ASX Announcement

22 December 2022

==> picture [594 x 105] intentionally omitted <==

POLAR BEAR NICKEL DRILLING: INTERIM UPDATE

Key Points

  • Three of a planned nine holes have been completed

  • First two of six electromagnetic (EM) conductors tested with sedimentary sulphides intersected at predicted target depths

  • First of three geological targets partially tested, with trace to disseminated magmatic sulphides intersected within a thick ultramafic unit

  • High priority targets to be drilled once drilling resumes after Christmas break

S2 Resources Ltd (“S2” or the “Company”) advises that it has completed the first three holes of a planned nine hole program testing six electromagnetic (EM) conductors and three geological targets at its Polar Bear nickel project where the Company has 100% of the nickel rights (see Figure 1).

Two of the lower priority EM conductors have been drilled, with sedimentary sulphides being intersected at the depth predicted by the EM. One geological target has been drilled, with intervals of trace to disseminated magmatic sulphides being intersected in a thick ultramafic sequence. The drilling sequence is based on logistical considerations, so the higher priority targets will be drilled in January following a pause for the Christmas break.

Hole SPBD0366 , testing conductor PBC22-5, intersected a package of ultramafics and high-magnesian basalts at the top of the hole before passing into basalt, with minor interflow sediments, from approximately 190 metres. A thin, sheared black shale intersected near the target depth (392 metres) of the modelled EM plate is considered the likely source of the MLEM response.

Conductor PBC22-5 is a cluster of three separately modelled EM which collectively form a 1.5 kilometre long trend of EM anomalism. Such long strike length trends are more typical of conductive stratigraphic units rather than discrete responses which are more typical of nickel sulphide mineralisation, so this conductor is intrinsically less prospective than some of the as yet untested conductors that will be drilled once the rig recommences drilling in January.

Hole SPBD0367 , testing conductor PBC22-3, intersected prospective ultramafic rocks at the top of the hole down to approximately 90 metres before passing into basalt. At 172 metres the hole intersected sedimentary rocks, including approximately 6 metres of strongly sulphidic black shales. The sulphides, comprising pyrrhotite, pyrite with minor chalcopyrite and sphalerite, are typical of black shales and are not of economic interest.

Level 8, 350 Collins Street, Melbourne, VIC 3000, Australia. PO Box 1209, Osborne Park, WA 6916, Australia ABN 18 606 128 090 T +61 8 6166 0240 F 61 8 6270 5410 E [email protected] W www.s2resources.com.au

==> picture [440 x 631] intentionally omitted <==

Figure 1. Location of electromagnetic conductors identified in the July SQUID EM survey at the Polar Bear Project, over regional magnetics and interpreted geology, showing location of recently completed drillholes. Level 8, 350 Collins Street, Melbourne, VIC 3000, Australia. PO Box 1209, Osborne Park, WA 6916, Australia ABN 18 606 128 090 T +61 8 6166 0240 F 61 8 6270 5410 E [email protected] W www.s2resources.com.au

Hole SPBD0368 , testing beneath a zone of anomalous nickel and copper in previous reconnaissance aircore drilling not covered by the recent SQUID EM survey, intersected more than 80 metres of prospective ultramafic rocks in two zones, separated by a late-stage felsic porphyry intrusion. Importantly, the ultramafic contains minor zones of trace to disseminated “cloud” sulphide consisting of pyrrhotite-chalcopyrite-pentlandite. This mineralisation, whilst not economic, confirms the presence of a fertile nickel prospective system, separate to the known Halls Knoll and Taipan – Gwardar trend. Laboratory assay results will be reported when the Company receives them

The hole was still in prospective ultramafic rocks when drilling ceased for the Christmas break, with the hole to be extended when drilling resumes in the new year.

All holes have been / will be cased with PVC to facilitate future down-hole electromagnetic (DHEM) surveys to confirm the drilling has adequately tested the EM anomalies.

