Silver One Resources Inc.
Management's Discussion and Analysis for the year ended December 31, 2024
This Management's Discussion and Analysis ("MD&A") for the year ended December 31, 2024, prepared as of March 10, 2025, should be read in conjunction with the audited consolidated financial statements for the year ended December 31, 2024 of Silver One Resources Inc. (the "Company" or "Silver One"), which have been prepared in accordance with International Financial Reporting Standards ("IFRS Accounting Standards"). All amounts included in this MD&A are expressed in Canadian dollars unless otherwise indicated.
These documents and other information relevant to the Company's activities are available for viewing on SEDAR+ at www.sedarplus.ca or on the Company's website at www.silverone.com.
COMPANY OVERVIEW
Silver One was incorporated pursuant to the provisions of the Business Corporations Act (British Columbia) on June 8, 2007.
The Company's principal activities include the acquisition, exploration and development of mineral properties. The Company owns a 100% interest in the Candelaria silver project in Nevada (the "Candelaria Project" or "Candelaria"), a 100% interest in the Phoenix Silver property in Arizona ("Phoenix Silver Property" or "Phoenix Silver"), and a 100% interest in the Cherokee project in Nevada ("Cherokee Project" or "Cherokee").
COMPANY HIGHLIGHTS
Current highlights (including subsequent events up to March 10, 2025) include:
Update On Metallurgical Test Results at the Candelaria Project
On February 26, 2025, the Company announced results of additional metallurgical testing using a novel, cyanide-free leaching process from the Company's Candelaria Project. Results confirm that the new technology can potentially double silver recoveries of leach pad material and cut leaching times. The tests were conducted on representative samples from the two heap-leach pads, as well as from the in-ground mineralization marginal to the two main open-pits in the project.
Silver One Receives Final Drill Results from Its Phoenix Silver Project
On February 24, 2025, the Company announced the analytical results for samples collected in the 2024 diamond drill program completed on its Phoenix Silver Property. The program consisted of 30 core holes from 6 drill pads, totaling 1,955 meters. The best intercept returned 3,800 g/t silver with 0.97% copper over 0.35 m within a quartz breccia. The presence of silver and base metals along the length of the structure tested suggests this fracture system may still host higher-grade material between or downdip from the drill hole intercepts, as well as elsewhere along the western and eastern extensions of the host structure.
ZTEM Airborne Geophysical Survey Outlines Exploration Targets at the Phoenix Silver Property
On February 20, 2025, the Company announced the completion of the geophysical processing and 3D modelling of helicopter-borne electromagnetic data from the Z-Axis Tipper Electromagnetic system ("ZTEM") survey conducted in October 2024 at its Phoenix Silver Property.
The survey and processing were done by Geotech Ltd. ("Geotech"). Geotech's processing, 3D-modelling, and targeting analysis have identified several significant anomalies potentially related to copper and silver mineralization. Anomalies identified include two priority copper targets and five priority silver targets, all recommended for further exploration.
Commencement of a ZTEM Geophysical Survey at the Phoenix Silver Property
On October 8, 2024, the Company announced that it has commenced a property-wide airborne geophysical survey at the Phoenix Silver Property. The geophysical program will cover an area of approximately 100 km² and consists of a helicopter-borne ZTEM survey that will be conducted by Geotech. This type of electromagnetic survey has been particularly successful in delineating alteration halos associated with porphyry copper deposits around the world. At the Phoenix Silver project, the survey is expected to be useful in outlining structures as well as areas of hydrothermal alteration potentially related to mineralization.
Page 1
Silver One Resources Inc.
Management's Discussion and Analysis for the year ended December 31, 2024
Drilling Commences at the Phoenix Silver Property
On October 2, 2024, the Company announced drilling has commenced at its high-grade Phoenix Silver Property in Arizona. The program consists of 2,500 metres in up to 40 holes of core drilling to test the first of several silver targets identified to date in the property. The main drill target is the 417 Target Area which includes the potential source of very high-grade silver vein fragments located around the 417 pound (189 kg) vein fragment found in the central part of the property. This vein fragment was not assayed, as it is a collectors' specimen, but specific gravity tests indicate a very high-grade silver content of up to 70% native silver (see News Release of Feb 5, 2020). Multiple other smaller specimens found in the property, also containing abundant visible native silver, assayed up to 459,000 g/t (13,385 troy ounce per short ton ("oz/T") silver.
Road and Pad Construction Commences in Preparation for Drilling at its Phoenix Silver Property
On September 17, 2024, the Company announced the commencement of construction of road and drill pads in preparation for drilling the first of several silver targets at its Phoenix Silver Property.
Forest Service fire restrictions were lifted in the project area and road construction started in preparation for drilling by the first week of October. The drill program approved by the company consists of 2,500 metres including up to 40 diamond drill holes off 13 different drill pads, as authorized by the Forest Service.
Phoenix Silver Property ZTEM Survey and Drilling
On August 12, 2024, the Company announced that it has entered into a contract with Geotech to conduct a ZTEM survey over its 100% owned Phoenix Silver Property in Arizona. The survey will be scheduled as soon as any Forest Service field restrictions permit. Silver One will also begin road and pad building in preparation for drilling the very high-grade silver targets in the 417 area. The program is fully permitted, fully funded and is ready to commence once weather conditions have improved.
Closing of Oversubscribed Private Placement
On June 21, 2024, the Company closed a non-brokered private placement financing by issuing 21,099,138 units of the Company (the "Units") at a price of $0.28 per Unit for aggregate gross proceeds of $5,907,759 (the "Offering").
MINERAL PROPERTIES
Candelaria, Nevada, United States
The Candelaria Mine is located in central-west Nevada just off the paved Highway 95, which connects Las Vegas with Reno. The past producing mine site is serviced by paved road, power, and water. Reclamation of the Candelaria Mine has been ongoing since 1998. The mine dumps were re-contoured and seeded, and the heap leach piles were rinsed with fresh water and seeded. Other infrastructure has been removed, and the substantial reclamation work meets all state and federal guidelines.
The project lies within the Candelaria Mining District, historically the richest silver mining district in Nevada. Estimated production from the late 1880's to 1954 was 22 million ounces of silver. From 1874 to 1883, the Northern Belle Deposit produced from high grade lodes averaging 1,700 – 2,000 grams per tonne (g/t) silver (50 – 60 oz/ton). Open pit mining between 1980 and 1999 resulted in the production of 47 million ounces of silver, with Kinross Gold producing approximately 13 million ounces of that between 1994 and 1999.
SSR completed a large drilling program prior to acquiring the project in 2001 and commissioned a technical resource report titled "Candelaria Project Technical Report" dated May 24, 2001 (filed on SEDAR+ on June 20, 2002), prepared by Pincock Allen & Holt. Historical resources as outlined in the report amount to approximately 44 million ounces of silver in the Measured and Indicated categories with an additional 82.8 million ounces of silver in the Inferred category. See section titled "Historical Resource Estimate" together with cautionary notes.
Page 2
Silver One Resources Inc.
Management's Discussion and Analysis for the year ended December 31, 2024
Option agreement
Silver One entered into a 3-year option agreement with SSR (announced on January 17 and 23, 2017) whereby Silver One issued 1,332,900 Silver One common shares worth US$1,000,000 upon TSX-V approval of the option agreement (January 23, 2017). On January 24, 2018, the Company announced the completion of its first anniversary payment to SSR by issuing 2,828,636 shares at a deemed value of US$1,000,000. On January 28, 2019, the Company announced the completion its second anniversary payment to SSR by issuing 5,827,338 shares at a deemed value of US$1,000,000. It was further obligated to issue an additional US$1,000,000 worth of Silver One shares in January 2020. However, Silver One entered into an agreement with SSR and Maverix Metals Inc. ("Maverix") whereby:
-
Silver One will assume a Production Payment obligation by SSR to Maverix (formerly to Kinross). For this, SSR agreed to relinquish the option payment of US$1,000,000 in shares of Silver One and instead received US$100,000 in units of Silver One (issued). This agreement obliges Silver One to assume the obligation to pay Maverix US$1,000,000 upon Candelaria achieving commercial production of not less than 2,500,000 ounces of silver per annum (the "Production Payment").
-
In consideration of Maverix agreeing to Silver One's assumption of the Production Payment, Maverix will receive US$100,000 in units of Silver One.
-
Maverix has agreed to amend the Production Payment so that Silver One may satisfy it with US$500,000 cash and $500,000 in shares of Silver One on the first anniversary after commencement of commercial production at Candelaria.
