Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

S2 RESOURCES LTD Capital/Financing Update 2023

Oct 22, 2023

65745_rns_2023-10-22_8c90e32a-ecb5-47ec-85cd-83d3afa9bfa5.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

ASX Announcement

23[rd] October 2023

==> picture [594 x 105] intentionally omitted <==

ELECTROMAGNETIC SURVEY STARTED AT KOONENBERRY

Key Points

  • S2 has commenced a ground electromagnetic survey at its Koonenberry nickelcopper project, NSW

  • Collation of results from previous wide spaced drilling confirms presence of nickel-copper sulphide occurrences

  • First of several surveys which will systematically cover the belt

S2 Resources Ltd (“S2” or the “Company”) advises that the first of several planned ground-based electromagnetic (EM) surveys has commenced at its 100% owned Koonenberry project in northwestern New South Wales (NSW). It is a regional-scale project covering 2,712 square kilometres and 140 strike kilometres of geology considered prospective for magmatic nickel-copper sulphide mineralisation.

The initial EM surveys will cover two parts of the Company’s tenure following the signing of land access agreements with relevant pastoral lease holders (see Figure 1). It is anticipated that this coverage will sequentially expand as more access agreements are concluded. The survey is expected to take two months, with results available in January 2024.

The initial EM survey comprises a combination of moving loop (MLEM) and fixed loop (FLEM) survey configurations using the highly sensitive deep penetrating ARMIT B-field system.

Meanwhile, collation of results from shallow and wide-spaced previous drilling by INCO/Vale and Carpentaria Exploration has confirmed the fertility of the belt for magmatic nickel-copper sulphides, with evidence of mineralisation having been intersected in several previous holes (see Figure 2). Key results from within the project area include:

  • 7 metres @ 0.46% nickel from 7 metres in hole CKOAC0053 (aircore) at Bald Hill South

  • 10 metres @ 0.35% nickel from 2 metres, including 3 metres @ 0.54% nickel and 0.1% copper from 3 metres in hole CKORB0160 (RAB) at Packsaddle

  • 4 metres @ 0.22% nickel and 0.11% copper from 31 metres in hole RC12KB008 (RC) at Packsaddle

  • 4 metres @ 0.3% nickel from 5 metres in hole CKORB0195 (RAB) at Highway

Furthermore, assessment of open file data confirms the presence of magmatic sulphides in the form of disseminated pentlandite, chalcopyrite and violarite in samples from old holes drilled at Packsaddle and Mt Arrowsmith East, located just outside of S2’s tenement boundary (see Figure 2).

Level 14, 333 Collins Street, Melbourne, VIC 3000, Australia. PO Box 143, Kingsway, WA 6065, Australia ABN 18 606 128 090 T +61 8 6166 0240 F 61 8 6270 5410 E [email protected] W www.s2resources.com.au

==> picture [446 x 637] intentionally omitted <==

Figure 1. Location of initial EM surveys at Koonenberry.

Level 14, 333 Collins Street, Melbourne, VIC 3000, Australia. PO Box 143, Kingsway, WA 6065, Australia ABN 18 606 128 090 T +61 8 6166 0240 F 61 8 6270 5410 E [email protected] W www.s2resources.com.au

==> picture [434 x 621] intentionally omitted <==

Figure 2. Summary of nickel-copper intercepts in sparse previous drilling, and proven magmatic nickel-copper sulphides in thin section confirming the fertility/prospectivity of the belt.

Level 14, 333 Collins Street, Melbourne, VIC 3000, Australia. PO Box 143, Kingsway, WA 6065, Australia ABN 18 606 128 090 T +61 8 6166 0240 F 61 8 6270 5410 E [email protected] W www.s2resources.com.au

Project geology and background

==> picture [286 x 139] intentionally omitted <==

The project is located 130km northeast of Broken Hill astride the Silver City Highway and covers 140 kilometres of strike of prospective stratigraphy of the Koonenberry Belt, a craton margin mobile belt where a series of mafic-ultramafic sills intrude the late Proterozoic to Cambrian Mt Arrowsmith volcanics. The project area covers that part of the belt that is deemed amenable to exploration in technical and financial terms by virtue of being either exposed at surface or being only buried by relatively shallow (less than 100 metres) of later (post-Carboniferous) cover. It contains a prominent elongate gravity high which coincides with numerous linear magnetic highs, which is interpreted to represent a slice of dense volcanic crust intruded by numerous mafic and ultramafic sills, of a similar scale to the Fraser Complex within the Albany-Fraser belt that contains the intrusion hosting Nova (Figures 3 and 4).

