Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

S2 RESOURCES LTD Regulatory Filings 2020

Apr 13, 2020

65745_rns_2020-04-13_54d36b2f-bdda-48c3-a05b-5d4562be73c7.pdf

Regulatory Filings

Open in viewer

Opens in your device viewer

ASX Announcement

Tuesday 14[th] April 2020

==> picture [594 x 105] intentionally omitted <==

EXPLORATION UPDATE

Key points

  • More nickel sulphide mineralisation intersected at Gwardar, Polar Bear, including 8.06 metres @ 1.33% nickel and 0.22% copper

  • Exploration commenced on S2’s Fraser Range project

  • New exploration ground pegged over nickel sulphide targets on western edge of Yilgarn Craton, WA

S2 Resources Ltd (“S2” or the “Company”) advises that low cost exploration and project generation work is proceeding in Western Australia (“WA”), where its activities are not currently impacted by any COVID19 pandemic countermeasures. The Company has received additional results from nickel drilling at its Gwardar prospect, (where it owns 100% of the nickel rights), has commenced reconnaissance exploration on its newly granted Fraser Range ground, and has applied for several large exploration licences over nickel sulphide targets recently identified along the western margin of the Yilgarn Craton in WA.

Polar Bear (100% nickel rights)

Assay results have been received from the second of two WA Government co-funded holes drilled at the Gwardar prospect in February. Hole SPBD0365 intersected numerous zones of disseminated nickel sulphides, including:

  • 24.68m @ 0.88% nickel from 241.0 metres, including 8.06 metres @ 1.33% nickel from 241.94 metres, associated with a hangingwall cumulate ultramafic flow above the main basal flow unit,

  • 6.00 metres @ 0.43% nickel from 292.00 metres

  • 7.82 metres @ 0.61% nickel from 306.00 metres on the basal contact of the ultramafic package, and

  • 3.13 metres @ 0.58% nickel from 348.87 metres within remobilised stringer mineralisation in the footwall rocks

These results extend the mineralisation defined by hole SPBD0364 located approximately 100 metres south along strike, which intersected numerous 1-5 metre wide intervals of disseminated nickel sulphide mineralisation and 1.63 metres of massive sulphide grading 2.22% nickel (refer to S2 ASX announcement dated 18 March 2020), and also extend the mineralised zone 100 metres down plunge from previous hole SPBD360, which intersected a broad disseminated sulphide zone (17.83 metres @ 0.69% nickel) with several narrower, higher grade intervals including 0.75 metres @ 2.41% nickel, 0.68 metres @ 3.31% nickel and 3.33 metres @ 1.38% nickel (refer to S2 ASX announcement dated 22 July 2019).

4/24 Parkland Road, Osborne Park, WA 6017, Australia. PO Box 1209, Osborne Park, WA 6916, Australia ABN 18 606 128 090 T +61 8 6166 0240 F 61 8 6270 5410 E [email protected] W www.s2resources.com.au

Of particular interest is that the high tenor disseminated mineralisation in hole SPBD0365 is primarily located within a hangingwall flow, indicating the presence of multiple mineralised horizons at Gwardar (see Figure 1).

Drilling has now defined a 100 metre thick nickel sulphide mineralised lava channel comprising multiple mineralised flows over a strike width of ~150 metres and at least 400 metres plunge extent, with the channel remaining open down plunge from deepest drilling. Such a large volume of mineralised ultramafic attests to the fertility and potential of this area, which is the strike continuation of the Widgiemooltha ultramafic package that hosts Mincor’s Cassini nickel discovery further to the north.

Fraser Range (100%)

Exploration has commenced at the Fraser Range project, where two of the Company’s three Exploration Licences have been granted. The granted tenements are considered prospective for magmatic nickel sulphides, being located between IGO’s Nova Nickel Mine, approximately 80 kilometres to the southwest, and Legend Mining’s recent Mawson discovery (refer to LEG ASX release dated 31 March 2020), approximately 70 kilometres to the northeast, and being surrounded by IGO, Mark Creasy and Legend (see Figure 2).

The granted tenements are situated in an area of extensive transported cover, obscuring the underlying prospective geology, and a review of limited historical exploration indicates there has been very little effective prior exploration within the company’s landholdings.

