Quarterly Report June 2013 & FY14 Guidance
----- End of picture text -----
==> picture [170 x 54] intentionally omitted <==
Q4 gold production up 24% to 107,000 ounces Encouraging exploration results at Simberi and Gold Ridge
Executive Summary
-
˃ Gold production increased in the June 2013 Quarter to 107,363 ounces; a 24% increase from the previous quarter.
-
˃ Combined FY13[1] production of 364,601 ounces of gold was within 0.4% of the FY13 production guidance range of 366,000 to 386,000 ounces, with a consolidated cash operating cost per ounce of A$1,013 per ounce[2] , within the FY13 guidance range of A$960 - A$1,020 per ounce.
-
˃ The Australian operations performed very well in Q4 and for the year. The Pacific Operations did not achieve the level of performance planned for FY13, and the Company is not satisfied with the rate of progress towards its stated goals.
-
˃ Two key issues impacting production in the Pacific Operations have been the delay in commissioning the Simberi oxide expansion, and lower than expected metallurgical recovery at Gold Ridge. The resolution of these two items is the immediate focus for the Pacific Operations.
-
˃ Early drilling results reported elsewhere in this report enhance our positive view of the long term value and upside potential of the Pacific Operations.
-
˃ Drilling results from Gold Ridge have been particularly encouraging with intersections of (all down-hole intercepts):
-
˃ GDC076: 13m @ 2.3 g/t Au from 48m; and 15m @ 2.6 g/t Au from 215m and 84m @ 2.0 g/t Au from 313m;
-
˃ DGD002: 4m @ 84.4 g/t Au from 231m, including 1m @ 332 g/t Au and 48.9 g/t Ag (silver).
-
˃ Encouraging drilling results at Mt Tiro, on Tatau Island, as a potential source of oxide material for the Simberi plant, include intersections of (all down-hole intercepts):
-
˃ TT034: 12m @ 8.8 g/t Au from 15m, including 3m @ 28.6 g/t Au from 15m;
-
˃ TT031: 23m @ 2.3 g/t Au from 10m, including 2m @ 13.5 g/t Au from 31m.
-
˃ The Company-wide Total Recordable Injury Frequency Rate (TRIFR), calculated as a rolling 12 month average, improved from 9.0 for the year to 30 June 2012, to 6.0 for the year to 30 June 2013. This is the lowest annual TRIFR since the measure was first adopted by St Barbara in 2009.
-
˃ St Barbara has a diversified portfolio of long term assets in Australia, Papua New Guinea and Solomon Islands as set out in the detail of this report. Key points include:
-
˃ Leonora Operations exceeded expectations with record quarterly production from Gwalia of 64,307 ounces.
-
˃ At Gold Ridge results demonstrate a lift in operating capability, as evidenced by increasing mining rates and processing throughput volumes.
-
˃ At Simberi we have encountered some short term issues that are being addressed (details page 7).
-
˃ Exploration activities are being focused on discovering additional ore feed sources for existing operations and to follow up positive drilling results in the Pacific.
-
˃ The Company is in a strong financial position with A$129 million cash at bank at 30 June 2013, and a long term debt structure that provides the Company great flexibility.
-
˃ The 2013 financial year has been one of transformation, with the divestment of Southern Cross Operations and the acquisition of the Pacific Operations.
-
˃ Included in this report is guidance for the 2014 financial year, with forecast gold production of 395,000 to 445,000 ounces (details page 12). The Company has developed a number of planning scenarios to operate profitably in a sustained lower gold price environment.
-
˃ The 2014 financial year will be one of further improvement and production growth through continuing to build operational capacity in the Pacific, focusing on reducing costs, and adding to gold inventory through exploration.
Tim Lehany
1 Financial year is 1 July to 30 June 2 Non-IFRS measure, calculation page 15
Managing Director and CEO 24 July 2013
St Barbara Limited Level 10, 432 St Kilda Road, Melbourne VIC 3004 ACN 009 165 066 Locked Bag 9, Collins Street East, Melbourne VIC 8003
T +61 3 8660 1900 F +61 3 8660 1999 W www.stbarbara.com.au
==> picture [378 x 38] intentionally omitted <==
St Barbara Attributable Gold Production
- ˃ The tables below show gold production and associated measures attributable to St Barbara, incorporating the Pacific Operations from the date of acquisition, 7 September 2012.
| Production Summary Consolidated |
Production Summary Consolidated |
Dec Qtr FY13 Mar Qtr FY13 Jun Qtr FY13 |
|
|---|---|---|---|
| Production Gwalia oz 43,745 40,772 64,307 King of the Hills oz 12,709 16,940 12,893 Southern Cross oz 12,292 - - Gold Ridge[1] oz 10,654 13,984 17,236 Simberi[1] oz 13,291 15,122 12,927 Consolidated oz 92,691 86,818 107,363 Mined Grade Gwalia g/t 7.7 8.2 9.0 King of the Hills g/t 4.7 4.1 4.4 Southern Cross g/t 2.1 - - Gold Ridge[1] g/t 1.4 1.5 1.7 Simberi[1] g/t 1.1 1.0 1.0 Total Cash Operating Costs[2] Gwalia $/oz 744 814 661 King of the Hills $/oz 829 892 901 Southern Cross $/oz 1,220 - - Gold Ridge[1] $/oz 2,180 1,393 1,627 Simberi[1] $/oz 1,253 1,080 1,598 |
43,745 40,772 64,307 12,709 16,940 12,893 12,292 - - 10,654 13,984 17,236 13,291 15,122 12,927 |
||
| Gwalia King of the Hills Southern Cross Gold Ridge[1] Simberi[1] |
|||
| Consolidated | $/oz 1,057 969 958 |
[1] Pacific Operations attributable to St Barbara from 7 September 2012. [2] Unaudited.
St Barbara Attributable Gold Production
==> picture [240 x 168] intentionally omitted <==
----- Start of picture text -----
107
99
93 87 17
28 78 11 13
14
4 13
4 13
16 19 12 15
13 17
16
64
54
44 41
34
FY 12 FY 13 FY 13 FY 13 FY 13
Q4 Jun Q1 Sep Q2 Dec Q3 Mar Q4 Jun
Gwalia King of the Hills Marvel Loch
Simberi Gold Ridge Total
koz
----- End of picture text -----
| Production Summary Consolidated |
Year FY13 Guidance FY13 |
|
|---|---|---|
| Production Gwalia oz King of the Hills oz Southern Cross oz Gold Ridge[1] oz Simberi[1] oz Consolidated oz Mined Grade Gwalia g/t King of the Hills g/t Southern Cross g/t Gold Ridge[1] g/t Simberi[1] g/t Total Cash Operating Costs[2] Gwalia $/oz King of the Hills $/oz Southern Cross $/oz Gold Ridge[1] $/oz Simberi[1] $/oz Consolidated $/oz Capital Expenditure[2] Gwalia $M King of the Hills $M Southern Cross $M Gold Ridge[1] $M Simberi[1] $M Consolidated $M |
183,116 175 -180,000 58,477 55 -60,000 31,468 31,000 45,931 50 -55,000 45,609 55 -60,000 |
|
| 364,601 366 -386,000 8.2 4.4 1.4 1.5 1.0 751 740-770 843 810-830 1,440 1,440-1,445 1,702 1,450-1,620 1,294 1,050-1,200 |
||
| 1,013 960-1,020 47 47-50 20 20-25 - - 11 17-20 51[3] 22-25 |
||
| 129 106-120 |
[1] Pacific Operations attributable to St Barbara from 7 September 2012. [2] Unaudited
[3] Includes $45 million relating to major projects
Figures displayed to nearest thousand ounces. Reported ounces in associated table.