==> picture [454 x 454] intentionally omitted <==

Figure 3. Regional gravity image showing areas of deep post-Carboniferous cover, with the project area straddling the key gravity ridge.

Level 14, 333 Collins Street, Melbourne, VIC 3000, Australia. PO Box 143, Kingsway, WA 6065, Australia ABN 18 606 128 090 T +61 8 6166 0240 F 61 8 6270 5410 E [email protected] W www.s2resources.com.au

==> picture [286 x 139] intentionally omitted <==

==> picture [463 x 463] intentionally omitted <==

Figure 4. Regional magnetic image showing northwest striking linear grain reflecting abundant sills intruding the belt.

Whereas the Albany-Fraser belt is Proterozoic in age and wraps around the southeastern margin of the Yilgarn Craton, the Koonenberry Belt is late Proterozoic to Cambrian in age and wraps around the northeastern margin of the Curnamona Craton (Figures 5 and 6). Both are accretionary mobile belts containing nickel prospective stratigraphy.

The prospective stratigraphy at Koonenberry comprises 140 strike kilometres of the Mt Arrowsmith Volcanics which contain extensive sills and intrusions described as gabbros with comagmatic orthocumulate ultramafic picrites. These rocks are readily identifiable in the regional airborne magnetics (Figure 3) and are petrographically similar to those that host mineralisation in the Russian Pechenga Ni-Cu-PGE camp, comprising distinctive olivine-rich orthocumulates with abundant intercumulus red hydrous hornblende (Kaersutite). The Pechenga camp contains roughly 25 Ni-Cu-PGE

Level 14, 333 Collins Street, Melbourne, VIC 3000, Australia. PO Box 143, Kingsway, WA 6065, Australia ABN 18 606 128 090 T +61 8 6166 0240 F 61 8 6270 5410 E [email protected] W www.s2resources.com.au

mines containing approximately 4.7 million tonnes of nickel and 2.4 million tonnes of copper, mainly hosted in the basal sections of the thicker ferropicrite sills and intrusions, and is close to the giant Sakatti Ni-Cu-PGE deposit just across the border in northern Finland.

==> picture [461 x 347] intentionally omitted <==

Figure 5. Location map of the Koonenberry Belt showing and a comparison to the Fraser Zone of the Fraser Range which hosts the Nova-Bollinger deposit. The Koonenberry Belt is located on the north-eastern margin of the Curnamona Craton.

Koonenberry also resembles other magmatic Ni-Cu-PGE sulphide endowed belts such as the CircumSuperior Belt of Canada, (which is also an accretionary mobile zone wrapped around the northern margin of the Superior Craton) which hosts the giant Raglan and Thompson Ni-Cu camps. In fact, this was the model that the S2 team (then as Sirius Resources) used to identify the prospectivity of the Fraser Range, leading to the discovery of Nova.

In terms of the above, plus the presence of extensive primitive orthoculmulate ferropicrite sills intruding sulphidic and carbonaceous sedimentary rocks, Koonenberry closely resembles the Pechenga Belt, and minor occurrences of magmatic pentlandite and chalcopyrite have been identified in outcrop in some orthocumulate picrites from the Mt Arrowsmith area.

Level 14, 333 Collins Street, Melbourne, VIC 3000, Australia. PO Box 143, Kingsway, WA 6065, Australia ABN 18 606 128 090 T +61 8 6166 0240 F 61 8 6270 5410 E [email protected] W www.s2resources.com.au

==> picture [463 x 348] intentionally omitted <==

Figure 6. Same-scale comparison of the Fraser Zone of the Albany-Fraser Orogen (left) and the Koonenberry Belt (right) showing tenure over a prominent gravity ridge.

This announcement has been provided to the ASX under the authorisation of the S2 Board.

For further information, please contact:

Mark Bennett Executive Chairman +61 8 6166 0240

Past Exploration results reported in this announcement have been previously prepared and disclosed by S2 Resources Ltd in accordance with JORC 2012. The Company confirms that it is not aware of any new information or data that materially affects the information included in these market announcements. The Company confirms that the form and content in which the Competent Person's findings are presented here have not been materially modified from the original market announcement. Refer to www.s2resources.com.au for details on past exploration results.

