Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

SANTOS LIMITED Capital/Financing Update 2017

May 14, 2017

65872_rns_2017-05-14_4b18adf7-d108-48cc-98f3-7cc3bae8e759.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

==> picture [96 x 57] intentionally omitted <==

Muruk Drilling Update

(ASX:OSH | ADR: OISHY | POMSoX: OSH)

15 May 2017

Since the last drilling update at the end of April, the Muruk 1ST3 well, to the south-west of the Muruk 1 gas discovery, was successfully drilled through the Toro reservoir objective. Well logs and pressure data have confirmed that the entire Toro reservoir section is gas saturated. The Toro sandstone interval at Muruk 1ST3 is similar to the high quality reservoir in the Hides field.

After cementing the 7” liner at 3,921 metres, Muruk 1ST3 penetrated the top Toro at 3,968 metres and was drilled to a depth of 4,025 metres. Two cores were cut and the well was then deepened to 4,130 metres, to enable a full suite of logs and pressure data to be acquired. No gas:water contact was penetrated.

The data acquired from logging, cores and pressure samples is now being evaluated. Subject to Joint Venture approval, production tests will be undertaken to assess the deliverability and potential flow rates from the Toro. After completion of the final evaluation and testing programme, the well will be plugged and abandoned, as planned.

The Muruk drilling programme has successfully discovered a potentially significant new gas field, 21 kilometres north-west of the Hides facilities and immediately north of the Juha gas field. The data from the Muruk drilling programme, which included three sidetracks, will be evaluated to assist in designing a potential appraisal programme in 2018.

Sydney office 1 Bligh Street Sydney NSW 2000 Australia

Oil Search Limited Incorporated in Papua New Guinea ARBN 055 079 868

Head office Port Moresby Papua New Guinea

Mailing address GPO Box 2442 Sydney NSW 2001 Australia

Tel: +61 2 8207 8400 Fax: +61 2 8207 8500 www.oilsearch.com

==> picture [86 x 35] intentionally omitted <==

Well Name Muruk 1ST3 Location PPL 402, Highlands, PNG, (north-west of the Hides Gas field) Objective/ Early Cretaceous sandstone of the Toro Targets Formation Operator Oil Search (PNG) Ltd

==> picture [188 x 188] intentionally omitted <==

Participants1 Oil Search (PNG) Ltd* 37.5%
Esso PNG Wren Ltd 42.5%
Barracuda Ltd (Santos Limited) 20.0%
Total 100.0%

1 Gross interests pre-Government and landowner back-in, rounded to one decimal place (Santos’s interest subject to regulatory approval).

PETER BOTTEN, CBE Managing Director

Ann Diamant

General Manager, Investor Relations and Communications

Tel: +612 8207 8440 Mob: +61 407 483 128

Stephanie Chu

Senior Investor Relations Advisor

Tel: +612 8207 8542 Mob: +61 481 038 179

Muruk Drilling Update – 15 May 2017 www.oilsearch.com

2