AI assistant
S2 RESOURCES LTD — Capital/Financing Update 2023
Oct 29, 2023
65745_rns_2023-10-29_ef194d8e-b180-4918-820a-587697753d95.pdf
Capital/Financing Update
Open in viewerOpens in your device viewer
ASX Announcement
30 October 2023
==> picture [594 x 105] intentionally omitted <==
DRILLING UNDERWAY AT GREATER FOSTERVILLE
Key Points
-
Diamond drilling started at Greater Fosterville
-
Initial roadside program to continue for three months
-
Targeting prospective corridor following up where Kirkland Lake left off
S2 Resources Ltd (“S2” or the “Company”) advises that its wholly owned subsidiary, Southern Star Exploration Pty Ltd (“Southern Star”), has commenced a 5,600 metre, 10 hole initial diamond drilling program at its 100% owned Greater Fosterville project. This program is expected to take approximately three months to complete.
The initial program will test a favourable gold corridor immediately north of Agnico Eagle’s Fosterville mine lease in the Goornong area, where previous exploration identified a strongly mineralised corridor centred on the Goornong South prospect (see Figure 1) and drilling during the 1990’s intersected significant oxide gold mineralisation (see Figure 2). During the last year that the exploration licence was held by Kirkland Lake (now Agnico Eagle) several diamond holes were drilled to the south along strike and down plunge of the historic oxide mineralisation. S2 has relogged these holes to construct the stratigraphic and structural architecture of what is now interpreted to be the next parallel prospective structure to the east of the O’Dwyers and Fosterville trends, which host the orebodies being mined by Agnico Eagle.
This first drill program will test immediately beneath and down plunge to the south of the Goornong South oxide mineralisation, testing multiple structures where they cross the main anticline that is interpreted to be the focus for mineralised fluids. Along the favourable anticline corridor any mineralised structure could refract and flatten into a favourable orientation with the potential to form high-grade trap sites for Swan zone-style gold mineralisation (the Swan Zone, located along the Fosterville trend within Agnico Eagle’s mine lease, had an initial Mineral Ore Reserve of 2.34Moz of gold at a grade of 49.6g/t, refer to the NI 43-101 Report dated 31 December 2018).
S2 will employ a combination of conventional across strike holes in the shallower part of the system (see Figures 2 and 4) and unconventional strike parallel holes down the axial plane of the target anticline corridor (see Figures 3 and 4) to test for multiple stacked structural positions that cross the anticline. These axial plane holes are designed to test positions down plunge to the south of the oxide gold mineralisation as well as numerous other mineralised structures intersected by the historic diamond drilling completed by Kirkland Lake, any one of which could yield a significant discovery where they refract, flatten and dilate across the fold corridor.
Level 14, 333 Collins Street, Melbourne, VIC 3000, Australia. PO Box 1209, Osborne Park, WA 6916, Australia ABN 18 606 128 090 T +61 8 6166 0240 F 61 8 6270 5410 E [email protected] W www.s2resources.com.au
==> picture [452 x 541] intentionally omitted <==
Figure 1. Map of the Goornong area showing gold oxide mineralised zone and Kirkland Lake holes drilled immediately prior to their relinquishment of the ground, aimed at testing the southerly down plunge continuation of this zone. Note, the Fosterville Fault (which contains the Swan zone further south) and the O’Dwyer’s Fault (which contains the Robbins Hill and Curie zones further south) both extend through this area.
Level 14, 333 Collins Street, Melbourne, VIC 3000, Australia. PO Box 1209, Osborne Park, WA 6916, Australia ABN 18 606 128 090 T +61 8 6166 0240 F 61 8 6270 5410 E [email protected] W www.s2resources.com.au
==> picture [438 x 605] intentionally omitted <==
Figure 2. Cross section of the Goornong area showing the gold oxide mineralised zone and Kirkland Lake holes drilled immediately prior to their relinquishment of the ground. Relogging of their diamond core has led to the interpretation shown, with several structures having the potential to transect the axial zone of the anticline where they may refract, flatten and dilate to create favourable sites for Swan Zone-style mineralisation.
Level 14, 333 Collins Street, Melbourne, VIC 3000, Australia. PO Box 1209, Osborne Park, WA 6916, Australia ABN 18 606 128 090 T +61 8 6166 0240 F 61 8 6270 5410 E [email protected] W www.s2resources.com.au
==> picture [453 x 211] intentionally omitted <==
Figure 3. Long section of the Goornong South area showing the shallow oxide gold mineralised zone, interpreted south plunge of folds, and schematic location of proposed drill holes (pierce points of holes to be drilled beneath the shallow oxide zone and traces of holes to be drilled with a northerly azimuth, parallel to the axial plane that will test the multiple structural positions that could occur within the anticline corridor being targeted).
