Sam Woo Construction Group Limited Interim / Quarterly Report 2015

Dec 4, 2014

50893_rns_2014-12-04_f84cf42b-dc7a-4fee-9235-ecd1e8f98e43.pdf

Interim / Quarterly Report

Open in viewer

Opens in your device viewer

INTERIM REPORT 2014/15

SAM WOO CONSTRUCTION GROUP LIMITED 三和建築集團有限公司

(Incorporated in the Cayman Islands with limited liability)

(Stock code : 3822)

CONTENTS
Page
Management Discussion and Analysis 2
Other Information 5
Condensed Consolidated Interim Statement of
Comprehensive Income 9
Condensed Consolidated
Interim Balance Sheet 10
Condensed Consolidated Interim Statement of 12
Changes in Equity
Condensed Consolidated Interim Statement of
Cash Flows 13
Notes to the Condensed Consolidated
Interim Financial Information 15

SAM WOO CONSTRUCTION GROUP LIMITED

Interim Report 2014/15

The board (the “Board”) of directors (the “Directors”) of Sam Woo Construction Group Limited (the “Company”) is pleased to present the unaudited interim results of the Company and its subsidiaries (collectively the “Group”) for the six months ended 30 September 2014 (the “Period”), together with the comparative figures for the corresponding period in 2013 (the “Previous Period”). These information should be read in conjunction with the prospectus of the Company dated 29 September 2014 (the “Prospectus”).

MANAGEMENT DISCUSSION AND ANALYSIS

The Group is principally engaged in the provision of foundation works and ancillary services.

BUSINESS REVIEW

During the Period, the Group derived revenue of HK$255.8 million and HK$262.1 million from foundation works and ancillary services projects based in Hong Kong and Macau, respectively. As at 30 September 2014, the Group had five contracts on hand for which the awarded contract sum and outstanding contract sum (including contracts in progress and contracts of which the work has yet to commence) amounted to HK$1.3 billion and HK$0.8 billion, respectively. Barring any unforeseen circumstances, the Directors anticipate that the works under three of these projects, namely Multi-storey logistics centre at Tsing Yi, Shatin to Central rail link project and the Hotel Casino Project will be completed in the second half of this financial year; while the works of Hong Kong boundary crossing facilities and the Composite Development Project are expected to carry on into the next financial year.

In November 2014, the Group mobilised its machinery and equipment to commence the piling works for the Composite Development Project following the grant of quota for non-Macau resident construction workers by the Macau government and the issuance of bored pile works construction instruction by the employer.

Since 30 September 2014, the Group had not been awarded with new material contracts in relation to tenders/quotation submitted for both public and private sectors up to the date of this report. Due to the recent uncertainties in the timing of funding approvals to be obtained from the relevant government councils, there may be delay in the rolling out of certain public infrastructure works. While the Directors take a cautious view in the business growth in the forthcoming year, they remain positive on the prospect of the construction industry attributable to the demand for commercial and residential buildings and infrastructure developments in Hong Kong and Macau.

SAM WOO CONSTRUCTION GROUP LIMITED Interim Report 2014/15

FINANCIAL REVIEW

The Group recorded revenue of HK$517.9 million for the Period, representing an increase of 29.4% as compared to HK$400.1 million for the Previous Period. The increase was mainly due to increased contract value of foundation works and ancillary services performed by the Group.

Administrative expenses increased by HK$20.7 million from HK$12.7 million for the Previous Period to HK$33.4 million for the Period, mainly due to professional fees related to the Company’s initial public offering (the “IPO”) of HK$11.5 million, provision for legal and professional fees related to legal and arbitration proceedings arising from operations of HK$3.6 million, as well as the increase in salaries and wages and other administrative expenses.

Finance costs for the Period were HK$7.2 million, representing an increase of 50.0% when compared to HK$4.8 million for the Previous Period. The increase was mainly attributable to the increase in bank borrowings for acquisition of machinery and equipment and for working capital.

As a result, profit before income tax of the Group was HK$126.6 million which was 9.4% higher than that of HK$115.7 million for the Previous Period.

The Group acquired machinery and equipment of HK$120.2 million during the Period which were mainly financed by bank borrowings. Total bank borrowings increased by HK$89.4 million to HK$426.1 million as at 30 September 2014 (31 March 2014: HK$336.7 million).

Liquidity, Financial Resources and Gearing

The Group generally finances its operations with internally generated resources and banking facilities. As at 30 September 2014, the Group had total cash and banks balances of HK$158.7 million (31 March 2014: HK$122.1 million) and total borrowings of HK$426.1 million (31 March 2014: HK$336.7 million). Borrowings usually include short term and long term bank loans, finance leases and overdrafts. As at 30 September 2014, borrowings classified under current liabilities were HK$274.0 million (31 March 2014: HK$298.9 million). The Group’s net gearing ratio, calculated by dividing net borrowings by total equity, was 1.00 times as at 30 September 2014 (31 March 2014: 1.10 times). For the purpose of calculating the Group’s net gearing ratio, net borrowings represent total bank borrowings minus cash and cash equivalents and restricted bank balances for securing the Group’s revolving loan facilities.

