Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

RUMBLE RESOURCES LIMITED Capital/Financing Update 2019

Aug 21, 2019

65736_rns_2019-08-21_83398603-a9d4-49d6-95d6-4c862c3df832.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

22[nd] August 2019

14 High Priority Targets at Braeside-Barramine and New Mineralisation Style defined at Earaheedy

Braeside-Barramine Zn-Pb-Cu-Ag-Au-V Project – Drill Targeting

Ongoing geochemical drill targeting has highlighted nine (9) new high priority targets. Exploration by Rumble has now defined a large mineralised vein array system over 60km in strike and 8km in width.

  • Moxems V-Pb Target (New)

  • Vanadinite has been defined over a strike of 400m (completely open)

  • Grab sampling has returned very high-grade vanadium and lead including:BR507 – 6.75% V2O5, 48.25% Pb

Rumble Resources Ltd

Suite 9, 36 Ord Street, West Perth, WA 6005

T +61 8 6555 3980 F +61 8 6555 3981

  - ➢ **BR643 – 6.62% V2O5, 31.3% Pb**

  - ➢ **BR640 – 4.62% V2O5, 16.71% Pb**
  • Bonecrusher Au-Zn Target (New)

  • Soil sampling has defined continuous gold anomalism (max value to 39ppb Au) with Zn and Ag over a strike of 1km

  • Au has not been previously defined at Braeside-Barramine

  • Other (New) targets include:

  • Far North Gossan Zn-Pb – grab sampling has highlighted alteration over 500m strike with Zn to 8.23% and Pb to 9.34%

  • No Dice Chicun Zn-Pbstrong soil anomalism over 1km with limited highgrade grab sample results including Pb to 34%, Ag to 88 g/t and Zn to 1.4%

  • Barramine Zn Southlarge 2km by 1km soil anomaly with peak value of 1200ppm Zn and 700ppm Pb

rumbleresources.com.au

ASX RTR

Executives & Management

Mr Shane Sikora Managing Director

Mr Brett Keillor Technical Director

  • Barramine Zn North – strong Zn in soil anomalism over 800m by 400m

  • Camel Hump CuShear zone style mineralization over 1.5km as returned Cu to 13.4%, Pb to 6.04%, Zn to 1.79% and Ag to 131 g/t from limited grab sampling

Mr Matthew Banks Non-executive Director

  • Great Southern Znlarge 1.4km long (open) soil anomaly with Zn to 498ppm.

  • Slimrose Ba-Pblarge alteration zone 600m by 500m with strong Ba (to >2000ppm) and Pb (571ppm) soil anomalism

Mr Michael Smith Non-executive Director

Next Steps

  • 14 High Priority Targets (9 new targets and 5 previously identified) will be further tested by infill geochemistry and prospect mapping to define for RC drilling

Earaheedy Zn-Pb Project – New Mineralisation Style – Drilling Results

Mr Steven Wood Company Secretary

Mr Mark Carder Exploration Manager

A style of mineralization not previously recognized has been discovered in the current round of drilling. Flat lying unconformity related sandstone grit hosting Zn Pb mineralization returned:

  • 4.7m @ 2.18% Zn, 0.63% Pb from 153.3m

  • 7m @ 2.11% Zn, 0.4% Pb from 150m

  • 2m @ 3.23% Zn, 1.73% Pb from 130m

The unconformity related mineralization is interpreted to form a shallow sub-basin at the base of the Frere Iron Formation with approximate dimensions of 8km by 2km .

Re-interpretation of historic drilling in conjunction with the current drilling has inferred the subbasin as highly prospective for laterally extensive flat lying sandstone hosted Zn-Pb deposits. Historic drill-holes have significant mineralized sandstone intercepts including:

  • TDH20 - 6m @ 3.91% Zn, 0.39% Pb from 210.5m

  • TRC47 – 7m @ 4.85% Zn+Pb from 103m (hole ended in mineralization)

Next Steps

  • Drill targeting of up-dip position where the sandstone sub-basin comes to the surface under cover with the focus on defining Zn Pb mineralization amenable to open cut mining.

1

==> picture [83 x 72] intentionally omitted <==

Rumble Resources Limited (ASX: RTR) (“Rumble” or “the Company”) is pleased to announce the results of ongoing drill targeting completed at the Braeside-Barramine Project and the results and interpretation of the recently completed drilling program at the Earaheedy Project.

Braeside-Barramine Zn-Pb-Cu-AG-Au-V Project

The Braeside-Barramine Project, located in the east Pilbara region of Western Australia, comprises an area of 1813 km² covering over 60km of prospective strike for significant mineralization . Polymetallic high-level vein sets discovered by Rumble are considered to be part of a large porphyry to epithermal alteration and mineralization system related to potential underlying Fortescue (2.7 Ga) felsic (subvolcanic to aerial volcanics) and associated A type granitoids.

Soil and grab sampling completed by Rumble has highlighted a further nine (9) high priority drill targets complimenting 5 high priority targets previously defined in 2018 – See image 1.

==> picture [462 x 548] intentionally omitted <==

Image 1. Braeside-Barramine Project – Tenure, Regional Geology and Targets

2

Drill Targeting Completed - (9) nine new high priority drill targets defined

==> picture [83 x 72] intentionally omitted <==

During May to June 2019, some 913 soil, 44 stream sediment and 195 grab samples were collected over a strike of 65 km within the Braeside-Barramine Project. The soils were collected on 400m by 400m, 200m by 200m and 100m by 50m grids over high priority targets.

The surface geochemistry has highlighted (9) nine new high priority drill targets.

1. Moxem’s V-Pb Target (Image 1, 2 & 3)

  • A new vanadinite vein has been discovered with very high-grade vanadium ( V2O5) lead (Pb) values from limited grab sampling including:

  • BR507 – 6.75% V2O5, 48.25% Pb.

  • BR640 – 4.62% V2O5, 16.71% Pb.

  • BR643 – 6.62% V2O5, 31.3% Pb.

  • BR647 – 3.44% V2O5, 16.64% Pb.

  • BR646 – 2.82% V2O5, 29.68% Pb.

  • BR634 – 3.87% V2O5, 16.34% Pb

==> picture [87 x 108] intentionally omitted <==

Image 2 – Vanadinite from Moxem’s

  • The high-grade vanadium-lead mineralization has been defined along an east-northeast trending altered structure over a strike length of 400m (completely open ).

  • The mineralization is vanadinite (see image 2) occurring as multiple veins and veinlets (generally < 1m in width) with the alteration to 40m in width.

==> picture [465 x 362] intentionally omitted <==

Image 3 - Moxem’s V Pb Target – Location of Grab Samples and Results.

3

2. Bonecrusher Au-Zn Target (Image 1 and 4)

==> picture [83 x 72] intentionally omitted <==

  • Gold in soil anomalism has been confirmed over a strike of 1km with the peak Au value 39ppb and strong continuity of anomalism has been determined by infill 100m by 50m soil sampling.

  • Limited grab sampling has highlighted strong Zn (to 2.54%) and Ag (to 32.7 g/t) mineralisation is associated with the gold in soil anomalism - Underlying the gold in soil anomalism is an outlier of altered shale/siltstone.

  • Bonecrusher lies within the main Ba Kspar Chlorite Silica sulphide vein alteration corridor (see image 1 ) and is the first significant gold target discovered since Rumble commenced exploration in 2017.

==> picture [319 x 357] intentionally omitted <==

Image 4 – Bonecrusher Au Zn Target – Gold in Soil Contours and Grab Sample results.

3. Far North Gossan Zn-Pb Target (Image 1)

  • Strong alteration over 500m in strike is associated with sphalerite and galena mineralisation. Grab sampling focused on the intersection of two structures where results returned 8.32% Zn (peak value), 6.45% Zn, 4.23% Zn, 9.34% Pb (peak value) and 3.4% Pb.

4. No Dice Chicun Zn-Pb Target (Image 1)

  • Soil anomalism over a strike of 1km and on average 200m wide is associated with altered shales and siltstone. Maximum Zn in soil value is 560ppm and Pb in soil is 422ppm. Limited grab sampling returned Pb to 34%, Ag to 88 g/t and Zn to 1.4%.

