Roxmore Resources Inc. — Audit Report / Information 2024
Apr 16, 2025
43528_rns_2025-04-16_4ae702d8-0aa2-401b-b175-288b2e01a922.pdf
Audit Report / Information
Open in viewerOpens in your device viewer
==> picture [310 x 73] intentionally omitted <==
13693 230a Street MAPLE RIDGE, BC. V4R 0G4 Tel. +1 (778) 240-5004 e-mail: [email protected]
Web: www.rockridgeconsult.com Business No: 81755 6632 BC0001
==> picture [470 x 117] intentionally omitted <==
----- Start of picture text -----
TECHNICAL REPORT
ON THE UPDATED
MINERAL RESOURCE ESTIMATE
----- End of picture text -----
==> picture [470 x 116] intentionally omitted <==
----- Start of picture text -----
AXCAP VENTURES,
CENTRAL BRITISH COLUMBIA,
CANADA
----- End of picture text -----
NI 43-101 REPORT
QUALIFIED PERSONS:
Michael F O’Brien, M.Sc., P.Geo. Kelly McLeod, P.Eng. Douglas Turnbull, H.B.Sc., P.Geo. Effective Date: December 1, 2024
28 March 2025
RockRidge Partnership & Associates
CONTENTS OF THE TECHNICAL REPORT
Title Page
Date and Signature Page
Table of Contents List of Tables
List of Figures
| TABLE OFCONTENTS | TABLE OFCONTENTS | |
|---|---|---|
| 1. | SUMMARY ................................................................................................................ | 1-10 |
| Executive Summary ................................................................................................ | 1-10 | |
| Technical Summary ................................................................................................ | 1-17 | |
| Mineral Resource Estimate ............................................................................................ | 1-24 | |
| 2. | INTRODUCTION ....................................................................................................... | 2-29 |
| 3. | RELIANCE ON OTHER EXPERTS ........................................................................... | 3-31 |
| 4. | PROPERTY DESCRIPTION AND LOCATION .......................................................... | 4-32 |
| Location .................................................................................................................. | 4-32 | |
| Land Tenure ........................................................................................................... | 4-32 | |
| Nature and Extent of Issuer’s Title .......................................................................... | 4-37 | |
| Property Agreements .............................................................................................. | 4-37 | |
| Permits and Environmental Liabilities ..................................................................... | 4-40 | |
| Other Factors ......................................................................................................... | 4-41 | |
| 5. | ACCESSIBILITY, CLIMATE, LOCAL RESOURCES, INFRASTRUCTURE |
AND |
| PHYSIOGRAPHY ................................................................................................................. | 5-42 | |
| Accessibility ............................................................................................................ | 5-42 |
Axcap Ventures Inc. – Newton Project
1-2
RockRidge Partnership & Associates
| Local Resources Infrastructure ............................................................................... 5-42 | |
|---|---|
| Physiography .......................................................................................................... 5-42 | |
| Climate ................................................................................................................... 5-42 | |
| Sufficiency of Surface Rights for Mining ................................................................. 5-43 | |
| 6. | HISTORY .................................................................................................................. 6-44 |
| Prior Ownership ...................................................................................................... 6-44 | |
| Exploration and Development History ..................................................................... 6-44 | |
| Historical Mineral Resource Estimates ................................................................... 6-53 | |
| 7. | GEOLOGICAL SETTING AND MINERALIZATION.................................................... 7-55 |
| Regional Geology ................................................................................................... 7-55 | |
| Local Geology ........................................................................................................ 7-59 | |
| Mineralization ......................................................................................................... 7-73 | |
| 8. | DEPOSIT TYPES ...................................................................................................... 8-77 |
| 9. | EXPLORATION ......................................................................................................... 9-77 |
| 10. | DRILLING ................................................................................................................ 10-79 |
| 11. | SAMPLE PREPARATION, ANALYSIS AND SECURITY ......................................... 11-96 |
| Historical Samples (Pre-2006) .............................................................................. 11-96 | |
| High Ridge Samples – 2006 ................................................................................. 11-97 | |
| Amarc Samples – 2009 Through 2012 ................................................................. 11-98 | |
| 12. | DATA VERIFICATION ........................................................................................... 12-118 |
| Introduction ........................................................................................................ 12-118 | |
| Data Verification 2012 – Amarc .......................................................................... 12-118 | |
| Data Verification 2012 – RPA ............................................................................. 12-119 | |
| Data Verification 2021 – RockRidge ................................................................... 12-119 | |
| Site Inspection and Drillhole Collar Verification .......................................................... 12-119 |
Axcap Ventures Inc. – Newton Project
1-3
RockRidge Partnership & Associates
| Core Verification ........................................................................................................ 12-123 | |
|---|---|
| Data Verification 2024 – RockRidge ................................................................... 12-126 | |
| Database Grade Verification ............................................................................... 12-126 | |
| Verification of 2012 Sampling ............................................................................. 12-127 | |
| Verification of Pre-2012 Data .............................................................................. 12-130 | |
| Topography Verification ...................................................................................... 12-130 | |
| Conclusions ........................................................................................................ 12-131 | |
| 13. | MINERAL PROCESSING AND METALLURGICAL TESTING ............................... 13-132 |
| 14. | MINERAL RESOURCE ESTIMATES .................................................................... 14-136 |
| Summary ............................................................................................................ 14-136 | |
| Descriptions of the Database .............................................................................. 14-137 | |
| Geological Domain Interpretation ....................................................................... 14-138 | |
| Compositing Methodology .................................................................................. 14-146 | |
| Grade Capping ................................................................................................... 14-147 | |
| Bulk Density ....................................................................................................... 14-151 | |
| Trend Analysis .................................................................................................... 14-152 | |
| Variography ........................................................................................................ 14-154 | |
| Block Model Construction ................................................................................... 14-157 | |
| Block Model Validation ....................................................................................... 14-160 | |
| Mineral Resource Classification.......................................................................... 14-163 | |
| Mineral Resource Statement .............................................................................. 14-164 | |
| 15. | MINERAL RESERVE ESTIMATES ....................................................................... 15-169 |
| 16. | MINING METHODS ............................................................................................... 16-170 |
| 17. | RECOVERY METHODS........................................................................................ 17-171 |
| 18. | PROJECT INFRASTRUCTURE ............................................................................ 18-172 |
Axcap Ventures Inc. – Newton Project
1-4
RockRidge Partnership & Associates
| 19. | MARKET STUDIES AND CONTRACTS ................................................................ 19-173 |
|---|---|
| 20. | ENVIRONMENTAL STUDIES, PERMITTING AND SOCIAL OR COMMUNITY IMPACT |
| 20-174 | |
| 21. | CAPITAL AND OPERATING COSTS .................................................................... 21-175 |
| 22. | ECONOMIC ANALYSIS ........................................................................................ 22-176 |
| 23. | ADJACENT PROPERTIES .................................................................................... 23-177 |
| 24. | OTHER RELEVANT DATA AND INFORMATION.................................................. 24-178 |
| 25. | INTERPRETATION AND CONCLUSIONS ............................................................ 25-179 |
| 26. | RECOMMENDATIONS ......................................................................................... 26-186 |
| 27. | REFERENCES ...................................................................................................... 27-189 |
| 28. | DATE AND SIGNATURE PAGE ............................................................................ 28-192 |
List of Tables
| Table | 1-1- SUMMARY OF MINERAL RESOURCES............................................................. 1-13 |
|---|---|
| Table | 1-2 – PROPOSED PHASE 1 RESOURCE EXPANSION DRILLING AND |
| METALLURGICAL TESTWORK BUDGET ........................................................................... 1-16 | |
| Table | 4-1 - LIST OF CLAIMS ................................................................................................ 4-32 |
| Table | 6-1 - EXPLORATION HISTORY .................................................................................. 6-44 |
| Table | 6-2 - WORK COMPLETED BY AMARC ...................................................................... 6-46 |
| Table | 10-1 - DRILLING SUMMARY .................................................................................... 10-79 |
| Table | 10-2 - DRILLHOLE DETAILS -HIGH RIDGE ............................................................. 10-82 |
| Table | 10-3 - AMARC 2009 DRILLING PROGRAM ............................................................. 10-83 |
| Table | 10-4 – AMARC 2010 – 2011 DRILLING PROGRAM ................................................. 10-84 |
| Table | 10-5 – AMARC LATE 2011 DRILLING PROGRAM ................................................... 10-85 |
| Table | 10-6 - AMARC 2012 DRILLING PROGRAM ............................................................. 10-86 |
| Table | 10-7 - CARLYLE 2023 DRILLING PROGRAM .......................................................... 10-88 |
| Table | 10-8 - SUMMARY OF SIGNIFICANT DRILL RESULTS ............................................ 10-88 |
| Table | 11-1 - ANALYTICAL LABORATORIES USED - NEWTON PROJECT ...................... 11-96 |
Axcap Ventures Inc. – Newton Project
1-5
RockRidge Partnership & Associates
Table 11-2 - SUMMARY OF EXTERNAL QA/QC SAMPLE TYPES USED ....................... 11-103 Table 11-3 - EXTERNAL QA/QC SUMMARY BY YEAR ................................................... 11-104 Table 11-4 - STANDARDS USED IN THE 2012 DRILL PROGRAM ................................. 11-108 Table 11-5 - SUMMARY OF DENSITY READINGS .......................................................... 11-115 Table 12-1 – FIELD CHECKS – COLLAR LOCATIONS .................................................... 12-122 Table 12-2 – REVIEW HOLE RUNS ................................................................................. 12-126 Table 13-1 – DRILL CORE INTERVALS ........................................................................... 13-132 Table 13-2 – MASTER COMPOSITE HEAD GRADE ....................................................... 13-133 Table 13-3 – GRAVITY TEST RESULTS .......................................................................... 13-133 Table 13-4 – WOL TEST RESULTS ................................................................................. 13-134 Table 13-5 - FLOTATION AND LEACH RESULTS ........................................................... 13-134 Table 14-1 – SUMMARY OF MINERAL RESOURCES – NEWTON ................................. 14-136 Table 14-2 – SUMMARY OF CUTTING VALUES ............................................................. 14-150 Table 14-3 – DESCRIPTIVE STATISTICS FOR GOLD .................................................... 14-150 Table 14-4 - DESCRIPTIVE STATISTICS FOR SILVER ................................................... 14-150 Table 14-5 – VARIOGRAM MODEL PARAMETERS ........................................................ 14-157 Table 14-6 – BLOCK MODEL PARAMETERS .................................................................. 14-158 Table 14-7 – SEARCH PARAMETERS ............................................................................. 14-159 Table 14-8 – PIT OPTIMIZATION INPUT PARAMETERS ................................................ 14-166 Table 14-9 – GRADE AND TONNAGE SENSITIVITY ....................................................... 14-167 Table 14-10 – SENSITIVITY TO METAL PRICE ............................................................... 14-167 Table 14-11 – SUMMARY OF MINERAL RESOURCES – NEWTON ............................... 14-168 Table 25-1 - SUMMARY OF MINERAL RESOURCES ...................................................... 25-181 Table 25-2 - MINERAL RESOURCE PROJECT RISK FACTORS .................................... 25-183 Table 26-1 – PROPOSED PHASE 1 RESOURCE EXPANSION DRILLING AND METALLURGICAL TESTWORK BUDGET ....................................................................... 26-188
List of Figures
| Figure | 4-1 - LOCATION MAP ................................................................................................ 4-35 |
|---|---|
| Figure | 4-2 - CLAIM MAP ....................................................................................................... 4-36 |
| Figure | 4-3 - LOCATION OF PRIVATE LAND ........................................................................ 4-39 |
| Axcap | Ventures Inc. – Newton Project 1-6 |
RockRidge Partnership & Associates
Figure 6-1 - EXPLORATION PROGRAMS ............................................................................ 6-48 Figure 6-2 - DRILLHOLE LOCATIONS AND IP CHARGEABILITY CONTOURS .................. 6-50 Figure 6-3 - DRILLHOLE LOCATIONS AND TOTAL FIELD INTENSITY .............................. 6-51 Figure 7-1 - REGIONAL GEOLOGY ..................................................................................... 7-56 Figure 7-2 - PROPERTY GEOLOGY .................................................................................... 7-57 Figure 7-3 - GEOLOGY LEGEND ......................................................................................... 7-58 Figure 7-4 - SURFACE GEOLOGY ....................................................................................... 7-60 Figure 7-5 - CROSS SECTION A - B .................................................................................... 7-61 Figure 7-6 - SECTION C - D ................................................................................................. 7-62 Figure 7-7 - EXAMPLES OF ROCKS FOUND IN THE NEWTON DEPOSIT ......................... 7-65 Figure 7-8 - EXAMPLES OF ALTERATION TYPES FOUND IN THE NEWTON DEPOSIT ... 7-72 Figure 7-9 - EXAMPLES OF MINERALIZATION TYPES ...................................................... 7-76 Figure 10-1 – DRILLHOLE LOCATION PLAN ..................................................................... 10-80 Figure 11-1 – SAMPLE PREPARATION AND ANALYTICAL FLOW CHART .................... 11-102 Figure 11-2 - SCATTER PLOT OF METALLIC Au VS. ORIGINAL Au ASSAY .................. 11-106 Figure 11-3 - METALLIC GOLD COMPONENT (RED) ..................................................... 11-107 Figure 11-4 - GOLD QUALITY CONTROL CHART (AMARC 2009-2012) ......................... 11-109 Figure 11-5 - SILVER QUALITY CONTROL CHART (AMARC 2009-2012) ...................... 11-110 Figure 11-6 - GOLD MONITORING CHART OF BLANKS (AMARC 2009-2012) ............... 11-111 Figure 11-7 - SILVER MONITORING CHART OF BLANKS (AMARC 2009-2012) ............ 11-112 Figure 11-8 - SCATTER PLOT OF GOLD IN-LINE DUPLICATE SAMPLES (AMARC 2012) .. 11113 Figure 11-9 - SCATTER PLOT OF SILVER IN-LINE DUPLICATE SAMPLES (AMARC 2012) 11114 Figure 12-1 - VIEW NORTHWEST OF NEWTON HILL ..................................................... 12-120 Figure 12-2 - VIEW FROM NEWTON HILL TOWARDS SCUM LAKE (ROCKRIDGE, 2021) .. 12121 Figure 12-3 – COLLAR OF DH12057 (ROCKRIDGE, 2021) ............................................. 12-122 Figure 12-4 – SELECTED CORE INSPECTION (ROCKRIDGE, 2021 .............................. 12-123 Figure 12-5 – STACKED CORE ALONG BERM OF STORAGE YARD (ROCKRIDGE, 2021) 12123 Figure 12-6 – K-SILICATE ALTERATION IN MAFIC FLOW (HOLE 11052) ...................... 12-124
Axcap Ventures Inc. – Newton Project
1-7
RockRidge Partnership & Associates
Figure 12-7 – ARGILLIC ALTERATION IN MONZONITE (HOLE 9004) ............................ 12-125 Figure 12-8 – BANDED TUFF WITH OXIDIZED SULPHIDES (HOLE 11052)................... 12-125 Figure 12-9 – LOCATION OF TWO HOLES USED IN CHECK ASSAYS .......................... 12-127 Figure 12-10 – SCATTERPLOT OF AU VALUES. ............................................................ 12-128 Figure 12-11 - SCATTERPLOT OF AG VALUES. ............................................................. 12-129 Figure 12-12 – DOWNHOLE ASSAY PROFILES FOR HOLE 11045 ................................ 12-129 Figure 12-13 - DOWNHOLE ASSAY PROFILES FOR HOLE 11052 ................................. 12-130 Figure 14-1 – DRILLHOLE LOCATIONS ........................................................................... 14-137 Figure 14-2 – NEWTON STRUCTURE MODEL ................................................................ 14-139 Figure 14-3 – NEWTON FAULT BLOCKS ........................................................................ 14-140 Figure 14-4 – SECTION N5738700 OF LITHOLOGY MODEL .......................................... 14-140 Figure 14-5 – BOXPLOT OF GOLD PER LITHOLOGIC UNIT .......................................... 14-141 Figure 14-6 – BOXPLOT OF SILVER PER LITHOLOGIC UNIT ........................................ 14-141 Figure 14-7 – GRADE DOMAINS IN FELSIC UNITS ........................................................ 14-142 Figure 14-8 – SECTION SHOWING DISPLACED HIGH-GRADE MINERALIZATION....... 14-143 Figure 14-9 – UN-FAULTING OF DOMAIN IN FAULT BLOCK 1 ...................................... 14-144 Figure 14-10 - UN-FAULTING OF DOMAIN IN FAULT BLOCK 4 ..................................... 14-145 Figure 14-11 – RELATIVE POSITIONS AFTER PALINSPASTIC RECONSTRUCTION ... 14-145 Figure 14-12 – HISTOGRAM OF SAMPLE LENGTH ........................................................ 14-146 Figure 14-13 – CV, LOG PROBABLILITY and DECILE ANALYSIS PLOTS FOR GOLD .. 14-148 Figure 14-14 - CV, LOG PROBABLILITY and DECILE ANALYSIS PLOTS FOR SILVER . 14-149 Figure 14-15 – HISTOGRAM OF DENSITY MEASUREMENTS ....................................... 14-151 Figure 14-16- GOLD CONTOURS AT SECTION 5738700N ............................................. 14-152 Figure 14-17 – GOLD CONTOURS AT SECTION 457450E ............................................. 14-153 Figure 14-18 – GOLD CONTOURS AT BENCH 1180m .................................................... 14-153 Figure 14-19 – VARIOGRAM MODELS FOR Au_IN DOMAIN .......................................... 14-154 Figure 14-20 - VARIOGRAM MODELS FOR Au_OUT DOMAIN ....................................... 14-155 Figure 14-21 - VARIOGRAM MODELS FOR Ag_IN DOMAIN ........................................... 14-155 Figure 14-22 - VARIOGRAM MODELS FOR Ag_OUT DOMAIN ....................................... 14-156 Figure 14-23 – SECTION 5738700N SHOWING BLOCK MODEL .................................... 14-159 Figure 14-24 – SCATTERPLOT OF Au BLOCK ESTIMATES VS. COMPOSITES ............ 14-161 Figure 14-25 - SWATH PLOT OF Au IN X ........................................................................ 14-162
Axcap Ventures Inc. – Newton Project
1-8
RockRidge Partnership & Associates
Figure 14-26 - SWATH PLOT OF Au IN Y ........................................................................ 14-162 Figure 14-27 – SWATH PLOT OF Au IN Z ........................................................................ 14-163 Figure 14-28 – SECTION OF BLOCK MODEL SHOWING PIT OUTLINE ......................... 14-164 Figure 25-1 – RECOMMENDED DRILL PROGRAM ......................................................... 25-184 Figure 25-2 – EXPLORATION POTENTIAL ...................................................................... 25-185
Axcap Ventures Inc. – Newton Project
1-9
RockRidge Partnership & Associates
1. SUMMARY
Executive Summary
INTRODUCTION
RockRidge Partnership & Associates (“RockRidge”) was retained by Axcap Ventures Inc. (“Axcap” or the “Company”) to prepare an independent technical report on the Newton Project (“Technical Report”), located in south-central British Columbia, Canada (the “Newton Project”, “Newton”, the “Newton Property”, the “Project” or the “Property”).
Axcap entered into a non-binding letter of intent (the “LOI”) dated September 27, 2024, with Carlyle Commodities Corp. (“Carlyle”) to acquire the Newton Project.
The Newton Property consists of 62 claims comprising an area of approximately 23,003 ha. Carlyle holds a 100% interest of the mineral rights of the Newton Project, subject to the Amarc NSR and an additional 2.0% NSR on certain mineral claims at the Newton Project in favour of two underlying owners, which can be purchased at any time for $2,000,000. Carlyle does not directly or indirectly hold any surface rights.
This Technical Report conforms to National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”). Mr. Michael O’Brien, P.Geo., a consulting geologist with RockRidge, most recently visited the property on October 8, 2024. During the field visit to the Property, Mr. O’Brien traversed the central portion of the deposit on foot and examined float material from rehabilitated trenches, drill collars and reviewed drill cores at Amarc’s warehouse facility located at Williams Lake.
The gold-silver mineralization at Newton is associated with disseminated pyrite that is hosted primarily by a sequence of pyroclastic flows of felsic composition that have been intruded by younger dykes of intermediate composition. From 2009 to 2012, Amarc conducted numerous exploration programs at the Newton Project to test for the presence of gold-silver mineralization in the northern extents of its large property holdings. These exploration programs included geophysical and geochemical surveying, mineralogical studies, re-logging of drill core generated from previous exploration programs, and diamond drilling. Amarc’s exploration culminated in a maiden resource estimate by Roscoe, Postle and Associates (“RPA”) in 2012.
Axcap Ventures Inc. – Newton Project
1-10
RockRidge Partnership & Associates
In December of 2022, Carlyle acquired a 100% interest in the Newton Property from Amarc and engaged RockRidge to complete a mineral resource estimate update in 2022. Prior to the LOI and subsequent to the 2022 mineral resource estimate update, Carlyle conducted 2,856.3 metres of diamond drilling in 10 drillholes and metallurgical testwork in 2023.
INTERPRETATION AND CONCLUSIONS
The QP believes exploration on the Newton Property to date has successfully identified a mineralized system that exhibits characteristics typical of bulk-tonnage, strata-bound, low to intermediate sulphidation epithermal gold-silver deposits. The mineralisation (disseminated gold and associated base metals) is primarily hosted by thick sequences of late Cretaceous-aged permeable felsic volcaniclastics and flows and contemporaneous felsic intrusions, emplaced into a structurally active graben environment. The host rocks show strong, widespread sericite- quartz alteration with variable siderite and several percent pyrite and/or marcasite. Additional mineralization is hosted to a lesser degree by intrusive rocks of intermediate and felsic composition. Initial studies suggest that the gold occurs predominantly as high fineness electrum and is preferentially associated with marcasite-bearing alteration.