The strike parallel holes drilling down the axial plane will test multiple structural levels within the anticline corridor, where structures may refract into relatively flat positions across the hinge zone. Drilling will be angled northwards to provide the optimal intersection angle for south plunging shoots within the south plunging fold noses, and this will also enable core orientation for the detailed structural measurements which are vital to interpreting the three-dimensional fault-fold architecture, so that any near misses can be interpreted for later drill follow-up.
Whilst the definition of gold mineralisation is a desired outcome of this drilling, the bigger picture objective is to better define the structural and stratigraphic architecture of the Goornong South trend, to define vectors to positions where otherwise insignificant structures have the potential to host significant mineralisation. An important focus for S2 is to gain an understanding of the area’s overall potential for a large gold deposit without getting drawn into close spaced drilling of targets that may never deliver sufficient tonnages to be economic, and the planned drill holes are spaced accordingly.
The drilling program will comprise a single rig operating primarily on a double-shift basis. It is expected that this first program will extend into February 2024, with the flexibility to modify later holes based on the knowledge gained from earlier drilling. Detailed structural and stratigraphic logging will be undertaken at the Company’s Bendigo field base (see Figure 5), with initial assay results expected around mid-December.
Level 14, 333 Collins Street, Melbourne, VIC 3000, Australia. PO Box 1209, Osborne Park, WA 6916, Australia ABN 18 606 128 090 T +61 8 6166 0240 F 61 8 6270 5410 E [email protected] W www.s2resources.com.au
==> picture [455 x 315] intentionally omitted <==
Figure 4. Schematic block model of the Goornong South area showing the south plunging fold structures and the targeted fault structures intersecting anticlines. Drilling will include both across strike (conventional) testing of mineralised structures (as shown in the cross sectional slices) and along strike (non-conventional) testing of multiple structural positions within the favourable Goornong anticline trend (as shown in the long sectional slices). Drillhole positions are illustrative only and locations may vary.
==> picture [455 x 231] intentionally omitted <==
Figure 5. Photo of S2’s Bendigo core processing facility, with core drilled by Kirkland Lake.
Level 14, 333 Collins Street, Melbourne, VIC 3000, Australia. PO Box 1209, Osborne Park, WA 6916, Australia ABN 18 606 128 090 T +61 8 6166 0240 F 61 8 6270 5410 E [email protected] W www.s2resources.com.au
Project background
==> picture [286 x 139] intentionally omitted <==
S2’s 100% owned subsidiary, Southern Star Exploration Pty Ltd, was announced as the winner of the highly competitive tender for the sole right to apply for an Exploration Licence (EL) over the ground surrounding Agnico Eagle’s (Agnico) world class Fosterville gold mine in October 2021 (see S2 ASX announcement of 29[th] October 2021). The EL application was submitted in late 2021, and various Traditional Owner-related preconditions were satisfied recently (see S2 ASX announcement of 4[th] July 2023). The ground was granted as Exploration Licence 7795 (EL7795) in early October (see S2 ASX announcement of 4[th] October 2023), and covers an area of 394 square kilometres, extending 55 kilometres north to south, and abuts and surrounds Agnico Eagle’s Fosterville mine lease. By virtue of its position, its size, and its inherent prospectivity, EL7795 is a highly strategic asset. EL7795 has a minimum expenditure commitment of A$10.4 million over the first five year term of the licence, inclusive of a minimum A$2.1 million commitment in the first two years.
As winners of the tender, S2 has also inherited a substantial amount of data acquired by previous explorers over the area, including the relatively recent exploration work undertaken by Kirkland Lake Gold (the owner of Fosterville prior to its acquisition by Agnico) on the tenement before it expired.
This data includes extensive and high quality geophysical and geochemical surveys such as gravity, induced polarisation (IP), electromagnetic (EM), seismic, magnetic and LIDAR surveys, which are being used to generate drill targets. The inheritance of such a significant amount of data represents a huge saving for the Company in terms of time and money that would otherwise be required to get it to the point of having drill ready targets for testing.