5. Barramine Zn South Target (Image 1)

  • A large 2km by 1km soil anomaly with peak value of 1200ppm Zn and 700ppm Pb is associated with andesitic volcaniclastics and siltstones. Random grab sampling returned anomalous Zn to 0.7% and Pb to 0.62%.

4

6. Barramine Zn North Target (Image 1)

==> picture [83 x 72] intentionally omitted <==

  • Strong Zn in soil anomalism occurs over an area 800m by 400m in shales and siltstones.with maximum Zn to 373ppm and Pb to 248ppm.

7. Camel Hump Cu Target (Image 1)

  • Shear zone style mineralization over 1.5km as returned Cu to 13.4%, Pb to 6.04%, Zn to 1.79% and Ag to 131 g/t from limited grab sampling . Soil sampling returned copper to 338 ppm.

8. Great Southern Zn Target (Image 1)

  • A large 1.4km long (open) soil anomaly with Zn to 498ppm is associated with a strongly altered. No grab sampling has been completed.

9. Slimrose Ba-Pb Target (Image 1)

  • A large alteration zone 600m by 500m is associated with strong Ba (to >2000ppm) and Pb (571ppm) soil anomalism. A single grab sample returned 0.52% Pb.

==> picture [349 x 489] intentionally omitted <==

Image 5 – Braeside-Barramine Regional Scale Porphyry to Epithermal System - Refer to Image 1 for prospect locations

5

Exploration Potential

==> picture [83 x 72] intentionally omitted <==

Exploration by Rumble has now outlined a large mineralised vein array system over 60km in strike and 8km in width.

Four styles of veining and alteration has been discovered ( See Image 1 and 5 ) with high level epizonal to epithermal base metal veining occurring in the east section of the vein system then ranging into low level epizonal to upper porphyry in the west section (deeper deposition level).

The recent surface geochemistry exploration has extended the mineralised vein system along strike and defined additional parallel vein sets.

Next Steps

14 high priority targets made up of (9) nine new targets (no drilling) recently defined and (5) five prospects outlined during the 2018 RC drilling programme ( see Image 1 ) have significant base metal and alteration intercepts and are open along strike.

  • Infill surface geochemistry with prospect mapping will define drill targets for the new (9) nine targets.

  • Up to 14 targets will be tested by RC drilling along strike and at depth .

Earaheedy Zn-Pb Project

Rumble has an option agreement with Fossil Prospecting Pty Ltd (a wholly owned subsidiary of ASX Listed Zenith Minerals Ltd – (ASX: ZNC) to acquire a 75% interest in E69/3464. Rumble owns 100% of the contiguous application E69/5503.

A style of Zn–Pb mineralization not previously recognized has been discovered at Earaheedy. Four holes (by Rumble) have intercepted this style of mineralization where Zn - Pb sulphides have developed in porous sandstone grits. The mineralization is interpreted to be associated with a shallow sub-basin unconformably overlying the carbonates that host widespread MVT (Mississippi Valley Type) Zn (dominant) – Pb occurrences.

Exploration Completed (Image 6)

Four (4) diamond drill holes (total metreage – 1199.8) and two (2) RC drill holes (total metreage – 374) were completed May – July 2019 in three stages. The program was interrupted by pastoral station activities and breakdowns.

Results

The new style of Zn Pb mineralisation has been delineated on the contact between the overlying Frere Iron Formation and underlying Navajoh Dolomite of the Palaeoproterozoic Yelma Formation. Drilling intercepted a flat lying porous sandstone to grit unit that lies at the base of the Frere Iron Formation. Sphalerite, galena and pyrite have developed interstitially within the porous sandstone grit host forming laterally extensive sulphide layers. Four drill-holes intersected the zone. Results include:

==> picture [6 x 8] intentionally omitted <==

  • 4.7m @ 2.18% Zn, 0.63% Pb from 153.3m (EDH004)

  • 2m @ 3.23% Zn, 1.73% Pb from 130m (EDH003)

  • 7m @ 2.11% Zn, 0.4% Pb from 150m (EHRC001)

  • 10m @ 1.24% Zn, 0.63% Pb from 150m (EHRC002)

Interpretation

The mineralisation is considered to be unconformity related sandstone hosted Zn Pb type and is later than the MVT carbonate hosted mineralisation defined by previous explorers. There is an approximate hiatus of 20-30 million years between the underlying Navajoh Dolomite and overlying Frere Iron Formation. The sandstone grit unit is the first sedimentation stage (local and coarse grained) of the Frere Iron Formation cycle over the partly eroded palaeo-surface (in part karstified) of the Navajoh Dolomite. The sandstone grit unit forms a sub-basin that’s lies unconformably over dolomite, siltstone and shales of the Yelma Formation.

The source of metal associated with the sandstone grit Zn Pb mineralisation is inferred to be chemically remobilised from the underlying Zn Pb bearing carbonates by low temperature chloride rich fluids.

6

==> picture [83 x 72] intentionally omitted <==

Re-interpretation of historic drilling has shown that at least 12 mineralised Zn-Pb intercepts are within the sandstone grit unit. Two examples are historic drill-hole TDH20 and TRC47 (see images 6 & 7).

TDH20 is interpreted to lie close to the margin or edge of the sandstone grit sub-basin and has two styles of mineralisation.

  • 6m @ 3.91% Zn, 0.39% Pb from 210.5m – hosted in sandstone

  • 16m @ 1% Zn, 0.3% Pb from 225m – hosted in carbonate

TRC47 is interpreted to lie within the sub-basin, approximately 1km in from the margin. The historic sandstone grit intercept was:

7m @ 4.85% Zn+Pb from 103m (EOH)

The area of the sandstone grit sub-basin is interpreted to be 8km by 2km .

==> picture [505 x 445] intentionally omitted <==

Image 6 – Earaheedy Project - Plan of Recent Drilling (Rumble) with Intercepts and Interpreted Geology

Section JJ’ (see image 7) represents a cross section of the sandstone sub-basin margin and highlights (diagrammatic) the unconformity. The underlying Navajoh Dolomite has been eroded completely towards the southwest, however, Zn Pb mineralisation persists in the porous sandstone grit unit at the unconformity. The Pb/Zn ratio increases towards the southwest into the sub-basin.

Of note, most historic RC drillholes (see image 6) did not completely penetrate and pass through the sandstone grit unit due to excessive highly saline water ingress.

7

Exploration Potential

==> picture [83 x 72] intentionally omitted <==

The sub-basin sandstone hosted mineralisation style is prospective for laterally extensive flat lying Zn Pb deposits.

The up-dip position towards the southwest, where the unconformity has not been tested, is considered as having the best potential as the mineralisation will be near surface and if economic, amenable to open cut mining.

There is also potential for further unconformity related sub-basin sandstone Zn Pb mineralisation along strike.

Next Steps

  • Rumble to generate drill targets in up-dip positions where the mineralised sandstone sub-basin comes to the surface.

==> picture [528 x 312] intentionally omitted <==

Image 7 – Cross Section JJ’ (from image 5) Highlighting the Sandstone Grit Unit and Unconformity.

  • Ends -

About Rumble Resources Ltd

Rumble Resources Ltd is an Australian based exploration company, officially admitted to the ASX on the 1st July 2011. Rumble was established with the aim of adding significant value to its current gold and base metal assets and will continue to look at mineral acquisition opportunities both in Australia and abroad.

Forward Looking and Cautionary Statement

The information in this report that relates to historic exploration results was collected from DMP reports submitted by government agencies and previous explorers. Rumble has not completed the historical data or the verification process . As sufficient work has not yet been done to verify the historical exploration results, investors are cautioned against placing undue reliance on them.