Foreign Exchange Exposure

Operations of the Group are mainly conducted in HK$ and MOP and its revenue, expenses, cash and bank balances, borrowings, other monetary assets and liabilities are principally denominated in HK$ and MOP. For the Period, the Group was not posed to significant foreign currency risk nor had employed any financial instrument for hedging.

SAM WOO CONSTRUCTION GROUP LIMITED

Interim Report 2014/15

Pledge of Assets

As at 30 September 2014, the net book value of plant and equipment held under finance leases and pledged for long term bank loans amounted to HK$161.5 million (31 March 2014: HK$114.1 million) and HK$109.0 million (31 March 2014: HK$99.1 million), respectively. Certain banking facilities of the Group were secured by the Group’s bank deposits of HK$27.0 million (31 March 2014: HK$36.1 million).

Capital Commitments

As at 30 September 2014, the Group had capital commitments of HK$0.3 million (31 March 2014: HK$104.8 million) in relation to acquisitions of machinery and equipment.

Human Resources

As at 30 September 2014, the Group had approximately 232 employees. The remuneration package includes salary, discretionary bonuses and allowances. In general, the Group determines employee salaries based on the individual’s qualifications, position and performance (where applicable).

Material Acquisitions and Disposals of Assets

During the Period, save as disclosed in the Prospectus, the Group did not have any material acquisitions or disposals of assets.

Contingent Liabilities

There has been no material change in the Group’s contingent liabilities since the publication of the Prospectus. As at 30 September 2014, save for guarantee of performance bond relating to a foundation works and ancillary services project of our Group of approximately HK$67.3 million, such performance bond is expected to be released in October 2016, the Group did not have material contingent liabilities.

RECENT DEVELOPMENT

On 16 October 2014, the shares of the Company were successfully listed on The Stock Exchange of Hong Kong Limited (the “Stock Exchange”) with stock code 3822. The Group intends to apply a substantial part of the net proceeds to finance the acquisition of machinery and equipment in accordance with the proposed application set out in the Prospectus. Since the Listing and up to the date of this report, the Group had not utilised any of the net proceeds from the IPO.

SAM WOO CONSTRUCTION GROUP LIMITED Interim Report 2014/15

OTHER INFORMATION

Disclosure of Interests

As the shares of the Company were listed on the Stock Exchange on 16 October 2014, the Company was not required to keep any register under Part XV of the Securities and Futures Ordinance (“SFO”) as at 30 September 2014.

Immediately after the listing of the Company on 16 October 2014 (“Listing”), the interests and short positions of directors in the shares, underlying shares and debentures of the Company or any of its associated corporation (within the meaning of Part XV of the Securities and Futures Ordinance) as recorded in the register required to be kept under section 352 of the SFO, or as notified to the Company and the Stock Exchange pursuant to the Model Code for Securities Transactions by Directors of Listed Issuers (the “Model Code”) as set out in Appendix 10 of the Listing Rules, are as follows:

(a) Directors’ interest in the Company:

Number of shares Percentage of
Name of director (long position) shareholding Capacity
Mr. Lau Chun Ming 300,000,000 75% Founder of a
discretionary trust
Ms. Leung Lai So 300,000,000 75% Beneficiary of a
discretionary trust

SAM WOO CONSTRUCTION GROUP LIMITED Interim Report 2014/15

(b) Directors’ interest in associated corporations of the Company:

Name of associated Percentage of
Name of director corporation shareholding Capacity
Mr. Lau Chun Ming Actiease Assets Limited 100% Founder of a
discretionary trust
Mr. Lau Chun Ming Silver Bright Holdings Limited
100%
Founder of a
discretionary trust
Ms. Leung Lai So Actiease Assets Limited 100% Beneficiary of a
discretionary trust
Ms. Leung Lai So Silver Bright Holdings Limited
100%
Beneficiary of a
discretionary trust

SAM WOO CONSTRUCTION GROUP LIMITED

Interim Report 2014/15

Immediately following the Listing of the Company, so far as the directors are aware, the interest and short positions of the persons, other than a director or chief executive of the Company, in the shares and underlying shares of the Company as recorded in the register required to be kept under section 336 of the SFO are as follows:

(c) Substantial shareholders’ interests in the Company

Number of shares Percentage of
Name of shareholder (long position) shareholding Capacity
Actiease Assets Limited 300,000,000 75% Beneficial owner
Silver Bright Holdings 300,000,000 75% Interest of a
Limited controlled
corporation
Managecorp Limited as 300,000,000 75% Trustee
trustee of a unit trust
Nautilus Trustees Asia 300,000,000 75% Trustee
Limited

Notes:

  1. 300,000,000 shares were held by Actiease Assets Limited, a company wholly owned by Silver Bright Holdings Limited which is indirectly owned by a discretionary trust of which Ms. Leung Lai So is the beneficiary.

