16 DECEMBER 2025

BLACK BUTTE COPPER PROJECT STUDY UPDATE

Sandfire Resources Limited (ASX: SFR) ( Sandfire ) provides the following update on the Black Butte Copper Project in Montana, USA ( Black Butte or the Project ) and refers to the TSX listed Sandfire Resources America Inc. (TSX-V: SFR) ( Sandfire America ) News Release dated 16 December 2025 which outlines an updated pre-feasibility study ( PFS ) for the Johnny Lee deposit and updated Mineral Resource for the Lowry deposit.

‑ Black Butte is a fully permitted, high grade copper development project. Sandfire’s interest is held through an 87% equity stake in Sandfire America, which owns 100% of the Project, comprising the Johnny Lee and Lowry deposits and a contiguous land package that remains underexplored with strong discovery potential.

The Johnny Lee PFS confirms the potential for a low technical risk underground operation and a conventional 1.2Mtpa processing plant producing ~35ktpa of contained copper in the initial four years of operation and an average ~29ktpa of contained copper over an initial eight ‑ year mine life[1] . These plans are supported by an updated Mineral Resource for Johnny Lee of 22.3Mt at 2.4% Cu (520kt contained Cu) and an updated Ore Reserve of 9.5Mt at 2.9% Cu (270kt contained Cu).

In parallel, Sandfire America has reported an updated Mineral Resource for Lowry of 9.3Mt at 2.3% Cu (210kt contained Cu) which is within ~3km of Johnny Lee and has the potential to be accessed from the planned Johnny Lee underground workings, thereby providing an opportunity to materially extend mine life at a low capital cost.

A copy of Sandfire America’s TSX News Release describing the PFS outcomes and Mineral Resource and Mineral Reserve estimates prepared in accordance with NI 43-101 can be found at this link. A summary JORC Code (2012) Table 1 is attached as Appendix 1.

BLACK BUTTE RESOURCE AND RESERVE HIGHLIGHTS

  • Increased tonnes within the Johnny Lee Mineral Resource by 64% for a 33% increase in contained copper[2] .

  • Increased tonnes in the Johnny Lee Ore Reserve by 8% for a 19% increase in contained copper[3] .

  • • Increased tonnes within the Lowry Mineral Resource by 12% for a 5% increase in contained copper[4] .

Sandfire’s Chief Executive Officer and Managing Director, Mr Brendan Harris, said:

“The completion of the Johnny Lee PFS marks a significant milestone for Sandfire America and I’d like to congratulate Lincoln and his team for taking the Black Butte Project one step closer to its ultimate development.

“All good projects in our industry are ultimately underpinned by high quality reserves and resources, and that’s why we’re particularly pleased to see the significant increase in tonnage that recent drilling and updated modelling assumptions have delivered at both Johnny Lee and Lowry. With all key permits in place, and the potential upside that the satellite Lowry deposit provides, Black Butte is well placed as one of the few near shovel ready copper projects in the United States.

“Having achieved this important milestone, Sandfire America is also ideally positioned to benefit from the tight fundamentals projected for the global copper market and the supportive investment environment for critical minerals projects located within the United States.

“As previously indicated, the completion of this significant body of work by the Sandfire America team and the announcement of the updated mineral resource and ore reserve estimates will enable Sandfire to appropriately assess the project’s strategic fit within our global portfolio.”

1 The production target and financial forecasts referred to in this announcement are underpinned solely by the Johnny Lee Ore Reserve of 9.5Mt at 2.9% Cu (100% Probable Ore Reserves), and the Johnny Lee PFS, and reflect assumptions regarding mining method, processing recoveries, operating costs, capital costs, commodity prices, foreign exchange rates and permitting. Sandfire confirms that it has reasonable grounds for providing the forecast financial information. These assumptions are subject to change and actual outcomes may differ materially from those reflected in the production targets. The material assumptions underpinning the production targets and forecast financial information are set out in this announcement and Appendix 1. There is no certainty that the production targets will be achieved.

2 Is compared with the estimate reported in 2019 and is supported by additional drilling, updated geological modelling and a revised cut ‑ off methodology. 3 Is compared with the estimate reported in 2020 and reflects updated resource and modifying factors.

4 Is compared with the estimate reported in 2020 and reflects additional drilling, updated geological modelling and a revised cut ‑ off methodology.

Page 1 | 38

ASX:SFR

==> picture [116 x 24] intentionally omitted <==

SUMMARY OF MINERAL RESOURCES AND ORE RESERVES (JORC CODE 2012)

Lowry Mineral Resource Update

Following additional drilling and evaluation, the Lowry deposit now has an updated Mineral Resource estimate comprising Measured, Indicated and Inferred categories; however, Lowry remains outside the current Johnny Lee PFS mine plan and financial analysis, and any potential development would require further technical studies, environmental review and permitting.

Johnny Lee and Lowry – Mineral Resources

Information material to understanding the Mineral Resource estimates reported for the Johnny Lee and Lowry deposits is summarised below.

Table 1 – Johnny Lee and Lowry Mineral Resources (JORC 2012), as at 5 November 2025 (100% basis)

Deposit Resource Tonnes Copper Contained
category (Mt) (%) copper (kt)
Measured 2.8 2.8 80
Johnny Lee Indicated 16.1 2.4 380
Inferred 3.4 1.9 60
Total 22.3 2.4 520
Measured 1.2 2.5 30
Lowry Indicated 5.3 2.3 120
Inferred 2.8 2.1 60
Total 9.3 2.3 210

Notes:

  • 1 Mineral Resources are not Ore Reserves and do not have demonstrated economic viability. Inferred Mineral Resources have a high degree of uncertainty as to their economic and technical feasibility. There is no certainty that all or any part of Inferred Mineral Resources will be converted to Measured or Indicated Mineral Resources in the future.

  • 2 To demonstrate reasonable prospects for eventual economic extraction, Mineral Resources for the Johnny Lee deposits are reported using an economic NSR cut-off value of $45/t, which is approximately equivalent to 0.52% recoverable Cu, based on long-term Cu price assumptions of $4.70/lb and variable recovery and mill processing cost assumptions; Mineral Resources for the Lowry deposits are reported using an economic NSR cut-off value of $110/t, which is approximately equivalent to 1.28% recoverable Cu, based on long-term Cu price assumptions of $4.70/lb and variable recovery and mill processing cost assumptions.

  • 3 Variable metallurgical recovery has been estimated in the Johnny Lee UCZ on a block basis with a consistent 95% Cu recovery applied to the Johnny Lee Lower Copper LCZ, Metallurgical recovery for Cu has been assigned to the Lowry deposits: 91% for both Lowry UCZ and Lowry MCZ and 94% for Lowry LCZ.

  • 4 There are no known legal, political, environmental, or other risks that could materially affect the potential future development of the Mineral Resources. All Mineral Resources are located within land currently under control or lease to Sandfire America.

  • 5 All quantities are rounded to the appropriate number of significant figures to reflect the relative accuracy of the estimate; consequently, sums may not add up due to rounding. Cu assay values were capped where appropriate.

  • 6 The Mineral Resources for the Johnny Lee UCZ and LCZ were reviewed and approved by Berkley Tracy, P.Geo (PGO#3024) of SRK Consulting (U.S.), Inc., a Competent Person as defined by JORC.

  • 7 The Mineral Resources for the Lowry Upper Copper Zone (LUCZ), Lowry Middle Copper Zone (LMCZ), and Lowry Lower Copper Zone (LLCZ) were reviewed and approved by Berkley Tracy, P.Geo (PGO#3024) of SRK Consulting (U.S.), Inc., a Competent Person as defined by JORC.

Page 2 | 38

ASX:SFR

==> picture [116 x 24] intentionally omitted <==

The total Johnny Lee Mineral Resource has increased by approximately 64% in tonnes and 33% in contained copper tonnes, with a decrease of approximately 16% in copper grade. These changes are ‑ due to additional drilling, updated geological modelling and changes to cut off methodology introduced since the previously reported Mineral Resource estimate as of 15 October 2019.[5]

The total Lowry Mineral Resource has increased by approximately 12% in tonnes and 5% in contained copper tonnes, with a decrease of approximately 4% in copper grade. These changes are the result of ‑ additional resource definition drilling, updated geological modelling and changes to cut off methodology introduced since the previously reported Mineral Resource estimate as of 15 October 2020.[6]

The Mineral Resource estimates were originally prepared and classified using the CIM Definition Standards under NI 43-101. The Competent Persons have reviewed the estimation methodology, cutoff grade criteria, modifying factors and classification parameters and are satisfied that the CIM categories are equivalent in definition and confidence level to the corresponding JORC Code (2012) categories (Measured, Indicated, Inferred). The Mineral Resources are therefore reported herein in accordance with the JORC Code (2012). Further details required by the JORC Code (2012) are set out in Appendix 1 – JORC Table 1 (Sections 1–3).

Geology and Geological Interpretation

  • Johnny Lee and Lowry are high-grade, stratabound, sediment-hosted copper deposits located in the Helena Embayment of the Belt Supergroup in central Montana.

  • Copper mineralisation occurs in laterally continuous, shallow-dipping sulphide horizons:

  • Johnny Lee: Upper Copper Zone (UCZ) and Lower Copper Zone (LCZ).

  • Lowry: Lowry Upper Copper Zone (LUCZ), Lowry Middle Copper Zone (LMCZ) and Lowry ‑

  • Lower Copper Zone (LLCZ), with lower grade mineralisation extending above and below the main lenses.

  • Geological interpretation is based on detailed lithological, alteration, structural and mineralogical logging of diamond drill core, supported by geophysical data and surface mapping.

Drilling, Sampling Techniques and Data Quality

  • Mineral Resources are supported by an extensive diamond drilling database; all drillholes used in the estimates are HQ or NQ core (with some PQ at Johnny Lee for metallurgical work), drilled from surface or as diamond tails on rock ‑ bit precollars.

  • Core is geologically and geotechnically logged by professional geologists, oriented (only at Johnny Lee since 2014), photographed, and sampled on nominal intervals adjusted to geological boundaries, following documented procedures.

  • Sample preparation and assaying are undertaken at accredited laboratories (ALS Reno) using ‑

  • industry standard methods, under a QA/QC program that includes blanks, certified reference materials, duplicates and umpire checks.

  • The Competent Persons consider the data quality appropriate for Mineral Resource estimation.

Estimation Methodology and Classification

  • Three ‑ dimensional wireframes define mineralised domains corresponding to the UCZ and LCZ at Johnny Lee and the LUCZ, LMCZ and LLCZ at Lowry, based on lithology, structure and chalcopyrite distribution. Grades are estimated into block models using ordinary kriging (OK); ‑

  • inverse distance weighted (IDW), top cutting and suitable search strategies, within these domains.

  • • Bulk density is estimated using the IDW method from extensive specific gravity measurements by lithology and sulphide content.

  • Classification as Measured, Indicated and Inferred reflects drill spacing, geological and grade continuity, data quality (including historical drilling) and estimation performance, and is consistent with the JORC Code (2012) and aligned with CIM guidelines.

5 Refer to Sandfire’s ASX announcement titled ‘Updated Mineral Resource Completed for Johnny Lee Deposit, Black Butte Copper Project, USA’, dated 30 October 2019 for details.

6 Refer to Sandfire’s ASX announcement titled ‘USA and Botswana Development Projects Update’, dated 28 October 2020 for details.

Page 3 | 38

ASX:SFR

==> picture [116 x 24] intentionally omitted <==

Cut-off Values and Reasonable Prospects

  • Mineral Resources are reported above a Net Smelter Return (NSR) value specified separately for each deposit ($45/t for Johnny Lee and $110/t for Lowry), selected to reflect reasonable prospects ‑

  • for eventual economic extraction based on long term copper price assumptions, metallurgical recoveries and operating cost estimates from the Black Butte PFS work.

  • The cut ‑ off values and reporting constraints are designed to exclude isolated or uneconomic material and to retain only mineralisation with a reasonable likelihood of future underground extraction.

Mining, Metallurgical and Other Modifying Factors (Resource Level)

  • Mineral Resources have been constrained and reported in a manner consistent with extraction by underground methods, informed by engineering studies and mine design work completed for Johnny Lee and conceptually applied to Lowry.