Page 2 of 22
St Barbara Limited Quarterly Report June 2013 & FY14 Guidance
==> picture [378 x 38] intentionally omitted <==
Gwalia, Leonora, WA
==> picture [219 x 133] intentionally omitted <==
----- Start of picture text -----
Gwalia Gold Production
64.3
54.3
43.8
40.7
34.3
FY 12 FY 13 FY 13 FY 13 FY 13
Q4 Jun Q1 Sep Q2 Dec Q3 Mar Q4 Jun
koz
----- End of picture text -----
==> picture [183 x 34] intentionally omitted <==
----- Start of picture text -----
Gwalia Mined Grade
10.5
9.0
7.4 7.7 8.2
----- End of picture text -----
| FY | 12 | FY | 13 | FY | 13 | FY 13 | FY 13 |
|---|---|---|---|---|---|---|---|
| Q4 | Jun | Q1 | Sep | Q2 | Dec | Q3 Mar | Q4 Jun |
| g/t | Au |
Operations
-
˃ Record quarterly gold production of 64,307 ounces was produced from Gwalia at a mined grade of 9.0 g/t Au and a cash operating cost of $661 per ounce.
-
˃ Key factors contributing to the record production included:
-
˃ Higher tonnes of mined ore (224 kt compared to 175 kt steady-state volume) and less tonnes of waste than normal, both as foreshadowed in the March quarterly report;
-
˃ An increase in mined grade to 9.0 g/t Au;
-
˃ Strong operating performance to plan; and
-
˃ Production was sourced mainly from the South West Branch (SWB).
-
˃ The significant reduction in cash operating costs per ounce from $814 per ounce in the March quarter to $661 per ounce was primarily a function of the significant increase in gold production and 10% higher mined ore grade.
-
˃ Mining and processing unit cash operating costs were lower in the June quarter due to the benefit of higher production and a lift in grade. Site services unit cost was significantly lower due to the benefit of higher gold production and lower aggregate spend.
-
˃ The drill and blast execution issues that occurred in January and February were resolved with production achieved in the order of 20,000 ounces of gold for each month during the quarter. Compliance to the mine schedule coupled with effective controls over drill and blast execution contributed to the strong operating performance.
| Production Summary | Mar Qtr | Jun Qtr | Year | |
|---|---|---|---|---|
| Gwalia | FY13 | FY13 | FY13 | |
| Underground ore mined | kt | 159 | 224 | 696 |
| Grade | g/t | 8.2 | 9.0 | 8.2 |
| Low grade ore & stockpiles | kt | 12 | 26 | 136 |
| milled | ||||
| Grade | g/t | 1.6 | 2.5 | 1.5 |
| Ore milled | kt | 171 | 247 | 834 |
| Grade[1] | g/t | 7.7 | 8.4 | 7.1 |
| Recovery | % | 96 | 96 | 96 |
| Gold production | oz | 40,772 | 64,307 183,116 | |
| Cash Operating Costs[2] | $ | per ounce | ||
| Mining | 493 | 462 | 503 | |
| Processing | 132 | 103 | 128 | |
| Site services | 81 | 47 | 69 | |
| Stripping and ore inventory | 73 | 17 | 17 | |
| adjustments | ||||
| 779 | 629 | 717 | ||
| By-product credits | (5) | (5) | (5) | |
| Third party refining & transport | 1 | 1 | 1 | |
| Royalties | 39 | 36 | 38 | |
| Total cash operating costs | 814 | 661 | 751 | |
| Depreciation and amortisation | 237 | 218 | 228 | |
| Total operating costs | 1,051 | 879 | 979 |
[1] Includes Tower Hill low grade stockpile and Gwalia mineralised waste.
[2] Unaudited.
- ˃ The Gwalia mill, with a nameplate capacity of 1.2 million tonnes per annum, performed well, processing in excess of 345,000 tonnes of ore for the quarter and maintained recoveries at 96%.
Page 3 of 22
St Barbara Limited Quarterly Report June 2013 & FY14 Guidance
==> picture [378 x 38] intentionally omitted <==
King of the Hills, Leonora, WA
King of the Hills Gold Production
==> picture [219 x 102] intentionally omitted <==
----- Start of picture text -----
16.4 15.9 16.9
12.7 12.9
FY 12 FY 13 FY 13 FY 13 FY 13
Q4 Jun Q1 Sep Q2 Dec Q3 Mar Q4 Jun
koz
----- End of picture text -----
Operations
-
˃ The King of the Hills operation maintained its consistent performance, producing 12,893 ounces of gold at a milled grade of 4.3 g/t Au for the quarter.
-
˃ Gold production was constrained by Gwalia mill capacity where priority was given to the higher grade Gwalia ore. By the end of the quarter, a stockpile of ore had been established with an estimated 5,000 ounces of contained gold.
-
˃ The majority of ore was sourced from the Western Flank of the mine where selective mining methods are being applied to good effect.
-
˃ Cash operating costs of $901 per ounce for the quarter were comparable to $892 per ounce for the March quarter, with the impact of the lower volume of gold ounces produced offset by reduced resource definitional drilling costs in the quarter.
-
˃ At the end of the quarter, a surface diamond drilling program commenced with the aim of extending the deposit further north, based on following up previously drilled mineralisation. This program will be followed by an underground drilling program on potential resource extensions.
| Production Summary | Production Summary | Mar Qtr | Jun Qtr | Year | |
|---|---|---|---|---|---|
| King of the Hills | FY13 | FY13 | FY13 | ||
| Underground ore | mined | kt | 130 | 127 |
470 |
| Grade | g/t | 4.1 | 4.4 |
4.4 | |
| Ore milled | kt | 132 | 98 |
439 | |
| Grade | g/t | 4.2 | 4.3 |
4.4 | |
| Recovery | % | 95 | 95 |
95 | |
| Gold production | oz | 16,940 | 12,893 |
58,477 | |
| Cash Operating Costs[1] | $ per ounce | ||||
| Mining | 642 | 942 |
684 | ||
| Processing | 247 | 207 |
215 | ||
| Site services | 61 | 73 |
68 | ||
| Stripping and ore inventory | (67) | (340) |
(136) | ||
| adjustments | |||||
| 883 | 882 |
831 | |||
| By-product credits | (32) | (18) |
(27) | ||
| Third party |
refining | & | 1 | 1 |
1 |
| transport | |||||
| Royalties | 40 | 36 |
38 | ||
| Total cash operating costs | 892 | 901 |
843 | ||
| Depreciation and | amortisation | 350 | 350 |
350 | |
| Total operating costs | 1,242 | 1,251 |
1,193 |
[1] Unaudited.
