AI assistant
ST BARBARA LIMITED — Fund Information / Factsheet 2004
Jan 19, 2004
65749_rns_2004-01-19_fa060d58-bc77-40d5-8dd6-dbe990933f07.pdf
Fund Information / Factsheet
Open in viewerOpens in your device viewer
ST BARBARA MINES LIMITED
ACN 009 165 066

$\overline{ASX}$ SHAREHOLDERS REPORT
Enquiries regarding this report may be directed to:
Stephen W. Miller
Executive Chairman Telephone $(08)$ 9476 5555 Overseas +61 8 9476 5555 or Colin G. Jackson Investor Relations Telephone 0417 929 107
St Barbara Mines Limited Level 2, 16 Ord Street West Perth Western Australia 6005 Telephone (08) 9476 5555 Overseas +61 8 9476 5555
Dollar values in this report are Australian dollars unless otherwise stated.
Meekatharra – Polelle Joint venture Exploration Update
Significant results have been recorded from the JV exploration programmes at the Mulla Mulla deposit and also 6 km south at the Kanji-Miniritchie prospect.
The St Barbara managed joint venture with Elara Mining Limited has recorded RC drill intersections from the Mulla Mulla Eastern Trend of 10 m at 7.9 g/t (vertical depth of 120 m), 34 m at 2.6 g/t (at 95 m), 12 m at 7.3 g/t* (at 80 m) and 8 m at 16.4 $g/t^*$ (at 65 m).
These results are from a 19 hole, 3,000 m programme which, based on previous drilling, continues to confirm the presence of an extensive zone of mineralisation. (* indicates the intersection grade is based on 4 m composite sample assays.)
It is intended that additional drilling of the Eastern Trend, and also the Central and Western Trends will commence in the near term with a view to establishing a resource base for future mine development.
Also in the Polelle joint venture, a 58 hole (2,640 m) aircore drill programme at Kanji-Miniritchie, 6 km south along the regional strike from Mulla Mulla, has resulted in sixteen holes cutting gold mineralisation. The best intercept was $4 \text{ m}$ at $4.8 \text{ g/t}$ . Further aircore, followed by initial RC drilling, is also planned for the coming months.
The potential for an increase in the resource at Mulla Mulla and for satellite deposits such as Kanji-Miniritchie has been demonstrated.
Follow-up drilling and other exploration will continue with the aim of establishing a resource inventory for inclusion in the future mine production schedule.
hen W. Miller
Executive Chairman
20 January 2004
ST BARBARA MINES LIMITED
ACN 009 165 066
RC Drill Results - Mulla Mulla (East), December 2003
| Mineralised Intercept | ||||||||||
|---|---|---|---|---|---|---|---|---|---|---|
| North | East | Dec. | Azm | Depth | From | $T\sigma$ | Length | Au | ||
| Hole No. | (AMG) | (AMG) | (Deg) | (Grid) | (m) | (m) | (m) | (m) | (g/t) | |
| MMRC 90 | 7 037 770 | 645 435 | $-60$ | 270 | 148 | 59 | 60 | $\boldsymbol{2}$ | 1.46 | |
| 73 | 76 | 3 | 0.76 | |||||||
| 83 | 89 | 6 | 1.58 | |||||||
| 101 | 104 | 3 | 2.17 | |||||||
| MMRC 91 | 7 037 770 | 645 475 | $-60$ | 270 | 200 | $32,$ | 33 | 1 | 0.62 | |
| 37 | $44,$ | 7 | 0.66 | |||||||
| 49 | 65 | 16 | 0.97 | |||||||
| 110 | 121 | 11 | 1.37 | |||||||
| 129 | 141 | $12,$ | 1.20 | |||||||
| 177 | 178 | $\mathbf{1}$ | 7.10 | |||||||
| 195 | 199 | 4 | 1.58 | |||||||
| MMRC 92 | 7 037 810 | 645 395 | $-60$ | 270 | 168 | $81,$ | $\bf 84$ | 3 | $0.61,$ | |
| $90,$ | 93 | 3 | 1.24 | |||||||
| 137 | 139 | $\overline{\mathbf{c}}$ | 3.51 | |||||||
| 142 | 152 | ${\bf 10}$ | 7.90 | |||||||
| inc | 143 | 145 | $,2$ | 29.95 | ||||||
| MMRC 93 | 7 037 810 | 645 435 | $-60$ | 270 | 200 | 32 | 33 | $\mathbf{I}$ | 0.52 | |
| $48,$ | 51 | 3 | 0.95 | |||||||