  • Metallurgical testwork and geometallurgical studies indicate that conventional flotation can achieve recoveries consistent with the assumptions used in the project studies, and no metallurgical, geotechnical, environmental or social factors have been identified at the current level of study that would materially compromise the reasonable prospects for eventual economic extraction of the reported Mineral Resources, subject to the risks and assumptions disclosed elsewhere in this announcement.

Johnny Lee – Ore Reserves

Information material to understanding the Ore Reserve estimate for the Johnny Lee deposit is summarised below.

Table 2 – Johnny Lee Ore Reserve (JORC 2012), as at 14 November 2025 (100% basis)

Deposit Reserve Tonnes Copper Contained
category (Mt) (%) copper (kt)
Johnny Lee Proved
Probable
-
9.5
-
2.9
-
270
Total 9.5 2.9 270

Notes:

  1. The Competent Person for the Ore Reserve estimate is Shane McLeay FAusIMM.

  2. Ore Reserves were estimated using a $4.70/lb Cu price and NSR cut-off values of $110/t (operating cost) and $45/t (incremental operating cost).

  3. Tonnages are rounded to the nearest 100kt, metal grades are rounded to one decimal place, and metal tonnes are rounded the nearest 10kt. All units are metric. Rounding as required by reporting guidelines may result in summation differences.

  4. Average LOM Metallurgical Recovery is 95% for LCZ, 78% for UCZ, and 86% combined.

  5. Ore Reserves are based on the Mineral Resource as at 5 November 2025.

  6. Ore Reserves are a subset of Mineral Resources.

The Johnny Lee Ore Reserve has increased by approximately 8% in tonnes and 19% in contained copper tonnes, with an increase of approximately 12% in copper grade compared to the previous Ore Reserve estimate as at 19 October 2020. These changes are due to an updated Mineral Resource estimate and modifying factors.[6]

The Ore Reserve estimates were originally prepared and classified using the CIM Definition Standards for Mineral Reserves under NI 43-101. The Competent Persons have reviewed the estimation methodology, cut-off grade criteria, modifying factors and classification parameters and are satisfied that the CIM Mineral Reserve categories are equivalent in definition and confidence level to the corresponding JORC Code (2012) Ore Reserve categories (Proved and Probable). The Ore Reserves are therefore reported herein in accordance with the JORC Code (2012). Further details required by the JORC Code (2012) are set out in Appendix 1 – JORC Table 1 (Section 4).

Page 4 | 38

ASX:SFR

==> picture [116 x 24] intentionally omitted <==

Material Assumptions and PFS Status

  • The Ore Reserve estimate for Johnny Lee is based on an underground PFS, which assumes:

  • Long-term copper price of $4.70/lb

  • Life of mine average metallurgical recovery of 86% for copper

  • Initial capital cost of approximately $474M, LOM sustaining capital of $82M; and

  • Life of mine C1 cash cost of $2.56/lb of payable copper

  • The level of engineering, costing and risk assessment is considered appropriate to a PFS and sufficient to support the declaration of Probable Ore Reserves

Mining Method and Assumptions

  • Mining is by underground methods, with access via a decline from surface, and ore extraction by mechanised drift-and-fill and mechanised cut-and-fill and longhole stripping with paste backfill

  • The mine is designed for a nominal production rate of 1.2Mtpa of ore

  • Life of mine mining dilution and recovery factors are based on detailed stope design, geotechnical assessments and backfill assumptions

  • Ore Reserves include the effects of dilution and mining losses and are reported on a diluted basis

Processing Method and Metallurgical Assumptions

  • Processing will be by conventional crushing, grinding and flotation to produce a copper concentrate

  • • Metallurgical recoveries are based on extensive laboratory test work and integrated geometallurgical modelling for UCZ and LCZ material, including variability testwork and assessment of deleterious elements

  • The Ore Reserve estimates assume an average life-of-mine copper recovery of 86% and concentrate quality and impurity levels consistent with the treatment and refining charges used in the PFS

Cut-off Values

  • A NSR value was calculated for all blocks which considered the metallurgical recovery of each block, allowances for payability, royalties, concentrate transport and treatment and refining costs and a copper price of $4.70/lb

  • Ore Reserves are reported based on the use of two NSR cut-off values. An operating cost of $110/t and an incremental cost of $45/t used to determine whether material is sent to waste or processed

Modifying Factors

Mining and Geotechnical

  • Geotechnical parameters for the PFS were derived from dedicated geotechnical drilling, logging and rock mass characterisation, with stope design and ground support specified accordingly

Environmental and Permitting

  • Exploration and project activities are being conducted under the Montana Department of Environmental Quality (MT DEQ) Exploration License #00710 with reclamation bonding in place, and closure obligations (including removal of groundwater wells) identified

  • Environmental impacts have been comprehensively assessed through the MT DEQ Environmental Impact Statement and the approved Mine Operating Permit (MOP). Including the approved MOP, 28 permits and plans are required; 23 have been granted and the remaining items are largely administrative, with work initiated on all but one. Key operating approvals, including the MOP, Air Quality Permit, MPDES and construction stormwater permit, together with the DEQ Record of Decision, demonstrate regulatory compliance and no environmental or permitting constraints have been identified that would materially affect the Ore Reserve

Page 5 | 38

ASX:SFR

==> picture [116 x 24] intentionally omitted <==

Infrastructure and Services

  • The Ore Reserve is premised on construction of decline access, underground infrastructure, process plant, paste backfill plant, double-lined and cemented tailings facility, water management systems and associated site infrastructure in line with the PFS design

Social, Legal and Government

  • The MOP has been confirmed as valid through recent Montana Supreme Court decisions in 2024 and 2025, which reinstated the Mine Operating Permit in full and upheld the Montana Department of Natural Resources & Conservation water rights determinations, removing all outstanding legal challenges

  • The Project is expected to deliver substantial employment and economic benefits to Meagher County and the State of Montana while operating under stringent environmental and social standards. Accordingly, no social, legal or governmental impediments have been identified that would materially impact the Ore Reserve

The Competent Persons consider that the modifying factors have been evaluated to a level consistent with PFS status and are reasonable for the purposes of estimating Probable Ore Reserves.

Page 6 | 38

ASX:SFR

==> picture [116 x 24] intentionally omitted <==

Competent Person’s Statement – Mineral Resources

The information in this report that relates to the Johnny Lee and Lowry Mineral Resources is based on and fairly represents information and supporting documentation reviewed and prepared by Mr Berkely Tracy who is a Certified Professional Geologist of The American Institute of Professional Geologists. Mr Tracy is a full-time employee of SRK Consulting (U.S.) Inc. Mr Tracy has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity that he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the 'Australasian Code for Reporting of Exploration Results, Minerals Resources and Ore Reserves'. Mr Tracy consents to the inclusion in this report of the matters based on the information in the form and context in which it appears.

Competent Person’s Statement – Ore Reserves

The information in this report that relates to the Johnny Lee Ore Reserves is based on and fairly represents information and supporting documentation prepared by Mr Shane McLeay who is a Fellow of The Australasian Institute of Mining and Metallurgy. Mr McLeay is a full-time employee of Entech Pty Ltd. Mr McLeay has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity that he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the 'Australasian Code for Reporting of Exploration Results, Minerals Resources and Ore Reserves'. Mr McLeay consents to the inclusion in this report of the matters based on the information in the form and context in which it appears.

Forward-Looking Statements

Certain statements made within or in connection with this release contain or comprise certain forward-looking statements regarding Sandfire’s Mineral Resources and Ore Reserves, exploration and project development operations, production rates, life of mine, projected cash flow, capital expenditure, operating costs and other economic performance and financial condition as well as general market outlook. Forward-looking statements can generally be identified by the use of forward-looking words such as ‘expect’, ‘anticipate’, ‘may’, ‘likely’, ‘should’, ‘could’, predict’, ‘propose’, ‘will’, ‘believe’, ‘estimate’, ‘target’, ‘guidance‘, and other similar expressions. Sandfire believes that it has reasonable grounds for making the forward-looking statements in this announcement, including the production target and forecast financial information. You are cautioned not to place undue reliance on forward-looking statements. Forward-looking statements are provided as a general guide only and should not be relied upon as an indication or guarantee of future performance. Although Sandfire believes that the expectations reflected in such forward-looking statements are reasonable, such expectations are only predictions and are subject to inherent risks and uncertainties which could cause actual values, results, performance or achievements to differ materially from those expressed, implied or projected in any forward- looking statements and no assurance can be given that such expectations will prove to have been correct.

Accordingly, results could differ materially from those set out in the forward-looking statements as a result of, among other factors, changes in economic and market conditions, delays or changes in project development, success of business and operating initiatives, changes in the regulatory environment and other government actions, fluctuations in metals prices and exchange rates and business and operational risk management.

Unless otherwise stated, the forward-looking statements are current as at the date of this announcement. Except as required by law or regulation, for statutory liability which cannot be excluded, each of Sandfire, its officers, employees and advisors expressly disclaim any responsibility for the accuracy or completeness of the material contained in these forward-looking statements and excludes all liability whatsoever (including in negligence) for any loss or damage which may be suffered by any person as a consequence of any information in forward-looking statements or any error or omission. Sandfire undertakes no obligation to update publicly or release any revisions to these forward-looking statements to reflect events or circumstances after today's date or to reflect the occurrence of unanticipated events other than required by the Corporations Act and ASX Listing Rules. Accordingly, you should not place undue reliance on any forward-looking statement.

– ENDS –

For further information, please contact: Investor Relations Media Relations David Wilson Kirsten Stoney Head of Commercial Head of Corporate Affairs M: +61 407 909 313 M: +61 409 571 961

This announcement is authorised for release by Sandfire’s Chief Executive Officer and Managing Director, Brendan Harris.

Page 7 | 38

ASX:SFR

==> picture [117 x 24] intentionally omitted <==

APPENDIX 1: JORC CODE, 2012 EDITION – TABLE 1

Mr Tracy assumes responsibility for matters related to Sections 1-3 of JORC Table 1 for the Johnny Lee and Lowry deposits. Mr McLeay assumes responsibility for matters related to Section 4 of JORC Table 1 for the Johnny Lee deposit.

BLACK BUTTE – JOHNNY LEE AND LOWRY PROJECTS

JORC Code Assessment Criteria Comment
Section 1 Sampling Techniques and Data Johnny Lee Lowry
Sampling techniques
Sampling for analytical testing has been
performed on diamond drill core either by
splitting of core on historical drilling (pre-2010)
or by half-core sawing (2010 to present).

Sampling intervals are nominally 1.0 m in
length.

Prior to 2010, analyses were undertaken by the
previous project owners at internal and external
laboratories. Details on the analytical methods
and QA/QC protocols is not available. Six
drillholes were twinned, resampled and re-
analysed with results demonstrating the
historical data is suitable for Mineral Resource
estimation.

The intervals selected for sampling were
halved using a core saw. The sample cut was
made approximately 5° clockwise (looking
downhole) from the orientation line. The half-
core that did not contain the orientation line
was sampled. Where a field duplicate had been
requested by the logging geologist, the
remaining half-core was quartered and the
quarter without the orientation line was
sampled. If core-orientation was not performed,
or had failed, the core was cut perpendicular to
bedding and the same half-core was
consistently sampled.

Post 2010, half-core is prepared and then
analysed by ALS Laboratories of Reno,
Nevada, USA. Samples were weighed and

Sampling for analytical testing has been
performed on diamond drill core either by
splitting of core on historical drilling (pre-2010)
or by half-core sawing (2010 to present).

Sampling intervals are nominally 1.5 to 2.0 m in
length.

Post 2010, half-core is prepared and then
analysed by ALS Laboratories of Reno,
Nevada, USA. Samples were weighed and
crushed to 70% passing 2mm and then a riffle
split 250g-split pulverised to 85%, <75um. A 25
to 50 g sub-sample was collected, and a 0.4 g
aliquot was subjected to four acid digestion and
analysed using ICP-AES. A 30 g aliquot was
assayed for gold by fire assay with an atomic
absorption spectroscopy (AAS) finish.

All sampling has been supervised by
professional geologists.

A quality assurance program has been in-place
since initial exploration on the Lowry Deposit
that includes regular addition of quality control
samples such as blanks, standards, and
duplicates. The Competent Person notes that
raw QA/QC data collected prior to 2010 is not
available, therefore the presence of historic
drilling has been taken into account for risk
assessment and Mineral Resource
classification purposes.