Page 4 of 22
St Barbara Limited Quarterly Report June 2013 & FY14 Guidance
==> picture [378 x 38] intentionally omitted <==
Southern Cross Operations, WA
Southern Cross Gold Production
==> picture [218 x 121] intentionally omitted <==
----- Start of picture text -----
19.2
12.3
Care & Maint Sold Q4
from Dec 12
FY 13 FY 13 FY 13 FY 13
Q1 Sep Q2 Dec Q3 Mar Q4 Jun
koz
----- End of picture text -----
Operations
-
˃ Southern Cross Operations ceased mining and processing operations during the December 2012 quarter, and was consequently placed on to care and maintenance.
-
˃ The sale of Southern Cross Operations was completed in April 2013 with A$18 million received in cash proceeds. A further A$8 million of cash previously used to secure cashbacked environmental bonds became available during the June quarter through retirement of the bonds. The retirement of the bonds and the transfer of the rehabilitation and closure obligations to the purchaser of the Southern Cross Operations provides an income statement benefit that will be recognised in the Company’s 30 June 2013 accounts.
-
˃ Southern Cross Operations achieved an outstanding safety performance up to the date of change of ownership in April 2013, with a Total Recordable Injury Frequency Rate of zero, calculated on a twelve month moving average.
| Production Summary Marvel Loch |
Sep Qtr FY 13 Dec Qtr FY13 Year FY13 |
|
|---|---|---|
| Underground ore mined kt Grade g/t Ore milled[1] kt Grade g/t Recovery % Gold production oz Cash Operating Costs[1] Mining Processing Site services Stripping and ore inventory adjustments By-product credits Third party refining & transport Royalties Total cash operating costs Depreciation and amortisation Total operating costs |
175 79 255 2.2 2.1 2.2 457 344 800 1.5 1.3 1.4 88 85 86 19,176 12,292 31,468 $ per ounce |
|
| 794 440 655 668 604 644 122 96 111 (33) 64 5 |
||
| 1,551 1,204 1,415 (6) (26) (15) 1 1 1 37 41 39 |
||
| 1,583 1,220 1,440 274 214 260 |
||
| 1,857 1,434 1,700 |
[1] Unaudited.
Page 5 of 22
St Barbara Limited Quarterly Report June 2013 & FY14 Guidance
==> picture [378 x 38] intentionally omitted <==
Gold Ridge, Solomon Islands
Gold Ridge Gold Production
==> picture [219 x 103] intentionally omitted <==
----- Start of picture text -----
16.8 17.2
14.1 14.0
10.7
FY 12 FY 13 FY 13 FY 13 FY 13
Q4 Jun Q1 Sep Q2 Dec Q3 Mar Q4 Jun
koz
----- End of picture text -----
Operations
-
˃ Gold Ridge continued to increase quarterly gold production with 17,236 ounces produced in the June quarter, up significantly from 13,984 ounces in the March quarter and 10,654 ounces in the December quarter.
-
˃ Key factors contributing to the increase in gold production were:
-
˃ Increased mining fleet utilisation, enhanced operating disciplines, improved plan compliance and maintenance programs resulted in higher tonnes of ore mined;
-
˃ Continuing improvements in the processing plant and operating capability leading to higher plant throughput.
-
˃ Unit mining costs for the June quarter are approximately one third lower than for the first half, reflecting the benefit of increased production and improved efficiency of the mining operations. The corresponding March quarter costs were lower due to the capitalisation of accumulated waste stripping costs.
-
˃ Processing throughput continued to improve with 471,275 tonnes of ore processed for the quarter (up from 451,993 tonnes in the March quarter) and head grade improved to 1.7 g/t Au (1.5 g/t Au in the March quarter). Combined with an improvement in recovery, these factors underpinned a further reduction in processing costs of $109 per ounce.
| Production Summary | Mar Qtr | Jun Qtr | Year | |
|---|---|---|---|---|
| **Gold Ridge ** | FY13 | FY13 | FY13 | |
| Ore mined | kt | 470 | 501 | 1,581 |
| Grade | g/t | 1.5 | 1.7 | 1.5 |
| Ore milled | kt | 452 | 471 | 1,437 |
| Grade | g/t | 1.6 | 1.7 | 1.5 |
| Recovery | % | 61 | 67 | 65 |
| Gold production | oz | 13,984 | 17,236 | 45,931 |
| Cash Operating Costs[2] | $ per ounce | |||
| Mining | 282 | 379 | 420 | |
| Processing | 766 | 657 | 771 | |
| Site services | 411 | 391 | 429 | |
| Stripping and ore inventory | (88) | 154 | 40 | |
| adjustments | ||||
| 1,371 | 1,581 | 1,660 | ||
| By-product credits | (16) | (9) | (14) | |
| Third party refining & transport | 2 | 8 | 6 | |
| Royalties | 36 | 47 | 50 | |
| Total cash operating costs | 1,393 | 1,627 | 1,702 | |
| Depreciation and amortisation | 381 | 381 | 409 | |
| Total operating costs | 1,774 | 2,008 | 2,111 |
[1] The table above shows gold production and associated measures attributable to St Barbara from the date of acquisition, 7 September 2012. [2] Unaudited.
-
˃ Metallurgical recoveries improved due to processing less refractory ore from the Valehaichichi deposit and on-going plant improvements. Detailed structural geology and geochemical analyses have identified a higher occurrence of arsenopyrite than previously documented. Processing solutions to address the higher refractory content and lift recovery rates are being investigated. Refer also to the FY 14 guidance notes.
-
˃ Stripping and ore inventory adjustments include the write down of ore stockpiles to net realisable value as a result of the fall in the gold price during the quarter.
Page 6 of 22
St Barbara Limited Quarterly Report June 2013 & FY14 Guidance
==> picture [378 x 38] intentionally omitted <==
Simberi, Papua New Guinea
Simberi Gold Production
==> picture [219 x 95] intentionally omitted <==
----- Start of picture text -----
14.6 15.1
13.7 13.3 12.9
FY 12 FY 13 FY 13 FY 13 FY 13
Q4 Jun Q1 Sep Q2 Dec Q3 Mar Q4 Jun
koz
----- End of picture text -----
Operations
-
˃ A number of short term issues contributed to the poor operating performance at Simberi during the quarter with initiatives underway to further lift operational performance and reliability.
-
˃ Mining rates were impacted by heavy rainfall in the quarter and mining fleet reliability issues. Planned improvements and upgrades to the mining fleet are set out in FY14 guidance notes attached.
-
˃ The mill performance was impacted by delays to the commissioning of the Simberi Oxide plant expansion attributable to both delays in receiving government permits and delays in the electrical commissioning of the new 3.5 Mtpa processing circuit. As a consequence, the old 2.0 Mtpa processing circuit was used throughout the quarter. Downtime in the ‘old processing circuit’ due to mechanical issues also adversely impacted throughput rates.
-
˃ The Simberi Oxide Plant Expansion is now substantially complete with final commissioning pending issue of government permits.
-
˃ Lower mining and processing throughput rates coupled with higher maintenance costs contributed to the higher cash operating costs per ounce.
