Sheffield Resources Ltd. Investor Presentation 2021

Nov 9, 2021

44780_rns_2021-11-09_bbef07fd-91f5-4de3-a654-d4e31e1b5d4e.pdf

Investor Presentation

Open in viewer

Opens in your device viewer

TZMI Congress Bruce Griffin – Executive Chair

November 2021

Notice and Disclaimer

IMPORTANT: You must read the following in conjunction with this document.
Summary information in relation to Sheffield
This document contains summary information about Sheffield Resources Limited (ACN 125 811 083) (Company or Sheffield), its subsidiaries and their activities which is current as at the date of this document, unless otherwise indicated. The
information in this document remains subject to change without notice, and Sheffield is not responsible for updating, nor does it undertake to update, it. This document should be read in conjunction with Sheffield's periodic and continuous
disclosure announcements lodged with the Australian Securities Exchange (ASX), which are available at http://www.sheffieldresources.com.au/irm/content/asx-announcements1.aspx?RID=398 or www.asx.com.au.
Industry data
Certain market and industry data used in connection with or referenced in this document, including in relation to other companies in Sheffield’s peer group, may have been obtained from public filings, research, surveys or studies made or
conducted by third parties, including as published in industry-specific or general publications. Neither Sheffield or their respective representatives have independently verified any such market or industry data.
Compliance Statements
Information and documentation which forms the basis of the Thunderbird Bankable Feasibility Study (BFS) and Bankable Feasibility Study Update (BFSU) in relation to Mineral Resources, Ore Reserves and metallurgy and process design has
previously been reported as detailed below. The Company confirms that it is not aware of any new information or data that materially affects the information included in the relevant market announcements and, in the case of the July 2016
Thunderbird Mineral Resources and the July 2019 Thunderbird Ore Reserve, that all material assumptions and technical parameters underpinning the estimates in the relevant market announcement continue to apply and have not materially
changed. In the case of the announcement entitled “BFS Update Materially Improves Project Economics" dated 31 July 2019, the Company confirms that all material assumptions underpinning any production target and any forecast financial
information derived from any production target that is disclosed in this announcement continue to apply and have not materially changed. The Company confirms that the form and context of the Competent Person's findings are presented and
have not been materially modified from the original market announcements.
Not financial product advice
This document does not constitute, and is not intended to constitute, investment or financial product advice (nor tax, accounting or legal advice). This document should not be relied upon as advice to investors or potential investors and has been
prepared without taking account of any person's individual investment objectives, financial situation or particular needs. Any investment decision should be made based solely upon appropriate due diligence.
Financial data
A number of figures, amounts, percentages, estimates, calculations of value and fractions in this document are subject to the effect of rounding. Accordingly, the actual calculation of these figures may differ from the figures set out in this
document. All currency amounts are in Australian Dollars ($ or A$) unless otherwise stated.
Future performance, forward-looking statements and key risks
This document contains certain "forward-looking statements". Forward-looking statements can generally be identified by the use of forward looking words such as "forecast", "likely", "believe", "future", "project", "opinion", "guidance", "should",
"could", "target", "propose", "to be", "foresee", "aim", "may", "will", "expect", "intend", "plan", "estimate", "anticipate", "continue", “indicative” and "guidance", and other similar words and expressions, which may include, without limitation,
statements regarding plans, strategies and objectives of management, anticipated production dates, expected costs or production outputs for the Company, based on (among other things) its estimates of future production of the Thunderbird
Project and the future operation of Sheffield and the Thunderbird Project.
To the extent that this document contains forward-looking information (including forward-looking statements, opinions or estimates), the forward-looking information is subject to a number of risk factors, including those generally associated with
the mineral sands industry. Any such forward-looking statement also inherently involves known and unknown risks, uncertainties and other factors that may cause actual results, performance and achievements to be materially greater or less than
estimated. These factors may include, but are not limited to, changes in commodity prices, foreign exchange fluctuations, general economic and share market conditions, increased costs and demand for production inputs, the speculative nature
of exploration and project development (including the risks of obtaining necessary licenses and permits and diminishing quantities or grades of reserves), ch1anges to the regulatory framework within which the Company operates or may in the
future operate, environmental conditions including extreme weather conditions, geological and geotechnical events, and environmental issues, and the recruitment and retention of key personnel.
Estimates of Mineral Resources and Ore Reserves and exploration results
This document contains estimates of Sheffield’s Ore Reserve and Mineral Resources and information that relates to exploration results.
The Mineral Resources and Ore Reserves of Sheffield have been extracted from Sheffield's ASX releases;
“BFS UPDATE MATERIALLY IMPROVES PROJECT ECONOMICS” 31 July 2019
“THUNDERBIRD ORE RESERVE UPDATE” 31 July 2019
“HIGH GRADE MAIDEN MINERAL RESOURCE AT NIGHT TRAIN” 31 January 2019
“MINERAL RESOURCE AND ORE RESERVE STATEMENT” 3 October 2018
“THUNDERBIRD ORE RESERVE UPDATE” 16 March 2017
“SHEFFIELD DOUBLES MEASURED MINERAL RESOURCE AT THUNDERBIRD” 5 July 2016
The exploration results have been extracted from Sheffield's ASX releases;
“NEW LARGE HIGH GRADE DISCOVERY SOUTH OF THUNDERBIRD” 13 November 2018
“EXCEPTIONAL RESULTS CONFIRM MAJOR DISCOVERY AT NIGHT TRAIN” 9 October 2018
A copy of these announcements is available at http://www.sheffieldresources.com.au/irm/content/asx-announcements1.aspx?RID=398 or www.asx.com.au.
Bankable Feasibility Study (“BFS”)
This document contains information that relates to a Bankable Feasibility Study. This information was extracted from the following ASX releases by Sheffield:
THUNDERBIRD BFS DELIVERS OUTSTANDING RESULTS” 24 March, 2017
Other Extracted Information
In addition to those ASX releases referred to above, this document contains information extracted from the following ASX releases:
“TRANSFORMATIONAL THUNDERBIRD JOINT VENTURE” 11 August 2020
“THUNDERBIRD PROJECT AND JOINT VENTURE UPDATE” 16 September 2020
“QUARTERLY ACTIVITIES REPORT” and "QUARTERLY CASHFLOW REPORT" 30 April 2021
“NATIVE TITLE AGREEMENT SIGNED BY TRADITIONAL OWNERS” 1 November 2018
“MINING LEASE GRANTED OVER THUNDERBIRD MINERAL SANDS PROJECT” 26 September 2018
“FEDERAL ENVIRONMENTAL APPROVAL GRANTED FOR THUNDERBIRD” 28 September 2018