  2. Silver Bright Holdings Limited is 100% held by Managecorp Limited as trustee of a unit trust, of which issued units are 100% held by Nautilus Trustees Asia Limited (formerly known as DBS Trustee H.K. (Jersey) Limited) as trustee of a discretionary trust set up by Mr. Lau Chun Ming.

Purchase, Sale or Redemption of Listed Securities

As the shares of the Company were not yet listed on the Stock Exchange as at 30 September 2014, neither the Company nor any of its subsidiaries had purchased, sold or redeemed any of the Company’s listed securities during the Period.

SAM WOO CONSTRUCTION GROUP LIMITED

Interim Report 2014/15

Corporate Governance

As the shares of the Company were not yet listed on the Stock Exchange as at 30 September 2014, the code provisions of the Corporate Governance Code as set out in Appendix 14 of the Listing Rules was not applicable to the Company for the Period. The Company has adopted and complied with the code provisions, where applicable, upon Listing.

Model Code of Securities Transactions by Directors

As the shares of the Company were not yet listed on the Stock Exchange as at 30 September 2014, the Model Code was not applicable to the Company during the Period. The Company has adopted the Model Code upon Listing. The Company has made specific enquiry with the Directors and all Directors have confirmed that they complied with the required standards as set out in the Model Code throughout the period from the date of Listing up to the date of this report.

Audit Committee

The audit committee, comprising three independent non-executive directors, namely Professor Wong Sue Cheun, Roderick, Mr. Chu Tak Sum and Mr. Ip Tin Chee, Arnold, has reviewed the accounting principles and practice adopted by the Group, and the unaudited consolidated financial statements of the Group for the Period.

On behalf of the Board of Sam Woo Construction Group Limited Lau Chun Ming Chairman

Hong Kong, 27 November 2014

As at the date of this report, the executive directors are Mr. Lau Chun Ming, Mr. Lau Chun Kwok, Mr. Lau Chun Ka and Ms. Leung Lai So; and the independent nonexecutive directors are Professor Wong Sue Cheun, Roderick, Mr. Chu Tak Sum and Mr. Ip Tin Chee, Arnold.

SAM WOO CONSTRUCTION GROUP LIMITED Interim Report 2014/15

CONDENSED CONSOLIDATED INTERIM STATEMENT OF COMPREHENSIVE INCOME

FOR THE SIX MONTHS ENDED 30 SEPTEMBER 2014

Note
Revenue
5
Cost of sales
6
Gross profit
Other income and gain, net
Administrative expenses
6
Operating profit
Finance income
7
Finance costs
7
Finance costs, net
7
Profit before income tax
Income tax expense
8
Profit for the period
Other comprehensive income
Profit and total comprehensive income attributable
to equity holders of the Company
Basic and diluted earnings per share (HK cents)
9
Dividends
10
Unaudited
Six months ended
30 September
2014
2013
HK$’000
HK$’000
517,880
400,056
(351,242)
(268,006)
166,638
132,050
229
1,017
(33,433)
(12,738)
133,434
120,329
345
109
(7,194)
(4,767)
(6,849)
(4,658)
126,585
115,671
(10,679)
(4,236)
115,906
111,435


115,906
111,435
38.64
37.15
50,000
50,000

SAM WOO CONSTRUCTION GROUP LIMITED Interim Report 2014/15

CONDENSED CONSOLIDATED INTERIM BALANCE SHEET

AS AT 30 SEPTEMBER 2014

Note
ASSETS
Non-current assets
Plant and equipment
11
Deferred income tax assets
Deposits and prepayments
Current assets
Trade and retention receivables
12
Deposits, prepayments and other receivables
Amounts due from customers for contract work
13
Amounts due from related companies
Income tax receivable
Restricted bank balances
14
Cash and cash equivalents (excluding bank
overdraft)
Total assets
EQUITY
Capital and reserves
Share capital
15(a)
Reserves
Total equity
LIABILITIES
Non-current liabilities
Long-term borrowings
18
Deferred income tax liabilities
Unaudited
30 September
2014
HK$’000
510,390
3,603
936
514,929
209,735
7,155
14,808

27
26,996
131,708
390,429
905,358

284,625
284,625
152,067
39,799
191,866
Audited
31 March
2014
HK$’000
398,832
3,602
1,368
403,802
78,586
3,115
19,481
386
27
36,138
85,937
223,670
627,472

218,719
218,719
37,806
31,846
69,652

10

SAM WOO CONSTRUCTION GROUP LIMITED Interim Report 2014/15

CONDENSED CONSOLIDATED INTERIM BALANCE SHEET (CONTINUED) AS AT 30 SEPTEMBER 2014

Note
Current liabilities
Trade and retention payables
16
Accruals and other payables
17
Amounts due to customers for contract work
13
Borrowings
18
Income tax payable
Total liabilities
Total equity and liabilities
Net current liabilities
Total assets less current liabilities
Unaudited
30 September
2014
HK$’000
38,090
37,264
74,364
274,028
5,121
428,867
620,733
905,358
(38,438)
476,491
Audited
31 March
2014
HK$’000
14,873
22,284