Logging for lithology, alteration, mineralisation,
and structure has been performed on all drill
Nature and quality of sampling (e.g., cut channels, random
chips, or specific specialised industry standard measurement
tools appropriate to the minerals under investigation, such as
downhole gamma sondes, or handheld XRF instruments, etc.).
These examples should not be taken as limiting the broad
meaning of sampling.
Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
Aspects of the determination of mineralisation that are Material
to the Public Report. In cases where ‘industry standard’ work
has been done this would be relatively simple (e.g., ‘reverse
circulation drilling was used to obtain 1 m samples from which
3 kg was pulverised to produce a 30 g charge for fire assay’).
In other cases, more explanation may be required, such as
where there is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation types (e.g.,
submarine nodules) may warrant disclosure of detailed
information.

Page 8 of 38

ASX:SFR

==> picture [117 x 24] intentionally omitted <==

JORC Code Assessment Criteria Comment
crushed to 70% passing 2mm and then a riffle
split 250g-split pulverised to 85%, <75um. A 25
to 50 g sub-sample was collected, and a 0.4 g
aliquot was subjected to four acid digestion and
analysed using ICP-AES. A 30 g aliquot was
assayed for gold by fire assay with an atomic
absorption spectroscopy (AAS) finish.

All sampling has been supervised by
professional geologists.

A quality assurance program has been in-place
since initial exploration on Johnny Lee Deposit
that includes regular addition of quality control
samples such as blanks, standards, and
duplicates. The Competent Person notes that
raw QA/QC data collected prior to 2010 is not
available, therefore the presence of historic
drilling has been taken into account for risk
assessment and Mineral Resource
classification purposes.

Logging for lithology, alteration, mineralisation,
and structure has been performed on all drill
core by professional geologists. Based on
mineralisation logging, samples are collected
within each mineralised zone, identified by
visual logging of chalcopyrite content, ensuring
at least 9 m of material was sampled above
and below the logged mineralised interval.
core by professional geologists. Based on
mineralisation logging, samples are collected
within each mineralised zone, identified by
visual logging of chalcopyrite content, ensuring
at least 9 m of material was sampled above
and below the logged mineralised interval.
Drilling techniques
All drilling is either diamond drill core from
surface or collared using a rock bit, switching
to diamond core drilling when competent
ground is encountered, prior to mineralisation.

All core used for resource estimation was
either HQ- or NQ-sized diameter. In 2018, PQ
core was collected for metallurgical testing of
the Johnny Lee Upper Copper Zone

Core orientation using a Reflex ACT-II or ACT-
III tool has been undertaken on all drillholes
since 2014. Drillhole core prior to 2014 was
not orientated.

All drilling is either diamond drill core from
surface or diamond core tail of a rock bit hole to
reach deeper mineralisation.

All core used for resource estimation was either
HQ- or NQ-sized diameter.

No oriented core has been performed at Lowry.
Drill type (e.g., core, reverse circulation, open-hole hammer,
rotary air blast, auger, Bangka, sonic, etc.), and details (e.g.,
core diameter, triple or standard tube, depth of diamond tails,
face sampling bit or other type, whether core is oriented and if
so, by what method, etc.).

Page 9 of 38

ASX:SFR

==> picture [117 x 24] intentionally omitted <==

JORC Code Assessment Criteria Comment
Drill sample recovery
Diamond drill core recovery and rock quality
designation (RQD) were logged by geologists.

Core recovery is considered acceptable with
average recoveries greater than 90% in the JL
UCZ and averaging 98% in the Johnny Lee
Lower Copper Zone (JL LCZ).

Drillers, in collaboration with Sandfire America
geologists, take measures such as reducing
torque and penetration rates of drilling when
targeting zones of known fracturing.

It is the opinion of the Competent Person that
core recovery loss is not material to overall
grade modelling and estimation.

Diamond drill core recovery and rock quality
designation (RQD) were logged by geologists.

Core recovery is considered acceptable with
average recovery of 89.3% for the Lowry
Middle Copper Zone and 86.6% for the Lowry
Lower Copper Zone with lower recoveries
(< 50%) observed in fault zones.

Drillers, in collaboration with Company
geologists, take measures such as reducing
torque and penetration rates of drilling when
targeting zones of known faulting.

It is the opinion of the Competent Person that
core recovery loss is not material to overall
grade modelling and estimation.
Method of recording and assessing core and chip sample
recoveries and results assessed.
Measures taken to maximise sample recovery and ensure
representative nature of the samples.
Whether a relationship exists between sample recovery and
grade and whether sample bias may have occurred due to
preferential loss/gain of fine/coarse material.
Logging
All diamond drill core from the Johnny Lee
Deposit has been geologically logged by
geologists.

No quantitative logging has occurred.

All core has been photographed using high
resolution digital photography.

Data logged includes lithology, alteration,
mineralisation, structural geology, veining,
recovery, and RQD.

Total length of drilling at the Johnny Lee
Deposit is 95,540.2 m with copper assay
intervals totalling 29,636.6 m.

All diamond drill core at the Lowry Deposit has
been geologically logged by geologists.

No quantitative logging has occurred.

All core has been photographed using high
resolution digital photography.

Data logged includes lithology, alteration,
mineralisation, major structures, recovery, and
RQD.

Total length of drilling at the Lowry Deposit is
40,586.5 m with copper assay intervals totalling
14,790.3 m.
Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate
Mineral Resource estimation, mining studies and metallurgical
studies.
Whether logging is qualitative or quantitative in nature. Core
(or costean, channel, etc.), photography.
The total length and percentage of the relevant intersections
logged.
Sub-sampling techniques and samplepreparation
Sampling for analytical testing has been
performed on diamond drill core either by
splitting of core on historical drilling (pre-2010)
or by half-core sawing (2010 to present).

Details of sample preparation and analyses
prior to 2010 are not available. Analyses of
samples from six twinned holes has confirmed
the validity of the historical data.

All samples subsequent to 2010 were prepared
and analysed at ALS Reno, USA or ALS
Vancouver, Canada.

Sampling for analytical testing has been
performed on diamond drill core either by
splitting of core on historical drilling or by half-
core sawing.

Sample drying and preparation was conducted
by an independent, reputable laboratory (ALS)
using four-acid digestion and analyses by
inductively coupled plasma – atomic emission
spectrometry (ICPAES), fire assay (FA), and
atomic absorption spectrometry (AAS).

Crushed samples were split to appropriate
sample aliquots.
If core, whether cut or sawn and whether quarter, half or all
core taken.
If non-core, whether riffled, tube sampled, rotary split, etc., and
whether sampled wet or dry.
For all sample types, the nature, quality and appropriateness
of the sample preparation technique.

Page 10 of 38

ASX:SFR

==> picture [117 x 24] intentionally omitted <==

JORC Code Assessment Criteria Comment
Quality control procedures adopted for all sub-sampling stages
to maximise representivity of samples.
Measures taken to ensure that the sampling is representative
of the in situ material collected, including for instance results
for field duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain size of the
material being sampled.

The samples were dried for a minimum of eight
hours at 100°C. The samples were then
coarse-crushed to 70% minus 6 mm using a
swing jaw-crusher. Every 30th sample was
passed through a dry sieve to ensure that
required crush specifications were obtained.

The coarse-crushed material was then fine-
crushed to 70% minus 2 mm using a Boyd jaw-
crusher and a 1,000 g analytical sample was
split off using a Boyd rotary splitter. The fine-
crushed material from every 20th sample was
passed through a dry-sieve for quality control of
fine-crushing.

The 1,000 g analytical sample was then
pulverised to 85% minus 75 µm using an Essa
LM2 vibratory pulverizing mill. A split of the
pulverised material from every 20th sample
was wet-sieved to ensure that at least 85% of
the pulverised material was <75 µm.

The 1,000 g pulverised sample (pulp) was
tipped-out of the grinding bowl onto a mat and
an approximately 130 g sub-sample collected,
for fire assay at ALS-Reno, by scooping an x-
pattern through the pulp pile (similar to cone
and quartering). A 25 to 50 g sub-sample was
collected in the same way for acid-digest ICP-
AES. The remaining pulp material (pulp
residue) was bagged and stored. Envelopes
containing the acid-digest ICP-AES sub-sample
were shipped to ALS Vancouver.

At ALS Reno, a duplicate 1,000 g fine-crush
split was created for selected samples
(Laboratory Duplicate) and pulverised to 85%
minus 75 µm. ALS Reno was also instructed to
retain all analytical sample pulp residues such
that a certain proportion could be reanalysed at
a different laboratory (Umpire Samples).

Subsequent to 2010, coarse duplicates were
inserted into the sample sequence to monitor

It is the opinion of the Competent Person that
sample interval size is acceptable based on
mean copper grade and thresholds used for
modelling of mineralised zones.

Page 11 of 38

ASX:SFR

==> picture [117 x 24] intentionally omitted <==

JORC Code Assessment Criteria Comment
potential laboratory contamination during
sample preparation.

It is the opinion of the Competent Person that
sample interval size is acceptable based on
mean copper grade and thresholds used for
modelling of mineralised zones.
Quality of assay data and laboratory tests
A split of the analytical pulp was sent to ALS
Global, 2155 Dollarton Highway, North
Vancouver, British Columbia (ALS Vancouver).
ALS Vancouver is ISO/IEC 17025 accredited
for gold assay by lead collection fire assay, four
acid sample digestion and multi-element
analysis using an Inductively Coupled Plasma -
Atomic Emission Spectrometer (ICP-AES) for
low-grade to high-grade base metal ores.

A four-acid digestion was performed on a 0.4 g
aliquot, and the analysis of the digest was
performed using an ICP-AES, calibrated for
intermediate level analyses (low to medium
grade ore).

When the upper limits of detection for the
intermediate level ICP-AES were exceeded for
Cu, Ag, Pb or Zn, the digests from the over-
limit samples were re-analysed for the over-
limit elements in an ore grade level ICP-AES
circuit.

All umpire sample analyses were completed at
American Assay Laboratories (AAL), 1506
Glendale Ave, Sparks, Nevada which is
ISO/IEC 17025 accredited. Gold analyses of
umpire samples were performed using a 30 g
charge, lead collection fire-assay, acid digest
and an ICP-AES finish. Detection range for
gold analyses using this technique at AAL is
0.003 to 10 ppm. AAL use a five acid-digest of
a 0.5 g aliquot to produce a digest for 35
element ICP-AES analysis.

Upper limits of detection for the ICP-AES were
sometimes exceeded for Cu and Zn. Where

Sampling, preparation, and analyses for copper
are considered appropriate for evaluation of the
Lowry Deposit.

ALS performed internal laboratory duplicates
for quality control on sample preparation.

Umpire samples were successfully completed
at American Assay Laboratories (AAL) of
Sparks, Nevada, USA with no significant
deviations.

Coarse duplicates were created by ALS for
duplicate analytical testing as part of the
broader QA/QC program. Results
demonstrated acceptable repeatability.

Four-acid digestion coupled with ICP-AES
provides robust analyses suitable for
assessment of mineralisation.

The company utilises an acceptable QA/QC
program which includes use of certified
reference material (CRM) standards, blanks,
and duplicates along with umpire samples at a
second independent laboratory.

QA/QC results indicate an acceptable level of
accuracy and precision for copper analyses
The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is
considered partial or total.
For geophysical tools, spectrometers, handheld XRF
instruments, etc., the parameters used in determining the
analysis including instrument make and model, reading times,
calibrations factors applied and their derivation, etc.
Nature of quality control procedures adopted (e.g., standards,
blanks, duplicates, external laboratory checks) and whether
acceptable levels of accuracy (i.e., lack of bias) and precision
have been established.

Page 12 of 38

ASX:SFR

==> picture [117 x 24] intentionally omitted <==

JORC Code Assessment Criteria Comment
this occurred the digests from the over-limit
umpire samples were re-analysed for the over-
limit elements in an ore grade level ICP-AES
circuit.

Sampling, preparation, and analyses for copper
are considered appropriate for evaluation of the
Johnny Lee Deposit.

Four-acid digestion coupled with ICP-AES
provides robust analyses suitable for
assessment of mineralisation.

The company utilises an acceptable QA/QC
program which includes use of certified
reference material (CRM) standards, blanks,
and duplicates along with umpire samples at a
second independent laboratory.

