AI assistant
Seadrill Limited — Earnings Release 2015
May 28, 2015
9186_iss_2015-05-28_fa68e792-79d9-4cc8-92f0-bfa9df600f1b.pdf
Earnings Release
Open in viewerOpens in your device viewer
| e/N Rig typ ame |
/ Gen tion era e 1 typ |
Bui lt |
Wa dep th ter (fee t) |
Dril ling de pth (fee t) |
Loc atio n |
Clie nt |
Cur t co ntra ren |
viou Pre s |
||
|---|---|---|---|---|---|---|---|---|---|---|
| Sta rt |
ire Exp |
ct \$ Day rate US |
\$ Day rate US |
|||||||
| Sem i-su bm ersi bles |
||||||||||
| 2 We st A lpha |
4th -HE |
198 6 |
2,00 0 |
23,0 00 |
Nor way |
9, 28 Exxo nM obil |
Jan -14 |
Jul- 16 |
516 ,000 |
479 ,000 |
| 2 We st V ent ure |
5th -HE |
200 0 |
2,60 0 |
30,0 00 |
Nor way |
oil 9 Stat |
-10 Aug |
Jul- 15 |
404 ,000 |
268 ,000 |
| 2 We st P hoe nix |
6th -HE |
200 8 |
10,0 00 |
30,0 00 |
UK | tal 7 To |
Jan -12 |
Sep -15 |
458 ,000 |
544 ,000 |
| les We st H ercu |
6th -HE |
200 8 |
10,0 00 |
35,0 00 |
ada Can |
il 9 St ato |
Jan -13 |
Jan -17 |
464 ,000 |
495 ,000 |
| 3 st S irius We |
6th -BE |
200 8 |
10,0 00 |
35,0 00 |
USA | SA 2 6 U |
Jul- 12 |
Jul- 17 |
297 ,000 |
535 ,000 |
| We st T aur us |
6th -BE |
200 8 |
10,0 00 |
35,0 00 |
Bra zil |
Bra zil |
- | - | - | 641 ,000 |
| We st E min enc e |
6th -HE |
200 9 |
10,0 00 |
30,0 00 |
Bra zil |
27, 32 , 8 Pet rob ras |
Jul- 09 |
Jul- 15 |
602 ,000 |
- |
| 3 We st A rius qua |
6th -HE |
200 9 |
10,0 00 |
35,0 00 |
Can ada |
Exxo nM obil |
Jan -13 |
Oct -15 |
540 ,000 |
530 ,000 |
| ada Can |
obil Exxo nM |
Oct -15 |
Apr -17 |
615 ,000 |
- | |||||
| r 4 Sev an D rille |
6th -BE |
200 9 |
10,0 00 |
40,0 00 |
zil Bra |
32, 8 Pet rob ras |
May -10 |
Jun -16 |
419 ,000 |
- |
| st O rion We |
6th -BE |
201 0 |
10,0 00 |
35,0 00 |
zil Bra |
27, 32 , 8 Pet rob ras |
Jul- 10 |
Jul- 16 |
602 ,000 |
- |
| We st P ega sus |
6th -HE |
201 1 |
10,0 00 |
35,0 00 |
ico Mex |
EX 1 3 PEM |
Aug -11 |
Aug -15 |
467 ,500 |
,000 555 |
| Mex ico |
EX 1 3 PEM |
Aug -15 |
Aug -16 |
Ma rket Rat e |
||||||
| n 3 We st C icor apr |
6th -BE |
201 1 |
10,0 00 |
35,0 00 |
USA | 0 BP 1 |
Jul- 12 |
Jul- 19 |
535 ,000 |
495 ,000 |
| clip We st E se |
6th -BE |
201 1 |
10,0 00 |
40,0 00 |
ola Ang |
al Tot |
Jan -14 |
Jun -15 |
450 ,000 |
435 ,000 |
| eo 3 We st L |
6th -HE |
201 2 |
10,0 00 |
35,0 00 |
Gha na |
Oil 1 8, 32 Tull ow |
Jun -13 |
Jul- 18 |
605 ,000 |
525 ,000 |
| l 4 Sev an B rasi |
6th -BE |
201 2 |
10,0 00 |
40,0 00 |
zil Bra |
32, 8 Pet rob ras |
Jul- 12 |
Jul- 18 |
391 ,000 |
- |
| 4 Sev an L ouis iana |
6th -BE |
201 3 |
10,0 00 |
40,0 00 |
USA | G 17 LLO |
May -14 |
May -17 |
350 ,000 |
- |
| ira We st M |
6th -HE |
201 5 |
10,0 00 |
40,0 00 |
Und tion nda i truc at Hyu er c ons |
23 Hus ky |
Sep -15 |
Sep -20 |
590 ,000 |
- |
| 2 igel We st R |
6th -HE |
201 5 |
10,0 00 |
40,0 00 |
Und tion at J truc er c ons uro ng |
- | - | - | - | - |
| r 4, 1 5 lope Sev an D eve |
6th -BE |
201 5 |
10,0 00 |
40,0 00 |
Und tion at C OSC O truc er c ons |
- | - | - | - | - |
| Dril lshi ps r 2 |
||||||||||
| avig We st N ato |
Ultr a-de ate epw r |
200 0 |
7,50 0 |
35,0 00 |
Nor way |
Nor way 33 obil |
- | - | - | 610 ,000 |
| olar We st P is lla 3 |
Ultr a-de ate epw r |
200 8 |
10,0 00 |