Each unit will be comprised of one share of Silver One and one-half of one share purchase warrant (each a "Warrant") with each whole Warrant entitling the holder to purchase one additional share at a price of $0.40 per share for a period of three years.
On July 25, 2019, the Company amended the Candelaria Option Agreement ("Amended Agreement"). The Amended Agreement deferred the assumption of the bond obligation by the Company until January 2023.
In December 2022, the Amended Agreement was further amended to extend the assumption of the bond obligation by Silver One by an additional sixty days, and in April 2023, the parties extended the period for the assumption of the bond obligation by Silver One until May 28, 2023. The Company further amended the Candelaria Option agreement to extend the option end date and issued 250,000 common shares to SSR.
During the year ended December 31, 2023, the Company assumed the reclamation bond of US$2,491,757 and acquired a 100% interest in Candelaria without a royalty payable to SSR.
Property development
On January 3, 2018, the Company announced the completion of a 1,110-metre sonic drilling program on the historic heaps, stockpiles, and waste dumps.
Assay results were reported in a news release of April 19, 2018. The results are encouraging as the head grade of the leach pads, estimated at 43 g/t, is greater than the head grades currently being mined at the Rochester Mine held by Coeur Mining approximately 220 kilometres north of Candelaria. Further, an average cyanide soluble silver extractions of 56% for leach pad material and 64% for fresh material in stockpiles, combined with their respective reported silver grades, provide a promising outlook for the project.
Historic silver recoveries at Candelaria ranged from 42% to 51% of the total silver through heap leaching ores crushed below 1 inch. Silver One believes that such recoveries may be improved by milling or the use of high-pressure grinding rolls (HPGR) prior to leaching. HPGR is being employed at numerous mines throughout Nevada, including Coeur's Rochester Mine, with resultant improved silver/gold recoveries and reduced operating costs.
Page 3
Silver One Resources Inc.
Management's Discussion and Analysis for the year ended December 31, 2024
In 2018, the Company prepared various composite samples from the heaps and stockpiles which were sent to McClelland Laboratories, Inc. in Reno, Nevada for ongoing metallurgical testing. The metallurgical results will assist in determining the best methods to potentially recover silver from the heap leach pads, stockpiles and dumps.
The Company is continuing its metallurgical testing to determine the most cost-effective means of potentially extracting the remaining silver from the historic leach pads. In 2019, samples were sent to Kappes Cassiday & Associates in Reno, Nevada for column leach testing using HPGR. Additionally, samples were sent to a silver producing mine to test very fine milling and cyanide recovery of silver using microbubble technology. Results were published in the company's May 21, 2019 news release. In light of the positive results of both HPGR and fine milling tests, the company continued metallurgical testing to investigate optimization alternatives.
On November 19, 2019, Silver One commenced a drilling program in the area of the historic open pits. A total of 2,860 metres were drilled in 9 holes. Seven holes were drilled in the Mount Diablo area, north of the Diablo pit and between the Diablo and Northern Belle pits. Two holes were drilled in the Northern Belle area. The program was shut down in March 2020 with the onset of COVID19.
The overall drilling program validated historic high-grade intercepts both down-dip from and between the Mount Diablo and Northern Belle past producing open-pits. Additionally, drill holes SO-C-19-049 and SO-C-19-051 extended the Lower Candelaria Shear (LCS) silver-gold-bearing horizon an additional 130 metres north of the nearest historic drill hole 49 (see News Releases March 2, 2020 and May 26, 2020). An area covering over 1,500 metres along strike hosts discrete zones of higher-grade mineralization and clearly demonstrated that additional drilling was warranted to more fully test the extent and grade of this system.
On October 15, 2020, the Company announced the commencement of a 15,000-metre reverse circulation drilling program and on February 16, 2021, May 26, 2021, and July 15, 2021, reported the completion of the program as well as assay results. The three main objectives of the program, included the outlining of deep, higher-grade silver and gold mineralization down-dip from the previously mined open-pits, extending near-surface, potentially open-pit mineralization to the east of west of the previously mined areas, and examining potential for porphyry-related mineralization at depth, were all successfully achieved.
The 15,000-metre drill program was successful in outlining a zone of higher-grade, down-dip mineralization north of the Mt. Diablo pit and between the Northern Belle and Mount Diablo pits. Similarly, drilling immediately east and west of the Mount Diablo pit reports significant widths of mineralized intervals with silver averages exceeding historic cut-off grades of 0.5 oz/ton (approximately 17 grams per tonne ("g/t")) of cyanide soluble silver. This confirms the continuity of near-surface silver-oxide mineralization along-strike for at least 500 m west and 100 m east of the Diablo pit. The mineralized system remains open along-strike in both directions. Additionally, porphyry-style alteration and mineralization have been identified in felsic dykes and altered intrusive rocks in hole SO-C-21-081 located west of the Northern Belle open pit. Here, a deep drill intercept of gold mineralization associated with this porphyry-style alteration returned 5.99 g/t gold over 0.67 m (from 927.97 m depth). This enhances the exploration potential for the discovery of additional mineralized systems at Candelaria.
On January 10, 2022, the Company announced the commencement of a 7,500-metre reverse circulation drilling program and on August 16, 2022, the Company released the results of the program. The objectives of the program, which included examining the extensions to silver-oxide mineralization adjacent to the past producing open pits and filling in between step-out holes drilled in 2021, were all successfully achieved. Drilling has extended the mineralization 400 m west (to drill hole SO-C-21-96) and 450 m east of the Mount Diablo pit (to drill hole SO-C-22-115). The mineralization remains open along strike in both directions as well as down-dip from Mt. Diablo and Northern Belle pits. Some very high-grade assays were returned. For example, 1,339 g/t Ag and 1.22 g/t Au over 10.67 m from 68.58 m depth, within a broad interval of 48.77 m at 332 g/t Ag and 0.39 g/t Au were intercepted from 60.96 m in hole SO-C-22-119B (in-fill hole west of Mt. Diablo pit).
Page 4
Silver One Resources Inc.
Management's Discussion and Analysis for the year ended December 31, 2024
On August 25, 2022, the Company reported the completion of a core drilling program for metallurgical testing. A total of 1,010 metres in six holes were drilled and the results from the metallurgical testing will be used in an upcoming in-ground resource estimate to be completed by the Company. Core samples and bulk samples of oxide mineralization, previously collected with a backhoe from the bottom of the Mt. Diablo pit, were delivered to Kappes, Cassiday & Associates (KCA) laboratory to undergo bottle roll and column cyanide leach tests to investigate silver and gold extractions.
On December 13, 2022, the Company reported positive initial bottle-roll metallurgical test results from six large-diameter core holes and three in-pit bulk samples from its Candelaria Project.
On June 14, 2023, the Company announced additional positive metallurgical test results from six core hole samples and three in-pit surface bulk samples from its Candelaria Project located in western Nevada, USA. The results include column cyanide-leach tests on oxide, mixed (oxide and sulphide) and sulphide samples, as well as separate flotation tests on two sulphide-rich samples, being conducted by Kappes, Cassiday & Associates in Reno, Nevada. The silver recoveries received to date already exceed the historic silver recoveries achieved during the past production of the mine. Moreover, the results also show that silver recovery can be improved significantly by High Pressure Grinding Rolls ("HPGR") crushing prior to heap-leaching. Silver and gold recoveries to date average 65.6% and 35.2% respectively, for column cyanide leach tests on oxides and mixed mineralization, utilizing material crushed with HPGR. In addition to that, the flotation-cyanidation testing on sulphide mineralization reveals excellent silver and gold recoveries as well as the ability to recover lead and zinc. Flotation extractions average 62% silver, 72% gold, 50% lead and 37% zinc. The sulphide results above are improved by leaching the flotation tails. Flotation followed by cyanidation of the tails increases the extractions to a range between 71% to 84% silver (average 77.5%) and 75% to 89% gold (average 82%).
On July 20, 2023, the Company announced the completion of metallurgical testing and final results from six core holes from its Candelaria Project in Nevada, USA. The current silver recoveries on oxide and mixed (oxide-sulphide) mineralization average 66%, which exceed the historic production recoveries of 51% recorded by previous operators. The column leach tests reflect an increase in silver recoveries over the historic silver recoveries by nearly 30% when compared to those achieved during the past production of the open-pit mine. This improvement is largely due to the addition of High Pressure Grinding Rolls ("HPGR") crushing prior to leaching.