The Company confirms that it is not aware of any new information or data that materially affects the information included in the relevant market announcements and, in the case of estimates of Mineral Resources and Ore Reserves, that all material assumptions and technical parameters underpinning the estimates in the relevant market announcement continue to apply and have not materially changed. The Company confirms that the form and context in which the Competent Person's findings are presented have not been materially modified from the original market announcements.

Sheffield Resources

Thunderbird Project Update

  • Large, high grade reserve in a low risk jurisdiction

  • Flowsheet and products

  • Yansteel titanium dioxide project update

  • Early works

  • Engineering and BFS

  • Funding and financials

  • Timeline to FID and Production

Mid West Project Update Our ESG Approach

==> picture [462 x 348] intentionally omitted <==

Aerial view of cleared process plant area and access road

Thunderbird – Large, high grade ore body … in a low risk jurisdiction

Ore Reserves and Grade for selected mineral sands deposits[1,2,3]

  • Large, mature mineral sands deposits globally typically show accelerating grade depletion trend with each new published Ore Reserve update

  • The highest grade and most significant zircon producing mine, Jacinth-Ambrosia (Iluka) is nearing the end of its mine life

  • The Zulti-South Project (currently on hold) is required to sustain RBM in the medium term

  • Increasing throughput and production rates at mature operations are accelerating the depletion of Ore Reserves and mine life

==> picture [777 x 253] intentionally omitted <==

----- Start of picture text -----

1.87%
Bubble size
represents
contained
VHM in Ore
Reserves
1.49%
Zircon Grade %
Grade %
2
TiO
----- End of picture text -----

Notes:

  1. Thunderbird Ore Reserve as published on the ASX on 31 July 2019. Thunderbird Ore Reserves ranked against latest published Ore Reserves of current mineral sands operations and projects under investigation globally. Accordingly, for the operating projects, no account is made for any volumes of product already produced

  2. Blue bubbles are operating mines, grey bubbles are Ore Reserves reported but the project is not operating

  3. Data compiled by Sheffield from public sources. This analysis does not illustrate the variance in product value between rutile, leucoxene and ilmenite