It also includes drilling data and drill core from holes drilled immediately prior to the expiry of the previous tenement, which although widely spaced and/or shallow and/or highly localised, have identified gold mineralisation in several locations. As a consequence, the Company has a range of targets at various stages of definition from early stage reconnaissance up to and including defined prospects simply requiring further drilling to determine the extent and quality of gold mineralisation at those locations.
These targets are located on a mix of Crown Land, freehold land (both broadacre farms and smaller blocks), and road reserves, which require the Company to obtain land access agreements and other relevant permits, as well as heritage clearances, before commencing exploration.
1 Until such time as access consents are obtained there is no guarantee that the Company will be able to access freehold property, but a substantial amount of drilling can be undertaken from roadsides.
This announcement has been provided to the ASX under the authorisation of the S2 Board.
For further information, please contact:
Mark Bennett Executive Chairman +61 8 6166 0240
Past Exploration results reported in this announcement have been previously prepared and disclosed by S2 Resources Ltd in accordance with JORC 2012. The Company confirms that it is not aware of any new information or data that materially affects the information included in these market
Level 14, 333 Collins Street, Melbourne, VIC 3000, Australia. PO Box 1209, Osborne Park, WA 6916, Australia ABN 18 606 128 090 T +61 8 6166 0240 F 61 8 6270 5410 E [email protected] W www.s2resources.com.au
announcements. The Company confirms that the form and content in which the Competent Person's findings are presented here have not been materially modified from the original market announcement. Refer to www.s2resources.com.au for details on past exploration results.
Competent Persons statement
Information in this report that relates to Exploration Results from Victoria is based on information compiled by Rohan Worland, who is an employee and equity holder of the Company. Mr Worland is a member of the Australian Institute of Geoscientists (AIG) and has sufficient experience of relevance to the style of mineralization and the types of deposits under consideration, and to the activities undertaken, to qualify as a Competent Person as defined in the 2012 Edition of the Joint Ore Reserves Committee (JORC) Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Worland consents to the inclusion in this report of the matters based on information in the form and context in which it appears.
Information in this report that relates to Exploration Results from Western Australia, New South Wales and Finland is based on information compiled by John Bartlett, who is an employee and equity holder of the Company. Mr Bartlett is a member of the Australian Institute of Mining and Metallurgy (MAusIMM) and has sufficient experience of relevance to the style of mineralization and the types of deposits under consideration, and to the activities undertaken, to qualify as a Competent Person as defined in the 2012 Edition of the Joint Ore Reserves Committee (JORC) Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Bartlett consents to the inclusion in this report of the matters based on information in the form and context in which it appears.
Table 1: Drill Collars
| Table 1: Drill | Collars | ||||||
|---|---|---|---|---|---|---|---|
| Hole ID | Easting (MGA) |
Northing (MGA) |
Elevation (m) |
Dip | Azimuth | Depth (m) |
Drill Type |
| GSDD073 | 278,265 | 5,943,281 | 147.7 | - | 258.1 | 69 | DD |
| GSDD081 | 278,070 | 5,943,280 | 146.2 | - | 99.5 | 246.8 | DD |
| GSDD082 | 278,069 | 5,943,279 | 146.2 | - | 99.5 | 261.1 | DD |
| GSDD083 | 278,068 | 5,943,279 | 146.2 | - | 99.5 | 192.5 | DD |
| GSDD084 | 278,049 | 5,943,104 | 146.3 | - | 99.5 | 305.6 | DD |
| GSDD085 | 278,056 | 5,942,555 | 147.1 | - | 99.5 | 526.7 | DD |
| GSDD086 | 278,628 | 5,942,481 | 147.5 | - | 261.2 | 443.4 | DD |
| GSDD087 | 278,628 | 5,942,481 | 147.5 | - | 252.1 | 455.7 | DD |
| GSDD088 | 278,630 | 5,942,482 | 147.4 | - | 73.2 | 533.4 | DD |
| GSDD089 | 278,572 | 5,941,643 | 148.9 | - | 81.2 | 650 | DD |
| GSDD090 | 278,568 | 5,941,645 | 148.9 | - | 259.2 | 434.2 | DD |
Level 14, 333 Collins Street, Melbourne, VIC 3000, Australia. PO Box 1209, Osborne Park, WA 6916, Australia ABN 18 606 128 090 T +61 8 6166 0240 F 61 8 6270 5410 E [email protected] W www.s2resources.com.au
