JUNE 2020 QUARTERLY ACTIVITIES REPORT
ANNOUNCEMENT TO THE AUSTRALIAN SECURITIES EXCHANGE
31 JULY 2020
HIGHLIGHTS
The Mabilo Project
-
RTG Mining Inc. ( ASX:RTG, TSX:RTG ) (“RTG” or “the Company”) holds a 40% interest in Mt. Labo Exploration and Development Corporation (“Mt. Labo”) which holds the high-grade Copper and Gold Mabilo Project in the Philippines.
-
During the quarter, Mt. Labo received written confirmation that the Mines and Geosciences Bureau (“MGB”) had approved the expansion of the current Mineral Production Sharing Agreement (“MPSA”) No. MLC-MRD-459 for the Nalesbitan Project to include the Mabilo Project, which has already secured an approved Declared Mine Feasibility Study and Environmental Clearance Certificate.
-
In July the Bangko Sentral ng Pilipinas (“BSP”) was quoted in the Philippine Star Newspaper, during a meeting with members of the House Committee on Economic Affairs, stating that they support re-opening of mining and the MGB are also focussed on stimulating mining to contribute to the struggling economy battered by the ongoing COVID-19 pandemic.
-
Mt. Labo has been advised by the Singapore International Arbitration Centre (“SIAC”) that the arbitration between Mt. Labo and Galeo Equipment Corporation (“Galeo”) was formally closed on 7 June 2020. We have also been advised by the Chairman of the Tribunal that the Tribunal’s draft Final Award was transmitted in June 2020 to the SIAC for its review in line with normal practice. This is a process that applies to awards under the SIAC Rules. Scrutiny does not affect the Tribunal’s right and power to decide the dispute.
-
Mt. Labo is seeking a number of reliefs, including, but not limited to, a declaration that Galeo is not the operator of the project, Galeo is not a co-permittee and the Joint Venture Agreement (“JVA”) with Galeo Equipment Corporation (“Galeo”) was validly terminated and the compromise agreement was validly rescinded.
-
The underlying value of the Mabilo Project has increased by approximately 146% due to significant increases in both the prevailing gold and copper prices.
Panguna
-
The Presidential elections have now commenced in Bougainville, with 25 registered candidates and collegiate rallies now held for all candidates to present their platforms in Buka in the North, Arawa in Central Bougainville and Buin, in the South.
-
The campaign period runs through until 12 August 2020 when a 3 week voting period commences, with results likely expected later in September 2020.
-
A State of Emergency (“SOE”) remains in place in PNG and the Autonomous Region of Bougainville (“AROB”) due to COVID-19.
-
Independence is an important initiative for most Presidential candidates given the extensive work and success achieved by the current members of the Autonomous Bougainville Government (“ABG”) and we understand the current position of the ABG is to resolve Panguna after the current elections in Bougainville are completed given its importance to the future of their Independence plans.
Corporate
-
On 22 May 2020, the Company announced that it had received commitments of approximately US$6 million (circa A$9.2 million) in a private placement to Australian and international institutional and sophisticated investors (“Private Placement”) for approximately 162 million new Chess Depository Instruments (“Securities”) to be issued through two tranches.
-
On 29 May 2020, 60,128,550 Securities were issued at a price of A$0.057 per Security to Australian and international institutional and sophisticated investors pursuant to tranche one of the Private Placement, raising proceeds of circa US$2.2 million (before costs).
-
Subsequent to the quarter, on 7 July 2020, Shareholders approved tranche two of the Private Placement at the Annual General Meeting, for the issue of approximately 102,422,120 Securities at a price of A$0.057 per Security to Australian and international institutional and sophisticated investors, raising proceeds of circa US$3.8 million (before costs), with settlement successfully completed on 15 July 2020.
-
Subsequent to quarter end, the proceeds of the placement were used in part to repay US$1 million of the corporate loan facility, with current fees and interest satisfied by an issue of shares, as approved by shareholders at the Annual General Meeting. The lender has agreed to extend the repayment date for the balance of the facility of US$1.5 million to 30 June 2021, with a 6% coupon and no security.
-
Subsequent to the quarter, on 10 July 2020, the Company announced that it had finalised agreements for the sale of its remaining interests in Thor Explorations Ltd (“Thor”), received in consideration for the sale of the Segilola Gold Project in Nigeria some years ago. The Company sold its interests for a total consideration of C$3.35 million: the shareholding for a total consideration of C$2.45 million and the royalty for a further C$0.65 million in cash and C$0.25 million in Vox Royalty Corp. (TSXV:VOX) shares.
-
The Company received full consideration for the sale of the shareholding on 14 July 2020 and the sale of the royalty is expected to settle in approximately 6 weeks due to notice periods.
Response to COVID-19
- The Company continues to review the impacts of the COVID-19 pandemic on the Company’s operations and working arrangements. The head office and project teams have now commenced returning to normal working arrangements in compliance with country-specific recommendations.
Cash and Liquid Assets
- Cash and liquid assets as at 30 June 2020 were A$5.9 million (including a receivable of US$0.30 million from other consultants). Subsequent to quarter end, the Company completed tranche two of the Private Placement, repaid US$1 million of the corporate loan facility and completed the sale of its shareholding interest in Thor. After adjusting for those net cash items, cash and liquid assets would be A$12.6 million, with a further C$650,000 in cash expected within 6 weeks.