On April 2, 2024, the Company announced the completion of metallurgical testing using a novel, cyanide-free leaching process that can potentially double silver recoveries and cut leaching times. The tests were conducted on representative samples of the largest heap leach pad (LP1) from the Candelaria Project. Results are positive and include average silver recoveries of 49% from oxide material in LP1, in comparison to the cyanide leach test recoveries of 21% to 29% in same pad LP1 from past tests commissioned by the Company (see Company's news releases of April 19, 2018 and May 21, 2019). Additional short-term (5-15 minutes) milling to 550 and 110 microns (0.55 and 0.11 mm) increases the leach pad recoveries to 59.9% and 64.4%, respectively. Additional testing on material from both the existing leach pads and fresh mineralization is planned for the second half of 2024.
Page 5
Silver One Resources Inc.
Management's Discussion and Analysis for the year ended December 31, 2024
Historical Resource Estimate
SSR reported in a technical report titled "Candelaria Project Technical Report" dated May 24, 2001 (filed on SEDAR+ on June 20, 2002), prepared by Mark G. Stevens, P.G., of Pincock Allen & Holt, the historical mineral resource estimate shown in the table below.
| Candelaria Project | |||||||
|---|---|---|---|---|---|---|---|
| Historical Resource Estimate | |||||||
| Area/Type | Classification | Tons | Factored Ag Grade (opt Agtotal) | Sol. Au Grade (opt AUsoluble) | AqEq Grade (opt AgEqtotal) | Ag Ounces (Agtotal) | Aq Equiv. Ounces (AqEqtotal) |
| Mount Diablo | Measured | 3,391,000 | 4.44 | 0.004 | 4.67 | 15,054,000 | 15,838,000 |
| Indicated | 10,231,185 | 2.84 | 0.003 | 3.01 | 29,005,000 | 30,796,000 | |
| Subtot. M + Ind | 13,623,000 | 3.23 | 0.003 | 3.42 | 44,060,000 | 46,633,000 | |
| Mount Diablo | Inferred | 5,191,000 | 2.12 | 0.003 | 2.30 | 11,015,000 | 11,939,000 |
| Northern Belle | 9,162,000 | 2.26 | 0.002 | 2.37 | 20,661,000 | 21,714,000 | |
| L.G. Stockpiles | 4,000,000 | 0.75 | --- | 0.75 | 3,000,000 | 3,000,000 | |
| Subtot. Inf. | 55,681,000 | 1.49 | 0.002 | 1.52 | 82,829,000 | 84,806,000 |
Notes
1. Lode resources tabulated at a 0.5 opt Agsoluble cut-off grades, with only Agtotal shown in this table.
2. Low grade stockpile resources tabulated for entire accumulation of material.
3. Total silver grades factored from soluble silver grades using regression formulas developed by Snowden.
4. Silver equivalent grade includes the contribution from the gold grade (soluble) using an Ag:Au equivalency ratio of 57.8:1.
The historical mineral resource estimate used "measured mineral resource", "indicated mineral resource" and "inferred mineral resource", which are categories set out in NI 43-101. Silver One considers these historical estimates reliable as well as relevant as it represents key targets for exploration work by Silver One.
Additional technical detail on preparation of the historical resource estimate:
(1) Mount Diablo Deposit consisted of 538 drill holes by previous owners and 10 drill holes by SSR. For drill holes that were twinned, the author used the lower of the two values assigned to the original holes. The mineral resource estimate used a kriging estimation method to establish ore zones with a cut-off grade of 0.5 opt Ag. Ordinary kriging was used to interpolate grades in the block model. The block models were set up with block dimensions of 25 feet by 25 feet in plan and 10 feet in height. The maximum search range used in the higher-grade zone was 235 feet, in the lower grade zone it was 1,000 feet and in the background zone it was 350 feet. Block models more than 300 feet from the nearest composite only constituted 3 percent of the total number of estimated blocks and were assigned to an inferred category.
(2) Northern Belle Deposit consisted of 226 drill holes by previous owners, of which a portion of these holes were duplicated for the Mount Diablo Deposit database. The mineral resource estimate used a kriging estimation method to establish ore zones with a cut-off grade of 0.5 opt Ag. The mineral resource estimate used multiple indicator kriging to interpolate grades in the block model. Block models were set up with block dimensions of 50 feet by 50 feet in plan and 20 feet in height. The maximum search range used in the higher-grade zone was 85 feet, in the intermediate-grade zone was 120 feet and the lower-grade zone was 140 feet and in the lower undifferentiated material below the current pit topography was 260 feet. Block models more than 300 feet from the nearest composite only constituted 3 percent of the total number of estimated blocks and were assigned to an inferred category.
Page 6
Silver One Resources Inc.
Management's Discussion and Analysis for the year ended December 31, 2024
(3) Low Grade Stockpile is based on limited and incomplete data and documentation. Material placed on the stockpiles ranged from 0.5 to 0.65 opt Ag.
A qualified person has not done sufficient work to classify the historical estimate as a current mineral resource therefore Silver One is not treating these historical estimates as a current mineral resources.
Current Leach Pads Resource Estimate
Silver One reported in the report titled “Technical Report: on the Heap Leach Pads within the Candelaria, Property, Mineral and Esmeralda Counties, Nevada, USA” dated August 6, 2020 (filed on SEDAR+ on August 19, 2020), prepared by James A. McCrea, P.Geo., an updated mineral resource estimate for the leach pads, including an upgrade of part of the resource from inferred to indicated as shown in the table below:
| Zone/ Category | Tonnes (000) | Ag (FA) (ppm) | Au (FA) (ppm) | Ag(soluble) (ppm) | Au(soluble) (ppm) | Contained Metal* | |
|---|---|---|---|---|---|---|---|
| Ag (Moz) | Au (oz) | ||||||
| Indicated | |||||||
| LP1 | 22,184.000 | 42.1 | 0.074 | 15.6 | 0.022 | 30.017 | 52,000 |
| Inferred | |||||||
| LP2 | 11,451.000 | 41.8 | 0.100 | 23.3 | 0.032 | 15.397 | 36,700 |
-
Contained Metal based on fire assay grades
-
Modifying Factors are considerations used to convert Mineral Resources to Mineral Reserves. These include, but are not restricted to, mining, processing, metallurgical, infrastructure, economic, marketing, legal, environmental, social and governmental factors.
- A Mineral Resource is a concentration or occurrence of solid material of economic interest in or on the Earth's crust in such form, grade or quality and quantity that there are reasonable prospects for eventual economic extraction.
An Inferred Mineral Resource is that part of a Mineral Resource for which quantity and grade or quality are estimated on the basis of limited geological evidence and sampling. Geological evidence is sufficient to imply but not verify geological and grade or quality continuity.
An Inferred Mineral Resource has a lower level of confidence than that applying to an Indicated Mineral Resource and must not be converted to a Mineral Reserve. It is reasonably expected that the majority of Inferred Mineral Resources could be upgraded to Indicated Mineral Resources with continued exploration.
An Indicated Mineral Resource is that part of a Mineral Resource for which quantity, grade or quality, densities, shape and physical characteristics are estimated with sufficient confidence to allow the application of Modifying Factors in sufficient detail to support mine planning and evaluation of the economic viability of the deposit. Geological evidence is derived from adequately detailed and reliable exploration, sampling and testing and is sufficient to assume geological and grade or quality continuity between points of observation.
An Indicated Mineral Resource has a lower level of confidence than that applying to a Measured Mineral Resource and may only be converted to a Probable Mineral Reserve.
- Mineral resources, which are not mineral reserves, do not have demonstrated economic viability. The estimate of mineral resources has no known issues and do not appear materially affected by any known environmental, permitting, legal, title, socio-political, marketing, or other relevant issues. There is no guarantee that Silver One will be successful in obtaining any or all of the requisite consents, permits or approvals, regulatory or otherwise for the project or that the project will be placed into production.
- The mineral resources in this study were estimated using the Canadian Institute of Mining, Metallurgy and Petroleum ('CIM'), CIM Standards on Mineral Resources and Reserves, Definitions and Guidelines prepared by the Standing Committee on Reserve Definitions and adopted by the CIM Council on May 10, 2014.
Metal prices used for the resource estimate are: US$1,500 per ounce for gold; US$20 per ounce of silver. These prices were used for calculating silver equivalents and for the exploitation scenarios related to reasonable prospects for eventual economic extraction.
Page 7
Silver One Resources Inc.