Thunderbird – New concentrate products identified

==> picture [915 x 440] intentionally omitted <==

----- Start of picture text -----

Thickener underflow to mine void
Feed Preparation, CUP Finisher Spirals
Mining
Scrubbing, Screening
and Desliming
Concentrate CUP Spirals CUP Finisher
Upgrade Plant WHIMS Zircon Concentrate
Primary Wet
Concentration
CUP Finisher Spiral Tails to mine void
WCP Tails to mine void CUP Spiral Tails to mine void Non-mag Finisher Co-product
Magnetic
Low Temperature Roast
Separation
LTR Ilmenite
Titanomagnetite
LTR Co-product
----- End of picture text -----

Thunderbird – Product Suite

LTR (Low Temperature Roast) Ilmenite (35% of revenue)

  • 530,000[1] tonnes per annum in Phase 1

  • 50% TiO 2 and low in key contaminants

  • Suitable for chloride slag or sulphate pigment

  • Binding offtake with Yansteel

  • Market price, life of mine, take or pay, 100% from Phase 1

  • First right of refusal, market price, 100% from expansions

LTR co-product

  • 20,000[1] tonnes of concentrate per annum in Phase 1

  • Contains TiO 2 and monazite

Zircon concentrate (60% of revenue)

  • 200,000[1] tonnes per annum in Phase 1

  • 39% ZrO2, 25% TiO2, 1% monazite

  • Binding with three customers

  • 5-year, take or pay, 170,000 tonnes per year

  • Price linked to market price for contained valuable minerals

==> picture [45 x 45] intentionally omitted <==

  • Strong interest from processors

Non-mag finisher co-product

  • 70,000[1] tonnes concentrate per annum in Phase 1

  • Contains ZrO2, TiO2 and monazite

  • Strong interest from processors

Titano-magnetite (5% of revenue)

  • 160,000[1] tonnes per annum in Phase 1

  • Offtake under discussion with Yansteel

Note:

  1. Average annual tonnage of first 4 years of Phase 1 production

Thunderbird – Yansteel Titanium Dioxide Project

KMS Joint Venture partner Yansteel facility to consume LTR ilmenite

  • Smelter and chloride pigment plant in China

  • Plant construction commenced in late 2020

  • Civil works were completed in June 2021

  • Process equipment and support systems installation commenced

  • Expected completion in mid-2022

  • Commissioning in 2H 2022 with ilmenite from other sources

==> picture [482 x 362] intentionally omitted <==

Yansteel Titanium Dioxide Plant under construction

Thunderbird – Early Works; Road and other infrastructure

Utilise 2021 dry season to prepare for process construction at the start of 2022 dry season

  • Mine access road

  • Upgrade first 18km

  • Build remaining 12km

  • Process plant site

  • Clearing underway

  • Construction water

  • Drilling two wells

  • Will be used for production water in operation

  • Accommodation Village

  • Recommissioned existing units

  • Tendered additional capacity

==> picture [489 x 367] intentionally omitted <==

Aerial view of access road from the junction with the main highway

Thunderbird – Early Works; Trial Mining

Second mining trial confirmed preferred mining method

  • D11 dozer trialled vs D9 dozer in Trial 1

  • Continuous miner also trialled

  • Dozer mining (D11) confirmed as preferred mining method

  • Samples taken to finalise in-pit separation and feed preparation circuits

  • Operating cost estimates updated based upon measured productivity of rip and push

==> picture [490 x 362] intentionally omitted <==

Second trial mining pit

Thunderbird – Early Works; Engineering and Long lead items

Engineering to EPC standard except LTR

  • Simplified LTR to be at EPC level early in 2022

Critical path long lead items to maintain 2024 production start

==> picture [244 x 183] intentionally omitted <==

  • Tenders received

  • First packages (Spirals and WHIMS) targeted for award in Q4 2021

==> picture [245 x 163] intentionally omitted <==

Second mining trial

Thunderbird Village

Thunderbird – BFS Activities

BFS to finalise capital and operating cost estimates

  • Cost inflation pressure – affecting all capital projects in Western Australia

  • Offset by change in scope; net reduction from removing zircon MSP, adding simplified LTR

  • Focus on capital minimisation

  • Continue LTR engineering until EPC ready to reduce risk premium and contingency requirements

  • BOO opportunities for infrastructure

  • Other value improvement opportunities

  • Targeting Stage 1 direct capital expenditure in line with the 2019 BFSU (A$392m)