QA/QC results indicate an acceptable level of
accuracy and precision for copper analyses.
Verification of sampling and assaying
Significant intercepts of mineralisation have
been confirmed over multiple drilling
campaigns based on preliminary models.

Six twinned holes have been completed at the
Johnny Lee Deposit.

Prior to the 2018 program, all logging was
conducted using graphic logging sheets. The
information recorded included: depth, colour,
lithology, mineralogy, oxidation, grain size,
texture, sedimentary structures, alteration,
mineralisation, and structure.

In the 2018/19 drill programs, digital logging
software (OCRIS™) was utilised to record all
logging information using a portable computer.
The digital logging was accompanied by
summary graphic logging such that
sedimentary facies could be identified in a
similar manner to the 2014 through 2018
Phase 1 drill programs. All geological logging
data was validated prior to use in geological
and resource modelling.

Significant intercepts of mineralisation have
been confirmed over multiple drilling
campaigns based on preliminary models.

Comparisons of historic (pre-2010) and recent
(2010 to current) sampling have demonstrated
acceptable comparisons of grade and
thickness of mineralisation within the Lowry
Deposit.

No twin drilling has been performed at the
Lowry Deposit.

Hole SC087 was wedged with minor deviation
that provided verification of logging and
mineralisation between the two drill holes.

No adjustments to assay data have been
required.
The verification of significant intersections by either
independent or alternative company personnel.
The use of twinned holes.
Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
Discuss any adjustment to assay data.

Page 13 of 38

ASX:SFR

==> picture [117 x 24] intentionally omitted <==

JORC Code Assessment Criteria Comment

For the 2021 / 2022 drill program, core holes
were logged by hand on paper sheets. This
information was then entered into OCRIS™ for
transfer to the database team in Perth.

For the 2023 / 2025 drill program, core holes
were logged by hand on paper sheets. This
information was then entered into MXDeposit™
for transfer to the database team in Perth.

A Structured Query Language (SQL) database
is used as the central data storage system,
managed in Perth, using DataShed™ v4.6.3 as
the front-end. User access to the database is
restricted and regulated by specific user
permissions. Existing protocols maximise data
functionality and quality, while minimizing the
likelihood of error introduction at primary data
collection points and subsequent database
upload, storage, and retrieval points.

Assay laboratory files are electronically
supplied to the data base administrator in .sif
and text file format. The assay data is loaded
into the database by the DBA. Project
Geologists assess the QA/QC of the assay
batch and decide whether it passes or fails.

The SQL server database is configured for
optimal validation through constraints, library
tables, triggers, and stored procedures. Data
that fails these rules during import is rejected or
quarantined until reviewed by a geologist.

No adjustments to assay data have been
required.
Location of datapoints
The Black Butte Copper Project uses the North
American datum of 1983 (NAD83) – universal
transverse Mercator (UTM), zone 12 North
coordinate system.

Upon completion of drillholes, the collars were
accuratelysurveyed bya registered surveyor

The Black Butte Copper Project uses the
North American datum of 1983 (NAD83) –
universal transverse Mercator (UTM), zone 12
North coordinate system.

Drill collars are surveyed by an independent
surveycontractor(WWC Engineeringof
Accuracy and quality of surveys used to locate drill holes
(collar and downhole surveys), trenches, mine workings and
other locations used in Mineral Resource estimation.
Specification of the grid system used.

Page 14 of 38

ASX:SFR

==> picture [117 x 24] intentionally omitted <==

JORC Code Assessment Criteria Comment
Quality and adequacy of topographic control. from WWC Engineering of Helena, Montana,
USA using an RTK GPS instrument (Trimble
R8 GNSS™) with horizontal and vertical
tolerance set to 0.05 ft (approximately 15 mm).
WWC Engineering located and surveyed all
historic drillhole collars used for the
determination of Mineral Resources.

Drillhole collars were pegged using either a
handheld Global Positioning System (GPS) or
a Real-Time Kinetic (RTK) GPS instrument.
Prior to the 2018 drill program, drill-rig
alignment was completed using a sighting
compass and inclinometer. For the 2019 Phase
2 program, a Reflex TN14 Gyrocompass™,
north-seeking gyroscopic alignment tool was
used to ensure accurate azimuth and
dip alignment. Prior to 2014, downhole
surveying was completed using either
singleshot downhole cameras or single-shot
electro-magnetic downhole survey instruments.

For the 2014 and 2015 drilling programs, a
Reflex EZ-Trac™ electromagnetic survey
instrument was used to record downhole
survey data. Survey shots were taken at 30 m
intervals downhole. During the 2018 Phase 1
and 2018/19 Phase 2 drill programs, a Reflex
EZTrac™ survey instrument was used to
record downhole survey data during drilling. A
Reflex EZ-Gyro™ (north seeking gyroscope)
was used to survey each hole at 3 m to 6 m
intervals, upon drillhole completion. For the
2023/2025 drill programs, an Omnix38
instrument was used for steeper holes, while
the Omnix42 was used for less steep holes.
Acceptable correlations between EZ-Trac and
EZ-Gyro instruments and low magnetic
susceptibility readings indicate that magnetic
interference of electro-magnetic survey
instruments was not occurring.

Site topography was obtained from a LiDAR
survey flown in October 2012 by MT LiDAR of
Helena, Montana, USA) using an RTK-GPS
survey instrument that determines collar co-
ordinates to sub-0.2 m accuracy.

Downhole survey was completed on all holes
using an electronic survey instrument REFLEX
tool at approximately 30 m intervals.

Site topography was obtained from a LiDAR
survey flown in October 2012 by MT LiDAR of
Kalispell, Montana, USA. Surface resolution is
less than 1 m.

Page 15 of 38

ASX:SFR

==> picture [117 x 24] intentionally omitted <==

JORC Code Assessment Criteria Comment
Kalispell, Montana, USA. Surface resolution is
less than 1 m.
Data spacing and distribution
It is the opinion of the Competent Person that
the current spacing is sufficient for the
estimation and classification of Mineral
Resources at Johnny Lee.

Data spacing at the Johnny Lee Deposit ranges
from 35 m to 120 m.

Using a cut-off grade that accounts for
operational costs and an estimate of
metallurgical recovery, a Mineral Resource
estimate has been undertaken for the Johnny
Lee deposit that classifies the mineralised
zones as Measured, Indicated, or Inferred
where there are sufficient drill data and
confidence to do so. Where there is insufficient
drill data, regardless of grade, a Mineral
Resource estimate has not been completed,
and the mineralisation remains unclassified.

Sampling intervals are nominally 1.0 m in
length. It was determined that 1.5 m composite
was most appropriate considering the data and
geological model. Residual lengths less than
0.75 m were distributed equally to the group of
composites within each domain. Additionally,
3.0 m composites were run for block height
comparisons during estimation validation.

It is the opinion of the Competent Person that
the current spacing is sufficient for the
estimation and classification of Mineral
Resources at Lowry.

Data spacing at the Lowry Deposit Middle
Copper Zone (LMCZ) ranges from 40 m to 100
m with the Lowry Deposit Lower Copper Zone
(LLCZ) ranging from 60 m to 200 m spacing.

Sampling intervals are nominally 1.5 to 2.0 m in
length. It was determined that a 2.5 m
composite was most appropriate considering
the data and geological model. Residual
lengths less than 1.0 m were merged with the
previous interval at the tail of each composited
domain.
Data spacing for reporting of Exploration Results.
Whether the data spacing, and distribution is sufficient to
establish the degree of geological and grade continuity
appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.
Whether sample compositing has been applied.
Orientation of data in relation togeological structure
Mineralisation at the Johnny Lee deposit is
replacement style that is bedding sub-parallel
and occurs in sedimentary strata with gentle to
moderate dips. Drillholes are steeply inclined
such that there is always a high angle between
the angle of drilling and the orientation of the
mineralization.

The Competent Person has reviewed the
various orientations of mineralisation intercepts
and concluded that there is no relational bias
observed in data.

All drilling is collared from surface and angled
with the aim of intercepting mineralisation
zones at perpendicular angles, when possible.
Due to local variations in strike and dip of
mineralisation, oblique, but not perpendicular,
intersections were obtained in some drillholes.

The Competent Person has reviewed the
various orientations of mineralisation intercepts
and concluded that there is no relational bias
observed in data.
Whether the orientation of sampling achieves unbiased
sampling of possible structures and the extent to which this is
known, considering the deposit type.
If the relationship between the drilling orientation and the
orientation of key mineralised structures is considered to have
introduced a sampling bias, this should be assessed and
reported if material.

Page 16 of 38

ASX:SFR

==> picture [117 x 24] intentionally omitted <==

JORC Code Assessment Criteria Comment
Sample security
Drill core was collected from the drill rigs daily
by staff and delivered directly to a secure core-
logging facility, attached to the office in White
Sulphur Springs, Montana, USA. After logging,
the drill core was stored in a secure
warehouse/core-cutting facility, until it was cut
and sampled. Access to the logging facility and
warehouse/ core cutting facility was restricted
to Company geological staff.

Once drill core samples were cut, they were
placed in labelled calico bags. Multiple calico
bags were placed in polypropylene sacks and
sealed with cable ties. Polypropylene sacks
were placed on wooden pallets and secured
using plastic wrap. Samples in preparation
were kept in the secure warehouse. Once a
pallet of samples was ready for dispatch it was
moved to the secure core logging facility

All samples were shipped to ALS Reno by
FedEx Corporation (FedEx). FedEx collected
the samples from the secure logging facility at
which point they assumed responsibility for the
chain of custody until delivery to the laboratory.

Upon delivery to the laboratory the samples
were unpacked and checked by laboratory
staff. ALS Reno has industry standard sample
security protocols at all sample preparation and
analytical facilities.

The final database housing all geological data
is maintained in a secure structured query
language (SQL) database housed by the
Company with sufficient back-ups in-place.
Access to the database is restricted and
regulated by specific user permissions to
Company staff.

All drill core is collected from the drill rig by
Company geologists and brought to a
centralised core logging facility.

The logging facility is access-controlled and
secure, located in White Sulphur Springs,
Montana, USA.

After logging and sample cutting, sample bags
are collected at the Company facility by a third-
party courier and delivered directly to the
independent analytical laboratory.

The final database housing all geological data
is maintained in a secure structured query
language (SQL) database housed by the
Company with sufficient back-ups in-place.
Access to the database is restricted and
regulated by specific user permissions to
Company staff.
The measures taken to ensure sample security.
Audits and reviews
The drilling, sampling, and logging techniques
and data were reviewed and deemed
satisfactory by the Competent Person, an
independent consultant to the Company.

The drilling, sampling, and logging techniques
and data were reviewed and deemed
satisfactory by the Competent Person, an
independent consultant to the Company.
The results of any audits or reviews of sampling techniques
and data.

Page 17 of 38

ASX:SFR

==> picture [117 x 24] intentionally omitted <==

JORC Code Assessment Criteria

Section 2 Reporting of Exploration Results Mineral tenement and land tenure status

Type, reference name/number, location and ownership including agreements or material issues with third parties such as joint ventures, partnerships, overriding royalties, native title interests, historical sites, wilderness or national park and environmental settings.

The security of the tenure held at the time of reporting along with any known impediments to obtaining a licence to operate in the area.

Comment Johnny Lee Lowry • The Black Butte Project is located within Meagher County, Montana, USA, approximately 27 kilometres (km) north of the town of White Sulphur Springs (see figure below).

==> picture [301 x 383] intentionally omitted <==

Page 18 of 38

ASX:SFR

==> picture [117 x 24] intentionally omitted <==

JORC Code Assessment Criteria

Comment

  • The Black Butte Copper Project Property consists of approximately 7,684.3 ha (18,986.8 acres) of fee simple lands under mineral lease by SRA through Tintina Montana Inc. (collectively referred to as SRA), and 1,040 unpatented mining claims on USFS lands covering approximately 8,077.8 ha (19,960.4 acres).

==> picture [277 x 367] intentionally omitted <==

Page 19 of 38

ASX:SFR

==> picture [117 x 24] intentionally omitted <==

JORC Code Assessment Criteria

Comment

  • A summary of mineral lands held on the property is provided in the table below. The project’s land holdings are within Sections 25, 26, 27, 29, 30, 31, 32, 34, 35, and 36 of Township 12 North, Range 7 East; Sections 23, 24, 25, 26, 27, 28, 30, 32, 33, 34, 35 and 36 of Township 12 North, Range 6 East; Sections 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 22, 23 and 24 of Township 11 North, Range 7 East; Sections 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, and 12 of Township 11 North, Range 6 East; Sections 1, 4, 5, 7, 8, 9, 10, 11, 12, 15, 16, 17, 20, 21, 22, 26, 27 and 28 of Township 11 North, Range 5 East; and, Sections 1 and 12 of Township 11 North, Range 4 East.

