September 2021 Quarterly Activities Report
Rumble Resources Ltd (ASX: RTR) ("Rumble" or "the Company") is pleased to provide an update with respect to the Company's activities during the September 2021 quarter.
Earaheedy Zn-Pb-Ag-Mn Project, Wiluna, Western Australia - Focus
- An expanded 4.1km by 1.9km mineralised footprint at the Chinook Zn-Pb Prospect, represents a 224% increase from the June Quarter.
- Flat lying Zn-Pb mineralisation remains open in all directions
- Upgraded 40,000m drill program Ongoing
- Significant Zn-Pb mineralisation at Chinook is now modelled to extend west across the boundary of tenement E69/3464 (RTR 75% JV) into Rumble's 100% owned ELA69/3787, which has an additional 12kms of untested strike.
- Exploration Target Range increased to 100mt - 120mt* at 3.5% to 4.5% Zn-Pb
- Regional Gravity Completed – Analysis Ongoing
- Passive Seismic Completed – Analysis Ongoing
Western Queen Au Project, Mt Magnet, Western Australia
- A new independent Indicated & Inferred JORC 2012 Mineral Resource of 2.1Mt grading 2.42 g/t Au for 163,268 oz Au
- Total Mineral Resource Estimate ounces Increased by 35%
- Indicated ounces Increased by 145%
- Western Queen South & Western Queen Central deposits Remain open at depth
- 35km strike of the largely untested Western Queen Shear Zone
Lamil Au-Cu Project - AIC Mines JV, Paterson Province, Western Australia
- 10,000m RC Drill Program Commenced Ongoing
- Airborne EM Completed – Analysis Commenced
Braeside Cu-Au-Zn-Pb-Ag Project, East Pilbara, Western Australia
Barker Well Prospect
• Ground IP survey completed – Analysis Commenced
Camel Hump Prospect
• Airborne EM Program completed - Analysis Commenced
Warroo Cu-Zn-Pb-Ag-Au-U-Pt Project, East Pilbara, Western Australia
• Airborne EM Program completed - Analysis Commenced
Munarra Gully Au-Cu-Ag-Zn Project, Cue, Western Australia
• EIS co-funded Diamond drilling Program – Commenced
Corporate
- Strong cash position of $33.7 million at the end of the quarter
- $160k in listed investments
* Refer page 7 for further details on the Exploration Target. Rumble's Zn-Pb exploration target at the Earaheedy Project is between 100 to 120 million tonnes at a grade ranging between 3.5% Zn-Pb to 4.5% Zn-Pb. The potential quantity and grade of the Exploration Target is conceptual in nature. There has been insufficient exploration to estimate a Mineral Resource and it is uncertain if further exploration will result in the estimation of a Mineral Resource.

Rumble Resources Ltd
Level 1, 16 Ord Street, West Perth, WA 6005
T +61 8 6555 3980
F +61 8 6555 3981
rumbleresources.com.au
ASX RTR
Executives & Management
Mr Shane Sikora Managing Director
Mr Brett Keillor Technical Director
Mr Matthew Banks Non-executive Director
Mr Michael Smith Non-executive Director
Mr Peter Venn Non-executive Director
Mr Steven Wood Company Secretary

Location of Rumble Projects - Multiple Avenues to Discovery


1. EXPLORATION AND DEVELOPMENT ACTIVITIES
1.1 Earaheedy Zn-Pb-Ag-Mn Project, Wiluna, Western Australia
The Earaheedy Project is located approximately 110km northeast of Wiluna, Western Australia. Rumble owns 75% of E69/3464 and Zenith Minerals Ltd (ASX: ZNC) owns 25%. Rumble has applied (100%) for two contiguous exploration licenses ELA69/3787 and ELA69/3862, south and west of E69/3464. The entire project area covers the inferred unconformity contact between the overlying Frere Iron Formation and underlying Yelma Formation of the Palaeoproterozoic Earaheedy Basin. On April 2021 Rumble announced a major Zinc-Lead Discovery with 'Tier 1' deposit potential at the Earaheedy Project (see ASX Announcement 19 April 2021) and since then have been rapidly advancing the discovery. There are three main prospects within E69/3464, Chinook and Magazine/Navajoh which lie 12km apart. Within the project area, Rumble controls 45km of prospective mineralised strike which has the potential for multiple large tonnage Zn – Pb deposits – (See image 1 and 2).