RESPONSES TO THE COVID-19 PANDEMIC
The Company continues to assess the wide reaching impacts of COVID-19, responding decisively on several fronts:
-
our offices in Perth and Manila have commenced returning to normal working arrangements in compliance with country-specific recommendations. The head office and project teams are operating at full capacity with reduced staff and working remotely where available, which has to date been both efficient and effective;
-
the Company continues to review every cost and has made significant adjustments reducing overheads across the board, including executive salaries, and directors’ fees, etc. This initiative resulted in the reduction of total overheads in the order of half of the pre-existing level;
-
despite the very challenging times for most, it is noted that we have had a significant improvement in both copper and gold commodity prices, with the net present value of the Mabilo Project, a near term development opportunity, having increased by 146% to US$384 million (24 July 2020: Cu US$6,523/t, Au US$1,878/oz) since the Feasibility Study was first completed and announced; and
-
our focus for now is directed primarily at advancing the Mabilo Project to start-up with the project having a very significant advantage in these times, where access to capital will be more limited. With the first phase being a Direct Shipping Operation, the capital requirements upfront are nominal (less than US$25 million) which should be able to be financed primarily with debt, given the first 12 months of operations can deliver cashflows in excess of US$105 million at current commodity prices of US$6,523/t of Cu and US$1,878/oz Au (subject to movements in commodity prices) (i.e. payback in less than 12 months).
OVERVIEW OF OPERATIONS
PHILIPPINES INTERESTS – THE MABILO PROJECT
During the quarter, Mt. Labo received written confirmation that the MGB had approved the expansion of the current Mineral Production Sharing Agreement No. MLC-MRD-459 for the Nalesbitan Project to include the Mabilo Project, having already secured an approved Declared Mine Feasibility Study and Environmental Clearance Certificate for the Project.
The expanded MPSA now contains five (5) parcels of land including the old EP-014-2013-V (see Figure 1 below) and is a significant milestone towards moving to production at the Mabilo Project. Since securing the expanded MPSA, work has concentrated on pre-production activities including updating mining schedules, grade control and sterilisation planning, infrastructure and continuing land acquisition.
We have established a data room and engaged with financing and offtake parties to progress plans, ready for a commitment to development, with the parties now well advanced with their due diligence work.
We have also undertaken an updated review of the previous work completed on the Declared Mine Feasibility, Social Development Management Programs, Environmental Protection and Enhancement Programs and the Final Mine Rehabilitation and Decommissioning Plans transfer, working closely with the MGB.
==> picture [424 x 300] intentionally omitted <==
Figure 1 – Expanded MPSA showing included parcels of land
In another positive development, we have been advised that the Philippines Department of Finance, Secretary Sonny Dominguez is working on an economic recovery plan for the Philippines. It is possible that the mining industry may well be a major beneficiary of the plan to restimulate the Philippines economy.
In July the Bangko Sentral ng Pilipinas (“BSP”) was quoted in the Philippine Star Newspaper, during a meeting with members of the House Committee on Economic Affairs, stating that they support reopening of mining and the MGB are also focussed on stimulating mining to contribute to the struggling economy battered by the ongoing COVID-19 pandemic.
Mt. Labo has been advised by the Singapore International Arbitration Centre (“SIAC”) that the arbitration between Mt. Labo and Galeo Equipment Corporation (“Galeo”) was formally closed on 7 June 2020. We have also been advised by the Chairman of the Tribunal that the Tribunal’s draft Final Award was transmitted in June 2020 to the SIAC for its review in line with normal practice. This is a process that applies to awards under the SIAC Rules. Scrutiny does not affect the Tribunal’s right and power to decide the dispute.
Mt. Labo is seeking a number of reliefs, including, but not limited to, a declaration that Galeo is not the operator of the project, Galeo is not a co-permittee and the Joint Venture Agreement (“JVA”) with Galeo Equipment Corporation (“Galeo”) was validly terminated and the compromise agreement was validly rescinded.
Mt. Labo is looking forward to the handing down of a final decision by the SIAC panel of Arbitrators.
Exploration and Development Activities
No update this quarter.
Mabilo Mineral Resource
Table 1 - Total Mabilo Resource at 0.3 g/t Au Cut-off Grade
Mineral Resource Estimate Results - Reporting at 0.3 g/t Au lower cut-off - Mabilo South and North Deposits
| Contained | Contained |
Contained | |||||||
|---|---|---|---|---|---|---|---|---|---|
| Million | |||||||||
| Classification | Weathering | Cu % |
Au g/t | Ag g/t | Fe % | Au | Cu | Fe | |
| Tonnes | |||||||||
| ('000s Oz) | ('000s t) | ('000s t) | |||||||
| Indicated | Oxide + Supergene | 0.78 | 4.1 | 2.7 | 9.7 | 41.2 | 67.1 | 32.1 | 320.8 |
| Indicated | Fresh | 8.08 | 1.7 | 2.0 | 9.8 | 46.0 | 510.5 | 137.7 | 3,713.7 |
| Indicated | Total All Materials | 8.86 | 1.9 | 2.0 | 9.8 | 45.6 | 577.6 | 169.8 | 4,034.5 |
| Inferred | Oxide + Supergene | 0.05 | 7.8 | 2.3 | 9.6 | 26.0 | 3.5 | 3.7 | 12.3 |
| Inferred | Fresh | 3.86 | 1.4 | 1.5 | 9.1 | 29.1 | 181.5 | 53.3 | 1,121.8 |
| Inferred | Total All Materials | 3.91 | 1.5 | 1.5 | 9.1 | 29.0 | 184.9 | 57.0 | 1,134.1 |
| Note: The Mineral Resource was estimated within constraining wireframe solids based on the mineralised geological units. The | |||||||||
| Mineral Resource is quoted from all classified blocks above a lower cut-off grade 0.3 g/t Au within these wireframe solids. | |||||||||
| Differences may occur due to rounding |
Feasibility Study (“FS”)[1]
The Company announced on 18 March 2016 the results from an independent NI 43-101 compliant FS for 100% of the high grade Mabilo Project in Southeast Luzon, Philippines[2] . The Mabilo Project is both high grade and low cost, underpinning the robust economics presented in the FS including a 33% IRR after tax at US$5,000/t Cu US$1,200/oz Au prices (43.6% with only a 10% lift in commodity prices). Since the preparation of the Feasibility Study, commodity prices for both copper and gold have improved materially, increasing the value of the project, with current commodity prices on 24 July 2020: Cu US$6,523/t, Au US$1,878/oz, providing a 146% increase in the NPV of the project .