  • There are no known impediments to obtaining a licence to operate on the property.

  • The Johnny Lee Deposit is located on two tracts of land holding termed the “Bar Z” and “Short” tracts with a surface use and mineral lease agreement. The Lowry deposit is located on the “Short” tract.

  • The agreement for the Bar Z tract sets out an advanced royalty payment of $193,800 per year plus $75,000 per year in surface rent. The combined mineral interest has a Net Smelter Royalty of 5% with an option to buy this down to a 2% NSR for $5,000,000.

  • The agreement for the Short Tract sets out an advanced royalty of payment of $160,802 per year plus $75,000 per year in surface rent. The combined mineral interest has a NSR of 5% with an option to buy this down to a 2% NSR for $5,000,000.

  • Summary landholdings for the entire Black Butte Copper project property in relation to the MOP are provided in the figure below.

==> picture [325 x 227] intentionally omitted <==

Page 20 of 38

ASX:SFR

==> picture [117 x 24] intentionally omitted <==

JORC Code Assessment Criteria Comment Comment
Exploration done by otherparties
Various exploration campaigns have occurred on the Black Butte Copper Project property from 1976
through 1993. Work was conducted by Cominco America, Inc., Utah International Inc., and BHP Billiton
Ltd.

Work programs included geological mapping, surface & downhole geochemical sampling, geophysical
surveys, and 342 drillholes across the entire property.

Tintina Resources (the predecessor to Sandfire Resources America) conducted exploration activities on
the property including compilation and updating of geological maps, soil chemical survey, airborne
magnetics and resistivity survey, and a ground-based magnetic survey over the areas that include the
Johnny Lee and Lowry Deposits.
Acknowledgment and appraisal of exploration by other parties.
Geology
The Johnny Lee Deposit is a hybrid deposit
exhibiting attributes of a sedimentary exhalative
sulphide deposit (SEDEX) and a sediment-
hosted stratabound copper deposit (SSC).

The Black Butte deposits feature large pyrite-
rich sulphide lenses that occur within marine
sediments deposited in a continental rift, a host
lithofacies, and paleo-tectonic setting
consistent with that of SEDEX deposits.
Whereas SEDEX deposits are commonly Pb-
and Zn- rich and form on or near the seafloor
the Johnny Lee Deposit is enriched in Cu-Co-
Ag and lacks significant Pb-Zn mineralization.
Textural evidence indicates that some Cu
sulphides at Johnny Lee formed synchronous
with primitive, early pyrite but that the majority
of Cu-Co-Ag sulphide mineralization occurred
by replacement of early pyrite and that
mineralization/remobilization continued post-
burial and lithification.

The Johnny Lee deposit shares some features
with a sub-class of deposits termed Reduced-
facies SSC deposits: Cu-Co-(Ag) mineralization
hosted by reduced, organic- and pyrite-bearing
shale, silt and carbonaceous dolomitic
siltstone. These SSC deposits are epigenetic,
and mineralization is typically found as pore
fillings or replacement of existing minerals.
Mineralization in typical SSC deposits generally
shows a zonation from relatively Cu-rich at the

The Lowry Deposit is considered a hybrid
deposit exhibiting attributes of a SEDEX and a
SCC deposit, like the Johnny Lee Deposit.

Copper mineralisation at the Lowry Deposit is
hosted in pyrite-rich sulphide lenses within
marine sediments deposited in a continental rift
setting.

The deposit is enriched in copper, cobalt, and
silver but lacks significant lead and zinc
mineralisation common to SEDEX deposits.

The current focus of the project is on copper
mineralisation.

Mineralisation of economic significance occurs
as lenses within several discrete zones termed
the Lowry Upper Copper Zone, Lowry Middle
Copper Zone, and the Lowry Lower Copper
Zone.
Deposit type, geological setting and style of mineralisation.

Page 21 of 38

ASX:SFR

==> picture [117 x 24] intentionally omitted <==

JORC Code Assessment Criteria Comment
base (native copper, chalcocite, digenite) to
more iron-rich at the top (i.e. chalcopyrite). No
zonation is evident in the Johnny Lee Deposit
but the association of Cu sulphide
mineralization with post-lithification veins and
hydraulic brecciation supports a partially
epigenetic origin.
Drill hole information
The Competent Person has purposely
excluded individual drill hole intercepts as the
Johnny Lee Deposit contains interpreted,
modelled, estimated, and classified Mineral
Resources, thus individual drill intercepts are
less important to the overall project that the
sum of Mineral Resources disclosed.

The Competent Person has purposely
excluded individual drill hole intercepts as the
Lowry Deposit contains interpreted, modelled,
estimated, and classified Mineral Resources,
thus individual drill intercepts are less important
to the overall project that the sum of Mineral
Resources disclosed.
A summary of all information material to the understanding of
the exploration results including a tabulation of the following
information for all Material drill holes:

Easting and northing of the drill hole collar

Elevation or RL (reduced level – elevation above sea
level in metres) of the drill hole collar

Dip and azimuth of the hole

Downhole length and interception depth

Hole length.
If the exclusion of this information is justified on the basis that
the information is not Material and this exclusion does not
detract from the understanding of the report, the Competent
Person should clearly explain why this is the case.
Data aggregation methods
Drilling data has been composited to 1.5 m
lengths based on a run-length compositing
method bound and broken by 3D modelled
wireframes.

Wireframes are constructed based on a
combination of structure, lithology, and grade
shelling. In the JL UCZ, the primary
mineralisation is modelled using a 1.2% Cu cut-
off threshold, while the JL LCZ geological
continuity was best achieved using a 2.0% Cu
cut-off for modelling.

No metal equivalent values are stated for this
property as all economics are based on copper.
• Drilling data has been composited to 2.5 m
lengths based on a run-length compositing
method bound and broken by 3D modelled
wireframes.
• Wireframes are constructed based on a
combination of structure, lithology, and grade
shelling. The primary mineralisation is modelled
using a 1.2% Cu cut-off threshold while
secondary or “halo” mineralisation is modelled
using an approximate 0.25% Cu threshold.
• No metal equivalent values are stated for this
property as all economics are based on copper.
• Capping was applied to Cu grades by domain,
as follows: Sulphide 1-7 at 1.0% Cu, Beds 1-6 at
In reporting Exploration Results, weighting averaging
techniques, maximum and/or minimum grade truncations (e.g.,
cutting of high grades) and cut-off grades are usually Material
and should be stated.
Where aggregate intercepts incorporate short lengths of high-
grade results and longer low-grade results, the procedure used
for such aggregation should be stated and some typical
examples of such aggregations should be shown in detail.
The assumptions used for any reporting of metal equivalent
values should be clearly stated.

Page 22 of 38

ASX:SFR

==> picture [117 x 24] intentionally omitted <==

JORC Code Assessment Criteria Comment

Capping was applied to Cu grades by domain,
as follows: JL UCZ HG Cu at 10.1% Cu, JL
UCZ Cu 1 at 4.51% Cu, JL LCZ MASU at
3.11% Cu, and no capping for JL UCZ Cu 2, JL
LCZ Main, and JL LCZ Upper.
2.0% Cu, LMCZ at 8.0% Cu, and LLCZ at 4.5%
Cu.
Relationship between mineralisation widths and intercept
lengths

The mineralisation zones at the Johnny Lee
UCZ occur within a gently folded.

Drillholes are inclined such that they intersect
mineralisation at high angles.

The mineralisation zones at the Johnny Lee
LCZ dip at shallow angles to the south.

Drillholes are inclined such that they intersect
mineralisation at high angles.

The stacked mineralisation zones at the Lowry
deposit dip at shallow angles to the south.

Drillholes are inclined such that they intersect
mineralisation at high angles.
These relationships are particularly important in the reporting
of Exploration Results.
If the geometry of the mineralisation with respect to the drill
hole angle is known, its nature should be reported.
If it is not known and only the downhole lengths are reported,
there should be a clear statement to this effect (e.g., ‘downhole
length, true width not known’).
Diagrams
No exploration results are reported in this
announcement.

No exploration results are reported in this
announcement.
Appropriate maps and sections (with scales) and tabulations of
intercepts should be included for any significant discovery
being reported These should include but not be limited to a
plan view of drill hole collar locations and appropriate sectional
views.
Balance reporting
The Competent Person has purposely
excluded all exploration results as the Johnny
Lee Deposit contains Mineral Resources.
Individual exploration results are not material to
the overall deposit.

The Competent Person has purposely
excluded all exploration results as the Lowry
Deposit contains Mineral Resources. Individual
exploration results are not material to the
overall deposit.
Where comprehensive reporting of all Exploration Results is
not practicable, representative reporting of both low and high
grades and/or widths should be practiced to avoid misleading
reporting of Exploration Results.
Other substantive exploration data
131 drillhole composites from the Johnny Lee
deposit were submitted for comprehensive
mineragraphy. The results from this study were
integrated with metallurgical test work to
develop a metallurgical recovery model for the
JL UCZ. Variable Cu recoveries are assigned
by block in the JL UCZ. Mineralogy work has
also been completed on the JL LCZ, which
supports an assigned 95.2% Cu recovery.

Metallurgical testing in the form of
comprehensive mineralogical analyses has
been completed on samples from the Lowry
Deposit. Testing results are similar to those
obtained at the nearby Johnny Lee Deposit,
also located on the Black Butte Copper Project
property. Metallurgical recovery for Cu has
been assigned to the Lowry deposits: 91% for
both LUCZ and LMCZ and 94% for LLCZ.
Other exploration data, if meaningful and material, should be
reported including (but not limited to): geological observations,
geophysical survey results, geochemical survey results, bulk
samples – size and method of treatment, metallurgical test
results, bulk density, groundwater, geotechnical and rock
characteristics, potential deleterious or contaminating
substances.

Page 23 of 38

ASX:SFR

==> picture [117 x 24] intentionally omitted <==

JORC Code Assessment Criteria Comment
Further work
Additional drilling to convert mineralisation
currently classified as Inferred Resource or
Unclassified may be conducted as the project
progresses.

Additional work is in the planning stages for the
Lowry Deposit. This includes additional infill
diamond drill core to improve data spacing and
additional metallurgical analysis, with updated
modelling and estimation.
The nature and scale of planned further work (e.g., tests for
lateral extensions or depth extensions or large-scale step-out
drilling).
Diagrams clearly highlighting the areas of possible extensions,
including the main geological interpretations and future drilling
areas, provided this information is not commercially sensitive.

Page 24 of 38

ASX:SFR

==> picture [117 x 24] intentionally omitted <==

Section 3 Estimation and Reporting of Mineral
Resources
Johnny Lee Lowry
Database integrity
The Competent Person has performed a
validation check on the database used for
Mineral Resource reporting. This included a
combination of visual, statistical and software
validation checks. No issues or errors were
found.

The Company has performed multiple
validation checks and data verification on
recent drilling campaigns. This includes cross-
checks of logging to analytical data, verification
of collar, survey, and associated data.

The Company has performed validation of all
analytical data in reference to the original
assay certificates obtained from third-party
laboratories for the 2010-2012 drilling
campaigns.

The Competent Person has performed a
validation check on the database used for
Mineral Resource reporting. This included a
combination of visual, statistical and software
validation checks. No issues or errors were
found.

The Company has performed multiple
validation checks and data verification on
recent drilling campaigns. This includes cross-
checks of logging to analytical data, verification
of collar, survey, and associated data.

The Company has performed validation of all
analytical data in reference to the original
assay certificates obtained from third-party
laboratories for the 2010-2012 drilling
campaigns.
Measures taken to ensure that data has not been corrupted by,
for example, transcription or keying errors, between its initial
collection and its use for Mineral Resource estimation
purposes.
Data validation procedures used.
Site visits
The Competent Person visited the Black Butte
Copper Project property during September
2022 and June 2025. During the site visit, the
CP observed drilling activities, sampling,
logging, data entry and toured the core shed,
logging facility, and the property.