-
˃ We continue to work on a number of initiatives at Simberi to resolve bottlenecks, reduce spend and lift operational reliability.
| Production Summary | Mar Qtr | Jun Qtr | Year | |
|---|---|---|---|---|
| Simberi | FY13 | FY13 | FY13 | |
| Ore mined | kt | 621 | 561 | 1,942 |
| Grade | g/t | 1.0 | 1.0 | 1.0 |
| Ore milled | kt | 485 | 414 | 1,471 |
| Grade | g/t | 1.1 | 1.1 | 1.1 |
| Recovery | % | 89 | 87 | 88 |
| Gold production | oz | 15,122 | 12,927 | 45,609 |
| Cash Operating Costs[2] | $ per ounce | |||
| Mining | 339 | 460 | 384 | |
| Processing | 499 | 641 | 559 | |
| Site services | 355 | 581 | 433 | |
| Stripping and ore inventory | (154) | (130) | (125) | |
| adjustments | ||||
| 1,039 | 1,552 | 1,251 | ||
| By-product credits | (2) | (3) | (3) | |
| Third party refining & transport | 11 | 11 | 12 | |
| Royalties | 32 | 38 | 34 | |
| Total cash operating costs | 1,080 | 1,598 | 1,294 | |
| Depreciation and amortisation | 319 | 319 | 327 | |
| Total operating costs | 1,399 | 1,917 | 1,621 |
[1] The table above shows gold production and associated measures attributable to St Barbara from the date of acquisition, 7 September 2012. [2] Unaudited.
Page 7 of 22
St Barbara Limited Quarterly Report June 2013 & FY14 Guidance
==> picture [378 x 38] intentionally omitted <==
Discovery and Growth
-
˃ In the June quarter drilling continued at Simberi and Gold Ridge on a number of highly prospective near-mine targets.
-
˃ Encouraging results have been achieved at :
-
˃ Simberi Island, PNG; significant gold results from trenching and drilling at Botlu and Pigicow on near-mine prospects.
-
˃ Tatau Island, PNG; significant gold results from drilling geochemical and geophysical targets at both the Mt Tiro and Mt Siro prospects.
-
˃ Guadalcanal Island, Solomon Islands; drilling has commenced on the Charivunga zone at Gold Ridge mine, with encouraging gold results, and drilling has also commenced on the first of several exploration targets near-mine.
-
˃ Exploration activities in Australia were scaled back in the June quarter in response to the fall in the gold price and from a portfolio review based on recent work completed.
Simberi, Tatau & Tabar Islands, Papua New Guinea
(Figure 1.0)
On Simberi Island , the exploration program is focussed on identifying additional oxide resources to support the current plant expansion. Channel and trench sampling continued on four near-mine gold prospects to define oxide targets for drill testing in the next quarter, all of which are potentially underlain by sulphide mineralisation. Additional surface geochemical sampling (grid soil and rock chip) continued at Pigicow, Pigiput and Samat. Diamond drilling was conducted at Botlu, Pigicow, Samat and Sorowar.
-
˃ Botlu, Simberi: preliminary results for initial diamond hole SDH266 intercepted 2m @ 11.7 g/t Au from 92m (down-hole intercept);
-
˃ Pigicow, Simberi: significant trenching results include 18m @ 1.6g/t Au;
Elsewhere within Exploration Licence (EL) 609 exploration continued on epithermal gold prospects located on Tatau Island, south of Simberi Island (Figure 1.0):
-
˃ Mt Tiro , Tatau : a series of short drill holes was completed to extend near surface gold oxide mineralisation as a potential source of oxide material for the Simberi plant. Significant oxide gold results from drilling include (all downhole intercepts):
-
˃ Drill hole TT034 intercepted 12m @ 8.8 g/t Au from 15m, including 3m @ 28.6 g/t Au from 15m; and
-
˃ Drill hole TT031 intercepted 23m @ 2.3 g/t Au from 10m, including 2m @ 13.5 g/t Au from 31m.
Encouraging gold anomalous results have also been returned from channel sampling at Mt Tiro; significant channel results include:
-
˃ 32m @ 3.1 g/t Au, including 6m @ 10.9 g/t Au; and
-
˃ 22m @ 4.6 g/t Au, including 4m @ 18.1 g/t Au.
These drilling and channel sampling results are related to a broad WNW trending structure, indicating potential for a gold oxide resource on Tatau; drilling is continuing along strike on this structural zone into the next quarter. The wider exploration program on Tatau will continue aimed at locating higher grade epithermal gold deposits, which includes the current drilling of a series of deeper holes testing geophysical targets.
˃ Mt Siro, Tatau: drilling also intercepted encouraging nearsurface gold oxide mineralisation in one hole but other drill holes intersected narrow or low grade mineralisation partly linked to poor drill core recovery:
-
˃ TTD27: 15m @ 0.9 g/t Au from 4m, including 6m @ 1.9g/t Au from 5m; and 5m @ 2.8 g/t Au from 50m including 1m @ 11.2 g/t Au (down-hole intercept).
-
˃ Patan, Simberi: encouraging, gold anomalous intercepts were returned from trenching, and this prospect is planned to be drilled early next Quarter when landowner access has been finalised;
-
˃ Samat, Simberi: first drill hole completed and results awaited;
-
˃ Geochemical sampling and ground electrical geophysical (IP) surveying continued on both the Mining Licence 136 and Exploration Licence 609 at Simberi Island.
Page 8 of 22
St Barbara Limited Quarterly Report June 2013 & FY14 Guidance
==> picture [378 x 38] intentionally omitted <==
Gold Ridge, Guadalcanal Island, Solomon Islands
(Figure 2.0)
During the June quarter, activities largely focused on drilling in the Charivunga zone, which is thought to be related to a major NNE trending set of structures controlling higher grade mineralisation, central to the Gold Ridge open pit mines.
Preliminary results indicate (see Table 2 for details) that Charivunga is potentially a large mineralised system of earlier low grade gold mineralisation over-printed by a series of later high grade veins and faults, as indicated by the encouraging intercepts below, including (all down-hole intercepts):
-
˃ GDC075: 38m @ 1.7 g/t Au from 292m;
-
˃ GDC076: 13m @ 2.3 g/t Au from 48m, 15m @ 2.6 g/t Au from 215m, and 84m @ 2.0 g/t Au from 313m;
-
˃ DGD001: 46m @ 2.0 g/t Au from 380m, including 12m @ 5.3g/t Au;
-
˃ DGD002: 4m @ 84.4 g/t Au from 231m, including 1m @ 332 g/t Au and 48.9 g/t Ag (silver);
-
˃ DGD003: 24.5m @ 3.8 g/t Au from 334m, including 10m @ 7.4 g/t Au; 5m @ 10.4 g/t Au from 376m including 2m @ 22.1 g/t Au from 377m, and 29m @ 2.5 g/t Au from 387m.
Elsewhere at Gold Ridge, ground electrical geophysical (IP) and geochemical surveys have been completed. On the surrounding Special Prospecting Licence 194, negotiations are nearing completion with landowners to finalise surface access agreements and permit exploration to be extended from the Mining Lease.
Other Areas
In the Gawler province, South Australia, subject to finalising land access in the September quarter, reconnaissance drilling will be completed upon the Brambles prospect, located near Whyalla, and a geophysical gravity survey will be completed over the Billa Kalina prospect, located east of Coober Pedy.