298,876
3,068
339,101
408,753
627,472
(115,431)
288,371

11

SAM WOO CONSTRUCTION GROUP LIMITED Interim Report 2014/15

CONDENSED CONSOLIDATED INTERIM STATEMENT OF CHANGES IN EQUITY

FOR THE SIX MONTHS ENDED 30 SEPTEMBER 2014

At 1 April 2013
Comprehensive income
Profit for the period
Contribution by and distribution
to owners
Dividends relating to the year
ended 31 March 2013 paid to
the then shareholders
At 30 September 2013
At 1 April 2014
Comprehensive income
Profit for the period
Contribution by and distribution
to owners
Dividends relating to the year
ended 31 March 2014 paid to
the then shareholders (note 10)
At 30 September 2014
Unaudited Unaudited
Share
capital
HK$’000
(note 15(a))







Other
reserves
HK$’000
(note 15(b))
10,500


10,500
10,500


10,500
Retained
earnings
HK$’000
131,133
111,435
(50,000)
192,568
208,219
115,906
(50,000)
274,125
Total
HK$’000
141,633
111,435
(50,000)
203,068
218,719
115,906
(50,000)
284,625

12

SAM WOO CONSTRUCTION GROUP LIMITED Interim Report 2014/15

CONDENSED CONSOLIDATED INTERIM STATEMENT OF CASH FLOWS

FOR THE SIX MONTHS ENDED 30 SEPTEMBER 2014

Note
Cash flows from operating activities
Net cash generated from operations
Interest paid
Interest received
Interest element of finance lease payments
7
Increase in restricted bank balances
14
Hong Kong profits tax (paid)/refund
Net cash generated from operating activities
Cash flows from investing activities
Purchase of plant and equipment
Prepayment for purchase of plant and equipment
Proceeds from sales of plant and equipment
Decrease in restricted bank balances
14
Net cash used in investing activities
Cash flows from financing activities
Capital element of finance lease payments
Drawdown of long-term bank loans
Repayment of long-term bank loans
Drawdown of short-term bank loans
Repayment of short-term bank loans
Increase in restricted bank balances
14
Dividends paid
Net cash (used in)/generated from
financing activities
Unaudited
Six months ended
30 September
2014
2013
HK$’000
HK$’000
122,490
120,351
(5,484)
(3,581)
345
109
(1,710)
(929)
(158)
(16,975)
(674)
288
114,809
99,263
(56,912)
(24,559)

(1,441)
2,380

9,300

(45,232)
(26,000)
(9,758)
(10,697)
54,630
5,387
(72,012)
(9,854)
89,726
190,655
(25,032)
(111,122)

(9,700)
(50,000)
(50,000)
(12,446)
4,669

13

SAM WOO CONSTRUCTION GROUP LIMITED

Interim Report 2014/15

CONDENSED CONSOLIDATED INTERIM STATEMENT OF CASH FLOWS (CONTINUED)

FOR THE SIX MONTHS ENDED 30 SEPTEMBER 2014

Note
Net increase in cash and cash equivalents
Cash and cash equivalents at beginning of
the period
Cash and cash equivalents at end of
the period
Analysis of cash and cash equivalents
Cash and cash equivalents
Bank overdraft
18
Unaudited
Six months ended
30 September
2014
2013
HK$’000
HK$’000
57,131
77,932
57,482
22,506
114,613
100,438
131,708
101,581
(17,095)
(1,143)
114,613
100,438
Unaudited
Six months ended
30 September
2014
2013
HK$’000
HK$’000
57,131
77,932
57,482
22,506
114,613
100,438
131,708
101,581
(17,095)
(1,143)
114,613
100,438
100,438
101,581
(1,143)
100,438

14

SAM WOO CONSTRUCTION GROUP LIMITED Interim Report 2014/15

NOTES TO THE CONDENSED CONSOLIDATED INTERIM FINANCIAL INFORMATION

1 General information and key events

1.1 General information

The Company was incorporated in the Cayman Islands on 17 September 2012 as an exempted company with limited liability under the Companies Law, Cap 22 (Law 3 of 1961, as consolidated and revised) of the Cayman Islands. The address of the Company’s registered office is Cricket Square, Hutchins Drive, P.O. Box 2681, Grand Cayman, KY1-1111, Cayman Islands.

The Company is an investment holding company. The Company and its subsidiaries now comprising the Group (together the “Group”) are principally engaged in foundation works and ancillary services in Hong Kong and Macau.

The Company has listed its shares on the Main Board of The Stock Exchange of Hong Kong Limited on 16 October 2014.

These condensed consolidated interim financial information is presented in Hong Kong dollars (“HK$”), unless otherwise stated and was approved for issue on 27 November 2014.

This condensed consolidated interim financial information has not been audited.

