ASX/Media Release 28 November 2011
DEGRUSSA PROJECT PICTORIAL UPDATE
Sandfire Resources NL is pleased to provide a pictorial update on the ongoing progress of construction and infrastructure development at DeGrussa.
-
Underground mine development is progressing on schedule with the “Evans Decline” currently advanced +775 metres from the portal, with approximately 675 metres of decline development remaining before the first ore is accessed.
-
Open pit mining is progressing on schedule with a total 4 million bank cubic metres (bcm) of material mined to date from the Stage 1 open pit, which is over 50 per cent complete. The open pit is currently at a depth of 30 metres below surface with oxide copper mineralisation now exposed (approximately 25m above Direct Shipping Ore).
-
Construction of major foundations for the coarse ore bin, SAG Mill raft, Ball Mill raft and crusher pocket are well advanced. Thickener plinths are also complete allowing five construction work fronts to be progressed simultaneously.
-
Power House steel structure complete with wall cladding underway.
-
Construction complete on the main access road from the Great Northern Highway to the DeGrussa site.
-
Aerodrome construction commenced.
==> picture [496 x 345] intentionally omitted <==
----- Start of picture text -----
Full open pit mining fleet now on site
----- End of picture text -----
ASX / Media Release
28 November 2011
Evans decline advanced 775 m
==> picture [384 x 403] intentionally omitted <==
2
ASX / Media Release
28 November 2011
==> picture [511 x 342] intentionally omitted <==
4 million bank cubic metres (bcm) of material mined to date
==> picture [511 x 342] intentionally omitted <==
3
ASX / Media Release
28 November 2011
==> picture [381 x 30] intentionally omitted <==
----- Start of picture text -----
Open pit 30 m below surface
----- End of picture text -----
==> picture [511 x 342] intentionally omitted <==
4
ASX / Media Release
28 November 2011
3G Network connected and mobile phone communications established
Sixty percent of powerline poles installed and stringing conductor has commenced
5
ASX / Media Release
28 November 2011
==> picture [511 x 296] intentionally omitted <==
Site access road complete
==> picture [487 x 365] intentionally omitted <==
6
ASX / Media Release
28 November 2011
==> picture [511 x 395] intentionally omitted <==
----- Start of picture text -----
Power House steel structure in progress
----- End of picture text -----
==> picture [511 x 317] intentionally omitted <==
7
ASX / Media Release
28 November 2011
==> picture [511 x 341] intentionally omitted <==
==> picture [235 x 315] intentionally omitted <==
Thickener tank plinths in progress and the 15m tails thickener and thickener insert ready for transport to site
==> picture [273 x 204] intentionally omitted <==
8
ASX / Media Release
28 November 2011
==> picture [454 x 317] intentionally omitted <==
----- Start of picture text -----
Ore Bin Reclaim Tunnel
----- End of picture text -----
SAG Mill Plinth
Float Cell and Float Cell Launder ready for transport to site
9
ASX / Media Release
28 November 2011
==> picture [427 x 306] intentionally omitted <==
----- Start of picture text -----
Aerodrome construction commenced
----- End of picture text -----
==> picture [511 x 342] intentionally omitted <==
10
ASX / Media Release
28 November 2011
ENDS
For further information contact: Sandfire Resources NL Karl Simich – Managing Director/CEO Office: +61 8 6430 3800
Read Corporate Mobile: +61 419 929 046 (Nicholas Read) Mobile: +61 421 619 084 (Paul Armstrong)
==> picture [327 x 220] intentionally omitted <==
– - Figure 1 DeGrussa Copper Gold Project location
n
Forward-Looking Statements
Certain statements made during or in connection with this statement contain or comprise certain forward-looking statements regarding Sandfire’s Mineral Resources and Reserves, exploration operations, project development operations, production rates, life of mine, projected cash flow, capital expenditure, operating costs and other economic performance and financial condition as well as general market outlook. Although Sandfire believes that the expectations reflected in such forward-looking statements are reasonable, such expectations are only predictions and are subject to inherent risks and uncertainties which could cause actual values, results, performance or achievements to differ materially from those expressed, implied or projected in any forward looking statements and no assurance can be given that such expectations will prove to have been correct. Accordingly, results could differ materially from those set out in the forward-looking statements as a result of, among other factors, changes in economic and market conditions, delays or changes in project development, success of business and operating initiatives, changes in the regulatory environment and other government actions, fluctuations in metals prices and exchange rates and business and operational risk management. Except for statutory liability which cannot be excluded, each of Sandfire, its officers, employees and advisors expressly disclaim any responsibility for the accuracy or completeness of the material contained in this statement and excludes all liability whatsoever (including in negligence) for any loss or damage which may be suffered by any person as a consequence of any information in this statement or any error or omission. Sandfire undertakes no obligation to update publicly or release any revisions to these forward-looking statements to reflect events or circumstances after today's date or to reflect the occurrence of unanticipated events other than required by the Corporations Act and ASX Listing Rules. Accordingly you should not place undue reliance on any forward looking statement.