Further work on the Nyngan tenements, located within the East Lachlan province, NSW, has been deferred.
Expenditure (unaudited)
All expenditure on mineral exploration for the June 2013 quarter was expensed:
Australia A$3.2 million South West Pacific A$4.2 million
September 2013 Quarter
Exploration in the September 2013 quarter will be largely focused on:
-
˃ Continuing to test near-mine drill targets on Simberi Island;
-
˃ Continuing drilling on Tatau Island;
-
˃ Drilling the Charivunga zone and other near-mine targets at Gold Ridge; and
-
˃ Completing drilling programs on targets near Gwalia mine in the Leonora region.
The map below shows current and planned target areas for the September 2013 quarter.
Australia
Leonora Region, WA
During the June quarter a reduced drilling program tested shallow drill targets in the Leonora district that can potentially provide material to the Gwalia plant. Work also continued to generate deep Gwalia-analogue targets for drill testing in the September quarter:
-
˃ Leonora tenements (Figure 3.0) : At Sullivans Creek , located north of Leonora, geochemical drilling has identified 2 targets which are now being tested by follow up drilling into the September quarter. Reconnaissance drilling has been completed on three other prospects in the Leonora district – Marionette, Coronation and Raeside.
-
˃ Yilgarn province – reconnaissance geochemical drilling has been completed on the Lake Carnage prospect, located 100km NW of Kalgoorlie, with results pending.
Page 9 of 22
St Barbara Limited Quarterly Report June 2013 & FY14 Guidance
==> picture [378 x 38] intentionally omitted <==
Health & Safety
- ˃ The Company-wide Total Recordable Injury Frequency Rate (TRIFR), calculated as a rolling 12 month average, improved from 9.0 for the year to 30 June 2012, to 6.0 for the year to 30 June 2013. This is the lowest annual TRIFR since the measure was first adopted by St Barbara in 2009.
$8.5 million, based upon an assessment of the higher value of the cash proceeds relative to the value of future revenue protection that the collar structure offered. As a consequence of the close out, security over the Company’s Australian assets held by Barclays Bank Plc has been removed.
Sale of Southern Cross reduced liabilities
Financials (unaudited)
-
˃ 108,693 ounces of gold were sold in the June quarter, at an average realised gold price of A$1,423 per ounce (March quarter A$1,566 per ounce). Gold sales for the full year were 361,721 ounces at an average gold price of A$1,550 per ounce.
-
˃ Cash at bank at 30 June 2013 increased to A$129 million. Cash movements for the June 2013 quarter are summarised in the following table:
-
˃ The sale of Southern Cross Operations realised net cash proceeds of $18 million in the June quarter as previously reported. All remaining creditors for Southern Cross Operations, amounting to approximately $20 million, have been paid, and a balance sheet provision for environmental rehabilitation of Southern Cross Operations amounting to approximately $16 million has been reversed through the FY13 Income Statement.
Asset impairment testing
| Cash balance | $M |
|---|---|
| Cash balance 31 March 2013 Net proceeds from sale of Southern Cross Net interest and finance costs Gold loan repayments Leonora – operating cash flow[3] Pacific Ops – operating cash flow[4] – project capex Southern Cross – care & maintenance Corporate & rehab Working capital movement Exploration Integration Closing cash balance 31 June 2013 |
120 18 1 (10) 41 (3) (10) (2) (10) (8) (7) (1) |
| 129 |
-
˃ Total interest bearing liabilities at 30 June 2013 of A$325 million included the Senior Secured Notes of US$250 million and the Red Kite gold loan of A$50 million, resulting in gearing of 28%[[4]] .
-
˃ The carrying value of assets is subject to impairment testing as at 30 June 2013 as part of normal year end reporting processes. In the context of the fall in the gold price and fall in the Company’s share market capitalisation during FY13, an impairment write down is anticipated. The Company will provide guidance on the outcome in due course.
-
˃ Any potential impairment write down will not have a cash impact, or impact debt conditions.
Corporate
Adapting to a lower gold price environment
-
˃ The diversified nature of the Company’s operations allows for flexibility and adaptability to different gold price scenarios.
-
˃ The Company has long term US bonds with terms and conditions aligned to our operations.
-
˃ The Company is keenly focussed on cash flow and preserving cash, with a number of measures taken to reduce cash outflow, including:
-
˃ a freeze on non-essential recruitment;
-
˃ delegated spending authorities tightened;
Close out of King of the Hills collar hedge
-
˃ The King of the Hills collar structure was established to underwrite a satisfactory IRR on capital invested, which has been achieved. Comprising gold put and call options the collar was closed out in July 2013 for cash proceeds of
-
˃ a freeze on Directors fees and senior management salaries;
-
˃ the Brisbane office is being significantly scaled down.
-
[3] Net of sustaining capex.
-
[4] Debt ÷ (debt + equity).
Page 10 of 22
St Barbara Limited Quarterly Report June 2013 & FY14 Guidance
==> picture [378 x 38] intentionally omitted <==
Capital at 30 June 2013
- ˃ Whilst the US$ gold price has been weakening, the impact on the A$ gold price has been reduced by the weakening of the Australian Dollar as shown in the following chart:
Gold Price for FY 13 - USD & AUD
==> picture [226 x 131] intentionally omitted <==
----- Start of picture text -----
$2,000
$1,800
$1,600
$1,400
USD
$1,200
AUD
$1,000
Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
FY13
Source: IRESS
----- End of picture text -----
| Issued shares Opening balance 31 March 2013 Share movement Closing balance 30 June 2013 Unlisted performance rights Opening balance 31 March 2013 Issued Lapsed Closing balance 30 June 2013 |
488,074,077 - |
|---|---|
| 488,074,077 | |
| 5,261,180 - -2,249,837 |
|
| 3,011,343 |
ASX & ADR
The Company’s shares are listed on ASX (SBM) and through American Depositary Receipts (ADR) traded in the USA.
- ˃ The Company has also undertaken scenario planning at different price points to identify strategic decisions and issues for consideration to further preserve cash funding if required.
Senior Secured Notes
| Issue | US$250 million |
|---|---|
| Closing bid at 30 June 2013 | US$ 0.91625 |
| Coupon | 8.875% |
| Redemption date | 15 April 2018 |
| S&P rating | B |
| Moody’s rating | B2 |
Scheduled Future Reporting
| Date 22 Aug 2013 22 Aug 2103 |
Report June 2013 Full Year Financial Report June 2013 Ore Reserves and Mineral Resources Statement |
|---|---|
Page 11 of 22
St Barbara Limited Quarterly Report June 2013 & FY14 Guidance
==> picture [378 x 38] intentionally omitted <==
FY14 Guidance - Overview
Executive Summary
-
˃ The Gwalia mine at Leonora remains the Company’s cornerstone asset and after capital expenditure is expected to generate significant cash in FY14, even at lower spot gold prices, and cover all finance and corporate overheads.
-
˃ The Pacific Operations, whilst taking longer and costing more to reach steady state, remain valuable long term assets. At current spot gold prices, a net investment will be made into the Pacific Operations during FY14. A higher steady state production level with lower unit costs is expected by the end of FY14.