The drilling completed to date has outlined a significant, gold-silver deposit over an area of approximately 800 m by 800 m and to a depth of approximately 560 m from surface. The deposit is coincident with a NW trending magnetic low and occupies a restricted area within an extensive, seven square kilometre hydrothermal system (as indicated by the outline of the 8 MV/V contour of the induced polarization (IP) chargeability anomaly) that exhibits widespread metal enrichment, and which remains to be fully explored. Drill results to date indicate that there is potential to expand the current bulk-tonnage gold resource and also suggest that there are possibilities to discover structurally controlled zones of higher-grade gold mineralization and copper-gold porphyry-style mineralization in proximity to the Newton mineralized system.
The QP has reviewed the quality assurance/quality control (“QA/QC”) programs employed by Carlyle during the most recent drilling campaigns and assaying programs and found them to meet current industry best practices.
During the 2022 site visit, discrepancies were noted between collar locations in the drillhole database and the current topographic data. Although these discrepancies were not deemed to
Axcap Ventures Inc. – Newton Project
1-11
RockRidge Partnership & Associates
have a material impact on the mineral resource estimate, any further drilling and interpretation would benefit from a new high-resolution topographic data set.
The QP has applied grade caps to the estimation domains that were used to prepare this Mineral Resource estimate. Review of the distribution of gold and silver grades suggested that capping is warranted.
Examination of contour plots of gold grades for selected sections and benches through the deposit reveal that a weak mineralization trend appears to be present in the data examined. A gradeblock model was prepared using the modeled domains to ensure proper coding of the model. “Hard” domain boundaries were used along the contacts of the mineralized domain model. Only data contained within the respective domain models were allowed to be used to estimate the grades of the blocks within the domain in question, and only those blocks within the domain limits were allowed to receive grade estimates. Only the capped, composited grades of the drillhole intersections were used to derive an estimate of a block’s grade.
A series of domain wireframe solids were created in three-dimensional modeling software (Leapfrog Geo) that outlined those portions of the deposit that demonstrate continuity of mineralization. These three-dimensional solids were used as one of the constraints in the preparation of the Mineral Resource estimate.
A conceptual pit shell was generated using a Lerchs-Grossmann optimizer as an additional constraint in the preparation of this Mineral Resource estimate. In the absence of definitive geotechnical information, a 50° overall pit wall slope angle was applied.
The Mineral Resources in this Technical Report were estimated in accordance with the definitions contained in the CIM Definition Standards on Mineral Resources and Mineral Reserves (CIM definitions) that were prepared by the CIM Standing Committee on Reserve Definitions and adopted by the CIM Council on May 10, 2014.
The mineralized material for each domain was classified by the QP into the Inferred Mineral Resource category based on the search ellipse ranges obtained from the variography study, the application of an open pit shell along with a constraining volume, and its experience with these deposit types in the past.
Axcap Ventures Inc. – Newton Project
1-12
RockRidge Partnership & Associates
The Mineral Resources are presented in Table 1-1. At a cut-off grade of 0.25 g/t Au, a total of 41,071,100 tonnes are estimated to be present at an average Au equivalent grade of 0.68 g/t (842,900 contained oz Au) and (4,506,100 contained oz Ag).
Table 1-1- SUMMARY OF MINERAL RESOURCES
| Resource in Optimized Pit (Inferred) |
Resource in Optimized Pit (Inferred) |
Grade | Metal Content | Metal Content | |||
|---|---|---|---|---|---|---|---|
| Cut Off Au |
Mass t |
Au (g/t) |
Ag (g/t) |
AuEQ³ (g/t) |
Au (t. Oz) |
Ag (t. Oz) |
AuEQ³ (t. Oz) |
| 0.25 | 41,071,100 | 0.64 | 3.41 | 0.68 | 842,900 | 4,506,100 | 900,200 |
Notes
-
Differences may occur in totals due to rounding.
-
CIM Definition Standards for Mineral Resources and Mineral Reserves (May 2014) and CIM Estimation of Mineral Resources and Mineral Reserves Best Practice Guidelines (November 2019) were used for mineral resource estimation.
-
Metal price used are US$1950/Oz for Gold and US$25/Oz for Silver.
-
Recovery factors used are 80.3% for Au and 32.7% for Ag.
-
Prices are in US$ per Troy ounce.
-
Effective date for the Mineral Resource December 1, 2024.
There are no Mineral Reserves estimated for the Newton Project.
EXPLORATION POTENTIAL
Much of the large Newton sulphide-bearing alteration zone, as defined by Amarc’s 2010 IP survey, has not been thoroughly explored. There is a clear relationship between the felsic volcanoclastic units and disseminated gold mineralization at the Newton Project. Felsic volcaniclastic units mapped on surface and modeled in 3D based on historic drilling indicate that these felsic units persist at depth but have only received a limited amount of drilling. Of the widely spaced drilling completed NW of the most intensely drilled portion of the Newton Deposit, 9 of the 10 drillholes completed in 1972 by Cyprus Exploration Corp. (Cyprus), intersected intervals of felsic volcaniclastic rocks. Of these 9 holes, 5 were not analyzed for gold and/or silver, and 4 were partially sampled and analyzed for gold only. At that time, Cyprus was primarily interested in the copper potential at Newton, and they did not conduct any gold analyses. Of the partially sampled holes, drillhole 72-06 contains two higher grade gold intersections (79.2m to 82.2m and 222.5m to 225.6m). Of particular note is drillhole 72-03 which intersected a 211m interval of felsic volcaniclastic rock and although there are indications this interval was sampled, likely for copper, gold analyses were not conducted. In 1987, Rea Gold Corp. (“Rea Gold”) resampled the 1972 drill core, but details and results of this sampling could not be found.
Axcap Ventures Inc. – Newton Project
1-13
RockRidge Partnership & Associates
The main part of the Newton deposit is also coincident with a NW trending magnetic low that extends from the eastern side of the resource model, approximately 1km to the northwest (Figure 25-2). The Newton Deposit and felsic volcaniclastic units immediately NW of the most intensely drilled portion of the Newton Deposit are coincident with this NW trending magnetic low. As part of the recommendations in their 2022 technical report, RockRidge recommended further drilling be carried out in this area to confirm mineralization identified in historical drilling. In 2023, Carlyle completed seven drillholes, northwest and north of the Newton Deposit. Based on favourable gold results from this drilling, Carlyle outlined two new target areas, Halo and Sunrise (See Figure 25-2).
At Halo, three drillholes (N23-93 to 95) were completed approximately 400 metres north of the Newton resource confirming and extending gold mineralization identified in historic drillhole 10030. A fourth drillhole (N23-96) was completed north of the Newton resource and approximately 200m south of Halo intersected mineralization suggesting that the mineralization at Halo may extend to the south toward the Newton Deposit. Further drilling is recommended to define the extent of mineralization at Halo.
At Sunrise, Carlyle completed a short exploration drillhole (N23-98) in a sparsely drilled area northwest of the Newton Deposit and peripheral to a broad area with elevated gold in soil and chargeability anomalies that correlate with untested felsic volcanics. Drillhole N23-98 intersected anomalous gold mineralization hosted in strongly altered felsic intrusive rocks.
Further drilling is recommended to investigate both of the Halo and Sunrise target areas.
RECOMMENDATIONS
Pending the completion of the Company’s transaction to acquire a 100% interest in the Newton Project, RockRidge recommends the Company carry out a two-phase program consisting of an initial phase focussing resource expansion drilling concurrent with a comprehensive metallurgical testwork program based on a larger, more representative sample of the Newton Deposit mineralization. The estimated cost of the proposed Phase 1 program would be approximately $4,100,000.
Axcap Ventures Inc. – Newton Project
1-14
RockRidge Partnership & Associates
The Phase 1 resource expansion and infill drilling program would be designed to accomplish a number of objectives including:
-
Expanding upon known mineralized zones and new discoveries of gold systems on the Property beyond the current resource limits
-
Increasing the currently delineated gold-silver resource by improving the grade definition and upgrading the resource classification through infill drilling.
-
Obtaining a larger and more representative sample for follow up metallurgical and geotechnical testwork
The Phase 1 drill program would potentially consist of:
-
Drill testing areas within or immediately adjacent to the significant plus seven square kilometre hydrothermal system as outlined by the 8MV/V contour of the IP chargeability anomaly where felsic volcanic units are projected, or have the potential to occur, including the Halo and Sunrise target areas (approximately 6,100m).
-
Infill diamond drilling to further delineate potentially economic mineralization (approximately 2,900m).
-
Additional detailed structural modelling completed within and proximal to the currently defined resource to assess the potential presence, and projected location, of zones of high-density veins and/or mineralized fractures. Such zones have the potential to host higher-grade, structurally controlled mineralization that would increase the tenor of the resource. As part of this exercise, detailed three-dimensional modelling of vein and fracture density is recommended to develop possible vectors toward prospective structural settings. Resulting targets should then be tested by diamond drillholes oriented appropriately to the projected plane of the controlling structures.
-
Generation of sample material for an expanded metallurgical and geotechnical testwork program.
Prior to commencing any further drilling, the following actions are also recommended.
Axcap Ventures Inc. – Newton Project
1-15
RockRidge Partnership & Associates
-
Acquisition of a detailed current digital terrain model to better define the topography is recommended using Lidar or detailed RPAS survey.
-
Other mapped felsic volcanic occurrences surrounding the focus area should be fully evaluated either on surface or by drilling, particularly NW of the footprint of the current resource model in the Halo and Sunrise target areas where felsic units have been mapped on surface and coincident with the NW trending magnetic low NW of the Newton Deposit. Much of this area has yet to receive an equivalent level of drilling as the main resource area.
-
The QP recommends continuing with the QA/QC protocols previously recommended by RPA in 2012 for the Newton Project in relation to future drilling so that sampling programs include certified reference materials for silver and, in accordance with established protocols, the results be monitored for departures from the recommended values with respect to the silver standards.
A budget of $4,100,000 is estimated for the Phase 1 program and is presented in Table 1-2 below.
Table 1-2 – PROPOSED PHASE 1 RESOURCE EXPANSION DRILLING AND METALLURGICAL TESTWORK BUDGET
| TESTWORK BUDGET | |
|---|---|
| Item | C$ |
| Resource Expansion and Infill Drilling (9000 m@ $400/m) | $3,600,000.00 |
| Detailed Topography | $50,000.00 |
| Metallurgical Testwork | $350,000.00 |
| Structural Modeling | $15,000.00 |
| Permitting/Community Relations/Environmental Studies | $35,000.00 |
| **General and Administration ** | $50,000.00 |
| TOTAL | $4,100,000.00 |
Based on the outcome of the Phase 1 Resource Expansion and Infill Drill Program, a followup Phase 2 program is proposed and would include an update of the Newton mineral resource incorporating the results of the Phase I drilling and metallurgical testwork. Utilizing the parameters derived from the updated mineral resource estimate and metallurgical testwork, the QP recommends the Company proceeds to undertake a full PEA of the Newton Deposit. The total Phase 2 budget would be approximately $350,000.
Axcap Ventures Inc. – Newton Project
1-16
RockRidge Partnership & Associates
Technical Summary
PROPERTY DESCRIPTION AND LOCATION
The Newton Property is located approximately 108 km west-southwest of Williams Lake, British Columbia and is road accessible via paved Highway 20 and all- weather forest service roads. Total driving time from Williams Lake to the Newton Property is approximately 2.5 hours.
The Property consists of 62 claims comprising an area of approximately 23,003 ha. Carlyle indirectly holds a 100% interest in the mineral rights of the Project through its wholly owned subsidiary, Isaac Newton Mining Corp. (“INMC”) and does not hold any surface rights. The entire Project is subject to the Amarc NSR, and certain claims are subject to an additional 2.0% NSR in favour of two underlying owners. British Columbia mining law allows for access and use of the surface for exploration through notification of surface rights holders. The Project is situated within the asserted traditional territory of the Tsilhqot’in National Government.
LAND TENURE
In September of 2024, Carlyle and Axcap announced that it entered into a non-binding letter of intent (the “LOI”) for the sale of Carlyle’s Newton Project. Pursuant to the LOI, Carlyle and Axcap agreed to negotiate the terms of a definitive agreement for the sale of Carlyle’s interest in the Newton Project (the “Newton Transaction”).
Pursuant to the LOI, Axcap will:
-
pay Carlyle a $100,000 cash fee following the signing of the LOI and a $150,000 cash fee upon the signing of a definitive agreement;
-
pay Carlyle a $250,000 cash fee upon Axcap closing an equity financing at a price of $0.20 per security for proceeds of not less than $4,000,000;
-
upon closing the Newton Transaction (i) issue to Carlyle 3,750,000 shares of Axcap and 500,000 warrants, each exercisable into one share at a price of $0.20 for a period of three years (subject to Canadian Securities Exchange (the “ Exchange ”) minimum pricing requirements); and (ii) in the event Axcap has not completed the above noted financing, pay Carlyle $125,000, with an additional $125,000 to be paid within 90 days of the closing of the Newton Transaction; and
Axcap Ventures Inc. – Newton Project
1-17
RockRidge Partnership & Associates
- on the date that is 12 months following closing of the Newton Transaction, issue to Carlyle shares of Axcap with a value of $1,250,000 calculated on the 20-day volume weighted average trading price of the Axcap shares on the Exchange;
Axcap is at arm’s length from Carlyle. Completion of the Newton Transaction remains subject to a number of conditions, including: the satisfactory completion of due diligence on the Newton Project; the receipt of any required regulatory approvals, including the Exchange; and the negotiation of definitive documentation. As of the date of this report, the sale of the Newton Project has not been finalized.
The entire Project is subject to 2% NSR payable to Amarc and certain claims are subject to an additional 2.0% NSR in favour of two underlying owners which can be purchased at any time for $2,000,000.
HISTORY
The earliest known work on the Property occurred in 1916 when a Mr. Newton produced a quantity of gold from a small shaft and some open cuts. The first documented work at Newton Hill was by Cyprus, which executed an exploration program in 1972, followed by several additional exploration programs by various operators from 1981 to 1997. No further exploration work was reported until High Ridge Resources Inc. (“High Ridge”) acquired the Property in 2004. From 2004 to 2006, High Ridge conducted a re-assessment of the 1972 IP geophysical data, a ground geological investigation, a total field ground magnetic survey and completed 12 diamond drillholes totaling 2,019.5 m in 2006.
In 2009, Amarc acquired the Newton Project and completed several exploration campaigns between 2009 and 2012. Exploration work completed by Amarc included airborne and groundbased geophysical surveys, soil sampling mineralogical analysis, and hyperspectral logging. In addition, Amarc re-logged core from 12 drillholes completed in 2006. During their tenure on the Project, Amarc completed 27,944 metres of core drilling in 89 holes which culminated in a maiden mineral resource estimate completed on Amarc’s behalf by RPA in 2012.
In December of 2022, Carlyle acquired a 100% interest in the Newton Property from Amarc and engaged RockRidge to complete a mineral resource estimate update in 2022. Prior to Axcap acquiring the Project in 2024 and subsequent to the 2022 mineral resource estimate update,
Axcap Ventures Inc. – Newton Project
1-18
RockRidge Partnership & Associates
Carlyle conducted 2,856.3 metres of diamond drilling in 10 drillholes and metallurgical testwork in 2023.
GEOLOGY
The most recent British Columbia Geological Survey regional geology compilation shows that rocks on the Newton Property include Mesozoic-aged intrusive, volcanic, and sedimentary rocks of the Spences Bridge Group overlain by Cenozoic volcanic rocks and unconsolidated glacial till. More recently, it has been suggested that Mid to Late Cretaceous calc-alkaline volcanism characterized by felsic pyroclastic units of the Kasalka Group and mafic to felsic flows and ignimbrites of the Spences Bridge and Kingsvale Groups are contemporaneous and represent a chain of stratovolcanoes associated with subsiding, fault-bounded basins.
Stratified rocks at Newton Hill have been assigned provisionally to the Cretaceous Spences Bridge Group and consist of mafic volcanic rocks, sedimentary rocks derived from mafic to intermediate volcanic protoliths, rhyolite flows, and felsic volcaniclastic rocks. These rock types are believed to have been deposited in a graben. The sequence is dominated by felsic volcanic and volcano-sedimentary rocks that unconformably overlie epiclastic sedimentary rocks.
The volcano-sedimentary sequence at Newton Hill is cut by several types of intrusions. The oldest are sub-volcanic felsic quartz-feldspar porphyries that have a quartz monzonite composition and are interpreted to be related to the felsic volcanic rocks in the Spences Bridge Group. Minor mafic dykes present in the area are considered to be related to mafic volcanic rocks in the Spences Bridge Group. The early intrusions are cut by a complex of Cretaceous monzonite intrusions. These monzonites are intruded in turn by porphyritic plagioclase-hornblende diorites. The youngest intrusions observed are minor plagioclase and biotite-phyric dykes which are believed to have formed after hydrothermal activity had ceased.
The Newton deposit is believed to have been formed within a structurally active volcanic environment. Felsic and mafic volcanic rocks were deposited in a rifted volcanic graben which was segmented along steeply dipping extensional faults. Two major structures have been recognized in the resource area. The South Graben fault (“SGF”) and the Newton Hill fault (“NHF”) can be correlated across much of the area of drilling within the Newton deposit.
Axcap Ventures Inc. – Newton Project
1-19
RockRidge Partnership & Associates
Although gold and base metal mineralization have been encountered in all rock types within the Newton deposit, felsic volcaniclastic and flow rocks are the primary host rocks to the mineralization. Quartz-feldspar porphyry and monzonite porphyry intrusions are also commonly, although not as consistently, well-mineralized. Mineralization in other rock types is more erratic. The felsic plagioclase and biotite porphyritic dykes are very late- or post- hydrothermal and do not contain significant concentrations of gold or base metals.
MINERALIZATION
Gold-silver mineralization, with or without base metal mineralization, is frequently associated with both disseminated and veinlet- hosted styles of mineralization. Veinlet-hosted mineralization, although widespread, is volumetrically minor compared to disseminated mineralization.
Most mineralization formed during two sub-stages of quartz-sericite alteration. These are (1) earliest quartz-sericite-(siderite)-pyrite alteration associated with gold, but with low concentrations of base metals; and (2) later quartz-sericite alteration associated with gold and higher concentrations of base metals, during which early pyrite was replaced by marcasite. Mineralization also occurs in late polymetallic veinlets which contain abundant pyrite, chalcopyrite, sphalerite, galena, arsenopyrite and locally, molybdenite.
There is evidence to suggest that there is a large gold-bearing hydrothermal system present at Newton. Geochemically significant gold concentrations, exceeding 50 ppb (0.05 g/t) values occur over an area of at least 1,300 m by 1,800 m. Geologically important gold concentrations of more than 100 ppb (0.1 g/t) have been returned from drill intersections throughout an area which measures approximately 1,300 by 900 meters. Short intersections of more than 100 ppb have also been encountered outside of this area. The resource area has been defined by variably spaced drilling over an area measuring 1,000 m by 900 m, extending to a maximum depth of 685 m.
DEPOSIT TYPES
Newton is viewed as a bulk-tonnage disseminated epithermal gold deposit with some elevated base metal concentration. It shares many similarities with a group of deposits that have been recently recognized in central British Columbia. Key similarities include: (1) a spatial and genetic relationship with Late Cretaceous (~72 Ma) felsic pyroclastic rocks and high-level intrusions which formed in a structurally active environment; (2) a primary gold-silver signature; (3) elevated
Axcap Ventures Inc. – Newton Project
1-20
RockRidge Partnership & Associates
concentrations of copper, zinc, lead, and molybdenum; (4) an association of mineralization with extensive, pervasive quartz-sericite alteration, which contains disseminated and vein-hosted pyrite, marcasite, chalcopyrite, sphalerite, galena, arsenopyrite, and sulphosalts; and (5) late stages of polymetallic vein formation.
EXPLORATION
Axcap has not conducted any exploration work on the Newton Property since entering into the LOI.
DRILLING
Axcap has not conducted any drilling on the Newton Property since entering into the LOI.
A number of historic drill campaigns have taken place on the Newton Property since the first hole was completed in 1972 to the last drilling program completed by Carlyle in 2023. In total, 36,417 m of core drilling has been completed in 138 holes up to hole N23-098. This work includes 27,944 metres in 89 holes completed during the four years Amarc was the project operator from 2009 to 2012 and 2,856.3 metres in 10 holes completed by Carlyle in 2023. All drill core from the historical programs were originally stored at the Newton Project site. In early 2011, Amarc salvaged what remained of this historical core and moved it to a secure location at Gibraltar Mine, near McLeese Lake, British Columbia. Currently all of the historic drill core previous to Carlyle’s drilling resides at a partially fenced industrial facility controlled by Mueller Electrical in Williams Lake. The drill core from Carlyle’s drill program in 2023 is stored in a locked facility at KiNiKiNiK Lodge in Redstone, B.C.
SAMPLE PREPARATION, ANALYSES, AND SECURITY
Axcap has not conducted any sampling since entering into the LOI.
Previous operators utilized several analytical laboratories to carry out analytical work on samples from the property. During their time as the most recent operator, Amarc utilized Acme Analytical facilities in Vancouver as the primary laboratory and ALS Chemex for check analyses.