1.2 Key events

Prior to the completion of the group reorganisation set out under the section “History and Corporate Structure” in the Prospectus, which was completed on 15 September 2014 (the “Reorganisation”), companies now comprising the Group were principally held under Sam Woo Group Limited (“SW (BVI)”), of which the sole shareholder was Actiease Assets Limited (“Actiease Assets”).

On 15 September 2014, Actiease Assets transferred its entire interest in the issued share capital of SW (BVI) to the Company by crediting the Company’s existing one nil-paid share in issue as fully paid and the Company allotting and issuing 999 additional shares, credited as fully paid, to Actiease Assets. Upon completion of the Reorganisation, the Company has become the holding company of the companies now comprising the Group.

On 15 September 2014, pursuant to the written resolution passed by the shareholders on 15 September 2014, the authorised share capital of the Company was increased from HK$380,000 to HK$10,000,000 by the creation of an additional 962,000,000 shares of HK$0.01 each.

15

SAM WOO CONSTRUCTION GROUP LIMITED Interim Report 2014/15

1 General information and key events (Continued)

1.2 Key events (Continued)

On 16 October 2014, pursuant to the Share Offer (as mentioned in the Prospectus), the Company issued a total 100,000,000 shares at a price of HK$1.5 per share. The Group intends to apply the net proceeds for acquisition and/or part finance of machinery and equipment and for working capital.

On 16 October 2014, pursuant to the Capitalisation Issue (as mentioned in the Prospectus), the Company issued additional 299,999,000 shares, credited as fully paid, to Actiease Assets.

2 Basis of preparation and summary of significant accounting policies

2.1 Basis of preparation

This condensed consolidated interim financial information for the six months ended 30 September 2014 has been prepared in accordance with Hong Kong Accounting Standard (“HKAS”) 34, “Interim Financial Reporting” issued by the Hong Kong Institute of Certified Public Accountants (“HKICPA”). The condensed consolidated interim financial information should be read in conjunction with the Accountant’s Report included in Appendix I to the Prospectus, which have been prepared in accordance with Hong Kong Financial Reporting Standards (“HKFRSs”) and has been prepared under the historical cost convention.

As at 30 September 2014, the Group’s current liabilities exceeded its current assets by approximately HK$38,438,000, because of (i) certain bank borrowings contractually due for repayment after one year with a repayment on demand clause amounting to approximately HK$24,476,000 have been classified as current liabilities in accordance with the HK Interpretation 5, “Presentation of Financial Statements – Classification by the Borrower of a Term Loan that contains a Repayment on Demand Clause”; and (ii) an increase in the Group’s non-current assets of approximately HK$111,127,000 during the period, which was partly financed by the borrowings classified under current liabilities.

In preparing the condensed consolidated interim financial information, the directors have taken into account all information that could reasonably be expected to be available, and consider that (i) it is not probable that the relevant banks will exercise their discretion to demand immediate repayment; (ii) it has various construction contracts on hand that can generate positive cash flows, and (iii) the net proceeds from the listing had been received. Management and the directors consider the Group has sufficient financial resources in the coming twelve months to meet its financial obligations as and when they fall due.

16

SAM WOO CONSTRUCTION GROUP LIMITED Interim Report 2014/15

2 Basis of preparation and summary of significant accounting policies (Continued)

2.2 Summary of significant accounting policies

Except as described below, the accounting policies applied are consistent with those described in the Accountant’s Report included in Appendix I to the Prospectus.

  • (a) New, revised and amended standards adopted by the Group The following amendments to standards and interpretation are mandatory for the Group’s financial year beginning 1 April 2014 and have been adopted by the Group:

HKAS 32 (Amendment) Offsetting Financial Assets and Financial Liabilities HKAS 36 (Amendment) Impairment of Assets – Recoverable amount disclosures for non-financial assets HKAS 39 (Amendment) Financial instruments: Recognition and Measurement HKFRS 10, HKFRS 12 and Investment entities HKAS 27 (2011) (Amendment) HK(IFRIC) – Int 21 Levies

The adoption of these new standards, amendments and interpretation to the existing standards does not have any significant impact to the results and financial position of the Group’s condensed consolidated interim financial information.

17

SAM WOO CONSTRUCTION GROUP LIMITED

Interim Report 2014/15

  • 2 Basis of preparation and summary of significant accounting policies (Continued)

  • 2.2 Summary of significant accounting policies (Continued)