Management's Discussion and Analysis for the year ended December 31, 2024
Phoenix Silver Property, Arizona, United States
The Phoenix Silver Property is a very high-grade native silver prospect in Arizona that lies within the “Arizona Silver Belt”, immediately adjacent to the prolific copper producing area of Globe, Arizona. Multiple native silver vein fragments, interpreted to have been transported short distances downslope from partially exposed vein structures, have been found at or near-surface in numerous areas throughout the property.
Some of the larger fragments have returned the following:
- A 417-pound (189 kg) native silver vein fragment was found buried beneath the overburden in a dry creek bed immediately downslope from prospective vein targets. Specific gravity measurements indicate a high silver content (possibly up to 70% silver). No assay was performed due to the desire to preserve the unique specimen nature of this sample.
- An 18.7 lb (8.5 kg) native silver vein fragment assayed 459,000 g/t (14,688 oz/ton) silver, as determined by a concentrate assay performed at Skyline Assayers and Laboratories, Tucson, Arizona (ISO: 17025:2005).
The above samples are selected samples and are not necessarily representative of the mineralization hosted on the property.
Option agreement
On February 4, 2020 (the “Effective Date”), the Company entered into an agreement (the “Phoenix Silver Agreement”) with Granite-Solid LLC (the “Optionor”) whereby the Company has the option to acquire a 100% interest in the Phoenix Silver Property. The Phoenix Silver Property consists of 86 unpatented lode claims and 2 unpatented placer claims, located in Gila County, Arizona.
The Company may exercise the option by making the following cash payments and share issuances:
- paying the Optionor US$350,000 within five days of TSX-V acceptance of the Phoenix Silver Agreement (the “Effective Date”) (paid); and
- issuing the Optionor: (i) 500,000 shares on the date that is six (6) months from the Effective Date (issued); (ii) 1,000,000 shares on the date that is twelve months from the Effective Date (issued); (iii) 2,500,000 shares on the date that is twenty-four months from the Effective Date (issued); (iv) 3,000,000 shares on the date that is thirty-six months from the Effective Date (issued); and (v) 3,000,000 shares on the date that is forty-eight months from the Effective Date (issued).
The Phoenix Silver Agreement is subject to a five-mile area of interest. Further, after two years of the Effective Date, Silver One has the right to require the Optionor to include other unpatented placer claims under this Phoenix Silver Agreement for no additional consideration.
The Phoenix Silver Property is subject to an underlying 2% Net Smelter Royalty (“NSR”) to the original prospectors of the project. Each 1% NSR may be purchased for US$500,000 resulting in a total of US$1,000,000 for the entire underlying NSR.
On February 8, 2024 the Company announced it exercised its option to acquire a 100% interest in the high-grade Phoenix Silver Project. Silver One paid US$350,000 and issued ten million common shares of Silver One over 3 years to the property vendors. The central portion of the claim block is subject to a 2% NSR, which can be purchased for US$1,000,000.
Page 8
Silver One Resources Inc.
Management's Discussion and Analysis for the year ended December 31, 2024
Property development
Work undertaken to August 2020 included prospecting, geological mapping, rock, and soil sampling, as well as ground supported Self Potential ("SP") geophysical surveys. The SP revealed strong anomalies upslope and to the northwest of the area of the very high-grade vein fragments. On January 11, 2021 the Company reported the completion of a drone-borne magnetic survey of the entire property as well as additional geological mapping and soil sampling and a ground electromagnetic survey around the 417 vein.
On January 11, 2021, the Company reported the completion of additional prospecting and geological mapping, soil and rock geochemical sampling, a property wide drone-borne magnetic survey, as well as ground self-potential (SP) and electromagnetic (EM) geophysical surveys in the project, in the vicinity of the vein fragment structures. From this work, a series of exploration targets have been identified and a drill plan (Plan of Operations) was submitted for permitting to the Tonto National Forest (TNF). During 2023, the Company received the drilling permit and looks forward to drilling the project in 2024.
On October 23, 2023, the Company announced that it had staked new claims, significantly expanding its ground holdings at its Phoenix Silver Property near Globe, Arizona. The new staking includes 139 unpatented lode claims covering 1,162 hectares (2,872 acres).
On December 19, 2023, the Company announced that it had staked additional claims securing 260 unpatented lode claims covering 2,090 hectares (5,165 acres). In total, the Phoenix Silver Property now covers 6,141 hectares (15,175 acres) in 774 lode claims.
On May 15, 2024, the Company announced the discovery of additional large silver vein fragments along the major east-west 417 vein structure, immediately to the west of the large angular and unabraded 417-pound silver vein fragment that was estimated to contain over 70% silver. Geological reconnaissance on the new claims staked in October and December 2023 has also uncovered several new copper and silver prospects with up to 1,785 g/t Ag and 2.74 % Cu in selected samples.
On June 6, 2024, the Company announced the discovery of additional copper and silver prospects with up to 1,240 g/t Ag and 7.79% Cu in selected samples. These samples were collected in the southern portion of the property where multiple copper and silver showings suggest potential for the discovery of porphyry related copper-silver mineralization.
On August 12, 2024 the Company announced it entered into a contract with Geotech to conduct a ZTEM survey over its 100% owned Phoenix Silver project. The survey will be scheduled as soon as any Forest Service field restrictions permit. Silver One will also begin road and pad building in preparation for drilling the very high-grade silver targets in the 417 area. The program is fully permitted, fully funded and is ready to commence once weather conditions have improved.
Page 9
Silver One Resources Inc.
Management's Discussion and Analysis for the year ended December 31, 2024
Cherokee, Nevada, United States
Cherokee is an emerging silver exploration target located approximately 75 kilometres south of the historic Pioche mining district. From 1869 to present, there have been over 6 million tons mined in the Pioche area producing in excess of 1 million ounces of gold, 20 million ounces of silver, 7 million pounds of copper, 350 million pounds of lead and 700 million pounds of zinc. Production was initially from gold-silver-copper veins and later from underlying carbonate-hosted replacement-type mineralized bodies. Mineralization at Cherokee is epithermal in nature and hosted in sedimentary and volcanic rocks, which is a similar geological setting to the past producing mineralized systems at Pioche.
In July 2018 Silver One announced that it has expanded its portfolio of high-quality silver projects with the staking of 636 lode claims (approximately 13,000 acres or 5,200 hectares) covering a 12-kilometre long by 4-kilometre wide, structurally controlled, silver-copper-gold system in Lincoln County, southeast Nevada. The property, known as Cherokee, hosts a series of epithermal-style veins, along with several large areas of strong silicification and associated jasperoid. A total of 125 samples were collected across the property in 2018, with individual values as high as 1,162 g/t silver, 2.9% copper and over 2 g/t gold being returned from surface dump, rock grab and rock chip samples taken along the exposed areas of these vein systems. These samples are selected samples and are not necessarily representative of the mineralization hosted on the property.
The Company also announced on July 18, 2018 that it entered into a Lease/Purchase Agreement with Castelton Park LLC of Sparks, Nevada to acquire five patented claims covering 83.5 acres along the Cherokee vein system.
On August 19, 2020, the Company acquired a 100% interest in the five patented claims of the Cherokee project. In order to obtain its 100% interest, Silver One paid US$92,500 over a two-year period from 2018 to 2020. During a 10-year period from July 18, 2018, Castelton is entitled to an additional payment of US$100,000 for every 7.5 million silver equivalent ounces calculated on the property and reported in a 43-101 Technical Report. The total dollar amount payable is not to exceed US$1,000,000. The 10-year term ends on July 18, 2028.
Further sampling results, along the 12+ kilometre long structures were announced in October 2018. A new zone called Hidden Treasure was identified in the southeastern portion of the property. Hidden Treasure lies east-southeast of the historic Johnnie Mine and hosts some of the highest gold values collected to date on the Cherokee property. It occurs where the high-grade Cherokee and Mojoto vein systems are interpreted to merge.
On February 1, 2021, the Company provided an update on the work undertaken on the Cherokee Project between August and December 2020. The work was successful in helping to define drill targets in the Cherokee Mine, Johnnie Mine and Hidden Treasure areas.
On August 17, 2021, the Company announced the commencement of a 1,500-metre diamond drilling program on company-owned patented claims. On November 16, 2021, the Company announced it had completed 796 metres of the planned 1,500 metre diamond drilling program. Silver One experienced extremely slow drilling and other technical issues, which led to the early termination of this program. The drilling tested silver-copper-gold epithermal vein targets on patented claims overlying the past producing Cherokee and Southeast Cherokee historic workings. Four of the nine holes intersected strongly anomalous silver and copper mineralization. The mineralization is associated with thick quartz veining (up to 25 metres thick in hole GC21-01) hosting narrower silver and copper mineralized intervals within the vein and structures.