| GSDD091 | 277,165 | 5,940,959 | 149.0 | - | 69.4 | 16.7 | DD |
| GSDD091A | 277,163 | 5,940,959 | 149.0 | - | 78.2 | 402 | DD |
| GSDD094 | 278,630 | 5,942,482 | 147.4 | - | 73.0 | 590.5 | DD |
| GSDD096 | 278,288 | 5,941,689 | 148.2 | - | 39.8 | 1178.6 | DD |
| GSRC014 | 278,233 | 5,943,321 | 146.8 | - | 79.1 | 54 | RC |
| GSRC028 | 278,217 | 5,943,367 | 146.5 | - | 79.1 | 60 | RC |
| GSRC031 | 278,259 | 5,943,480 | 147.1 | - | 253.1 | 78 | RC |
| GSRC032 | 278,208 | 5,943,315 | 146.7 | - | 80.1 | 75 | RC |
| GSRC033 | 278,236 | 5,943,284 | 147.0 | - | 79.1 | 67 | RC |
| GSRC038 | 278,185 | 5,943,696 | 147.0 | - | 81.1 | 60 | RC |
| GSRC051 | 278,253 | 5,943,098 | 147.6 | - | 78.1 | 74 | RC |
| GSRC058 | 278,216 | 5,943,269 | 146.9 | - | 78.1 | 86 | RC |
| GSRC062 | 278,184 | 5,943,313 | 146.7 | - | 78.1 | 98 | RC |
Level 14, 333 Collins Street, Melbourne, VIC 3000, Australia. PO Box 1209, Osborne Park, WA 6916, Australia ABN 18 606 128 090 T +61 8 6166 0240 F 61 8 6270 5410 E [email protected] W www.s2resources.com.au
Table 2: Drill Assays (>5g/t gold grades shown in bold)
| Hole ID | From (m) | To (m) | Interval (m) |
Au (g/t) | Hole ID | From (m) | To (m) | Interval (m) |
Au (g/t) |
|---|---|---|---|---|---|---|---|---|---|
| GSDD073 | 24 | 36 | 12.0 | 2.5 | GSRC032 | 60 | 75 | 15.0 | 1.4 |
| including | 24 | 30 | 6.0 | 4.6 | including | 72 | 75 | 3.0 | 4.1 |
| including | 28 | 30 | 2.0 | 9.3 | including | 72 | 74 | 2.0 | 5.7 |
| GSDD081 | 191.9 | 198.2 | 6.3 | 0.7 | GSRC033 | 14 | 50 | 36.0 | 1.6 |
| GSDD082 | 103.85 | 126.3 | 22.5 | 2.1 | including | 38 | 46 | 8.0 | 5.6 |
| GSDD082 | 196 | 203 | 7.0 | 0.3 | including | 40 | 44 | 4.0 | 7.5 |
| GSDD082 | 256.3 | 256.65 | 0.3 | 2.1 | GSRC038 | 18 | 28 | 10.0 | 2.5 |
| GSDD084 | 251.5 | 255 | 3.5 | 6.8 | GSRC051 | 32 | 38 | 6.0 | 2.7 |
| including | 251.95 | 254 | 2.1 | 11.2 | GSRC058 | 14 | 34 | 20.0 | 2.2 |
| GSDD084 | 281.55 | 286 | 4.5 | 1.6 | and | 16 | 18 | 2.0 | 7.9 |
| including | 281.55 | 284 | 2.5 | 2.6 | GSRC058 | 56 | 74 | 18.0 | 1.8 |
| including | 281.55 | 282.4 | 0.8 | 5.2 | including | 64 | 72 | 8.0 | 3.6 |
| GSDD088 | 213.1 | 217 | 3.9 | 1.5 | GSRC062 | 52 | 66 | 14.0 | 1.0 |
| including | 213.1 | 215 | 1.9 | 3.0 | including | 52 | 56 | 4.0 | 3.3 |
| GSDD088 | 213.1 | 214 | 0.9 | 5.0 | GSRC062 | 70 | 94 | 24.0 | 5.0 |
| GSDD088 | 448.9 | 451 | 2.1 | 2.3 | including | 88 | 90 | 2.0 | 29.4 |
| including | 449.9 | 450.6 | 0.7 | 5.9 | |||||
| GSDD090 | 80.2 | 87.7 | 7.5 | 2.3 | |||||
| including | 84.8 | 86.5 | 1.7 | 6.0 | |||||
| GSDD090 | 207.1 | 212.8 | 5.7 | 2.2 | |||||
| Including | 211.05 | 211.6 | 0.5 | 7.9 | |||||
| GSDD094 | 437 | 461.5 | 24.5 | 1.3 | |||||
| including | 438.7 | 444.4 | 5.7 | 2.0 | |||||
| and | 454 | 461.5 | 7.5 | 2.2 | |||||
| including | 460.1 | 461 | 0.9 | 6.7 | |||||
| GSDD094 | 576.5 | 576.95 | 0.5 | 6.9 | |||||
| GSDD096 | 350.2 | 363.8 | 13.6 | 1.5 | |||||
| including | 357.4 | 363.2 | 5.8 | 3.2 | |||||
| including | 360.55 | 361.45 | 0.9 | 5.7 | |||||
| GSDD096 | 383.65 | 404.85 | 21.2 | 0.9 | |||||
| including | 399.2 | 404.85 | 5.7 | 2.1 | |||||
| including | 403.85 | 404.85 | 1.0 | 6.6 | |||||
| GSRC014 | 50 | 54 | 4.0 | 2.3 | |||||
| including | 50 | 52 | 2.0 | 4.6 | |||||
| GSRC028 | 4 | 26 | 22.0 | 2.1 | |||||
| including | 6 | 18 | 12.0 | 3.7 | |||||
| including | 12 | 14 | 2.0 | 16.3 | |||||
| GSRC031 | 12 | 40 | 28.0 | 1.9 | |||||
| including | 32 | 36 | 4.0 | 11.0 | |||||
| including | 32 | 34 | 2.0 | 17.2 | |||||
Level 14, 333 Collins Street, Melbourne, VIC 3000, Australia. PO Box 1209, Osborne Park, WA 6916, Australia ABN 18 606 128 090 T +61 8 6166 0240 F 61 8 6270 5410 E [email protected] W www.s2resources.com.au
==> picture [286 x 139] intentionally omitted <==
The following Tables are provided to ensure compliance with the JORC code (2012) edition requirements for the reporting of exploration results.
SECTION 1: SAMPLING TECHNIQUES AND DATA
| Criteria | JORC Code explanation | Commentary |
|---|---|---|
| Sampling techniques |
Nature and quality of sampling (e.g. cut channels, random chips, or specific specialised industry standard measurement tools appropriate to the minerals under investigation, such as down hole gamma sondes, or handheld XRF instruments, etc). These examples should not be taken as limiting the broad meaning of sampling. |