    • (b) New and amended standards not yet adopted

      • The following new standards and amendments have been issued but are not effective for the financial year beginning on or after 1 April 2014 and have not been early adopted:
Effective for annual
periods beginning
on or after
HKAS 16 and HKAS 38 (Amendment) Clarification of Acceptable Methods 1 January 2016
of Depreciation and Amortisation
HKAS 16 and HKAS 41 (Amendment) Bearer Plants 1 January 2016
HKAS 19 (2011) (Amendment) Defined Benefit Plans: Employee Contribution 1 July 2014
HKAS 27 (Amendment) Equity Method 1 January 2016
HKFRS 9 Financial Instruments 1 January 2018
HKFRS 10 and HKAS 28 (Amendment) Sale or Contribution of Assets between 1 January 2016
an Investor and its Associate and
Joint Venture
HKFRS 11 (Amendment) Joint Arrangements – Accounting for
Acquisitions of Interests in Joint Operation 1 January 2016
HKFRS 14 Regulatory Deferral Accounts 1 January 2016
HKFRS 15 Revenue from Contracts with Customers 1 January 2017
HKFRSs (Amendment) Annual improvements to 1 July 2014
HKFRSs 2010 – 2012 cycle
HKFRSs (Amendment) Annual improvements to 1 July 2014
HKFRSs 2011 – 2013 cycle
HKFRSs (Amendment) Annual improvements to 1 July 2016
HKFRSs 2012 – 2014 cycle

Management is in the process of making an assessment on the impact of these standards, amendments and interpretations to existing HKFRSs and is not yet in a position to state whether they will have a significant impact on the Group’s results of operations and financial position.

18

SAM WOO CONSTRUCTION GROUP LIMITED Interim Report 2014/15

3 Financial risk management

All aspects of the Group’s financial risk management objectives and policies are consistent with those disclosed in the Accountant’s Report included in Appendix I to the Prospectus.

During the Period, there were no significant changes in the business or economic circumstances that affect the fair value of the Group’s financial assets and liabilities.

4 Critical accounting estimates and judgements

The preparation of the condensed consolidated interim financial information requires management to make judgements, estimates and assumptions that affect the application of accounting policies and the reported amounts of assets and liabilities, income and expenses. Actual results may differ from these estimates. In preparing this condensed consolidated interim financial information, the critical accounting estimates and judgements applied were consistent with those described in the Accountant’s Report included in Appendix I to the Prospectus.

5 Revenue and segment information

Revenue, which is also the Group’s turnover, represents gross contract receipts on foundation works and ancillary services in the ordinary cause of business. Revenue recognised is as follows:

Unaudited
Six months ended
30 September
2014
2013
HK$’000 HK$’000
Turnover
Foundation works and ancillary services 517,880
400,056

The chief operating decision-maker has been identified as the executive directors of the Company. The executive directors regard the Group’s business as a single operating segment and review financial information accordingly. Therefore, no segment information is presented.

19

SAM WOO CONSTRUCTION GROUP LIMITED Interim Report 2014/15

6 Expenses by nature

Cost of sales
Construction contracts costs_(note (a))
Depreciation
Repair and maintenance
Others
Administrative expenses
Depreciation
Operating leases rental in respect of
– Office premises and storage premises
– Directors’ quarters
Professional fees
– incurred for intital public offering
– others
Staff costs, including directors’ emoluments
(note (b))_
Others
Total cost of sales and administrative expenses
Unaudited
Six months ended
30 September
2014
2013
HK$’000
HK$’000
340,105
260,479
7,302
4,619
3,741
2,024
94
884
351,242
268,006
356
325
1,762
1,643
1,084
1,084
11,481
12
6,856
1,640
7,293
5,209
4,601
2,825
33,433
12,738
384,675
280,744
Unaudited
Six months ended
30 September
2014
2013
HK$’000
HK$’000
340,105
260,479
7,302
4,619
3,741
2,024
94
884
351,242
268,006
356
325
1,762
1,643
1,084
1,084
11,481
12
6,856
1,640
7,293
5,209
4,601
2,825
33,433
12,738
384,675
280,744
268,006
325
1,643
1,084
12
1,640
5,209
2,825
12,738
280,744

note:

(a) Construction contract costs included but not limited to costs of construction materials, staff costs (refer to note (b) below), consultancy fee, parts and consumables, subcontracting charges and transportation.

(b)
Total staff cost
Less: amount included in construction contracts
costs or capitalised in work-in progress
85,951
(78,658)
7,293
74,062
(68,853)
5,209

20

SAM WOO CONSTRUCTION GROUP LIMITED

Interim Report 2014/15

7 Finance income and costs

Finance income and costs
Finance income:
– Interest income on bank deposits
Finance costs:
– Interest expense on bank loans wholly repayable
within 5 years
– Interest expense on obligations under finance leases
– Interest expense on bank overdrafts
Finance costs, net
Unaudited
Six months ended
30 September
2014
2013
HK$’000
HK$’000
345
109
(5,308)
(3,733)
(1,710)
(929)
(176)
(105)
(7,194)
(4,767)
6,849
4,658
(3,733)
(929)
(105)
(4,767)
4,658

8 Income tax expense

Hong Kong profits tax and Macau complementary tax have been provided at the rate of 16.5% and 12%, respectively, on the estimated assessable profit for the Period and the Previous Period.