Mabilo Mineral Reserves
Mineral Reserves are quoted within specific pit designs based on Indicated Resources only and take into consideration the mining, processing, metallurgical, economic and infrastructure modifying factor
1 The Company confirms that all the material assumptions underpinning the Feasibility Study as announced to the ASX on the 18[th] of March 2016 continue to apply and have not materially changed. A copy of the announcement can be found on the Company’s website at www.rtgmining.com.
2 The FS is based on a treatment rate of 1Mtpa. A treatment rate of 1.35Mtpa was also considered in an upside case. Factored indicative capital and operating cost estimates were developed for a planned throughput of 1.35 Mtpa. The capital cost estimates were derived from first principles for the 1 Mtpa process plant to an accuracy of +/- 15% and then the capital cost estimates were factored with an accuracy of +/- 25% for the 1.35 Mtpa process plant. The operating cost estimates were derived from first principles for the 1Mtpa process plant and then plant costs were factored with an accuracy of +/- 25% for the 1.35Mtpa operating scenario. All costs are in 2015 US dollars.
Table 2 - Probable Mineral Reserve Estimate
| Ore | Ore | Waste | Strip Ratio | |||||
|---|---|---|---|---|---|---|---|---|
| Class | **Type ** | Mt | Fe % | Aug/t | Cu % | Ag g/t | Mt | |
| Probable | Gold Cap Supergene Oxide Skarn Fresh |
0.351 40.1 3.11 0.38 3.26 0.104 36.5 2.20 20.7 11.9 0.182 43.6 2.52 4.17 19.9 7.155 45.9 1.97 1.70 8.73 |
77.713 | 10.0 | ||||
| Total Probable Ore | 7.792 45.5 2.04 1.95 8.79 |
The November 2015 Resource estimation provided by CSA classified the Resource for the Mabilo Project as Indicated and Inferred. Only Indicated Mineral Resources as defined in NI 43-101 were used to establish the Probable Mineral Reserves. No Reserves were categorized as Proven.
KYRGYZ REPUBLIC INTERESTS – THE CHANACH PROJECT
RTG holds a 90% interest in the Chanach Project.
Highlights of the Chanach Project include:
-
Strategic addition to RTG’s portfolio with an existing high grade JORC compliant Inferred Mineral Resource of 2.95 Mt @ 5.11 g/t Au for 484,000 ounces of Au and 17.23 Mt @ 0.37% Cu for 64,000t of Cu[3] (141.1 Mlbs Cu) from only limited drilling to date .
-
Acquisition cost of US$3.65 / ounce of Gold and US$0.0063 / pound of Copper.
-
Experienced technical expert, advising RTG, believes the exploration potential at the Chanach Project is excellent.
The Chanach Project is located in the prolific southern Tien Shan metallogenic belt, which runs more than 1,500 km from Uzbekistan through to China and hosts one of the world’s largest open pit gold mines, Murantau (175 Moz[4] ) with production believed to be in the order of 2 million ounces per annum[4] . RTG has appointed Mr. Greg Hall of Phoenix Gold International and former Chief Geologist for Placer Dome, as a consultant given his knowledge of the Chanach Project and other projects in similar geological settings.
The Chanach Project has extensive outcropping mineralised geology with high grade gold veins from surface and significant gold and copper Inferred Mineral Resources. With only 5% of the identified strike length tested to date, RTG believes the Chanach Project has substantial upside. The Chanach Project area is considered to be highly prospective for world class epithermal gold, porphyry copper-gold and polymetallic skarn deposits with numerous targets already identified.
3 The Mineral Resource estimates were originally compiled and announced by WCN on 30 May 2018, in accordance with the JORC Code, 2012 and was last disclosed in WCN’s March, 2019 quarterly report on 30 April 2019 - https://www.asx.com.au/asxpdf/20190430/pdf/444pg6f8t5ln5t.pdf
4 Wilde, A. and Gilbert, D. 2000. Setting of the giant Muruntau Gold Deposit: Implications for ore genesis. In: (Ed.) Gordon Lister, Geological research for the exploration industry, Journal of the Virtual Explorer, Electronic Edition, ISSN 1441-8142, volume 1, paper 1, doi:10.3809/jvirtex.2000.00004
To date the limited exploration activities have defined an Inferred Mineral Resource of 2.95 Mt @ 5.11 g/t Au for 484,000 ounces of Au and 17.23 Mt @ 0.37% Cu for 64,000t of Cu.
==> picture [419 x 243] intentionally omitted <==
Figure 2: Chanach Project Location
Exploration and Development Activities
No update this quarter.
Geological Setting
The Chanach Project (prospecting licence AP590) is located in the North Western part of the Kyrgyz Republic in the Jalal-Abad province and covers an area of 57.25 km[2] of the Chatkal Rangers inside the south-western Tien Shan metallogenic belt, which runs more than 1,500 km from Uzbekistan through to China and hosts one of the world’s largest open pit gold mines, Murantau (175 Moz) with production believed to be in the order of 2 million ounces per annum[4] .
Discovery & Drill Results
The Chanach Project area was discovered around 1963 with geological mapping and surface sampling intermittently up to 2010. The geology of the Chanach Project area is prospective for epithermal gold deposits, porphyry copper deposits and polymetallic skarn deposits. The project area has outcropping mineralised geology seen as multiple high grade outcropping epithermal veins and skarns, which have indicated several porphyry targets.