The half-core samples were crushed at Acme (Vancouver or Smithers) to greater than 80% passing 10 mesh (2 mm), then a 500 g sub-sample was split and pulverized to >85% passing 200 mesh (75 µm). Prior to hole 11045, a 250 g sub-sample was split and pulverized to >85% passing 200 mesh. The coarse rejects and pulps from the assay samples are retained at the secure, long-
Axcap Ventures Inc. – Newton Project
1-21
RockRidge Partnership & Associates
term storage facility of Hunter Dickinson Services Inc. (“HDSI”) at Port Kells, British Columbia. The gold content was determined by 30 g fire assay fusion with Inductively Coupled Plasma - Atomic Emission Spectroscopy (ICP-AES) finish (Acme method code: 3B01). The concentrations of copper, silver, and 32 additional elements were analyzed using a 1.0 g sample aqua regia digestion with ICP-AES or Inductively Coupled Plasma - Mass Spectroscopy finish (Acme method code: 7AX).
Amarc implemented and maintained an effective external QA/QC system consistent with industry best practice from 2009 to 2012. This program is in addition to the QA/QC procedures used internally by the analytical laboratories. Standards (Certified Reference Materials) were randomly inserted into the sample stream at a frequency of 1 in 20. Duplicate samples were created by taking an additional split from the remaining pulp reject, coarse reject quarter-core or half-core remainder at a frequency of 1 in 20 on a random basis. Blank samples were inserted into the sample stream at a frequency of 1%.
A total of 1,494 bulk density (or specific gravity, SG) measurements have been taken by site personnel using the water immersion method since 2010. Drillhole logs are entered into notebook computers running the Amarc Access data entry module for the Newton Project at the core logging area on site. The core logging computers are synchronized on a daily basis with the master site entry database at the site geology office. Core photographs are also transferred to the site geology office computer daily. In the geology office, the logs are printed, reviewed, and validated and initial corrections made.
DATA VERIFICATION
The QP conducted a thorough review of the documented historic data collection procedures. In particular, the review focused on data verification and validation procedures described in the 2012 RPA report that were implemented during the most recent drilling completed from 2009 to 2012 on behalf of Amarc by Hunter Dickinson Inc. (“HDI”) exploration staff. Based on this review, the QP found the QA/QC programs employed by Amarc and HDI exploration staff during the drilling and assaying programs meet current industry best practices.
During site visits in 2022 and 2024, RockRidge’s associate consultant Michael O’Brien, examined the existing site access, infrastructure and visited a number of drillhole collar sites. The QP believes that the logging and sampling procedures used by Amarc and HDI have been carried
Axcap Ventures Inc. – Newton Project
1-22
RockRidge Partnership & Associates
out to industry standards adequate for the estimation of mineral resources. The lithologies, structure, alteration, and mineralization encountered by in selected drillholes were examined and compared with the descriptions presented in the drillhole logs. No material discrepancies were noted.
A program of check assaying was carried out by the QP where two complete drillholes (Hole 11045 and 11052) were check assayed during the site visit undertaken by the QP in June 2021. While a small number of check samples cannot be considered as adequate to confirm the accuracy of all of the assays contained with the Newton Project drillhole database, the QP is satisfied that it has independently confirmed the presence of gold in approximately similar quantities as have been reported by Amarc in the selected samples.
The QP carried out a program of validating the digital drillhole database in 2022 by means of spot checking a selection of drillholes that intersected the mineralized material. Approximately 10% of the drillhole database was selected for validation. The QP discovered no material discrepancies as a result of its spot-checking of the drillhole database. As a result of its data verification activities, The QP believes that the drillhole database assembled by Amarc, subsequently updated by Carlyle and provided by Axcap is suitable for use in the preparation of a Mineral Resource estimate.
MINERAL PROCESSING AND METALLURGICAL TESTING
Continuous intervals of drill core from three holes were submitted by Carlyle for metallurgical testwork. Testing was carried out and supervised by Base Metallurgical Laboratories (“BaseMet”), Kamloops, B.C. under test program BL1338. The objective of the program was to conceptualize a preliminary process flowsheet that would produce gold and silver doré, and to evaluate the metallurgical performance of the mineralization.
A master composite was generated from the drill core samples to investigate gravity concentration, whole-ore-leach (“WOL”) and flotation at various grind sizes followed by leach of the rougher concentrate and tailings. The best results were achieved at a primary grind size of 80% passing (P80) 75 microns following the float/leach flowsheet. The rougher concentrate underwent further size reduction to a P80 of 15 micron followed by a 48 hour leach. A 24 hour
Axcap Ventures Inc. – Newton Project
1-23
RockRidge Partnership & Associates
leach of the rougher tailings contributed approximately 8% additional gold to the overall extraction. The total extraction achieved from the float/leach test for gold and silver was 80.3% and 32.7%, respectively.
Mineral Resource Estimate
DESCRIPTION OF THE DATABASE
RockRidge and the QP were provided with a digital drillhole database in comma-delimited format, containing information on collar location, downhole surveys, lithology, and assays. The final dataset consists of 36,417 meters of drilling from 138 drillholes, with 128 drilled by previous operators and 10 by Carlyle. Within the model footprint, there are 31,659 meters of drilling across 106 holes, including 9 drilled by Carlyle. The model area contains 10,481 gold (Au) samples over 29,896 meters of drilling and 9,942 silver (Ag) samples across 28,731 meters.
GEOLOGICAL DOMAIN INTERPRETATION
The deposit was updated from the previous interpretation using lithological logs from the additional holes in the drillhole database, a surface geological map, advanced 3D modeling software, and vertical section interpretations. While still primarily based on drilling data from the 2022 estimate, the new model has been refreshed with the addition of 10 new drillholes.
The structural model was developed using implicit modeling in Leapfrog Geo software, which defined fault-bounded blocks within the lithology model. Eight fault blocks were identified, but only three (FB1, FB4, and FB7) contained significant gold grades within large felsic volcanic units. These units were displaced by the west-dipping Newton Hill fault and laterally shifted by the Ruby fault.
Lithological solids were modeled in Leapfrog by assigning drillhole data specific codes to identify distinct intervals. Significant time was invested in refining the wireframe solids to align with interpreted lithological and tectonic boundaries. An improved topography digital terrain model based on publicly available digital elevation model (DEM) data from the Shuttle Radar Topography Mission (“SRTM”), and an overburden surface derived from drill logs were incorporated. The Felsic units hosted nearly all significant gold and silver mineralization. Syn- to post-mineralization dykes cross-cut the three felsic blocks. Three mineralized domains were defined within these felsic units using a grade shell approach aligned with the observed
Axcap Ventures Inc. – Newton Project
1-24
RockRidge Partnership & Associates
mineralization trend, applying a gold cut-off grade of 0.4 g/t. Three additional domains were constructed outside the 0.4 g/t grade areas, regardless of lithology.
Analysis of the geometry of lithological and mineralized units enabled three-dimensional palinspastic reconstruction of displacements along the Newton Hill and Ruby faults. Geostatistical analysis and block model interpolation were performed in pre-deformation space, with interpolated blocks subsequently transformed to their current faulted positions. This method assumes deformation occurred post-mineralization, and variography modeling in pre-deformed space better captures the original spatial uncertainties.
In the pre-deformation model, the three fault-block domains within the 0.4 g/t Au grade shells formed a single coherent volume, representing the mineralization's original position before faulting. Similarly, the three domains outside the grade shells in fault blocks 1, 4, and 7 also formed a single volume after reconstruction. For estimation purposes, these were coded as “IN” (within the grade shells) and “OUT” (outside the grade shells). This process resulted in two domains in un-faulted space, enabling gold and silver estimates before translating back to the current faulted spatial orientation.
Compared to the previous model, more lithological units were modeled, and the volume estimates of lithology solids were significantly improved. The palinspastic reconstruction approach enhanced the accuracy of the estimation process.
GRADE CAPPING
Cumulative coefficient of variation plots and log probability plots were used to select suitable capping values for gold and silver in each of the four domains. For the Au_IN domain, a capping value of 11.5 g/t Au was determined, while the Au_OUT domain was assigned a capping value of 3.11 g/t Au. Similarly, capping values of 41.1 g/t Ag and 16.2 g/t Ag were chosen for the Ag_IN and Ag_OUT domains, respectively.
COMPOSITING METHODS
The drillhole database was coded to correspond with the interpreted domains, ensuring that only data within the domain boundaries was composited to standardize sample support. An analysis of gold sample length distributions showed that a nominal core length of three meters was optimal
Axcap Ventures Inc. – Newton Project
1-25
RockRidge Partnership & Associates
for calculating composites. This length represented the predominant sample size and preserved the original resolution of the deposit data.
A target composite length of 3 meters was applied, allowing composite lengths to vary on a holeby-hole basis. This approach ensured that all data within a mineralized domain was utilized in the estimate, while eliminating very short composites without discarding data. The QP believes that the composite length is appropriate for the mineral resource estimation. .
BULK DENSITY
A total of 1,782 density measurements were available in the updated Newton database. Values that were recognizably erroneous were deleted from the data set. Specific gravities were estimated using an inverse distance squared estimator with an anisotropic search in a horizontal orientation. The search volume proportions were created such that a value could be estimated into each block of the project area. The QP believes that the verification of the bulk density measurements and application in the mineral resource is appropriate.
TREND ANALYSIS
An analysis of the general continuity of mineralization trends in three- dimensions was carried out before experimental variograms were modeled. Radial basis function (RBF) interpolation was used to generate volumetric fields of the irregularly spaced metal grade data. The RBF interpolant was created in Leapfrog software using gold grades without applying any trends. A 3-dimensional contour of gold grades at fixed grade intervals with 0.2 g/t intervals was selected.
Slices were taken through the RBF interpolant in east-west and north-south orientations as well as horizontally. Overall, the gold values are distributed as relatively large zones bordered by faults with grades of less than 1 g/t Au that enclose areas of slightly elevated gold grades. Although poorly defined, a major trend could be observed in all three planes with a general orientation that is roughly parallel to the Newton-Hill fault dipping at about 25 ⁰ with a long axis at a strike of roughly NNW-SSE. The QP believes that the trend analysis process is appropriate, and it has been used to define the grade continuity in the mineral resource estimations.
VARIOGRAPHY
Experimental semi-variograms were calculated and modeled for gold and silver in each reconstructed domain. One or two structure spherical models were fitted. All domains had enough
Axcap Ventures Inc. – Newton Project
1-26
RockRidge Partnership & Associates
samples to create stable experimental semi-variograms. Mild anisotropy was observed for the most part and therefore directional variogram models were considered applicable for this study. The nugget values were established from downhole variograms. The QP believes that the semivariograms reflect the observable ranges of spatial grade continuity and are appropriate for precious metals grade estimation in the deposit.
BLOCK MODEL CONSTRUCTION
An orthogonal block model was created within each domain wireframe to encompass the full extent of the Newton mineralization. The block model was not rotated, but a sub-blocking approach was utilized to accurately represent the volume of each domain. A block size of 15mX x 15mY x 3mZ was chosen to best reflect the data density, deposit shape, and composite length, while also minimizing the number of blocks lacking data support.
The metal grade estimation work involved a multi-step approach. For the “IN” domains the first step considered a search ellipsoid which was equal to the variogram range. This was doubled in size for the second step and tripled for the third step. A minimum of eight composites from two different drillholes were required to estimate a block in the first step. In the second step the requirement was six composites and in the third step four composites from two holes was required. The “OUT” domains were estimated with two passes using eight samples in the first pass and six samples in the second pass.
The selection of search radii was guided by variography-derived modeled ranges, enabling the estimation of a significant portion of blocks within the modeled area while minimizing extrapolation. These parameters were refined through iterative test estimates, with the results reviewed in a series of plan views and sections.
"Hard" domain boundaries were applied at the contacts of the un-faulted mineralized domains. Only data within a specific domain was utilized to estimate the grades of blocks within that domain, and grade estimates were restricted to blocks located within the domain boundaries. The QP believes that the block model and estimation search parameters are appropriate for grade estimation in this deposit.
Axcap Ventures Inc. – Newton Project
1-27
RockRidge Partnership & Associates
BLOCK MODEL VALIDATION
The resource block model was validated by completing a series of visual inspections of the interpolated block model grades compared to the drillhole composite grades, as well as swath plots.
On average, the estimated blocks correlate well to the assay data. An acceptable degree of conditional bias is evident from the validation. Generally, at lower composite grades, the estimates are slightly higher, whereas at higher composite grades, the estimates are marginally lower, which is to be expected from an ordinary kriged estimate for this deposit type. The QP believes that these validations are industry-standard and appropriate for this deposit.
CUT-OFF GRADE
Given the early stage of Newton Project, no recent studies have been undertaken that have contemplated potential operating scenarios. For the purposes of this assignment, a conceptual operating scenario was developed in which mineralized material would be excavated using a conventional truck and shovel open pit mine and the material then being processed using either a conventional flotation-leach or whole ore leach circuit. This conceptual scenario will likely change as more information becomes available for this deposit. The QP believes that a gold price of US$1,950/oz and a silver price of US$25/oz, and a gold recovery of 80.3% and a silver recovery of 32.7%, is appropriate for use in the estimation of a cut-off grade for this project. A review of similar bulk tonnage gold deposits in the region suggests that a 0.25 g/t Au is an appropriate threshold for use in preparation of a Mineral Resource estimate.
Axcap Ventures Inc. – Newton Project
1-28
RockRidge Partnership & Associates
2. INTRODUCTION
RockRidge was retained by Axcap Ventures Inc. (“Axcap”), to prepare this independent Technical Report on the Newton Project, located in south-central British Columbia, Canada on behalf of Axcap. The purpose of this Technical Report is to disclose the results of an updated Mineral Resource estimate for the gold-silver mineralization outlined by all drilling completed to date on the Newton Property. Gold-silver mineralization at Newton is associated with disseminated pyrite that is hosted primarily by a felsic volcanic sequence has been intruded by younger dykes of intermediate composition.
The mineral resource estimate update includes assay results from two drill campaigns completed on the Newton Project in 2023 and subsequent to the previous mineral resource estimate completed by RockRidge on behalf of Carlyle Commodities Corp. (“Carlyle”) in 2022. (O’Brien et al, 2022)
This Technical Report conforms to NI 43-101. Mr. Michael O’Brien, P.Geo., Associate Principal Consultant with RockRidge, visited the property on October 8, 2024. During the site visit, Mr. O’Brien reviewed mineralized intersections of core from drillholes completed since his previous site visit in 2020 and carried out a personal inspection of selected trenches and drillhole collars.
Qualified persons (“QPs” or “Authors”) for this Technical Report as defined in NI 43-101 and in compliance with Form 43-101F1 are:
-
Michael F. O’Brien, P.Geo., Associate Principal Consultant with RockRidge Partnership & Associates and an independent consultant and director of Red Pennant Communications Corp.
-
Kelly McLeod, P. Eng., President K-Met Consultants Inc.
-
Douglas Turnbull, P.Geo., geological consultant and President of Lakehead Geological Services Inc.
The information, conclusions, opinions, and estimates contained herein are based on:
-
Information available to RockRidge at the time of preparation of this Technical Report,
-
Assumptions, conditions, and qualifications as set forth in this Technical Report, and
Axcap Ventures Inc. – Newton Project
2-29
RockRidge Partnership & Associates
- Data, reports, and other information supplied by Axcap, Carlyle and other third-party sources, as applicable.
The source of information used by the QPs in preparation of this Technical Report include data provided by Carlyle to complete the 2022 mineral resource update on behalf of Carlyle, and data provided by Axcap including the current drillhole data base, previous technical reports as well as public domain information listed in detail Section 27. All measurement units used in this Technical Report are metric, and currency is expressed in Canadian dollars unless stated otherwise.
LIST OF ABBREVIATIONS
| a annum A ampere bbl barrels btu British thermal units °Cdegree Celsius C$ Canadian dollars cal calorie cfm cubic feet per minute cm cm2 centimetre square centimetre d dia day diameter dmt dry metric tonne dwt dead-weight ton °Fdegree Fahrenheit ft ft2 ft3 foot square foot cubic foot ft/s foot per second g gram G giga (billion) Gal Imperial gallon g/L gram per litre Gpm Imperial gallons per minute g/t gr/ft3 gr/m3 gram per tonne grain per cubic foot grain per cubic metre ha hectare hp horsepower hr hour Hz hertz in. in2 inch square inch J joule k kilo (thousand) |
kWh kilowatt-hour L litre lb pound L/s litres per second m metre M mega (million); molar m2 square metre m3 cubic metre µ MASL micron metres above sea level µg m3/h microgram cubic metres per hour mi mile min minute µm micrometre mm mph MVA millimetre miles per hour megavolt-amperes MW megawatt MWh megawatt-hour oz Troy ounce (31.1035g) oz/st, opt ounce per short ton ppb part per billion ppm part per million psia psig RL pound per square inch absolute pound per square inch gauge relative elevation s second st short ton stpa short ton per year stpd short ton per day t tpa metric tonne metric tonne per year tpd metric tonne per day US$ United States dollar |
|---|---|
| xcap Ventures Inc. – Newton Project |
Axcap Ventures Inc. – Newton Project
2-30
RockRidge Partnership & Associates
kcal kilocalorie USg United States gallon kg kilogram USgpm US gallon per minute km kilometre V volt km[2] square kilometre W watt km/h kilometre per hour wmt wet metric tonne kPa kilopascal wt% weight percent kVA kilovolt-amperes yd3 cubic yard kW kilowatt yr year
3. RELIANCE ON OTHER EXPERTS
For the purpose of this Technical Report, the Authors have reviewed and exclusively relied on transaction details and ownership information provided by Carlyle, Axcap and AxCap’s counsel McMillan LLP of Vancouver. The Authors have reviewed a copy of the Non-Binding Letter of Intent – Newton Project (“LOI”) signed and executed by Axcap and Carlyle, dated September 27, 2024, and provided to the Authors by Axcap’s VP of Exploration, Blake McLaughlin. The LOI is summarized under “Property Agreements” in Section 4, to which this disclaimer applies.
Axcap Ventures Inc. – Newton Project
3-31
RockRidge Partnership & Associates
4. PROPERTY DESCRIPTION AND LOCATION
Location
The Newton Property is located in west central British Columbia, in the Clinton Mining Division, on NTS map sheet 92O/13, and BCGS maps 092O.072, 073, 082 and 083. The Property is located approximately 108 km west-southwest of Williams Lake, British Columbia, at 51º 47.85’ N Latitude and 123º 37.26’ W Longitude: or UTM Zone 10 (NAD 83) at 5,738,700 m N and 457,175 m E, as shown in Figure 4-1 and Figure 4-2.
The Property is road-accessible via paved Highway 20 and all-weather forest service roads. Total driving time from Williams Lake to the Newton Property is approximately 2.5 hours. Access to the Newton Property is gained from the 7000 Road, west of Alexis Creek, British Columbia.
Land Tenure
The Newton Property consists of 62 claims comprising an area of approximately 23,003 ha (Figure 4-2). All claims are indirectly held by Carlyle through its wholly owned subsidiary Isaac Newton Mining Company (“INMC”). A complete list of the project claims, the expiration dates, and the area of each claim is contained in Table 4-1.