35,0 00 |
ola Ang |
Exxo nM |
Ma r-13 |
Ma r-18 |
653 ,000 |
628 ,000 |
| st C We ape |
Ultr a-de ate epw r |
200 8 |
10,0 00 |
35,0 00 |
Nige ria |
obil Exxo nM al 33 |
Apr -14 |
Apr -17 |
627 ,500 |
562 ,120 |
| We st G emi ni a 3 |
Ultr a-de ate epw r |
201 0 |
10,0 00 |
35,0 00 |
ola Ang |
Tot BP 2 5 |
Oct -13 |
Oct -17 |
656 ,000 |
447 ,000 |
| We st A urig 3 |
Ultr a-de ate epw r |
201 3 |
12,0 00 |
40,0 00 |
USA | BP 2 4 |
Oct -13 |
Oct -20 |
565 ,000 |
- |
| We st V ela |
Ultr a-de ate epw r |
201 3 |
12,0 00 |
40,0 00 |
USA | 8 | Nov -13 |
Nov -20 |
565 ,000 |
- |
| ellu We st T s |
Ultr a-de ate epw r |
201 3 |
12,0 00 |
40,0 00 |
zil Bra |
Pet rob ras |
Apr -15 |
Apr -18 |
473 ,000 |
- |
| We st N ept une |
Ultr a-de ate epw r |
201 4 |
12,0 00 |
40,0 00 |
USA | G 29 LLO 11, 3 3 |
Dec -14 |
Dec -17 |
576 ,000 |
- |
| We st S atu rn |
Ultr a-de ate epw r |
201 4 |
12,0 00 |
40,0 00 |
Nige ria |
Exxo nM obil |
-14 Dec |
-16 Dec |
633 ,750 |
- |
| We st Ju pite r arin |
Ultr a-de ate epw r Ultr a-de |
201 4 |
12,0 00 |
40,0 00 |
Nige ria |
al Tot nsit iod |
Dec -14 |
Dec -19 |
581 ,000 biliz atio |
|
| We st C a |
ate epw r |
201 5 |
12,0 00 |
40,0 00 |
In T it rans |
Tra Per 8 |
Jan -15 |
Jun -15 |
Mo n |
- |
| We st D |
Ultr a-de ate |
201 | 12,0 | 40,0 | Bra zil Und tion at S truc |
rob Pet ras |
Jun -15 |
Jun -18 |
463 ,000 |
|
| raco do We st D ora |
epw r Ultr a-de ate epw |
5 201 |
00 12,0 |
00 40,0 |
er c ons ams ung Und tion at S truc er c ons ams |
- | - | - | - | - |
| We st A quil a |
r Ultr a-de ate epw r |
5 201 5 |
00 12,0 00 |
00 40,0 00 |
ung Und tion DSM E truc at er c ons |
- | - | - | - | - |
| ibra We st L |
Ultr a-de ate epw r |
201 5 |
12,0 00 |
40,0 00 |
Und truc tion at DSM E er c ons |
- - |
- - |
- - |
- - |
- - |
| e/N Rig typ ame |
/ Gen tion era e 1 typ |
Bui lt |
Wa dep th ter (fee t) |
Dril ling de pth (fee t) |
Loc atio n |
|||||
|---|---|---|---|---|---|---|---|---|---|---|
| Cur t co ren |
ntra ct |
viou Pre s |
||||||||
| Clie nt |
Sta rt |
ire Exp |
\$ Day rate US |
\$ Day rate US |
||||||
| Jack -up s |
||||||||||
| on 2 We st E psil |
vy-d Hea uty - HE |
199 3 |
400 | 30,0 00 |
Nor way |
oil 9 Stat |
Dec -10 |
Dec -16 |
258 ,000 |
320 ,000 |
| 2 We st E lara |
vy-d Hea uty - HE |
201 1 |
450 | 40,0 00 |
Nor way |
oil 9 , 12 Stat |
r-12 Ma |
Ma r-17 |
330 ,000 |
- |
| Opt ions |
oil 9 Stat |
r-17 Ma |
r-19 Ma |
330 ,000 |
- | |||||
| 2 We st L inus |
Hea vy-d - HE uty |
201 4 |
450 | 40,0 00 |
Nor | 9, 30, 14 Con Phil lips oco |
May -14 |
May -19 |
344 ,000 |
|
| way Opt ions |
9 Con Phil lips oco |
May -19 |
May -21 |
344 ,000 |
- | |||||
| r 5 efe We st D nde |
BE | 200 7 |
350 | 30,0 00 |
Mex ico |
PEM EX |
Sep -14 |
Sep | 155 | - 136 |
| lute We st R eso |
200 7 |
30,0 | Sha rjah |
Sha | -20 | ,500 | ,458 140 |
|||
| We st P rosp ero |
BE BE |
200 7 |
350 400 |
00 30,0 00 |
Ma lays ia |
rjah Lun din |
- May -14 |
- May -16 |
- 156 ,000 |
,000 163 ,000 |
| 5 We st C our age ous |
BE | 200 7 |
350 | 30,0 00 |
Mex ico |
PEM EX |
Sep -14 |
Jul- | 155 | 150 |
| We st T rito n |
BE | 200 8 |
375 | 30,0 00 |
Sha rjah |
Sha rjah |
21 | ,500 | ,000 145 ,000 |
|
| igila We st V nt |