Whilst drilling to date has not intersected material magmatic nickel sulphides, it is encouraging to note that the EM appears to be working well in terms of its ability to detect and predict the position of sulphides, which bodes well for the remainder of the program in which the more prospective targets will be tested.

As stated in S2’s previous ASX announcement of 16[th] November 2022, the sequence in which the holes are being drilled is based primarily on logistical considerations rather than perceived prospectivity of each target.

Project background

S2, through various wholly owned subsidiary companies, has been exploring the Polar Bear ground since 2010, during which time five heritage surveys have been undertaken and over 4,000 holes drilled primarily for gold and to a lesser extent for nickel.

The earlier exploration, undertaken by Polar Metals Pty Ltd (“Polar Metals”), which was a wholly owned subsidiary of Sirius Resources and, post-demerger, of S2, led to the discovery of the Taipan nickel prospect in 2014 and the discovery, drillout and mineral resource estimate of the Baloo gold deposit between 2015 and 2017.

In February 2018, Polar Metals was sold to Westgold Resources Ltd (“Westgold”), with S2 via another wholly owned subsidiary, Southern Star Exploration Pty Ltd (“Southern Star”), retaining the right to explore, develop and mine nickel together with associated base metals (eg, copper and cobalt) and associated platinum group metals (“PGM’s) on those tenements owned by Polar Metals (“nickel rights”).

S2 retains 100% of the nickel rights in a core holding of tenements held 100% by Polar Metals which cover the majority of the nickel prospective stratigraphy (the Polar Bear project sensu stricto ), and 80% of the nickel rights in additional tenements which cover a smaller part of the nickel prospective stratigraphy, by virtue of these tenements being held 80% by Polar Metals in a joint venture known as the Eundynie JV (see Figure 3).

Westgold sold its Higginsville operations and Polar Metals to Karora Resources (“Karora”), which then developed the Baloo gold deposit as an open pit mine on Lake Cowan.

Level 8, 350 Collins Street, Melbourne, VIC 3000, Australia. PO Box 1209, Osborne Park, WA 6916, Australia ABN 18 606 128 090 T +61 8 6166 0240 F 61 8 6270 5410 E [email protected] W www.s2resources.com.au

Since the sale of Polar Metals, S2, through its subsidiary Southern Star, has continued to explore the Polar Bear project for nickel through its nickel rights, with exploration drilling leading to the discovery of the Gwardar prospect in 2019, and the recent SQUID survey leading to the identification of new EM conductors beneath the salt lake.

S2 has recently transferred its nickel rights from its Southern Star subsidiary to another wholly owned subsidiary, Dark Star Exploration Pty Ltd (“Dark Star”).

This announcement has been provided to the ASX under the authorisation of the S2 Board.

For further information, please contact:

Mark Bennett Executive Chairman +61 8 6166 0240

Past Exploration results reported in this announcement have been previously prepared and disclosed by S2 Resources Ltd in accordance with JORC 2012. The Company confirms that it is not aware of any new information or data that materially affects the information included in these market announcements. The Company confirms that the form and content in which the Competent Person's findings are presented here have not been materially modified from the original market announcement. Refer to www.s2resources.com.au for details on past exploration results.

Competent Persons statements

The information in this report that relates to Exploration Results from Australia is based on information compiled by John Bartlett, who is an employee and shareholder of the Company. Mr Bartlett is a member of the Australian Institute of Mining and Metallurgy (MAusIMM) and has sufficient experience of relevance to the style of mineralization and the types of deposits under consideration, and to the activities undertaken, to qualify as a Competent Person as defined in the 2012 Edition of the Joint Ore Reserves Committee (JORC) Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Bartlett consents to the inclusion in this report of the matters based on information in the form and context in which it appears.