Hong Kong profits tax
Current income tax
Deferred income tax
Macau profits tax
Current income tax
Unaudited
Six months ended
30 September
2014
2013
HK$’000
HK$’000
772
2
7,952
3,257
1,955
977
10,679
4,236
Unaudited
Six months ended
30 September
2014
2013
HK$’000
HK$’000
772
2
7,952
3,257
1,955
977
10,679
4,236
4,236

21

SAM WOO CONSTRUCTION GROUP LIMITED Interim Report 2014/15

9 Earnings per share

(a) Basic

Basic earnings per share is calculated by dividing the profit attributable to equity holders of the Company by the weighted average number of ordinary shares in issue during the respective periods. The weighted average number of ordinary shares used for such purpose has been retrospectively adjusted for the effects of the issue of shares in connection with the Reorganisation completed on 15 September 2014 and the Capitalisation Issue of ordinary shares which took place on 16 October 2014. It does not take into account the issue of shares pursuant to the Share Offer which took place after the Period end date.

Profit attributable to equity holders of the
Company (HK$’000)
Weighted average number of ordinary shares
for the purpose of calculating basic earnings
per share
Basic earnings per share (HK cents)
Unaudited
Six months ended
30 September
2014
2013
115,906
111,435
300,000,000
300,000,000
38.64
37.15
Unaudited
Six months ended
30 September
2014
2013
115,906
111,435
300,000,000
300,000,000
38.64
37.15
37.15

(b) Diluted

Diluted earnings per share is of the same amount as the basic earnings per share as there were no potential dilutive ordinary shares outstanding at Period end.

10 Dividends

The Board does not recommend the payment of interim dividend for the Period (2013: nil).

Final dividends of HK$50,000,000 relating to the year ended 31 March 2013 and HK$50,000,000 relating to the year ended 31 March 2014 were declared and paid to the then shareholders in August 2013 and September 2014, respectively.

22

SAM WOO CONSTRUCTION GROUP LIMITED

Interim Report 2014/15

11 Plant and equipment

At 1 April
Additions
Disposals
Write-off
Depreciation
At 30 September
Trade and retention receivables
Trade receivables
Retention receivables
Unaudited
Six months ended
30 September
2014
2013
HK$’000
HK$’000
398,832
314,777
120,231
26,944
(717)

(298)

(7,658)
(4,944)
510,390
336,777
Unaudited
Audited
30 September
31 March
2014
2014
HK$’000
HK$’000
153,788
27,799
55,947
50,787
209,735
78,586
Unaudited
Six months ended
30 September
2014
2013
HK$’000
HK$’000
398,832
314,777
120,231
26,944
(717)

(298)

(7,658)
(4,944)
510,390
336,777
Unaudited
Audited
30 September
31 March
2014
2014
HK$’000
HK$’000
153,788
27,799
55,947
50,787
209,735
78,586
336,777
Audited
31 March
2014
HK$’000
27,799
50,787
78,586

12 Trade and retention receivables

The credit period granted to trade customers other than for retention receivables was within 45 days. The terms and conditions in relation to the release of retention vary from contract to contract, which may be subject to practical completion, the expiry of the defect liability period or a pre-agreed time period. The Group does not hold any collateral as security.

The ageing analysis of trade receivables based on invoice date is as follows:

Unaudited Audited
30 September 31 March
2014 2014
HK$’000 HK$’000
1 to 30 days 153,788 27,799

As at 30 September 2014 and 31 March 2014, retention receivables of HK$2,072,000 were past due but not impaired.

23

SAM WOO CONSTRUCTION GROUP LIMITED

Interim Report 2014/15

13 Contracting work-in-progress

Contract costs incurred plus attributable
profits less foreseeable losses to date
Progress billings to date
Included in current assets/(liabilities) are the following:
Due from customers for contract work
Due to customers for contract work
Unaudited
30 September
2014
HK$’000
557,650
(617,206)
(59,556)
14,808
(74,364)
(59,556)
Audited
31 March
2014
HK$’000
118,807
(99,326)
19,481
19,481
19,481

14 Restricted bank balances

As at 30 September 2014, bank deposits of HK$26,996,000 were placed to secure the issuance of a performance bond and revolving loan facilities.

15 Share capital and reserves

(a) Share capital

On 17 September 2012, the Company was incorporated with an authorised share capital of HK$380,000 divided into 38,000,000 shares with par value of HK$0.01 each. On the same day, one subscriber share was allotted and issued nil-paid. The subscriber share was subsequently transferred to Actiease Assets. Pursuant to the increase in authorised and issued share capital mentioned in note 1.2, the Company’s share capital as at 30 September 2014 was as follows:

Ordinary shares of HK$0.01 each
Authorised
Issued and fully paid:
Number of
shares
1,000,000,000
1,000
HK$
10,000,000
10

24

SAM WOO CONSTRUCTION GROUP LIMITED Interim Report 2014/15

15 Share capital and reserves (Continued)

(b) Reserves

Other reserves of the Group represented the difference between the share capital of the subsidiaries acquired pursuant to the Reorganisation over the nominal value of the share capital of the Company issued in exchange thereof and the difference between the aggregation of the nominal value of the share capital of Sam Woo Bore Pile Foundation Limited and Sam Woo Engineering Equipment Limited acquired over the nominal value of the share capital of SW (BVI) issued in exchange thereof pursuant to the reorganisation completed in 2003.