Competent Persons Statement

The information in this report that relates to Exploration Results is based on information compiled by Mr Brett Keillor, who is a Member of the Australasian Institute of Mining & Metallurgy and the Australian Institute of Geoscientists. Mr Keillor is an employee of Rumble Resources Limited. Mr Keillor has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Keillor consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

8

Section 1 Sampling Techniques and Data

==> picture [83 x 72] intentionally omitted <==

Criteria JORC Code explanation Commentary
Sampling Nature and quality of sampling (e.g. cut channels, Diamond Core – ¼ core cut at one
techniques random chips, or specific specialised industry
standard measurement tools appropriate to the
minerals under investigation, such as down hole
gamma sondes, or handheld XRF instruments, etc.).
These examples should not be taken as limiting the
metre intervals or if significant
geological boundary present, cut to
boundary. Entire ¼ core is crushed,
pulverised and split for analysis by
multi-element 4 acid digest for base
metals.
broad meaning of sampling.
Include reference to measures taken to ensure
sample representivity and the appropriate calibration
Core cut on recognised mineralisation
(determined by pXRF).
of any measurement tools or systems used. RC chip sampling every metre. Cone
Aspects of the determination of mineralisation that split with +2kg sample assayed by wet
are Material to the Public Report. analysis. Wet analysis was multi-
In cases where ‘industry standard’ work has been
done this would be relatively simple (e.g. ‘reverse
circulation drilling was used to obtain 1 m samples
element 4 acid digest for base metals.
Sample for assaying determined by
pXRF.
from which 3 kg was pulverised to produce a 30 g
charge for fire assay’). In other cases more
explanation may be required, such as where there is
coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (e.g.
submarine nodules) may warrant disclosure of
detailed information.
Drilling Drill type (e.g. core, reverse circulation, open-hole Diamond drilling completed by Three
techniques hammer, rotary air blast, auger, Bangka, sonic, etc.)
and details (e.g. core diameter, triple or standard
tube, depth of diamond tails, face-sampling bit or
other type, whether core is oriented and if so, by
what method, etc.)..
Rivers Drilling. Two rigs were used
individually. Rig 3 was a Edson
MP4000 and rig 4 was a Hydco 1000H.
Drilling was HQ from the surface before
changing to NQ in more competent
rock for two holes. The remaining two
diamond drill holes used a tricone/roller
bit as the pre-collar.
RC drilling was completed by Precision
Exploration Drilling using a Hydco 220
with 155mm bit.
Drill sample
Method of recording and assessing core and chip
Core was logged and orientated (if
recovery sample recoveries and results assessed.
Measures taken to maximise sample recovery and
ensure representative nature of the samples.
Whether a relationship exists between sample
recovery and grade and whether sample bias may
have occurred due to preferential loss/gain of
fine/coarse material.

possible) with total recovery recorded.
For assay core split and then quartered
for assaying.
No core loss over mineralised section
evident.
RC chips collect from wet cone splitter.
The split sample was collected by
calico +2kg.
Visual estimation of sample in bag
volume. No undersize bags recorded.
Very wet RC samples collected in large
polyweave bags and left to drain
overnight. If sample from polyweave
bag, then collected by spear along
length of bag.
Logging Whether core and chip samples have been All Diamond Core and RC chips
geologically and geotechnically logged to a level of
detail to support appropriate Mineral Resource
estimation, mining studies and metallurgical studies.
Whether logging is qualitative or quantitative in
nature. Core (or costean, channel, etc.)
photography.
The total length and percentage of the relevant


geologically logged by site geologist.
Detailed logging of core was conducted
by Rumble in it’s Perth shed faculty.
Drilling is considered first pass
exploration, no resource estimation
completed.
Individual RC metres logged and library
sample collected every metre.
_intersections logged. _
Sub- If core, whether cut or sawn and whether quarter, For diamond core drilling, ¼ core taken
sampling halfor allcore taken. for assay.

9

Criteria JORC Code explanation Commentary
techniques If non-core, whether riffled, tube sampled, rotary For RC drilling, wet cone split taken.
and sample
split, etc. and whether sampled wet or dry.
For diamond core, the core quality was
preparation For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
Quality control procedures adopted for all sub-
sampling stages to maximise representivity of
samples.

relatively oxidised and broken,
however, overall recovery was high.
Sample collection and preparation
consider adequate for reconnaissance
drilling.
Appropriate base metal and OREAS
standards and blanks used for both
Measures taken to ensure that the sampling is diamond core and RC drilling.
representative of the in situ material collected,
including for instance results for field
duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain
_size of the material being sampled. _
Quality of
The nature, quality and appropriateness of the
All samples assayed by 4 acid digest –
assay data
and
laboratory
tests

assaying and laboratory procedures used and
whether the technique is considered partial or total.
For geophysical tools, spectrometers, handheld XRF
instruments, etc., the parameters used in
determining the analysis including instrument make
and model, reading times, calibrations factors
applied and their derivation, etc.

considered total digest for base metal
mineralisation. Samples assayed by
Intertek, Maddington using OE finish
for
multi-elements.
Higher
grade
assays were redone by 4 acid digest as
single elements.
Use of pXRF to control and select
sampling. Other instruments include
Nature of quality control procedures adopted (e.g. magnetic susceptibility meter.
standards, blanks, duplicates, external laboratory CRM used at appropriate intervals. (20
checks) and whether acceptable levels of accuracy samples for standard and blanks)
(i.e. lack of bias) and precision have been
_established. _
include OREAS base metal standards
and blanks.
Verification The verification of significant intersections by either Drill sample assays internally checked.
of sampling
independent or alternative company personnel.
No twins completed
and The use of twinned holes. Data entry on site and office using
assaying Documentation of primary data, data entry
procedures, data verification, data storage (physical
and electronic) protocols.
standard spreadsheets. Verification
completed on database entry.
No adjustment to data.
• _Discuss any adjustment to assay data. _
Location of
Accuracy and quality of surveys used to locate drill
Drill-hole collars sited by hand held
data points holes (collar and down-hole surveys), trenches, GPS – GDA94 Z51.
mine workings and other locations used in Mineral
Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
Data Data spacing for reporting of Exploration Results. Reconnaissance Diamond Core and
spacing and
Whether the data spacing and distribution is
RC drilling only
distribution sufficient to establish the degree of geological and
grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s)
No composites used, maximum sample
length was 1m.
and classifications applied.
Whether sample compositing has been applied.
Orientation Whether the orientation of sampling achieves Historic mapping and drill holes confirm
of data
relation
geological
in
to


unbiased sampling of possible structures and the
extent to which this is known, considering the
deposit type.
flat lying sediments and mineralization.
Sample orientation and mineralized
intercepts are near true width.
structure If the relationship between the drilling orientation .
and the orientation of key mineralised structures is
considered to have introduced a sampling bias, this
should be assessed and reported if material.
Sample The measures taken to ensure sample security. Rumble contractors controlled transport
security and delivery samples.
Audits or
The results of any audits or reviews of sampling
No review has been completed
reviews techniques and data.

10

Section 2 Reporting of Exploration Results

==> picture [83 x 72] intentionally omitted <==

Criteria JORC Code explanation JORC Code explanation Commentary Commentary Commentary
Mineral Type, reference name/number, location and The Braeside-Barramine project
tenement and
land
tenure
status

ownership including agreements or material
issues with third parties such as joint ventures,
partnerships, overriding royalties, native title
interests, historical sites, wilderness or national
comprises of four granted exploration
licenses – E45/2032, E45/4368,
E45/4873, and E45/4874. A number of
pending EL’s form part of the project area.
park and environmental settings. o E45/2032 is currently owned by
The security of the tenure held at the time of
reporting along with any known impediments to
obtaining a licence to operate in the area.
Maverick Exploration Pty Ltd.
Rumble Resources has an earn in
JV agreement. The license is
granted, in a state of good standing
and has no known impediments to
operate in the area.
o E45/4368 is held by Great Sandy Pty
Ltd. Rumble has a JV whereby it
earns 70% of the project (except for
Mn and Fe rights).
o E45/4873 and E45/4874 are 100%
owned by Rumble.
o Rumble has an additional 6 EL
applications
o The total area of the project is 1813
km²
The Earaheedy Project comprises of a
granted exploration licence –
E69/3464 and two applications
o E69/3464 is currently owned by
Fossil Prospecting Pty Ltd. Rumble
Resources has an option agreement
to acquire 75% of the licence over 2
years.
o E69/3464 is granted, in a state of
good standing and has no known
impediments to operate in the area.
Exploration Acknowledgment and appraisal of exploration by Exploration solely completed by
done by other other parties. Rumble Resources
parties
Geology Deposit type, geological setting and style of Braeside _ Barramine -Target is Zn,
mineralisation. Pb, Cu, V and precious metals.
Deposit type is conceptual. Porphyry
related (including VHMS) polymetallic
deposit type and disseminated
sediment hosted type.
The Earaheedy Project Deposit type is
MVT (Mississippi Valley Type). The
geological setting is carbonate hosted.
The style is stratiform replacement and
fault breccia massive sulphides.
Current work by Rumble has identified
unconformity related sandstone hosted
Zn Pb type
Drill
hole
Information