Level 14, 333 Collins Street, Melbourne, VIC 3000, Australia. PO Box 143, Kingsway, WA 6065, Australia ABN 18 606 128 090 T +61 8 6166 0240 F 61 8 6270 5410 E [email protected] W www.s2resources.com.au

Competent Persons statement

==> picture [286 x 139] intentionally omitted <==

Information that relates to Exploration Results is based on information compiled by John Bartlett, who is an employee and equity holder of the Company. Mr Bartlett is a member of the Australian Institute of Mining and Metallurgy (MAusIMM) and has sufficient experience of relevance to the style of mineralization and the types of deposits under consideration, and to the activities undertaken, to qualify as a Competent Person as defined in the 2012 Edition of the Joint Ore Reserves Committee (JORC) Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Bartlett consents to the inclusion in this report of the matters based on information in the form and context in which it appears.

Information in this report that relates to Exploration Results from Victoria is based on information compiled by Rohan Worland, who is an employee and equity holder of the Company. Mr Worland is a member of the Australian Institute of Geoscientists (AIG) and has sufficient experience of relevance to the style of mineralization and the types of deposits under consideration, and to the activities undertaken, to qualify as a Competent Person as defined in the 2012 Edition of the Joint Ore Reserves Committee (JORC) Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Worland consents to the inclusion in this report of the matters based on information in the form and context in which it appears.

Table 1. Summary of Significant drill results from historical drilling at Koonenberry. Note: *the Mt Arrowsmith East prospect is located just outside S2’s Koonenberry project area.

Prospect Hole Id Drill
**Type **
Depth
(m)
Easting Northing RL Azi/Incl. From
(m)
To
(m)
Interval
(m)
Ni
(pct)
Cu
(pct)
Packsaddle RC12KB008 RC 144 601411 6616110 144.9 060/-60 31 35 4 0.22 0.11
Bald Hill South CKOAC0053 AC 52 586014 6635012 118.3 225/-60 37 44 7 0.46 0.02
Packsaddle CKORB0160 RAB 41 601478 6616132 145.3 225/-60 2 12 10 0.35 0.06
Incl. 3 6 3 0.54 0.10
Highway CKORB0195 RAB 30 595395 6622919 147.5 225/-60 5 9 4 0.30 0.03
Mt Arrowsmith
East*
DH119113 DDH 65 564320 6662857 156.7 240/-55 19.8 21.6 1.8 0.43 0.43
Mt Arrowsmith
East*
DH119114 DDH 51 564290 6662909 157.4 240/-55 21.8 34.36 12.56 0.26 0.23
Incl. 31.41 33.41 2 0.42 0.41
Mt Arrowsmith
East*
CKORB0282 RAB 44 564242 6662951 158.5 225/-60 1 18 17 0.18 0.17

Level 14, 333 Collins Street, Melbourne, VIC 3000, Australia. PO Box 143, Kingsway, WA 6065, Australia ABN 18 606 128 090 T +61 8 6166 0240 F 61 8 6270 5410 E [email protected] W www.s2resources.com.au

