Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

SOUTHERN HEMISPHERE MINING LIMITED Capital/Financing Update 2021

Jul 4, 2021

65877_rns_2021-07-04_cb834036-be7e-48f9-adaf-7bf2c9e3bae9.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

==> picture [201 x 69] intentionally omitted <==

ASX Announcement 5 July 2021

- Carbon Neutral Manganese for the EV Battery Market

  • Work progresses on the Los Pumas Project to sustainably develop the deposit to meet the needs of the EV battery market

Southern Hemisphere Mining (“SUH or the Company”) reports on its plan to sustainably develop the 100% owned Los Pumas Manganese project into a globally significant reliable source of Manganese to meet the demand and rapid growth in the EV and EV battery metals industries.

A key part of sustainably developing the Los Pumas Manganese Deposit is the Company’s carbon neutrality plan designing the project to operate with minimum greenhouse emissions by implementing energy saving initiatives coupled with offsetting any unavoidable emissions. SUH is working on initiatives seeking alternative energy and raw material sources where possible and viable to adopt green energy practices. These include:

  • Supplementing power generation systems with one or more of:

  • ❖ Power generation from conveyors transporting concentrate to the rail head.

  • ❖ Hydro power from recent developments nearby.

  • ❖ Solar power.

  • ❖ Wind power – this option has now been considered and excluded as average wind strengths in the Los Pumas area are suboptimal.

  • Production of water from the atmosphere using atmospheric water generators, which have negligible effect on the environment when powered with renewable energy sources.

  • ❖ A trial onsite is required to confirm atmospheric water generators will work effectively which will be included in feasibility studies.

  • Use of alternative fuels.

  • Rail Transport instead of trucking which has a much lower energy use and substantial potential opex saving than contemplated in the PEA/Scoping Study (ASX release 2 February 2011 – PEA).

  • Opting for autonomous vehicles, where possible, which consistently report lower fuel consumptions when compared to traditional vehicles.

ACN: 140 494 784 Suite 2, 20 Howard Street Perth WA 6000 Ph: +61 8 6144 0590 www.shmining.com.au

==> picture [201 x 69] intentionally omitted <==

High Purity Manganese Sulphate (HPMSM)

SUH has engaged industry experts to carry out a mineralogy review to assess the process flowsheet options to produce HPMSM. Early work shows the DMS product is low in impurities with no identified technical impediments to producing HPMSM. There may be potential to benefit from precipitating potassium from the Cryptomelane dominant ore as Sulphate of Potash (SOP).

Commodity Traders and EV Battery Manufacturers

SUH are actively seeking and engaging with commodity traders, financiers, EV manufacturers and EV battery manufacturers to advance the Los Pumas Manganese Project with the aim to supply a carbon-neutral battery cathode manganese component.

This announcement was approved by the Board

For Further Information, Contact: Luke Abbott – Company Secretary T: +61 8 6144 0590 [email protected] www.shmining.com.au

ACN: 140 494 784 Suite 2, 20 Howard Street Perth WA 6000 Ph: +61 8 6144 0590 www.shmining.com.au

==> picture [201 x 69] intentionally omitted <==

Appendix 1

Los Pumas Manganese Project: Total Measured and Indicated Resources - JORC (2004) Compliant. As announced to the market on 25 March 2011.

Resource Tonnes
Mn % SiO2 % Fe2O3 % Al % K % P %
**(at 4% Mn cut-off) ** Millions
Measured 5.27 7.39 57.85 2.78 5.62 2.88 0.05
Indicated 13.06 7.65 55 2.96 5.64 2.92 0.05
Measured plus
Indicated
18.34 7.58 55.82 2.91 5.62 2.91 0.05
Inferred
Total
5.39
23.73
8.59
7.81
51.44 2.72 5.49 2.69 0.06

Metallurgical studies have demonstrated greater than 38% Mn concentrates are achievable by DMS with low impurities and high silica product.

In relation to the above resources, the Company confirms that it is not aware of any new information or data that materially affects the information in the announcements, and all material assumptions and technical parameters in the announcements underpinning the estimates in the relevant market announcement continue to apply and have not materially changed.

ACN: 140 494 784 Suite 2, 20 Howard Street Perth WA 6000 Ph: +61 8 6144 0590 www.shmining.com.au