Image 1 – Earaheedy Project With Regional Geology and Prospect Locations

Image 2 – Earaheedy Project – Prospect Location and Simplified Geology Plan

RC Drill Program – Chinook Zinc-Lead-Silver-Manganese Discovery
The current exploration drilling program at Earaheedy has been expanded to 40,000m (refer to ASX announcement from 23rd August 2021) and is designed to define the limits of the flat to gently northeast dipping Zn-Pb-Ag-(Mn) mineralisation associated with the unconformity that forms the hiatus between the overlying Palaeoproterozoic Frere Iron formation and the underlying Palaeoproterozoic Yelma Formation (lower section of the Tooloo Group) at the Chinook Prospect. Drill scoping is also occurring at the Magazine and Navajoh Zn-Pb Prospects that lie 7 and12km respectively southeast of the Chinook prospect, whilst also targeting new discoveries along the 17km strike of the interpreted mineralised unconformity within E69/3464 (see Image 2).
Latest Drilling Results - Chinook Prospect (E69/3464)
- Zinc-Lead (Zn-Pb) mineralisation envelope has increased by 224%, to 4.1km strike and 1.9km down dip length since the June Quarter and remains open in all directions
- Significant Zn-Pb mineralisation is modelled to extend west across the boundary of tenement E69/3464 (RTR 75% JV) into Rumble's 100% owned ELA69/3787, which has an additional 12kms of untested strike along the prospective unconformity to the Sweetwater Zn-Pb Prospect, providing further potential to significantly increase the known footprint at Chinook
- Nearly 35,000m of RC drilling has been completed at Earaheedy with only 9,000m of RC assay results (~25%) reported due to the high levels of exploration in Western Australia and industry wide laboratory turnaround issues (refer to RTR ASX Release 23/8/2021 - Exploration Update)
- RC drill results to date (>2% Zn + Pb Cut Off) include:
- 15m @ 4.02% Zn + Pb, 4.86 g/t Ag from 116m (EHRC089)⃰ within 27m @ 2.54% Zn + Pb from 115m
- 11m @ 3.92% Zn + Pb, 4.23 g/t Ag from 142m (EHRC090)⃰ within 22m @ 2.35% Zn + Pb from 139m
- 16m @ 3.67% Zn + Pb, 3.9 g/t Ag from 79m (EHRC100)¹ within 25m @ 2.7% Zn + Pb from 76m
- 14m @ 4.17% Zn + Pb, 14.9 g/t Ag from 71m (EHRC103)¹ within 29m @ 3.09% Zn + Pb from 67m
- 8m @ 5.20% Zn + Pb, 9.57 g/t Ag from 133m (EHRC152)⃰ within 37m @ 2.04% Zn + Pb from 112m
- 5m @ 4.25% Zn + Pb, 3.66 g/t Ag from 90m (EHRC133)⃰ within 26m @ 2.9% Zn + Pb from 90m
- 20m @ 3.47% Zn + Pb, 4.16 g/t Ag from 119m (EHRC216)⃰ within 26m @ 2.91% Zn + Pb from 116m
- 17m @ 3.08% Zn + Pb, 7.74 g/t Ag from 72m (EHRC251)⃰ within 47m @ 1.88% Zn + Pb, 6.14 g/t Ag from 48m
Sonic drill results include:
- 19m @ 6.10% Zn + Pb, 8.52 g/t Ag from 55m (EHS002)⃰ o 19m recovered within 26.5m zone of mineralisation
- 22.2m @ 4.32% Zn + Pb, 4 g/t Ag from 67m (EHS001)⃰ o 22.2m recovered within 28m zone of mineralisation

• Broad widths of Silver (Ag) mineralisation intercepted southeast of the main Chinook Zn-Pb Prospect in drill hole EHRC251.

Image 3 – Chinook Prospect – Recent Drill-Hole Intersections and Assays > 2% Zn + Pb Cut Off
Multiple Mineralisation Styles and Potential in the District (image 2)
As the RC drill scoping has continued, the footprint of the very large Earaheedy Zn-Pb-Ag-Mn system has increased. Additionally, a number of styles of primary mineralisation have now been encountered over a broadly tested 17 km of strike between Chinook, Magazine and Navajoh.
Unconformity Hosted Zn-Pb-Ag-Mn Sulphide Types
• 21m @ 16 g/t Ag from 88m (EHRC251)⃰
- Carbonate Hosted Style Sphalerite-Galena-Pyrite-(Manganese) Dominant
- Silica Replacement of Carbonate Hosted Style
- Clastic Hosted Style Sphalerite-Galena-Pyrite
- o Higher grade associated with coarser grain siliciclastic sediment Matrix replacement
Shale Hosted Sulphide Type
- Footwall Shale Hosted Zinc-Galena-Silver-Pyrite
- o Footwall shale locally known as Purple Shale (oxidized)
- o Associated with footwall structures (feeders)
- o Increase in anomalous copper and elevated arsenic.
MVT Sulphide Type
Historic exploration (RGC) focused on the main carbonate units that lie deeper under the Frere Iron Formation. MVT (Mississippi Valley Type) Zn dominant mineralisation included
- MVT high angle Zinc-Lead-Pyrite sulphide breccias
- Stratabound (conformable) Zn
- o Zn replacement disseminated and dissolution controlled Silica Overprint.