Annexure 1

Hole Easting Northing RL Dip Azi. Depth From To Width Grade
Ni_pct
Grade
Cu_pct
SPBD0366 388,837 6,470837 280 -65 270 438.9 AWR
SPBD0367 389,785 6,471,600 263 -60 280 197.9 AWR
SPBD0368 389,825 6,471,020 263 -60 270 181.0 IP

*AWR – awaiting results, IP – in progress

Level 8, 350 Collins Street, Melbourne, VIC 3000, Australia. PO Box 1209, Osborne Park, WA 6916, Australia ABN 18 606 128 090 T +61 8 6166 0240 F 61 8 6270 5410 E [email protected] W www.s2resources.com.au

The following Tables are provided to ensure compliance with the JORC code (2012) edition requirements for the reporting of exploration results.

SECTION 1: SAMPLING TECHNIQUES AND DATA

Criteria JORC Code explanation Commentary
Sampling
techniques
Nature and quality of sampling (e.g. cut channels,
random chips, or specific specialised industry
standard measurement tools appropriate to the
minerals under investigation, such as down hole
gamma sondes, or handheld XRF instruments, etc).
These examples should not be taken as limiting the
broad meaning of sampling.
Drilling at the Polar Bear project has comprised three
diamond drill holes, completed by KalDrill Pty Ltd, based out
of Kalgoorlie, Western Australia.
Sampling has been carried out by cutting and sampling half
core through areas of visible mineralisation, with sample
intervals to lithological contacts, to a maximum length of 1.2
metres.
All are forwarded for analyses by ALS Geochemistry in Perth.
Include reference to measures taken to ensure
sample representivity and the appropriate
calibration of any measurement tools or systems
used
Sampling and QAQC procedures are carried out using S2
protocols as per industry best practice.
Aspects of the determination of mineralisation
that are Material to the Public Report. In cases
where ‘industry standard’ work has been done this
would be relatively simple (e.g. ‘reverse circulation
drilling was used to obtain 1 m samples from
which 3 kg was pulverised to produce a 30 g
charge for fire assay’). In other cases more
explanation may be required, such as where there
is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation
types (e.g. submarine nodules) may warrant
disclosure of detailed information
The diamond core is HQ and NQ2 size, sampled on
geological intervals (0.2 m to 1.2 m), cut into half core to be
submitted to the laboratory for analysis. Samples are to be
crushed, dried and pulverised (total prep) to produce a sub
sample for multi-element analysis by four acid digest with
an ICP/OES as well as a 25 gram charge fire assay by MS for
precious metals (Au, Pt, Pd)
Drilling techniques Drill type (e.g. core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic,
etc) and details (e.g. core diameter, triple or
standard tube, depth of diamond tails, face-
sampling bit or other type, whether core is
oriented and if so, by what method, etc).
Drilling is standard diamond coring, using either HQ triple
tube or NQ2 core diameter. The core has been orientated
using an Ace orientation tool.
Drill sample
recovery
Method of recording and assessing core and chip
sample recoveries and results assessed
Diamond core recoveries are logged and recorded in the
database. Overall recoveries are >>95% within fresh rock,
although some core loss has been experienced through the
weathered zones.
Measures taken to maximise sample recovery and
ensure representative nature of the samples
Diamond core is reconstructed into continuous runs on an
angle iron cradle for orientation marking. Depths are
checked against the depth given on the core blocks and rod
counts are routinely carried out by the drillers.
Whether a relationship exists between sample
recovery and grade and whether sample bias may
have occurred due to preferential loss/gain of
fine/coarse material.
No relationship has been seen to exist
Logging Whether core and chip samples have been
geologically and geotechnically logged to a level of
detail to support appropriate Mineral Resource
estimation, mining studies and metallurgical
studies.
Logging of diamond core and RC samples records lithology,
mineralogy, mineralisation, structural, weathering, colour
and other features of the samples
logging uses a standard legend developed by S2 which is
suitable for wireframing of the basement interface.
Exploration holes are not routinely geotechnically logged but
resource holes are.