BE | 200 8 |
350 | 30,0 00 |
lays Ma ia |
Tali sma n |
- Nov -14 |
- Jun -15 |
- 140 ,000 |
167 ,000 |
| id 5 We st In trep |
BE | 200 8 |
350 | 30,0 00 |
Mex ico |
PEM EX |
May -14 |
Jan -21 |
155 ,500 |
180 ,000 |
| We st A riel |
BE | 200 8 |
400 | 30,0 00 |
Rep ubli c of Co ngo |
ENI | Aug -14 |
Aug -16 |
205 ,000 |
170 ,000 |
| st C ida We ress |
BE | 200 9 |
375 | 30,0 00 |
Tha ilan d |
Coa stal Ene rgy |
Apr -15 |
-16 Apr |
96,0 00 |
,000 155 |
| reed We st F om |
BE | 200 9 |
350 | 30,0 00 |
ela Ven ezu |
don Car IV |
Oct -14 |
Apr -17 |
225 ,000 |
187 ,000 |
| allis We st C to |
BE | 201 0 |
400 | 30,0 00 |
di A rab Sau ia |
co 1 9 di A Sau ram |
Nov -12 |
Ma r-15 |
150 ,000 |
134 ,900 |
| Sau di A rab ia |
Sau di A ram co |
Apr -15 |
Nov -15 |
135 ,000 |
- | |||||
| ion Opt |
di A Sau ram co |
Nov -15 |
Nov -16 |
150 ,000 |
- | |||||
| eda We st L |
BE | 201 0 |
375 | 30,0 00 |
Viet nam |
JVP C |
Apr -15 |
Jun -15 |
150 ,000 |
165 ,000 |
| We st M isch ief |
BE | 201 0 |
350 | 30,0 00 |
In T it rans |
Tra nsit Per iod |
May -15 |
Aug -15 |
Mo biliz atio n |
- |
| Abu Dh abi |
31 NDC |
Sep -15 |
Dec -15 |
117 ,000 |
195 ,000 |
|||||
| Abu Dh abi |
NDC | Jan -16 |
Sep -17 |
130 ,000 |
- | |||||
| l AOD |
BE | 201 3 |
400 | 20,0 00 |
di A rab ia Sau |
co 2 2 Sau di A ram |
May -13 |
Ma r-15 |
180 ,000 |
- |
| di A rab Sau ia |
di A Sau ram co |
Apr -15 |
Ma r-16 |
162 ,000 |
- | |||||
| Sau di A rab ia |
Sau di A ram co |
Apr -16 |
May -16 |
180 ,000 |
- | |||||
| Opt ion |
di A Sau ram co |
May -16 |
May -17 |
205 ,000 |
- | |||||
| ll AOD |
BE | 201 3 |
400 | 20,0 00 |
di A rab Sau ia |
co 2 1 Sau di A ram |
Jul- 13 |
Ma r-15 |
180 ,000 |
- |
| Sau di A rab ia |
Sau di A ram co |
Apr -15 |
Ma r-16 |
162 ,000 |
- | |||||
| Sau di A rab ia |
Sau di A ram co |
-16 Apr |
Jul- 16 |
180 ,000 |
- | |||||
| Opt ion |
di A Sau ram co |
Jul- 16 |
Jun -17 |
205 ,000 |
- | |||||
| lll AOD |
BE | 201 3 |
400 | 20,0 00 |
di A rab Sau ia |
co 2 0 di A Sau ram |
Oct -13 |
Ma r-15 |
180 ,000 |
- |
| Sau di A rab ia |
Sau di A ram co |
Apr -15 |
Ma r-16 |
162 ,000 |
- | |||||
| di A rab ia Sau |
di A Sau ram co |
Apr -16 |
Oct -16 |
180 ,000 |
- | |||||
| Opt ion |
di A Sau ram co |
Oct -16 |
Oct -17 |
205 ,000 |
- | |||||
| We st T uca na eles |
BE | 201 3 |
400 | 30,0 00 |
Ang ola tral |
Cab ina Gul f Oi l Co ny L imit ed mpa |
May -15 |
May -17 Jul- |
220 ,000 |
167 ,000 |
| We st T to |
BE | 201 3 |
400 | 30,0 00 |
Aus ia Aus tral ia |
ed Orig in E gy L imit ner Car on H ibis Ltd narv cus |
Jan -15 Jul- |
15 Aug |
265 ,000 265 |
156 ,975 |
| st C We asto r |
BE | 201 3 |
30,0 | nei Bru |
Pty She ll |
15 Dec |
-15 May |
,000 155 |
- | |
| on 5 We st O ber |
BE | 201 3 |
400 400 |
00 30,0 00 |
ico Mex |
EX PEM |
-13 -14 |
-16 | ,000 171 |
- |
| ia 5 | May | -20 May |
,500 | - | ||||||
| We st T itan itan |
BE | 201 4 |
400 | 35,0 00 |
Mex ico Und Dali tion |
PEM EX |
Dec -14 |
Jun -19 |
171 ,500 |
- |
| We st T We st P rote us |
BE BE |
201 5 201 5 |
400 | 30,0 00 30,0 |
truc at er c ons an Und tion Dali truc at er c ons an |
- | - | - | - | - |
| hea We st R |
BE | 201 5 |
400 | 00 30,0 |
Und tion Dali truc at er c ons an |
- | - | - | - | - |