A summary of all information material to the
understanding of the exploration results including
a tabulation of the following information for all
Table 1. - Braeside – Barramine Project –
Grab Sample Location and Results –
Vanadium
Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation
Table 2. - Earaheedy Project – Drill Hole
Location and Survey
above sea level in metres) of the drill hole Table 3. - Earaheedy Project - Diamond
collar Core and RC Drill Assays
o dip and azimuth of the hole

11

Criteria JORC Code explanation Commentary
o down hole length and interception depth
o hole length.
If the exclusion of this information is justified on
the basis that the information is not Material and
this exclusion does not detract from the
understanding of the report, the Competent
Person should clearly explain why this is the case.
Data In reporting Exploration Results, weighting Reporting of Diamond Core and RC
aggregation
methods
averaging techniques, maximum and/or minimum
grade truncations (e.g. cutting of high grades) and
cut-off grades are usually Material and should be
stated.
Where aggregate intercepts incorporate short
sampling and assays includes
highlighting zones of alteration and
elevated metal. The main reporting of
significant intercepts uses 0.1% Zn or
Pb as the lower cutoff. No upper
cutoff.
lengths of high-grade results and longer lengths of
low-grade results, the procedure used for such

If the diamond core drilling is cut to
geological boundaries, weighted
aggregation should be stated and some typical averaging of results has been
examples of such aggregations should be shown completed.
in detail.
The assumptions used for any reporting of metal
_equivalent values should be clearly stated. _
Relationship These relationships are particularly important in Diamond Core and RC mineralization
between
mineralisation
widths
and
intercept
lengths

the reporting of Exploration Results.
If the geometry of the mineralisation with respect
to the drill hole angle is known, its nature should
be reported.
If it is not known and only the down hole lengths
widths are reported as intercept (down
hole length) widths, essentially 98% of
true width. The geology dips 8° to 10°
and the inclination of the drill hole is
70°. Best geological efforts were
utilized to minimize down dip drilling.
are reported, there should be a clear statement to Drill hole azimuths were normal to the
this effect (e.g. ‘down hole length, true width not mineralized outcrops.
known’).
Diagrams Appropriate maps and sections (with scales) and Image 1 – Braeside-Barramine Project
tabulations of intercepts should be included for
any significant discovery being reported These
– Tenure, Regional Geology and
Targets
should include, but not be limited to a plan view of Image 2 – Vanadinite from Moxem’s
drill hole collar locations and appropriate sectional
views.
Image 3 – Moxem’s V Pb Target –
Location of Grab Samples and
Results.
Image 4 – Bonecrusher Au Zn Target
– Gold in Soil Contours and Grab
Sample Results.
Image 5 – Braeside-Barramine
Geological/Alteration Model
Image 6 - Earaheedy Project - Plan of
Recent Drilling (Rumble)with
Intercepts and Interpreted Geology
Image 7 - Cross Section JJ’ (from
image 5) Highlighting the Sandstone
Grit Unit and Unconformity.
Balanced Where comprehensive reporting of all Exploration Table 2 and 3 presents the drill hole
reporting Results is not practicable, representative reporting
of both low and high grades and/or widths should
locations andalldownhole drilling
assays for Earaheedy Project
be practiced to avoid misleading reporting of
Exploration Results.
Other Other exploration data, if meaningful and material,
Historic drilling and results have
substantive should be reported including (but not limited to): previously been reported in
exploration
data
geological observations; geophysical survey
results; geochemical survey results; bulk samples
o
Announcement ASX – Drilling
Commenced at Earaheedy
– size and method of treatment; metallurgical test Zinc Project – 10/4/2019
_results; bulkdensity, groundwater, geotechnical _

12

Criteria JORC Code explanation Commentary
and rock characteristics; potential deleterious or
contaminating substances.
Further work The nature and scale of planned further work (e.g.
Braeside – Barramine Project
tests for lateral extensions or depth extensions or
large-scale step-out drilling).
Diagrams clearly highlighting the areas of possible
extensions, including the main geological
interpretations and future drilling areas, provided
o
o
o
Detailed infill in situ pXRF
geochemistry
Prospect mapping of high priority
targets
Planned RC and diamond drilling
for 2020 season.
this information is not commercially sensitive. Earaheedy Project
o Plan RC drilling to test up dip
positions of prospective
sandstone unit.

Table 1

Braeside– Barramine Project– Grab Sample Location and Results– Vanadium Braeside– Barramine Project– Grab Sample Location and Results– Vanadium Braeside– Barramine Project– Grab Sample Location and Results– Vanadium Braeside– Barramine Project– Grab Sample Location and Results– Vanadium Braeside– Barramine Project– Grab Sample Location and Results– Vanadium Braeside– Barramine Project– Grab Sample Location and Results– Vanadium Braeside– Barramine Project– Grab Sample Location and Results– Vanadium Braeside– Barramine Project– Grab Sample Location and Results– Vanadium Braeside– Barramine Project– Grab Sample Location and Results– Vanadium Braeside– Barramine Project– Grab Sample Location and Results– Vanadium Braeside– Barramine Project– Grab Sample Location and Results– Vanadium Braeside– Barramine Project– Grab Sample Location and Results– Vanadium Braeside– Barramine Project– Grab Sample Location and Results– Vanadium Braeside– Barramine Project– Grab Sample Location and Results– Vanadium Braeside– Barramine Project– Grab Sample Location and Results– Vanadium
SampleID GDA94_z51 E
GDA94_z51 N

Aug/t

Ag g/t

Bappm

Cdppm

Cuppm

Mnppm

Moppm

Pb%
Sppm Vppm V2O5 % Zn %
BR507 300121 7662949 0.02 39.8 62 13.1 1676 1077 13 48.25 19847 37792 6.75 1.05
BR643 299992 7662984 0.07 4.8 76 0.5 22 87 0.01 31.30 384 37070 6.62 0.04
BR640 300021 7662973 0.06 13 152 1.2 1338 489 9 16.71 1934 25869 4.62 0.21
BR634 300111 7662953 0.01 1.6 97 1.5 1938 273 10 16.34 387 21655 3.87 0.40
BR647 300172 7662931 0.04 7.2 118 3.1 567 518 10 16.64 799 19282 3.44 0.27
BR646 300154 7662941 0.06 16.8 142 0.01 27 372 3 29.68 1705 15805 2.82 0.03
BR648 300317 7662871 0.03 3.2 174 0.01 448 133 6 27.26 179 14091 2.52 0.03
BR645 300130 7662949 0.08 22.2 379 0.6 117 710 6 25.62 367 13923 2.49 0.06
BR639 300040 7662972 0.03 13.6 137 0.7 7397 277 42 14.32 961 12104 2.16 0.13
BR641 300016 7662974 0.05 13.3 256 1 188 437 4 4.68 681 8279 1.48 0.07
BR509 300307 7662874 0.12 1.2 156 1.1 1153 337 9 26.15 245 4608 0.82 0.09
BR506 299763 7663375 0.03 41.2 103 3.9 793 77 3 31.35 22854 4598 0.82 0.28
BR649 299754 7663382 0.02 17 70 187.2 1401 203 15 9.68 7431 3348 0.60 9.95
BR636 300111 7662952 0.01 1.5 1025 0.01 176 1059 4 5.09 76 2438 0.44 0.12
BR642 300002 7662977 0.06 26.7 228 24.1 4050 402 14 4.13 905 1456 0.26 1.66
BR633 300112 7662952 0.08 5.1 141 1.1 848 89 15 0.97 23926 722 0.13 0.09
BR544 299918 7656543 0.02 0.9 248 1.4 1525 2874 37 5.16 1014 696 0.12 0.12

Table 2.