Historic drilling from surface includes diamond core and Reverse Circulation (RC). All historical drilling data has been obtained from open file reporting, the majority which was compiled and reported by Kirland Lake Gold in the EL3539 Final Relinquishment Report (2019). Data has been reviewed, appraised and integrated into a database. Data is of sufficient quality, relevance and applicability. |
| Include reference to measures taken to ensure sample representivity and the appropriate calibration of any measurement tools or systems used |
No information about the historic QAQC procedures have been compiled. |
|
| Aspects of the determination of mineralisation that are Material to the Public Report. In cases where ‘industry standard’ work has been done this would be relatively simple (e.g. ‘reverse circulation drilling was used to obtain 1 m samples from which 3 kg was pulverised to produce a 30 g charge for fire assay’). In other cases more explanation may be required, such as where there is coarse gold that has inherent sampling problems. Unusual commodities or mineralisation types (e.g. submarine nodules) may warrant disclosure of detailed information |
Sampling intervals were typically 0.3 to 2.0m for core and 1 to 4m for RC. Core was typically split in half by core saw. All samples were sent to an external laboratory for preparation and analysis. Based on the distribution of mineralisation the sample size is considered adequate for representative sampling. |
|
| Drilling techniques | Drill type (e.g. core, reverse circulation, open-hole hammer, rotary air blast, auger, Bangka, sonic, etc) and details (e.g. core diameter, triple or standard tube, depth of diamond tails, face- sampling bit or other type, whether core is oriented and if so, by what method, etc). |
Historic drilling from surface includes diamond core and Reverse Circulation (RC). Diamond core is oriented. No details about hole diameter have been compiled. |
| Drill sample recovery |
Method of recording and assessing core and chip sample recoveries and results assessed |
Core recoveries have been compiled. No information about chip sample recoveries has been compiled. |
| Measures taken to maximise sample recovery and ensure representative nature of the samples |
No information about maximising sample recovery has been compiled. |
|
| Whether a relationship exists between sample recovery and grade and whether sample bias may have occurred due to preferential loss/gain of fine/coarse material. |
A link between sample recovery and grade is not apparent. | |
| Logging | Whether core and chip samples have been geologically and geotechnically logged to a level of detail to support appropriate Mineral Resource estimation, mining studies and metallurgical studies. |
The compilation of historic diamond core and RC drilling includes records of lithology, alteration, structure and recovery. |
| Whether logging is qualitative or quantitative in nature. Core (or costean, channel, etc) photography. |
The compilation of historic diamond core and RC logging is quantitative and qualitative. Core photography is available. |
Level 14, 333 Collins Street, Melbourne, VIC 3000, Australia. PO Box 1209, Osborne Park, WA 6916, Australia ABN 18 606 128 090 T +61 8 6166 0240 F 61 8 6270 5410 E [email protected] W www.s2resources.com.au
| Criteria | JORC Code explanation | Commentary |
| The total length and percentage of the relevant intersections logged |
The compilation of historic diamond core and RC logging is comprehensive for all exploration results reported. S2R geologists and consultants have been able to relog 80% of the core for the Goornong South prospect. |
|
| Sub-sampling techniques and sample preparation |
If core, whether cut or sawn and whether quarter, half or all core taken. |
Core is split in half by core saw and one-half submitted to the laboratory for analysis. |
| If non-core, whether riffled, tube sampled, rotary split, etc and whether sampled wet or dry. |
No information about RC sampling has been compiled. | |
| For all sample types, the nature, quality and appropriateness of the sample preparation technique. |
Historic samples were submitted to reputable commercial laboratories (OSLS Bendigo and Bureau Veritas Adelaide) that used standard industry preparation techniques. |
|
| Quality control procedures adopted for all sub- sampling stages to maximise representivity of samples. |
Historic reports note QAQC protocols but no data has been compiled to assess the QAQC results. |
|
| Measures taken to ensure that the sampling is representative of the in situ material collected, including for instance results for field duplicate/second-half sampling. |