-
˃ Consolidated FY14 gold production guidance is estimated to be between 395,000 and 445,000 ounces (FY13 attributable production 364,601 ounces), comprising:
==> picture [261 x 156] intentionally omitted <==
----- Start of picture text -----
FY14 Production
Indicative Quarterly Guidance Profile
27%
25% 25%
23%
FY 14 FY 14 FY 14 FY 14
Q1 Sep Q2 Dec Q3 Mar Q4 Jun
Actual Indicative % of annual production (koz)
----- End of picture text -----
| Gwalia King of the Hills Gold Ridge Simberi Consolidated |
Gold production Cash operating costs[5] Capex |
|---|---|
| koz A$ / oz A$M 180 – 195 720 – 750 45 – 50 55 – 60 1,040 – 1,090 12 – 15 75 – 90 1,100 – 1,190 14 – 18 85 – 100 900 – 990 20 – 25 |
|
| 395 – 445 880 – 940 91 - 108 |
FY 14 Cost Guidance Ranges
==> picture [236 x 144] intentionally omitted <==
----- Start of picture text -----
A$ / oz
1,250
1,000
750
500
Gwalia King of the Gold Ridge Simberi Consolidated
Hills
Cash Operating Costs
----- End of picture text -----
[5] Cash operating cost includes mine exploration. Corporate overhead not included in cash operating cost, is estimated at between A$50 to A$55 per ounce.
Page 12 of 22
St Barbara Limited Quarterly Report June 2013 & FY14 Guidance
==> picture [378 x 38] intentionally omitted <==
FY14 Guidance - Operations
Gwalia, Leonora Operations, Western Australia
King of the Hills, Leonora Operations, Western Australia
Gold production 180 – 195 koz Cash operating cost A$720 -A$750 / oz Capital expenditure A$45 - $50 million
Gold production 55 – 60 koz Cash operating cost A$1,040 – A$1,090 / oz Capital expenditure A$12 - $15 million
-
˃ The Gwalia mine is the Company’s cornerstone asset and will continue to provide the major source of cash generation for the business. Capital will primarily be spent on underground decline and lateral development.
-
˃ The ongoing establishment of mining fronts ahead of actual mining operations and compliance to the mine schedule are key success factors. A small amount of capital will be spent as part of infrastructure upgrades and replacement of surface facilities.
-
˃ Cash operating cost guidance includes the cost of cable bolting hanging walls in future South West Branch stopes, to minimise potential hanging wall dilution.
-
˃ King of the Hills mine will continue to produce gold from the higher grade Western Flank with 95% of the gold produced through the higher cost “cut and fill” and “room and pillar” mining methods.
-
˃ Capital expenditure at King of the Hills is mainly sustaining capital in the form of on-going underground development, as well as A$2 million capital expenditure for resource extension drilling activities and exploration drilling to the north of the mine aimed at extending the resource / reserve position and life of the mine.
-
˃ The quarter by quarter gold production profile is steady across the year.
-
˃ The quarter by quarter gold production profile is steady across the year.
-
˃ As part of normal business improvement activities, opportunities to improve capital efficiency and reduce operating costs will continue to be pursued.
Page 13 of 22
St Barbara Limited Quarterly Report June 2013 & FY14 Guidance
==> picture [378 x 38] intentionally omitted <==
Gold Ridge Operations, Solomon Islands
Simberi, Papua New Guinea
Gold production 75 - 90 koz Cash operating cost A$1,100 - A$1,190 / oz Capital expenditure A$14 - $18 million
-
˃ Prior to the acquisition of Gold Ridge, due diligence work based on available metallurgical test work indicated Life of Mine recoveries in the order of 82%. Post-acquisition, detailed studies of the Gold Ridge deposits have distinguished a primary mineralisation event with gold closely associated with arsenopyrite. This earlier event can occur at higher than expected levels in the more refractory weathered and transitional zones, and is overprinted by a series of high grade veins associated with higher grade free gold. As a consequence of more refractory ores being encountered in the current operation, gold recoveries from the circuit as currently configured will be about 70%.
-
˃ Metallurgical test work is underway as a priority to determine the appropriate processing solution to increase recoveries.
-
˃ As a direct consequence of lower recoveries in FY14, gold production will be lower and unit costs will be higher.
-
˃ Kupers and Dawsons (H2) open pits will provide the main sources of ore during the year.
-
˃ In addition to investigating solutions to the refractory ore, work improving ore processing efficiencies is an on-going focus. This will entail:
-
˃ An upgrade of the gravity screen (end H1); and
-
˃ The installation of an oxygen use enhancement system (end Q1).
-
˃ Work already completed on the processing plant to improve materials handling include the use of a mobile crusher, installation of a new vibrating grizzly, and access to more ore with a lower clay content.
-
˃ Capital expenditure at Gold Ridge of $14M to $18M includes funding for a tailings dam wall lift, geological drilling to sterilise ground for a waste dump, upgrading some mining equipment, and expenditure in relation to community relations activities.
Gold production 85 – 100 koz Cash operating cost A$900 - A$990 / oz Capital expenditure A$20 - A$25 million (inc. A$5-6M to complete FY13 projects)
-
˃ Delays in the permitting and commissioning of the Simberi oxide plant expansion have slowed the planned ramp up of production, and remain the key focus in H1 of FY14 with sustainable production at the 3.5 Mtpa run rate anticipated by Q2 FY14.
-
˃ Drill and blast activities anticipated to commence in H1 FY14 await government approval. This will greatly assist in the enhancement of mine volumes and not only bring the mines stripping ratio back into balance but also provide more operating flexibility.
-
˃ The mining fleet at Simberi will be enhanced by the addition of some new equipment in the capital expenditure program for the year. In addition, other capital expenditure includes a rebuild programme on some of the older vehicles in the Heavy Vehicle fleet, a Heavy Vehicle maintenance facility to be constructed on site, a new dump pocket to be established at Sorowar, plus funding for community relations projects. Additional equipment such as cranes and ancillary equipment needed to maintain high safety performance will also be purchased during the year.
-
˃ The Company is waiting on government approvals to commission the oxide expansion.
-
˃ The production profile for the year will be lower in the first quarter and then steady at a higher rate for the remainder of the year.
-
˃ A number of opportunities for additional potential ore sources are emerging from drilling and exploration activities in proximity to existing mining operations.
-
˃ Risks for FY14 include the time required to obtain necessary permits relating to the oxide plant expansion.
-
˃ As initiatives in place aimed at reducing costs and increasing gold production take hold in H2 FY14, cash costs will reduce to A$1,000 – A$1,050 / oz by the end of the year.
-
˃ The quarter by quarter production profile has lower production in the first and third quarters and higher production in the second and fourth quarters.
-
˃ The Company is engaging constructively with government, landowners and the community, including taking steps to manage incursions by artisanal miners onto the mining lease.
-
˃ Opportunities include continuing drilling to realise the significant geological potential for a much larger mineralisation system within the current operations.
Page 14 of 22
St Barbara Limited Quarterly Report June 2013 & FY14 Guidance
==> picture [378 x 38] intentionally omitted <==
FY14 Guidance - Discovery & Growth
Strategy
- ˃ The FY14 exploration program will largely focus on potential near-mine ore sources around the Gwalia, Simberi and Gold Ridge operations. The aim for FY14 is to extend the life of each operation and provide future growth options for the Company.