Earaheedy Project – Drill Hole Location and Survey

Hole ID Type E N Depth(m) Azi Dip
EDH001 DD 261464 7161637 432.4 40 -70
EDH002A DD 264108 7160083 403 40 -70
EDH003 DD 264825 7158112 174.4 330 -70
EDH004 DD 264987 7158351 189.6 330 -70
EHRC001 RC 264944 7158430 186 330 -70
EHRC002 RC 264925 7158464 188 330 -70
GDA94 Z51

13

Table 3
Earaheedy Project- Diamond Core and RC Drill Assays
Table 3
Earaheedy Project- Diamond Core and RC Drill Assays
Table 3
Earaheedy Project- Diamond Core and RC Drill Assays
Table 3
Earaheedy Project- Diamond Core and RC Drill Assays
Table 3
Earaheedy Project- Diamond Core and RC Drill Assays
Table 3
Earaheedy Project- Diamond Core and RC Drill Assays
Table 3
Earaheedy Project- Diamond Core and RC Drill Assays
Table 3
Earaheedy Project- Diamond Core and RC Drill Assays
Table 3
Earaheedy Project- Diamond Core and RC Drill Assays
Table 3
Earaheedy Project- Diamond Core and RC Drill Assays
Table 3
Earaheedy Project- Diamond Core and RC Drill Assays
Table 3
Earaheedy Project- Diamond Core and RC Drill Assays
Zn %
0.02
0.03
0.01
0.00
0.11
0.01
0.00
0.00
0.00
0.01
0.01
0.00
0.00
0.00
0.00
0.01
0.01
0.04
0.03
0.01
0.06
0.09
0.01
0.05
0.05
3.05
0.05
0.13
0.04
0.00
0.07
0.10
0.84
0.01
0.08
2.27
0.04
0.03
0.13
0.00
0.01
0.07
0.27
0.00
0.56
0.01
0.02
0.72
0.56
0.00
0.06
0.02
0.08
0.15
0.11
0.27
0.05
0.02
1.24
1.57
1.58
1.09
2.71
1.54
1.93
1.49
0.27
0.02
0.00
0.00
0.00
Hole ID From(m)
To(m)

Ag g/t

Bappm

Ca %

Cuppm

Fe_%

Mg %

Mnppm

Pb %
Sppm Zn %
EDH001 213 214 0.01 112 18.30 15 1.31 10.03 2518 0.00 1574 0.02
EDH001 214 215 0.01 87 18.67 18 1.14 10.23 2186 0.00 997 0.03
EDH001 215 216 0.01 86 17.28 32 1.04 9.55 2015 0.00 778 0.01
EDH001 216 217 0.01 71 19.69 4 0.95 10.85 2001 0.00 366 0.00
EDH001 217 218 0.01 225 18.75 8 0.97 10.43 2025 0.01 1492 0.11
EDH001 218 219 0.01 79 18.87 3 0.73 10.53 1881 0.01 287 0.01
EDH001 219 220 0.01 87 19.48 0.01 0.76 10.83 2105 0.00 104 0.00
EDH001 220 221 0.01 79 19.51 0.01 0.76 10.89 2166 0.00 274 0.00
EDH001 221 222 0.01 92 19.44 0.01 0.71 10.84 1900 0.00 148 0.00
EDH001 222 223 0.01 77 18.83 1 0.73 10.54 2033 0.02 477 0.01
EDH001 223 224 0.01 52 19.50 2 0.69 10.97 1533 0.02 1665 0.01
EDH001 224 225 0.01 87 18.84 0.01 0.62 10.63 1399 0.00 736 0.00
EDH001 225 226 0.01 76 18.97 0.01 0.74 10.60 1860 0.00 185 0.00
EDH001 240 241 0.01 35 20.13 0.01 0.89 11.37 1950 0.00 2180 0.00
EDH001 241 242 0.01 47 19.96 0.01 0.64 11.24 1585 0.00 232 0.00
EDH001 242 243 0.01 46 19.62 0.01 0.55 11.08 1244 0.00 655 0.01
EDH001 243 244 0.01 58 19.81 5 0.71 11.23 1273 0.01 2436 0.01
EDH001 244 245 0.01 57 20.06 2 0.57 11.38 1389 0.01 1020 0.04
EDH001 245 246 0.01 57 19.12 2 0.57 10.86 1163 0.00 1576 0.03
EDH001 246 247 0.01 51 19.40 0.01 0.52 11.07 1166 0.00 730 0.01
EDH001 247 248 0.01 46 19.84 12 0.57 11.36 1308 0.01 1116 0.06
EDH001 248 249 0.01 41 15.29 5 0.76 8.71 1302 0.03 4838 0.09
EDH001 249 250 0.01 108 19.42 0.01 0.45 11.14 1115 0.00 881 0.01
EDH001 250 251 0.01 40 19.59 3 0.78 11.09 1163 0.01 5177 0.05
EDH001 251 252 0.01 39 20.02 1 0.37 11.38 919 0.00 1105 0.05
EDH001 252 253 1.4 57 17.18 42 2.31 9.71 1497 0.02 36487 3.05
EDH001 253 254 0.01 58 18.72 4 0.84 10.63 1363 0.02 4898 0.05
EDH001 254 255 0.01 57 18.98 2 0.72 10.79 1295 0.01 3995 0.13
EDH001 255 256 0.01 58 19.37 1 0.46 11.04 1107 0.00 976 0.04
EDH001 256 257 0.01 54 19.46 0.01 0.58 11.09 1699 0.00 829 0.00
EDH001 257 258 0.01 67 18.43 1 0.63 10.44 1968 0.00 1295 0.07
EDH001 258 259 1 61 18.64 11 1.28 10.56 1358 0.01 11313 0.10
EDH001 259 260 2.5 64 18.68 12 0.79 10.64 976 0.45 11160 0.84
EDH001 260 261 0.01 43 19.39 2 0.35 11.05 1093 0.00 542 0.01
EDH001 261 262 0.01 56 19.41 3 0.37 11.11 1019 0.01 1291 0.08
EDH001 262 263 1.7 84 16.05 40 1.52 9.15 1393 0.08 23866 2.27
EDH001 263 264 0.01 79 17.55 7 0.54 10.00 1287 0.03 1926 0.04
EDH001 264 265 0.01 82 18.82 6 0.39 10.74 981 0.00 1084 0.03
EDH001 265 266 0.01 81 19.41 6 0.54 11.22 1496 0.01 2253 0.13
EDH001 266 267 0.01 73 19.28 2 0.39 11.03 1083 0.00 550 0.00
EDH001 267 268 0.01 102 19.04 3 0.5 10.93 1084 0.01 1825 0.01
EDH001 268 269 0.01 85 19.04 5 0.6 10.84 1062 0.02 3210 0.07
EDH001 269 270 0.01 95 19.52 11 0.43 11.10 824 0.01 3270 0.27
EDH001 270 271 0.01 50 20.21 2 0.27 11.53 745 0.00 321 0.00
EDH001 271 272 0.5 72 19.45 14 0.56 11.07 914 0.04 6044 0.56
EDH001 272 273 0.01 64 19.81 4 0.49 11.34 803 0.01 3321 0.01
EDH001 273 274 0.01 85 19.25 3 0.62 10.96 962 0.00 3239 0.02
EDH001 274 275 0.01 88 19.81 7 0.65 11.28 1119 0.01 6995 0.72
EDH001 275 276 0.01 85 19.74 4 0.57 11.24 1218 0.01 4940 0.56
EDH001 276 277 0.01 69 20.16 0.01 0.35 11.57 1034 0.00 376 0.00
EDH001 277 278 0.9 98 19.54 5 1.37 11.20 1034 0.12 12735 0.06
EDH001 278 279 0.01 63 20.57 0.01 0.38 11.72 1215 0.00 489 0.02
EDH001 279 280 0.01 130 19.40 3 0.5 11.07 1035 0.03 2414 0.08
EDH001 280 281 0.5 121 18.71 3 0.64 10.71 1407 0.21 2786 0.15
EDH001 281 282 0.01 101 18.18 4 0.66 10.35 940 0.13 4503 0.11
EDH001 282 283 0.01 123 16.58 2 0.41 9.48 847 0.02 2826 0.27
EDH001 283 284 0.01 170 18.67 0.01 0.48 10.75 1214 0.01 612 0.05
EDH001 284 285 0.01 108 18.03 3 0.4 10.29 1037 0.01 585 0.02
EDH001 285 286 0.01 110 19.45 5 0.51 11.07 1159 0.07 7990 1.24
EDH001 286 287 0.01 104 19.60 4 0.38 11.17 971 0.13 9365 1.57
EDH001 287 288 0.6 171 20.46 8 0.55 11.61 1040 0.08 10601 1.58
EDH001 288 289 0.6 164 19.44 4 0.44 11.03 1075 0.17 6598 1.09
EDH001 289 290 1.4 163 18.89 10 0.56 10.68 1116 0.38 15548 2.71
EDH001 290 291 0.8 171 18.87 5 0.45 10.76 975 0.24 9392 1.54
EDH001 291 292 4.6 184 17.83 3 0.64 10.11 1222 1.26 14851 1.93
EDH001 292 293 1.1 177 18.33 10 0.78 10.28 1702 0.33 11072 1.49
EDH001 293 294 0.01 199 18.18 4 0.83 10.25 1857 0.03 2354 0.27
EDH001 294 295 0.01 175 18.67 0.01 0.92 10.52 2083 0.02 984 0.02
EDH002A 217 218 0.01 840 0.89 38 1.55 0.88 440 0.00 732 0.00
EDH002A 218 219 0.6 794 0.98 83 1.28 0.98 456 0.00 801 0.00
EDH002A 219 220 1.3 638 5.83 194 1.95 3.08 1965 0.00 1403 0.00