Other Types
- Fault Related Epigenetic Cu-Ag
- o High grade Ag with strong Cu zonation
Exploration to the south of the Project area by Strickland Metals has also reported significant Zn-Pb-Ag-Mn mineralisation with assays including 23m @ 5.5% Zn + Pb in the Iroquois Carbonate Member at the Iroquois Zn-Pb-Mn Prospect – refer to image 2 for location (refer ASX announcement by Strickland Metals – ASX: STK – 14/10/2021). The drilling has demonstrated the lower Iroquois Carbonate Member is very prospective for MVT (Mississippi Valley Type) high-grade Zn-Pb-Ag lodes in association with basement/footwall feeder faults.
Within the Earaheedy tenement E69/3464, the top of the Iroquois Carbonate Formation has been intersected below the footwall shale in recent drilling (assays pending) by Rumble. At this stage the drilling by Rumble has not targeted MVT mineralization or the Iroquois Carbonate Formation. Based on the depth to the top of the Iroquois Carbonate Formation below the recent Rumble drilling at Chinook, Magazine and Navajoh on tenement E69/3464, the Iroquois Carbonate Formation is modelled to reach surface 2-5km to the south and southwest in Rumble's application ELA69/3787 (see images 1 and 2).
Ongoing Exploration Steps
- RC drill scoping of Chinook, Magazine and Navajoh
- o 40,000m RC program ongoing Likely to expand due to increase in mineralised footprint
- Diamond core drilling
- o Clastic hosted Zn-Pb-Ag and footwall shale hosted sulphide mineralisation to be targeted
- Sonic drilling
- o Reasonable recovery at EHS001 and EHS002 compared to diamond core drilling has given Rumble confidence to restart the Sonic drill testing.
- o Sonic drilling of different mineralisation styles, including oxide.
- Metallurgy
- o Diamond and Sonic drilling to be used for initial metallurgical sighter programs
- Geophysics
- o Airborne Magnetics planned over Applications
- o Analysis of Gravity and passive Seismic ongoing
First Stage Exploration Target
Rumble's Zn-Pb exploration target at the Earaheedy Project is between 100 to 120 million tonnes at a grade ranging between 3.5% Zn-Pb to 4.5% Zn-Pb. The exploration target is at a shallow depth (120m), and over 40kms of prospective strike (completely open) has been defined within the Earaheedy Project. The potential quantity and grade of the exploration target is conceptual in nature, there has been insufficient exploration to estimate a Mineral Resource and it is uncertain if further exploration will result in the estimation of a Mineral Resource.
The exploration target, being conceptual in nature, takes no account of geological complexity, possible mining method or metallurgical recovery factors. The exploration target has been estimated in order to provide an assessment of the potential for large-scale Zn-Pb deposits within the Earaheedy Project. The exploration target has been prepared and reported in accordance with the 2012 edition of the JORC Code.

| Earaheedy Zn-Pb Project - Exploration Target | |||||
|---|---|---|---|---|---|
| Range | Tonnes | Grade | |||
| Lower | 100,000,000 | $3.5%$ Zn + Pb | |||
| Upper | 120,000,000 | $4.5%$ Zn + Pb |
Table 1: Near surface exploration target down to 100 metres - shallow depth
The potential quantity and grade of the exploration target is conceptual in nature. There has been insufficient exploration to estimate a Mineral Resource and it is uncertain if further exploration will result in the estimation of a Mineral Resource.
The exploration target is based on the current geological understanding of the mineralisation geometry, continuity of mineralisation and regional geology. This understanding is provided by an extensive drill hole database, regional mapping, coupled with understanding of the host stratigraphic sequence.
Included in the data on which this exploration target has been prepared is recent RC drilling of seventeen (17) holes for approximately 2,500m (RC/Diamond), thirty (30) holes for 2,690m (three RC stages), eighty-eight (88) RC holes for 14,988m recently completed (ongoing) and diamond drilling of four (4) holes for 1,199.8m completed by Rumble along with sixty-four (64) historic RC drill holes completed within the project area (E69/3464) by previous explorers (refer historical exploration results in previous ASX announcements dated 5 February 2019 and 12 October 2017, 23rd January 2020 which continue to apply and have not materially changed).
Some of the considerations in respect of the estimation of the exploration target include:
- Drilling results have demonstrated strong continuity of shallow, flat lying mineralisation;
- Over 45km's of prospective strike and open (refer image 2);
- Minimum 600m of width (based on shallow 7.5° and shallow depth to 120m, based on drilling results;
- True width (thickness) of mineralisation up to 34 metres received in drilling results; and
- Specific gravity (SG) of 2.5 (world average SG of sandstone not accounting for metal).
The Company intends to test the exploration target with drilling and this further drilling is expected to extend over approximately 12 months. Grade ranges have been either estimated or assigned from lower and upper grades of mineralisation received in drilling results. A classification is not applicable for an exploration target.
1.2 Western Queen Au Project, Mt Magnet, Western Australia
The Western Queen Gold Project lies 110km NW of Mt Magnet within the Yalgoo mineral field of Western Australia comprising two 100% owned mining leases M59/45 and M59/208 and 2 exploration tenements E20-0967 and E59-2443 which are also 100% RTR. The Project is located within a 110km radius of three operating gold processing facilities.
During the quarter Rumble announced an updated resource:
- A new independent Indicated & Inferred JORC 2012 Mineral Resource of 2.1Mt grading 2.42 g/t Au for 163,268 oz Au has been estimated for the 100% owned Western Queen Project
- Mineral Resource Estimate ounces increased by 35%
- Indicated ounces increased by 145%
- Western Queen South & Western Queen Central deposits remain open at depth
- Rumble owns 35km of the Western Queen Shear Zone which hosts the Western Queen resources, with exceptional potential for further discoveries & delineation of new mineral resources – See image 7


Image 6: Western Queen Gold Project – Longitudinal Section of Resources, previous mining & near deposit Exploration Potential

Image 7 – Western Queen Shear Zone Prospectivity (outside of resources) over TMI Airborne Magnetics
Next Steps
• Planned exploration on newly granted E20/967

1.3 Lamil Gold-Copper JV Project, Paterson Province, Western Australia
The Lamil Project is located in between the major mining operations of the Nifty Cu mine and the large Telfer Au-Cu mine within the Paterson Province, East Pilbara, Western Australia (see Image 8).
In July 2019 Rumble signed a $10m Farm Out of the Lamil Project with AIC Mines (ASX: A1M). AIC can earn a 50% interest by spending $6 million over 4 years. Thereafter AIC can earn a further 15% by spending $4 million over 1 year if Rumble elects not to contribute.
The Lamil Dome target exhibits the key structural features required to host a Telfer-style dome deposit (32Moz Au, 1Mt Cu resource) which lies 30km to the northeast of Rumble's Lamil

