ASX/Media Release 20 December 2011
DEGRUSSA PROJECT PICTORIAL UPDATE
Sandfire Resources NL is pleased to provide a pictorial update on the ongoing progress of construction and infrastructure development at DeGrussa.
-
Underground mine development is progressing on schedule with the “Evans Decline” currently advanced +870 metres from the portal, with approximately 580m of decline development remaining before the first ore is accessed. A second jumbo is also now operating underground.
-
Open pit mining is progressing on schedule with a total 4.4 million bank cubic metres (bcm) of material mined to date from the Stage 1 open pit, which is over 56 per cent complete. The open pit is currently at a depth of 37 metres below surface with oxide copper mineralisation now exposed (approximately 18m above Direct Shipping Ore).
-
Process Plant construction is 25% complete with construction of major concrete foundations for the SAG mill and crushed ore bin complete and concrete foundations for the crusher pocket, ball mill and thickeners well advanced. Excavations have commenced for the filter foundations and the concentrate shed. Construction remains on schedule for feeding ore into the SAG Mill in Q3 2012.
-
Kalgoorlie Power Systems (KPS) have completed the power station building, ready for installation of generating units in January 2012. The 11 kV Switchroom, complete with high voltage gear has arrived on site. Commissioning of an initial 4 MVA power generating capacity is on schedule for February 2012.
-
Major equipment delivery remains on schedule to arrive on site during March 2012. The Concentrate Filter shipment was dispatched on 16 December.
-
Permanent fibre optic communication networks are now established across the site.
-
All site office buildings have been installed.
-
Installation of the 600 accommodation village rooms is complete and softscaping and landscaping of the common user areas has commenced.
==> picture [213 x 281] intentionally omitted <==
High Grade Oxide Copper Stockpile showing cooperite, malachite and chrysocholla (bright blue)
==> picture [278 x 215] intentionally omitted <==
ASX / Media Release
20 December 2011
==> picture [545 x 313] intentionally omitted <==
Open pit 37 m below surface (approximately 18m above Direct Shipping Ore)
2
ASX / Media Release
20 December 2011
4.4 million bank cubic metres (bcm) of material mined to date
Waste dump haul road to tailings storage facility (background)
3
ASX / Media Release
20 December 2011
Recording multi element grades with a portable XRF on the High Grade Oxide Copper Stockpile
==> picture [460 x 337] intentionally omitted <==
4
ASX / Media Release
20 December 2011
Evans decline advanced 870 metres
==> picture [511 x 374] intentionally omitted <==
==> picture [307 x 213] intentionally omitted <==
==> picture [267 x 221] intentionally omitted <==
5
ASX / Media Release
20 December 2011
Plant Equipment in Production
==> picture [312 x 304] intentionally omitted <==
----- Start of picture text -----
Flotation Cell Insert
----- End of picture text -----
==> picture [203 x 23] intentionally omitted <==
----- Start of picture text -----
Jaw Crusher Factory Testing
----- End of picture text -----
==> picture [311 x 287] intentionally omitted <==
----- Start of picture text -----
Flotation Cell Tank
----- End of picture text -----
==> picture [266 x 366] intentionally omitted <==
----- Start of picture text -----
SAG Mill Shell
----- End of picture text -----
==> picture [260 x 207] intentionally omitted <==
----- Start of picture text -----
Ball Mill Ring Gear Machining
----- End of picture text -----
6
ASX / Media Release
20 December 2011
Process Plant Construction
==> picture [287 x 226] intentionally omitted <==
----- Start of picture text -----
Ball Mill Concrete Pour
----- End of picture text -----
==> picture [200 x 265] intentionally omitted <==
----- Start of picture text -----
Coarse Ore Bin Strake
----- End of picture text -----
Coarse Ore Bin Reclaim Tunnel
Concentrate Shed Pad
==> picture [264 x 196] intentionally omitted <==
----- Start of picture text -----
Mill Concrete Work
----- End of picture text -----
==> picture [246 x 196] intentionally omitted <==
----- Start of picture text -----
Crusher Pocket
----- End of picture text -----
7
ASX / Media Release
20 December 2011
==> picture [476 x 266] intentionally omitted <==
----- Start of picture text -----
Power House Switch Room
----- End of picture text -----
Power House (left) and Fuel Farm (right)
==> picture [424 x 269] intentionally omitted <==
----- Start of picture text -----
Powerhouse Fuel Tanks
----- End of picture text -----
8
ASX / Media Release
20 December 2011
==> picture [510 x 267] intentionally omitted <==
----- Start of picture text -----
Process Infrastructure Area
----- End of picture text -----
==> picture [245 x 195] intentionally omitted <==
----- Start of picture text -----
Underground Workshop
----- End of picture text -----
==> picture [295 x 194] intentionally omitted <==
----- Start of picture text -----
Emergency Response Training Centre
----- End of picture text -----
==> picture [220 x 171] intentionally omitted <==
----- Start of picture text -----
On Site Laboratory
----- End of picture text -----
==> picture [347 x 170] intentionally omitted <==
----- Start of picture text -----
Site Warehouse
----- End of picture text -----
9
ASX / Media Release
20 December 2011
ENDS
For further information contact: Sandfire Resources NL Karl Simich – Managing Director/CEO Office: +61 8 6430 3800
Read Corporate Mobile: +61 419 929 046 (Nicholas Read) Mobile: +61 421 619 084 (Paul Armstrong)
Figure 1 – DeGrussa Copper Mine location
==> picture [175 x 219] intentionally omitted <==
==> picture [373 x 235] intentionally omitted <==
Forward-Looking Statements
Certain statements made during or in connection with this statement contain or comprise certain forward-looking statements regarding Sandfire’s Mineral Resources and Reserves, exploration operations, project development operations, production rates, life of mine, projected cash flow, capital expenditure, operating costs and other economic performance and financial condition as well as general market outlook. Although Sandfire believes that the expectations reflected in such forward-looking statements are reasonable, such expectations are only predictions and are subject to inherent risks and uncertainties which could cause actual values, results, performance or achievements to differ materially from those expressed, implied or projected in any forward looking statements and no assurance can be given that such expectations will prove to have been correct. Accordingly, results could differ materially from those set out in the forward-looking statements as a result of, among other factors, changes in economic and market conditions, delays or changes in project development, success of business and operating initiatives, changes in the regulatory environment and other government actions, fluctuations in metals prices and exchange rates and business and operational risk management. Except for statutory liability which cannot be excluded, each of Sandfire, its officers, employees and advisors expressly disclaim any responsibility for the accuracy or completeness of the material contained in this statement and excludes all liability whatsoever (including in negligence) for any loss or damage which may be suffered by any person as a consequence of any information in this statement or any error or omission. Sandfire undertakes no obligation to update publicly or release any revisions to these forward-looking statements to reflect events or circumstances after today's date or to reflect the occurrence of unanticipated events other than required by the Corporations Act and ASX Listing Rules. Accordingly you should not place undue reliance on any forward looking statement.
Exploration and Resource Targets
Any discussion in relation to the potential quantity and grade of Exploration Targets for the DeGrussa Project is only conceptual in nature. While Sandfire is confident that it will report additional JORC compliant resources for the DeGrussa Project, there has been insufficient exploration to define mineral resources in addition to the current JORC compliant resource inventory and it is uncertain if further exploration will result in the determination of additional JORC compliant Mineral Resources.
10