No information regarding the representativity of the sampling has been compiled. |
|
| Whether sample sizes are appropriate to the grain size of the material being sampled. |
Sample sizes are appropriate to the grain size of the material being sampled. |
|
| Quality of assay data and laboratory tests |
The nature, quality and appropriateness of the assaying and laboratory procedures used and whether the technique is considered partial or total. |
Core and RC samples were analysed for Au by OSLS (Bendigo) using a 25g fire assay with AAS finish (PE01S) or by Bureau Veritas (Adelaide) using a 40g fire assay with AAS finish (FA001). Core and RC samples were analysed for a variable suite of multi-elements by OSLS (Bendigo) using method B010 (aqua regia digest and ICP-AES finish) or by Bureau Veritas (Adelaide) by technique MA101/102 (four acid digest and ICP-AES/MS finish). Fire assay for Au is considered total. Multi-element assay four acid digest are considered near-total for all but the most resistive minerals (not of relevance). Aqua-regia digestion is considered partial depending on element and minerals present, but sulphide minerals as seen on the project are readily and completely digestible. |
| For geophysical tools, spectrometers, handheld XRF instruments, etc, the parameters used in determining the analysis including instrument make and model, reading times, calibrations factors applied and their derivation, etc. |
No geophysical tools were used to determine any element concentrations. |
|
| Nature of quality control procedures adopted (e.g. standards, blanks, duplicates, external laboratory checks) and whether acceptable levels of accuracy (i.e. lack of bias) and precision have been established. |
Historic reports note QAQC protocols, but no data has been compiled to assess the QAQC results. |
|
| Verification of sampling and assaying |
The verification of significant intersections by either independent or alternative company personnel. |
Significant intersections have been checked and verified by alternative company personnel or independent consultants. |
| The use of twinned holes. | No twin holes are reported. |
Level 14, 333 Collins Street, Melbourne, VIC 3000, Australia. PO Box 1209, Osborne Park, WA 6916, Australia ABN 18 606 128 090 T +61 8 6166 0240 F 61 8 6270 5410 E [email protected] W www.s2resources.com.au
| Criteria | JORC Code explanation | Commentary |
| Documentation of primary data, data entry procedures, data verification, data storage (physical and electronic) protocols. |
All historical drilling data has been obtained from open file reporting, the majority which was compiled and reported by Kirland Lake Gold in the EL3539 Final Relinquishment Report (2019). Data has been reviewed, appraised and integrated into S2’s central database. |
|
| Discuss any adjustment to assay data. | No adjustments made. | |
| Location of data points |
Accuracy and quality of surveys used to locate drillholes (collar and down-hole surveys), trenches, mine workings and other locations used in Mineral Resource estimation. |
Most drill collar locations were recorded using a handheld GPS with a small number of drill collars recorded using a differential GPS. |
| Specification of the grid system used. | The grid system is MGA GDA94 (Zone 55). Local easting and northing are in MGA. |
|
| Quality and adequacy of topographic control. | Topographic control is provided by a high-resolution LiDAR survey DEM. The accuracy of the DEM is +/-1m. |
|
| Data spacing and distribution |
Data spacing for reporting of Exploration Results. | Data spacing (drill holes) is variable and appropriate to the geology. |
| Whether the data spacing and distribution is sufficient to establish the degree of geological and grade continuity appropriate for the Mineral Resource and Ore Reserve estimation procedure(s) and classifications applied. |
Not applicable. | |
| Whether sample compositing has been applied. | No sample compositing has been applied. | |
| Orientation of data in relation to geological structure |
Whether the orientation of sampling achieves unbiased sampling of possible structures and the extent to which this is known, considering the deposit type. |
The drill holes may not necessarily be perpendicular to the orientation of the intersected mineralisation. Mineralised structures have multiple orientations. Some of the mineralised structures are intersected at low angles to the drill holes resulting in multiple intersections of the same mineralised structure, though for the majority of drilling there is no significant orientation-based sampling bias. Reported intersections are down-hole intervals and not true widths. |