| eth We st T ys |
BE | 201 6 |
400 | 00 30,0 |
Und Dali tion truc at er c ons an |
- | - | - | - | - |
| We st H rion ype |
BE | 201 6 |
400 400 |
00 30,0 00 |
Und tion Dali truc at er c ons |
- | - | - | - | - |
| mb riel We st U |
BE | 201 6 |
400 | 30,0 00 |
an Und Dali truc tion at er c ons an |
- - |
- | - - |
- - |
- - |
| We st D ione |
BE | 201 7 |
400 | 30,0 00 |
Und tion Dali truc at er c ons an |
- | - | - | - | - |
| We ima st M s |
BE | 201 7 |
400 | 30,0 00 |
Und tion Dali truc at er c ons an |
- | - | - | - | - |
| e/N Rig typ ame |
/ Gen tion era |
Bui lt |
Wa dep th ter |
Dril ling de pth |
Loc atio n |
||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| e 1 typ |
(fee t) |
(fee t) |
Cur t co ntra ct ren |
Pre viou s |
|||||||
| Clie nt |
Sta rt |
ire Exp |
\$ Day rate US |
\$ Day rate US |
|||||||
| Ten der rig s |
|||||||||||
| 3 T15 |
Barg e |
201 3 |
6,50 0 |
30,0 00 |
Tha ilan d |
Che vro n |
Jul- 13 |
Jul- 18 |
127 ,000 |
- | |
| 3 T16 |
Barg e |
201 3 |
6,50 0 |
30,0 00 |
Tha ilan d |
Che vro n |
Aug -13 |
Aug -18 |
127 ,000 |
- | |
| r 3 We st V edo enc |
Sem i-te nde r |
201 0 |
6,50 0 |
30,0 00 |
Sing apo re |
Sing apo re |
- | - | - | 212 ,000 |
|
Footnotes:1) HE - Harsh environment BE - Benign environment2) Owned by North Atlantic Drilling Ltd in which Seadrill Limited owns 70.4 percent3) Owned by Seadrill Partners in which Seadrill Limited owns 46.6 percent4) Owned by Sevan Drilling Ltd in which Seadrill Limited owns 50.1 percent5) Owned by SeaMex in which Seadrill Limited owns 50.0 percent6) Daily rates partly received in Euros. Assumed EUR/US\$ foreign exchange rate of 1.30.7) Daily rates partly received in GBP pounds. Assumed US\$/GBP foreign exchange rate 1.558) Daily rates partly received in Brazilian Real. Assumed US\$/BRZ foreign exchange rate 2.879) Daily rates partly received in Norwegian kroner. Assumed NOK/US\$ foreign exchange rate 7.510) For West Capricorn the dayrate includes the mobilization fee of US\$30 million which will be received during the original contract period.11) For West Saturn a mobilization fee of US\$35 million will be received upfront12) For West Elara a mobilization fee of US\$24 million will be taken to income over the contract period.13) For West Pegasus a mobilization fee of US\$25 million will be taken to income over the contract period.14) For West Linus a mobilization fee of US\$24 million will be taken to income over the contract period.15) Delivery is deferred for 12 months with mutually agreed options, exercisable at 6 month intervals, to extend the delivery date for up to a total of 36 months from October 201416) For West Resolute a mobilization fee of US\$18 million will be taken to income over the contract period.17) For Sevan Louisiana a mobilization fee of US\$32.5 million was received upfront18) For West Leo a mobilization fee of US\$18 million will be taken to income over the contract period.19) For West Callisto a mobilization fee of US\$20 million will be taken to income over the contract period.20) For AOD lll a mobilization fee of US\$34 million will be taken to income over the contract period. 