Thunderbird – Project Funding and Financials

Project Funding

  • Kimberley Mineral Sands cash A$119.7m at 30 September 2021

  • Sheffield Resources to contribute A$10m to Kimberley Mineral Sands 60 days after FID

  • Progressing NAIF loan facility (not infrastructure specific)[1]

  • Balance from commercial finance facility

Project Financials

  • Outcomes expected to be similar to the 2019 BFSU
Option Option Project
Capital
A$m
Total
Funding
A$m
Ungeared Ungeared
NPV8Post Tax
A$m
IRR Post Tax
2017 BFS LTR Ilmenite + Full MSP 4632 5792 6202 21%2
2019 BFSU Ilmenite Concentrate + Full MSP 3923 4783 9803 30%3
2021 BFS LTR Ilmenite + Zircon Concentrate TBC TBC TBC TBC

Reference:

  1. ASX Announcement “Thunderbird BFS Delivers Outstanding Results” 24 March 2017 2. ASX Announcement “BFS Update Materially Improves Project Economics” 31 July 2019 3. ASX Announcement “Sheffield Signs Taurus Debt Facility and EPC Contract” 12 November 2018

Thunderbird – Pathway to FID, Construction and Production

==> picture [864 x 447] intentionally omitted <==

----- Start of picture text -----

Kimberley Wet Season
Q1 2021 Q2 2021 Q3 2021 Q4 2021 Q1 2022 Q2-Q4 2022 2023 2024
Mar 2021: Feb 2022:
KMS Formed BFS Completed FID
Construction
DFS
2 [nd] Mining Trial Production
Pre FID Site Works
Detailed Engineering
Long Lead Items
EPC Agreement
Other Key Contracts
Offtake – Zircon Con
Debt Facility Term Sheets Approval, DD and Close
Note:
1. All timelines are estimated and subject to further study and confirmation 13
----- End of picture text -----

Note:

1. All timelines are estimated and subject to further study and confirmation

Mid West Project

Eneabba (Sheffield – 100%)

  • Mineral Resource 211.4 million tonnes @ 3.0% HM containing 5.1 million tonnes of VHM

  • 11 deposits, 140 km southeast of Geraldton

  • 2021 scoping study update indicated 26 year, 190,000 tpa HMC as the preferred development concept

  • Non-binding proposals to acquire the project received, Sheffield is currently assessing these proposals

  • Should a transaction occur, the consideration will be used to fund Sheffield’s A$10m post-FID KMS equity contribution

McCalls (Sheffield – 100%)

  • Mineral Resource 5.8 billion tonnes @ 1.4% HM containing 5.1 million tonnes of VHM

  • 2 deposits, 110 km northeast of Perth

  • 2012 scoping study being updated

  • Potential transaction to realise value will be considered once Eneabba process completed

Our ESG Approach

Environmental

Full State and Federal environmental approvals granted following a detailed Public Environmental Review ("PER") process

  • PER concluded all risks can be adequately managed

  • Approvals contain standard industry conditions and controls

  • Specific Greater Bilby management plans in place

Social

Co-existence Agreement (Native Title Agreement) in place

  • Targeted 40% Aboriginal Employment by year 8 of operations

  • Aboriginal Training Fund to support employment

  • Aboriginal Business support via supply and contract opportunities

  • Cash royalties to Traditional Owners over 37 year mine life

  • Environmental offset fund established

  • Restrictions on speeds and travel times for haulage of products to Port of Derby

  • Rehabilitation throughout mine life – minimises disturbed area

Environmental practices & protocols mirror Equator Principles

Addressing the Climate Change challenge

  • CO2 baseline emissions estimated 11mt CO2e (40+ year life of project)*

  • Opportunity to add renewable energy to gas generation

  • Longer term initiatives to reduce emissions being identified (e.g. electric haul trucks)

  • 2030 target and target date for net zero to be set prior to FID

High standards in safeguarding the environment, water, diversity and Aboriginal heritage

Local Employment

  • 300 regional jobs on a Drive In Drive Out basis

Intergenerational Employment over 37 year mine life

State and Federal Tax Contribution of >A$1B over 37 year mine life

Governance

Compliant with ASX recommended governance framework

Commitment to increase Board and management diversity

*Emissions forecast based upon 2017 Public Environmental Review and 2017 (Stage 1 & Stage 2) Bankable Feasibility Study estimates

THANK YOU

Registered and Corporate Office

Sheffield Resources Limited

Level 2

41–47 Colin Street West Perth WA 6005 p. +61 8 6555 8777

e. [email protected]

APPENDIX: Sheffield Resources Corporate Overview

Sheffield Resources is an ASX listed mineral sands developer which owns 50% of the large scale shovel ready Thunderbird Mineral Sands Project

Capital structure[1]

  • Sheffield Resources Limited (“Sheffield” or the “Company”) is an ASX listed mineral sands developer and explorer based in Perth, Western Australia (ASX:SFX)

  • Sheffield is focused on the development of the 50% owned Thunderbird Mineral Sands Project (“Thunderbird” or the "Project") located on the Dampier Peninsula in Northern Western Australia.