Exploration drilling at the Chanach Gold Project commenced in 2014 and to date there have been spectacular intersections of gold mineralisation spanning across the project area, as previously reported by WCN.
Significant intervals from the Quartz Gold Zone include:
-
UGZ-15-35 - 8m @ 57.08 g/t Au from 75m including 1m @ 85.53 g/t Au from 76m, 1m @ 89.34 g/t Au from 80m followed by 1m @ 73.28 g/t Au from 81m.
-
ERC16-035 - 7m @ 23.52 g/t Au from 45m including 1m @ 149.41 g/t Au from 45m.
-
ERC16-036 - 12m @ 15.65 g/t Au including 1m @ 63.24 g/t Au from 82m followed by 1m @ 95.12 g/t Au from 83m.
Significant intervals from the Sandstone Gold Zone include:
-
UGZ-15-33 - 4m @ 99.15 g/t Au from 65m including 1m @ 348.48 g/t Au from 67m.
-
• UGZ-15-32A - 3m @ 41.45 g/t Au including 1m @ 71.58 g/t Au from 53m.
Significant intervals from the Lower & Upper Gold Zone include:
-
LGZ-15-29A - 6m @ 38.40 g/t Au from 26m with 4m @ 56.46 g/t Au from 26m including 1m @ 49.79 g/t Au from 26m, 1m @ 23.55 g/t Au from 27m, 1m @ 95.22 g/t Au from 28m and 1m @ 57.29 g/t Au from 29m.
-
CH14-18 - 4m @ 23.83 g/t Au from 85m including 1m @ 30.19 g/t Au from 86m.
Readers are advised that these assay intervals have not been top-cut prior to reporting and true mineralisation widths are not reported. Mineralisation is expected to be sub-vertical. Intervals selected have used a lower cut-off of 0.50 g/t Au. Locations of significant drill intercepts with respect to the mapped mineralised zones are shown in Figure 2.
==> picture [423 x 247] intentionally omitted <==
Figure 3: Locations of Significant Drill Intercepts at Chanach Gold Project
Mineral Resource
In May 2018, WCN reported an Inferred Mineral Resource of 2.95 Mt at 5.1 g/t gold for 484,000 ounces and 17.23 Mt at 0.37% copper for 64,000 copper tonnes.
The most recent mineral resource estimates for the Chanach Gold Project are summarised in Table 3 for gold and Table 4 for copper. These Mineral Resources are reported in accordance with JORC Code, 2012 and were first publicly reported 30 May 2018 by WCN. Refer to the cautionary statement below.
Table 3 - Chanach May 2018 Gold Mineral Resource (cut-off grade 1.0g/t Au)[3]
| Resource Category |
Zone | Tonnes (Kt) |
Au (g/t) |
Ounces (KOz) |
|---|---|---|---|---|
| Inferred | LowerGoldZone | 1,155 | 4.00 | 148 |
| Inferred | Upper Gold Zone | 772 | 4.67 | 116 |
| Inferred | Sandstone Zone | 279 | 11.41 | 102 |
| Inferred | Quartz Main | 325 | 6.22 | 65 |
| Inferred | Quartz Min | 185 | 1.87 | 11 |
| Inferred | EasternGoldZone | 123 | 2.79 | 11 |
| Inferred | Camp Gold Zone | 106 | 8.77 | 30 |
| Inferred | **Total ** | 2,945 | 5.11 | **484 ** |
Table 4 - Chanach May 2018 Copper Mineral Resource (cut-off grade 0.25% Cu)[3 ]
| Resource Category |
Zone | Tonnes (Kt) |
Au (g/t) |
Ounces (KOz) |
|---|---|---|---|---|
| Inferred | QuartzCu | 700 | 0.51 | 4 |
| Inferred | Chanach | 16,534 | 0.36 | 60 |
| Inferred | **Total ** | **17,234 ** | **0.37 ** | **64 ** |
RTG believes that this information has not materially changed since it was last reported. The Mineral Resources have been reviewed by RTG’s Competent Person.
Quarterly Activities
Due to restrictions associated with COVID-19 and the weather, work at the Chanach Project has been reduced. During the quarter, work focused on compiling statutory reports, reviewing and compiling geological interpretations as a result of the previous quarter’s drilling program and planning for the structural survey.
BOUGAINVILLE INTERESTS – THE PANGUNA PROJECT OPPORTUNITY
RTG is the nominated development partner with the joint venture company established by the Special Mining Lease Osikaiyang Landowners Association (“SMLOLA”) and Central Exploration Pty Ltd (“Central”) in the Landowner proposal with respect to the redevelopment of the Copper-Gold Panguna Project located in the Central Region of the island of Bougainville, within the Autonomous Region of Bougainville, PNG. RTG owns just under 70% of Central, with additional loans to Central that can be converted to increase our interest. The proposal, being led by the SMLOLA, is a landowner initiative and will be subject to the success or otherwise of the SMLOLA in securing a role in the redevelopment of the mine and the minerals which are owned by the landowners represented by the SMLOLA. The SMLOLA proposal is dependent upon them gaining the support of the ABG, with the composition of the ABG now subject to ongoing elections which are expected to be completed in late September.
The members of the SMLOLA are the owners of the customary land which is the subject of the old Panguna open pit mine, and in which the mineral resources of the Panguna mine are located.
The SMLOLA was established by the ABG nearly a decade ago to represent the customary owners of the land at the old Panguna pit. The SMLOLA constitution was drafted by the ABG legal officers representing the ABG Department of Justice and remains unchanged to this day.