SECTION 1: SAMPLING TECHNIQUES AND DATA

==> picture [286 x 139] intentionally omitted <==

SECTION 1 SAMPLING TECHNIQUES AND DATA

Criteria JORC Code explanation Commentary
Sampling techniques Nature and quality of sampling (e.g. cut channels,
random chips, or specific specialised industry
standard measurement tools appropriate to the
minerals under investigation, such as down hole
gamma sondes, or handheld XRF instruments, etc).
These examples should not be taken as limiting the
broad meaning of sampling.
All results are historical in nature. No sampling by S2 has
been conducted on the tenements
Include reference to measures taken to ensure
sample representivity and the appropriate
calibration of any measurement tools or systems
used
All results are historical in nature. No sampling by S2 has
been conducted on the tenements
Aspects of the determination of mineralisation
that are Material to the Public Report. In cases
where ‘industry standard’ work has been done this
would be relatively simple (e.g. ‘reverse circulation
drilling was used to obtain 1 m samples from
which 3 kg was pulverised to produce a 30 g
charge for fire assay’). In other cases more
explanation may be required, such as where there
is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation
types (e.g. submarine nodules) may warrant
disclosure of detailed information
All results are historical in nature. No sampling by S2 has
been conducted on the tenements
Drilling techniques Drill type (e.g. core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic,
etc) and details (e.g. core diameter, triple or
standard tube, depth of diamond tails, face-
sampling bit or other type, whether core is
oriented and if so, by what method, etc).
No drilling by S2 has been conducted on the tenements.
Historical drilling (RAB, AC, RC & Diamond) has been
conducted across the project area, the verification and
validation of these data sets is ongoing.
Drill sample
recovery
Method of recording and assessing core and chip
sample recoveries and results assessed
No drilling or sampling by S2 has been conducted on the
tenements. All drilling on the project is historical in nature
and verification and validation of these data sets are ongoing.
Measures taken to maximise sample recovery and
ensure representative nature of the samples
No drilling or sampling by S2 has been conducted on the
tenements. All drilling on the project is historical in nature
and verification and validation of these data sets are
ongoing.
Whether a relationship exists between sample
recovery and grade and whether sample bias may
have occurred due to preferential loss/gain of
fine/coarse material.
No drilling or sampling by S2 has been conducted on the
tenements. All drilling on the project is historical in nature
and verification and validation of these data sets are ongoing.
Logging Whether core and chip samples have been
geologically and geotechnically logged to a level of
detail to support appropriate Mineral Resource
estimation, mining studies and metallurgical
studies.
No drilling or sampling by S2 has been conducted on the
tenements. All drilling on the project is historical in nature
and verification and validation of these data sets are ongoing.
Whether logging is qualitative or quantitative in
nature. Core (or costean, channel, etc)
photography.
No drilling or sampling by S2 has been conducted on the
tenements. All drilling on the project is historical in nature
and verification and validation of these data sets are ongoing.
The total length and percentage of the relevant
intersections logged
No drilling or sampling by S2 has been conducted on the
tenements. All drilling on the project is historical in nature
and verification and validation of these data sets are ongoing.

Level 14, 333 Collins Street, Melbourne, VIC 3000, Australia. PO Box 143, Kingsway, WA 6065, Australia ABN 18 606 128 090 T +61 8 6166 0240 F 61 8 6270 5410 E [email protected] W www.s2resources.com.au

Criteria JORC Code explanation Commentary
Sub-sampling
techniques and
sample preparation
If core, whether cut or sawn and whether quarter,
half or all core taken.
No drilling or sampling by S2 has been conducted on the
tenements. All drilling on the project is historical in nature
and verification and validation of these data sets are ongoing.
If non-core, whether riffled, tube sampled, rotary
split, etc and whether sampled wet or dry.
No drilling or sampling by S2 has been conducted on the
tenements. All drilling on the project is historical in nature
and verification and validation of these data sets are ongoing.
For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
No drilling or sampling by S2 has been conducted on the
tenements. All drilling on the project is historical in nature
and verification and validation of these data sets are ongoing.
Quality control procedures adopted for all sub-
sampling stages to maximise representivity of
samples.
No drilling or sampling by S2 has been conducted on the
tenements. All drilling on the project is historical in nature
and verification and validation of these data sets are ongoing.
Measures taken to ensure that the sampling is
representative of the in situ material collected,
including for instance results for field
duplicate/second-half sampling.
No drilling or sampling by S2 has been conducted on the
tenements. All drilling on the project is historical in nature
and verification and validation of these data sets are ongoing.
Whether sample sizes are appropriate to the grain
size of the material being sampled.
No drilling or sampling by S2 has been conducted on the
tenements. All drilling on the project is historical in nature
and verification and validation of these data sets are ongoing.
Quality of assay data
and laboratory tests
The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or
total.
No assaying of samples has been conducted by S2 on the
tenements. All sampling on the project is historical in nature
and verification and validation of these data sets are ongoing.
For geophysical tools, spectrometers, handheld
XRF instruments, etc, the parameters used in
determining the analysis including instrument
make and model, reading times, calibrations
factors applied and their derivation, etc.
No assaying of samples has been conducted by S2 on the
tenements. All sampling on the project is historical in nature
and verification and validation of these data sets are ongoing.
Nature of quality control procedures adopted (e.g.
standards, blanks, duplicates, external laboratory
checks) and whether acceptable levels of accuracy
(i.e. lack of bias) and precision have been
established.
No assaying of samples has been conducted by S2 on the
tenements. All sampling on the project is historical in nature
and verification and validation of these data sets are ongoing.
Verification of
sampling and
assaying
The verification of significant intersections by
either independent or alternative company
personnel.
No assaying of samples has been conducted on the tenements
The use of twinned holes. No drilling by S2 has been conducted on the tenements.
Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
No drilling or sampling has been conducted on the tenements.
All drilling and sampling on the project are historical in nature
and verification and validation of these data sets are ongoing.
Discuss any adjustment to assay data. No adjustments to the assay data have been carried out by S2.
drilling or sampling has been conducted by S2 on the
tenements.
Location of data
points
Accuracy and quality of surveys used to locate
drillholes (collar and down-hole surveys), trenches,
mine workings and other locations used in Mineral
Resource estimation.
No drilling or sampling has been conducted on the
tenements. All drilling and sampling on the project are
historical in nature and verification and validation of these
data sets are ongoing. Only selected historical drill sites have
been verified in the field by S2.
Specification of the grid system used. The grid system used by S2 is GDA94 (MGA), zone 54.
Historical results have been reported in various grid formats
and these have been converted to a standard grid system in
QGIS.
Quality and adequacy of topographic control. Elevation data for all data is determined by a digital elevation
model derived from public domain SRTM 10m Elevation grids