| If the relationship between the drilling orientation and the orientation of key mineralised structures is considered to have introduced a sampling bias, this should be assessed and reported if material. |
Where the drilling orientation intersects a mineralised structure at a low angle appropriate commentary is provided in the body of the report. |
|
| Sample security | The measures taken to ensure sample security. | No information regarding the sample security has been compiled. |
| Audits or reviews | The results of any audits or reviews of sampling techniques and data. |
No records of any audits or reviews of sampling have been compiled to date. |
Level 14, 333 Collins Street, Melbourne, VIC 3000, Australia. PO Box 1209, Osborne Park, WA 6916, Australia ABN 18 606 128 090 T +61 8 6166 0240 F 61 8 6270 5410 E [email protected] W www.s2resources.com.au
SECTION 2: REPORTING OF EXPLORATION RESULTS
| Criteria | JORC Code explanation | Commentary |
|---|---|---|
| Mineral tenement and land tenure status |
Type, reference name/number, location and ownership including agreements or material issues with third parties such as joint ventures, partnerships, overriding royalties, native title interests, historical sites, wilderness or national park and environmental settings. |
The Greater Fosterville Project consists of two granted exploration licences (EL7795 & EL8074) and two deferred exploration licence applications (EL8166 & EL8167) in the State of Victoria. The tenements are owned by Southern Star Exploration Pty Ltd (SSE), a wholly owned subsidiary of S2 Resources Ltd. The Greater Fosterville Project is located within Recognition and Settlement Agreement Areas held by the Dja Dja Wurrung Clans Aboriginal Corporation (DJAARA) and the Taungurung Land and Waters Council Aboriginal Corporation (TLaWC) under the Traditional Owner Settlement Act 2010 (Vic). Access and compensation agreements are required to conduct work on freehold land and while it is hoped that landowners will agree to these there is no guarantee that they will be forthcoming. |
| The security of the tenure held at the time of reporting along with any known impediments to obtaining a licence to operate in the area. |
EL7795 & EL8074 are current and in good standing. EL8166 & EL8167 are deferred applications following a competitive assessment that resulted in the government selecting an alternate preferred applicant. EL8166 & EL8167 will remain in abeyance until the highest ranked application is either granted or refused. |
|
| Exploration done by other parties |
Acknowledgment and appraisal of exploration by other parties. |
The Greater Fosterville Project has seen exploration conducted by the various owners of the Fosterville Gold Mine that has included Perseverance Exploration Company Ltd, Northgate Minerals, AuRico Gold, Crocodile Gold, Newmarket and Kirkland Lake Gold over the period 1989- 2019. Historic exploration has also included work by Planet Mining Company Pty Ltd (1965-70), Lone Star Exploration NL (1973-74), Noranda Australia Ltd (1974-76), Brunswick NL (1989-92), Bendigo Gold Associates (1989-92), BHP Minerals Ltd (1986-90), Western Mining Corporation Limited (1978-89) and Rio Tinto Exploration Pty Ltd (1980- 1988). All historical work has been obtained from open file reporting, the majority which was compiled and reported by Kirland Lake Gold in the EL3539 Final Relinquishment Report (2019). Data has been reviewed, appraised and integrated into a database. Data is of sufficient quality, relevance and applicability. |
| Geology | Deposit type, geological setting and style of mineralisation. |
The deposit style sought is orogenic gold mineralisation located in the Bendigo Zone of the Victorian Gold Province. The Fosterville Goldfield is hosted by Lower Ordovician turbidites within the Castlemaine Group rocks. The sequence is metamorphosed to sub-greenschist facies. Gold mineralisation is typically hosted by quartz reefs located in fold and fault structures related to multiple compression events that formed upright chevron style fold geometry. |
Level 14, 333 Collins Street, Melbourne, VIC 3000, Australia. PO Box 1209, Osborne Park, WA 6916, Australia ABN 18 606 128 090 T +61 8 6166 0240 F 61 8 6270 5410 E [email protected] W www.s2resources.com.au
| Criteria | JORC Code explanation | Commentary |