The ABG established the SMLOLA as the Landowner Association to represent the Customary Owners of the land contained within the original but now expired Panguna Special Mining Licence - SML (hence the name SMLOLA, and the similarly EL 01), which covers the entire Panguna Open Pit area. This membership is automatic for those persons born into the 7 named villages, which comprise the customary land area within the SML.
RTG continues to work with the SMLOLA team and the community to progress meaningful and transparent discussions with the ABG on the redevelopment proposal of the Landowner Led Consortium and undertake and support local community and social programs and reconciliations, however activities are currently suspended given the SOE implemented by the ABG in response to the COVID-19 pandemic.
The Panguna Landowner’s and RTG’s proposal, offers the ABG an initial 100% interest in the mineral resources of Panguna, subject only to the Customary Landowners being respected. We understand the Landowner Led Consortium’s indicative offer is materially better than any other alternative offer.
During December, the ABG successfully conducted the Referendum on Independence, with approximately 98% of Bougainvilleans voting in favour of Independence.
Any form of Independence will require Bougainville to demonstrate to the National Government that it is on a pathway to economic independence. Panguna is the only asset which can materially assist Bougainville establish that critical pathway to economic independence and upon which the aspirations of so many Bougainvilleans depend.
The Presidential elections have now commenced in Bougainville, with 25 registered candidates and collegiate rallies now held for all candidates to present their platforms in Buka in the North, Arawa in Central Bougainville and Buin, in the South.
The campaign period runs through until 12 August 2020 when a 3 week voting period commences, with results likely expected later in September 2020.
The SMLOLA is engaging during the campaign period with the various presidential candidates and is ready to work co-operatively and constructively with the new President and his team to win their support for a development proposal for Panguna, that will have broad support not only from its members but importantly all Bougainvilleans, and which will deliver a strong and successful future for Bougainville and the ABG.
CORPORATE
On 22 May 2020, the Company announced that it had received commitments of approximately US$6 million (circa A$9.2 million) in the Private Placement for approximately 162 million new Chess Depository Instruments (“Securities”) to be issued through two tranches. On 29 May 2020, 60,128,550 Securities were issued at a price of A$0.057 per Security to Australian and international institutional and sophisticated investors pursuant to tranche one of the Private Placement, raising proceeds of circa US$2.2 million (before costs).
Subsequent to the quarter, on 7 July 2020, Shareholders approved tranche two of the Private Placement at the Annual General Meeting, for the issue of approximately 102,422,120 Securities at a price of A$0.057 per Security to Australian and international institutional and sophisticated investors, raising proceeds of circa US$3.8 million (before costs), with settlement successfully completed on 15 July 2020.
Subsequent to quarter end, the proceeds of the placement were used in part to repay US$1 million of the corporate loan facility, with current fees and interest satisfied by an issue of shares, as approved by shareholders at the Annual General Meeting. The lender has agreed to extend the repayment date for the balance of the facility of US$1.5 million to 30 June 2021, with a 6% coupon and no security.
On 10 July 2020, the Company announced that it had finalised agreements for the sale of its remaining interests in Thor Explorations Ltd (“Thor”), received in consideration for the sale of the Segilola Gold Project in Nigeria some years ago. The Company sold its interests for a total consideration of C$3.35 million: the shareholding for a total consideration of C$2.45 million and the royalty for a further C$0.65 million in cash and C$0.25 million in Vox Royalty Corp. (TSXV:VOX) shares. The Company received full consideration for the sale of the shareholding on 14 July 2020 and the sale of the royalty is expected to settle in approximately 6 weeks due to notice periods.
Cash and liquid assets as at 30 June 2020 were A$5.9 million, including US$0.30 million due and outstanding from other consultants. Subsequent to quarter end, the Company completed tranche two of the Private Placement, repaid US$1 million of the corporate loan facility and completed the sale of its shareholding interest in Thor and after adjusting for those net cash items the total cash and liquid assets would be A$12.6 million, with a further C$650,000 in cash due in approximately 6 weeks.
During the quarter, the Company paid US$91,757 of Directors’ fees paid to the Company’s Directors.
ABOUT RTG MINING INC
RTG Mining Inc. is a mining and exploration company listed on the main board of the Toronto Stock Exchange and the Australian Securities Exchange. RTG is currently focused primarily on progressing the Mabilo Project to start-up having recently received a mining permit for the Project, with a view to moving quickly and safely to a producing gold and copper company.
RTG also has a number of exciting new opportunities including the Panguna Project in Bougainville, which it remains committed to but during these uncertain times the primary focus is on advancing the Mabilo Project.
RTG has an experienced management team which has to date developed seven mines in five different countries, including being responsible for the development of the Masbate Gold Mine in the Philippines through CGA Mining Limited. RTG has some of the most respected international institutional investors as shareholders including Franklin Templeton, Equinox Partners and Sun Valley.
ENQUIRIES
Australian Contact US Contact President & CEO – Justine Magee Investor Relations – Jaime Wells Tel: +61 8 6489 2900 +1 970 640 0611 Fax: +61 8 6489 2920 Email: [email protected] [email protected]
CAUTIONARY NOTE REGARDING FORWARD LOOKING STATEMENTS
The Toronto Stock Exchange has not reviewed nor does it accept responsibility for the accuracy or adequacy of this press release, which has been prepared by management.