Level 14, 333 Collins Street, Melbourne, VIC 3000, Australia. PO Box 143, Kingsway, WA 6065, Australia ABN 18 606 128 090 T +61 8 6166 0240 F 61 8 6270 5410 E [email protected] W www.s2resources.com.au

Criteria JORC Code explanation Commentary
Data spacing and
distribution
Data spacing for reporting of Exploration Results. No drilling or sampling has been conducted by S2 on the
tenements. Historical drilling and sampling have been carried
out on various grid spacings as well as isolated, ad hoc
manner.
Whether the data spacing and distribution is
sufficient to establish the degree of geological and
grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s)
and classifications applied.
No assaying of samples has been conducted by S2 on the
tenements. All drilling and sampling on the project are
historical in nature and verification and validation of these
data sets are ongoing.
Whether sample compositing has been applied. No sample compositing has been applied by S2
Orientation of data
in relation to
geological structure
Whether the orientation of sampling achieves
unbiased sampling of possible structures and the
extent to which this is known, considering the
deposit type.
All drilling and sampling on the project are historical in nature
and verification and validation of these data sets are ongoing.
If the relationship between the drilling orientation
and the orientation of key mineralised structures is
considered to have introduced a sampling bias,
this should be assessed and reported if material.
All drilling and sampling on the project are historical in nature
and verification and validation of these data sets are ongoing.
Sample security The measures taken to ensure sample security. All drilling and sampling on the project is historical in nature
and S2 is currently unable to verify what (if any measures)
have been taken.
Audits or reviews The results of any audits or reviews of sampling
techniques and data.
No audits or reviews have been conducted by S2 at this stage.

SECTION 2: REPORTING OF EXPLORATION RESULTS

Criteria JORC Code explanation Commentary
Mineral tenement
and land tenure
status
Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint ventures,
partnerships, overriding royalties, native title
interests, historical sites, wilderness or national
park and environmental settings.
The Koonenberry Project comprises three exploration licences
(see list below), covering approximately 2700 square kilometres
and extending approximately 140km in a NW-SE orientation. The
tenements are held in the name of Dark Star Exploration Pty Ltd,
a wholly owned subsidiary of S2 Resources Ltd.
TENID
TENSTATUS
HOLDER
EL 9574
LIVE
Dark Star Exploration PtyLtd
EL 9575
LIVE
Dark Star Exploration PtyLtd
EL 9576
LIVE
Dark Star Exploration PtyLtd
The project is located approximately 130km northeast of Broken
Hill astride the Silver City Highway, with the Packsaddle
Roadhouse located centrally within the project area.
Pastoral leases (Western Land Leases “WWL”)) cover the majority
of the project area (>>90%), with stock including cattle, sheep, and
goats.
The southern portion of the tenement is within the determination
area of the Barkandji-Malyangapa Determined area, although the
WLL pastoral stations have been determined to extinguish Native
Title. The remaining area is within the Malyangapa Part A Native
Title Claim area.