Silver One's near-term objective is to continue surface exploration, including additional geophysical surveys to evaluate large target areas of this property that remain untested. The medium-term goal will be to rank drill targets to potentially extend known mineralized areas both at depth and along-strike from the exposed veins, as well as permit selected targets outside the patented claims for subsequent drilling.
Page 10
Silver One Resources Inc.
Management's Discussion and Analysis for the year ended December 31, 2024
SELECTED ANNUAL INFORMATION
The following is a summary of selected audited financial information of the Company for each of the last three fiscal years:
| 2024 | 2023 | 2022 | |
|---|---|---|---|
| $ | $ | $ | |
| Total revenues | - | - | - |
| Net loss | (2,834,959) | (3,207,642) | (4,098,688) |
| Net loss per share (basic and diluted)¹ | (0.01) | (0.01) | (0.02) |
| Total assets | 42,780,407 | 35,687,997 | 32,552,214 |
| Total liabilities | 1,181,421 | 890,468 | 234,448 |
¹ The basic and diluted loss per share calculations result in the same amount due to the anti-dilutive effect of outstanding stock options and warrants.
SUMMARY OF QUARTERLY RESULTS
| Three months ended ($) | December 31
2024¹ | September 30
2024 | June 30
2024² | March 31
2024 |
| --- | --- | --- | --- | --- |
| Revenues | - | - | - | - |
| Net loss | (1,295,916) | (554,837) | (487,601) | (496,605) |
| Net loss per share – (basic and diluted)⁵ | (0.00) | (0.00) | (0.00) | (0.00) |
| Total assets | 42,780,407 | 41,417,677 | 42,216,536 | 36,422,111 |
| Three months ended ($) | December 31
2023³ | September 30
2023 | June 30
2023⁴ | March 31
2023 |
| --- | --- | --- | --- | --- |
| Revenues | - | - | - | - |
| Net loss | (1,097,906) | (547,181) | (864,899) | (697,656) |
| Net loss per share - (basic and diluted)⁵ | (0.00) | (0.00) | (0.00) | (0.00) |
| Total assets | 35,687,997 | 36,631,886 | 36,241,250 | 32,595,158 |
¹ The increase in net loss during the three months ended December 31, 2024 was partly due to an impairment of $717,500 recognized on an accounts receivable balance.
² The increase in total assets during the three months ended June 30, 2024 was mostly due to the private placement of $5,907,759 that occurred during the quarter.
³ The increase in net loss during the three months ended December 31, 2023 was partly due to an impairment of $437,500 recognized on an accounts receivable balance.
⁴ The increase in total assets during the three months ended June 30, 2023 was mostly due to the private placement of $5,000,000 that occurred during the quarter.
⁵ The basic and diluted loss per share calculation results in the same value as there is an anti-dilutive effect of outstanding options and warrants due to the net loss.
RESULTS OF OPERATIONS
Three months ended December 31, 2024
During the three months ended December 31, 2024, the Company reported a net loss of $1,295,916 or $0.00 per share compared to a loss of $1,097,906 or $0.00 per share for the three months ended December 31, 2023. The most significant expenses of variance to the prior year period are as follows:
Gain on marketable securities of $16,862 (2023 – loss of $43,750)
The gain/loss on marketable securities relates to the fair value adjustment of marketable securities held by the company during the three months ended December 31, 2024. As the marketable securities are fair valued at the end of each period, there was a small increase in the share price of the marketable securities held during the period compared to a decrease in the share price during the year December 31, 2023.
Impairment of receivables of $717,500 (2023 - $437,500)
During the three months ended December 31, 2023, the Company recognized an impairment on accounts receivable outstanding of $437,500 related to an expected credit loss related on a receivable outstanding. This
Page 11
Silver One Resources Inc.
Management's Discussion and Analysis for the year ended December 31, 2024
same receivable balance had an additional impairment recorded in 2024 of $717,500 bringing the receivable balance to $95,000.
Year ended December 31, 2024
During the year ended December 31, 2024, the Company reported a net loss of $2,834,959 or $0.01 per share compared to a loss of $3,207,642 or $0.01 per share for the year ended December 31, 2023. The most significant expenses of variance to the prior year period are as follows:
Consulting fees of $193,012 (2023 - $335,936)
The decrease in consulting fees is the result of bonuses paid to certain consultants of $164,640 during the year ended December 31, 2023.
Professional fees of $139,831 (2023 - $215,813)
Professional fees decreased as a result of increased legal fees during the year ended December 31, 2023 for various corporate matters.
Share-based payments of $500,662 (2023 - $615,094)
The decrease in share-based payments is the result options with lower weighted average fair values vesting over the year ended December 31, 2024.
Travel and related costs of $192,739 (2023 - $262,020)
The decrease in travel and related costs is the result of less travel during the year ended December 31, 2024.
Loss on marketable securities of $77,475 (2023 - $302,107)
The loss on marketable securities relates to the fair value adjustment of marketable securities held by the company during the year ended December 31, 2024. As the marketable securities are fair valued at the end of each period, there was a smaller decrease in the share price of the marketable securities held during the year than in the previous year.
Impairment of receivables of $717,500 (2023 - $437,500)
During the year ended December 31, 2023, the Company recognized an impairment on accounts receivable outstanding of $437,500 related to an expected credit loss related on a receivable outstanding. This same receivable balance had an additional impairment recorded bringing the receivable balance to $95,000.
FINANCIAL CONDITION, LIQUIDITY AND CAPITAL RESOURCES
Net working capital including cash
As at December 31, 2024, the Company had $2,732,037 in cash, $nil in short-term investments, and working capital of $2,630,528, compared to $959,557 in cash, $278,501 in short-term investments, and working capital of $2,189,645 at December 31, 2023.
Operating activities
Cash used in operating activities for the year ended December 31, 2024 was $1,465,969 compared to cash used of $1,794,330 in the year ended December 31, 2023. The cash used in operating activities results from the net loss during the period plus non-cash items and changes in working capital.
Investing activities
Cash used in investing activities for year ended December 31, 2024 was $2,544,273 compared to cash used of $5,278,092 in the year ended December 31, 2023. The cash used in investing activities during the year ended December 31, 2023 included $3,434,160 to purchase reclamation deposits.
Financing activities
Cash provided by financing activities for the year ended December 31, 2024 was $5,757,675 compared to cash provided of $4,978,961 in the year ended December 31, 2023. The increase in the cash provided by financing
Page 12
Silver One Resources Inc.
Management's Discussion and Analysis for the year ended December 31, 2024
activities is the result of a private placement during the year of $5,907,759 compared to a private placement of $5,000,000 during the year ended December 31, 2023.
Capital expenditures
The capital expenditures of the Company during the year ended December 31, 2024 included cash mineral property expenditures of $2,822,774 on the Company's properties (2023 - $1,831,605) plus a $200,247 change in mineral property expenditures included in accounts payable (2023 – less $117,382).
Liquidity and capital resources
As at December 31, 2024, the Company had a working capital of $2,630,528. The Company has not yet put into commercial production any of its mineral properties and as such has no operating revenues or cash flows. Accordingly, the Company is dependent on the equity markets as its sole source of operating working capital, and the Company's capital resources are largely determined by the strength of the junior resource capital markets, by the status of the Company's projects in relation to these markets, and its ability to compete for investor support of its projects. There can be no assurance that financing, whether debt or equity, will always be available to the Company in the amount required at any particular time or for any particular period or, if available, that it can be obtained on terms satisfactory to it.
OFF-BALANCE SHEET ARRANGEMENTS
The Company has no off-balance sheet arrangements.
RELATED PARTY TRANSACTIONS
The Company's related parties consist of the Company's directors and officers, and any companies associated with them. The Company incurred the following charges during the years ended December 31, 2024 and 2023:
| 2024 | 2023 | |
|---|---|---|
| $ | $ | |
| Consulting fees | 274,500 | 252,000 |
| Director fees | 78,000 | 78,000 |
| Salaries and benefits | 280,474 | 282,883 |
| Share-based payments | 315,235 | 326,350 |
Consulting fees include amounts paid to Amezquita Management Inc., a company of which the CFO is President, as well as amounts paid to Raul Diaz, a director of the Company, for geological consulting services. Included in the amounts above is $178,462 in consulting fees for the year ended December 31, 2023 that was capitalized to mineral properties (2023 - $181,010).