This announcement includes certain “forward-looking statements” within the meaning of Canadian securities legislation including, among others, statements made or implied relating to the interpretation of exploration results, accuracy of mineral resource and mineral reserve estimates, parameters and assumptions used to estimate mineral reserves and mineral resources, realization of mineral reserve and mineral resource estimates, estimated economic results of the Mabilo Project, future operational and financial results, including estimated cashflow and the timing thereof, estimated expenditures, expansion, exploration and development activities and the timing thereof, including expectations regarding the DSO, plans for progressing Stage 2 development, completion of a debt funding package, the negotiation of contracts for start up works and offtake arrangements and the completion of merged documentation, RTG’s objectives, strategies to achieve those objectives, RTG’s beliefs, plans, estimates and intentions, and similar statements concerning anticipated future events, results, circumstances, performance or expectations. All statements, other than statements of historical fact, included herein, are forward-looking statements. Forward looking statements generally can be identified by words such as “objective”, “may”, “will”, “expected”, “likely”, “intend”, “estimate”, “anticipate”, “believe”, “should”, “plans”, or similar expressions suggesting future outcomes or events. Forward-looking statements involve various risks and uncertainties and are based on certain factors and assumptions. There can be no assurance that such statements will prove to be accurate, and actual results and future events could differ materially from those anticipated in such statements. Important factors that could
cause actual results to differ materially from RTG’s expectations include uncertainties related to fluctuations in gold and other commodity prices and currency exchange rates; uncertainties relating to interpretation of drill results and the geology, continuity and grade of mineral deposits; uncertainty of estimates of capital and operating costs, recovery rates, production estimates and estimated economic return; the need for cooperation of government agencies in the development of RTG’s mineral projects; the need to obtain additional financing to develop RTG’s mineral projects; the possibility of delay in development programs or in construction projects and uncertainty of meeting anticipated program milestones for RTG’s mineral projects and other risks and uncertainties as discussed in RTG’s annual report for the year ended December 31, 2019 and detailed from time to time in our other filings with the ‐ Canadian securities regulatory authorities available at www.sedar.com. The forward looking statements made in this announcement relate only to events as of the date on which the statements are made. RTG ‐ will not release publicly any revisions or updates to these forward looking statements to reflect events, circumstances or unanticipated events occurring after the date of this announcement except as required by law or by any appropriate regulatory authority.
QUALIFIED PERSON AND COMPETENT PERSON STATEMENT
The information in this release that relates to Exploration Results and Mineral Resource Estimates of the Chanach Project is based upon information compiled, reviewed and approved by Elizabeth Haren who is a Qualified Person under National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“ NI 43-101 ”) and a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’ who is a Member and Chartered Professional of the Australian Institute of Mining and Metallurgy and a Member of the Australian Institute of Geoscientists. Elizabeth Haren is employed by Haren Consulting Pty Ltd and is a consultant to RTG. Elizabeth Haren has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person and a Qualified Person for the purposes of NI 43-101. Elizabeth Haren consents to the inclusion in the release of the matters based on her information in the form and the context in which it appears.
The information in this release that relates to Exploration Targets of the Chanach Project is based upon information compiled, reviewed and approved by Greg Hall who is a Qualified Person under NI 43-101 and a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’ who is a Member and Chartered Professional of the Australian Institute of Mining and Metallurgy and a Member of the Australian Institute of Geoscientists. Greg Hall is employed by Golden Phoenix International Pty Ltd and is a consultant to RTG. Greg Hall has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person and a Qualified Person for the purposes of NI 43-101. Greg Hall consents to the inclusion in the release of the matters based on his information in the form and the context in which it appears.
The information in this release that relates to exploration results at the Mabilo Project is based upon information prepared by or under the supervision of Robert Ayres BSc (Hons), who is a Qualified Person and a Competent Person. Mr Ayres is a member of the Australian Institute of Geoscientists. Mr Ayres has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken, to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” and to qualify as a “Qualified Person” under National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”). Mr. Ayres has verified the data disclosed in this release, including sampling, analytical and test data underlying the information contained in the release. Mr. Ayres consents to the inclusion in the release of the matters based on his information in the form and the context in which it appears.
The information in this release that relates to Mineral Resources is based on information prepared by or under the supervision of Mr Aaron Green, who is a Qualified Person and Competent Person. Mr Green is a Member of the Australian Institute of Geoscientists and is employed by CSA Global Pty Ltd, an independent consulting company. Mr Green has sufficient experience that is relevant to the style of
mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” and to qualify as a “Qualified Person” under National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”). Mr. Green has verified the data disclosed in this release, including sampling, analytical and test data underlying the information contained in the release. Mr Green consents to the inclusion in the release of the matters based on his information in the form and context in which it appears.
The information in this release that relates to Mineral Reserves and Mining is based on information prepared by or under the supervision of Mr Carel Moormann, who is a Qualified Person and Competent Person. Mr Moormann is a Fellow of the AusIMM and is employed by Orelogy Consulting, an independent consulting company. Mr Moormann has sufficient experience that is relevant to the type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” and to qualify as a “Qualified Person” under National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”). Mr Moormann has verified the data disclosed in this release, including sampling, analytical and test data underlying the information contained in the release. Mr Moormann consents to the inclusion in the release of the matters based on his information in the form and context in which it appears.
The information in this release that relates to Metallurgy and Processing is based on information prepared by or under the supervision of David Gordon, who is a Qualified Person and Competent Person. David Gordon is a Member of the Australasian Institute of Mining and Metallurgy and is employed by Lycopodium Minerals Pty Ltd, an independent consulting company. David Gordon has sufficient experience that is relevant to the type of process under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” and to qualify as a “Qualified Person” under National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”). David Gordon has verified the data disclosed in this release, including sampling, analytical and test data underlying the information contained in the release. David Gordon consents to the inclusion in the release of the matters based on his information in the form and context in which it appears.
The information in this release that relates to areas outside of exploration results, Mineral Resources, Mineral Reserves and Metallurgy and Processing is based on information prepared by or under the supervision of Mark Turner, who is a Qualified Person and Competent Person. Mark Turner is a Fellow of the Australasian Institute of Mining and Metallurgy and is employed by RTG Mining Inc, the Company. Mark Turner has sufficient experience that is relevant to the information under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” and to qualify as a “Qualified Person” under National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”). Mark Turner has verified the data disclosed in this release. Mark Turner consents to the inclusion in the release of the matters based on his information in the form and context in which it appears.