| 64 | 65 | 1 | 3.33 | |||||||
| 105 | 118 | 13 | 1.40 | |||||||
| 134 | 139 | 5 | 1.58 | |||||||
| 144 | 149 | 5 | 4.10 | |||||||
| 159 | 161 | $\overline{\mathbf{c}}$ | 1.58 | |||||||
| 168 | 171 | 3 | $1.87,$ | |||||||
| 174 | 175 | 1 | 1.41 | |||||||
| 182 | 183 | 1 | 1.88 | |||||||
| 188 | 189 | 1 | 1.49 | |||||||
| MMRC 94 | 7 037 810 | 645 475 | $-60$ | 270 | 200 | 49 | 62 | 13 | 2.26 | |
| inc | 58 | 62 | 4 | 6.24 | ||||||
| MMRC 95 | 7 037 850 | 645 395 | $-60$ | 270 | 72 | $30,$ | 36 | 6 | 0.90 | |
| 56 | 60 | 4 | 0.65 | |||||||
| 66 | 68 | 2 | 2.05 | |||||||
| MMRC 96 | 7 037 850 | 645 435 | -60 | 270 | 200 | 105 | 109 | 4 | 1.23 | |
| 113 | 147 | 34 | 2.58 | |||||||
| inc | 123 | 130 | 7 | 6.90 | ||||||
| inc | 124 | 126 | 2 | 16.60 | ||||||
| 170 | 171 | 1 | 2.50 | |||||||
| MMRC 97 | 7 037 850 | 645 475 | $-60$ | 270 | 195 | $51,$ | $54,$ | 3 | 0.62 | |
| 156 | 158 | 2 | 6.01 | |||||||
| 176 | 180 | 4 | 1.94 | |||||||
| 183 | 184 | 1 | 2.49 | |||||||
| 188 | 189 | 1 | 3.49 | |||||||
| 193 | 194 | 1 | 4.25 |
ST BARBARA MINES LIMITED
ACN 009 165 066
| North(AMG) | East(AMG) | Mineralised Intercept | |||||||
|---|---|---|---|---|---|---|---|---|---|
| Dec. | Azm | $\bold{Depth}$ | From | To | Length | Au | |||
| Hole No. | (Deg) | (Grid) | (m) | (m) | (m) | (m) | (g/t) | ||
| MMRC 98 | 7 037 890 | 645 395 | $-60$ | 270 | 208 | 28 | 44 | 16 | 0.87 |
| 49 | 50 | 1 | 2.90 | ||||||
| 54 | 55 | 1 | 1.98 | ||||||
| MMRC 99 | 7 037 890 | 645 435 | $-60$ | 270 | 210 | 30 | 39 | 8 | 1.94 |
| 69 | 70 | 1 | 1.19 | ||||||
| 94 | 95 | 1 | 1.85 | ||||||
| 98 | 100 | $\overline{c}$ | 1.04 | ||||||
| 129 | 135 | 6 | 1.05 | ||||||
| 139 | 148 | 9 | 1.99 | ||||||
| 150 | 151 | 1 | 2.05 | ||||||
| 153 | 154 | 1 | 1.02 | ||||||
| MMRC 100 | 7 037 890 | 645 475 | $-60$ | 270 | 210 | 196 | 204 | 8 | $0.94*$ |
| MMRC 101 | 7 037 770 | 645 170 | -60 | 270 | 130 | 64 | 72 | 8 | $0.99*$ |
| MMRC 102 | 7 037 730 | 645 190 | $-60$ | 270 | 147 | 52 | 64 | 12 | $0.96*$ |
| 88 | 96 | $,$ 8 $,$ | $1.11*$ | ||||||
| MMRC 103 | 7 037 730 | 645 210 | $-60$ | 270 | 127 | 20 | $24,$ | $\overline{4}$ | $1.52*$ |
| 36 | 44 | 8 | $0.62*$ | ||||||
| 60 | 76 | 16 | $0.82*$ | ||||||
| 80 | 84 | 4 | $0.78*$ | ||||||
| 92 | 104 | 12 | $7.25*$ | ||||||
| inc | 92 | 94 | 4 | 17.80* | |||||
| MMRC 104 | 7 037 770 | 645 150 | $-60$ | 270 | 99 | 48 | 52 | $\overline{4}$ | $0.55*$ |
| MMRC 105 | 7 037 770 | 645 170 | -60 | 270 | 99 | 76 | 84 | 8 | $16.40*$ |
| inc | 76 | 80 | 4 | 31.10* | |||||
| MMRC 106 | 7 037 770 | 645 190 | -60 | 270 | 120 | 36 | 40 | 4 | $0.54*$ |
| 56 | 60 | 4 | $0.91*$ | ||||||
| 104 | 112 | 8 | $1.15*$ | ||||||
| MMRC 107 | 7 037 770 | 645 210 | $-60$ | 270 | 120 | 48 | 52 | $\overline{4}$ | $0.66*$ |
| 56 | 60 | $\bf{4}$ | $1.35*$ | ||||||
| 68 | 72 | 4 | $1.37*$ |
Notes:
-
- All assay values are based on 50 gm fire assays.
- * indicates the intercept grade is based on 4 m composite sample assays. 2.
-
- True widths of mineralised zones are probably about 60% of intercept lengths.
-
- The terms of the Polelle joint venture provide for Elara Mining Limited to earn a 65% interest over a four year period through the expenditure of $5 million.
Information in this report relating to mineral resources conforms to the reporting requirements of the Australasian Code for Reporting of Identified Mineral Resources and Ore Reserves (The JORC Code). It is based on information compiled by Mr Graham Miller, FAusIMM, a Competent Person as defined by the Code. It is included in this report with his consent.