Level 14, 333 Collins Street, Melbourne, VIC 3000, Australia. PO Box 143, Kingsway, WA 6065, Australia ABN 18 606 128 090 T +61 8 6166 0240 F 61 8 6270 5410 E [email protected] W www.s2resources.com.au

Criteria JORC Code explanation Commentary
The security of the tenure held at the time of
reporting along with any known impediments to
obtaining a licence to operate in the area.
All of the Exploration Licences are in good standing. Prior to
accessing the ground S2 is required to obtain signed land access
agreements with the landowners.
There are four small blocks of crown land, which S2 would be
required to negotiate further land access with the traditional
owners prior to undertaking any exploration. All four blocks are
currently considered un-prospective for magmatic nickel-copper
sulphide mineralisation.
Exploration done
by other parties
Acknowledgment and appraisal of exploration
by other parties.
The first recorded exploration for nickel mineralisation was by
CRAE who completed a regional stream sediment sampling
program identifying anomalous ultramafic rocks at Mt Wright/
Macs Tank, Conns Creek and Wyndonga. Follow-up soil and rock
chip sampling focussed on Mt Wright/ Macs Tank (located south
of the Koonenberry project, now within the Mootwingee
National Park). CRAE concluded the project was unlikely to be of
economic significance and withdrew from exploring the area.
Vale / Inco explored for magmatic nickel-copper sulphide
mineralisation between 2005 and 2009. Work included mapping,
soil and rock chip sampling, detailed aeromagnetic survey,
ground electromagnetic surveying and drilling (RAB/AC, RC and
diamond). Vale identified nickel-copper sulphide mineralisation
at the Mt Arrowsmith East prospect as well as anomalous nickel
in RAB/aircore drilling at Bald Hill South, Packsaddle and
Highway. In addition, copper staining was observed at the Mt
Arrowsmith Cu-Ag (MAC) prospect, hosted in basalt and
interpreted to have potential affinities with Keweenaw- Cu
mineralisation (Michigan, USA).
Carpentaria Exploration undertook exploration between 2011
and 2014.. Work included rock chip sampling and mapping,
magnetic modelling and limited RC drilling, intersecting nickel-
copper sulphides at the Packsaddle prospect.
In 2017, IGO completed a series of AMT geophysical lines over
the belt. Although most of the work was completed north of the
current project area, a single line did extend through the very
north of the project area.

Level 14, 333 Collins Street, Melbourne, VIC 3000, Australia. PO Box 143, Kingsway, WA 6065, Australia ABN 18 606 128 090 T +61 8 6166 0240 F 61 8 6270 5410 E [email protected] W www.s2resources.com.au

Criteria JORC Code explanation Commentary
Geology Deposit type, geological setting and style of
mineralisation.
The project area cover part of the Koonenberry Belt, an exposed
segment of the continental Late Neoproterozoic to Early
Cambrian rocks in far western New South Wales. Intra-
contintental rifting associated with the Neoproterozoic breakup
of the Rodinia supercontinent resulted in the deposition of the
shelf to slope sediments (silt, mud and dolomite) of the Kara
Formation.
During sediment deposition in a shallow sea, contemporaneous
rifting resulted in the eruption of bi-modal, alkaline, sub-aerial to
submarine pyroclastic tuffs and lava flows of the Mount
Arrowsmith Volcanics, along with feeder gabbroic sills and likely
comagmatic orthocumulate ultramafic picrite sills and intrusions.
The ultramafic intrusions associated with the Mt Arrowsmith
Volcanics are considered prospective for magnetic nickel-copper-
PGE mineralisation. The tectonic setting resembles other
magmatic Ni-Cu-PGE sulphide endowed belts such as the Circum-
Superior Belt of Canada, which hosts the giant Raglan and
Thompson Ni-Cu camps.
Petrographically, rocks are considered petrographically similar to
those that host mineralisation in the Russian Pechenga Ni-Cu-
PGE camp, with distinctive olivine-rich orthocumulates with
abundant intercumulus red hydrous hornblende (Kaersutite).
Adding support to the model, previous exploration has identified
trace to minor amounts of co-magmatic nickel sulphides
(pentlandite, and vilolerite) and copper sulphides (chalcopyrite)
within ultramafic picrite rocks.
Drill hole
Information
A summary of all information material to the
understanding of the exploration results
including a tabulation of the following
information for all Material drill holes:
easting and northing of the drill hole collar
elevation or RL (Reduced Level – elevation
above sea level in metres) of the drill hole collar
dip and azimuth of the hole
down hole length and interception depth
hole length.
Results of material drill holes is provided in Table 1. All drilling is
historical in nature verification and validation of these data sets
are ongoing.
Data aggregation
methods
In reporting Exploration Results, weighting
averaging techniques, maximum and/or
minimum grade truncations (e.g. cutting of high
grades) and cut-off grades are usually Material
and should be stated.
All results reported are historical in nature and cannot been
verified. Where intervals have been reported a cut-off grade of
0.15% Ni and/or 0.1% Cu has been used with no top-cut applied.
Intervals have been calculated by length weighting individual
assays and using a nominal maximum internal dilution of 2 metres.
Where aggregate intercepts incorporate short
lengths of high grade results and longer lengths
of low grade results, the procedure used for
such aggregation should be stated and some
typical examples of such aggregations should be
shown in detail.
Where aggregate intercepts include individual zones of higher
grade these are reported, using the same methodology as for the
larger intervals. The lower cut-off grade for the including
intervals is reported in the relevant tables.
The assumptions used for any reporting of metal
equivalent values should be clearly stated.
No metal equivalent results have been reported.