The information in this release based on historic and public information on the Panguna Project has been compiled and reviewed by Mark Turner, who is a Qualified Person and Competent Person. Mark Turner is a Fellow of the Australasian Institute of Mining and Metallurgy and is employed by RTG Mining Inc, the Company. Mark Turner has sufficient experience that is relevant to the information under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” and to qualify as a “Qualified Person” under National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101). Mark Turner consents to the inclusion in the release of the matters based on his information in the form and context in which it appears.
For the ASX Feasibility Study announcement including JORC tables please refer to the RTG Mining website (www.rtgmining.com) and on the ASX, under announcements (www.asx.com.au).
Appendix 1 – Schedule of interests and location of Tenements
| Tenement reference | Location | Nature of interest | Interest at beginning of quarter |
Interest at end of quarter |
|---|---|---|---|---|
| Licence 590 | Kyrgyzstan | Chanach Project | 90% | 90% |
| MPSA-MLC-MRD- 459-V |
Philippines | Mabilo Project and Nalesbitan Project |
40% | 40% |
| APSA-002-V | Philippines | Nalesbitan Project | 40% | 40% |
| Exploration Permit (“EP”) 014-2013-V |
Philippines | Approved 2ndEP renewal Mabilo Project |
40% | 40% |
| EXPA-000209-V | Philippines | Mabilo Project | 40% | 40% |
| EXPA-000188-V | Philippines | Mabilo Project | 40% | 40% |
| EXPA-000231-V | Philippines | Mabilo Project | 40% | 40% |
| Exploration Permit Application (“EXPA”) 118-XI |
Philippines | RTG’s interest is held through its interest in its associate entity Bunawan Mining Corporation. |
40% | 40% |
| APSA-003-XIII | Philippines | 40% | 40% | |
| EXPA-037A-XIII | Philippines | 40% | 40% | |
| EP 033-14-XIII | Philippines | Approved 1st Renewal EP | 40% | 40% |
| EP-001-06-XI | Philippines | 40% | 40% | |
| EP-01-10-XI | Philippines | RTG’s interest is held through its interest in its associate entity Oz Metals Exploration & Development Corporation. (Both EP-02-10-XI and EP-01- 10-XI are subject to 2ndrenewal) |
40% | 40% |
| EP-02-10-XI | Philippines | 40% | 40% | |
| EXPA-123-XI | Philippines | 40% | 40% |
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Name of entity
RTG Mining Inc. ABN Quarter ended (“current quarter”) 70 164 362 850 30 June 2020
| Consolidated statement of cash flows | Current quarter $US |
Year to date (three months) $US |
|---|---|---|
| 1. Cash flows from operating activities 1.1 Receipts from customers 1.2 Payments for (a) exploration & evaluation (if expensed) (b) development (c) production (d) staff costs (e) administration and corporate costs (f) business development 1.3 Dividends received (see note 3) 1.4 Interest received 1.5 Interest and other costs of finance paid 1.6 Income taxes paid 1.7 Government grants and tax incentives 1.8 Other (provide details if material) 1.9 Net cash from / (used in) operating activities |
- (42,803) - - (175,668) (110,803) (271,943) - - - - - - |
- (86,120) - - (393,029) (657,425) (924,082) - 506 - - - - |
| (601,217) | (2,060,150) | |
| 2. Cash flows from investing activities 2.1 Payments to acquire: (a) entities (b) tenements (c) property, plant and equipment (d) exploration & evaluation (if capitalised) |
- - (2,650) - |
- - (6,660) - |
| ASX Listing Rules Appendix 5B (01/12/19) Page 1 |
- See chapter 19 of the ASX Listing Rules for defined terms.
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
| Consolidated statement of cash flows | Current quarter $US |
Year to date (three months) $US |
|---|---|---|
| (e) investments (f) other non-current assets 2.2 Proceeds from the disposal of: (a) entities (b) tenements (c) property, plant and equipment (d) investments (e) other non-current assets 2.3 Cash flows from loans to other entities - legal expenses (Philippines) 2.4 Dividends received (see note 3) 2.5 Other (provide details if material) 2.6 Net cash from / (used in) investing activities |
- - - - - - - (70,148) (217,020) - - |
- - - - - - - (708,298) (335,336) - - |
| (289,818) | (1,050,294) | |
| 3. Cash flows from financing activities 3.1 Proceeds from issues of equity securities (excluding convertible debt securities) 3.2 Proceeds from issue of convertible debt securities 3.3 Proceeds from exercise of options 3.4 Transaction costs related to issues of equity securities or convertible debt securities 3.5 Proceeds from borrowings 3.6 Repayment of borrowings 3.7 Transaction costs related to loans and borrowings 3.8 Dividends paid 3.9 Other (provide details if material) 3.10 Net cash from / (used in) financing activities |
2,239,143 - - (84,800) - - - - - |
2,239,143 - - (84,800) - - - - - |
| 2,154,343 | 2,154,343 |
ASX Listing Rules Appendix 5B (01/12/19)
Page 2
- See chapter 19 of the ASX Listing Rules for defined terms.