  • Thunderbird has been developed as a greenfield project since discovery in 2012 and is one of the largest and highest grade zircon rich discoveries in the last 30 years and is one of a few greenfield mineral sands deposits globally in a secure jurisdiction

  • Experienced and skilled Board and management with strong in-house intellectual property and knowledge and capable of developing, delivering and operating Thunderbird

  • Sheffield has a portfolio of mineral sands assets in Australia with a focus on zircon rich assemblages which includes:

  • Thunderbird with Ore Reserve of 748Mt @11.2%HM[2]

  • Night Train deposit, 20km to the east of Thunderbird and with an Inferred Mineral Resource[3] of 130Mt @ 3.3% HM, containing 3.6Mt of VHM

  • Dampier Project has delineated 12 zones of significant mineralisation along a 120km long highly mineralised trend[4]

  • Market data as at 27 October 2021 and sourced from ASX

  • Refer to ASX announcement 31 July 2019 titled “Thunderbird Ore Reserve Update”

  • Refer to ASX announcement 31 January 2019 titled "High Grade Maiden Mineral Resource at Night Train"

Item Unit Value
Ordinary Shares #m 346.6
Share Price (as at 27 October 2021)1 A$/sh 0.34
Market Capitalisation A$m 117.8
Cash Balance (30 September 2021)* A$m 5.8
Debt A$m -
Enterprise Value A$m 112.0

*Cash balance excludes joint venture proceeds of $119.7m as at 30 Sep 2021

Share Price Information

==> picture [317 x 202] intentionally omitted <==

----- Start of picture text -----

$0.60
$0.50
$0.40
$0.30
$0.20
$0.10
19-Oct-20 06-Nov-20 26-Nov-20 16-Dec-20 05-Jan-21 25-Jan-21 12-Feb-21 04-Mar-21 24-Mar-21 13-Apr-21 03-May-21 21-May-21 10-Jun-21 30-Jun-21 20-Jul-21 09-Aug-21 27-Aug-21 16-Sep-21 06-Oct-21
----- End of picture text -----

  1. Refer to ASX announcement 13 November 2018 titled "New Large High Grade Discovery South of Thunderbird

APPENDIX: Kimberley Mineral Sands

Kimberley Mineral Sands[1]

  • Owns 100% of the Thunderbird Project

  • Yansteel (via YGH Australia) contributed A$130.1m in equity to acquire 50%

  • Sheffield retains 50%

  • Four person Board with two Yansteel and two Sheffield directors

  • Key decisions require unanimous approval of both Yansteel and Sheffield

  • Operates as a standalone entity with its own management and employees

Kimberley Mineral Sands Executive Management

  • Stuart Pether – CEO

  • Geoff Williams – GM Operations

==> picture [375 x 235] intentionally omitted <==

----- Start of picture text -----

YGH Australia 9.9% Sheffield Resources
Investment Limited Limited
50% 50%
Kimberley Mineral
Sands Pty Ltd
100%
Thunderbird
Eneabba & McCalls
Project
----- End of picture text -----

  • Neil Patten-Williams – GM Marketing

  • Robert Cicchini – Project Director

  • Quentin Webb – CFO

  • Trevor Wienert – GM People

Reference:

  1. ASX Announcement “Joint Venture Completion and Board Restructure” 12 March 2021 2. ASX Announcement “Transformational Thunderbird Joint Venture” 11 August 2020

APPENDIX: Thunderbird Ore Reserves

Thunderbird Ore Reserves: Valuable Heavy Mineral in-situ grade[1]

Ore Reserve
Category
Ore Tonnes
(Mt)
In-situ HM
Tonnes
(Mt)
HM Grade
(%)
Valuable Heavy Mineral Grade (In-situ)2
Oversize
(%)
Slimes
(%)
Zircon
(%)
HiTi Leucoxene
(%)
Leucoxene
(%)
Ilmenite
(%)
Proved
219
30.0
13.7
1.02
0.30
0.28
3.68
14.0
16.1
Probable
529
53.4
10.1
0.79
0.27
0.27
2.87
10.5
14.5
Total
748
83.8
11.2
0.86
0.27
0.27
3.11
11.6
15.0