Director fees were paid to the directors of the Company.
Salaries and benefits include amounts paid to Greg Crowe, President and Chief Executive Officer of the Company.
Share-based payments include options granted to officers and directors.
As at December 31, 2024, directors, officers or their related companies were owed $6,300 (2023 - $3,675) in respect of services. The amounts due to related parties are included in accounts payable.
Key management includes directors and executive officers of the Company. Other than the amounts disclosed above, there was no other compensation paid or payable to key management for employee services for the reported periods.
Page 13
Silver One Resources Inc.
Management's Discussion and Analysis for the year ended December 31, 2024
FINANCIAL INSTRUMENTS AND CAPITAL RISK MANAGEMENT
Classification of financial instruments
The Company's financial instruments consist of cash, short-term investments, receivables, reclamation deposits, marketable securities, and accounts payable and accrued liabilities. The Company classifies its cash, short-term investments, receivables and reclamation deposits as financial assets at amortized cost. The Company classifies its accounts payable and accrued liabilities as financial liabilities at amortized cost. The Company classifies its marketable securities as FVTPL.
The classification of the financial instruments as well as their carrying values as at December 31, 2024 and 2023 is shown in the table below.
| At December 31, 2024 | FVTPL
(Financial Assets) | Amortized cost
(Financial Assets) | Amortized cost
(Financial Liabilities) | Total |
| --- | --- | --- | --- | --- |
| | $ | $ | $ | $ |
| Financial assets | | | | |
| Cash | - | 2,732,037 | - | 2,732,037 |
| Receivables | - | 95,000 | - | 95,000 |
| Reclamation deposits | - | 3,713,797 | - | 3,713,797 |
| Marketable securities | 66,205 | - | - | 66,205 |
| Total financial assets | 66,205 | 6,540,834 | - | 6,607,039 |
| Financial liabilities | | | | |
| Accounts payable and accrued liabilities | - | - | 353,228 | 353,228 |
| Total financial liabilities | - | - | 353,228 | 353,228 |
Note that the fair values approximate the carrying values due to their short-term nature.
| At December 31, 2023 | FVTPL
(Financial Assets) | Amortized cost
(Financial Assets) | Amortized cost
(Financial Liabilities) | Total |
| --- | --- | --- | --- | --- |
| | $ | $ | $ | $ |
| Financial assets | | | | |
| Cash | - | 959,557 | - | 959,557 |
| Short-term investments | - | 278,501 | - | 278,501 |
| Receivables | - | 812,500 | - | 812,500 |
| Reclamation deposits | - | 3,419,898 | - | 3,419,898 |
| Marketable securities | 143,680 | - | - | 143,680 |
| Total financial assets | 143,680 | 5,470,456 | - | 5,614,136 |
| Financial liabilities | | | | |
| Accounts payable and accrued liabilities | - | - | 100,917 | 100,917 |
| Total financial liabilities | - | - | 100,917 | 100,917 |
Note that the fair values approximate the carrying values due to their short-term nature.
Fair value
Financial instrument disclosures establish a fair value hierarchy that requires the Company to maximize the use of observable inputs and minimize the use of unobservable inputs when measuring fair value. The Company primarily applies the market approach for recurring fair value measurements. This section describes three input levels that may be used to measure fair value:
Level 1 – unadjusted quoted prices in active markets for identical assets or liabilities. An active market for the asset or liability is a market in which transactions for the asset or liability occur with sufficient frequency and volume to provide information on an ongoing basis.
Page 14
Silver One Resources Inc.
Management's Discussion and Analysis for the year ended December 31, 2024
Level 2 – quoted prices for similar assets or liabilities; quoted prices in markets that are not active; or other inputs that are observable or can be corroborated by observable market data for substantially the full term of the assets or liabilities.
Level 3 – unobservable inputs that are supported by little or no market activity and that are significant to the fair value of the assets or liabilities.
The fair value of cash, short-term investments, receivables, reclamation deposits and accounts payable and accrued liabilities approximates their carrying values. Marketable securities are measured at fair value using level 1 inputs.
Financial instruments risk management
The Board of Directors has overall responsibility for the determination of the Company's risk management objectives and policies. The overall objective of the Board is to set policies that seek to reduce risk as far as possible without unduly affecting the Company's competitiveness and flexibility.
The Company thoroughly examines the various financial instruments and risks to which it is exposed and assesses the impact and likelihood of those risks. These risks include foreign currency risk, interest rate risk, credit risk, and liquidity risk. Where material, these risks are reviewed and monitored by the Board of Directors.
Discussions of risks associated with financial assets and liabilities are detailed below:
a) Foreign currency risk
The Company is exposed to the financial risk related to the fluctuation of foreign exchange rates. The Company operates in Canada and the US and a portion of the Company's expenses are incurred in Canadian dollars ("CAD") and US dollars ("USD"). A significant change in the currency exchange rates between the Canadian and US dollar, could have an effect on the Company's results of operations, financial position or cash flows. The Company has not hedged its exposure to currency fluctuations.
As at December 31, 2024, the Company is exposed to currency risk on the following financial assets and liabilities denominated in USD. The sensitivity of the Company's net earnings due to changes in the exchange rate between the USD against the Canadian dollar is included in the table below in Canadian dollar equivalents:
| USD amount | Total | |
|---|---|---|
| $ | $ | |
| Cash | 162,550 | 162,550 |
| Accounts payable and accrued liabilities | (278,790) | (278,790) |
| Net exposure | (116,240) | (116,240) |
| Effect of +/- 10% change in currency | (11,624) |
b) Interest rate risk
Interest rate risk is the risk that the fair value or future cash flows of a financial instrument will fluctuate because of changes in market interest rates. The risk that the Company will realize a cash loss is limited as the Company's liabilities are non-interest bearing. The Company considers this risk to be immaterial.
c) Credit risk
Credit risk is the risk of an unexpected loss if a customer or third party to a financial instrument fails to meet its contractual obligations. Credit risk arises from cash held with banks and financial institutions as well as from outstanding accounts receivable. The maximum exposure to credit risk is equal to the carrying value of the financial assets. The Company considers credit risk with respect to its cash to be immaterial as cash is mainly held through large Canadian financial institutions. The credit risk with respect to accounts receivable is subject to the expected credit loss model where any identified impairment loss is applied. During the years ended December 31, 2024 and 2023, the Company recognized a credit loss on its short-term receivable from the sale of KCP.
Page 15
Silver One Resources Inc.
Management's Discussion and Analysis for the year ended December 31, 2024
d) Liquidity risk
Liquidity risk is the risk that the Company is not able to meet its financial obligations as they become due. The Company manages its liquidity risk by continuously monitoring forecasted and actual cash flows, as well as anticipated investing and financing activities. Accounts payable and accrued liabilities have contractual maturities of 30 days or are due on demand and are subject to normal trade terms.
Management of capital
The Company's objectives when managing capital are to safeguard the Company's ability to continue as a going concern in order to pursue the exploration of and retention of its mineral properties. In the management of capital, the Company includes its components of shareholders' equity.
The capital structure of the Company consists of equity attributable to common shareholders, comprised of issued capital, reserves and deficit.
The Company maintains and adjusts its capital structure based on changes in economic conditions and the Company's planned requirements. The Company may adjust its capital structure by issuing new equity, issuing new debt, or acquiring or disposing of assets, and controlling the capital expenditures program. The Company is not subject to externally imposed capital requirements.
The Company does not have a source of revenue. As such, the Company is dependent on external financing to fund its activities. In order to pay for administrative costs, the Company will spend its existing working capital and raise additional amounts as needed.
Management reviews its capital management policies on an ongoing basis. There were no changes in the Company's approach to capital management during the year ended December 31, 2024.
ACCOUNTING STANDARDS ISSUED BUT NOT YET EFFECTIVE
The following new standard has been issued but not yet applied:
In April 2024, the IASB issued IFRS 18, Presentation and Disclosure of Financial Statements ("IFRS 18"), which replaces IAS 1, Presentation of Financial Statements. IFRS 18 introduces a specified structure for the income statement by requiring income and expenses to be presented into the three defined categories of operating, investing and financing, and by specifying certain defined totals and subtotals. Where company-specific measures related to the income statement are provided, IFRS 18 requires companies to disclose explanations around these measures, which are referred to as management-defined performance measures. IFRS 18 also provides additional guidance on principles of aggregation and disaggregation which apply to the primary financial statements and the notes. IFRS 18 will not affect the recognition and measurement of items in the financial statements, nor will it affect which items are classified in other comprehensive income and how these items are classified. The standard is effective for reporting periods beginning on or after January 1, 2027, including for interim financial statements. Retrospective application is required, and early application is permitted. We are currently assessing the effect of this new standard on our financial statements.