14

Table 3 Continued

==> picture [83 x 72] intentionally omitted <==

Hole ID From(m) To(m) Ag g/t Bappm Ca % Cuppm Fe_% Mg % Mnppm Pb % Sppm Zn %
EDH002A 220 221 0.01 158 17.73 13 2.81 8.97 4069 0.00 1266 0.00
EDH002A 221 222 0.8 165 17.80 24 2.16 9.35 3014 0.03 3549 0.51
EDH002A 222 223 0.7 155 18.14 7 1.62 9.71 2280 0.03 1084 0.11
EDH002A 223 224 0.01 177 18.17 40 1.35 9.90 2185 0.01 476 0.03
EDH002A 224 225 0.01 179 17.37 9 1.22 9.48 1963 0.01 667 0.02
EDH002A 225 226 0.01 344 13.93 4 1.23 7.26 2030 0.01 774 0.00
EDH002A 226 227 0.01 286 14.40 7 1.12 6.70 1668 0.01 1109 0.00
EDH002A 227 228 0.01 163 16.06 0.01 1.32 8.84 2304 0.00 872 0.00
EDH002A 228 229 0.01 161 17.49 0.01 1.24 9.57 2232 0.00 605 0.00
EDH002A 229 230 0.01 116 18.85 0.01 1.33 10.25 2457 0.00 215 0.00
EDH002A 230 231 0.01 221 18.22 0.01 1.19 10.08 2019 0.00 662 0.00
EDH002A 231 232 0.01 259 17.68 2 1.23 9.85 2018 0.00 1277 0.00
EDH002A 232 233 0.01 191 18.81 0.01 0.96 10.56 1805 0.00 321 0.00
EDH002A 233 234 0.01 296 18.42 0.01 0.89 10.33 1598 0.00 3429 0.18
EDH002A 234 235 0.01 211 20.02 1 0.62 11.33 1449 0.01 2371 0.28
EDH002A 235 236 0.01 7435 18.60 3 0.53 10.63 1206 0.04 8419 1.06
EDH002A 236 237 0.01 982 19.68 49 0.56 11.22 1482 0.02 3616 0.48
EDH002A 237 238 0.01 171 20.17 11 0.54 11.47 1631 0.01 2379 0.34
EDH002A 238 239 0.01 322 19.42 0.01 0.61 10.98 1949 0.03 3208 0.43
EDH002A 239 240 0.01 174 20.35 0.01 0.61 11.49 2092 0.01 1168 0.09
EDH002A 240 241 0.01 598 19.77 1 0.7 11.21 1655 0.04 4300 0.19
EDH002A 241 242 0.01 133 19.85 7 0.61 11.34 1394 0.04 6230 0.59
EDH002A 242 243 0.01 171 19.20 4 0.87 10.87 2225 0.03 5300 0.36
EDH002A 243 244 0.01 184 19.80 0.01 0.71 11.20 2045 0.01 3297 0.33
EDH002A 244 245 0.01 194 19.02 0.01 0.68 10.81 2054 0.02 2682 0.24
EDH002A 245 246 1.1 5385 17.98 8 1.13 10.21 2103 0.23 16460 1.48
EDH002A 246 247 0.01 254 19.41 8 0.79 10.95 2288 0.02 4549 0.37
EDH002A 247 248 0.01 188 18.81 21 0.68 10.64 2347 0.01 3393 0.47
EDH002A 248 249 0.01 232 18.91 7 0.43 10.81 1108 0.03 3590 0.40
EDH002A 249 250 0.01 119 18.90 11 0.61 10.78 1579 0.02 2339 0.03
EDH002A 250 251 0.01 113 20.22 4 0.69 11.57 2032 0.00 1166 0.01
EDH002A 251 252 0.01 140 19.63 3 0.55 11.19 1516 0.01 1327 0.00
EDH002A 252 253 1.2 1178 19.55 17 1.71 11.08 1485 0.05 19416 0.76
EDH002A 253 254 0.01 158 20.32 5 0.38 11.64 1173 0.00 704 0.01
EDH002A 254 255 0.01 124 20.71 0.01 0.37 11.79 1077 0.00 520 0.00
EDH002A 255 256 0.01 187 19.89 1 0.36 11.40 893 0.00 721 0.00
EDH002A 256 257 1.3 215 19.98 7 0.71 11.35 913 0.17 6909 0.33
EDH002A 257 258 8.2 1019 18.26 63 3.63 10.26 1126 1.45 46121 0.89
EDH002A 258 259 0.6 137 20.49 11 0.71 11.71 1040 0.03 5202 0.16
EDH002A 259 260 1.8 128 19.85 33 0.92 11.33 984 0.08 8970 0.35
EDH002A 260 261 1 119 20.90 27 0.6 11.88 879 0.08 5615 0.38
EDH002A 261 262 9 102 16.88 104 4.04 9.64 741 0.06 45349 0.34
EDH002A 262 263 0.8 109 20.37 10 0.39 11.64 867 0.05 3211 0.39
EDH002A 263 264 0.01 88 21.14 5 0.35 12.19 864 0.01 1806 0.17
EDH002A 264 265 0.01 117 20.32 6 0.36 11.78 860 0.01 983 0.04
EDH002A 265 266 0.01 89 20.39 1 0.33 11.78 821 0.00 670 0.02
EDH002A 266 267 0.9 154 19.54 14 0.73 11.24 1005 0.03 5297 0.15
EDH002A 267 268 2.1 108 20.21 22 1.39 11.65 933 0.04 14411 0.30
EDH002A 268 269 0.01 111 20.11 9 0.47 11.61 1109 0.05 2940 0.34
EDH002A 269 270 0.01 127 19.75 7 0.47 11.46 892 0.00 1593 0.03
EDH002A 270 271 0.01 164 18.79 18 0.61 10.76 922 0.04 4113 0.20
EDH002A 271 272 0.01 97 21.09 9 0.37 12.19 740 0.02 1699 0.09
EDH002A 272 273 0.01 110 20.01 6 0.4 11.51 833 0.01 2016 0.17
EDH002A 273 274 0.01 95 20.96 2 0.31 12.09 709 0.00 432 0.00
EDH002A 274 275 0.01 112 20.20 9 0.34 11.57 815 0.00 401 0.00
EDH002A 275 276 0.01 138 20.92 4 0.3 12.07 699 0.00 357 0.00
EDH002A 276 277 0.01 106 19.66 12 0.37 11.36 982 0.00 500 0.01
EDH002A 277 278 0.01 157 19.73 8 0.4 11.37 809 0.00 746 0.00
EDH002A 278 279 0.01 174 20.02 13 0.41 11.48 839 0.01 1042 0.02
EDH002A 279 280 1.8 213 19.52 65 0.58 11.25 874 0.73 5791 0.30
EDH002A 280 281 0.5 238 19.00 8 0.48 10.92 821 0.01 2676 0.15
EDH002A 281 282 0.01 218 19.07 12 0.5 11.00 928 0.02 2087 0.01
EDH002A 282 283 0.01 183 19.67 15 0.4 11.24 820 0.00 805 0.00
EDH002A 283 284 0.01 168 20.05 120 0.4 11.55 986 0.00 567 0.01
EDH002A 284 285 0.01 186 18.76 8 0.37 10.88 765 0.00 553 0.00
EDH002A 285 286 0.6 295 16.57 11 0.54 9.45 794 0.02 2729 0.15
EDH002A 286 287 0.5 201 16.94 13 0.55 9.66 777 0.02 3057 0.28
EDH002A 287 288 1.3 180 14.57 25 0.67 8.32 829 0.20 13668 2.18
EDH002A 288 289 0.01 184 14.30 1 0.84 8.11 1014 0.01 5228 0.23
EDH002A 289 290 0.01 240 11.20 5 0.64 6.34 986 0.01 904 0.06
EDH003 129 130 2.2 639 0.06 20 1.99 0.55 84 0.03 582 0.02
EDH003 130 131 13.3 602 0.04 458 3.68 0.49 87 2.82 49343 3.11