Geological and geophysical mapping and a passive seismic survey is underway with the aim of determining the depth of transported cover prior to planning reconnaissance moving loop electromagnetic (MLEM) surveys over areas considered prospective for Nova-style nickel and palaeochannel-hosted gold.

New exploration initiatives (100%)

The company has recently applied for a number of exploration licenses along the western margin of the Yilgarn craton in Western Australia, including:

  • Two exploration licenses, covering an area of approximately 350 square kilometres at the Three Springs project, located approximately 250 kilometres north of Perth, and

  • Three exploration licenses, covering an area of approximately 690 square kilometres at the West Murchison project, located approximately 500 kilometres north of Perth

These areas were identified as having prospectivity for magmatic nickel-copper-cobalt-PGE style mineralisation on the basis of the interpreted presence of unexplored mafic-ultramafic intrusions within predominantly granite-gneiss terrain along the western edge of the Archaean Yilgarn Craton (see Figure 3). Regional government (GSWA) mapping has identified mafic-ultramafic intrusive rocks, and regional aeromagnetics indicates these intrusives may be considerably more extensive than previously thought due to the bodies being buried beneath younger transported cover. Chalice Gold’s recent Julimar nickel-copperPGE discovery further south attests to the potential of this margin.

A review of open file exploration reports indicates the there has been no meaningful historical exploration for nickel sulphide mineralisation within the project areas.

4/24 Parkland Road, Osborne Park, WA 6017, Australia. PO Box 1209, Osborne Park, WA 6916, Australia ABN 18 606 128 090 T +61 8 6166 0240 F 61 8 6270 5410 E [email protected] W www.s2resources.com.au

==> picture [446 x 638] intentionally omitted <==

Figure 1: Cross section 6,472,440mN of Gwardar prospect, showing drill hole SPBD0365 relative to earlier drilling. 4/24 Parkland Road, Osborne Park, WA 6017, Australia. PO Box 1209, Osborne Park, WA 6916, Australia ABN 18 606 128 090 T +61 8 6166 0240 F 61 8 6270 5410 E [email protected] W www.s2resources.com.au

==> picture [449 x 574] intentionally omitted <==

Figure 2: Fraser Range showing S2 and competitor tenure and known mines/prospects over aeromagnetics.

4/24 Parkland Road, Osborne Park, WA 6017, Australia. PO Box 1209, Osborne Park, WA 6916, Australia ABN 18 606 128 090 T +61 8 6166 0240 F 61 8 6270 5410 E [email protected] W www.s2resources.com.au

==> picture [474 x 534] intentionally omitted <==

Figure 3: Location of S2’s Western Australia’s exploration projects over simplified regional geology. The new tenement applications at Three Springs and West Murchison are situated along the western margin of the Archaean Yilgarn craton (as is Chalice Gold’s recent Julimar nickel-copper-PGE discovery), whereas its Fraser Range tenements are situated along the southeastern margin of the Yilgarn Craton.

4/24 Parkland Road, Osborne Park, WA 6017, Australia. PO Box 1209, Osborne Park, WA 6916, Australia ABN 18 606 128 090 T +61 8 6166 0240 F 61 8 6270 5410 E [email protected] W www.s2resources.com.au

This announcement has been provided to the ASX under the authorization of Mark Bennett, Managing Director & CEO.

For further information, please contact:

Mark Bennett Anna Neuling
Managing Director & CEO Executive Director & Company Secretary
+61 8 6166 0240 +61 8 6166 0240

Past Exploration results reported in this announcement have been previously prepared and disclosed by S2 Resources Ltd in accordance with JORC 2012. The Company confirms that it is not aware of any new information or data that materially affects the information included in these market announcements. The Company confirms that the form and content in which the Competent Person's findings are presented here have not been materially modified from the original market announcement. Refer to www.s2resources.com.au for details on past exploration results.

Competent Persons statements

The information in this report that relates to Exploration Results from Australia is based on information compiled by John Bartlett, who is an employee and shareholder of the Company. Mr Bartlett is a member of the Australian Institute of Mining and Metallurgy (MAusIMM) and has sufficient experience of relevance to the style of mineralization and the types of deposits under consideration, and to the activities undertaken, to qualify as a Competent Person as defined in the 2012 Edition of the Joint Ore Reserves Committee (JORC) Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Bartlett consents to the inclusion in this report of the matters based on information in the form and context in which it appears.