Table 4-1 - LIST OF CLAIMS
| Tenure No. | Claim Name | Date Recorded | Expiry Date | Area(ha) |
|---|---|---|---|---|
| 208327 | NEWTON I | 1987/Sep/14 | 2027/Apr/30 | 500.00 |
| 414743 | NWT 5 | 2004/Oct/07 | 2027/Apr/29 | 375.00 |
| 507905 | 2005/Feb/25 | 2027/Apr/28 | 699.86 | |
| 507914 | 2005/Feb/25 | 2027/Apr/27 | 399.65 | |
| 511965 | NWT 7 | 2005/May/02 | 2027/Apr/26 | 399.61 |
| 511967 | NWT 8 | 2005/May/02 | 2027/Apr/25 | 299.94 |
| 514976 | 2005/Jun/22 | 2027/Apr/24 | 559.68 | |
| 514979 | 2005/Jun/22 | 2027/Apr/23 | 499.92 | |
| 514981 | 2005/Jun/22 | 2027/Apr/22 | 379.78 | |
| 606674 | NEWT 19 | 2009/Jun/26 | 2027/Apr/21 | 499.90 |
| 606675 | NEWT 04 | 2009/Jun/26 | 2027/Apr/20 | 500.13 |
| 606676 | NEWT 20 | 2009/Jun/26 | 2027/Apr/10 | 499.90 |
| 606677 | NEWT 31 | 2009/Jun/26 | 2027/Apr/10 | 499.30 |
Axcap Ventures Inc. – Newton Project
4-32
RockRidge Partnership & Associates
| Tenure No. | Claim Name | Date Recorded | Expiry Date | Area(ha) |
|---|---|---|---|---|
| 606678 | NEWT 05 | 2009/Jun/26 | 2027/Apr/10 | 500.13 |
| 606679 | NEWT 21 | 2009/Jun/26 | 2027/Apr/10 | 299.94 |
| 606680 | NEWT 06 | 2009/Jun/26 | 2027/Apr/10 | 500.12 |
| 606681 | NEWT 32 | 2009/Jun/26 | 2027/Apr/10 | 499.35 |
| 606682 | NEWT 07 | 2009/Jun/26 | 2027/Apr/10 | 500.37 |
| 606683 | NEWT 33 | 2009/Jun/26 | 2027/Apr/10 | 499.35 |
| 606684 | NEWT 22 | 2009/Jun/26 | 2027/Apr/10 | 199.89 |
| 606685 | NEWT 36 | 2009/Jun/26 | 2027/Apr/10 | 499.12 |
| 606686 | NEWT 23 | 2009/Jun/26 | 2027/Apr/10 | 499.67 |
| 606687 | NEWT 08 | 2009/Jun/26 | 2027/Apr/10 | 500.37 |
| 606688 | NEWT 37 | 2009/Jun/26 | 2027/Apr/10 | 499.12 |
| 606689 | NEWT 09 | 2009/Jun/26 | 2027/Apr/10 | 500.37 |
| 606690 | NEWT 24 | 2009/Jun/26 | 2027/Apr/10 | 299.80 |
| 606691 | NEWT 38 | 2009/Jun/26 | 2027/Apr/10 | 499.07 |
| 606692 | NEWT 25 | 2009/Jun/26 | 2027/Apr/10 | 439.48 |
| 606693 | NEWT 18 | 2009/Jun/26 | 2027/Apr/10 | 480.53 |
| 606694 | NEWT 17 | 2009/Jun/26 | 2027/Apr/10 | 480.53 |
| 606695 | NEWT 34 | 2009/Jun/26 | 2027/Apr/10 | 459.56 |
| 606696 | NEWT 26 | 2009/Jun/26 | 2027/Apr/10 | 499.32 |
| 606697 | NEWT 03 | 2009/Jun/26 | 2027/Apr/10 | 500.13 |
| 606698 | NEWT 35 | 2009/Jun/26 | 2027/Apr/10 | 479.26 |
| 606699 | NEWT 02 | 2009/Jun/26 | 2027/Apr/10 | 500.13 |
| 606700 | NEWT 43 | 2009/Jun/26 | 2027/Apr/10 | 299.33 |
| 606701 | NEWT 10 | 2009/Jun/26 | 2027/Apr/5 | 500.37 |
| 606702 | NEWT 27 | 2009/Jun/26 | 2027/Apr/5 | 479.39 |
| 606703 | NEWT 11 | 2009/Jun/26 | 2027/Apr/5 | 500.37 |
| 606704 | NEWT 44 | 2009/Jun/26 | 2027/Apr/5 | 399.13 |
| 606705 | NEWT 16 | 2009/Jun/26 | 2027/Apr/5 | 480.54 |
| 606706 | NEWT 45 | 2009/Jun/26 | 2027/Apr/5 | 399.13 |
| 606707 | NEWT 28 | 2009/Jun/26 | 2027/Apr/5 | 419.30 |
| 606708 | NEWT 15 | 2009/Jun/26 | 2027/Apr/5 | 240.27 |
| 606709 | NEWT 46 | 2009/Jun/26 | 2027/Apr/5 | 479.00 |
| 606710 | NEWT 29 | 2009/Jun/26 | 2027/Apr/5 | 419.18 |
| 606711 | NEWT 14 | 2009/Jun/26 | 2027/Apr/5 | 300.34 |
| 606712 | NEWT 30 | 2009/Jun/26 | 2027/Apr/5 | 179.68 |
| 606713 | NEWT 13 | 2009/Jun/26 | 2027/Apr/5 | 400.32 |
| 606714 | NEWT 31 | 2009/Jun/26 | 2027/Apr/5 | 379.17 |
| 606715 | NEWT 12 | 2009/Jun/26 | 2027/Apr/5 | 120.06 |
| 606716 | NEWT 32 | 2009/Jun/26 | 2027/Apr/5 | 219.49 |
Axcap Ventures Inc. – Newton Project
4-33
RockRidge Partnership & Associates
| Tenure No. | Claim Name | Date Recorded | Expiry Date | Area(ha) |
|---|---|---|---|---|
| 606717 | NEWT 01 | 2009/Jun/26 | 2027/Apr/5 | 240.05 |
| 615743 | NEWT47 | 2009/Aug/07 | 2027/Apr/5 | 59.94 |
| 615803 | NEWT 48 | 2009/Aug/07 | 2027/Apr/5 | 20.00 |
| 615843 | NEWT 49 | 2009/Aug/07 | 2027/Apr/5 | 19.99 |
| 615863 | NEWT 50 | 2009/Aug/07 | 2027/Apr/5 | 39.96 |
| 616023 | NEWT 51 | 2009/Aug/07 | 2027/Apr/5 | 79.92 |
| 840950 | NEWS 450 | 2010/Dec/16 | 2027/Apr/5 | 19.98 |
| 840951 | NEWS 451 | 2010/Dec/16 | 2027/Apr/5 | 19.99 |
| 840952 | NEWS 452 | 2010/Dec/16 | 2027/Apr/5 | 19.97 |
| 840953 | NEWS 453 | 2010/Dec/16 | 2027/Apr/5 | 19.95 |
Axcap Ventures Inc. – Newton Project
4-34
RockRidge Partnership & Associates
==> picture [453 x 150] intentionally omitted <==
==> picture [453 x 150] intentionally omitted <==
==> picture [453 x 150] intentionally omitted <==
==> picture [453 x 150] intentionally omitted <==
Figure 4-1 - LOCATION MAP
Axcap Ventures Inc. – Newton Project
4-35
RockRidge Partnership & Associates
==> picture [449 x 150] intentionally omitted <==
==> picture [449 x 150] intentionally omitted <==
==> picture [449 x 150] intentionally omitted <==
==> picture [449 x 150] intentionally omitted <==
Figure 4-2 - CLAIM MAP
Axcap Ventures Inc. – Newton Project
4-36
RockRidge Partnership & Associates
Nature and Extent of Issuer’s Title
Carlyle holds a 100% interest in the mineral rights of the tenures listed above. To keep these claims in good standing in accordance with the Mineral Tenure Act (British Columbia), a minimum value of work or cash-in-lieu is required annually. These values are currently set at $5 per hectare in the first two years of holding the tenure, $10 per hectare in the third and fourth years, $15 per hectare for the fifth and sixth years, and $20 per hectare for subsequent years. Cash-in-lieu values are double the work values. The Newton claims are beyond the 6th year of their tenure and in good standing until 2027.
Carlyle does not, directly or indirectly, hold any surface rights. British Columbia mining law allows for access and use of the surface for exploration through notification of surface rights holders. There are several lots of private land on some of the claims, as shown in Figure 4-3. None of the claims are covered by placer mining claims.
The Project is situated within the asserted traditional territory of the Tsilhqot’in National Government.
Property Agreements
In September of 2024, Carlyle and Axcap announced that it entered into a non-binding letter of intent dated September 27, 2024 (the “LOI”) for the sale of Carlyle’s Newton Project. Pursuant to the LOI, Carlyle and Axcap agreed to negotiate the terms of a definitive agreement for the sale of Carlyle’s interest in the Newton Project (the “Newton Transaction”).
Pursuant to the LOI, Axcap will:
-
pay Carlyle a $100,000 cash fee following the signing of the LOI and a $150,000 cash fee upon the signing of a definitive agreement;
-
pay Carlyle a $250,000 cash fee upon Axcap closing an equity financing at a price of $0.20 per security for proceeds of not less than $4,000,000;
-
upon closing the Newton Transaction (i) issue to Carlyle 3,750,000 shares of Axcap and 500,000 warrants, each exercisable into one share at a price of $0.20 for a period of three years (subject to Canadian Securities Exchange (the “ Exchange ”) minimum pricing
Axcap Ventures Inc. – Newton Project
4-37
RockRidge Partnership & Associates
requirements); and (ii) in the event Axcap has not completed the above noted financing, pay Carlyle $125,000, with an additional $125,000 to be paid within 90 days of the closing of the Newton Transaction; and
- on the date that is 12 months following closing of the Newton Transaction, issue to Carlyle shares of Axcap with a value of $1,250,000 calculated on the 20-day volume weighted average trading price of the Axcap shares on the Exchange;
Axcap is at arm’s length from Carlyle. Completion of the Newton Transaction remains subject to a number of conditions, including: the satisfactory completion of due diligence on the Newton Project; the receipt of any required regulatory approvals, including the Exchange; and the negotiation of definitive documentation. As of the date of this report, the sale of the Newton Project has not been finalized.
The entire Project is subject to 2% NSR payable to Amarc and certain claims are subject to an additional 2.0% NSR in favour of two underlying owners which can be purchased at any time for $2,000,000.
Axcap Ventures Inc. – Newton Project
4-38
RockRidge Partnership & Associates
==> picture [449 x 149] intentionally omitted <==
==> picture [449 x 149] intentionally omitted <==
==> picture [449 x 149] intentionally omitted <==
==> picture [449 x 149] intentionally omitted <==
Figure 4-3 - LOCATION OF PRIVATE LAND
Axcap Ventures Inc. – Newton Project
4-39
RockRidge Partnership & Associates
Permits and Environmental Liabilities
Most of the Newton mineral claims are located on Crown land (see Figure 4-3 for location of private land parcels), and the area is open to mineral exploration and development. None of the mineral claims are covered by placer mining claims. The Project borders the northeast corner of Nuntsi Provincial Park, within the asserted traditional territory of the Tsilhqot’in National Government.
The project area is being actively logged and lies within an area of extensive beetle kill. The logging roads are extensive and in heavy use.
A permit under the Mines Act (British Columbia) (“Mines Act”) is required for exploration activities involving any work on a claim that disturbs the surface by any mechanical means including drilling, trenching, excavating, blasting, construction or demolishment of a camp or access, induced polarization surveys using exposed electrodes and site reclamation (e.g., drilling). The application and subsequent permit are called a “Notice of Work” (“NOW”).
A NOW for the Newton Mineral project was filed with the Chief Permitting Officer, submitted on Mar 16, 2021, and last updated on Nov 17, 2021. The application included a plan of the proposed work system (“Mine Plan”) and a program for the protection and reclamation of the surface of the land and watercourses (“Reclamation Program”), affected by the NOW.
The Mines Act, the Health, Safety and Reclamation Code for Mines in British Columbia, and this Mines Act Permit contain the requirements of the Chief Permitting Officer for the execution of the Mine Plan and Reclamation Program, including the deposit of reclamation securities. Nothing in this permit limits the authority of other government agencies to set additional requirements or to act independently under their respective authorizations and legislation.
On May 31, 2022, The British Columbia Ministry of Energy, Mines and Low Carbon Innovation issued Carlyle a Mines Act Permit (MX100000220) to carry out exploration on the Newton Property for a period of 5 years ending May 21, 2027.
The QP is not aware of any environmental liabilities related to the Property. There are no other significant factors or risks that the author is aware of that would affect access, title, or the ability to perform work on the Property.
Axcap Ventures Inc. – Newton Project
4-40
RockRidge Partnership & Associates
Other Factors
Axcap has reviewed and will be adopting the previous internal protocols and continuing the ongoing work with respect to archeological studies implemented originally by Amarc and adopted by Carlyle. During the time Amarc owned the Project, they conducted desk-based Archeological Oversight Assessments and Preliminary Field Reviews in conjunction with local First Nations and identified restricted areas of high archeological potential around the Newton Hill area.
Axcap Ventures Inc. – Newton Project
4-41
RockRidge Partnership & Associates
5. ACCESSIBILITY, CLIMATE, LOCAL RESOURCES, INFRASTRUCTURE AND PHYSIOGRAPHY
Accessibility
The Newton Property is readily accessible by vehicle from Highway 20 and all-weather forest service roads (see Figure 4-1). Distance by road from the City of Williams Lake (population 11,000), the major business and service centre that is closest to the property, is 180 km.
Total driving time from Williams Lake to the Newton Property is approximately 2.5 hours. Access to the property is gained from the 7000 Road, west of Alexis Creek.
Local Resources Infrastructure
The district is well served by existing transportation and power infrastructure and a skilled workforce, which support several operating mines, as well as late-stage mineral development and exploration projects.
Physiography
The Newton Property is situated in the Chilcotin Forest District of the Southern Interior Forest Region. The region has been extensively logged and lies within an area of extensive beetle kill. The drilled area of the Newton Property is open forest populated primarily by Douglas fir with minor lodge pole pine and rare aspen.
Topography is flat to gentle, varying from 1,200 m at Scum Lake to 1,375 m at the top of Newton Hill. The Taseko River cuts through the western side of the claim area, along a deeply incised valley with a relief of 350 m at Newton Hill.
Climate
Temperatures in Williams Lake can average 18ºC to 22ºC in summer and -10ºC to +2ºC in winter, with maximums up to 35ºC in summer and minimums down to -30ºC in winter. Annual rainfall and
Axcap Ventures Inc. – Newton Project
5-42
RockRidge Partnership & Associates
snowfall in 2024 averaged 17.2 cm and 100.7 cm, respectively (https://williamslake.weatherstats.ca/). The main exploration period is between mid-May and late October; however, year-round diamond drilling is possible, as water can be trucked from a local lake or river and a winterized camp can be established.
Sufficiency of Surface Rights for Mining
Carlyle does not currently hold any surface rights within the Property; however, the surface rights remain available should the project progress to more advanced stages. While the project is still at the exploration stage, the size and topography of the Newton Property in the vicinity of the mineralized zone is amenable to mine development.
Axcap Ventures Inc. – Newton Project
5-43
RockRidge Partnership & Associates
6. HISTORY
Prior Ownership
The earliest known work on the Newton Property occurred in 1916 when a Mr. Newton produced gold from a small shaft and some open cuts (Durfeld, 1994). No further work is reported until 1965. A detailed summary of the ownership changes since 2009 has been provided in Section 4 – Property Agreements of this Technical Report.
Exploration and Development History
The following summary of the exploration history of the Newton Property is taken from Hantelmann (2007) and has been amended herein. A summary of historical work is shown in Table 6-1.
Table 6-1 - EXPLORATION HISTORY
| Year(s) | Owner/Operator | Work Done | Assessment Reports |
|---|---|---|---|
| 1916 | Mr. Newton | Shaft and open cuts | Unknown |
| 1965 | Southwest Potash (Amex) |
Soils | Unknown |
| 1971/72 | Cyprus Exploration Corp. | Induced polarization, magnetometer, geology, 10 diamond drillholes (1,615 m) |
Unknown |
| 1981/82 | Taseko Mines Limited | 8 percussion drillholes (2,095 ft), 4 diamond drillholes (1,913 ft) |
11001 |
| 1987/88 | R. Durfeld, A. Schmidt | Resampled/assayed soils, rock, core | 18081 |
| 1990/94 | Rea Gold Corp. | Soils | 20585 |
| 1989/91 | Rea Gold Corp. and Verdstone Gold Corp |
Geology, soils, rocks, trenching (4,048 ft), ground magnetometer, induced polarization, 5 diamond holes |
22198, 23114, 23660 |
| 1996 | Verdstone Gold Corp. | Minor trenching (90 m) and surveying | 24724 |
| 1997 | Verdstone Gold Corp. | Minor infill soils | 25264 |
| 2004 | High Ridge Resources Inc. |
Revisited old, induced polarization data | 27497 |
| 2005 | High Ridge Resources Inc. |
Geology, ground magnetometer, soils orientation |
28011 |
| 2006 | High Ridge Resources Inc. |
12 diamond drillholes (2,019.5 m) | 29088 |
Axcap Ventures Inc. – Newton Project
6-44
RockRidge Partnership & Associates
| Year(s) | Owner/Operator | Work Done | Assessment Reports |
|---|---|---|---|
| 2009 | Amarc Resources Ltd. | Re-logged all 2006 holes, 75 spectrometer analyses |
31221 |
| 2009/10 | Amarc Resources Ltd. | 14 diamond drillholes (4,076.5m) | 31636 |
| 2010/11 | Amarc Resources Ltd. | 29 diamond drillholes (7,646.6m) | 32965 |
| 2011/12 2023 |
Amarc Resources Ltd. Isaac Newton Mining/Carlyle Commodities Corp. |
46 diamond drillholes (16,221.4m) 3 diamond drillholes (2016.1m) |
34056 41282 |
| 2023 | Isaac Newton Mining/Carlyle Commodities Corp. |
7 diamond drillholes (840.3m), Metallurgical testwork |
41789 |
In 1965, South-West Potash (Amex) and K. W. Livingstone are to have performed soil surveys in the Newton area, but results were not considered to be significant.
The first documented work at Newton Hill was by Cyprus which, in 1972, completed geological mapping, magnetometer, and IP geophysical surveys, followed by 1,615 m of BQ-sized diamond drilling. The IP survey delineated an elliptical chargeability anomaly encompassing a gossanous zone and identified an estimated 5% sulphide halo around Newton Hill. Results from the diamond drilling failed to identify ore grade copper mineralization. No analyses were made for gold.
Taseko Mines Limited (“Taseko”) acquired what were the Ski claims in 1981. Eight percussion holes were drilled, totaling 638.6 m (2,095 ft), and another 583.1 m (1,913 ft) in four diamond drillholes were completed in 1982. Selected samples were analyzed for copper, gold, and silver; however, the results were not considered significant at that time.
R. M. Durfeld and A. J. Schmidt acquired the rights to the Newton Hill claims in 1987. A soil geochemical survey, consisting of 82 samples, and re-assaying of selected core samples from the 1972 drilling program were completed in 1988.
In 1989, in conjunction with Rea Gold, additional soil sampling was undertaken. A total of 218 soil samples were collected and analyzed for copper, gold, silver, and arsenic.
From 1990 through 1992, Rea Gold (formerly Verdstone Gold Corp.) (“Verdstone Gold”) conducted geological mapping, soil sampling, trenching, and diamond drilling. In 1990, an 18.5 line-mile grid was constructed and a total of 1,153 soil samples were subsequently collected and
Axcap Ventures Inc. – Newton Project
6-45
RockRidge Partnership & Associates
analyzed for copper, gold, arsenic, mercury, and molybdenum. Twelve trenches, totaling 1,233.8 m (4,048 ft), were excavated and 606 rock samples were collected and analyzed.
In 1996, Verdstone Gold completed 90 m of trenching using Global Positioning System surveying. The trenches identified anomalous copper and gold values. In 1997, Verdstone Gold conducted minor soil sampling to infill gaps and to look for extensions to the previously identified copper geochemical anomalies.
High Ridge began working on the property in 2004. Part of their work involved re-assessing the 1972 IP geophysical data. In 2005, High Ridge conducted a geological investigation and a total field ground magnetic survey. In 2006, 12 diamond drillholes were completed for a total of 2,019.5 m.
Amarc acquired the Newton Property in 2009 and completed several exploration campaigns between 2009 and 2012. Exploration work completed by Amarc included airborne and groundbased geophysical surveys, soil sampling mineralogical analysis, and hyperspectral logging. Table 6-2 summarizes all the exploration apart from drilling undertaken by Amarc at the Newton Project. The areas of the original Newton Property covered by the several types of exploration are shown in Figure 6-1.
Table 6-2 - WORK COMPLETED BY AMARC
| Year | Work | Methods | Results |
|---|---|---|---|
| 2010 | ZTEM survey | 7,114.3 line-km, with lines spaced 200 m apart. Flown by helicopter at a mean height of 155 m above the ground. |
Several targets identified for IP surveys and soil sampling. |
| 2010 | Soil sampling | 13,572 samples collected on 19 grids with sample spacing of 50 m. |
Three copper- and molybdenum-in-soil anomalies identified for follow-up work. |
| 2010 | Induced polarization survey |
248.9 line-km on 13 grids, with line spacing varying from 200 m to 700 m, depending on the grid. |
Three chargeability anomalies coincident with the soil anomalies identified for follow-up drilling; including chargeability anomaly at Newton. |
Axcap Ventures Inc. – Newton Project
6-46
RockRidge Partnership & Associates
| Year | Work | Methods | Results |
|---|---|---|---|
| 2011 | QEMSCAN | Analysis of 19 samples to characterize mineral assemblages of two visually distinct alteration types and to establish characteristics of gold mineralization. |
Discovered two mineralogically-distinct alteration types and sulphide assemblages associated with gold. |
| 2011 | Induced polarization survey |
188.9 line-km on 5 grids, with line spacing varying from 500 m to 1,000 m, depending on the grid. |
One chargeability anomaly identified for follow-up drilling. |
| 2011 | Magnetic Survey | 25 line-km at 50-m line spacing. |
Total field magnetic low. |
| 2012 | Induced polarization survey |
96.5 line-km completed on three grids. |
Completed. |
| 2012 | Hyperspectral logging | Visible light spectral analysis of core. |
Completed. |
Axcap Ventures Inc. – Newton Project
6-47
RockRidge Partnership & Associates
==> picture [449 x 149] intentionally omitted <==
==> picture [449 x 149] intentionally omitted <==
==> picture [449 x 149] intentionally omitted <==
==> picture [449 x 150] intentionally omitted <==
Figure 6-1 - EXPLORATION PROGRAMS
Axcap Ventures Inc. – Newton Project
6-48
RockRidge Partnership & Associates
2010 INDUCED POLARIZATION SURVEY
Figure 6-2 illustrates the plus seven square kilometre extent of the hydrothermal sulphide system at Newton as indicated by the 8 MV/V contour of the chargeability anomaly defined by the 2010 IP geophysical survey. The results of the survey indicate that the current Newton resource occupies only a small portion of the anomaly in the southeast sector of this significant hydrothermal system which remains to be fully explored.
The results were derived from an 85 line-km survey carried out by contractor Peter E. Walcott & Associates. Survey lines were spaced at 200 m intervals within the zone of hydrothermal alteration and peripheral lines at 400 m. The survey was conducted using a pulse type system, using the “pole-dipole” method. The principal components of the system were manufactured by Walcer Geophysics of Enniskillen, Ontario, and Instrumentation GDD of St. Foy, Québec.
2012 MAGNETIC SURVEY
Figure 6-3 presents a map that shows the Total Field Magnetics and the location of drillhole collars in the Newton deposit-area. The results show that the Newton gold deposit lies within a northwest trending total field magnetic low that extends approximately 500 m to the northwest beyond the deposit, as defined by the higher density of drillholes, into an area that contains only a few, widely spaced reconnaissance drillholes.