Thunderbird Ore Reserves: Mineral assemblage as percentage of HM grade[1]

Ore Reserve
Category
Ore Tonnes
(Mt)
In-situ HM
Tonnes
(Mt)
HM Grade
(%)
Mineral Assemblage3
Oversize
(%)
Slimes
(%)
Zircon
(%)
HiTi Leucoxene
(%)
Leucoxene
(%)
Ilmenite
(%)
Proved
219
30.0
13.7
7.4
2.2
2.0
26.9
14.0
16.1
Probable
529
53.4
10.1
7.8
2.6
2.7
28.4
10.5
14.5
Total
748
838
11.2
7.7
2.4
2.4
27.8
11.6
15.0

Notes:

  1. Ore Reserves are presented both in terms of in-situ VHM grade, and HM mineral assemblage. Tonnes and grades have been rounded to reflect the relative accuracy and confidence level of the estimate, thus the sum of columns may not equal. Ore Reserves reported for the Dampier Project were prepared and first disclosed under the JORC Code (2012). Refer to Sheffield’s ASX Announcement dated 31 July 2019 titled “Thunderbird Ore Reserve Update” for further detail. Ore Reserve is reported to a design overburden surface with appropriate consideration for modifying factors, costs, mineral assemblage, process recoveries and product pricing

  2. The in-situ grade is determined by multiplying the HM Grade by the percentage of each valuable heavy mineral within the heavy mineral assemblage

  3. Mineral Assemblage is reported as a percentage of HM Grade. It is derived by dividing the in-situ grade by the HM grade

APPENDIX: Thunderbird Mineral Resources

Thunderbird Mineral Resources: Valuable Heavy Mineral in-situ grade[1]

Cut-off
(HM%)
Mineral Resource
Category
Ore Tonnes
(Mt)
In-situ HM
Tonnes
(Mt)
HM Grade2
(%)
Valuable Heavy Mineral Grade (In-situ)3
Slimes
(%)
Oversize
(%)
Zircon
(%)
HiTi Leucoxene
(%)
Leucoxene
(%)
Ilmenite
(%)
> 3% HM Measured
510
45
8.9
0.71
0.20
0.19
2.4
18
12
Indicated
2,120
140
6.6
0.55
0.18
0.20
1.8
16
9
Inferred
600
38
6.3
0.53
0.17
0.20
1.7
15
8
Total
3,230
223
6.9
0.57
0.18
0.20
1.9
16
9
>7.5% HM Measured
220
32
14.5
1.07
0.31
0.27
3.9
16
15

Indicated
640
76
11.8
0.90
0.28
0.25
3.3
14
11

Inferred
180
20
10.8
0.87
0.27
0.26
3.0
13
9
Total
1,050
127
12.2
0.93
0.28
0.26
3.3
15
11

Thunderbird Mineral Resources: Mineral assemblage as percentage of HM grade[1]

Cut-off
(HM%)
Mineral Resource
Category
Ore Tonnes
(Mt)
In-situ HM
Tonnes
(Mt)
HM Grade2
(%)
Mineral Assemblage4
Slimes
(%)
Oversize
(%)
Zircon
(%)
HiTi Leucoxene
(%)
Leucoxene
(%)
Ilmenite
(%)
> 3% HM Measured
510
45
8.9
8.0
2.3
2.2
27
18
12
Indicated
2,120
140
6.6
8.4
2.7
3.1
28
16
9
Inferred
600
38
6.3
8.4
2.6
3.2
28
15
8
Total
3,230
223
6.9
8.3
2.6
2.9
28
16
9
>7.5% HM Measured
220
32
14.5
7.4
2.1
1.9
27
16
15

Indicated
640
76
11.8
7.6
2.4
2.1
28
14
11

Inferred
180
20
10.8
8.0
2.5
2.4
28
13
9
Total
1,050
127
12.2
7.6
2.3
2.1
27
15
11

Notes:

  1. The Thunderbird Mineral Resources are reported inclusive of (not additional to) Ore Reserves. The Mineral Resource reported above 3% HM cut-off is inclusive of (not additional to) the Mineral Resource reported above 7.5% HM cut-off. All tonnages and grades have been rounded to reflect the relative accuracy and confidence level of the estimate and to maintain consistency throughout the table, therefore the sum of columns may not equal. The Mineral Resource estimate was prepared and first disclosed under the JORC Code (2012). Refer to Sheffield’s ASX announcement dated 5 July 2016 titled "Sheffield Doubles Thunderbird Measured Mineral Resource" for further detail

  2. Total heavy minerals (HM) is within the 38µm to 1mm size fraction and has been reported as a percentage of the total material quantity

  3. The Valuable HM in-situ grade is reported as a percentage of the total material quantity and is determined by multiplying the percentage of total HM by the percentage of each valuable heavy mineral within the HM assemblage at the resource block model scale

  4. The Mineral Assemblage is represented as the percentage of HM grade. Estimates of mineral assemblage are determined by screening and magnetic separation. Magnetic fractions were analysed by QEMSCAN for mineral determination as follows: >90% liberation; ilmenite 40-70% TiO2; leucoxene 70-94% TiO2; high titanium leucoxene (HiTi Leucoxene) >94% TiO2 and zircon 66.7% ZrO2+HfO2. The non-magnetic fraction was analysed by XRF and minerals determined as follows: Zircon ZrO2+HfO2/0.667 and HiTi Leucoxene TiO2/0.94

APPENDIX: Significant Regional Exploration Upside

Strategic value demonstrated through multiple discoveries made along a 120km long trend

  • Exploration has delineated 12 zones of significant mineralisation along a 120km long highly mineralised trend which extends from Cisco in the north to Runaway in the south[1]

  • Maiden high grade Mineral Resource[1] outlined at Night Train

  • Mineral sands discoveries include Argo, Buckfast, Bohemia, Cisco, Cold Duck, Concorde, Nomad, Night Train, Porpyry Pearl

  • Characterised by broad sheet-like geometries with varying thickness (ie exceptionally thick intervals at Thunderbird, thick intervals at Buckfast, moderate thicknesses at Bohemia and narrow thicknesses at Nomad)

  • Mineral assemblages domains where different TiO2 minerals dominate (ie ilmenite at Thunderbird, Leucoxene at Night Train and Cisco Upper and altered ilmenite at Concorde to Buckfast regions)

  • Thick high grade intervals[2] have been intersected, including;

  • 43.5m @ 2.35% HM from 16.5m (NLAC018), including 10.5m @ 4.25% HM from 25.5m (Bohemia)

  • Numerous zircon-rich targets identified for follow-up drilling

Bohemia – Cross Section[2]

==> picture [328 x 182] intentionally omitted <==

Dampier Project – Regional Plan[1]

==> picture [275 x 368] intentionally omitted <==

----- Start of picture text -----

A
A’
----- End of picture text -----

Notes:

  1. Refer to ASX announcement 31 January 2019 titled "High Grade Maiden Mineral Resource at Night Train" 2. Refer to ASX announcement 13 November 2018 titled "New Large High Grade Discovery South of Thunderbird“ page 2 note

Appendix ESG: Environment

All necessary State and Federal environmental approvals received

  • Strong social licence to operate is supported by full State and Federal environmental approvals following an extensive Public Environmental Review ("PER")

  • The PER process required full environmental impact assessment, with detailed public consultation and identification of key environmental concerns for the community. The key issues identified were:

  • Impact on the Greater Bilby

  • Impact on ground water resources

  • Haulage of mineral sands products through Derby

  • Impact of ocean going vessels on marine animals

  • The Environmental Protection Authority ("EPA") conducted a detailed review , including a site visit by the EPA Board and two periods of public comment and consultation

  • All environmental approvals were received on the following basis:

  • PER concluded all risks can be adequately managed

  • Approvals contain standard industry conditions and controls

  • Specific Greater Bilby management plans in place

  • Environmental offset fund established

  • Restrictions on speeds and travel times for haulage of products to Port of Derby

  • Practices to mirror Equator Principles

==> picture [218 x 291] intentionally omitted <==

Thunderbird personnel receive training in Bilby management as part of our Bilby Management Program (2018)

Appendix ESG: Environment

Continuous Rehabilitation

  • Proposed dry mining via conventional dozer trap mineral sand mining

  • Topsoil and overburden excavated and transported using truck and excavators

  • Topsoil is deposited and seeded following completion of mining within each zone

  • Active rehabilitation of mined areas occurs continuously throughout the mine life