Dome Target (see Image 8). Image 8: Lamil Project location and Targets

Image 9. Lamil Project - Schematic cross section illustrating relative positions of Key Targets Areas with respect to interpreted geology
RC Drilling Program Commenced
During the quarter, JV Partner AIC Mines (ASX: A1M) announced a 10,000m reverse circulation (RC) drilling program had commenced in September 2021. A total of 23 holes for 4,738m were completed by the end of the September 2021 Quarter as per AIC's ASX announcement 20th October 2021. Further information is also contained in AIC's ASX announcement released on 6th September 2021.
Seven holes were drilled on the eastern margin of the Lamil Main Dome (Image 10) aimed at intersecting the mafic intrusive that was intersected in the 2020 drilling program, and which returned the better Cu-Au mineralisation.

The intrusive has now been defined over a strike length of approximately 4 kilometres and again chalcopyrite and pyrite were observed associated with the contact between the mafic and host sediments.
Thirteen holes were drilled at the Desert Pea target (Image 10). The aim of the program was to determine the nature of a magnetic anomaly associated with an interpreted NE trending fault. While the program appears to have been successful in confirming the presence of the interpreted fault, the cover depth was greater than modelled and contains a considerable component of magnetically responsive gravels which contribute to the overall magnetic response and makes the discrimination of basement responses from that of cover difficult. However, strong alteration and the presence of sphalerite and pyrite was intersected in two adjacent holes proximal to the fault.

Image 10: Location of prospects with planned and completed drilling on a RTP aeromagnetic image
Three holes were completed at the Goodenia target (Image 10), a conceptual base metal target defined by coincident magnetic and gravity anomalies located on the eastern margin of a soil Cu-Pb-Zn geochemical anomaly. Carbonaceous sediments were intersected in an area of shallower than modelled cover. Sulphides (predominately pyrite) associated with intervals of brecciation with silica-carbonate infill, and moderate to intensive intervals of bleaching and silicification were observed in the holes situated above the modelled gravity and magnetic anomaly centres.

Drilling is also planned at the Hovea target, a coincident magnetic and gravity anomaly at a prominent flexure in the NNW trending stratigraphy proximal to the regionally significant Table Top-Camel fault zone and a NE trending cross fault (Image 11). The target is interpreted as hosted within the Broadhurst Formation and thus represents a Niftystyle sediment hosted copper target.

Image 11. Hovea Target- Magnetic RTP Image (LHS) and Gravity Bouguer Image (RHS)
Geophysics
• An Airborne Electromagnetic (AEM) survey was flown over the western margin of the northern tenement and the majority of the southern tenement on 250m spaced lines for a total of 2,600 line kilometres by Geotech Airborne in mid-August. The survey has the potential for both direct detection of sulphide mineralisation but will also complement other geophysical datasets for mapping stratigraphic units under cover sediments and thus provide context for future targeting. Processing is underway.
Next Steps
• The current drilling program is expected to be completed in November 2021. Given the large backlog of samples at Western Australian assay laboratories, assay results are not expected until very late in the December 2021 Quarter and probably into the March 2022 Quarter.

1.4 Braeside and Warroo Projects, East Pilbara Western Australia
The Braeside and Warroo Projects (see Image 12) are located east of Marble Bar in the East Pilbara Region of Western Australia. The Braeside Project is held 100% by Rumble and comprises of 4 granted exploration licences (E45/2032, E45/4368, E45/4873 and E45/4874) with an area of 670 km². The project hosts a regional scale porphyry epithermal and potential VMS province fracture system over 60km in strike and 8km wide.
Over 30 high priority base metal targets have been generated including:
- Barkers Well Prospect 800m long fracture zone with multiple high grade Pb breccia pipes
- Camel Hump Cu Prospect - Wide zone of oxide stringer copper mineralisation hosted in volcaniclastic siltstone and shale – VMS Potential
The Rumble 100% owned Warroo Project consists of 2 granted exploration licences (E45/5366 and E45/5689) with an area of 793 km². The host lithology to the copper mineralisation at Camel Hump has similar characteristics to the Warroo Hill Member lithologies. The Camel Hump and Warroo Hill Member lithologies lie within the same corridor with respect to strike and structure and represents a potential new VMS Province.
During the quarter:
- An orientation IP survey was completed to test both the north and south breccia zones at Barkers Well to aid in targeting deeper high-grade mineralisation positions for RC and Diamond drilling. Results will be announced once Rumble's technical team has analysed the data.
- Airborne TEM over the Camel Hump prospect and Warroo Synform (located within the Warroo project area) has been completed and was aimed at discovering conductors for drill testing. Results will be announced once Rumble's technical team has analysed the data.