These results were derived from a detailed ground magnetic survey carried out in late spring of 2012 by contractor by Peter E. Walcott & Associates. The survey employed three GSM19W GPS enabled magnetometers manufactured by Gem Systems Inc. of Markham, Ontario – two rovers and one base station. The survey grid was established using real time differential GPS guidance using a series of predefined waypoints uploaded to the respective magnetometers. The survey maintained a nominal line spacing of some 50 m, using a one second sampling interval over 21 north-south orientated lines. A total of some 22 line - kilometres in the Newton deposit area were traversed. Data were subsequently downloaded daily from the respective units, base station corrected, and loaded into Oasis Montaj for subsequent processing, filtering, and final presentation.
Axcap Ventures Inc. – Newton Project
6-49
RockRidge Partnership & Associates
==> picture [553 x 105] intentionally omitted <==
==> picture [553 x 105] intentionally omitted <==
==> picture [553 x 105] intentionally omitted <==
==> picture [553 x 106] intentionally omitted <==
Figure 6-2 - DRILLHOLE LOCATIONS AND IP CHARGEABILITY CONTOURS
Axcap Ventures Inc. – Newton Project
6-50
RockRidge Partnership & Associates
==> picture [553 x 106] intentionally omitted <==
==> picture [553 x 106] intentionally omitted <==
==> picture [553 x 105] intentionally omitted <==
==> picture [553 x 105] intentionally omitted <==
Figure 6-3 - DRILLHOLE LOCATIONS AND TOTAL FIELD INTENSITY
Axcap Ventures Inc. – Newton Project
6-51
RockRidge Partnership & Associates
In 2009, Amarc re-logged core from 12 drillholes completed in 2006 by High Ridge. Seventy- five selected core samples were analyzed with shortwave infrared spectroscopy using a TerraSpec spectrometer.
Diamond drilling programs completed by Amarc included a 14-hole diamond drill program in 20092010 totaling 4,076.5 m of core to investigate the southeastern continuation of gold and copper mineralization encountered by drilling completed in 2006 by High Ridge; a wide-spaced, 29-hole diamond drill program in 2010-2011 totaling 7,646.6 m to investigate the extent of the gold-silver mineralization encountered by previous drilling programs across an area of seven square kilometres as well as to follow up a chargeability anomaly in the area of the Newton discovery; and a 46-hole delineation diamond drill program totaling 16,221.4 m completed in 2011-2012 to determine the grade and extent of the main gold-silver zone. At the end of the 2012 drill program, Amarc engaged RPA to complete a maiden mineral resource estimate and prepare a technical report.
2023 DRILLING AND METALLURGICAL TESTWORK
In December 2020, Carlyle acquired the Newton Property and carried out a mineral resource estimate update in 2022, preliminary metallurgical testwork in 2023 and completed 10 diamond drillholes in two phases totaling 2856.3 metres in 2023. The objective of the 2023 drill program was to;
-
Upgrade the resource classification by utilizing infill drilling
-
Increase the currently delineated gold-silver resource on the property by improving grade definition
In early 2023, Carlyle carried out a Phase 1, three-hole drilling program totaling 2016.09 m. In December of 2023 Carlyle carried out a Phase 2, seven-hole drill program totaling 840.3m. The program was successful in extending the known mineralization associated with the main felsic domain.
The Company submitted a master composite consisting of primarily felsic volcanic material of continuous drill core intervals from the Phase 1 drill program for testing, Testing was carried out and supervised by Base Metallurgical Laboratories (BaseMet), Kamloops, B.C. under test program BL1338. The objective of the program was to conceptualize a preliminary process
Axcap Ventures Inc. – Newton Project
6-52
RockRidge Partnership & Associates
flowsheet that would produce gold and silver doré, and to evaluate the metallurgical performance of the mineralization. The testwork included gravity concentration, Whole-ore-leach (WOL) and flotation at various grind sizes followed by leach of the rougher concentrate and tailings. (Dube, 2024)
Over the course of the 2023 exploration program, Carlyle confirmed:
-
A new, near surface, higher grade gold and silver bearing zone to the north of the current inferred mineral resource, referred to as Halo area (“Halo”).
-
Gold and silver mineralization in another farther north-western area, referred to as the Sunrise Area (“Sunrise”)
-
Encouraging preliminary gold and silver extractions from metallurgical testing of material from the Newton project
Historical Mineral Resource Estimates
The QP considers the 2012 and 2022 mineral resource estimates summarized below to be historical in nature and they are superseded by the MRE presented in this report.
In 2022 RockRidge Partnership and Associates (“RockRidge”) completed a mineral resource estimate update (“2022 MRE”) of the Newton Deposit on behalf of Carlyle (O’Brien et al, 2022). At a cut-off grade of 0.25 g/t Au, a historic inferred mineral resource totalling 42,396,600 tonnes at an average grade of 0.63 g/t gold and 3.43 g/t silver was estimated. The historic 2022 MRE was based on the drillhole database compiled by Amarc in 2012 but supplemented with additional grade information from four drillholes assayed after completion of the maiden (historic) estimate completed by RPA in 2012. The historic 2022 MRE inferred estimate was prepared using a grade block model with 10,819 Au assay records and 10,165 Ag records from 130 drillholes. This 2022 historical estimate was based on the data available at the time and is included here for historic completeness only.
In 2012, RPA on behalf of Amarc completed a historic mineral resource estimate of the Newton Deposit (“2012 MRE”). At a cut-off grade of 0.25 g/t Au, RPA estimated a total of 111,460,000 tonnes at an average grade of 0.44 g/t Au and 2.1 g/t Ag (Pressacco, 2012). This historical 2012
Axcap Ventures Inc. – Newton Project
6-53
RockRidge Partnership & Associates
estimate is included here for historic completeness. The historical inferred estimate was prepared using a grade block model with 128 drillholes and 10,945 assays.
Prior to the 2012 MRE, no historical mineral resource or mineral reserve estimates were prepared for the Newton property.
Other than the historical small-scale production reported for 1916, there is no record of mining production on the Newton Property.
Axcap Ventures Inc. – Newton Project
6-54
RockRidge Partnership & Associates
7. GEOLOGICAL SETTING AND MINERALIZATION
Regional Geology
The Nechako-Chilcotin region is underlain by Mesozoic Island arc assemblages of the Stikina Terrane and is bordered to the west and east by the major Yalakom and Fraser faults, respectively. These bounding structures represent major regional tectonic events of the North American Cordillera. Post-accretionary (Stikina) Cretaceous to Early Eocene crustal-scale extension resulted in northwest-trending extensional faults with a dextral component, including the Yalakom fault and contemporaneous northeast-trending strike-slip faults. This crustal-scale extensional event was accompanied by Late Cretaceous and Eocene volcanism. To the east, the Nechako-Chilcotin region is bounded by the north- trending Fraser fault which has both normal and dextral movement components; displacement began during northwest-oriented extension in the Early Eocene to Early Oligocene (Figure 7-1).
A British Columbia Geological Survey regional geology compilation (Riddell, 2006;Figure 7-2) shows that rocks on the Newton Property include Mesozoic intrusive, volcanic, and sedimentary rocks of the Spences Bridge Group overlain by Cenozoic volcanic rocks and unconsolidated glacial till. More recently, Bordet et al. (2011) suggest that Mid- to Late-Cretaceous calc-alkaline volcanism characterized by felsic pyroclastic units of the Kasalka Group and mafic to felsic flows and welded and non-welded ignimbrites of the Spences Bridge and Kingsvale Groups are contemporaneous and represent a chain of stratovolcanoes associated with subsiding, faultbounded basins.
Axcap Ventures Inc. – Newton Project
7-55
RockRidge Partnership & Associates
==> picture [459 x 150] intentionally omitted <==
==> picture [459 x 151] intentionally omitted <==
==> picture [459 x 150] intentionally omitted <==
==> picture [459 x 151] intentionally omitted <==
==> picture [163 x 10] intentionally omitted <==
----- Start of picture text -----
Figure 7-1 - REGIONAL GEOLOGY
----- End of picture text -----
Axcap Ventures Inc. – Newton Project
7-56
RockRidge Partnership & Associates
==> picture [450 x 149] intentionally omitted <==
==> picture [450 x 150] intentionally omitted <==
==> picture [450 x 149] intentionally omitted <==
==> picture [450 x 149] intentionally omitted <==
Figure 7-2 - PROPERTY GEOLOGY
Axcap Ventures Inc. – Newton Project
7-57
RockRidge Partnership & Associates
==> picture [454 x 150] intentionally omitted <==
==> picture [454 x 151] intentionally omitted <==
==> picture [454 x 151] intentionally omitted <==
==> picture [454 x 151] intentionally omitted <==
Figure 7-3 - GEOLOGY LEGEND
Axcap Ventures Inc. – Newton Project
7-58
RockRidge Partnership & Associates
Cretaceous rock types in the region can be subdivided into three major groups (after Riddell, 2006):
-
Early to Late Cretaceous Spences Bridge Group. This group includes andesite and dacite flows, breccia, and tuff; volcano-sedimentary rocks, and minor basalts and rhyolites.
-
Jurassic-Cretaceous intrusions. These comprise granodiorite, diorite, quartz diorite, quartz monzonite, and tonalite intrusions.
-
Cretaceous feldspar porphyry. These rocks are dominated by feldspar ± biotite porphyry, felsite, and hornblende-biotite-feldspar porphyry intrusions.
Cenozoic rocks are primarily Miocene to Pleistocene basalts assigned to the Chilcotin Group. Quaternary cover consists of unconsolidated glacial till and glaciofluvial deposits.
Outcropping rock types at Newton Hill comprise volcanic and sedimentary rocks of the Early to Late Cretaceous Spences Bridge Group which may, in the vicinity of the Newton deposit, include rock types correlative with the Late Cretaceous Kasalka Group, and Late Cretaceous feldspar porphyry intrusions. Intrusions of the Jurassic to Cretaceous suite are well-exposed along the Taseko River valley to the west and northwest of Newton Hill.
Local Geology
DEPOSIT GEOLOGY
Stratified rocks at Newton Hill (Figure 7-4, Figure 7-5 and Figure 7-6) have been assigned provisionally to the Cretaceous Spences Bridge Group, bearing in mind the uncertainties in regional correlation noted above, and consist of mafic volcanic rocks, sedimentary rocks derived from mafic to intermediate volcanic protoliths, rhyolite flows, and felsic volcaniclastic rocks. These rock types are believed to have been deposited in a graben. The sequence is dominated by felsic volcanic and volcano-sedimentary rocks that unconformably overlie epiclastic sedimentary rocks (Figure 7-5 and Figure 7-6). The epiclastic rocks consist of pebble conglomerates that are interbedded with sandstone and siltstone, similar to Cretaceous Churn Creek conglomerates that have been correlated with both the Silverquick-Powell Creek Formation (Riesterer et al.,2001) and the Spences Bridge Group (Riddell, 2006).
Axcap Ventures Inc. – Newton Project
7-59
RockRidge Partnership & Associates
==> picture [553 x 105] intentionally omitted <==
==> picture [553 x 105] intentionally omitted <==
==> picture [553 x 105] intentionally omitted <==
==> picture [553 x 105] intentionally omitted <==
Figure 7-4 - SURFACE GEOLOGY
Axcap Ventures Inc. – Newton Project
7-60
RockRidge Partnership & Associates
==> picture [459 x 120] intentionally omitted <==
==> picture [459 x 120] intentionally omitted <==
==> picture [459 x 120] intentionally omitted <==
==> picture [459 x 120] intentionally omitted <==
==> picture [459 x 120] intentionally omitted <==
Figure 7-5 - CROSS SECTION A - B
Axcap Ventures Inc. – Newton Project
7-61
RockRidge Partnership & Associates
==> picture [465 x 121] intentionally omitted <==
==> picture [465 x 121] intentionally omitted <==
==> picture [465 x 120] intentionally omitted <==
==> picture [465 x 121] intentionally omitted <==
==> picture [465 x 120] intentionally omitted <==
Figure 7-6 - SECTION C - D
Axcap Ventures Inc. – Newton Project
7-62
RockRidge Partnership & Associates
The volcano-sedimentary sequence at Newton Hill is cut by several types of intrusions (Figure 7-4). The oldest are sub-volcanic felsic quartz-feldspar porphyries that have a quartz monzonite composition and are interpreted to be related to the felsic volcanic rocks in the Spences Bridge Group. Minor mafic dykes present in the area are likely related to mafic volcanic rocks in the Spences Bridge Group. The early intrusions are cut by a complex of Cretaceous monzonite intrusions which broadly strike about azimuth 030[o] and dip steeply to the northwest. These monzonites are intruded in turn by porphyritic plagioclase-hornblende diorites. The youngest intrusions observed are minor plagioclase- and biotite-phyric dykes which are believed to have formed after hydrothermal activity had ceased.
SPENCES BRIDGE GROUP
Within the Newton deposit, the Spences Bridge Group comprises epiclastic wackes, felsic tuffs and flows, and mafic flows.
Epiclastic Rocks
This is stratigraphically the oldest rock type and occurs mostly to the northeast, east, and south of Newton Hill (Figure 7-3) and at depth on the east side of the deposit (Figure 7-4). It is unconformably overlain by the felsic and mafic volcanic rock sequences (Figure 7-5 and Figure 7-6); fragments of epiclastic rocks are locally found at the base of the felsic volcanic section near its contact with the underlying epiclastic rock package. The epiclastic rocks range from green to beige in colour and comprise interbedded pebble conglomerate, sandstone, and siltstone. The conglomerate beds are poorly sorted and immature, with 5% to 60% sub- angular to rounded clasts (Figure 7-7 a) supported in a matrix of fine-grained sand. The fragments comprise mafic volcanic and sedimentary rocks, felsic volcanic rocks and intrusions and chert, all of which are from an undetermined provenance. The sandstone and siltstone interbeds are less abundant and commonly display normal-facing, upward-fining graded bedding.
Felsic Volcanic Rocks
The felsic volcanic rocks found at the Newton Project are mostly pyroclastic deposits which range from ash tuffs to tuff breccias (Figure 7-7 b & c). These units form several thick beds (Figure 7-5 and Figure 7-6) that represent multiple depositional cycles of ash fall and poorly welded ignimbrite deposits. Felsic volcanic rocks have been found to occur both above and below the Newton Hill fault (Figure 7-5; see descriptions below); those below the fault strike approximately 300 ⁰ to 320 ⁰
Axcap Ventures Inc. – Newton Project
7-63
RockRidge Partnership & Associates
and dip 65 ⁰ to 70 ⁰ to the southwest. These units have been dated at 72.09 ± 0.63 Ma (Cretaceous) by U-Pb methods on zircon (Oliver, 2010).
The felsic tuffs are light grey, aphanitic to very fine grained and consist predominantly of devitrified glass shards and feldspar microliths. The ash tuffs locally contain up to 3% rounded quartz crystals. Although some ash tuffs are massive, most are characterized by convoluted laminations and flow-bands (Figure 7-7 c) and are commonly auto-brecciated (Figure 7-7 c). Overall, the tuffs are poorly welded, although limited intervals exhibit stronger welding textures.
Interbedded units within the tuffs contain centimetre-scale angular and sub-angular lithic fragments which consist mostly of felsic intrusive rocks and hematitic fragments of uncertain provenance in a tuff matrix. Minor, immature, clast-supported conglomerate interbeds are interpreted to be locally derived from the thicker beds of felsic tuff.
Felsic flows also occur within the felsic volcaniclastic sequence. The flows are rhyolite to rhyodacite in composition, grey to white in colour, commonly glassy, flow-banded, autobrecciated, and competent. The flows are locally porphyritic with up to 10% combined quartz and plagioclase grains one millimetre to three millimetres in size. The grey to white colour variation is likely a consequence of small differences in composition, degree of devitrification and later alteration. Felsic flows typically contain orbicular, millimetre- to centimetre-scale, pale creamcoloured devitrification features such as spherulites and lithophysae.
Axcap Ventures Inc. – Newton Project
7-64
RockRidge Partnership & Associates
==> picture [468 x 591] intentionally omitted <==
Figure 7-7 - EXAMPLES OF ROCKS FOUND IN THE NEWTON DEPOSIT
Axcap Ventures Inc. – Newton Project
7-65
RockRidge Partnership & Associates
Mafic Flows, Volcaniclastic Sediments, and Mafic Volcanic Derived Sediments
Mafic flows are basaltic or andesitic in composition, dark green and massive in texture (Figure 7-7 d). They are predominantly aphanitic in grain size but, locally, may contain 2% to 3% (chloritized) pyroxene phenocrysts from two millimetres to four millimetres in size and up to 10% plagioclase phenocrysts between one to three millimetres in size. Flow fabrics and autobrecciation textures are rare. The mafic flows are mostly found in the hanging wall to the Newton Hill fault (Figure 7-5 and Figure 7-6).
Sedimentary strata derived from a mafic source commonly form narrow interbeds within mafic flow sequences. They are most commonly encountered to the north and northeast of Newton Hill. The sedimentary rocks are green to black, very thinly bedded, non-graded and range from mudstone to sandstone; in rare cases, they contain black, lapilli-sized fragments of mafic volcanic rock. These sedimentary intervals are characterized by alternating beds of non-magnetic, green siltstone/sandstone and magnetic black mudstone.
Other rock types with a mafic composition include hematitic andesite tuffs, coarse mafic volcaniclastic rocks, and mafic epiclastic sedimentary rocks that contain millimetre- to centimetrescale fragments of mafic volcanic rocks in a fine-grained chloritic matrix. These rock types are volumetrically very minor in the Newton Hill area.
CRETACEOUS INTRUSIONS
Quartz-Feldspar Porphyry
These intrusions are quartz monzonite in composition. They contain 5% to 10% rounded, commonly myrmekitic quartz phenocrysts one millimetre to three millimetres in size set in a white to cream coloured aphanitic and quenched groundmass (Figure 7-7 e). Feldspar phenocrysts that are less than one millimetre to two millimetres in size form under 5% to 15% of the intrusions. Locally, up to 3% biotite phenocrysts approximately one millimetre in size is preserved. Oliver (2010) reports that both the quartz-feldspar porphyry intrusions and the felsic volcanic rocks have high-K, calc-alkaline, rhyolite to rhyodacite compositions and lie within the field of volcanic arc granites on tectonic discrimination plots. As such, the volcanic and intrusive rocks are interpreted to be broadly cogenetic on a regional scale. This is consistent with a single U-Pb date of 70.91 ± 0.49 Ma on zircon from a quartz-feldspar porphyry intrusion (Oliver, 2010) which overlaps, within error, the date reported above for the felsic volcanic sequence.
Axcap Ventures Inc. – Newton Project
7-66
RockRidge Partnership & Associates
Mafic Dykes
Volumetrically very minor, mafic dykes of basaltic to andesitic composition locally intrude other rock types at Newton Hill. The dykes are fine-grained and mostly equi-granular, although a few examples contain 5% to 25% plagioclase phenocrysts, ranging from two millimetres to four millimetres in size and up to 10% hornblende and biotite phenocrysts between one millimetre and three millimetres in size. The mafic dykes are interpreted to be related to the mafic volcanic component of the Spences Bridge Group.
Monzonite Porphyry
The most common intrusive rock type at Newton is green to grey, fine- to medium-grained monzonite porphyry dyke (Figure 7-7 f). These intrusions are characterized by 10% to 30% plagioclase phenocrysts of between one millimetre and eight millimetres in size, accompanied locally by up to 5% biotite ± hornblende phenocrysts that are up to three millimetres in size. The groundmass is fine-grained, felted, and composed of tightly interlocking feldspar (± mafic) grains. These intrusions typically lack free quartz, although in a few cases up to 2% quartz phenocrysts from one millimetre to three millimetres in size are present. In a few cases, these intrusions contain abundant xenoliths of adjacent host rocks.
Diorite
Diorite intrusions (Figure 7-7 g) are medium-grained, magnetic, and commonly exhibit flow foliation. They are variably altered and their colour ranges from brown, where biotite-altered, to pale green, where altered to chlorite. This rock type contains 20% to 30% plagioclase phenocrysts from one millimetre to four millimetres in size, up to 20% mafic (hornblende >> biotite > pyroxene) phenocrysts and trace magnetite phenocrysts from one millimetre to two millimetres in size. Locally, the host rocks to the diorite intrusions may be converted to hornfels.
Felsic Plagioclase and Biotite Porphyritic Dykes
Plagioclase and/or biotite phyric dykes cut the felsic volcano-sedimentary sequence, the quartzfeldspar porphyry intrusions, and the monzonite porphyry intrusions. These dykes mainly strike to the southwest and have steep dips (Figure 7-4). They are characterized by 25% to 35% plagioclase phenocrysts from one millimetre to two millimetres in size, up to 8% biotite phenocrysts between one millimetre to two millimetres in size, and up to 2% millimetre-scale
Axcap Ventures Inc. – Newton Project
7-67
RockRidge Partnership & Associates
quartz phenocrysts in an aphanitic groundmass. They are volumetrically minor and were emplaced very late to post hydrothermal activity.
STRUCTURE
The Newton deposit is believed to have been hosted within a structurally active volcanic environment. Felsic and mafic volcanic rocks were deposited in a rifted volcanic graben which was segmented along steeply dipping extensional faults. The SGF and the NHF can be correlated across much of the area of drilling within the Newton deposit (Figure 7-5 and Figure 7-6).
The SGF is located to the south of Newton Hill. It has an easterly strike and is approximately vertical with dips between 85 ⁰ to the south and 85 ⁰ to the north. It is locally segmented and cut by younger faults. Displacement across the SGF is north-side-down and believed to be a minimum of 600 m. An unconstrained component of dextral strike-slip movement may also be present (Oliver, 2012).