Australia
-
˃ A strategic review of the portfolio of prospects on the tenements around the Leonora operation, based on work completed in FY13, produced a list of exploration targets ranked on value, size and potential to deliver new feed options to the mine. In FY14 the five most prospective of these will be drilled tested. Drilling has already commenced on the first of these targets. Low potential tenements will be relinquished reducing land holding costs. Other leases will be offered for sale or JV also reducing holding costs whilst retaining access to exploration upside.
-
˃ Outside Leonora, work in the Yilgarn of Western Australia and Gawler Craton of South Australia is focused on advancing early stage projects to decision point or drill ready targets. The longer lead time, high risk but possibly high reward Nyngan Project in NSW targeting porphyry-related goldcopper mineralisation will be deferred.
South-West Pacific
-
˃ At Simberi, encouraging exploration results for the near mine targets at Sorowar, Botlu, Pigicow, Patan and Samat will continue to be aggressively pursued for both oxide and sulphide ore. To the south on Tatau Island, drilling at Mt Tiro and Mt Siro is aimed at delineating the extent of existing gold mineralisation. Drilling will also be undertaken on a number of other high priority geochemical and geophysical targets.
-
˃ Likewise at Gold Ridge, work will be centred on drilling targets around the existing pits to expand the mine’s mineral resources. A key focus will be the Charivunga zone where high grade zones have been targeted that could support production at higher grades than currently being mined and potentially within a larger scale mining operation.
Non-IFRS Measures
-
˃ The Company supplements its financial information reporting determined under International Financial Reporting Standards (IFRS) with certain non-IFRS financial measures, including cash operating costs. We believe that these measures provide additional meaningful information to assist management, investors and analysts in understanding the financial results and assessing our prospects for future performance.
-
˃ Cash operating costs for FY13 are calculated according to common mining industry practice using The Gold Institute (USA) Production Cost Standard (1999 revision).
Competent Persons Statement
-
˃ The information in this report that relates to Exploration Results and Mineral Resources is based on information compiled by Mr Phillip Uttley, who is a Fellow of The Australasian Institute of Mining and Metallurgy. Phillip Uttley is a full-time employee of St Barbara Ltd and has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (JORC Code). Mr Uttley consents to the inclusion in the statement of the matters based on his information in the form and context in which it appears.
-
˃ The information in this report that relates to Ore Reserves is based on information compiled by Mr John de Vries, who is a Member of The Australasian Institute of Mining and Metallurgy. Mr de Vries is a full-time employee of St Barbara Ltd and has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (JORC Code). Mr de Vries consents to the inclusion in the statement of the matters based on his information in the form and context in which it appears.
-
˃ Outside the immediate mine areas exploration will continue at both Simberi and Gold Ridge to generate new drill targets.
Budget
- ˃ The exploration budget for FY14 is estimated at $2025 million, which will be split between Australia ($8-10M) and the SW Pacific tenements (Simberi $7-9M and Gold Ridge $5-6M), of which approximately 40% will be spent on drill testing targets. Tenement rationalisation and prioritisation of work is targeting lease holding savings of $0.5 million per annum.
Page 15 of 22
St Barbara Limited Quarterly Report June 2013 & FY14 Guidance
==> picture [378 x 38] intentionally omitted <==
Corporate Directory
St Barbara Limited
ABN 36 009 165 066
Board of Directors
Colin Wise .......................................... Non-Executive Chairman Tim Lehany ....................................... Managing Director & CEO Doug Bailey ........................................... Non-Executive Director Betsy Donaghey .................................... Non-Executive Director Phil Lockyer .......................................... Non-Executive Director Robert Rae ............................................ Non-Executive Director
Shareholder Enquiries
Computershare Limited
GPO Box 2975 Melbourne Victoria 3001 Australia Telephone (within Australia) 1300 653 935 Telephone (international) +61 3 9415 4356 Facsimile +61 3 9473 2500
Investor Relations Contacts
Ross Kennedy + 61 3 8660 1903 Rowan Cole + 61 3 8660 1914
Executive Team
Tim Lehany ....................................... Managing Director & CEO Garth Campbell-Cowan .......................... Chief Financial Officer Alistair Croll .......................................... Chief Operating Officer Ross Kennedy ..................................... EGM Corporate Services Katie-Jeyn Romeyn .............................. EGM Human Resources Phil Uttley ......................................... EGM Discovery & Growth
Australian Securities Exchange (ASX) Listing code “SBM”
American Depositary Receipts (ADR) – through The Bank of New York Mellon, www.adrbnymellon.com
Financial figures are in Australian dollars.
Registered Office
Level 10, 432 St Kilda Road
| Melbourne Victoria | 3004 | Australia |
|---|---|---|
| Telephone | +61 3 8660 1900 | |
| Facsimile | +61 3 8660 1999 | |
| [email protected] | ||
| Website | www.stbarbara.com.au |
| Substantial Shareholders | % of Holdings1 |
|---|---|
| M&G Investment Management Ltd2 | 19.1% |
| Van Eck Associates Corporation | 7.9% |
| Baker Steel Capital Managers | 6.0% |
| Franklin Resources Inc | 6.0% |
-
% as notified by the substantial shareholders to 30 June 2013.
-
M&G Group’s interest includes shares also disclosed by Vanguard Precious Metals & Mining Fund.