Image 12. Braeside and Warroo Project Location over Province Geology
Next Steps
• RC drilling of any high priority targets identified in the IP and Airborne TEM surveys

1.5 Munarra Gully Au-Cu-Ag-Zn Project, Cue District, Murchison, WA
The Munarra Gully Project is located some 50km NNE of the town of Cue within the Murchison Goldfields of Western Australia. Rumble owns 80% of E51/1677 and 100% of ELA51/1919 and ELA51/1927 (see Image 13).
At the Amaryllis Prospect, Rumble has defined a large-scale gold-copper-silver system over 2.3km's in strike that remains open under shallow cover (10 to 40 metres) coincident with a major north-south trending shear zone . This 2.3km of mineralised strike has only been partly tested by Rumble on wide spaced drill traverses. Recent regional reconnaissance exploration which involved mapping and relogging all available historic drill-holes has inferred the highly mineralised regionally extensive Amaryllis Shear zone extends over 15km to the north under cover. This priority target remains to be drill tested.
The style of mineralisation at Munarra Gully has very similar characteristics to the Chibougamau Au-Cu-Ag shear vein style deposits located in the eastern part of the Abitibi Greenstone Belt in Quebec, Canada. Of note: the Chibougamau Au-Cu-Ag shear vein style deposits have produced 3.5 million oz (gold) and 1 million copper metal tonnes at an average weighted grade of 1.76% Cu and 2.05 g/t Au. Some of the deposits at Chibougamau have been mined down to 1.1km in depth.

Image 13 – Munarra Gully Project – Location of Amaryllis Prospect over Airborne Magnetics
Next Steps
• EIS co-funded Diamond drilling commenced

1.6 Fraser Range Ni-Cu-Au Projects, Fraser Range Western Australia
Rumble has a significant holdings in the Albany Fraser Range Region, Western Australia with over 1,126 square kilometres of highly prospective tenure.
The Thunderstorm and Thunderdome JV Projects with IGO Limited (ASX: IGO) comprises four tenements, E28/2528, E28/2529, E28/2595 and E28/2366 (70% IGO / 30% RTR). The Thunderbolt Project; E28/2924 and ELA28/3062, Thunderclap Project; E28/2971, E28/2972, E28/2973 and E28/2968 and Squall Project; E28/3155 are 100% owned by Rumble (see Image 14).

Image 14 – Location of Rumble's Fraser Range Projects over Magnetics.
Thunderdome JV Project (70% IGO/ 30% RTR), Fraser Range
IGO Limited's plans for December Quarter 2021:
• An MLEM survey has been designed to test the Apollo Target within the Thunderdome tenement. The target is derived from multiple mafic intersects in aircore drilling and being located within a negative magnetic anomaly observed in the vertical derivative of the total magnetic intensity field.
Thunderstorm JV Project (70% IGO/ 30% RTR)
IGO Limited's plans for December Quarter 2021:
• Analysis of hyperspectral results from Gazelle Gold will be finalised, combined with structural and lithological interpretation to identify potential structural controls on gold mineralisation within the basement.
Thunderbolt Project (100% RTR)
Exploration for December Quarter 2021:
- Airborne Magnetics
- Regional Soil Sampling Program

2. Corporate
2.1 Cash and Investments
As at 30 June 2021, Rumble held $33.7 million in Cash and a further $160,000 in listed investments.
2.2 Appendix 5b – Quarterly Cashflow
Cash outflows for the September 2021 Quarter (not including capital raising fees) totalled $5.98 million across exploration activity (80%), staff costs (5%), property (vehicle) purchases (4%), government taxes (6%) and administration and corporate costs (5%).
Cash inflows for the September 2021 Quarter totalled $13k consisting 100% of options exercised.
2.3 Appendix 5b – Payments to related parties and their associates
Totalled $204k consisting of Executive and Non-Executive Directors fees and salaries, geological consulting, and superannuation payments.
2.4 Tenement Holdings – Tenement Holdings
In accordance with ASX Listing Rule 5.3, please refer to Appendix 1 for a listing of all tenement holdings.
Authorised for release on behalf of the company by Shane Sikora, Managing Director of the Company.
For further information, please visit www.rumbleresources.com.au to view our latest corporate presentation.
Follow our communications:
Linkedin: https://www.linkedin.com/company/rumble-resources-ltd Twitter: https://twitter.com/RumbleResources
About Rumble Resources Ltd
Rumble is currently firmly focussed on rapidly advancing the major Zinc-Lead 'Tier 1' SEDEX-variant discovery at the Earaheedy Project in Western Australia. Rumble Resources Limited is an Australian based ASX Listed exploration company with a clear strategy to generate and drill test a pipeline of projects providing the capability to make world-class discoveries on multiple projects. The company critically reviews each project against stringent criteria and has assembled a portfolio of seven highly prospective base and precious metal projects located in Tier 1 regions in Western Australia. Rumble's board and management team has a successful track record in making discoveries and project development.
Competent Persons Statement
The information in this report that relates to Exploration Results and Exploration Targets is based on information compiled by Mr Brett Keillor, who is a Member of the Australasian Institute of Mining & Metallurgy and the Australian Institute of Geoscientists. Mr Keillor is an employee of Rumble Resources Limited. Mr Keillor has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves". Mr Keillor consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.
Additionally, the information in this report that relates to Exploration Results is extracted from the Company's following ASX announcements:
- 20th October 2021 A1M: September Quarterly
- 18th October 2021 Earaheedy Zn-Pb-Mn-Ag Project Growth Continues at Chinook
- 2 August 2021 Western Queen Resource Upgrade to 163,000oz Au
- 12 July 2021 Rumble Consolidates 100% Ownership of the Braeside Project
- 8 July 2021 Significant Increase of Earaheedy Mineralisation Footprint
- 2 June 2021 Large Scale SEDEX Style System Emerging at Earaheedy Project
- 19 April 2021 Major Zinc-Lead Discovery at Earaheedy Project
- 8 April 2021 Drilling Update at Earaheedy Zinc-Lead-Silver Project
- 25 March 2021 Drilling Commenced at Earaheedy Zinc-Lead-Silver Project
- 26 February 2021 A1M: Final Results from Maiden Drilling Program at Lamil Proj
- 23 February 2021 Drilling Expands Large-Scale Gold-Copper-Silver System
- 17 February 2021 Multiple High-Grade Lead-Zinc-Silver Breccia Zones Discovery
- 15 February 2021 Significant Widths of Copper at Camel Hump Prospect