21) For AOD ll a mobilization fee of US\$36 million was received upfront22) For AOD l a mobilization fee of US\$39.5 million was received upfront23) For West Mira a mobilization fee of US\$40 million will be taken to incomce over the contract period. 24) For West Vela a mobilization fee of US\$37.5 million will be taken to income over the contract period.25) For West Auriga a mobilization fee of US\$37.5 million will be taken to income over the contract period. 26) West Sirius received a notice of termination from BP. In accordance with the cancellation provisions in the West Sirius contract, Seadrill Partners will receive payments over the remaining contract term27) The mobilization fee of US\$39.5 million is taken to income over the contract period.28) Excludes potential bonus payments of maximum 5% of the daily rate, which are based on certain performance criteria.29) For West Neptune a mobilization fee of US\$37.5 million will be taken to income over the contract period. 30) For West Linus we will receive an additional compensation of US\$12,430 per day over the initial 5 year contract period.31) For West Mischief a mobilization fee of US\$17 million will be taken to income over the contract period.32) The daily rate includes performance bonus based on a 95% utilization.33) An element of the daily rate will be payable to our JV partner.
The information contained in this Fleet Update report (the "Information") is as of the date of the report only and is subject to change without notice to the recipient. Seadrill Limited assumes no duty to update any portion of the Information.
DISCLAIMER. NEITHER SEADRILL LIMITED NOR ITS AFFILIATES MAKE ANY EXPRESS OR IMPLIED WARRANTIES (INCLUDING, WITHOUT LIMITATION, ANY WARRANTY OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE OR USE) REGARDING THE INFORMATION CONTAINED IN THIS REPORT, WHICH INFORMATION IS PROVIDED "AS IS."
No Unauthorized Publication or Use. All information provided by Seadrill Limited in this report is given for the exclusive use of the recipient and may not be published, redistributed or retransmitted without the prior written consent of Seadrill Limited.
Client Contract Duration, Timing and Dayrates and Risks Associated with Operations. The duration and timing (including both starting and ending dates) of the client contracts are estimates only, and client contracts are subject to cancellation, suspension and delays for a variety of reasons, including some beyond the control of Seadrill Limited. Also, the dayrates set forth in the report are estimates based upon the full contractual operating dayrate. However, the actual average dayrate earned over the course of any given contract will be lower and could be substantially lower. The actual average dayrate will depend upon a number of factors (rig downtime, suspension of operations, etc.) including some beyond the control of Seadrill Limited. Our client contracts and operations are generally subject to a number of risks and uncertainties, and we urge you to review the description and explanation of such risks and uncertainties in previous prospectus. The dayrates do not include revenue for mobilizations, demobilizations, upgrades, shipyards or recharges.