameters underpinning the estimates in the original ASX announcements continue to apply and have not materially changed. The Company confirms that the form and context in which the Competent Person's findings are presented have not been materially modified from the original ASX announcements.

  • Full details are contained in the ASX release dated 24 August 2020 ‘Ore Reserves and Mineral Resources Statements 30 June 2020’ available at www.stbarbara.com.au.

St Barbara Limited Quarterly Report / Q2 December FY21

Page 19 of 19