- 3 February 2021 High-Grade Gold Shoots at Western Queen South Deposit
- 28 January 2021 A1M: Initial Results Maiden Drilling Program at Lamil Proj
- 18 December 2020 A1M: Phase 1 Drilling Completed at Lamil Project
- 17 December 2020 Drilling Update Gold and Copper Projects
- 15 December 2020 Significant Copper and Lead Discovered at Braeside Project
- 4 November 2020 Discovery High-Grade Gold Shoots and Shear Zone Extension
- 6 October 2020 16m at 6.69 g/t Gold Intersected at Fraser Range
- 4 May 2020 Higher Grade Zn-Pb in Drilling confirms Discoveries
- 23 April 2020 Drilling Confirms Large Scale Gold-Copper-Silver System
- 17 February 2020 High Grade Gold Discovery at the Western Queen Project
- 11 February 2020 Large Scale Copper-Gold System Defined at Munarra Gully
- 30 January 2020 High Priority Targets Identified Warroo Project
- 23 January 2020 Large Scale Zn-Pb-Ag Discoveries at Earaheedy
The Company confirms that it is not aware of any new information or data that materially affects the Exploration Results information included in the Announcements. The Company confirms that the form and context in which the Competent Person's findings are presented have not been materially modified from the Announcements.
Western Queen Resource
| Prospect | Mining Method | Cut-off g/t | Classification | Tonnes (t) | Au g/t | Contained Metal |
|---|---|---|---|---|---|---|
| Indicated | 273,946 | 1.23 | 10,833 | |||
| WQCentral | OC | 0.5 | Inferred | 1,545 | 1.06 | 53 |
| Total | 275,491 | 1.23 | 10,894 | |||
| Indicated | 33,032 | 4.99 | 5,299 | |||
| UG | 1.5 | Inferred | 347,774 | 3.98 | 44,499 | |
| Total | 380,806 | 4.06 | 49,705 | |||
| Indicated | 306,978 | 1.63 | 16,132 | |||
| TOTAL | Inferred | 349,319 | 3.97 | 44,552 | ||
| Total | 656,297 | 2.88 | 60,684 | |||
| Indicated | 745,150 | 2.04 | 48,870 | |||
| WQ South | OC | 0.5 | Inferred | 254,738 | 2.32 | 19,000 |
| Total | 999,888 | 2.11 | 67,828 | |||
| Indicated | 17,090 | 3.9 | 2,143 | |||
| UG | 1.5 | Inferred | 423,897 | 2.39 | 32,571 | |
| Total | 440,987 | 2.45 | 34,735 | |||
| Indicated | 762,240 | 2.08 | 51,013 | |||
| TOTAL | Inferred | 678,635 | 2.36 | 51,571 | ||
| Total | 1,440,875 | 2.21 | 102,584 | |||
| Indicated | 1,069,218 | 1.95 | 67,145 | |||
| WQ MRE | O/C and UG | Inferred | 1,027,954 | 2.91 | 96,123 | |
| Total | 2,097,172 | 2.42 | 163,268 |
Table 1: Mineral Resource Estimate Tabulation for the Western Queen Project
Footnote: The pit optimisation has shown that much of the resource has the potential to be mined economically, and further mining studies are warranted to further progress the project. Mineral Resources that are not Ore Reserves have not demonstrated economic viability at this point. The estimate of Mineral Resources may be materially affected by environmental, permitting, legal, title, taxation, socio-political, marketing, or other relevant issues. Mining Method refers to either open cut (OC) or Underground (UG).
Competent Persons Statement (Western Queen Resource)
The information in this report that relates to Mineral Resources is based on and fairly represents information and supporting information prepared by Mr Michael Job who is a Fellow of the Australasian Institute of Mining and Metallurgy (FAusIMM) and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity to which he is undertaking to qualify as a competent person as defined in the 2012 edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves".
Mr Michael Job is a full-time employee of Cube Consulting and has provided his prior written consent to the inclusion in this report of the matters based on his information and supporting information in the form and context in which it appears.