16 Trade and retention payables

Trade payables
Retention payables
Unaudited
30 September
2014
HK$’000
37,396
694
38,090
Audited
31 March
2014
HK$’000
14,534
339
14,873

The ageing analysis of trade payables based on invoice date is as follows:

0 to 30 days
31 to 60 days
61 to 90 days
91 to 180 days
181 to 365 days
More than 365 days
Unaudited
30 September
2014
HK$’000
12,987
16,814
7,595



37,396
Audited
31 March
2014
HK$’000
13,275
641

10
196
412
14,534

17 Accruals and other payables

Accruals and other payables mainly represent the accruals and other payables for wages, legal and professional fees and other miscellaneous expenses.

25

SAM WOO CONSTRUCTION GROUP LIMITED Interim Report 2014/15

19

18 Bank overdrafts and borrowings

Non-current
Obligations under finance leases
Long-term bank loans
Current
Bank overdraft
Short-term bank loans
Current portion of long-term bank loans due
for repayment within one year
Long-term bank loans due after one year which
contain repayment on demand clause
Obligations under finance leases due for repayment
within one year
Obligations under finance leases due after one
year which contain repayment on demand clause
Total borrowings
Commitments
(a)
Capital commitments
Contracted but not provided for:
Plant and equipment
Unaudited
30 September
2014
HK$’000
69,621
82,446
152,067
17,095
157,251
43,972
24,476
31,234

274,028
426,095
Unaudited
30 September
2014
HK$’000
317
Audited
31 March
2014
HK$’000
23,656
14,150
37,806
28,455
92,556
44,023
110,104
15,354
8,384
298,876
336,682
Audited
31 March
2014
HK$’000
104,815

26

SAM WOO CONSTRUCTION GROUP LIMITED Interim Report 2014/15

19 Commitments (continued)

(b) Operating lease commitments – as lessee

The future aggregate minimum lease rental expenses in respect of hiring equipment, office and storage premises, and quarters for workers and directors under noncancellable operating leases are payable in the following periods:

No later than 1 year
Later than 1 year and no later than 5 years
Unaudited
30 September
2014
HK$’000
5,414
8,610
14,024
Audited
31 March
2014
HK$’000
3,264
917
4,181

20 Related party transactions

Save as disclosed elsewhere in the condensed consolidated interim financial information, the following were carried out with related parties in normal course of business during the Period.

(a) Rental expenses paid to related companies

Unaudited
Six months ended
30 September
2014
2013
HK$’000 HK$’000
Rental expenses paid to:
Cheer Crown Limited 960
900
East Ascent Enterprise Limited 23
23
Cheer Profit International Enterprise Limited 23
23
Long Ascent Development Limited 300
300
Cheer Wealth International Development Limited 438
438
Healthy World Investment Limited 300
300

Rental expenses in respect of storage premises and directors’ quarters were paid to companies beneficially owned by certain directors of the Company based on agreements entered into between the parties involved with reference to market rates of similar properties.

27

SAM WOO CONSTRUCTION GROUP LIMITED Interim Report 2014/15

20 Related party transactions (continued)

(b) Reimbursement of expenses from related parties

Unaudited
Six months ended
30 September
2014
2013
HK$’000 HK$’000
Received from related parties:
Reimbursement of administrative expenses
from Redland Precast Concrete
Products Limited 58
67
Reimbursement of staff costs from
Asian Giant Limited 484
635

Reimbursement of administrative expenses and staff costs were charged at cost.

(c) Key management compensation

Key management includes directors (executive and non-executive) of the Group. The compensation paid or payable to key management for employee services is disclosed below.

Salaries
Directors’ quarters
Employer’s contribution to pension scheme
Unaudited
Six months ended
30 September
2014
2013
HK$’000
HK$’000
1,346
1,226
1,084
1,084
17
15
2,447
2,325
Unaudited
Six months ended
30 September
2014
2013
HK$’000
HK$’000
1,346
1,226
1,084
1,084
17
15
2,447
2,325
2,325

21

Subsequent events

Save as disclosed in note 1, the following significant events took place subsequent to 30 September 2014:

(a) In October 2014, a director deposited a sum of HK$20,000,000 into a bank account maintained by the Group solely for the purpose of settling any claim and/or legal costs for which our Group may become liable to pay, by reason of or in connection with any transaction contemplated in or carried out pursuant to the machinery leasing arrangements among certain subsidiaries before the listing date of the Company. For details, please refer to the Prospectus.

(b) Bank overdrafts, bank loans and finance leases under personal guarantee and/or security provided by certain executive directors as at 30 September 2014 had been released upon the Listing and replaced by guarantees provided by the Company.

28