The Competent Person visited the Black Butte
Copper Project property during September
2022 and June 2025. During the site visit, the
CP observed drilling activities, sampling,
logging, data entry and toured the core shed,
logging facility, and the property.
Comment on any site visits undertaken by the Competent
Person and the outcome of those visits.
If no site visits have been undertaken indicate why this is the
case.
Geological interpretation
The Competent Person’s confidence in the
geological interpretation of the Johnny Lee
Deposit is considered adequate for the
estimation, classification, and reporting of
Mineral Resources.

Geological modelling was performed by
Sandfire Resources America, Inc. personnel in
close collaboration with the Competent Person.

Geological modelling was performed using a
combination of explicit and implicit modelling
techniques based on regional and local.

Geology, understanding of the lithostratigraphic
sequence, and aided by analytical data.
Multiple iterations of the interpreted geological

The Competent Person’s confidence in the
geological interpretation of the Lowry Deposit is
considered adequate for the estimation,
classification, and reporting of Mineral
Resources.

Geological modelling was performed by
Sandfire Resources America, Inc. personnel in
close collaboration with the Competent Person.

Geological modelling was performed using a
combination of explicit and implicit modelling
techniques based on regional and local.

Geology, understanding of the lithostratigraphic
sequence, and aided by analytical data.
Multiple iterations of the interpreted geological
Confidence in (or conversely, the uncertainty of) the geological
interpretation of the mineral deposit.
Nature of the data used and of any assumptions made.
The effect, if any, of alternative interpretations on Mineral
Resource estimation. The use of geology in guiding and
controlling Mineral Resource estimation.
The factors affecting continuity both of grade and geology.
.

Page 25 of 38

ASX:SFR

==> picture [117 x 24] intentionally omitted <==

model were created including use of historic
geological models of the deposit.

All modelling was performed in 3D with
occasional 2D cross-sectional validation
checks performed.

Grade is highly controlled by specific geological
horizons and interaction with major structures.
The modelled mineralisation envelops were
truncated based on supporting data or lack
thereof.
model were created including use of historic
geological models of the deposit.

All modelling was performed in 3D with
occasional 2D cross-sectional validation
checks performed.

Grade is highly controlled by specific geological
horizons and interaction with major structures.
The modelled mineralisation envelops were
truncated based on supporting data or lack
thereof.
Dimensions
The Johnny Lee Upper Copper Zone is
truncated in the north by the Volcano Valley
HW Fault and has plan-view dimensions of 550
m east-west by up to about 1,025 m north-
south. The true width of the JL UCZ extends up
to about 30 m in the south.

The Johnny Lee Lower Copper Zone occurs at
depths of 350 to 525 m below surface, strikes
approximately east-west for about 1,200 m and
dips at 20° to the south. The north-south
dimension is variable with extents from 50 to
250 m. The true width of the JL LCZ extends
up to about 10 m in the east.

Modelled mineralisation at the Lowry Deposit
extends approximately 1,000 m north-south
and up to 600 m east-west. Mineralisation can
be locally discontinuous within select lenses of
the LMCZ and LLCZ

High-grade (> 1.2% Cu) mineralisation
thickness averages 3-10 m with a broader and
lower grade (> 0.25% Cu) “halo” zone
extending around the high-grade up to 20 m
thickness.
The extent and variability of the Mineral Resource expressed
as length (along strike or otherwise), plan width, and depth
below surface to the upper and lower limits of the Mineral
Resource.
Estimation and modelling techniques
Cu and SG were estimated into the modelled
3D mineralised wireframes with hard-boundary
conditions within the JL UCZ and JL LCZ.

Statistical and geostatistical analyses were
performed on each zone with an emphasis on
copper.

Analytical data was composited at 1.5 m
bounded and broken by mineralisation volumes
with residual lengths less than 0.75 m
distributed equally.

A high-yield capping analysis was performed
on copper by zone. Capping was applied to Cu
grades by domain, as follows: JL UCZ HG Cu
at 10.1% Cu, JL UCZ Cu 1 at 4.51% Cu, JL
LCZ MASU at 3.11% Cu, and no capping for JL
UCZ Cu 2, JL LCZ Main, and JL LCZ Upper.

Cu and SG were estimated into the modelled
3D mineralised wireframes with hard-boundary
conditions at Lowry.

Statistical and geostatistical analyses were
performed on all zones with an emphasis on
copper.

Analytical data was composited at 2.5 m
bounded and broken by mineralisation volumes
with residual lengths less than 1.0 m merged
with the previous interval.

A high-yield capping analysis was performed
on copper by zone. Capping was applied to Cu
grades by domain, as follows: Sulphide 1-7 at
1.0% Cu, Beds 1-6 at 2.0% Cu, LMCZ at 8.0%
Cu, and LLCZ at 4.5% Cu.
The nature and appropriateness of the estimation technique(s)
applied and key assumptions, including treatment of extreme
grade values, domaining, interpolation parameters, and
maximum distance of extrapolation from data points. If a
computer assisted estimation method was chosen include a
description of computer software and parameters used.
The availability of check estimates, previous estimates and/or
mine production records and whether the Mineral Resource
estimate takes appropriate account of such data.
The assumptions made regarding recovery of by-products.

Page 26 of 38

ASX:SFR

==> picture [117 x 24] intentionally omitted <==

Estimation of deleterious elements or other non-grade
variables of economic significance (e.g., sulphur for acid mine
drainage characterisation).
In the case of block model interpolation, the block size in
relation to the average sample spacing and the search
employed.
Any assumptions behind modelling of selective mining units.
Any assumptions about correlation between variables.
Description of how the geological interpretation was used to
control the resource estimates.
Discussion of basis for using or not using grade cutting or
capping.
The process of validation, the checking process used, the
comparison of model data to drill hole data, and use of
reconciliation data if available.

Cu estimation was performed using Ordinary
Kriging (OK) in a multiple pass search
neighbourhood. SG estimation was conducted
via IDW2 interpolation with separate 1.5-m
composites broken on domains in the JL UCZ
and JL LCZ.

Due to the undulating nature of mineralisation
at the Johnny Lee Deposit, a variable
orientation surface was utilized to optimise the
local search neighbourhood.

Block dimensions are parent blocks at 25 m x
25 m x 3 m with octree sub-blocking to 1.5625
m x 1.5625 m x 1.5 m. It is the opinion of the
Competent Person that block size is
appropriate for the data spacing observed at
the Johnny Lee deposit.

No by-products or co-products are considered
economically viable at this time. Copper is the
focus of the Johnny Lee Deposit.

The estimated resource block model was
validated against composited data and a
nearest neighbour block estimate for copper
using visual validation, summary statistical
comparisons, and swath plots. The results of
the validation show no material bias, and it is
the opinion of the Competent Person that the
model provides adequate representation of
drilling data appropriate in block volumes.

Cu estimation was performed using OK in a
multiple pass search neighbourhood and filled
in with IDW3 estimates for poorly informed
blocks. SG was estimated using IDW3 and a
unique search neighbourhood by domain.

Block dimensions are parent blocks at 20 m x
20 m x 5 m with sub-blocking to 2.5 m x 2.5 m
x 2.5 m. It is the opinion of the Competent
Person that block size is appropriate for the
variable data spacing observed at the Lowry
deposit.

No by-products or co-products are considered
economically viable at this time. Copper is the
focus of the Lowry Deposit.

The estimated resource block model was
validated against composited data and a
nearest neighbour block estimate for copper
using visual validation, summary statistical
comparisons, and swath plots. The results of
the validation show no material bias, and it is
the opinion of the Competent Person that the
model provides adequate representation of
drilling data appropriate in block volumes.
Moisture
All Mineral Resource tonnes are estimated and
reported on a dry basis.

All Mineral Resource tonnes are estimated and
reported on a dry basis.
Whether the tonnages are estimated on a dry basis or with
natural moisture, and the method of determination of the
moisture content.
Cut-offparameters
To demonstrate reasonable prospects for
eventual economic extraction, a Net Smelter
Return (NSR) cut-off value (CoV) was applied.

The CoV was determined based on a modelled
variable copper recovery for the JL UCZ and a
95.2% recovery for the JL LCZ with the
following assumed economic parameters.

To demonstrate reasonable prospects for
eventual economic extraction, a NSR CoV was
applied.

The CoV was determined based on assigned
Lowry metallurgical recovery (91 % for LUCZ
and LMCZ and 94% for LLCZ), and the
following assumed economic parameters.
The basis of the adopted cut-off grade(s) or quality parameters
applied.

Page 27 of 38

ASX:SFR

==> picture [117 x 24] intentionally omitted <==


Mill Processing Costs are based on dry
concentrate and include costs for treatment
($79.00 per dry material tonne (dmt)
concentrate), refining ($0.079 per pound of
payable Cu), freight ($167.00 per dmt
concentrate), and a 2% NSR royalty.

Long-term Cu price of $4.70 per pound
($10,360 per tonne) was used based on current
market consensus forecast for upside Cu
pricing.

Using these metrics, a CoV of $45/t NSR,
which is approximately equal to 0.56%
recoverable Cu, was used to report the Johnny
Lee deposit.

Mill Processing Costs are based on dry
concentrate and include costs for treatment
($79.00 per dry material tonne (dmt)
concentrate), refining ($0.079 per pound of
payable Cu), freight ($167.00 per dmt
concentrate), and a 2% NSR royalty.

Long-term Cu price of $4.70 per pound
($10,360 per tonne) was used based on current
market consensus forecast for upside Cu
pricing.

Using these metrics, a CoV of $110/t NSR,
which is approximately equal to 1.28%
recoverable Cu, was used to report the Lowry
deposit.
Mining factors or assumptions
The assumed mining method is underground
drift and fill mining.

No considerations to dilution or a minimum
mining width were applied for Mineral
Resources purposes.

The assumed mining method is underground
cut & paste fill mining.

No considerations to dilution or a minimum
mining width were applied for Mineral
Resources purposes.
Assumptions made regarding possible mining methods,
minimum mining dimensions and internal (or, if applicable,
external) mining dilution.
It is always necessary as part of the process of determining
reasonable prospects for eventual economic extraction to
consider potential mining methods, but the assumptions made
regarding mining methods and parameters when estimating
Mineral Resources may not always be rigorous. Where this is
the case, this should be reported with an explanation of the
basis of the mining assumptions made.
Metallurgical factors or assumptions
Historical Metallurgical studies of the Johnny
Lee Upper Copper Zone have indicated that
metallurgical Cu Recovery is highly variable.

For the purpose of this study, 131 drillhole
composites were used for systematic
mineragraphy.

Comprehensive metallurgical testing was
undertaken on 21 drillhole composites and the
results were used to derive a regression-based
Cu recovery algorithm using mineragraphy
metrics.

For the JL UCZ, the estimation of recovery in
concentrate was extended from the 2019

Mineralogical testing at the Lowry Deposit was
used in combination of recovery regression
curves derived from the nearby Johnny Lee
Deposit. As the mineralogical testing was
considered comparable to data collected at
Johnny Lee Deposit, these regressions were
used.

Lowry metallurgical recovery tests indicated
averages of 91 % for LUCZ and LMCZ and
94% for LLCZ. These values were assigned
across the Lowry deposit by domain for the
purposes of determining NSR CoV.
The basis for assumptions or predictions regarding
metallurgical amenability. It is always necessary as part of the
process of determining reasonable prospects for eventual
economic extraction to consider potential metallurgical
methods, but the assumptions regarding metallurgical
treatment processes and parameters made when reporting
Mineral Resources may not always be rigorous. Where this is
the case, this should be reported with an explanation of the
basis of the metallurgical assumptions made.

Page 28 of 38

ASX:SFR

==> picture [117 x 24] intentionally omitted <==

geometallurgical recovery model, an IDW2 estimate developed by SRA, into the 2025 block model using a NN interpolation of the 2019 block centroids.

• Metallurgical test work for the JL LCZ has shown relatively consistent Cu recoveries that average 95.2%, which has been applied for the Mineral Resource estimate.

Environmental factors or assumptions

Assumptions made regarding possible waste and process residue disposal options. It is always necessary as part of the process of determining reasonable prospects for eventual economic extraction to consider the potential environmental impacts of the mining and processing operation. While at this stage the determination of potential environmental impacts, particularly for a greenfields project, may not always be well advanced, the status of early consideration of these potential environmental impacts should be reported. Where these aspects have not been considered this should be reported with an explanation of the environmental assumptions made.