As at December 31, 2024, there are no other IFRS or IFRIC interpretations with future effective dates that are expected to have a material impact on the Company.
Page 16
Silver One Resources Inc.
Management's Discussion and Analysis for the year ended December 31, 2024
CRITICAL JUDGMENTS IN APPLYING ACCOUNTING POLICIES
The critical judgments that the Company's management has made in the process of applying the Company's accounting policies with the most significant effect on the amounts recognized in the Company's consolidated financial statements are as follows:
a) Functional currency
The functional currency for each of the Company and its subsidiary is the currency of the primary economic environment in which the entity operates. Determination of functional currency involves certain judgements to determine the primary economic environment of an entity, and this is re-evaluated for each new entity following an acquisition, or if events and conditions change.
b) Impairment of mineral properties
Expenditures on mineral properties are capitalized. The Company makes estimates and applies judgment about future events and circumstances in determining whether the carrying amount of a mineral property exceeds its recoverable amount. The recoverability of amounts shown as mineral properties and deferred exploration costs is dependent upon the discovery of economically recoverable reserves, the Company's ability to obtain financing to develop the properties, and the ultimate realization of profits through future production or sale of the properties. Management reviews the carrying values of its mineral properties on an annual basis, or when an impairment indicator exists, to determine whether an impairment should be recognized. In making its assessment, management considers, among other things, exploration results to date and future exploration plans for a particular property. In addition, capitalized costs related to relinquished property rights are written off in the period of relinquishment. Capitalized costs in respect of the Company's mineral properties may not be recoverable and there is a risk that these costs may be written down in future periods.
c) Impairment of financial assets
The expected credit losses for financial assets are based on assumptions about risk of default and expected loss rates. The Company uses judgment in making these assumptions and selecting the inputs to the impairment calculation, based on the available information.
d) Determining amount and timing of rehabilitation costs
Management must determine if estimates of the future costs the Company will incur to complete the rehabilitation work is required to comply with existing laws, regulations and agreements in place at each exploration site. Actual costs incurred may differ from those amounts estimated. Future changes to environmental laws and regulations could increase the extent of rehabilitation work required by the Company. Management determined at the date of the statement of financial position that no material rehabilitation provisions were required under IAS 37, Provisions, Contingent Liabilities, and Contingent Assets.
e) Going concern
In preparing these consolidated financial statements on a going concern basis, Management's critical judgment is that the Company will be able to meet its obligations and continue its operations for the next twelve months.
KEY SOURCES OF ESTIMATION UNCERTAINTY
The preparation of consolidated financial statements requires that the Company's management make assumptions and estimates of effects of uncertain future events on the carrying amounts of the Company's assets and liabilities at the end of the reporting period. Actual results may differ from those estimates as the estimation process is inherently uncertain. Actual future outcomes could differ from present estimates and assumptions, potentially having material future effects on the Company's consolidated financial statements. Estimates are reviewed on an ongoing basis and are based on historical experience and other facts and circumstances. Revisions to estimates and the resulting effects on the carrying amounts of the Company's assets and liabilities are accounted for prospectively.
Page 17
Silver One Resources Inc.
Management's Discussion and Analysis for the year ended December 31, 2024
The significant assumptions about the future and other major sources of estimation uncertainty as at the end of the reporting period that have a significant risk of resulting in a material adjustment to the carrying amounts of the Company's assets and liabilities are as follows:
a) Deferred income taxes
Deferred income tax assets and liabilities are measured using enacted or substantively enacted tax rates at the reporting date in effect for the period in which the temporary differences are expected to be recovered or settled. The effect on deferred income tax assets and liabilities of a change in tax rates is recognized as part of the provision for income taxes in the period that includes the enactment date. The recognition of deferred income tax assets is based on the assumption that it is probable that taxable profit will be available against which the deductible temporary differences can be utilized.
b) Share-based payments
Share-based payments are determined using the Black-Scholes option pricing model based on estimated fair values of all share-based awards at the date of grant and are expensed to the statement of loss and comprehensive loss over each award's vesting period. The Black-Scholes option pricing model utilizes subjective assumptions such as expected price volatility, expected life of the option, risk free interest rates, and forfeiture rates. Changes in these input assumptions can significantly affect the fair value estimate.
c) Impairment of mineral properties
The Company applies significant estimates when performing impairment tests on mineral properties. Should these estimates prove to be incorrect, this could result in material differences in the Company's impairment testing and conclusions reached therein.
d) Impairment of financial assets
The expected credit losses for financial assets are based on assumptions about risk of default and expected loss rates. The Company uses forward-looking estimates to input into the impairment calculation.
SECURITIES OUTSTANDING
Authorized share capital: The Company can issue an unlimited number of common shares with no par value.
Issued and Outstanding Common Shares as at March 10, 2025
268,893,369
| Expiry date | Exercise Price | Number | |
|---|---|---|---|
| Options | |||
| September 28, 2025 | $0.70 | 2,575,000 | |
| January 28, 2026 | $0.65 | 100,000 | |
| March 9, 2026 | $0.67 | 100,000 | |
| April 23, 2026 | $0.75 | 50,000 | |
| June 6, 2026 | $0.75 | 2,950,000 | |
| January 20, 2027 | $0.45 | 100,000 | |
| April 26, 2027 | $0.45 | 300,000 | |
| August 25, 2027 | $0.33 | 2,590,000 | |
| July 27, 2028 | $0.40 | 1,995,000 | |
| October 15, 2028 | $0.25 | 200,000 | |
| August 12, 2029 | $0.24 | 3,705,000 | |
| Warrants | |||
| July 14, 2025 | $0.65 | 10,191,669 | |
| June 20, 2027 | $0.40 | 10,786,576 | |
| Fully Diluted | 304,536,614 |
Page 18
Silver One Resources Inc.
Management's Discussion and Analysis for the year ended December 31, 2024
DISCLOSURE OF CONTROLS AND PROCEDURES
In connection with National Instrument 52-109 (Certificate of Disclosure in Issuer's Annual and Interim Filings) ("NI 52-109"), the Chief Executive Officer and Chief Financial Officer of the Company have filed a Venture Issuer Basic Certificate with respect to the financial information contained in the consolidated financial statements for the year ended December 31, 2024 and this accompanying MD&A (together, the "Annual Filings").
In contrast to the full certificate under NI 52-109 the Venture Issuer Basic Certificate does not include representations relating to the establishment and maintenance of disclosure controls and procedures and internal control over financial reporting, as defined in NI 52-109. For further information, the reader should refer to the Venture Issuer Basic Certificates filed by the Company with its filings on SEDAR+ at www.sedarplus.ca.
RISKS AND UNCERTAINTIES
Financing risks
The Company has incurred significant losses since inception. The continued operations of the Company are dependent on its ability to generate future cash flow and obtain additional financing. The Company has traditionally financed its cash requirements through the issuance of common shares. If the Company is unable to generate cash from operations or obtain additional financing its ability to continue as a going concern could be impeded.
Exploration and development
Resource exploration is a speculative business and involves a high degree of risk. There is no known body of commercial ore on the Company's mineral properties and there is no certainty that the expenditures made by the Company in the exploration of its mineral properties or otherwise will result in discoveries of commercially recoverable quantities of minerals. The exploration for and development of mineral deposits involves significant risks, which even a combination of careful evaluation, experience and knowledge may not eliminate. Although the discovery of an ore body may result in substantial rewards, few properties explored are ultimately developed into producing mines. It is impossible to ensure that the current exploration programs planned by the Company will result in a profitable commercial mining operation.
There is no assurance that the Company's mineral properties possess commercially mineable bodies of ore. The Company's mineral properties are in the exploration stage as opposed to the development stage and has no known body of economic mineralization. The known mineralization of the properties has not been determined to be economic ore and there can be no assurance that a commercially mineable ore body exists on the properties. Such assurance will require completion of final comprehensive feasibility studies and, possibly, further associated exploration and other work that concludes a potential mine is likely to be economic. In order to carry out exploration and development programs of any economic ore body and place it into commercial production, the Company may be required to raise substantial additional funding.