The NHF is a gently west-dipping normal fault which may have listric attributes. Near the surface, this fault strikes approximately 027 ⁰ and dips 31 ⁰ to 35 ⁰ to the northwest, whereas at depth the fault rotates to a strike of approximately 060 ⁰ and the dip decreases to about 24 ⁰ . The NHF is between five metres and 30 m in width; it comprises an intensely sheared core, marked by massive clay gouge and black, pyritic seams, flanked by a brecciated rock mass that less commonly exhibits shear fabrics. Absolute normal displacement is estimated to be 300 m to 350 m with no strike-slip component. Cross-cutting relationships indicate that the NHF is younger than the SGF. The low angle of dip on the NHF has been attributed to post- fault rotation (Oliver, 2012).
Narrow fault zones are common, particularly in the hanging wall to the NHF in the central part of Newton Hill (Figure 7-4). These faults generally strike north-northwest and dip 60 ⁰ to 85 ⁰ to the west-southwest. They are characterized by one centimetre to tens of centimetres thickness of clay gouge and/or fault breccia and are also commonly associated with quartz- carbonate ± gypsum extension veins. Individual fault planes cannot be confidently correlated between drillholes.
Axcap Ventures Inc. – Newton Project
7-68
RockRidge Partnership & Associates
ALTERATION
Based on observations of drill core from the 2023 drill program, Carlyle considered three of these types of alteration, quartz-sericite, argillic and propylitic to be dominant (Dube 2024).
Quartz-Sericite Alteration
Quartz-sericite alteration (Figure 7-8 a) occurs predominantly in the felsic volcaniclastic and pyroclastic units located in both the hanging and footwall of the NHF. The alteration comprises pervasive quartz and sericite. It may be weakly to intensely developed and is characterized by a white to light green colour. Quartz-sericite alteration is more weakly developed in quartz-feldspar porphyry and monzonite porphyry intrusions. Quartz-sericite alteration is associated with the presence of most of the gold and base metals in the Newton deposit.
Quartz-sericite alteration comprises two pervasive alteration assemblages and occurs in association with late polymetallic base metal veinlets:
-
The oldest sub-stage of quartz-sericite alteration comprises a pervasive assemblage of quartz, sericite, minor siderite, and several percent pyrite. This alteration is seen to be associated with a significant amount of the gold and, to a lesser degree, base metal mineralization to a much lesser degree. In addition, pervasive alteration quartz- sericitepyrite alteration envelopes are noted in association with quartz-sericite-pyrite ± molybdenite veinlets; however, these veinlets and associated alteration envelopes typically form less than 1% of the affected rock mass.
-
In the subsequent sub-stage of quartz-sericite ± siderite alteration, the early pyrite is partially to completely replaced by marcasite. Inclusions of both early pyrite and trace early chalcopyrite are commonly seen to be enclosed within the younger marcasite. This alteration also appears to be associated, at least spatially, with precipitation of gold but is distinguished by a markedly higher concentration of base metals, which include elevated concentrations of zinc and copper above and below the Newton Hill fault, respectively. It is not clear whether additional quartz veinlets with associated alteration envelopes formed during this stage of alteration or if this alteration phase is entirely typified by pervasive alteration.
Axcap Ventures Inc. – Newton Project
7-69
RockRidge Partnership & Associates
Textural evidence suggests that late polymetallic veinlets (Figure 7-8 c) cut the early pyrite- and marcasite-dominated sub-types of quartz-sericite alteration. These veinlets are typically less than one centimetre in width and contain various combinations of pyrite, chalcopyrite, sphalerite, galena, arsenopyrite and, locally, molybdenite. The extent to which these veins may be associated with the introduction of gold to the deposit is not known.
Argillic Alteration
Argillic alteration, which replaces quartz-sericite alteration, is most commonly encountered in the monzonite porphyry and quartz-feldspar porphyry intrusions. Argillic alteration comprises kaolinite, sericite, calcite and/or iron-bearing carbonates, minor chlorite and up to approximately 5% pyrite. Kaolinite is commonly more abundant than sericite. This alteration is characterized by strong selective to pervasive alteration of feldspar phenocrysts by kaolinite-sericite, chlorite alteration of hornblende and biotite phenocrysts, and a less intense replacement of the igneous groundmass. Monzonite porphyry and quartz-feldspar porphyry intrusions affected by argillic alteration locally have a spotted appearance defined by orbicular aggregates of green to blue clays belonging to the kaolinite ± smectite group (Figure 7-8 d; McClenaghan, 2010). Similar green and blue clay alteration is rare in the felsic volcanic sequence. The clay aggregates are interpreted to be altered mafic phenocrysts or mafic fragments.
Propylitic Alteration
Propylitic alteration mainly affects the mafic flows and mafic sedimentary rocks and is approximately contemporaneous with early quartz-sericite alteration. This alteration assemblage consists of pervasive green chlorite variably accompanied by patchy epidote, albite, calcite ± ankerite and minor quartz. The quartz and carbonate minerals most commonly occur in veinlets. Locally, magnetite grains one millimetre to two millimetres in size are intergrown with or replace epidote, particularly in the alteration envelopes to veinlets filled predominantly by quartz-ironcarbonate minerals.
Potassium-silicate alteration
Potassium-silicate alteration is the least common assemblage observed at Newton and replaces other alteration types. It is characterized by fine-grained, brown hydrothermal biotite ± magnetite (Figure 7-8 e). It occurs mostly within the chilled margins of monzonite porphyry and diorite intrusions in contact with quartz feldspar porphyry intrusions, mafic flows, and/or mafic
Axcap Ventures Inc. – Newton Project
7-70
RockRidge Partnership & Associates
sedimentary rocks. It is also locally observed as alteration envelopes to some quartz- veinlets which cut mafic rock types in proximity to intrusive contacts. The distribution and timing of the potassium-silicate alteration may indicate that it represents a biotite hornfels related to latehydrothermal diorite intrusions.
Other Alteration Types
Silicification and albite alteration have been noted in some drillholes. These alteration types are spatially associated and are interpreted to comprise a single quartz, albite, chlorite, and minor iron-carbonate assemblage. The silica-albite alteration is most commonly observed in quartzfeldspar porphyry bodies that have been intruded by monzonite porphyry. An early stage of strong silicification locally replaces an even earlier stage of moderate albite alteration and produces unusual textures that include grey and white colour banding and laminae (Figure 7-8 f). In a single drillhole, texturally destructive silicification (Figure 7-8 e & f) was observed to have overprinted mineralized felsic tuffs in the footwall of the NHF. Silica- albite alteration is locally present in mafic volcanic rocks, epiclastic wacke and diorite intrusions, where it commonly overprints propylitic alteration.
The youngest alteration type thus far identified is characterized by extensional, one millimetre to 20 mm wide, carbonate veinlets. These late veinlets are found in all rock types on Newton Hill.
Axcap Ventures Inc. – Newton Project
7-71
RockRidge Partnership & Associates
==> picture [468 x 556] intentionally omitted <==
Figure 7-8 - EXAMPLES OF ALTERATION TYPES FOUND IN THE NEWTON DEPOSIT
Axcap Ventures Inc. – Newton Project
7-72
RockRidge Partnership & Associates
Mineralization
Although gold and base metal mineralization have been encountered in all rock types within the Newton deposit, felsic volcaniclastic and flow rocks are the primary host rocks to the mineralization (Figure 7-4 and Figure 7-7). The close spatial relationship between mineralization and the felsic volcanic rocks may reflect a higher relative primary permeability to fluid flow in felsic volcanic rocks compared to other rock types. A typical grade in the felsic volcanic rocks is in the order of 0.4 to 1.5 g/t Au. Quartz-feldspar porphyry and monzonite porphyry intrusions are also commonly, although not as consistently, well-mineralized.
Mineralization in other rock types is less consistent; however strong mineralization has been observed at least locally in mafic epiclastic sedimentary rocks (e.g., 24 m grading 0.83 g/t Au and 0.09% Cu in drillhole 10030), mafic volcanic rocks (e.g., three metres grading 2.31 g/t Au and 33 m grading 0.34 g/t Au in drillhole 10027 and 29.9 m grading 0.48 g/t Au and 0.22% Zn in drillhole 10020), and diorite (e.g., 15 m grading 0.35 g/t Au in drillhole 10023). Propylitic alteration (chloriteepidote-pyrite-calcite-albite magnetite) has been noted in mafic rocks, but no significant gold mineralization is associated with this assemblage (McLenaghan 2013). The gold grade in diorite is typically less than 0.20 g/t Au, whereas in epiclastic and mafic rocks it is typically less than 0.10 g/t Au. The felsic plagioclase and biotite porphyritic dykes are very late- or post-hydrothermal and do not contain significant concentrations of gold or base metals.
Gold-silver ± base metal mineralization is associated with both disseminated and veinlet- hosted styles of mineralization (Figure 7-9). Veinlet-hosted mineralization, although widespread, is volumetrically minor compared to disseminated mineralization; overall, the total concentration of veinlets in altered and mineralized rock is estimated at less than one percent by volume. In felsic volcanic rocks and in quartz-feldspar porphyry intrusions proximal to the felsic volcanic sequence, mineralization is predominately disseminated in style (Figure 7-9 a, b, c) and veinlets are rare. Mineralization in the monzonite porphyry and quartz-feldspar porphyry intrusions is also characterized by disseminated sulphide minerals; however, quartz ± sulphide veinlets with strong quartz-sericite-pyrite alteration envelopes are estimated to be comparatively more common than in other rock types (Figure 7-9 d). Mineralization also locally occurs as a sulphide matrix to brecciated rocks (Figure 7-9 e).
Axcap Ventures Inc. – Newton Project
7-73
RockRidge Partnership & Associates
Most mineralization formed during the two sub-stages of quartz-sericite alteration. These are (1) earliest quartz-sericite-(siderite)-pyrite alteration associated with gold but with low concentrations of base metals; and (2) later quartz-sericite alteration associated with gold and relatively higher concentrations of base metals, during which early pyrite was replaced by marcasite. Mineralization also occurs in late polymetallic veinlets which contain abundant pyrite, chalcopyrite, sphalerite, galena, arsenopyrite, and, locally, molybdenite, but it is not known how much of the gold is associated with these late polymetallic veinlets.
The total concentration of sulphide minerals is estimated to range from 0.5% to 15% in felsic volcanic rocks. Gold mineralization of similar tenor occurs across intervals with both high and low concentrations of sulphide minerals. There is, however, a general spatial coincidence of gold and base metal mineralization, although close elemental correlations have not been recognized at sample-scale.
No visible gold has been observed in drill core. Preliminary optical petrography and scanning electron microscopy studies by Gregory (2011) have identified the following relationships with respect to gold:
-
Electrum inclusions occur within siderite, chalcopyrite, and pyrite in felsic ash tuff samples affected by the later quartz-sericite-marcasite alteration.
-
Petzite (Ag3AuTe2), undifferentiated Au-Bi-Te minerals, and minor electrum inclusions occur in pyrite in felsic ash tuff samples altered by the early quartz-sericite-pyrite assemblage.
-
Electrum inclusions hosted by pyrite in felsic ash tuff and epiclastic sedimentary rock samples altered by the early quartz-sericite-pyrite assemblage.
-
Volumetrically, electrum associated with the marcasite-bearing alteration may make the largest contribution to the overall gold budget in the Newton deposit.
Partial oxidation occurs along fractures in the upper 10 m to 30 m of the Newton deposit. Minor chalcocite has been identified within the zone of partial oxidization, but no other significant effects have been noted. Mineralization below this level is hypogene in character.
Axcap Ventures Inc. – Newton Project
7-74
RockRidge Partnership & Associates
A rhenium-osmium date of 72.1 ± 0.3 Ma was obtained on molybdenite from a quartz vein hosted by quartz-feldspar porphyry (McClenaghan, 2012). This date establishes near contemporaneity among quartz feldspar porphyry intrusions, felsic volcanic rocks, and the hydrothermal system which precipitated gold mineralization at Newton. In addition, the date indicates that the mineralization at Newton is similar in age to the mineralization at the Capoose and Blackwater deposits.
There is evidence to suggest that there is a large gold-bearing hydrothermal system present at Newton. Geochemically significant gold concentrations, exceeding 50 ppb (0.05 g/t) values occur over an area of at least 1,300 m by 1,800 m. Geologically important gold concentrations of more than 100 ppb (0.1 g/t) have been returned from drill intersections throughout an area which measures approximately 1,300 m by 900 m. Short intersections of more than 100 ppb have also been encountered outside of this area.
The resource area is defined by variably spaced drilling over an area measuring 1,000 m by 900 m, which extends to a maximum depth of 685 m.
Axcap Ventures Inc. – Newton Project
7-75
RockRidge Partnership & Associates
==> picture [468 x 604] intentionally omitted <==
Figure 7-9 - EXAMPLES OF MINERALIZATION TYPES
Axcap Ventures Inc. – Newton Project
7-76
RockRidge Partnership & Associates
8. DEPOSIT TYPES
Newton is regarded as a bulk-tonnage, disseminated, strata-bound, epithermal gold-silver deposit with elevated concentrations of base metals. It shares many similarities with a group of deposits that have been recently recognized in central British Columbia, including the Blackwater Gold Deposit owned by Artemis Gold Inc. and the Capoose deposit owned by New Gold Inc., both located some 175 km northwest of Newton. Key similarities among these deposits include: (1) a spatial and genetic relationship with Late Cretaceous (~72 Ma) felsic pyroclastic rocks and highlevel intrusions which formed in a structurally active environment; (2) a primary gold-silver signature; (3) elevated concentrations of copper, zinc, lead, and molybdenum; (4) an association of mineralization with extensive, pervasive quartz-sericite alteration, which contains disseminated and vein-hosted pyrite, marcasite, chalcopyrite, sphalerite, galena, arsenopyrite, and sulphosalts; and (5) late stages of polymetallic vein formation.
The Newton hydrothermal system shares many hydrodynamic features consistent with the epithermal model recently presented by Rowland and Simmons (2012) for the Taupo Volcanic Zone, New Zealand. These features include magmatically induced, convective hydrothermal circulation, permeable host rocks receptive to hydrothermal fluid flow (e.g., a high primary porosity in felsic pyroclastic flows) and fault-fracture permeability created by volcanism and tectonism (e.g., basin and graben structures).
Although the Newton deposit has similarities to low-sulphidation epithermal systems under the classification system of Sillitoe and Hedenquist (2003), it also has characteristics compatible with intermediate sulphidation epithermal gold-silver deposits (McLenaghan, 2013), that may display a spatial association with porphyry base and precious metal deposits that formed in extensional basins or rifted grabens. Other low-sulphidation epithermal systems that have a close spatial and genetic association to Cu-Au porphyry deposits are present in the Iskut region of northern British Columbia, and include the Snowfields (Armstrong et al., 2011) and Sulphurets (Ghaffari et al., 2011) deposits.
9. EXPLORATION
Axcap has not conducted any exploration on the Newton Property.
Axcap Ventures Inc. – Newton Project
9-77
RockRidge Partnership & Associates
Axcap Ventures Inc. – Newton Project
9-78
RockRidge Partnership & Associates
10. DRILLING
Axcap has not conducted any drilling on the Newton Property.
Numerous drill campaigns have taken place on the Newton Property since the first hole was completed in 1972. To date, a total of 36,563 m has been completed in 138 holes up to hole N2398. A summary of the various drilling programs that have been completed on the project over the years is provided in Table 10-1 and a plan of drillhole locations showing additional drilling completed subsequent to the previous MRE is illustrated in Figure 10-1.
Table 10-1 - DRILLING SUMMARY
| Operator | Year | Drillhole ID | No of Holes |
Size | Meters |
|---|---|---|---|---|---|
| Cyprus | 1972 | 72-01 to 72-10 | 10 | BQ | 1634.3 |
| Taseko | 1982 | 82-01to 82-04 | 4 | Core | 553.8 |
| P82-01toP82-08 | 8 | Percussion | 589.2 | ||
| Rea Gold | 1992 | 92-01to 92-05 | 5 | NQ | 970.3 |
| **Ventex ** | 1996 | 96-01to 96-02 | 2 | n/a | 90.0 |
| High Ridge | 2006 | 06-01to 06-12 | 12 | HQ/NQ | 2044.5 |
| Amarc | 2009 | 9001 to 9014 | 14 | HQ | 4076.5 |
| Amarc | 2010 | 10015 to10031 | 17 | HQ | 5286.1 |
| Amarc | 2011 | 11032to11056* | 26 | HQ | 7268.3 |
| Amarc | 2012 | 12057to12088 | 32 | HQ | 11231.1 |
| Carlyle | 2023 | N23-89 to 98 | 10 | HQ/NQ | 2857.2 |
| TOTAL | 138 | 36631.3 |
*** Includes 11051A (abandoned at 18.79m)**
Axcap Ventures Inc. – Newton Project
10-79
RockRidge Partnership & Associates
==> picture [556 x 105] intentionally omitted <==
==> picture [556 x 105] intentionally omitted <==
==> picture [556 x 105] intentionally omitted <==
==> picture [556 x 105] intentionally omitted <==
Figure 10-1 – DRILLHOLE LOCATION PLAN
Axcap Ventures Inc. – Newton Project
10-80
RockRidge Partnership & Associates
CYPRUS DRILLING – 1972
Cyprus acquired the property in 1972 and completed 1,634 m of BQ diamond drilling in 10 holes as a follow-up to other exploration work on the property. Diamond drilling failed to encounter significant supergene enrichment and low copper grades were intercepted, so the company did not pursue the project any further. As copper was the primary target at the time, no systematic gold analyses were performed. The 1972 drill core was subsequently re-sampled and re-assayed in 1987 by Rea Gold.
TASEKO DRILLING – 1982
In 1981, Taseko acquired the property. They completed four diamond drillholes (554 m) in 1982 and eight percussion holes (559 m) on the outer parts of the large IP anomaly that was outlined by a survey in 1972. Note that the position of the 1982 drillholes is uncertain. Amarc drilled in the same apparent area but encountered different rock types.
REA GOLD DRILLING – 1992
As a follow up to previous work on the property, in 1992 Rea Gold Corp. (Rea) completed five diamond drillholes with a total length of 970 m.
HIGH RIDGE DRILLING – 2006
High Ridge completed 12 drillholes numbered 06-01 through 06-12 on the property in 2006 for a total length of 2,045 m. Drilling was conducted by Hy-Tech Drilling Ltd. (Hy-Tech) using a portable drill and a helicopter for drill moves. Most holes were initiated with HQ (63.5 mm diameter) core then reduced to NQ (47.6 mm diameter). The predominant drillhole orientation was at an azimuth of 35° (measured clockwise from due north) and an inclination (dip) of -50°, with the following exceptions: 06-02 was drilled vertically, 06-03 at -87° dip, 0° azimuth, and 06-10 at -50° dip, 0° azimuth (Table 10-2). Reflex downhole directional surveys were taken at the bottom of two of the 2006 drillholes.
In the 2006 drill program by High Ridge, drill core was boxed at the drill rig and transported by drill truck to the logging facility on site. The remaining core after sampling was stored on site near the top of Newton Hill.
In 2009, Amarc photographed, re-logged, and took representative quarter core samples of the material from this program.
Axcap Ventures Inc. – Newton Project
10-81
RockRidge Partnership & Associates
All drill cores from the historical programs were originally stored at the Newton Project site. In early 2011, Amarc salvaged what remained of this historical core and moved it to the Gibraltar Mine site, near McLeese Lake, British Columbia. All data from the historical drilling, such as the drillhole locations, drill logs, and analytical results, is derived from the Durfeld and Rea compilations, assessment reports, and information provided by High Ridge.
Table 10-2 - DRILLHOLE DETAILS -HIGH RIDGE
| Hole ID | Length (m) | Azimuth (°) | Dip (°) |
|---|---|---|---|
| 06-01* | 25.0 | 35 | -50 |
| 06-02 | 212.5 | 0 | -90 |
| 06-03 | 210.0 | 0 | -87 |
| 06-04 | 204.0 | 35 | -50 |
| 06-05 | 167.0 | 35 | -50 |
| 06-06 | 180.0 | 35 | -50 |
| 06-07 | 180.0 | 35 | -50 |
| 06-08 | 177.0 | 35 | -50 |
| 06-09 | 183.0 | 35 | -50 |
| 06-10 | 175.0 | 0 | -50 |
| 06-11 | 121.0 | 35 | -50 |
| 06-12 | 210.0 | 35 | -50 |
*Drillhole 06-01 was abandoned at a depth of 25 m
AMARC DRILLING - 2009
In 2009, Amarc completed 14 drillholes (holes 9001 through 9014) for a total of 4,076.5 m. The drilling contractor, Hy-Tech, used a LS-5 drill to recover HQ core. Most holes were drilled vertically with the exception of hole 9001, which was drilled at -45° dip, 90° azimuth (Table 10-3).
A Magellan ProMark3 differential GPS incorporating a Base Station and Rover was used to take the 2009 drill collar surveys. All surveys by Amarc were recorded in UTM NAD 83, Zone 10 coordinates. Downhole orientation surveys were performed at 60 m to 175 m intervals by HyTech using a Reflex E-Z shot tool. Drill core was geologically logged and photographed prior to sampling. No geotechnical logs or core density measurements were made during the 2009 drilling program.