  • Progressive mining limits active mining to a maximum of 16km[2]

  • Continuous rehabilitation limits maximum disturbed area during mine life to 60km[2]

==> picture [565 x 242] intentionally omitted <==

Appendix ESG: Environment

Embracing the Climate Change challenge

  • CO2 baseline Scope 1 emissions estimated: 11mt CO2e (40+ year life of project)*

CO2reductionopportunities across a 37 year mine life

  • Introduction of renewable electricity to complement LNG gas generation

  • Innovation within the process plant value chain

  • Logistics at the mine site and to port (eg electric fleet solutions)

  • 2030 target and target date for net zero emission to set prior to FID

Our goals for a Sustainable future

==> picture [156 x 63] intentionally omitted <==

----- Start of picture text -----

Acceptance
----- End of picture text -----

==> picture [156 x 63] intentionally omitted <==

----- Start of picture text -----

Invest in
Climate Safe
Practices
----- End of picture text -----

==> picture [203 x 230] intentionally omitted <==

----- Start of picture text -----

Energy Consumption:
% CO2 Emissions
8
23
46
23
Diesel Fleet Power Generation
Roaster Other Processing
----- End of picture text -----*

  • Accept Climate change  Renewables for power  Measure our  Partner with our local science generation climate performance community

  • Support net-zero global  Diesel substitution  Consider carbon offsets  Determine net zero ambitions  Partner with innovative  Climate Risk Assessments emissions pathway

  • Support our community’s suppliers  Low-carbon inputs  Engage with our peers, goals suppliers and customers

*Emissions forecast based upon 2017 Public Environmental Review and 2017 (Stage 1 & Stage 2) Bankable Feasibility Study estimates

Appendix ESG: Our Community Stakeholders

Actively working with community stakeholders to create and maintain a robust relationship

  • Central to the Kimberley regional strategy is our social licence to operate ("SLTO")

  • Built over ten years and based on formal and informal community relations practices alongside constant delivery of Sheffield’s pledges

  • Sheffield's strategy focuses on:

  • Aboriginal engagement and advancement

  • Local content employment and workforce on a drive-in and drive-out basis (as opposed to fly-in, fly-out)

  • Low environmental and Aboriginal Heritage impact

  • Regional economic opportunities and local business development

==> picture [225 x 141] intentionally omitted <==

Sheffield Community Project February 2019 with the Sisters of St John of God

  • Sheffield's community engagement practices to date are built on strong stakeholder, social and community support for Thunderbird and ensures a positive foundation for project development, land access, construction and project operation

  • Achieved through development and implementation of communication and consultation strategies which ensure stakeholders to the ports, Traditional Owners, pastoralists, local shires, government authorities, local businesses and local communities are informed and engaged positively

  • Strongly supported by State and Federal Government , Thunderbird has a 37-year mine life which will see opportunity flow within the Kimberley region for future generations

==> picture [225 x 142] intentionally omitted <==

Environmental Advisor Gayle Williams speaks to local community members at Community Engagement workshops (Broome, September 2018)

Appendix ESG: Our Commitment to Traditional Owners

Native Title agreement signed and is irrevocably binding on both the Company and the Traditional Owners

  • Signed the Co-existence Agreement (Native Title Agreement) for Thunderbird on 31 October 2018

  • The Traditional Owners authorised the Named Applicants to sign the Coexistence Agreement for Thunderbird, making it binding on both the Company and the Traditional Owners

  • Details of the Co-existence Agreement are confidential, however the final agreement is in line with the Company’s commitment to the community and contains:

  • Royalty payments to the Traditional Owners

  • Local and Aboriginal employment and business commitments

  • Protection for Aboriginal heritage and the environment

==> picture [350 x 182] intentionally omitted <==

Sheffield, Arma Legal and Traditional Owner representatives with signed CoExistence Agreement (October 2018)

Cash Royalties to Traditional Owners over 37 years

Indigenous Employment Strategy

  • The Co-existence Agreement establishes the framework by which the Company can work with the Traditional Owners to protect Aboriginal heritage and the environment while delivering sustainable employment and business outcomes for Traditional Owners and the wider Aboriginal community

  • Previous success in building a strong locally based workforce to be replicated during 37-year operation, particularly in the area of Aboriginal employment

  • Strong commitment to training and development which results in ongoing employment

  • In addition, key strategy targets include:

  • To achieve 40% Aboriginal employment by year 8 of operations

  • To commit to Aboriginal businesses during construction and operations