Annexure 1

Hole ID Zone Depth North East RL Azi Dip From
(m)
To
(m)
Interval
(m)
Ni
(pct)
Cu
(pct)
SPBD0083 Gwardar 286.23 6472647 388748 266 272 -60 NSI
SPBD0360 Gwardar 268.02 6472440 388840 266 270 -60 159.00 166.00 7.00 0.47 0.04
and 183.00 200.83 17.83 0.69 0.05
including 194.53 195.28 0.75 2.41 0.08
and, including 200.15 200.83 0.68 3.31 0.43
and 223.67 227.00 3.33 1.38 0.24
SPBD0361 Gwardar 286.9 6472470 388825 266 290 -60 248.90 254.6 5.70 0.57 0.07
SPBD0362 Gwardar 240.26 6472400 388870 266 250 -55 186.30 188.09 1.79 0.60 0.04
and 211.20 212.42 1.22 1.38 0.05
including 212.27 212.42 0.15 6.16 0.09
SPBD0363 Gwardar 57.6 6472400 388877 266 230 -79 Hole Abandoned
SPBD0364 Gwardar 491.8 6472400 388879 266 230 -77.5 313.43 318 4.57 0.53 <0.01
and 348.06 349.00 0.94 0.54 0.01
and 375.00 376.00 1.00 0.54 <0.01
and 397.00 398.00 1.00 0.42 <0.01
and 403.00 404.00 1.00 0.50 0.01
and 424.27 425.25 0.98 0.66 0.04
and 429.37 431.00 1.63 2.22 0.19
SPBD0365 Gwardar 390.7 6472440 388841 266 260 -74 241.00 265.68 24.68 0.88 0.10
including 241.94 250.00 8.06 1.33 0.22
and 272.55 275.00 2.45 0.47 <0.01
and 292.00 298.00 6.00 0.43 0.01
and 306 313.82 7.82 0.61 0.04

4/24 Parkland Road, Osborne Park, WA 6017, Australia. PO Box 1209, Osborne Park, WA 6916, Australia ABN 18 606 128 090 T +61 8 6166 0240 F 61 8 6270 5410 E [email protected] W www.s2resources.com.au

and 348.87 352 3.13 0.58 0.06

The following Tables are provided to ensure compliance with the JORC code (2012) edition requirements for the reporting of exploration results.

SECTION 1: SAMPLING TECHNIQUES AND DATA

Criteria JORC Code explanation Commentary
Sampling techniques Nature and quality of sampling (e.g. cut channels,
random chips, or specific specialised industry
standard measurement tools appropriate to the
minerals under investigation, such as down hole
gamma sondes, or handheld XRF instruments, etc).
These examples should not be taken as limiting the
broad meaning of sampling.
The Gwardar prospect was sampled in four diamond drill holes,
undertaken by DDH1 Pty Ltd. Drilling is orientated in a westerly
direction, with specific azimuth modified to gain desired
separation along strike.
Sampling has been carried out by cutting and sampling half core
through areas of visible mineralisation, with sample intervals to
lithological contacts, to a maximum length of 1.2 metres.
All are forwarded for analyses by Minanalytical Laboratories
Services Australia Pty Ltd or Bureau Veritas Laboratories in Perth.
Include reference to measures taken to ensure
sample representivity and the appropriate
calibration of any measurement tools or systems
used
Sampling and QAQC procedures are carried out using S2 protocols
as per industry best practice.
Aspects of the determination of mineralisation
that are Material to the Public Report. In cases
where ‘industry standard’ work has been done this
would be relatively simple (e.g. ‘reverse circulation
drilling was used to obtain 1 m samples from
which 3 kg was pulverised to produce a 30 g
charge for fire assay’). In other cases more
explanation may be required, such as where there
is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation
types (e.g. submarine nodules) may warrant
disclosure of detailed information
The diamond core is HQ and NQ2 size, sampled on geological
intervals (0.2 m to 1.2 m), cut into half (NQ2) or quarter (HQ) core
to give sample weights under 3 kg. Samples were crushed, dried
and pulverised (total prep) to produce a sub sample for analysis
by four acid digest with an ICP/OES
Drilling techniques Drill type (e.g. core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic,
etc) and details (e.g. core diameter, triple or
standard tube, depth of diamond tails, face-
sampling bit or other type, whether core is
oriented and if so, by what method, etc).
Drilling is standard diamond coring, using either HQ triple tube or
NQ2 core diameter. The core has been orientated using a an Ace
orientation tool.
Drill sample
recovery
Method of recording and assessing core and chip
sample recoveries and results assessed
Diamond core recoveries are logged and recorded in the
database. Overall recoveries are >>95%.
Measures taken to maximise sample recovery and
ensure representative nature of the samples
Diamond core is reconstructed into continuous runs on an angle
iron cradle for orientation marking. Depths are checked against
the depth given on the core blocks and rod counts are routinely
carried out by the drillers.
Whether a relationship exists between sample
recovery and grade and whether sample bias may
have occurred due to preferential loss/gain of
fine/coarse material.
No relationship has been seen to exist
Logging Whether core and chip samples have been
geologically and geotechnically logged to a level of
detail to support appropriate Mineral Resource
estimation, mining studies and metallurgical
studies.
Logging of diamond core and RC samples records lithology,
mineralogy, mineralisation, structural (DDH only), weathering,
colour and other features of the samples
logging uses a standard legend developed by S2 which is suitable
for wireframing of the basement interface.
Exploration holes are not routinely geotechnically logged but
resource holes are.