Axcap Ventures Inc. – Newton Project
10-82
RockRidge Partnership & Associates
Table 10-3 - AMARC 2009 DRILLING PROGRAM
| Hole ID | East-X (m) | North-Y (m) | Elev-Z (m) | Length (m) | Azimuth (°) | Dip (°) |
|---|---|---|---|---|---|---|
| 9001 | 457002.3 | 5738700.9 | 1317.3 | 501.0 | 90 | -45 |
| 9002 | 457101.2 | 5738705.7 | 1308.9 | 323.0 | 0 | -90 |
| 9003 | 457152.7 | 5738705.8 | 1302.3 | 350.0 | 0 | -90 |
| 9004 | 457203.3 | 5738705.1 | 1296.9 | 350.0 | 0 | -90 |
| 9005 | 457251.4 | 5738704.6 | 1291.7 | 351.0 | 0 | -90 |
| 9006 | 457200.4 | 5738656.4 | 1287.9 | 306.5 | 0 | -90 |
| 9007 | 457206.1 | 5738756.1 | 1306.6 | 252.0 | 0 | -90 |
| 9008 | 457300.9 | 5738703.7 | 1286.0 | 174.0 | 0 | -90 |
| 9009 | 457254.1 | 5738654.5 | 1282.4 | 186.0 | 0 | -90 |
| 9010 | 457247.5 | 5738756.3 | 1300.2 | 233.0 | 0 | -90 |
| 9011 | 457149.1 | 5738654.4 | 1290.5 | 252.0 | 0 | -90 |
| 9012 | 457258.6 | 5738606.7 | 1272.4 | 228.0 | 0 | -90 |
| 9013 | 457103.2 | 5738654.4 | 1294.7 | 288.0 | 0 | -90 |
| 9014 | 457248.4 | 5738808.2 | 1310.7 | 282.0 | 0 | -90 |
AMARC DRILLING - LATE 2010 AND EARLY 2011
From October 2010 to January 2011, Amarc completed 29 diamond drillholes numbered 10015 through 11043, for a total of 7,691 m. The drilling contractor, Black Hawk Drilling Ltd. (Black Hawk), recovered HQ diameter core from the holes which were all drilled vertically or near vertically (Table 10-4). Drillhole collar coordinates were surveyed using a differential GPS as in 2009. Downhole surveys were performed at 75 m to 125 m intervals using a Reflex E-Z shot tool.
Geological and geotechnical logging, as well as bulk density measurements and core photography, was performed prior to sampling. The related logging data was entered into a Microsoft Access entry database on site and then transferred to an SQL database in the Vancouver office of Amarc. In the drilling program, a total of 2,458 drill run measurements were taken and an overall average core recovery of 92.6% was calculated. Among them, 770 measurements have 100% recovery.
Axcap Ventures Inc. – Newton Project
10-83
RockRidge Partnership & Associates
Table 10-4 – AMARC 2010 – 2011 DRILLING PROGRAM
| Hole ID | East-X (m) | North-Y (m) | Elev-Z (m) | Length (m) | Azimuth (°) | Dip (°) |
|---|---|---|---|---|---|---|
| 10015 | 457199.3 | 5738806.2 | 1319.0 | 306.9 | 295.8 | -88.6 |
| 10016 | 457108.1 | 5738766.4 | 1321.4 | 346.6 | 190.6 | -89.8 |
| 10017 | 457249.7 | 5738852.7 | 1319.0 | 352.7 | 0 | -90 |
| 10018 | 457345.7 | 5738892.6 | 1310.6 | 169.8 | 210.4 | -89.1 |
| 10019 | 457353.6 | 5738997.7 | 1322.9 | 415.4 | 278 | -88.7 |
| 10020 | 457306.1 | 5738796.1 | 1301.6 | 300.8 | 0 | -90 |
| 10021 | 457179.0 | 5738400.8 | 1246.8 | 240.7 | 0 | -90 |
| 10022 | 456996.1 | 5738197.0 | 1229.4 | 220.1 | 0 | -90 |
| 10023 | 456840.8 | 5739069.8 | 1331.1 | 310.0 | 0 | -90 |
| 10024 | 457415.6 | 5739160.6 | 1317.3 | 145.4 | 252.8 | -89.4 |
| 10025 | 457690.6 | 5738977.9 | 1277.5 | 242.9 | 275.4 | -89.7 |
| 10026 | 457157.6 | 5738853.0 | 1329.7 | 329.8 | 51.8 | -89.4 |
| 10027 | 457024.4 | 5739138.7 | 1343.0 | 370.9 | 0 | -90 |
| 10028 | 456615.9 | 5738994.6 | 1312.4 | 337.4 | 144.2 | -89.6 |
| 10029 | 456496.5 | 5738975.7 | 1303.4 | 416.7 | 0 | -90 |
| 10030 | 457105.6 | 5739277.3 | 1329.0 | 337.4 | 169.7 | -89.6 |
| 10031 | 456802.2 | 5739280.2 | 1304.2 | 416.7 | 0 | -90 |
| 11032 | 456794.2 | 5739621.9 | 1260.3 | 300.8 | 0 | -90 |
| 11033 | 456058.5 | 5739641.7 | 1169.1 | 262.1 | 0 | -90 |
| 11034 | 457298.2 | 5738750.2 | 1293.1 | 178.9 | 0 | -90 |
| 11035 | 455697.1 | 5739556.3 | 1127.9 | 43.9 | 0 | -90 |
| 11036 | 457355.0 | 5738808.6 | 1296.7 | 185.0 | 0 | -90 |
| 11037 | 455697.1 | 5739556.3 | 1127.9 | 181.4 | 0 | -90 |
| 11038 | 457503.5 | 5738997.6 | 1302.5 | 178.0 | 0 | -90 |
| 11039 | 456497.7 | 5738396.0 | 1239.5 | 188.1 | 0 | -90 |
| 11040 | 457500.1 | 5738790.5 | 1277.5 | 295.4 | 0 | -90 |
| 11041 | 456252.2 | 5739202.7 | 1248.3 | 216.1 | 0 | -90 |
| 11042 | 456003.2 | 5739105.1 | 1216.9 | 228.4 | 0 | -90 |
| 11043 | 456243.4 | 5738601.5 | 1226.7 | 172.8 | 0 | -90 |
AMARC DRILLING - LATE 2011
Amarc completed 14 HQ size core holes between September and December 2011. A total of 4,919 m of drilling was completed by contractor Black Hawk. These holes numbered 11044
Axcap Ventures Inc. – Newton Project
10-84
RockRidge Partnership & Associates
through 11056 (including 11051A), were all drilled vertically (Table 10-5). Collar coordinates were surveyed by differential GPS, as described in the 2009 and 2010 programs. Downhole surveys were performed using Reflex E-Z shot equipment on all holes except for 11044, 11050, and 11051A. The downhole survey measurement interval ranged between 75 m and 100 m.
A total of 1,545 drill runs were measured and an overall average core recovery of 94.6% was calculated. Among the intervals measured, 396 have 100% recovery.
Table 10-5 – AMARC LATE 2011 DRILLING PROGRAM
| Hole ID | East-X (m) | North-Y (m) | Elev-Z (m) | Length (m) | Azimuth (°) | Dip (°) |
|---|---|---|---|---|---|---|
| 11044 | 457450.0 | 5738790.0 | 1275.0 | 355.1 | 0 | -90 |
| 11045 | 457500.0 | 5738740.0 | 1262.0 | 290.8 | 0 | -90 |
| 11046 | 457550.0 | 5738790.0 | 1265.0 | 154.5 | 0 | -90 |
| 11047 | 457500.0 | 5738840.0 | 1275.0 | 121.9 | 0 | -90 |
| 11048 | 457450.0 | 5738740.0 | 1270.0 | 367.9 | 0 | -90 |
| 11049 | 457450.0 | 5738690.0 | 1264.0 | 511.2 | 0 | -90 |
| 11050 | 457400.0 | 5738790.0 | 1282.0 | 63.1 | 0 | -90 |
| 11051 | 457400.0 | 5738790.0 | 1282.0 | 572.1 | 0 | -90 |
| 11051A | 457400.0 | 5738790.0 | 1282.0 | 18.8 | 0 | -90 |
| 11052 | 457400.0 | 5738690.0 | 1265.0 | 587.4 | 0 | -90 |
| 11053 | 457400.0 | 5738740.0 | 1275.0 | 577.6 | 0 | -90 |
| 11054 | 457400.0 | 5738640.0 | 1260.0 | 614.8 | 0 | -90 |
| 11055 | 457500.0 | 5738690.0 | 1255.0 | 364.9 | 0 | -90 |
| 11056 | 457400.0 | 5738590.0 | 1250.0 | 319.1 | 0 | -90 |
AMARC DRILLING - 2012
Up to June 2012, Amarc completed 32 HQ size core holes with a total length of 10,258.0 m. These holes, numbered 12057 through 12088, were drilled by the drilling contractor Black Hawk. Most of the holes were drilled vertically except for holes 12063, 12064, 12072, 12074,12080, 12086, and 12088, which were drilled at a dip of -50° with azimuths of 90°, 180°, or 360°. Table 10-6 lists the collar coordinates and orientations.
Collar coordinates were surveyed by differential GPS as described in the 2009 and 2010 programs. Downhole surveys were performed using Reflex E-Z shot equipment on all holes. The measuring interval for the downhole surveys ranged from 50 m to 100 m.
Axcap Ventures Inc. – Newton Project
10-85
RockRidge Partnership & Associates
Geological and geotechnical logging, as well as bulk density measurements and core photography, was performed at site prior to sampling. The related logging data were entered into a Microsoft Access entry database on site and then transferred to an SQL database in Amarc’s Vancouver office.
In the 2012 drilling, a total of 3,568 drill runs were measured and an overall average core recovery of 95.1% was calculated. Among the intervals measured, 847 have 100% recovery.
Table 10-6 - AMARC 2012 DRILLING PROGRAM
| Hole ID | East-X (m) | North-Y (m) | Elev-Z (m) | Length (m) | Azimuth (°) | Dip (°) |
|---|---|---|---|---|---|---|
| 12057 | 457446.8 | 5738838.7 | 1290.0 | 348.7 | 0 | -90 |
| 12058 | 457346.8 | 5738693.6 | 1280.5 | 111.9 | 0 | -90 |
| 12059 | 457449.9 | 5738891.4 | 1297.8 | 203.6 | 0 | -90 |
| 12060 | 457452.2 | 5738642.2 | 1253.5 | 602.8 | 0 | -90 |
| 12061 | 457398.2 | 5738839.2 | 1283.4 | 526.7 | 0 | -90 |
| 12062 | 457351.0 | 5738849.0 | 1290.7 | 557.4 | 0 | -90 |
| 12063 | 457452.2 | 5738642.2 | 1253.5 | 255.1 | 90 | -50 |
| 12064 | 457452.2 | 5738642.2 | 1253.5 | 137.8 | 180 | -50 |
| 12065 | 457497.8 | 5738636.0 | 1261.7 | 511.2 | 0 | -90 |
| 12066 | 457500.0 | 5739300.0 | 1290.0 | 306.9 | 0 | -90 |
| 12067 | 457550.4 | 5738632.9 | 1258.0 | 322.2 | 0 | -90 |
| 12068 | 457300.0 | 5738850.0 | 1300.0 | 386.2 | 0 | -90 |
| 12069 | 457550.0 | 5738590.0 | 1245.0 | 383.1 | 0 | -90 |
| 12070 | 457350.0 | 5738640.0 | 1268.0 | 452.6 | 0 | -90 |
| 12071 | 457250.0 | 5738900.0 | 1324.0 | 364.9 | 0 | -90 |
| 12072 | 457550.0 | 5738590.0 | 1245.0 | 267.3 | 90 | -50 |
| 12073 | 457300.0 | 5738900.0 | 1316.0 | 247.3 | 0 | -90 |
| 12074 | 457550.0 | 5738590.0 | 1245.0 | 227.7 | 180 | -50 |
| 12075 | 457110.0 | 5738280.0 | 1230.0 | 151.5 | 0 | -90 |
| 12076 | 457350.0 | 5738950.0 | 1310.0 | 687.9 | 0 | -90 |
| 12077 | 457550.0 | 5738690.0 | 1260.0 | 118.0 | 0 | -90 |
| 12078 | 457150.0 | 5738600.0 | 1270.0 | 267.3 | 0 | -90 |
| 12079 | 457500.0 | 5738590.0 | 1242.0 | 331.3 | 0 | -90 |
| 12080 | 457500.0 | 5738590.0 | 1250.0 | 154.5 | 180 | -50 |
| 12081 | 457050.0 | 5738650.0 | 1285.0 | 224.6 | 0 | -90 |
| 12082 | 457450.0 | 5738590.0 | 1248.0 | 405.6 | 0 | -90 |
| 12083 | 457325.0 | 5738700.0 | 1280.0 | 322.2 | 0 | -90 |
| 12084 | 457350.0 | 5738705.0 | 1290.0 | 651.4 | 0 | -90 |
| 12085 | 457350.0 | 5738755.0 | 1295.0 | 644.4 | 0 | -90 |
Axcap Ventures Inc. – Newton Project
10-86
RockRidge Partnership & Associates
| 12086 | 457250.0 | 5738320.0 | 1228.0 | 343.5 | 360 | -50 |
|---|---|---|---|---|---|---|
| 12087 | 457000.0 | 5738800.0 | 1315.0 | 471.5 | 0 | -90 |
| 12088 | 457300.0 | 5739000.0 | 1310.0 | 271.0 | 90 | -50 |
CARLYLE COMMODITIES DRILLING – 2023
In 2023, Carlyle completed two phases of drilling at the Newton Deposit totalling 2,856.3 metres in ten HQ plus NQ size core holes.
The Phase I drill program was completed from January 13 to February 12, 2023, and consisted of three drillholes (N23-89 to 91) totalling 2016 metres. Collar locations were recorded using a Garmin handheld GPS with ±3 m accuracy. Standard wireline drilling practice was applied. Each run of drill core was collected in a 3-meter core barrel. Drill core was retrieved and placed into wooden core boxes with marking blocks that recorded depth of drilling. Drill casing was left in place at the end of the drilling work and all holes were plugged and cemented. Stick-up lengths of casing above surface were subsequently cut to surface level. Sampled intervals were cut in half along the core axis using a diamond saw in a secure purpose-built plywood core cutting facility with a lockable door at KiNiKiNiK Lodge. Cut samples were tagged, sealed inside a polybag and grouped into rice bags. These samples were then transported by Bandstra Transport to Bureau Veritas in Vancouver, BC, for analysis. Individual drillholes are summarized in Table 10-7 (Dube,2023).
The Phase 2 drill program was completed from December 4 to December 23, 2023, and consisted of 7 drillholes totalling 840.3 metres. Both phases of drilling were completed by Black Hawk Drilling. Table 10-7 lists the collar coordinates and orientations for the drillholes completed by Carlyle (Dube, 2024).
The 2023 drill programs were successful in extending the known mineralization associated with the main felsic domain and the Newton deposit remains open in multiple directions. The 2023 drill program also identified a new, near surface, gold and silver bearing zone to the north of the current inferred mineral resource, which Carlyle calls the Halo area. Additionally, gold and silver mineralization was identified in an area further northwest of the current mineral resource which Carlyle referred to as the ‘Sunrise Area’.
Axcap Ventures Inc. – Newton Project
10-87
RockRidge Partnership & Associates
Table 10-7 - CARLYLE 2023 DRILLING PROGRAM
| Hole ID | East-X(m) | North-Y(m) | Elev-Z(m) | Length(m) | Azimuth(°) | Dip (°) |
|---|---|---|---|---|---|---|
| N23-089 | 457500 | 5738701.4 | 1269 | 1001.1 | 270 | -65 |
| N23-090 | 457499 | 5738588.6 | 1255 | 251.0 | 267 | -78 |
| N23-091 | 457497 | 5738774.9 | 1276 | 764.0 | 220 | -69 |
| N23-092 | 457108 | 5738816 | 1322 | 258.0 | 0 | -90 |
| N23-093 | 457130 | 5739235 | 1324 | 105.3 | 0 | -90 |
| N23-094 | 457086 | 5739318 | 1306 | 109.0 | 0 | -90 |
| N23-095 | 457142 | 5739312 | 1309 | 92.0 | 0 | -90 |
| N23-096 | 457218 | 5739008 | 1333 | 87.0 | 0 | -90 |
| N23-097 | 456925 | 5738660 | 1290 | 135.0 | 0 | -90 |
| N23-098 | 456430 | 5739110 | 1276 | 54.0 | 0 | -90 |
| TOTAL | 2856.39 |
SUMMARY OF RESULTS
A summary of the significant intervals of mineralization from the drillholes used in the preparation of the mineral resource estimate is shown in Table 10-8. It is to be noted that the lengths of the mineralized intersections presented below represent core lengths.