• No direct assumptions were applied for environmental considerations in Mineral Resource calculations at Johnny Lee.

  • No direct assumptions were applied for environmental considerations in Mineral Resource calculations at the Lowry deposit.

• Tailings materials generated over the LOM • Assumptions on waste disposal and impacts from the on-site process plant will be mixed are that the Lowry Deposit would utilise with binder/cement and either be pumped to planned infrastructure as part of the Johnny the double-lined Cemented Tailings Storage Lee Deposit development and operation. Facility (CTF) for permanent storage on surface Tailings would be incorporated into a paste or utilised as underground paste backfill during plant and utilised in the cut & paste fill mining mining operations and mine closure. method with excess stored in the Johnny Lee long-term storage facility.

• Waste rock sourced from the underground mine workings will ultimately be transferred to the CTF for permanent storage where it along with the cemented tailings paste will ultimately be covered with excess bedrock, HDPE liner, and soils in order to minimise any surface water seepage directly into the waste materials and that will allow the surface to be used for beneficial use at the end of the mine life. • Collection of all water pumped out of the mine during construction, operations, and mine closure will be stored in various double-lined ponds. Each of these facilities include the additional protection of constant leak detection systems. • Water will be treated through a two stage Reverse Osmosis (RO) water treatment system capable of treating water to nondegradation standards for groundwater before being ultimately reintroduced (discharged) to the groundwater through the alluvial underground infiltration gallery. Brine reject from the WTP operations will either be stored in the brine cell

Page 29 of 38

ASX:SFR

==> picture [117 x 24] intentionally omitted <==

of the CWP, added to the tailings thickener, or
ultimately hauled off site to an approved
disposal facility.

In mine closure the planned installation of plugs
in declines and shafts will segment the mine at
certain locations that will make the planned
underground pumping and rinsing more
efficient and result in the environmental benefit
of reducing flow of contact water through open
tunnels and shafts. The Mine Operating Permit
satisfies the substantive requirements of the
Montana Metal Mine Reclamation Act.
Bulk density
Bulk density was measured using the
immersion method from diamond drill core.

All SG data was tested by Company staff at the
core logging facility.

Bulk density was estimated in the Lowry
Deposit resource block model by domain using
Inverse Distance Weighting Power of Two
(IDW2) interpolation.

A mean SG value based on composite data
within each domain was applied to unestimated
blocks.

Bulk density was measured using the
immersion method from diamond drill core.

All SG data was tested by Sandfire Resources
America Inc. staff at the core logging facility.

Bulk density was estimated in the Lowry
Deposit resource block model by domain using
Inverse Distance Weighting Power of Three
(IDW3) interpolation.

A mean SG value based on composite data
within each domain was applied to unestimated
blocks
Whether assumed or determined. If assumed, the basis for
the assumptions. If determined, the method used, whether wet
or dry, the frequency of the measurements, the nature, size
and representativeness of the samples.
The bulk density for bulk material must have been measured
by methods that adequately account for void spaces (vugs,
porosity, etc.), moisture and differences between rock and
alteration zones within the deposit.
Discuss assumptions for bulk density estimates used in the
evaluation process of the different materials.
.
Classification
Considerations for the Mineral Resource
classification at the Johnny Lee Deposit
includes deposit geological knowledge,
continuity of copper grade within mineralised
volumes, the thickness of mineralised zones,
confidence in the raw drilling and analytical
data, spatial continuity of copper based on
variography studies, estimation quality
variables including Kriging Efficiency and Slope
of Regression, mean distance to samples, and
the estimation pass number.

Based on the above inputs, the Competent
Person has assigned a combination of
Measured, Indicated, and Inferred Mineral
Resources at the Johnny Lee Deposit.

Considerations for the Mineral Resource
classification at the Lowry Deposit includes
deposit geological knowledge, continuity of
copper grade within mineralised volumes, the
thickness of mineralised zones, confidence in
the raw drilling and analytical data, spatial
continuity of copper based on variography
studies, estimation quality variables including
Kriging Efficiency and Slope of Regression,
mean distance to samples, and the estimation
pass number.

Based on the above inputs, the Competent
Person has assigned a combination of
Measured, Indicated, and Inferred Mineral
Resources at the Lowry Deposit.
The basis for the classification of the Mineral Resources into
varying confidence categories.
Whether appropriate account has been taken of all relevant
factors, i.e., relative confidence in tonnage/grade estimations,
reliability of input data, confidence in continuity of geology and
metal values, quality, quantity and distribution of the data.
Whether the result appropriately reflects the Competent
Person(s)’ view of the deposit.

Page 30 of 38

ASX:SFR

==> picture [117 x 24] intentionally omitted <==

• The Competent Person is satisfied that the • The Competent Person is satisfied that the reported Mineral Resource classification reported Mineral Resource classification reflects the relevant factors of the deposit. reflects the relevant factors of the deposit. Audits or reviews • All stages of the Mineral Resource estimation • All stages of the Mineral Resource estimation The results of any audits or reviews of Mineral Resource and classification have undergone reviews by and classification have undergone reviews by estimates. the Competent Person as an independent the Competent Person as an independent consultant, and reviews by geological personal consultant, and reviews by geological personal within Sandfire Resources America, Inc. within Sandfire Resources America, Inc. Discussion of relative accuracy/confidence • The relevant accuracy and confidence in • The relevant accuracy and confidence in Where appropriate a statement of the relative accuracy and Mineral Resources reflects the current level of Mineral Resources reflects the current level of confidence level in the Mineral Resource estimate using an study for the Johnny Lee Deposit at Feasibility study for the Lowry Deposit. approach or procedure deemed appropriate by the Competent level. • The Competent Person has relied on Person. For example, the application of statistical or assumptions applied to the nearby Johnny Lee geostatistical procedures to quantify the relative accuracy of Deposit due to the similarity of mineralisation the resource within stated confidence limits, or, if such an and minerology observed in both deposits at approach is not deemed appropriate, a qualitative discussion the Black Butte Copper Project. of the factors that could affect the relative accuracy and confidence of the estimate.

The statement should specify whether it relates to global or local estimates, and, if local, state the relevant tonnages, which should be relevant to technical and economic evaluation. Documentation should include assumptions made and the procedures used.

These statements of relative accuracy and confidence of the estimate should be compared with production data, where available.

Page 31 of 38

ASX:SFR

==> picture [117 x 24] intentionally omitted <==

Section 4 Estimation and Reporting of Ore
Reserves
Johnny Lee
Mineral Resource estimate for conversion to Ore Reserve
The Ore Reserve is based on the Johnny Lee Mineral Resources with an effective date of 5 November
2025.

Mineral Resources are reported inclusive of Ore Reserves
Description of the Mineral Resource estimate used as a basis
for the conversion to an Ore Reserve.
Clear statement as to whether the Mineral Resources are
reported additional to, or inclusive of, the Ore Reserves.
Site visits
The CP undertook a site visit to the project site in June 2025.

The CP inspected drill core, current site status, surroundings, and site access routes and found no
causes for concern regarding the viability of the Ore Reserve plan.
Comment on any site visits undertaken by the Competent
Person and the outcome of those visits.
If no site visits have been undertaken indicate why this is the
case.
Study status
The Ore Reserve estimate is underpinned by a comprehensive pre-feasibility study conducted on the
Project.

Modifying factors accurate to the study level were applied based on detailed expert design analysis.
The study indicates that the Ore Reserve mine plan is technically achievable and economically viable.
The type and level of study undertaken to enable Mineral
Resources to be converted to Ore Reserves.
The Code requires that a study to at least Pre-Feasibility Study
level has been undertaken to convert Mineral Resources to
Ore Reserves. Such studies will have been carried out and will
have determined a mine plan that is technically achievable and
economically viable, and that material Modifying Factors have
been considered.
Cut-offparameters
A Net Smelter Return (NSR) was calculated for all blocks which considered the varying metallurgical
recovery of each block, allowances for payability, royalties, concentrate transport and treatment/refining
costs. The currency denomination used for the analysis and referenced in this table was US$.

The NSR was calculated using a $4.70/lb Cu Price.

A cut off value of $110/t was used to determine the economic inventory envelope.

In addition, an incremental cut off value of $45/t was used for development that has to be mined to gain
access to fully costed economic material.
The basis of the cut-off grade(s) or quality parameters applied.
Mining Factors or assumptions
Cut-off values and geotechnical inputs were used to apply mathematical stope optimisation algorithms
on the Mineral Resource to identify economic mining areas. Detailed underground mine designs were
then completed, incorporating the optimisation results, and these were used as the basis of the Ore
Reserve estimate. Modifyingfactors were applied to the design based on PFS-level analysis and a
The method and assumptions used as reported in the Pre-
Feasibility or Feasibility Study to convert the Mineral Resource
to an Ore Reserve(i.e. either by application of appropriate

Page 32 of 38

ASX:SFR

==> picture [117 x 24] intentionally omitted <==

factors by optimisation or by preliminary or detailed design).
The choice, nature and appropriateness of the selected mining
method(s) and other mining parameters including associated
design issues such as pre-strip, access, etc.
The assumptions made regarding geotechnical parameters
(e.g. pit slopes, stope sizes, etc.), grade control and pre-
production drilling.
The major assumptions made, and Mineral Resource model
used for pit and stope optimisation (if appropriate).
The mining dilution factors used.
The mining recovery factors used.
Any minimum mining widths used.
The manner in which Inferred Mineral Resources are utilised in
mining studies and the sensitivity of the outcome to their
inclusion.
The infrastructure requirements of the selected mining
methods
mine plan was subsequently scheduled. This mine plan was evaluated with a detailed financial model to
ensure that the Ore Reserve is economically viable at the forecast commodity price.

The mining methods employed were primary-secondary overhand jumbo cut-and-fill, and primary-
secondary jumbo drift-and-fill. Cemented pastefill will be used for post-mining void filling. This will be
generated using tailings from the processing plant.

The mining methods were selected based on a detailed analysis having regard for orebody geometry
and geotechnical advice. Diesel powered trucks and loaders will be used for materials handling. Diesel-
electric jumbo drill rigs will be used for development and ground support installation, and diesel-electric
longhole rigs used for production drilling. Ore will be hauled directly to the processing plant run-of-mine
(ROM) pad by the underground trucking fleet. Waste rock will be initially deposited on a surface waste
dump to be constructed close to the portal then transferred to the cemented tailings facility (CTF) for
final disposal.

The mining methods chosen are well-known and widely used in the local mining industry and
production rates and costing can be estimated with an appropriate degree of accuracy.

Independent geotechnical consultants Entech Pty Ltd contributed appropriate geotechnical analyses to
a PFS level of detail based on geotechnical drilling and data analysis. These inputs were incorporated
into the mining method selection, mine design, ground support and dilution assumptions for the Ore
Reserve estimate.

A maximum unsupported underground void span of 10 m x 30 m was designed based on the
geotechnical analysis.

Costing and design allowance have been made for grade control activities.

The Mineral Resource models used for stope optimisation were those noted previously.

Only the Measured and Indicated portions of the Mineral Resource were used to estimate the Ore
Reserve. NSR cut-off values used for optimisation were those noted previously. Mining geometry and
modifying factor assumptions used are detailed below.

All unsupported stripping voids had a waste dilution of 5% applied mathematically.

No additional dilution outside of design was applied to development.

A mining recovery of 90% was applied to all unsupported stripping activities. In addition, barrier pillars
were designed to be left in-situ in the UCZ area for global stability based on geotechnical advice. All
development had 100% mining recovery assumed.

A minimum ore drive height of 4.5 m was applied in UCZ, and 5.0 m in LCZ, based on the proposed
mining methods and equipment fleet. Any waste material contained within the ore drive profile was
captured as planned dilution.

All Inferred material was set to waste grade and all mining shapes subsequently falling below NSR cut
off were excluded. The Ore Reserve is technically and economically viable without the inclusion of
Inferred Mineral Resource material.

The Ore Reserve mine plan will require installation of all mining infrastructure including electrical power
connection and distribution, water and compressed air supply, ventilation infrastructure, dewatering
systems and storage, communications and emergency response and egress facilities.

Page 33 of 38

ASX:SFR

==> picture [117 x 24] intentionally omitted <==


All required surface infrastructure will also need to be provided including access road upgrade, site
offices, ablutions, workshops, waste dumps and ore pads, laydown yards, water management systems
and explosives magazines.