4/24 Parkland Road, Osborne Park, WA 6017, Australia. PO Box 1209, Osborne Park, WA 6916, Australia ABN 18 606 128 090 T +61 8 6166 0240 F 61 8 6270 5410 E [email protected] W www.s2resources.com.au

Criteria JORC Code explanation Commentary
Whether logging is qualitative or quantitative in
nature. Core (or costean, channel, etc)
photography.
All core is photographed in both dry and wet form.
The total length and percentage of the relevant
intersections logged
All drillholes were logged in full to end of hole.
Sub-sampling
techniques and
sample preparation
If core, whether cut or sawn and whether quarter,
half or all core taken.
Core was cut in half (NQ2) and quarter core (HQ) onsite using an
automatic core saw. All samples were collected from the same side
of the core.
If non-core, whether riffled, tube sampled, rotary
split, etc and whether sampled wet or dry.
No non-core sampling was completed
For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
The sample preparation follows industry best practice in sample
preparation involving oven drying, coarse crush and pulverisation
of entire sample to minimum of 85% passing -75um.
Quality control procedures adopted for all sub-
sampling stages to maximise representivity of
samples.
Full QAQC system in place to determine accuracy and precision of
assays
Measures taken to ensure that the sampling is
representative of the in situ material collected,
including for instance results for field
duplicate/second-half sampling.
Non-biased sampling using the orientation line as a guide for
cutting with the same half used for all sampling.
No duplicate samples have been collected at this stage
Whether sample sizes are appropriate to the grain
size of the material being sampled.
The sample sizes are considered to be appropriate to correctly
represent the sought after mineralisation style
Quality of assay data
and laboratory tests
The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or
total.
For core samples the analytical techniques used a four acid digest
multi element suite with ICP/OES or ICP/MS finish (25 gram or 50
gram FA/AAS for precious metals).
The acids used are hydrofluoric, nitric, perchloric and hydrochloric
acids, suitable for silica based samples.
The method approaches total dissolution of most minerals.
For geophysical tools, spectrometers, handheld
XRF instruments, etc, the parameters used in
determining the analysis including instrument
make and model, reading times, calibrations
factors applied and their derivation, etc.
No geophysical tools were used to determine any element
concentrations.
Nature of quality control procedures adopted (e.g.
standards, blanks, duplicates, external laboratory
checks) and whether acceptable levels of accuracy
(i.e. lack of bias) and precision have been
established.
Full QAQC system in place including Certified Standards and blanks
of appropriate matrix and levels.
Verification of
sampling and
assaying
The verification of significant intersections by
either independent or alternative company
personnel.
The S2 Exploration Manager has personally inspected all sampled
core and assay results.
The use of twinned holes. No twinned holes were drilled within the main infilled anomaly.
Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
Primary sampling data is collected in a set of standard Excel
templates. The information is managed by S2’s database manager
for validation and compilation into S2’s central database.
Discuss any adjustment to assay data. No adjustments made