Level 14, 333 Collins Street, Melbourne, VIC 3000, Australia. PO Box 143, Kingsway, WA 6065, Australia ABN 18 606 128 090 T +61 8 6166 0240 F 61 8 6270 5410 E [email protected] W www.s2resources.com.au

Criteria JORC Code explanation Commentary
Relationship
between
mineralisation
widths and
intercept lengths
These relationships are particularly important in
the reporting of Exploration Results.
If the geometry of the mineralisation with
respect to the drill hole angle is known, its
nature should be reported.
If it is not known and only the down hole lengths
are reported, there should be a clear statement
to this effect (e.g. ‘down hole length, true width
not known’).
All drilling and sampling on the project are historical in nature
and verification and validation of these data sets are ongoing. S2
is unable to determine any relationship at this stage and all
results reported are downhole lengths only and true widths are
unknown.
Diagram Appropriate maps and sections (with scales) and
tabulations of intercepts should be included for
any significant discovery being reported These
should include, but not be limited to a plan view
of drill hole collar locations and appropriate
sectional views.
Refer to Figures in body of text.
Balanced
reporting
Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low and high
grades and/or widths should be practiced to
avoid misleading reporting of Exploration
Results.
All historical results considered significant are reported.
Other substantive
exploration data
Other exploration data, if meaningful and
material, should be reported including (but not
limited to): geological observations; geophysical
survey results; geochemical survey results; bulk
samples – size and method of treatment;
metallurgical test results; bulk density,
groundwater, geotechnical and rock
characteristics; potential deleterious or
contaminating substances.
A Geoscience Australia airborne electromagnetic survey (SkyTEM)
survey has been flown on nominal 2.5kilometre line spacing over
the project area. The line spacing is not considered sufficient to
effectively explore for magmatic nickel-copper sulphide
mineralisation, although the survey has shown that much of the
project area has conductive cover, significantly limiting the
effectiveness of any such survey.
Various isolated MLEM geophysical surveys have been carried out
within the project (Figure 1). These surveys have been reviewed
by the company’s geophysical consultants (Newexco). The
historical MLEM surveys have not identified any bedrock
conductors within the limitations of the surveys (estimated to be
approx. 200 metres depth penetration).
Inco/Vale have flown a 100-metre line spaced aeromagnetic and
radiometric survey over much of the project area. This data has
been merged into the regional dataset.
Other exploration has included rock chip, stream sediment and
soil sampling, and any material results have been reported.
Further work The nature and scale of planned further work
(e.g. tests for lateral extensions or depth
extensions or large-scale step-out drilling).
Diagrams clearly highlighting the areas of
possible extensions, including the main
geological interpretations and future drilling
areas, provided this information is not
commercially sensitive
S2 intends to undertake systematic early-stage exploration over
the Koonenberry project area, using ground EM (MLEM and
reconnaissance
FLEM)
surveys,
combined
with
surface
prospecting (including mapping, rock chip sampling and ultrafine
soil sampling) in areas where prospective stratigraphy.

Level 14, 333 Collins Street, Melbourne, VIC 3000, Australia. PO Box 143, Kingsway, WA 6065, Australia ABN 18 606 128 090 T +61 8 6166 0240 F 61 8 6270 5410 E [email protected] W www.s2resources.com.au