Costs associated with mobilisation, establishment and all required site and mine infrastructure to
support underground mining have been accounted for in the study.
Metallurgical factors or assumptions
Copper will be recovered by a standard comminution and flotation process. The 1.2 Mtpa processing
plant will be a conventional flotation-based concentrator consisting of crushing, grinding, sulphide
flotation, thickening and filtering. The plant will be constructed on-site and engineered to the specific
characteristics of the orebody.

The proposed metallurgical process is well established and widely used in the mining jurisdiction.

Extensive metallurgical testwork has been performed on the Johnny Lee deposit to a sufficient level of
detail to support the Ore Reserve. Testwork has shown consistent high copper recoveries from the LCZ
while the copper recoveries from the UCZ are generally lower than the LCZ, and more variable.
Blending of ore feed from the two orebodies will require management to optimise recovery results, and
this is reflected in the Ore Reserve estimate mine plan which accesses both zones prior to
commencement of processing.

Copper recoveries are forecast to be variable in the UCZ and were therefore added as a field in the
block model to generate a recovered copper grade for subsequent value analysis. The LCZ has a
consistent 95.2% Cu recovery applied. Global forecast project Cu recovery is 86.1%.

Arsenic is the only potential deleterious element that is expected to be present in the saleable copper
concentrate to be transported off site. This has been accounted for in financial modelling via penalty
allowances in $/dmt concentrate, and higher treatment/refining cost allowances.

No bulk sample or pilot scale test work has been conducted. The proposed processing methods are
sufficiently well-established to enable support for the Ore Reserve assumptions based on the extensive
testwork conducted to date.

The copper concentrate is expected to be saleable in existing markets. No prescriptive specification is
applicable.
The metallurgical process proposed and the appropriateness
of that process to the style of mineralisation.
Whether the metallurgical process is well-tested technology or
novel in nature.
The nature, amount and representativeness of metallurgical
test work undertaken, the nature of the metallurgical domaining
applied and the corresponding metallurgical recovery factors
applied.
Any assumptions or allowances made for deleterious
elements.
The existence of any bulk sample or pilot scale test work and
the degree to which such samples are considered
representative of the orebody as a whole.
For minerals that are defined by a specification, has the Ore
Reserve estimation been based on the appropriate mineralogy
to meet the specifications?
Environmental
Environmental impacts have been comprehensively assessed through the MT DEQ Environmental
Impact Statement and the approved MOP. Including the approved MOP, 28 permits and plans are
required; 23 have been granted and the remaining items are largely administrative, with work initiated
on all but one. Key operating approvals, including the MOP, Air Quality Permit, MPDES and
construction stormwater permit, together with the DEQ Record of Decision, demonstrate regulatory
compliance and no environmental or permitting constraints have been identified that would materially
affect the Ore Reserve.
The status of studies of potential environmental impacts of the
mining and processing operation. Details of waste rock
characterisation and the consideration of potential sites, status
of design options considered and, where applicable, the status
of approvals for process residue storage and waste dumps
should be reported.
Infrastructure
Limited infrastructure currently exists at the site.

The site is located 27 km north of the township of White Sulphur Springs, close to existing public road,
power and rail infrastructure.

Concentrate is planned to be shipped using a combination of trucking and rail over existing networks to
port facilities located on the west coast of the USA. Regional and international airports are located at
various locations within the state of Montana for personnel movement where required. An
The existence of appropriate infrastructure: availability of land
for plant development, power, water, transportation
(particularly for bulk commodities), labour, accommodation; or
the ease with which the infrastructure can be provided or
accessed.

Page 34 of 38

ASX:SFR

==> picture [117 x 24] intentionally omitted <==

accommodation village is planned to be constructed in the project area to ease the local housing
burden during construction and operations. Labour is expected to be sourced locally, from within the
State and wider USA and internationally dependent on availability of the required skillsets for the phase
of development and operation.

There is sufficient land within the lease area for the establishment and operation of the planned facilities
including the processing plant, water management facilities and tailings dam.

Power is planned to be supplied from the public grid. A 58 km 100 kV overhead transmission line will be
constructed for this connection.

Service and process water is planned to be primarily sourced from recycled water and dewatering of
the underground workings.

There are no known impediments to construction of all required infrastructure.
Costs
Capital cost estimates for establishment and construction of the processing plant and site surface
non-processing infrastructure were estimated under the oversight of GR Engineering Services Pty Ltd
(GRES) to a PFS level of detail.

The infrastructure capital estimate is based upon preliminary engineering, quantity take-offs, budget
price quotations for major equipment, and bulk commodity costs achieved recently on similar projects
undertaken in the minerals processing industry. Unit rates for installation were benchmarked to those
achieved recently on similar projects undertaken in the minerals processing industry.

Underground mine capital costs were primarily based on a request for quotation (RFQ) process
involving three experienced and reputable underground mining contractors. Costs for major mine
infrastructure items not included in the contractor quotes were sourced from vendors.

Operating cost estimates were based on mining contractor RFQ submissions, detailed quotes from
suppliers, current labour market conditions, first principles estimates, and benchmarking.

A penalty has been allowed for elevated As grade in concentrate in the Ore Reserve economic
analysis, based on forecast mined grades and metallurgical testing data.

All costs and revenues were calculated in US dollars. No exchange rates were required for the financial
analysis of the Ore Reserve estimate.

Road, rail and sea transport charges for concentrate are based on concentrate transport studies
prepared by a third party.

As penalties and treatment and refining charges were estimated based on standard market agreements
and consultations with potential offtake partners.

A 2% landholder royalty plus $10M option payment was allowed for based on advice provided by SRA.
The derivation of, or assumptions made, regarding projected
capital costs in the study.
The methodology used to estimate operating costs.
Allowances made for the content of deleterious elements.
The source of exchange rates used in the study.
Derivation of transportation charges.
The basis for forecasting or source of treatment and refining
charges, penalties for failure to meet specification, etc.
The allowances made for royalties payable, both Government
and private

Page 35 of 38

ASX:SFR

==> picture [117 x 24] intentionally omitted <==

Revenue Factors
Commodity price assumptions were based on forecasts provided by Consensus Economics.

The copper price used in the Ore Reserve estimation economic viability analysis was $4.70/lb.

Payability and deduction terms were based on standard copper concentrate marketing terms and are
considered appropriate for the project.
The derivation of, or assumptions made regarding revenue
factors including head grade, metal or commodity price(s)
exchange rates, transportation and treatment charges,
penalties, net smelter returns, etc.
The derivation of assumptions made of metal or commodity
price(s), for the principal metals, minerals and co-products.
Market assessment
The project will be a producer of copper concentrate sold on the open global market.

The price of copper is generally set based on the LME which is a mature, well established and publicly
traded exchange. Sandfire Resources America relies upon independent expert publications (CRU,
Wood Mac, Metal Bulletin) and other sources (bank reports, trader reports, conferences, other trade
publications) in forming a view about future demand and supply and the likely effects of this on both
metal prices and concentrate prices.
The demand, supply and stock situation for the particular
commodity, consumption trends and factors likely to affect
supply and demand into the future.
A customer and competitor analysis along with the
identification of likely market windows for the product.
Price and volume forecasts and the basis for these forecasts.
For industrial minerals the customer specification, testing and
acceptance requirements prior to a supply contract.
Economic
The Ore Reserve estimate is based on a financial evaluation prepared at a PFS level of accuracy.
Mining operations, processing, transportation, sustaining capital, and contingencies, have been
scheduled and evaluated to generate a life of mine financial model.

A discount rate of 8% has been applied to determine net present value (NPV).

The NPV of the project is positive at the assumed commodity price.

The NPV is most sensitive to changes in Cu selling price followed by mine operating costs and total
capital costs. The project is economically viable with a commodity price reduction of 7%.
The inputs to the economic analysis to produce the net present
value (NPV) in the study, the source and confidence of these
economic inputs including estimated inflation, discount rate,
etc.
NPV ranges and sensitivity to variations in the significant
assumptions and inputs.
Social
SRA are in liaison with both government and key stakeholders regarding development of the project.
The Competent Person is not aware of any reason why additional required permitting will not be
granted within a reasonable time frame to allow mining to commence
The status of agreements with key stakeholders and matters
leading to social licence to operate.
Other
A formal process to assess and mitigate naturally occurring risks has been undertaken as part of the
PFS. Currently, all naturally occurring risks are assumed to have adequate prospects for control and
mitigation.
To the extent relevant, the impact of the following on the
project and/or on the estimation and classification of the Ore
Reserves:

Page 36 of 38

ASX:SFR

==> picture [117 x 24] intentionally omitted <==

Any identified material naturally occurring risks.
The status of material legal agreements and marketing
arrangements.
The status of governmental agreements and approvals critical
to the viability of the project, such as mineral tenement status,
and government and statutory approvals. There must be
reasonable grounds to expect that all necessary Government
approvals will be received within the timeframes anticipated in
the Pre-Feasibility or Feasibility study. Highlight and discuss
the materiality of any unresolved matter that is dependent on a
third party on which extraction of the reserve is contingent.

The tenements are all current and held in good standing. Discussions with key stakeholders are
ongoing.

Sandfire Resources America has advised that Black Butte Copper is currently compliant with all legal
and regulatory requirements.

No marketing arrangements are in place, however based on available information, the Competent
Person sees no major concerns around successful resolution of these agreements within a reasonable
timeframe.
Classification
The Probable Ore Reserve is based on that portion of the Measured and Indicated Mineral Resource
within the mine designs that may be economically extracted and includes an allowance for dilution and
ore loss. The Competent Person is of the opinion that insufficient support exists to classify any material
as a Proved Ore Reserve

The results appropriately reflect the Competent Person’s view of the deposit

The proportion of Cu metal in the Probable Ore Reserves derived from Measured Resources is 21%.
The basis for the classification of the Ore Reserves into
varying confidence categories.
Whether the result appropriately reflects the Competent
Person’s view of the deposit.
The proportion of Probable Ore Reserves that have been
derived from Measured Mineral Resources (if any).
Audits or reviews
The Ore Reserves estimation has been subjected to an internal review by senior technical personnel of
Entech Pty Ltd.

The Ore Reserve estimate has been reviewed by Sandfire Corporate Technical Services.

WSP conducted an independent, high-level peer review of the pre-feasibility study to assess potential
red-flag risks to project delivery, with no significant issues identified.
The results of any audits or reviews of Ore Reserve estimates.
Discussion of relative accuracy/ confidence
The design, schedule, and financial model on which the Ore Reserve is based has been completed to a
PFS standard, with a corresponding level of confidence.

All modifying factors have been applied on a global scale.

Considerations which could affect the relative accuracy and confidence in the Ore Reserve include:

Commodity price forecasts carry an inherent level of risk.

There is a degree of uncertainty associated with geological estimates. The Ore Reserve classifications
reflect the levels of geological confidence in the estimates.
Where appropriate a statement of the relative accuracy and
confidence level in the Ore Reserve estimate using an
approach or procedure deemed appropriate by the Competent
Person. For example, the application of statistical or
geostatistical procedures to quantify the relative accuracy of
the reserve within stated confidence limits, or, if such an
approach is not deemed appropriate, a qualitative discussion
of the factors which could affect the relative accuracy and
confidence of the estimate.

Page 37 of 38

ASX:SFR

==> picture [117 x 24] intentionally omitted <==

The statement should specify whether it relates to global or local estimates, and, if local, state the relevant tonnages, which should be relevant to technical and economic evaluation. Documentation should include assumptions made and the procedures used.

Accuracy and confidence discussions should extend to specific discussions of any applied Modifying Factors that may have a material impact on Ore Reserve viability, or for which there are remaining areas of uncertainty at the current study stage.

  • There is a degree of uncertainty regarding the impacts of natural phenomena including geotechnical assumptions, hydrological assumptions, and the modifying mining factors, commensurate with the level of study.

  • Permits for the Black Butte Copper Project are substantially in place having received the Final Mine Operating Permit from the MDEQ.

  • No marketing agreements are yet in place.

  • • Confidence in the Project will be increased by moving to the next phase of study. • Further quantitative analysis of risk is not warranted or considered appropriate at the current level of technical and financial study.

It is recognised that this may not be possible or appropriate in all circumstances. These statements of relative accuracy and confidence of the estimate should be compared with production data, where available.

Page 38 of 38