Title of mineral properties
There is no assurance that the Company's title to its properties will not be challenged. Title to and the area of mineral properties may be disputed. While the Company has diligently investigated title to its properties, it may be subject to prior unregistered agreements or transfers or indigenous land claims to which title may be affected. Consequently, the boundaries may be disputed.
Unknown environmental risks for past activities
Exploration and mining operations involve a potential risk of releases to soil, surface water and groundwater of metals, chemicals, fuels, liquids having acidic properties and other contaminants. In recent years, regulatory requirements and improved technology have significantly reduced those risks. However, those risks have not been eliminated and the risk of environmental contamination from present and past exploration or mining activities exists for mining companies. Companies may be liable for environmental contamination and natural resource damages relating to properties that they currently own or operate or at which environmental
Page 19
Silver One Resources Inc.
Management's Discussion and Analysis for the year ended December 31, 2024
contamination occurred while or before they owned or operated the properties. However, no assurance can be given that potential liabilities for such contamination or damages caused by past activities at these properties do not exist.
Political regulatory risks
Any changes in government policy may result in changes to laws affecting ownership of assets, mining policies, monetary policies, taxation, rates of exchange, environmental regulations, labour relations, repatriation of income and return of capital. This may affect both the Company's ability to undertake exploration and development activities in respect of present and future properties in the manner currently contemplated, as well as its ability to continue to explore, develop and operate those properties in which it has an interest or in respect of which it has obtained exploration and development rights to date. The possibility that future governments may adopt substantially different policies, which might extend to expropriation of assets, cannot be ruled out.
FORWARD-LOOKING INFORMATION
The Company's consolidated financial statements for the year ended December 31, 2024, and this accompanying MD&A, contain statements that constitute "forward-looking statements" within the meaning of National Instrument 51-102, Continuous Disclosure Obligations of the Canadian Securities Administrators. It is important to note that, unless otherwise indicated, forward-looking statements in this MD&A describe the Company's expectations up to the date of the MD&A.
Forward-looking statements often, but not always, are identified by the use of words such as "seek", "anticipate", "believe", "plan", "estimate", "expect", "targeting" and "intend" and statements that an event or result "may", "will", "should", "could", or "might" occur or be achieved and other similar expressions. Forward-looking statements in this MD&A include statements regarding the Company's future plans and expenditures, the satisfaction of rights and performance of obligations under agreements to which the Company is a part, the ability of the Company to hire and retain employees and consultants and estimated administrative assessment and other expenses. Forward-looking statements involve known and unknown risks, uncertainties, assumptions, and other factors that may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements. Factors that could cause the actual results to differ include market prices, continued availability of capital and financing, inability to obtain required regulatory approvals and general market conditions. These statements are based on a number of assumptions, including assumptions regarding general market conditions, the timing and receipt of regulatory approvals, the ability of the Company and other relevant parties to satisfy regulatory requirements, the availability of financing for proposed transactions and programs on reasonable terms acceptable to the Company and the ability of third-party service providers to deliver services in a timely manner. Some of these risks and uncertainties are identified under the heading "RISKS AND UNCERTAINTIES" as disclosed elsewhere in this MD&A. Additional information regarding these factors and other important factors that could cause results to differ materially may be referred to as part of particular forward-looking statements.
Forward-looking statements contained herein are made as of the date of this MD&A and the Company disclaims any obligation to update any forward-looking statements, whether as a result of new information, future events or results or otherwise except as required by securities law. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements.
Page 20
Silver One Resources Inc.
Management's Discussion and Analysis for the year ended December 31, 2024
OUTLOOK
Silver One's aim is to become a premier silver exploration and development company. The Company owns a 100% interest in the past silver producing Candelaria Mine and a 100% interest in the Cherokee project, both in the state of Nevada. In addition to the Nevada properties, the Company owns a 100% interest in the Phoenix Silver Property in Arizona.
Ultimately, the Company's goal is to add shareholder value through identifying, acquiring, and exploring silver properties. In 2024, the Company intends to grow through further potential acquisitions of companies and/or properties, and organically through the continued exploration of its current mineral property holdings.
QUALIFIED PERSONS
Robert Cann, P.Geo, is a Qualified Person ("QP") as defined in National Instrument 43-101 Standards of Disclosure for Mineral Projects, and has reviewed and approved the technical information in this MD&A. The QP is an independent consultant to the Company.
OTHER INFORMATION
Additional information relating to the Company can be found on SEDAR+ at www.sedarplus.ca or on the Company's website at www.silverone.com.
Page 21
Silver One Resources Inc.
Management's Discussion and Analysis for the year ended December 31, 2024
ADDITIONAL DISCLOSURE FOR VENTURE ISSUERS WITHOUT SIGNIFICANT REVENUE – MINERAL PROPERTY EXPENDITURES
| Balance December 31 2024 | Additions December 31 2024 | Balance December 31 2023 | Additions December 31 2023 | Balance December 31 2022 | |
|---|---|---|---|---|---|
| $ | $ | $ | $ | $ | |
| Candelaria | |||||
| Option payments – shares | 3,831,678 | - | 3,831,678 | - | 3,831,678 |
| Acquisition costs – shares | 467,072 | - | 467,072 | 82,500 | 384,572 |
| Acquisition costs – cash | 115,150 | - | 115,150 | - | 115,150 |
| Consulting fees | 4,019,623 | 263,546 | 3,756,077 | 430,760 | 3,325,317 |
| Drilling | 7,332,365 | - | 7,332,365 | - | 7,332,365 |
| Field supplies and other | 562,740 | 55,835 | 506,905 | 61,303 | 445,602 |
| Laboratory and analysis fees | 2,509,084 | 473,686 | 2,035,398 | 322,117 | 1,713,281 |
| Land payments | 2,099,514 | 360,495 | 1,739,019 | 312,785 | 1,426,234 |
| Staking and survey costs | 211,474 | - | 211,474 | - | 211,474 |
| Travel and accommodation | 1,018,834 | 41,627 | 977,207 | 74,617 | 902,590 |
| Reclamation obligation | 694,823 | (94,728) | 789,551 | 789,551 | - |
| Currency translation | 2,545,955 | 1,973,446 | 572,509 | (478,397) | 1,050,906 |
| 25,408,312 | 3,073,907 | 22,334,405 | 1,595,236 | 20,739,169 | |
| Phoenix Silver | |||||
| Acquisition costs - cash | 487,609 | - | 487,609 | - | 487,609 |
| Acquisition costs - shares | 3,222,500 | 465,000 | 2,757,500 | 675,000 | 2,082,500 |
| Consulting fees | 1,003,816 | 489,608 | 514,208 | 70,378 | 443,830 |
| Drilling | 590,702 | 590,702 | - | - | - |
| Equipment rental | 180,898 | 180,898 | - | - | - |
| Field supplies and other | 61,804 | 55,178 | 6,626 | 197 | 6,429 |
| Laboratory and analysis fees | 28,033 | 11,247 | 16,786 | 5,765 | 11,021 |
| Land payments | 749,251 | 221,969 | 527,282 | 224,161 | 303,121 |
| Staking and survey costs | 178,348 | 16,865 | 161,483 | 61,619 | 99,864 |
| Travel and accommodation | 67,131 | 47,723 | 19,408 | 7,608 | 11,800 |
| Currency translation | 554,423 | 483,969 | 70,454 | (102,276) | 172,730 |
| 7,124,515 | 2,563,159 | 4,561,356 | 942,452 | 3,618,904 | |
| Cherokee | |||||
| Consulting fees | 804,236 | 40,316 | 763,920 | 3,148 | 760,772 |
| Drilling | 439,312 | - | 439,312 | - | 439,312 |
| Field supplies and other | 75,832 | 2,633 | 73,199 | 622 | 72,577 |
| Laboratory and analysis fees | 133,917 | - | 133,917 | - | 133,917 |
| Land payments | 1,412,913 | 169,859 | 1,243,054 | 138,338 | 1,104,716 |
| Staking and survey costs | 125,450 | - | 125,450 | - | 125,450 |
| Travel and accommodation | 187,050 | 837 | 186,213 | 805 | 185,408 |
| Currency translation | 347,726 | 271,852 | 75,874 | (67,010) | 142,884 |
| 3,526,436 | 485,497 | 3,040,939 | 75,903 | 2,965,036 | |
| Total | 36,059,263 | 6,122,563 | 29,936,700 | 2,613,591 | 27,323,109 |
Page 22