| Drill hole Information |
A summary of all information material to the understanding of the exploration results including a tabulation of the following information for all Material drill holes: • easting and northing of the drill hole collar • elevation or RL (Reduced Level – elevation above sea level in metres) of the drill hole collar • dip and azimuth of the hole • down hole length and interception depth • hole length. |
A table of completed drill hole collar information for exploration results presented here is provided below. |
| Data aggregation methods |
In reporting Exploration Results, weighting averaging techniques, maximum and/or minimum grade truncations (e.g. cutting of high grades) and cut-off grades are usually Material and should be stated. |
All Exploration Results reported are downhole weighted means. |
| Where aggregate intercepts incorporate short lengths of high grade results and longer lengths of low grade results, the procedure used for such aggregation should be stated and some typical examples of such aggregations should be shown in detail. |
A table of significant intercepts presented here is provided below. |
|
| The assumptions used for any reporting of metal equivalent values should be clearly stated. |
Not applicable. | |
| Relationship between mineralisation widths and intercept lengths |
These relationships are particularly important in the reporting of Exploration Results. If the geometry of the mineralisation with respect to the drill hole angle is known, its nature should be reported. If it is not known and only the down hole lengths are reported, there should be a clear statement to this effect (e.g. ‘down hole length, true width not known’). |
The relationship between mineralization and drill hole angle is not fully understood, therefore the down hole mineralized and composited lengths are shown. A true width is not known at this time. |
| Diagram | Appropriate maps and sections (with scales) and tabulations of intercepts should be included for any significant discovery being reported These should include, but not be limited to a plan view of drill hole collar locations and appropriate sectional views. |
Appropriate maps, sections and tables are included in the body of the report. |
| Balanced reporting | Where comprehensive reporting of all Exploration Results is not practicable, representative reporting of both low and high grades and/or widths should be practiced to avoid misleading reporting of Exploration Results. |
Maps showing individual sample locations are included in the report. All results considered significant are reported. |
| Other substantive exploration data |
Other exploration data, if meaningful and material, should be reported including (but not limited to): geological observations; geophysical survey results; geochemical survey results; bulk samples – size and method of treatment; metallurgical test results; bulk density, groundwater, geotechnical and rock characteristics; potential deleterious or contaminating substances. |
Previous exploration data reported include historic dipole- dipole IP-resistivity surveys (refer ASX Announcement 17 February 2023). Other historical exploration data has not yet been compiled to a level where it can be reported. Further compilation of such data will be reviewed and reported when considered material. |
Level 14, 333 Collins Street, Melbourne, VIC 3000, Australia. PO Box 1209, Osborne Park, WA 6916, Australia ABN 18 606 128 090 T +61 8 6166 0240 F 61 8 6270 5410 E [email protected] W www.s2resources.com.au
| Criteria | JORC Code explanation | Commentary |
| Further work | The nature and scale of planned further work (e.g. tests for lateral extensions or depth extensions or large-scale step-out drilling). Diagrams clearly highlighting the areas of possible extensions, including the main geological interpretations and future drilling areas, provided this information is not commercially sensitive |
Planning of drill holes to test targets defined by historical data is in progress. Broader surface exploration activities including IP-resistivity and soil geochemical surveys are also being planned to generate new targets for drill testing. Drilling and surface exploration activities are planned to commence during the last Quarter of 2023. |
Level 14, 333 Collins Street, Melbourne, VIC 3000, Australia. PO Box 1209, Osborne Park, WA 6916, Australia ABN 18 606 128 090 T +61 8 6166 0240 F 61 8 6270 5410 E [email protected] W www.s2resources.com.au