15

==> picture [83 x 72] intentionally omitted <==

Table 3 Continued

Hole ID From(m) To(m) Ag g/t Bappm Ca % Cuppm Fe_% Mg % Mnppm Pb % Sppm Zn %
EDH003 131 132 3.2 719 0.02 244 2.5 0.47 82 0.65 35503 3.36
EDH003 132 133 4.4 360 0.02 366 2.92 0.15 358 0.12 8430 0.13
EDH003 133 134 0.7 470 0.04 55 8.99 0.23 217 0.05 245 0.10
EDH003 134 135 0.8 1143 0.02 35 1.69 0.35 324 0.02 408 0.02
EDH003 135 136 0.8 9572 0.19 52 3.76 0.25 38584 0.03 2474 0.05
EDH003 136 137 0.01 6001 0.08 48 10.37 0.31 12180 0.08 1686 0.14
EDH003 137 138 0.6 988 0.02 56 3.49 0.25 370 0.04 355 0.02
EDH003 138 139 0.8 706 0.02 47 5.08 0.23 158 0.03 151 0.06
EDH003 139 140 0.7 619 0.02 67 5.19 0.30 208 0.06 527 0.07
EDH003 140 141 1.1 580 0.02 31 2.85 0.24 101 0.02 351 0.05
EDH003 141 142 0.01 582 0.02 93 11.54 0.29 242 0.08 233 0.13
EDH003 142 143 0.01 326 0.17 222 28.52 0.26 605 0.07 259 0.18
EDH003 143 144 0.01 501 0.86 66 6.91 0.88 18606 0.03 1501 0.44
EDH003 144 145 0.01 397 11.99 4 2.04 6.41 2949 0.00 78 0.00
EDH003 145 146 0.01 297 14.94 0.01 2.18 7.99 3657 0.00 425 0.00
EDH003 146 147 0.01 334 14.82 3 2.3 7.85 3831 0.00 91 0.00
EDH003 147 148 0.01 215 13.76 0.01 3.23 6.84 4764 0.00 982 0.00
EDH003 148 149 0.01 719 0.70 3 1.36 0.56 361 0.00 104 0.00
EDH003 149 150 0.01 997 0.56 1 1.35 0.56 454 0.00 190 0.00
EDH004 152 153 1.3 752 0.05 30 2.59 0.52 72 0.03 973 0.01
EDH004 153 153.3 3 652 0.03 62 2.25 0.47 89 0.01 1013 0.01
EDH004 153.3 154 6 662 0.03 253 2.02 0.48 82 1.23 29850 3.12
EDH004 154 154.7 1.6 484 0.02 64 2.67 0.49 97 0.35 11549 0.93
EDH004 154.7 155 5 792 0.02 89 2.97 0.63 57 0.73 52264 4.94
EDH004 155 155.25 4.7 888 0.03 71 3.24 0.64 105 0.74 45005 3.91
EDH004 155.25 155.8 7.4 936 0.02 282 2.53 0.64 67 1.68 40508 3.23
EDH004 155.8 156 2 891 0.02 87 1.92 0.59 119 0.15 16128 1.15
EDH004 156 156.3 1.4 897 0.02 38 1.81 0.60 95 0.09 12599 0.28
EDH004 156.3 156.9 1.5 854 0.02 39 1.79 0.56 85 0.08 13161 0.42
EDH004 156.9 157.2 3.7 625 0.03 125 3.8 0.43 97 0.72 51157 3.52
EDH004 157.2 157.45 3.5 630 0.03 99 4.75 0.54 101 0.70 64085 3.82
EDH004 157.45 157.75 0.7 866 0.02 50 2.04 0.52 82 0.01 14530 0.07
EDH004 157.75 158 2.6 493 0.02 127 2.47 0.40 94 0.03 29407 2.24
EDH004 158 158.4 1 322 0.02 52 1.77 0.28 144 0.01 6455 0.18
EDH004 158.4 159 0.7 787 0.02 44 1.34 0.52 113 0.00 2326 0.02
EDH004 159 160 0.6 892 0.06 89 2.61 0.43 4107 0.00 1830 0.06
EDH004 160 160.4 0.6 697 0.20 5 11.33 0.52 26985 0.01 1279 0.51
EDH004 160.4 161 0.6 636 0.16 9 7.55 0.30 16955 0.01 1305 0.41
EDH004 161 161.45 0.01 673 0.20 6 10.39 0.40 29225 0.01 873 0.74
EDH004 161.45 162 0.5 709 0.14 13 7 0.29 16046 0.03 529 0.28
EDH004 162 162.25 0.01 851 0.04 11 1.17 0.27 243 0.01 535 0.00
EDH004 162.25 162.65 0.6 907 0.16 13 4.06 0.46 8217 0.01 1150 0.20
EDH004 162.65 163 0.01 821 0.05 12 1.21 0.27 378 0.01 911 0.00
EDH004 163 164 0.01 752 0.12 6 3.24 0.28 6792 0.00 600 0.05
EDH004 164 165 0.01 659 5.07 1 1.08 2.81 1235 0.00 147 0.00
EHRC001 147 148 0.01 842 0.04 32 9.23 0.70 1056 0.06 2125 0.07
EHRC001 148 149 0.6 947 0.04 26 11.03 0.71 1318 0.05 2150 0.08
EHRC001 149 150 0.01 700 0.03 21 11 0.67 1095 0.05 1845 0.08
EHRC001 150 151 1.6 832 0.05 63 7.18 0.49 1066 0.33 26933 2.30
EHRC001 151 152 1 907 0.04 62 6.19 0.52 1116 0.28 15134 1.53
EHRC001 152 153 1.8 1006 0.04 72 6.95 0.54 1175 0.26 16822 1.43
EHRC001 153 154 4.1 746 0.03 83 4.12 0.48 304 0.76 47058 3.63
EHRC001 154 155 2 911 0.03 62 2.78 0.61 184 0.45 25272 2.03
EHRC001 155 156 2 983 0.03 87 2.99 0.69 209 0.44 24591 1.81
EHRC001 156 157 3.7 325 0.02 95 3.46 0.26 384 0.26 24261 2.08
EHRC001 157 158 0.9 501 0.05 40 9.04 0.48 5096 0.08 9551 0.48
EHRC001 158 159 1.9 668 0.07 59 5.71 0.67 6819 0.08 11468 0.34
EHRC001 159 160 0.7 582 0.10 41 5.98 0.64 8675 0.06 7860 0.30
EHRC001 160 161 0.8 581 0.07 42 4.6 0.49 3751 0.05 6566 0.35
EHRC001 161 162 1.1 639 0.07 57 3.91 0.50 1875 0.04 6679 0.28
EHRC001 162 163 0.7 714 0.09 57 2.09 0.38 1269 0.03 4083 0.14
EHRC001 163 164 0.9 609 0.08 150 3.41 0.30 2064 0.03 4611 0.16
EHRC001 164 165 0.01 561 0.07 32 2.15 0.22 1391 0.01 2504 0.08
EHRC001 165 166 0.01 640 0.31 39 1.64 0.37 485 0.01 2294 0.06
EHRC001 166 167 0.5 604 0.91 30 2.09 0.67 680 0.01 2865 0.08
EHRC001 167 168 0.01 548 1.89 36 1.69 1.14 857 0.01 2582 0.08
EHRC001 168 169 0.01 596 0.85 34 1.47 0.70 665 0.01 2954 0.08
EHRC001 169 170 0.6 499 3.86 51 1.55 2.27 1217 0.01 3543 0.13
EHRC001 170 171 0.6 324 8.02 29 2.03 4.14 2438 0.01 2702 0.08
EHRC001 171 172 0.01 365 9.93 5 1.96 5.20 2606 0.00 1189 0.02
EHRC001 172 173 0.01 434 8.87 4 1.95 4.68 2334 0.00 816 0.01