Level 8, 350 Collins Street, Melbourne, VIC 3000, Australia. PO Box 1209, Osborne Park, WA 6916, Australia ABN 18 606 128 090 T +61 8 6166 0240 F 61 8 6270 5410 E [email protected] W www.s2resources.com.au

Criteria JORC Code explanation Commentary
Whether logging is qualitative or quantitative in
nature. Core (or costean, channel, etc)
photography.
All core is photographed in both dry and wet form.
The total length and percentage of the relevant
intersections logged
All drillholes were logged in full to end of hole.
Sub-sampling
techniques and
sample preparation
If core, whether cut or sawn and whether quarter,
half or all core taken.
Core was cut in half (for both NQ2 and HQ3 core onsite using
a manual “clipper” saw. All samples were collected from the
same side of the core.
If non-core, whether riffled, tube sampled, rotary
split, etc and whether sampled wet or dry.
No non-core sampling was completed
For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
The sample preparation follows industry best practice in
sample preparation involving oven drying, coarse crush and
pulverisation of entire sample to minimum of 85% passing -
75um.
Quality control procedures adopted for all sub-
sampling stages to maximise representivity of
samples.
Full QAQC system in place to determine accuracy and
precision of assays
Measures taken to ensure that the sampling is
representative of the in situ material collected,
including for instance results for field
duplicate/second-half sampling.
Non-biased sampling using the orientation line as a guide for
cutting with the same half used for all sampling.
No duplicate samples have been collected at this stage
Whether sample sizes are appropriate to the grain
size of the material being sampled.
The sample sizes are considered to be appropriate to
correctly represent the sought after mineralisation style
Quality of assay
data and laboratory
tests
The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or
total.
For core samples the analytical techniques used a four acid
digest multi element suite with ICP/OES finish on a nominal
0.4g sample as well as Au, Pt, Pd using a 25 gram FA/MS
analysis.
The acids used are hydrofluoric, nitric, perchloric and
hydrochloric acids, suitable for silica based samples.
The method approaches total dissolution of most minerals.
For geophysical tools, spectrometers, handheld
XRF instruments, etc, the parameters used in
determining the analysis including instrument
make and model, reading times, calibrations
factors applied and their derivation, etc.
No geophysical tools were used to determine any element
concentrations.
Nature of quality control procedures adopted (e.g.
standards, blanks, duplicates, external laboratory
checks) and whether acceptable levels of accuracy
(i.e. lack of bias) and precision have been
established.
Full QAQC system in place including Certified Standards and
blanks of appropriate matrix and levels.
Verification of
sampling and
assaying
The verification of significant intersections by
either independent or alternative company
personnel.
The S2 Exploration Manager has personally inspected all
sampled core and assay results.
The use of twinned holes. No twinned holes were drilled within the main infilled
anomaly.
Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
Primary sampling data is collected in a set of standard Excel
templates. The information is managed by S2’s database
manager for validation and compilation into S2’s central
database.
Discuss any adjustment to assay data. No adjustments made

Level 8, 350 Collins Street, Melbourne, VIC 3000, Australia. PO Box 1209, Osborne Park, WA 6916, Australia ABN 18 606 128 090 T +61 8 6166 0240 F 61 8 6270 5410 E [email protected] W www.s2resources.com.au