Appendix 1
In accordance with Listing Rule 5.3.3. Rumble provides the following information in relation to its mining tenements.
1. The mining tenements held at the end of the quarter and their location.
| Project | Tenement Number | Status | Location | Beneficial Percentage Interest |
|---|---|---|---|---|
| Thunderstorm | E28/2528 | Granted | Western Australia | 30% Note 2 |
| Thunderstorm | E28/2529 | Granted | Western Australia | 30% Note 2 |
| Thunderstorm | E28/2595 | Granted | Western Australia | 30% Note 2 |
| Thunderdome | E28/2366 | Granted | Western Australia | 30% Note 2 |
| Thunderbolt | E28/2924 | Granted | Western Australia | 100% |
| Thunderbolt | E28/3062 | Granted | Western Australia | 100% |
| Thunderbolt | E28/3065 | Granted | Western Australia | 100% |
| Thunderclap | E28/2971 | Granted | Western Australia | 100% |
| Thunderclap | E28/2972 | Granted | Western Australia | 100% |
| Thunderclap | E28/2973 | Granted | Western Australia | 100% |
| Thunderclap | E28/3125 | Application | Western Australia | 100% |
| Thunderclap | E28/2968 | Application | Western Australia | 100% |
| Squall | E28/3155 | Application | Western Australia | 100% |
| Braeside | E45/4873 | Granted | Western Australia | 100% |
| Braeside | E45/4874 | Granted | Western Australia | 100% |
| Braeside | E45/4368 | Granted | Western Australia | 100% |
| Braeside | E45/2032 | Granted | Western Australia | 100% |
| Warroo | E45/5366 | Granted | Western Australia | 100% |
| Warroo | E45/5689 | Granted | Western Australia | 100% |
| Warroo | E45/5860 | Application | Western Australia | 100% |
| Earaheedy | E69/3464 | Granted | Western Australia | 75% Note 1 |
| Earaheedy | E69/3787 | Application | Western Australia | 100% |
| Earaheedy | E69/3862 | Application | Western Australia | 100% |
| Munarra Gully | E51/1677 | Granted | Western Australia | 80% Note 3 |
| Munarra Gully | E51/1919 | Granted | Western Australia | 100% |
| Munarra Gully | E51/1927 | Granted | Western Australia | 100% |
| Lamil | E45/5270 | Granted | Western Australia | 100% Note 4 |
| Lamil | E45/5271 | Granted | Western Australia | 100% Note 4 |
| Western Queen | M59/0045 | Granted | Western Australia | 100% |
| Western Queen | M59/0208 | Granted | Western Australia | 100% |
| Western Queen | L59/40 | Granted | Western Australia | 100% |