4/24 Parkland Road, Osborne Park, WA 6017, Australia. PO Box 1209, Osborne Park, WA 6916, Australia ABN 18 606 128 090 T +61 8 6166 0240 F 61 8 6270 5410 E [email protected] W www.s2resources.com.au

Criteria JORC Code explanation Commentary
Location of data
points
Accuracy and quality of surveys used to locate
drillholes (collar and down-hole surveys), trenches,
mine workings and other locations used in Mineral
Resource estimation.
Drill hole collar locations were recorded using handheld Garmin
GPS. Elevation values were in AHD RL and values recorded within
the database. Expected accuracy is + or – 5 m for easting,
northing and 10m for elevation coordinates.
Downhole surveys using an Axis north-seeking gyro with readings
at surface and then every 30m downhole.
Specification of the grid system used. The grid system is MGA_GDA94 (zone 51), local easting and
northing are in MGA.
Quality and adequacy of topographic control. Topographic surface uses handheld GPS elevation data, which is
adequate at the current stage of the project.
Data spacing and
distribution
Data spacing for reporting of Exploration Results. The nominal drillhole spacing is project specific, refer to figures in
text
Whether the data spacing and distribution is
sufficient to establish the degree of geological and
grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s)
and classifications applied.
Data spacing, sampling technique and distribution is not sufficient
at this stage to allow the estimation of mineral resources.
Whether sample compositing has been applied. No sample compositing has been applied.
Orientation of data
in relation to
geological structure
Whether the orientation of sampling achieves
unbiased sampling of possible structures and the
extent to which this is known, considering the
deposit type.
Geochemical sampling of basement interface only.
If the relationship between the drilling orientation
and the orientation of key mineralised structures is
considered to have introduced a sampling bias,
this should be assessed and reported if material.
Drilling of diamond core is on a nominal 60 degrees to the west,
which is broadly orthogonal to the mineralisation.
Sample security The measures taken to ensure sample security. Chain of custody is managed by S2 personnel. Drill samples and
core is visually checked at the drill rig and then transported to S2’s
logging and cutting facilities on site at the S2 remote camp.
Bagged samples are transferred to Minanalytical Laboratory in
Kalgoorlie by S2 personnel.
Audits or reviews The results of any audits or reviews of sampling
techniques and data.
No audits or reviews have been conducted at this stage.

SECTION 2 REPORTING OF EXPLORATION RESULTS

Criteria JORC Code explanation Commentary
Mineral tenement
and land tenure
status
Type, reference name/number, location and
ownership including agreements or material issues
with third parties such as joint ventures,
partnerships, overriding royalties, native title
interests, historical sites, wilderness or national
park and environmental settings.
The Gwardar prospect is located on tenement M63/230 owned by
Polar Metals Pty Ltd (a wholly owned subsidiary of Royal Nickel
Corp) and is part of the Polar Bear Project. S2 retains rights to
nickel mineralisation within the Polar Bear project.
M63/230 is located within the Ngadju Native Title Claim
(WC99/002).
The security of the tenure held at the time of
reporting along with any known impediments to
obtaining a licence to operate in the area.
All of the Exploration Licences are in good standing and no known
impediments exist on the tenements being actively explored.

4/24 Parkland Road, Osborne Park, WA 6017, Australia. PO Box 1209, Osborne Park, WA 6916, Australia ABN 18 606 128 090 T +61 8 6166 0240 F 61 8 6270 5410 E [email protected] W www.s2resources.com.au

Criteria JORC Code explanation Commentary
Exploration done by
other parties
Acknowledgment and appraisal of exploration by
other parties.
Historical drilling by Anaconda Nickel Ltd drilled a number of
diamond and percussion drill holes along the interpreted
ultramafic basal contact. Collar locations from historical drill holes
have not been field verified.
INCO conducted a reconnaissance small loop Slingram type EM
survey. Six diamond holes were drilled (none at Gwardar).
Sirius Resources undertook MLEM and RC and diamond drilling
along the Taipan – Gwardar trend, with a total of one diamond
hole and six RC holes within the Gwardar prospect.
The collar locations for all INCO and Sirius drill holes have been
verified by S2 personnel.
Geology Deposit type, geological setting and style of
mineralisation.
The geology at Polar Bear is dominated by complexly deformed
Achaean greenstone assemblages of the Norseman-Wiluna
Greenstone Belt which have been metamorphosed to upper
greenschist facies.
The Eundynie Mafic Sequence (EMS) consists of tightly folded
ultramafic and mafic intrusives and extrusives with minor interflow
sediments. The rocks are frequently talc-carbonate altered and
moderately well foliated. The ultramafic rocks are typically
komatiites and komatiitic basalt.
The deposit style sought after is analogous to Kambalda-style
nickel copper sulphide deposits.
Drill hole
Information
A summary of all information material to the
understanding of the exploration results including
a tabulation of the following information for all
Material drill holes:

easting and northing of the drill hole
collar

elevation or RL (Reduced Level –
elevation above sea level in metres) of
the drill hole collar

dip and azimuth of the hole

down hole length and interception
depth

hole length.
Refer Annexure 1.
Data aggregation
methods
In reporting Exploration Results, weighting
averaging techniques, maximum and/or minimum
grade truncations (e.g. cutting of high grades) and
cut-off grades are usually Material and should be
stated.
Reported assay results for diamond drilling have been length and
bulk density weighted. Intervals have been calculated using a 0.4%
nickel lower cut-off, with maximum of 2m internal dilution.
Where aggregate intercepts incorporate short
lengths of high grade results and longer lengths of
low grade results, the procedure used for such
aggregation should be stated and some typical
examples of such aggregations should be shown in
detail.
Individual sample intervals vary between 0.2 and 1.2 metres,
selected based on lithological contacts.
The assumptions used for any reporting of metal
equivalent values should be clearly stated.
No reporting of metal equivalent has been used.

4/24 Parkland Road, Osborne Park, WA 6017, Australia. PO Box 1209, Osborne Park, WA 6916, Australia ABN 18 606 128 090 T +61 8 6166 0240 F 61 8 6270 5410 E [email protected] W www.s2resources.com.au

Criteria JORC Code explanation Commentary
Relationship
between
mineralisation
widths and intercept
lengths
These relationships are particularly important in
the reporting of Exploration Results.
If the geometry of the mineralisation with respect
to the drill hole angle is known, its nature should
be reported.
If it is not known and only the down hole lengths
are reported, there should be a clear statement to
this effect (e.g. ‘down hole length, true width not
known’).
The trend of mineralisation at the prospects described is broadly
NNW, dipping at approximately 60 degrees to the ENE. RC and
Diamond drilling has been used to determine this.
Refer to figures in body of text.
Diagram Appropriate maps and sections (with scales) and
tabulations of intercepts should be included for
any significant discovery being reported These
should include, but not be limited to a plan view of
drill hole collar locations and appropriate sectional
views.
Refer to Figures in body of text.
Balanced reporting Where comprehensive reporting of all Exploration
Results is not practicable, representative reporting
of both low and high grades and/or widths should
be practiced to avoid misleading reporting of
Exploration Results.
All results considered significant are reported.
Other substantive
exploration data
Other exploration data, if meaningful and
material, should be reported including (but not
limited to): geological observations; geophysical
survey results; geochemical survey results; bulk
samples – size and method of treatment;
metallurgical test results; bulk density,
groundwater, geotechnical and rock
characteristics; potential deleterious or
contaminating substances.
No other exploration data present.
Further work The nature and scale of planned further work (e.g.
tests for lateral extensions or depth extensions or
large-scale step-out drilling).
Diagrams clearly highlighting the areas of possible
extensions, including the main geological
interpretations and future drilling areas, provided
this information is not commercially sensitive
Detailed assessment of all available data, including DHEM and
petrology prior to planning any future work programs.

4/24 Parkland Road, Osborne Park, WA 6017, Australia. PO Box 1209, Osborne Park, WA 6916, Australia ABN 18 606 128 090 T +61 8 6166 0240 F 61 8 6270 5410 E [email protected] W www.s2resources.com.au

==> picture [286 x 139] intentionally omitted <==

4/24 Parkland Road, Osborne Park, WA 6017, Australia. PO Box 1209, Osborne Park, WA 6916, Australia ABN 18 606 128 090 T +61 8 6166 0240 F 61 8 6270 5410 E [email protected] W www.s2resources.com.au