Page 16 of 22
St Barbara Limited Quarterly Report June 2013 & FY14 Guidance
==> picture [378 x 38] intentionally omitted <==
Figure 1.0 Simberi Location Map
Papua New Guinea
Figure 1.1 Mt Tiro, Tatau Island
Papua New Guinea
==> picture [241 x 311] intentionally omitted <==
Page 17 of 22
St Barbara Limited Quarterly Report June 2013 & FY14 Guidance
==> picture [378 x 38] intentionally omitted <==
Figure 2.0 Gold Ridge location map Solomon Islands
Figure 2.1 Gold Ridge Drill Hole location map
Solomon Islands
==> picture [240 x 383] intentionally omitted <==
Page 18 of 22
St Barbara Limited Quarterly Report June 2013 & FY14 Guidance
==> picture [378 x 38] intentionally omitted <==
Figure 3.0 Leonora Region
Western Australia
==> picture [240 x 320] intentionally omitted <==
Page 19 of 22
St Barbara Limited Quarterly Report June 2013 & FY14 Guidance
==> picture [378 x 38] intentionally omitted <==
Table 1: Significant Intercepts - Simberi, Tabar & Tatau Islands, Papua New Guinea-
| Down-hole Mineralised Intersection |
Down-hole Mineralised Intersection |
Down-hole Mineralised Intersection |
||||||||
|---|---|---|---|---|---|---|---|---|---|---|
| Hole No | North | East | Dip/ | Vertical | Lode | |||||
| RL | Total | |||||||||
| Azimuth | Depth | Depth | ||||||||
| From | Length | Gold grade | ||||||||
| mbs | m | m | g/t Au | |||||||
| Tatau Island, Papua | New Guinea | |||||||||
| TTD027 (Mt Siro) | 189285 | 35865 | 93.0 | -62/245 | 134.4 | 4 | 15 | 0.9 | ||
| including | 5 | 6 | 1.9 | |||||||
| 50 | 5 | 2.8 | ||||||||
| including | 52 | 1 | 11.2 | |||||||
| TTD028 (Mt Tiro) | 189350 | 36469 | 214.0 | -59/227 | 203.7 | No significant assays | ||||
| TTD029 (Mt Tiro) | 189406 | 36405 | 169.0 | -60/222 | 237.0 | No significant assays | ||||
| TTD030 (Mt Tiro) | 189407 | 36406 | 168.0 | -60/273 | 237.6 | No significant assays | ||||
| TTD031 (Mt Tiro) | 188374 | 37225 | 289.0 | -56/61 | 40.0 | 10 | 23 | 2.3 | ||
| including | 31 | 2 | 13.5 | |||||||
| TTD032 (Mt Tiro) | 188471 | 37058 | 289.0 | -56/61 | 34.2 | No significant assays | ||||
| TTD033 (Mt Tiro) | 188449 | 37091 | 299.0 | -55/61 | 30.6 | No significant assays | ||||
| TTD034 (Mt Tiro) | 188412 | 37123 | 308.0 | -56/65 | 42.1 | 15 | 12 | 8.8 | ||
| including | 15 | 3 | 28.6 | |||||||
| including | 16 | 2 | 42.4 | |||||||
| and | 20 | 7 | 2.7 | |||||||
| including | 24 | 1 | 12.1 | |||||||
| TTD035 (Mt Tiro) | 188351 | 37125 | 302.0 | -54/64 | 58.4 | No significant assays | ||||
| SDH266 (Botlu) | 208026 | 43069 | 134.6 | -61/267 | 133.3 | 92 | 2 | 11.7 | ||
| including | 93 | 1 | 16.0 | |||||||
| SDH268 (Botlu) | 208023 | 43067 | 134.2 | -60/225 | 202.6 | No significant assays |
NOTE:
Down hole intercepts are determined using a cut-off of 0.5 g/t Au with up to 5m of internal dilution. No high grade cut is applied. The reported intercepts are all down hole lengths. Intercepts quoted are above 10 gram metres.
Page 20 of 22
St Barbara Limited Quarterly Report June 2013 & FY14 Guidance
==> picture [378 x 38] intentionally omitted <==
Table 2: Significant Intercepts - Gold Ridge, Solomon Islands
| Down-hole Mineralised Intersection |
||||||||||
| Hole No | North | East | RL | Dip/ | Vertical | Lode | ||||
| Total | ||||||||||
| Azimuth | Depth | Depth | Gold grade |
|||||||
| From | Length | |||||||||
| mbs | m | m | g/t Au | |||||||
| Gold Ridge, Solomon Islands | ||||||||||
| GDC072 | 40831 | 23800 | 376.7 | -60/90 | 272.5 | 59 | 20 | 1.3 | ||
| GDC073 | 41017 | 24091 | 284.0 | -53/99 | 110.4 | 7 | 14 | 1.0 | ||
| GDC074 | 41017 | 24091 | 284.0 | -54/270 | 311.2 | 0 | 9 | 2.4 | ||
| including | 8 | 1 | 15.9 | |||||||
| 15 | 5 | 2.3 | ||||||||
| including | 19 | 1 | 8.5 | |||||||
| 135 | 3 | 19.6 | ||||||||
| including | 135 | 1 | 57.1 | |||||||
| GDC075 | 406685 | 23803 | 433.0 | -61/90 | 503.5 | 292 | 38 | 1.7 | ||
| including | 328 | 2 | 16.7 | |||||||
| GDC076 | 40624 | 23727 | 427.0 | -56/191 | 518.5 | 48 | 13 | 2.3 | ||
| 215 | 15 | 2.6 | ||||||||
| including | 215 | 1 | 12.8 | |||||||
| and | 221 | 1 | 9.3 | |||||||
| 261 | 44 | 1.5 | ||||||||
| including | 296 | 9 | 3.3 | |||||||
| and | 304 | 1 | 14.8 | |||||||
| 313 | 84 | 2.0 | ||||||||
| including | 318 | 40 | 2.6 | |||||||
| including | 334 | 1 | 17.1 | |||||||
| and | 340 | 18 | 2.6 | |||||||
| and | 360 | 37 | 1.7 | |||||||
| including | 371 | 1 | 14.2 | |||||||
| 469 | 11 | 2.1 | ||||||||
| DGD001 | 40563 | 23738 | 412.0 | -61/133 | 458.3 | 147 | 12 | 2.6 | ||
| including | 153 | 6 | 4.5 | |||||||
| including | 157 | 2 | 11.1 | |||||||
| 209 | 43 | 1.2 |
Page 21 of 22
St Barbara Limited Quarterly Report June 2013 & FY14 Guidance
==> picture [378 x 38] intentionally omitted <==
| Down-hole Mineralised Intersection |
||||||||||
| Hole No | North | East | RL | Dip/ | Vertical | Lode | ||||
| Total | ||||||||||
| Azimuth | Depth | Depth | Gold grade |
|||||||
| From | Length | |||||||||
| mbs | m | m | g/t Au | |||||||
| Gold Ridge, Solomon Islands | ||||||||||
| DGD001 (cont’d) | 352 | 23 | 1.9 | |||||||
| including | 365 | 10 | 2.01 | |||||||
| 380 | 46 | 2.0 | ||||||||
| including | 380 | 12 | 5.3 | |||||||
| including | 380 | 2 | 17.6 | |||||||
| DGD002 | 40718 | 23798 | 396.0 | -54/130 | 507.8 | 112 | 1 | 16.7 | ||
| 120 | 1 | 25.2 | ||||||||
| 183 | 16 | 3.3 | ||||||||
| including | 190 | 1 | 39.0 | |||||||
| 231 | 4 | 84.4 | ||||||||
| including | 231.5 | 1 | 332 | |||||||
| 279 | 4 | 9.2 | ||||||||
| including | 281 | 1 | 34.9 | |||||||
| DGD003 | 40376 | 23491 | 450.0 | 60/134 | 545.5 | 264 | 22 | 4.2 | ||
| including | 269 | 7 | 11.1 | |||||||
| including | 270 | 1 | 57.8 | |||||||
| 302 | 20 | 2.2 | ||||||||
| including | 312 | 8 | 2.7 | |||||||
| 334 | 24.5 | 3.8 | ||||||||
| including | 346 | 10 | 7.4 | |||||||
| including | 348 | 4 | 13.7 | |||||||
| 370 | 11 | 6.0 | ||||||||
| including | 376 | 5 | 10.4 | |||||||
| 377 | 2 | 22.1 | ||||||||
| 387 | 57 | 1.9 | ||||||||
| including | 387 | 29 | 2.5 |
NOTE:
Down hole intercepts are determined using a cut-off of 0.5 g/t Au with up to 5m of internal dilution. No high grade cut is applied. The reported intercepts are all down hole lengths. Intercepts quoted are above 20 gram metres, in addition to individual metres returning above or around 10 gram metres. Diamond drill holes GDC072, GDC073 and GDC074 represent resource development holes that were drilled from within the proposed pit outline of the Valehaichichi deposit.
Page 22 of 22
St Barbara Limited Quarterly Report June 2013 & FY14 Guidance