| Western Queen | E20/0967 | Granted | Western Australia | 100% |
|---|---|---|---|---|
| Western Queen | E59/2443 | Application | Western Australia | 100% |
2. Mining tenements acquired during the quarter and their location:
| Project | TenementNumber | Status | Location | BeneficialPercentageInterest |
|---|---|---|---|---|
3. Mining tenements disposed of during the quarter and their location:
| Project | TenementNumber | Status | Location | Comment |
|---|---|---|---|---|
- 1. Earaheedy Project, Western Australia E69/3464 75% RTR / 25% Zenith Minerals
- 2. Fraser Range Projects, Western Australia E28/2528, E28/2529, E28/2595, E28/2366 - IGO 70% / RTR 30%
- 3. Munarra Gully, Western Australia E51/1677 80% / 20% Marjorie Anne Molloy
- 4. Lamil Project, western Australia AIC Mines can earn 65% by spending $10 million in 5 years. Refer ASX announcement 22 July 2019.
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
| Name of entity | |
|---|---|
| Rumble Resources Limited | |
| ABN | Quarter ended ("current quarter") |
| 74 148 214 260 | 30 September 2021 |
| Consolidated statement of cash flows | Current quarter$A'000 | Year to date(3 months)$A'000 | |
|---|---|---|---|
| 1. | Cash flows from operating activities | ||
| 1.1 | Receipts from customers | - | - |
| 1.2 | Payments for | ||
| (a)exploration & evaluation | - | - | |
| (b)development | - | - | |
| (c)production | - | - | |
| (d)staff costs | (327) | (327) | |
| (e)administration and corporate costs | (296) | (296) | |
| 1.3 | Dividends received (see note 3) | - | - |
| 1.4 | Interest received | 1 | 1 |
| 1.5 | Interest and other costs of finance paid | - | - |
| 1.6 | Income taxes paid | - | - |
| 1.7 | Government grants and tax incentives | - | - |
| 1.8 | Other (GST) | (339) | (339) |
| 1.9 | Net cash from / (used in) operatingactivities | (961) | (961) |
| 2. | Cash flows from investing activities | |||
|---|---|---|---|---|
| 2.1 | Payments to acquire or for: | |||
| (a) | entities | - | - | |
| (b) | tenements | - | - | |
| (c) | property, plant and equipment | (241) | (241) | |
| (d) | exploration & evaluation | (4,774) | (4,774) | |
| (e) | investments | - | - | |
| (f) | other non-current assets | - | - |
| Consolidated statement of cash flows | Current quarter$A'000 | Year to date(3 months)$A'000 | |
|---|---|---|---|
| 2.2 | Proceeds from the disposal of: | ||
| (a)entities | - | - | |
| (b)tenements | - | - | |
| (c)property, plant and equipment | - | - | |
| (d)investments | - | - | |
| (e)other non-current assets | - | - | |
| 2.3 | Cash flows from loans to other entities | (1) | (1) |
| 2.4 | Dividends received (see note 3) | - | - |
| 2.5 | Other (provide details if material) | - | - |
| 2.6 | Net cash from / (used in) investingactivities | (5,016) | (5,016) |
| 3. | Cash flows from financing activities | ||
|---|---|---|---|
| 3.1 | Proceeds from issues of equity securities(excluding convertible debt securities) | - | - |
| 3.2 | Proceeds from issue of convertible debtsecurities | - | - |
| 3.3 | Proceeds from exercise of options | 13 | 13 |
| 3.4 | Transaction costs related to issues of equitysecurities or convertible debt securities | - | - |
| 3.5 | Proceeds from borrowings | - | - |
| 3.6 | Repayment of borrowings | - | - |
| 3.7 | Transaction costs related to loans andborrowings | - | - |
| 3.8 | Dividends paid | - | - |
| 3.9 | Other (provide details if material) | - | - |
| 3.10 | Net cash from / (used in) financingactivities | 13 | 13 |
| 4. | Net increase / (decrease) in cash andcash equivalents for the period | ||
|---|---|---|---|
| 4.1 | Cash and cash equivalents at beginning ofperiod | 39,664 | 39,664 |
| 4.2 | Net cash from / (used in) operatingactivities (item 1.9 above) | (961) | (961) |
| 4.3 | Net cash from / (used in) investing activities(item 2.6 above) | (5,016) | (5,016) |
| 4.4 | Net cash from / (used in) financing activities(item 3.10 above) | 13 | 13 |
| Consolidated statement of cash flows | Current quarter$A'000 | Year to date(3 months)$A'000 | |
|---|---|---|---|
| 4.5 | Effect of movement in exchange rates oncash held | - | - |
| 4.6 | Cash and cash equivalents at end ofperiod | 33,700 | 33,700 |
| 5. | Reconciliation of cash and cashequivalentsat the end of the quarter (as shown in theconsolidated statement of cash flows) to therelated items in the accounts | Current quarter$A'000 | Previous quarter$A'000 |
|---|---|---|---|
| 5.1 | Bank balances | 3,652 | 39,656 |
| 5.2 | Call deposits | 30,048 | 8 |
| 5.3 | Bank overdrafts | - | - |
| 5.4 | Other (provide details) | - | - |
| 5.5 | Cash and cash equivalents at end ofquarter (should equal item 4.6 above) | 33,700 | 39,664 |
| 6. | Payments to related partiesof the entityand theirassociates | Current quarter$A'000 |
|---|---|---|
| 6.1 | Aggregate amount of payments to related parties and theirassociates included in item 1 | 161 |
| 6.2 | Aggregate amount of payments to related parties and theirassociates included in item 2 | 43 |
| Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and anexplanation for, such payments. |
| 7. | FinancingfacilitiesNote: the term "facility' includes all forms of financingarrangements available to the entity.Add notes as necessary for an understanding of thesources of finance available to the entity. | Total facilityamountat quarterend$A'000 | Amount drawnatquarter end$A'000 |
|---|---|---|---|
| 7.1 | Loan facilities | - | - |
| 7.2 | Credit standby arrangements | - | - |
| 7.3 | Other (please specify) | - | - |
| 7.4 | Total financing facilities | - | - |
| 7.5 | Unused financing facilities available at quarter end | - | |
| 7.6 | Include in the box below a description of each facility above, including the lender, interestrate, maturity date and whether it is secured or unsecured. If any additional financingfacilities have been entered into or are proposed to be entered into after quarter end,include a note providing details of those facilities as well. | ||
| N/A |
| 8. | Estimated cash available for future operating activities | $A'000 |
|---|---|---|
| 8.1 | Net cash from / (used in) operating activities (item 1.9) | (961) |
| 8.2 | (Payments for exploration & evaluation classified as investingactivities) (item 2.1(d)) | (4,774) |
| 8.3 | Total relevant outgoings (item 8.1 + item 8.2) | (5,734) |
| 8.4 | Cash and cash equivalents at quarter end (item 4.6) | 33,700 |
| 8.5 | Unused finance facilities available at quarter end (item 7.5) | - |
| 8.6 | Total available funding (item 8.4 + item 8.5) | 33,700 |
| 8.7 | Estimated quarters of funding available (item 8.6 divided byitem 8.3) | 5.88 |
| Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as "N/A".Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7. | ||
| 8.8If item 8.7 is less than 2 quarters, please provide answers to the following questions: | ||
| 8.8.1Does the entity expect that it will continue to have the current level of net operatingcash flows for the time being and, if not, why not? | ||
| Answer: n/a | ||
| 8.8.2Has the entity taken any steps, or does it propose to take any steps, to raise furthercash to fund its operations and, if so, what are those steps and how likely does itbelieve that they will be successful? | ||
| Answer: n/a | ||
| 8.8.3 | Does the entity expect to be able to continue its operations and to meet its business |
|---|---|
| objectives and, if so, on what basis? |
Answer: n/a
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
Compliance statement
- 1 This statement has been prepared in accordance with accounting standards and policies which comply with Listing Rule 19.11A.
- 2 This statement gives a true and fair view of the matters disclosed.
25 October 2021
Date: ...................................................................................
Company Secretary
Authorised by: ................................................................................... (Name of body or officer authorising release – see note 4)
Notes
-
- This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the entity's activities for the past quarter, how they have been financed and the effect this has had on its cash position. An entity that wishes to disclose additional information over and above the minimum required under the Listing Rules is encouraged to do so.
-
- If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash Flows apply to this report. If this quarterly cash flow report has been prepared in accordance with other accounting standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report.
-
- Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities, depending on the accounting policy of the entity.
-
- If this report has been authorised for release to the market by your board of directors, you can insert here: "By the board". If it has been authorised for release to the market by a committee of your board of directors, you can insert here: "By the [name of board committee – eg Audit and Risk Committee]". If it has been authorised for release to the market by a disclosure committee, you can insert here: "By the Disclosure Committee".
-
- If this report has been authorised for release to the market by your board of directors and you wish to hold yourself out as complying with recommendation 4.2 of the ASX Corporate Governance Council's Corporate Governance Principles and Recommendations, the board should have received a declaration from its CEO and CFO that, in their opinion, the financial records of the entity have been properly maintained, that this report complies with the appropriate accounting standards and gives a true and fair view of the cash flows of the entity, and that their opinion has been formed on the basis of a sound system of risk management and internal control which is operating effectively.