AI assistant
Sigma Lithium — Regulatory Filings 2021
Jul 16, 2021
46936_rns_2021-07-15_558d74ce-a921-498b-be92-d0d7d8a2d667.pdf
Regulatory Filings
Open in viewerOpens in your device viewer
==> picture [162 x 44] intentionally omitted <==
CONSENT OF QUALIFIED PERSON PORFÍRIO CABALEIRO RODRIGUEZ
GE21 Consultoria Mineral
Avenida Afonso Pena, 3130, 12º andar Belo Horizonte, MG, Brazil, CEP 30.130-910
I, Porfirio Cabaleiro Rodriguez, BSc., consent to the public filing of the technical report titled “ Grota do Cirilo Lithium Project Araçuaí and Itinga Regions, Minas Gerais, Brazil Phase 2 (Barreiro) Update of the NI 43-101 Technical Report on Feasibility Study ”, with an effective date of June 2, 2021 (the “ Technical Report ”) by Sigma Lithium Corporation (the “ Issuer ”).
Signed and dated this July 15, 2021, at Belo Horizonte, Minas Gerais State.
“Signed and sealed” Porfirio Cabaleiro Rodriguez, BSc. (MEng), FAIG
Porfirio Cabaleiro Rodriguez, BSc. (MEng) Senior Director GE21, FAIG #3708