Criteria JORC Code explanation Commentary
Location of data
points
Accuracy and quality of surveys used to locate
drillholes (collar and down-hole surveys), trenches,
mine workings and other locations used in Mineral
Resource estimation.
Drill hole collar locations were recorded using handheld
Garmin GPS. Elevation values were in AHD RL using the 20m
DEM model over the project area. Expected accuracy is + or
– 5 m for easting, northing and 10m for elevation
coordinates.
Downhole surveys using an Axis north-seeking gyro with
readings at 5m interval down the length of the hole using a
DeviGyro.
Specification of the grid system used. The grid system is MGA_GDA94 (zone 51), local easting and
northing are in MGA.
Quality and adequacy of topographic control. Topographic surface uses handheld GPS elevation data,
which is adequate at the current stage of the project.
Data spacing and
distribution
Data spacing for reporting of Exploration Results. Drilling to date has been on individual drill holes into a
specific target.
Whether the data spacing and distribution is
sufficient to establish the degree of geological and
grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s)
and classifications applied.
Data spacing, sampling technique and distribution is not
sufficient at this stage to allow the estimation of mineral
resources.
Whether sample compositing has been applied. No sample compositing has been applied.
Orientation of data
in relation to
geological structure
Whether the orientation of sampling achieves
unbiased sampling of possible structures and the
extent to which this is known, considering the
deposit type.
Insufficient information to determine at this time.
If the relationship between the drilling orientation
and the orientation of key mineralised structures is
considered to have introduced a sampling bias,
this should be assessed and reported if material.
Drilling of diamond core is on a nominal 60 degrees, either
grid west or east depending on the orientation of the
modelled EM plate. The orientation of drilling is broadly
orthogonal to the overall geology.
Sample security The measures taken to ensure sample security. Chain of custody is managed by S2 personnel. Drill samples
and core is visually checked at the drill rig and then
transported to S2’s logging and cutting facilities on site at the
S2 remote camp.
Bagged samples are transported to the ALS laboratory in
Perth. Samples have remainediin the custody of S2 personnel
at all times up until the delivery to the commercial laboratory.
Audits or reviews The results of any audits or reviews of sampling
techniques and data.
No audits or reviews have been conducted at this stage.

SECTION 2: REPORTING OF EXPLORATION RESULTS

Criteria JORC Code explanation Commentary
Mineral tenement
and land tenure
status
Type, reference name/number, location and
ownership including agreements or material issues
with third parties such as joint ventures,
partnerships, overriding royalties, native title
interests, historical sites, wilderness or national
park and environmental settings.

The Polar Bear project consists of a number of exploration
licenses, prospecting licenses, mining licenses and a mining
license application. The tenements are owned by Polar
Metals Pty Ltd, a wholly owned subsidiary of Karora
Resources (KRR:TSE). S2 hold rights (100%) of any nickel
mineralisation (and associated metals) within the Polar Bear
project through its 100% owned subsidiary (Dark Star
Exploration Pty Ltd).
The Polar Bear Project is located within the Ngadju Native
Title Claim (WC99/002).

Level 8, 350 Collins Street, Melbourne, VIC 3000, Australia. PO Box 1209, Osborne Park, WA 6916, Australia ABN 18 606 128 090 T +61 8 6166 0240 F 61 8 6270 5410 E [email protected] W www.s2resources.com.au

Criteria JORC Code explanation Commentary
The security of the tenure held at the time of
reporting along with any known impediments to
obtaining a licence to operate in the area.
All of the Exploration Licences are in good standing and no
known impediments exist on the tenements being actively
explored.
Exploration done by
other parties
Acknowledgment and appraisal of exploration by
other parties.
The first recorded exploration for nickel at Polar Bear was
undertaken by Anaconda Nickel Ltd, who completed rock
chip sampling, soil sampling, costean sampling as well as
percussion and diamond drilling along interpreted
ultramafic basal contact. Collar locations from historical
drill holes have not been field verified.
INCO conducted a reconnaissance small loop Slingram type
EM survey. Inco completed limited aircore drilling and six
diamond holes within the Polar Bear project
Sirius Resources undertook targeted MLEM geophysical
surveys over selected areas, regional aircore drilling as well
as RC and diamond drilling at Halls Knoll, Taipan and
Gwardar prospects.
The collar locations for all INCO and Sirius drill holes have
been verified by S2 personnel.
Geology Deposit type, geological setting and style of
mineralisation.
The geology at Polar Bear is dominated by complexly
deformed Achaean greenstone assemblages of the
Norseman-Wiluna Greenstone Belt which have been
metamorphosed to upper greenschist facies.
The Eundynie Mafic Sequence (EMS) consists of tightly
folded ultramafic and mafic intrusives and extrusives with
minor interflow sediments. The rocks are frequently talc-
carbonate altered and moderately well foliated. The
ultramafic rocks are typically komatiites and komatiitic
basalt.
The deposit style sought after is analogous to Kambalda-
style nickel copper sulphide deposits.
Drill hole
Information
A summary of all information material to the
understanding of the exploration results including
a tabulation of the following information for all
Material drill holes:

easting and northing of the drill hole
collar

elevation or RL (Reduced Level –
elevation above sea level in metres) of
the drill hole collar

dip and azimuth of the hole

down hole length and interception
depth

hole length.
Refer Annexure 1.
Data aggregation
methods
In reporting Exploration Results, weighting
averaging techniques, maximum and/or minimum
grade truncations (e.g. cutting of high grades) and
cut-off grades are usually Material and should be
stated.
All historical reported assay results for diamond drilling have
been length weighted, and in the case of diamond drilling
bulk density weighted. Intervals have been calculated using
a 0.4% nickel lower cut-off, with maximum of 2m internal
dilution.
Where aggregate intercepts incorporate short
lengths of high grade results and longer lengths of
low grade results, the procedure used for such
aggregation should be stated and some typical
examples of such aggregations should be shown in
detail.
Individual sample intervals vary between 0.2 and 1.2
metres, selected based on lithological contacts.

Level 8, 350 Collins Street, Melbourne, VIC 3000, Australia. PO Box 1209, Osborne Park, WA 6916, Australia ABN 18 606 128 090 T +61 8 6166 0240 F 61 8 6270 5410 E [email protected] W www.s2resources.com.au

Criteria JORC Code explanation Commentary
The assumptions used for any reporting of metal
equivalent values should be clearly stated.
No reporting of metal equivalent has been used.
Relationship
between
mineralisation
widths and intercept
lengths
These relationships are particularly important in
the reporting of Exploration Results.
If the geometry of the mineralisation with respect
to the drill hole angle is known, its nature should
be reported.
If it is not known and only the down hole lengths
are reported, there should be a clear statement to
this effect (e.g. ‘down hole length, true width not
known’).
All historical drill results reported are down hole lengths,
with true widths not confirmed.
Diagram Appropriate maps and sections (with scales) and
tabulations of intercepts should be included for
any significant discovery being reported These
should include, but not be limited to a plan view of
drill hole collar locations and appropriate sectional
views.
Refer to Figures in body of text.
Balanced reporting Where comprehensive reporting of all Exploration
Results is not practicable, representative reporting
of both low and high grades and/or widths should
be practiced to avoid misleading reporting of
Exploration Results.
All results considered significant are reported.
Other substantive
exploration data
Other exploration data, if meaningful and
material, should be reported including (but not
limited to): geological observations; geophysical
survey results; geochemical survey results; bulk
samples – size and method of treatment;
metallurgical test results; bulk density,
groundwater, geotechnical and rock
characteristics; potential deleterious or
contaminating substances.
This report refers to results of a recent MLEM program,
completed by GEM Geophysics utilising a low temperature
(liquid helium) superconducting quantum interference
device (SQUID) in a slingram configuration. The survey was
completed using 200m x 200m loops and station spacing of
100m and lines spacing of 200m
Further work The nature and scale of planned further work (e.g.
tests for lateral extensions or depth extensions or
large-scale step-out drilling).
Diagrams clearly highlighting the areas of possible
extensions, including the main geological
interpretations and future drilling areas, provided
this information is not commercially sensitive
The diamond drilling program to test the SQUID EM targets
as well as selected geological targets is ongoing, scheduled
to resume in early January.
Follow-up downhole EM is planned on each of the drill holes
completed to confirm the source of the MLEM response has
been tested.