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
| Consolidated statement of cash flows | Current quarter $US |
Year to date (three months) $US |
|---|---|---|
| 4. Net increase / (decrease) in cash and cash equivalents for the period |
||
| 4.1 Cash and cash equivalents at beginning of period 4.2 Net cash from / (used in) operating activities (item 1.9 above) 4.3 Net cash from / (used in) investing activities (item 2.6 above) 4.4 Net cash from / (used in) financing activities (item 3.10 above) 4.5 Effect of movement in exchange rates on cash held 4.6 Cash and cash equivalents at end of period1 |
1,458,254 (601,217) (289,818) 2,154,343 222,557 |
3,927,667 (2,060,150) (1,050,294) 2,154,343 (27,447) |
| 2,944,119 | 2,944,119 | |
| 1 The above cash and cash equivalents does not include funds held on trust of $0.87 million and a receivable of $0.30 million due in the next quarter. |
||
| 5. Reconciliation of cash and cash equivalents at the end of the quarter (as shown in the consolidated statement of cash flows) to the related items in the accounts |
Current quarter $US |
Previous quarter $US |
| 5.1 Bank balances 5.2 Call deposits 5.3 Bank overdrafts 5.4 Other (provide details) 5.5 Cash and cash equivalents at end of quarter (should equal item 4.6 above) |
2,944,119 - - - |
1,458,254 - - - |
| 2,944,119 | 1,458,254 | |
| 6. Payments to related parties of the entity and their associates 6.1 Aggregate amount of payments to related parties and their associates included in item 12 6.2 Aggregate amount of payments to related parties and their associates included in item 2 Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must and an explanation for, such payments |
||
| Current quarter $US |
||
| 91,757 | ||
| - | ||
| include a description of, |
2 Director fees paid to the Company’s Directors.
ASX Listing Rules Appendix 5B (01/12/19)
Page 3
- See chapter 19 of the ASX Listing Rules for defined terms.
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
| 7. Financing facilities Note: the term “facility’ includes all forms of financing arrangements available to the entity. Add notes as necessary for an understanding of the sources of finance available to the entity. Total facility amount at quarter end $US Amount drawn at quarter end $US 7.1 Loan facilities 2,500,000 2,500,000 7.2 Credit standby arrangements - - 7.3 Other (please specify) - - 7.4 Total financing facilities 2,500,000 2,500,000 7.5 Unused financing facilities available at quarter end - 7.6 Include in the box below a description of each facility above, including the lender, interest rate, maturity date and whether it is secured or unsecured. If any additional financing facilities have been entered into or are proposed to be entered into after quarter end, include a note providing details of those facilities as well. |
Total facility amount at quarter end $US |
Amount drawn at quarter end $US |
|---|---|---|
| 2,500,000 | 2,500,000 | |
| - | - | |
| - | - | |
| 2,500,000 | 2,500,000 | |
| Description of loan facility in 7.1 above: Unsecured corporate loan facility with repayment due on 30 June 2021 together with fees and interest at 6%. Subsequent to the end of the quarter, a principal amount owing has reduced to US$1.5 million given repayment of US$1m from the placement proceeds. |
| 8. Estimated cash available for future operating activities |
$US |
|---|---|
| 8.1 Net cash from / (used in) operating activities (Item 1.9) 8.2 Capitalised exploration & evaluation (Item 2.1(d)) 8.3 Total relevant outgoings (Item 8.1 + Item 8.2) 8.4 Cash and cash equivalents at quarter end (Item 4.6) 8.5 Unused finance facilities available at quarter end (Item 7.5) 8.6 Total available funding (Item 8.4 + Item 8.5) 8.7 Estimated quarters of funding available (Item 8.6 divided by Item 8.3) *This item ignores any discretionary spend should Mt. Labo commit to progressing the development of the Mabilo Project |
(601,217) - (601,217) 2,944,119 - 2,944,119 |
| 4.9* | |
| If Item 8.7 is less than 2 quarters, please provide answers to the following questions: |
8.8
- Does the entity expect that it will continue to have the current level of net operating cash flows for the time being and, if not, why not?
Answer: N/A
- Has the entity taken any steps, or does it propose to take any steps, to raise further cash to fund its operations and, if so, what are those steps and how likely does it believe that they will be successful?
ASX Listing Rules Appendix 5B (01/12/19)
Page 4
- See chapter 19 of the ASX Listing Rules for defined terms.
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Answer: N/A
- Does the entity expect to be able to continue its operations and to meet its business objectives and, if so, on what basis?
Answer: N/A
Compliance statement
-
1 This statement has been prepared in accordance with accounting standards and policies which comply with Listing Rule 19.11A.
-
2 This statement gives a true and fair view of the matters disclosed.
Date: 31 July 2020
Authorised by: By the Board of Directors
(Name of body or officer authorising release – see note 4)
Notes
-
This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the entity’s activities for the past quarter, how they have been financed and the effect this has had on its cash position. An entity that wishes to disclose additional information over and above the minimum required under the Listing Rules is encouraged to do so.
-
If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash Flows apply to this report. If this quarterly cash flow report has been prepared in accordance with other accounting standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report.
-
Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities, depending on the accounting policy of the entity.
-
If this report has been authorised for release to the market by your board of directors, you can insert here: “By the board”. If it has been authorised for release to the market by a committee of your board of directors, you can insert here: “By the [ name of board committee – eg Audit and Risk Committee ]”. If it has been authorised for release to the market by a disclosure committee, you can insert here: “By the Disclosure Committee”.
-
If this report has been authorised for release to the market by your board of directors and you wish to hold yourself out as complying with recommendation 4.2 of the ASX Corporate Governance Council’s Corporate Governance Principles and Recommendations , the board should have received a declaration from its CEO and CFO that, in their opinion, the financial records of the entity have been properly maintained, that this report complies with the appropriate accounting standards and gives a true and fair view of the cash flows of the entity, and that their opinion has been formed on the basis of a sound system of risk management and internal control which is operating effectively.
ASX Listing Rules Appendix 5B (01/12/19)
Page 5
- See chapter 19 of the ASX Listing Rules for defined terms.