16

==> picture [83 x 72] intentionally omitted <==

Table 3 Continued

Hole ID From(m) To(m) Ag g/t Bappm Ca % Cuppm Fe_% Mg % Mnppm Pb % Sppm Zn %
EHRC001 173 174 0.01 338 10.37 2 2.08 5.34 3254 0.00 1218 0.03
EHRC001 174 175 0.01 475 5.67 11 2.22 3.00 2470 0.01 2726 0.11
EHRC001 175 176 0.01 625 0.61 15 1.79 0.57 661 0.02 3111 0.15
EHRC001 176 177 0.01 734 0.36 8 2.35 0.54 373 0.01 1824 0.05
EHRC001 177 178 0.01 599 1.33 17 2.62 0.83 1195 0.00 1569 0.02
EHRC001 178 179 0.01 928 1.50 7 2.12 1.02 1385 0.00 1337 0.02
EHRC001 179 180 0.01 617 1.32 61 2.41 0.87 1382 0.01 2303 0.07
EHRC001 180 181 0.01 631 0.43 14 1.66 0.51 643 0.01 3402 0.15
EHRC001 181 182 0.6 622 1.41 24 2.03 0.97 1979 0.02 4616 0.21
EHRC001 182 183 0.01 573 0.76 25 1.65 0.55 970 0.01 2825 0.08
EHRC001 183 184 0.01 810 0.60 29 1.67 0.72 833 0.01 2296 0.05
EHRC001 184 185 0.01 849 1.97 85 2.13 1.39 2521 0.00 2398 0.04
EHRC001 185 186 0.01 817 1.70 83 4.31 1.39 2187 0.01 2747 0.10
EHRC002 138 139 0.01 338 0.02 4 5.43 0.46 116 0.00 1309 0.01
EHRC002 139 140 0.01 284 0.02 0.01 4.44 0.38 90 0.00 1179 0.01
EHRC002 140 141 0.01 273 0.03 0.01 4.61 0.36 97 0.00 1149 0.01
EHRC002 141 142 0.01 384 0.02 5 4.12 0.51 101 0.01 1252 0.01
EHRC002 142 143 0.01 1648 0.03 20 2.3 0.53 83 0.03 1244 0.01
EHRC002 143 144 0.01 1463 0.03 28 4.59 0.56 104 0.07 1163 0.02
EHRC002 144 145 0.6 645 0.05 22 8.17 0.44 197 0.06 1170 0.06
EHRC002 145 146 0.01 728 0.04 15 3.68 0.52 153 0.05 1439 0.03
EHRC002 146 147 0.01 606 0.03 16 3.4 0.49 143 0.06 1271 0.02
EHRC002 147 148 0.01 550 0.02 24 2.43 0.60 80 0.10 1184 0.01
EHRC002 148 149 0.7 615 0.03 37 3.83 0.54 129 0.12 1374 0.02
EHRC002 149 150 1.5 542 0.02 74 2.65 0.59 57 0.08 1454 0.03
EHRC002 150 151 1.5 700 0.03 58 1.79 0.62 62 0.41 13158 0.81
EHRC002 151 152 1.6 677 0.03 84 2.72 0.55 75 0.41 22815 0.52
EHRC002 152 153 1.2 570 0.03 75 2.24 0.47 66 0.22 20888 0.66
EHRC002 153 154 6.4 648 0.03 115 3 0.54 65 2.63 37691 2.00
EHRC002 154 155 3.6 616 0.03 136 2.55 0.51 60 0.97 39416 3.75
EHRC002 155 156 1.1 657 0.02 86 2.12 0.50 71 0.14 15430 0.19
EHRC002 156 157 1.9 714 0.03 91 3.15 0.56 86 0.39 22133 0.91
EHRC002 157 158 2.2 753 0.03 97 2.79 0.57 77 0.52 20624 0.88
EHRC002 158 159 1.8 756 0.03 74 2.04 0.54 82 0.30 14583 0.61
EHRC002 159 160 8.7 379 0.02 122 3.31 0.24 122 0.32 34247 2.10
EHRC002 160 161 0.9 448 0.03 38 2.12 0.31 1050 0.07 7477 0.26
EHRC002 161 162 0.7 411 0.06 45 5.54 0.35 2139 0.06 4942 0.22
EHRC002 162 163 0.5 321 0.03 59 2.98 0.21 784 0.05 5419 0.22
EHRC002 163 164 0.5 513 0.06 42 3.22 0.29 3510 0.02 4436 0.18
EHRC002 164 165 0.6 531 0.09 89 3.14 0.31 4006 0.02 4031 0.21
EHRC002 165 166 0.6 586 0.17 130 4.55 0.31 4534 0.05 4177 0.17
EHRC002 166 167 0.7 555 0.10 53 5.23 0.27 1367 0.05 4294 0.14
EHRC002 167 168 0.8 557 0.13 63 5.11 0.29 1335 0.03 3201 0.09
EHRC002 168 169 1.5 542 1.19 52 1.72 0.78 503 0.05 9525 0.58
EHRC002 169 170 1.9 569 0.17 44 2.33 0.30 1608 0.06 10210 0.73
EHRC002 170 171 1.2 711 3.32 105 1.8 2.17 1093 0.03 5474 0.22
EHRC002 171 172 1.3 216 12.70 83 2.95 6.44 3479 0.03 5931 0.21
EHRC002 172 173 1 322 12.29 15 2.41 6.51 2879 0.02 4750 0.19
EHRC002 173 174 0.5 328 12.19 3 2.32 6.37 3483 0.00 1376 0.02
EHRC002 174 175 1.8 254 7.21 34 2.19 3.70 1844 0.05 10852 0.54
EHRC002 175 176 0.9 388 11.55 5 2.9 5.91 4065 0.02 2775 0.08
EHRC002 176 177 1.6 407 6.25 24 3.16 3.15 2956 0.04 8620 0.39
EHRC002 177 178 1.1 778 1.03 19 2.17 0.75 636 0.02 5468 0.22
EHRC002 178 179 0.8 580 0.57 21 3.03 0.61 474 0.02 4576 0.17
EHRC002 179 180 1.1 820 1.94 13 2.76 1.24 1928 0.02 4586 0.14
EHRC002 180 181 1.9 510 0.82 31 2.15 0.60 882 0.04 7872 0.41
EHRC002 181 182 1.3 630 0.79 27 2.54 0.67 765 0.03 6522 0.24
EHRC002 182 183 0.6 777 1.33 9 2.13 0.95 1552 0.01 1825 0.04
EHRC002 183 184 0.7 769 1.46 35 2.24 1.05 1719 0.01 3085 0.06
EHRC002 184 185 1.1 870 0.50 46 1.85 0.67 632 0.02 5083 0.13
EHRC002 185 186 2.3 875 0.90 98 2.41 0.82 1201 0.05 9983 0.45
EHRC002 186 187 3.3 590 0.17 50 3.76 0.48 283 0.10 12011 0.71
EHRC002 187 188 3.3 428 0.51 49 3.02 0.51 688 0.10 13466 0.68

17