Table 10-8 - SUMMARY OF SIGNIFICANT DRILL RESULTS
| Hole ID² | Incl | From (m) | To (m) | Int.³ (m) | Au (g/t) | Ag (g/t) |
|---|---|---|---|---|---|---|
| Historical Drillholes | ||||||
| 82-03 | 28.0 | 142.7 | 114.6 | 0.17 | ||
| 82-04 | 22.0 | 150.0 | 128.0 | 0.25 | ||
| 82-04 | incl. | 116.4 | 134.7 | 18.3 | 0.51 | |
| P82-1 | 3.0 | 86.9 | 83.8 | 0.34 | 2.4 | |
| 92-03 | 36.0 | 90.0 | 54.0 | 0.5 | ||
| 92-03 | incl | 36.0 | 66.0 | 30.0 | 0.7 | |
| 92-04 | 10.0 | 130.0 | 120.0 | 0.42 | ||
| 92-04 | incl. | 14.0 | 74.0 | 60.0 | 0.69 | |
| 92-04 | and | 14.0 | 40.0 | 26.0 | 0.9 | |
| 92-05 | 190.0 | 214.6 | 24.6 | 0.57 | ||
| 92-05 | incl. | 196.0 | 200.0 | 4.0 | 2.76 | |
| 06-02 | 175.0 | 212.5 | 37.5 | 0.33 | 2.1 | |
| 06-03 | 115.0 | 210.0 | 95.0 | 0.52 | 4.2 | |
| 06-03 | incl. | 159.0 | 210.0 | 51.0 | 0.6 | 5.7 |
| 06-04 | 183.0 | 187.0 | 4.0 | 0.39 | 2.4 |
Axcap Ventures Inc. – Newton Project
10-88
RockRidge Partnership & Associates
| Hole ID² | Incl | From (m) | To (m) | Int.³ (m) | Au (g/t) | Ag (g/t) |
|---|---|---|---|---|---|---|
| 06-06 | 151.0 | 159.0 | 8.0 | 0.5 | 0.9 | |
| 06-11 | 3.0 | 49.0 | 46.0 | 0.54 | 0.5 | |
| 06-12 | 105.0 | 210.0 | 105.0 | 1.15 | 11.8 | |
| 06-12 | incl. | 169.0 | 210.0 | 41.0 | 2.49 | 20 |
| Drillholes Completed byAmarc | ||||||
| 9001 | 3.0 | 39.0 | 36.0 | 0.6 | 0.9 | |
| 9001 | 228.0 | 297.0 | 69.0 | 1.41 | 10.9 | |
| 9001 | incl. | 233.1 | 234.0 | 0.9 | 11.19 | 22.2 |
| 9001 | incl. | 252.8 | 297.0 | 44.2 | 1.74 | 15.9 |
| 9001 | 441.0 | 477.0 | 36.0 | 0.34 | 0.6 | |
| 9002 | 222.0 | 255.2 | 33.2 | 0.96 | 2.8 | |
| 9002 | incl. | 234.0 | 252.0 | 18.0 | 1.1 | 3.3 |
| 9003 | 3.0 | 224.5 | 221.5 | 0.6 | 5.6 | |
| 9003 | incl. | 18.0 | 39.0 | 21.0 | 0.71 | 2.3 |
| 9003 | incl. | 96.0 | 224.5 | 128.5 | 0.84 | 8.9 |
| 9003 | and | 156.0 | 198.0 | 42.0 | 1.25 | 16.8 |
| 9004 | 6.0 | 195.0 | 189.0 | 1.56 | 7.9 | |
| 9004 | incl. | 54.0 | 195.0 | 141.0 | 2.01 | 10 |
| 9004 | and | 96.0 | 195.0 | 99.0 | 2.76 | 12.2 |
| 9004 | and | 126.0 | 195.0 | 69.0 | 3.79 | 9.1 |
| 9004 | and | 129.0 | 132.0 | 3.0 | 13.47 | 14.4 |
| 9004 | and | 168.9 | 195.0 | 26.1 | 5.54 | 12.5 |
| 9005 | 12.0 | 27.0 | 15.0 | 0.32 | 1.4 | |
| 9005 | 41.0 | 54.0 | 13.0 | 0.44 | 4.4 | |
| 9005 | 76.0 | 163.2 | 87.2 | 0.5 | 7.1 | |
| 9005 | incl. | 88.0 | 89.0 | 1.0 | 16.56 | 221.6 |
| 9005 | 279.0 | 303.0 | 24.0 | 0.34 | 0.8 | |
| 9006 | 9.0 | 306.5 | 297.5 | 0.26 | 2.3 | |
| 9006 | incl. | 78.0 | 192.2 | 114.2 | 0.32 | 3.7 |
| 9006 | incl. | 264.0 | 306.5 | 42.5 | 0.43 | 0.6 |
| 9007 | 48.0 | 252.0 | 204.0 | 0.33 | 4.5 | |
| 9007 | incl. | 48.0 | 66.0 | 18.0 | 0.49 | 1.9 |
| 9007 | incl. | 135.0 | 216.0 | 81.0 | 0.46 | 8 |
| 9007 | and | 183.0 | 216.0 | 33.0 | 0.62 | 13.4 |
| 9008 | 18.0 | 42.0 | 24.0 | 0.44 | 6.4 | |
| 9008 | 123.7 | 129.0 | 5.3 | 0.44 | 8 | |
| 9009 | 15.0 | 147.9 | 132.9 | 0.25 | 5.9 | |
| 9009 | incl. | 66.0 | 114.0 | 48.0 | 0.36 | 6.3 |
| 9010 | 35.4 | 189.0 | 153.6 | 0.29 | 3 |
Axcap Ventures Inc. – Newton Project
10-89
RockRidge Partnership & Associates
| Hole ID² | Incl | From (m) | To (m) | Int.³ (m) | Au (g/t) | Ag (g/t) |
|---|---|---|---|---|---|---|
| 9010 | incl. | 35.4 | 69.0 | 33.6 | 0.52 | 3.2 |
| 9011 | 83.4 | 207.0 | 123.6 | 0.44 | 2.3 | |
| 9011 | incl. | 149.0 | 207.0 | 58.0 | 0.6 | 2.4 |
| 9011 | and | 186.0 | 207.0 | 21.0 | 1.13 | 2.9 |
| 9014 | 72.0 | 210.0 | 138.0 | 0.74 | 4.2 | |
| 9014 | incl. | 147.0 | 210.0 | 63.0 | 1.17 | 6.8 |
| 9014 | and | 168.0 | 207.0 | 39.0 | 1.45 | 6.5 |
| 9014 | and | 204.0 | 207.0 | 3.0 | 11.7 | 50.8 |
| 10015 | 95.0 | 134.0 | 39.0 | 0.35 | 3.1 | |
| 10015 | 194.0 | 230.0 | 36.0 | 0.43 | 4.7 | |
| 10016 | 141.0 | 249.0 | 108.0 | 0.37 | 1.5 | |
| 10016 | incl. | 231.0 | 249.0 | 18.0 | 0.57 | 1.8 |
| 10017 | 75.0 | 215.0 | 140.0 | 0.35 | 2.3 | |
| 10017 | incl. | 138.0 | 168.0 | 30.0 | 0.52 | 3.4 |
| 10017 | 307.3 | 311.5 | 4.3 | 1.13 | 4.6 | |
| 10018 | 54.0 | 60.0 | 6.0 | 0.47 | 0.8 | |
| 10018 | 141.0 | 150.0 | 9.0 | 0.45 | 2.6 | |
| 10019 | 33.0 | 42.0 | 9.0 | 0.21 | 4.7 | |
| 10019 | 321.2 | 393.0 | 71.8 | 0.48 | 1.9 | |
| 10020 | 18.0 | 156.0 | 138.0 | 0.46 | 4.1 | |
| 10020 | incl. | 63.0 | 98.7 | 35.7 | 0.58 | 2.3 |
| 10020 | incl. | 116.8 | 156.0 | 39.3 | 0.79 | 10.5 |
| 10020 | and | 116.8 | 132.0 | 15.3 | 1.55 | 5.9 |
| 10020 | 294.0 | 297.0 | 3.0 | 6.58 | 1 | |
| 10023 | 30.0 | 39.0 | 9.0 | 0.46 | 2 | |
| 10023 | 249.0 | 288.0 | 39.0 | 1.21 | 2 | |
| 10023 | incl. | 249.0 | 273.0 | 24.0 | 1.81 | 1.6 |
| 10023 | and | 267.0 | 273.0 | 6.0 | 5.15 | 2.6 |
| 10026 | 185.0 | 221.0 | 36.0 | 0.41 | 2.7 | |
| 10027 | 75.0 | 78.0 | 3.0 | 2.31 | 0.2 | |
| 10027 | 102.0 | 135.0 | 33.0 | 0.34 | 6.2 | |
| 11034 | 9.1 | 33.0 | 23.9 | 0.34 | 3 | |
| 11036 | 10.0 | 31.0 | 21.0 | 0.25 | 1.3 | |
| 11040 | 15.4 | 171.0 | 155.6 | 0.58 | 2.9 | |
| 11040 | incl. | 15.4 | 42.0 | 26.6 | 1.12 | 4.2 |
| 11040 | incl. | 69.0 | 108.0 | 39.0 | 0.71 | 3.6 |
| 11044 | 56.4 | 350.0 | 293.6 | 0.61 | 2.3 | |
| 11044 | incl. | 56.4 | 204.0 | 147.6 | 0.73 | 3.1 |
| 11044 | and | 56.4 | 92.0 | 35.6 | 1.43 | 6 |
Axcap Ventures Inc. – Newton Project
10-90
RockRidge Partnership & Associates
| Hole ID² | Incl | From (m) | To (m) | Int.³ (m) | Au (g/t) | Ag (g/t) |
|---|---|---|---|---|---|---|
| 11044 | incl. | 272.0 | 338.0 | 66.0 | 0.84 | 1.8 |
| 11044 | and | 272.0 | 317.0 | 45.0 | 1.02 | 2 |
| 11045 | 16.3 | 178.0 | 161.7 | 1.05 | 3.6 | |
| 11045 | incl. | 52.0 | 178.0 | 126.0 | 1.24 | 4.1 |
| 11045 | and | 79.0 | 157.0 | 78.0 | 1.71 | 5.1 |
| 11045 | and | 79.0 | 115.0 | 36.0 | 2.51 | 8.7 |
| 11045 | and | 85.0 | 88.0 | 3.0 | 12.5 | 18.5 |
| 11046 | 68.0 | 83.0 | 15.0 | 0.23 | 1.7 | |
| 11047 | 17.0 | 50.0 | 33.1 | 0.54 | 3.1 | |
| 11048 | 34.0 | 175.0 | 141.0 | 0.65 | 1.7 | |
| 11048 | incl. | 34.0 | 49.0 | 15.0 | 0.8 | 4.1 |
| 11048 | incl. | 73.0 | 109.0 | 36.0 | 1.23 | 2.2 |
| 11048 | 277.0 | 337.0 | 60.0 | 0.6 | 2.1 | |
| 11049 | 23.5 | 144.0 | 120.5 | 0.86 | 2.2 | |
| 11049 | incl. | 23.5 | 84.0 | 60.5 | 1.21 | 2.3 |
| 11049 | 213.0 | 342.0 | 129.0 | 0.71 | 3.4 | |
| 11049 | incl. | 228.0 | 261.0 | 33.0 | 1 | 5.2 |
| 11049 | incl. | 297.0 | 315.0 | 18.0 | 1.4 | 2.3 |
| 11051 | 81.0 | 129.0 | 48.0 | 0.77 | 3.7 | |
| 11051 | incl. | 81.0 | 102.0 | 21.0 | 0.96 | 5.5 |
| 11051 | 315.0 | 408.0 | 93.0 | 0.76 | 1.8 | |
| 11051 | incl. | 366.0 | 408.0 | 42.0 | 1.21 | 0.8 |
| 11052 | 48.0 | 456.0 | 408.0 | 0.6 | 2.6 | |
| 11052 | incl. | 48.0 | 207.0 | 159.0 | 0.84 | 3.1 |
| 11052 | and | 99.0 | 207.0 | 108.0 | 1 | 3.6 |
| 11052 | and | 138.0 | 207.0 | 69.0 | 1.23 | 4.7 |
| 11052 | and | 168.0 | 171.0 | 3.0 | 7.7 | 3.6 |
| 11052 | incl. | 318.0 | 456.0 | 138.0 | 0.6 | 2.8 |
| 11052 | and | 378.0 | 456.0 | 78.0 | 0.73 | 2.8 |
| 11052 | and | 378.0 | 426.0 | 48.0 | 0.93 | 3.8 |
| 11053 | 79.0 | 94.0 | 15.0 | 0.47 | 1.9 | |
| 11053 | 166.0 | 187.0 | 21.0 | 0.65 | 1.4 | |
| 11053 | 235.0 | 271.0 | 36.0 | 0.87 | 1.5 | |
| 11053 | incl. | 235.0 | 238.0 | 3.0 | 3.58 | 1.4 |
| 11053 | and | 256.0 | 259.0 | 3.0 | 4.89 | 3.5 |
| 11053 | 445.0 | 475.0 | 30.0 | 0.64 | 1 | |
| 11054 | 43.0 | 442.0 | 399.0 | 0.5 | 2.4 | |
| 11055 | 30.1 | 151.0 | 120.9 | 0.7 | 2.4 | |
| 11055 | incl. | 78.0 | 151.0 | 73.0 | 0.86 | 2 |
Axcap Ventures Inc. – Newton Project
10-91
RockRidge Partnership & Associates
| Hole ID² | Incl | From (m) | To (m) | Int.³ (m) | Au (g/t) | Ag (g/t) |
|---|---|---|---|---|---|---|
| 11055 | 238.0 | 286.0 | 48.0 | 0.57 | 2.8 | |
| 12057 | 68.0 | 134.0 | 66.0 | 0.6 | 3.3 | |
| 12057 | incl. | 89.0 | 134.0 | 45.0 | 0.7 | 3.5 |
| 12057 | 149.0 | 164.0 | 15.0 | 0.63 | 2 | |
| 12057 | 239.0 | 254.0 | 15.0 | 1.3 | 2.7 | |
| 12057 | 269.0 | 305.0 | 36.0 | 0.54 | 0.9 | |
| 12058 | 36.0 | 42.0 | 6.0 | 0.47 | 7.8 | |
| 12060 | 11.6 | 332.9 | 321.3 | 0.55 | 3 | |
| 12060 | incl. | 11.6 | 179.9 | 168.3 | 0.71 | 3.8 |
| 12060 | and | 21.0 | 99.0 | 78.0 | 0.93 | 6.2 |
| 12060 | and | 75.0 | 99.0 | 24.0 | 1.84 | 12.4 |
| 12060 | and | 147.0 | 177.0 | 30.0 | 0.69 | 1.5 |
| 12061 | 82.0 | 154.0 | 72.0 | 0.31 | 1.6 | |
| 12061 | 334.0 | 343.0 | 9.0 | 0.48 | 2.3 | |
| 12062 | 354.0 | 372.0 | 18.0 | 0.49 | 1.2 | |
| 12062 | 390.0 | 435.0 | 45.0 | 0.41 | 1.5 | |
| 12063 | 28.0 | 34.0 | 6.0 | 1.13 | 4.6 | |
| 12063 | 52.0 | 208.0 | 156.0 | 0.4 | 12.7 | |
| 12063 | incl. | 52.0 | 139.0 | 87.0 | 0.49 | 19.9 |
| 12063 | and | 52.0 | 76.0 | 24.0 | 0.71 | 24.1 |
| 12064 | 22.4 | 43.0 | 20.6 | 0.65 | 2.7 | |
| 12064 | 76.0 | 91.0 | 15.0 | 0.55 | 6.1 | |
| 12065 | 19.2 | 28.0 | 8.8 | 0.39 | 5.5 | |
| 12065 | 43.0 | 388.0 | 345.0 | 0.43 | 3.6 | |
| 12065 | incl. | 46.0 | 67.0 | 21.0 | 0.49 | 7.7 |
| 12065 | incl. | 97.0 | 112.0 | 15.0 | 0.37 | 17.5 |
| 12065 | incl. | 205.0 | 388.0 | 183.0 | 0.55 | 2 |
| 12065 | and | 244.0 | 328.0 | 84.0 | 0.72 | 2 |
| 12065 | and | 244.0 | 259.0 | 15.0 | 1.09 | 2.3 |
| 12065 | and | 292.0 | 328.0 | 36.0 | 0.82 | 2.5 |
| 12067 | 19.5 | 100.0 | 80.5 | 0.32 | 7.3 | |
| 12067 | incl. | 19.5 | 55.0 | 35.5 | 0.44 | 6.6 |
| 12067 | 160.0 | 250.0 | 90.0 | 0.3 | 2.7 | |
| 12068 | 33.0 | 39.0 | 6.0 | 0.47 | 1.8 | |
| 12068 | 66.0 | 162.0 | 96.0 | 0.46 | 2.8 | |
| 12068 | incl. | 126.0 | 162.0 | 36.0 | 0.69 | 4 |
| 12068 | and | 147.0 | 162.0 | 15.0 | 1.02 | 5.9 |
| 12068 | 246.0 | 252.0 | 6.0 | 0.92 | 2 | |
| 12069 | 28.0 | 102.0 | 74.0 | 0.4 | 3.9 |
Axcap Ventures Inc. – Newton Project
10-92
RockRidge Partnership & Associates
| Hole ID² | Incl | From (m) | To (m) | Int.³ (m) | Au (g/t) | Ag (g/t) |
|---|---|---|---|---|---|---|
| 12069 | incl. | 63.0 | 72.0 | 9.0 | 0.76 | 3.8 |
| 12069 | incl. | 90.0 | 102.0 | 12.0 | 0.56 | 4.8 |
| 12069 | 279.0 | 306.0 | 27.0 | 0.49 | 2.8 | |
| 12070 | 74.0 | 104.0 | 30.0 | 0.38 | 3 | |
| 12070 | 203.0 | 221.0 | 18.0 | 0.35 | 0.8 | |
| 12070 | 266.0 | 293.0 | 27.0 | 0.8 | 3.1 | |
| 12070 | incl. | 278.0 | 293.0 | 15.0 | 1.12 | 4.9 |
| 12071 | 104.0 | 113.0 | 9.0 | 0.33 | 0.3 | |
| 12071 | 203.0 | 218.0 | 15.0 | 0.4 | 1.9 | |
| 12073 | 115.0 | 124.0 | 9.0 | 0.37 | 0.8 | |
| 12074 | 37.0 | 46.0 | 9.0 | 0.4 | 2 | |
| 12076 | 288.0 | 459.0 | 171.0 | 0.69 | 2.1 | |
| 12076 | incl. | 321.0 | 447.0 | 126.0 | 0.82 | 2.2 |
| 12076 | and | 321.0 | 342.0 | 21.0 | 0.96 | 4.6 |
| 12076 | and | 384.0 | 447.0 | 63.0 | 1.07 | 1.5 |
| 12077 | 94.0 | 106.0 | 12.0 | 0.33 | 0.8 | |
| 12079 | 20.2 | 173.0 | 152.8 | 0.7 | 4.7 | |
| 12079 | incl. | 23.0 | 53.0 | 30.0 | 1.08 | 9.8 |
| 12079 | incl. | 116.0 | 173.0 | 57.0 | 0.78 | 3.8 |
| 12081 | 130.0 | 139.0 | 9.0 | 0.53 | 1.2 | |
| 12082 | 38.0 | 242.0 | 204.0 | 0.71 | 3.1 | |
| 12082 | incl. | 56.0 | 98.0 | 42.0 | 0.84 | 4.7 |
| 12082 | incl. | 125.0 | 131.0 | 6.0 | 3.4 | 6 |
| 12082 | incl. | 158.0 | 188.0 | 30.0 | 0.85 | 4.2 |
| 12082 | incl. | 194.0 | 224.0 | 30.0 | 0.82 | 1.5 |
| 12082 | 305.0 | 314.0 | 9.0 | 0.52 | 3.9 | |
| 12082 | 365.0 | 401.0 | 36.0 | 0.42 | 1.9 | |
| 12083 | 106.0 | 118.0 | 12.0 | 0.66 | 3.6 | |
| 12083 | 136.0 | 145.0 | 9.0 | 0.36 | 0.9 | |
| 12083 | 160.0 | 205.0 | 45.0 | 0.57 | 2.1 | |
| 12083 | incl. | 160.0 | 184.0 | 24.0 | 0.79 | 1.7 |
| 12083 | 259.0 | 289.0 | 30.0 | 0.57 | 4.5 | |
| 12084 | 69.0 | 72.0 | 3.0 | 4.71 | 1.3 | |
| 12084 | 90.0 | 99.0 | 9.0 | 1.01 | 8 | |
| 12084 | 153.0 | 195.0 | 42.0 | 0.56 | 3.7 | |
| 12084 | incl. | 156.0 | 180.0 | 24.0 | 0.7 | 5 |
| 12084 | 243.0 | 279.0 | 36.0 | 2.63 | 2.4 | |
| 12084 | incl. | 249.0 | 252.0 | 3.0 | 21.1 | 1.2 |
| 12084 | 291.0 | 549.0 | 258.0 | 0.44 | 1.4 |
Axcap Ventures Inc. – Newton Project
10-93
RockRidge Partnership & Associates
| Hole ID² | Incl | From (m) | To (m) | Int.³ (m) | Au (g/t) | Ag (g/t) |
|---|---|---|---|---|---|---|
| 12084 | incl. | 360.0 | 432.0 | 72.0 | 0.58 | 1.1 |
| 12084 | incl. | 507.0 | 546.0 | 39.0 | 0.76 | 2.2 |
| 12086 | 14.6 | 23.0 | 8.4 | 0.32 | 1 | |
| 12086 | 173.0 | 179.0 | 6.0 | 1.8 | 5.2 | |
| 12086 | 260.0 | 290.0 | 30.0 | 0.38 | 1 | |
| Drillholes Completed byCarlyle | ||||||
| N23-089 | 18.0 | 1001.0 | 983.0 | 0.37 | 1.11 | |
| incl. | 18.0 | 707.0 | 689.0 | 0.51 | 1.48 | |
| incl. | 18.0 | 566.0 | 548.0 | 0.60 | 1.75 | |
| incl. | 18.0 | 466.0 | 448.0 | 0.67 | 2.03 | |
| N23-090 | 20.0 | 251.0 | 231.0 | 0.41 | 2.86 | |
| incl. | 20.0 | 218.0 | 198.0 | 0.46 | 3.25 | |
| incl. | 20.0 | 188.0 | 168.0 | 0.52 | 3.71 | |
| incl. | 20.0 | 182.0 | 162.0 | 0.53 | 3.81 | |
| N23-091 | 18.1 | 764.0 | 745.9 | 0.45 | 1.67 | |
| incl. | 18.1 | 668.0 | 649.9 | 0.50 | 1.87 | |
| incl. | 18.1 | 632.0 | 613.9 | 0.53 | 1.93 | |
| incl. | 18.1 | 581.0 | 562.9 | 0.55 | 2.01 | |
| incl. | 32.0 | 149.0 | 117.0 | 0.80 | 3.06 | |
| incl. | 35.0 | 53.0 | 18.0 | 1.65 | 1.83 | |
| incl. | 110.0 | 149.0 | 39.0 | 0.94 | 6.10 | |
| incl. | 272.0 | 350.0 | 78.0 | 1.07 | 3.18 | |
| incl. | 317.0 | 350.0 | 33.0 | 1.41 | 3.44 | |
| N23-092 | 15.0 | 27.0 | 12.0 | 0.11 | 1.43 | |
| also | 219.0 | 225.0 | 6.0 | 0.14 | 0.55 | |
| also | 238.9 | 245.0 | 6.1 | 0.15 | 0.48 | |
| N23-093 | 10.0 | 105.3 | 95.3 | 0.40 | 1.06 | |
| incl. | 10.0 | 75.0 | 65.0 | 0.51 | 1.30 | |
| incl. | 10.0 | 54.0 | 44.0 | 0.69 | 1.76 | |
| incl. | 14.9 | 54.0 | 39.1 | .0.75 | 1.90 | |
| incl. | 48.0 | 54.0 | 6.0 | 3.83 | 7.05 | |
| incl. | 96.0 | 105.3 | 9.3 | 0.41 | 1.13 | |
| N23-094 | 6.0 | 108.0 | 102.0 | 0.13 | 0.35 | |
| incl. | 6.0 | 93.0 | 87.0 | 0.14 | 0.36 | |
| incl. | 42.0 | 93.0 | 51.0 | 0.16 | 0.39 | |
| N23-095 | 39.0 | 92.0 | 53.0 | 0.19 | 0.35 | |
| incl. | 54.0 | 92.0 | 38.0 | 0.23 | 0.37 | |
| incl. | 54.0 | 63.0 | 9.0 | 0.57 | 0.43 | |
| incl. | 54.0 | 72.0 | 18.0 | 0.38 | 0.50 |
Axcap Ventures Inc. – Newton Project
10-94
RockRidge Partnership & Associates
| Hole ID² | Incl | From (m) | To (m) | Int.³ (m) | Au (g/t) | Ag (g/t) |
|---|---|---|---|---|---|---|
| N23-096 | 2.0 | 81.0 | 79.0 | 0.17 | 1.20 | |
| incl. | 2.0 | 45.0 | 43.0 | 0.26 | 1.89 | |
| incl. | 2.0 | 18.0 | 16.0 | 0.32 | 2.26 | |
| incl. | 2.0 | 9.0 | 7.0 | 0.34 | 1.51 | |
| incl. | 6.0 | 18.0 | 12.0 | 0.36 | 2.38 | |
| incl. | 31.7 | 45.0 | 13.3 | 0.40 | 3.08 | |
| N23-097 | 3.0 | 81.0 | 78.0 | 0.13 | 0.39 | |
| incl. | 3.0 | 21.0 | 18.0 | 0.16 | 0.68 | |
| incl. | 3.0 | 63.0 | 60.0 | 0.14 | 0.41 | |
| incl. | 33.0 | 63.0 | 30.0 | 0.17 | 0.31 | |
| also | 120.0 | 126.0 | 6.0 | 0.24 | 0.88 | |
| N23-098 | 9.0 | 54.0 | 45.0 | 0.15 | 0.42 |
Notes:
-
All holes are vertical, except for holes 92-03, 92-04, 92-05, 06-04, 06-06, 06-11, 06-12, 9001, 12063, 12064, 12072, 12074, and 12080
-
Widths reported are drill widths.
-
All assay intervals represent length weighted averages.
-
Hole lost at 112 m when entering favoured host rock.
-
No significant intersection in holes 9012, 9013, 10021, 10024, 10025, 11038, 11056, 12059, 12066, 12072, 12075, 12078, 12080, 12085, 12087 and 12088.
-
No assays recorded for holes 72-1, 72-3, 72-10, and 06-01
Axcap Ventures Inc. – Newton Project
10-95
RockRidge Partnership & Associates
11. SAMPLE PREPARATION, ANALYSIS AND SECURITY
A summary of the various preparation and analytical laboratories that carried out analytical work on samples from the Newton Property is summarized by year in Table 11-1.
Table 11-1 - ANALYTICAL LABORATORIES USED - NEWTON PROJECT
| Year | Sample Preparation Laboratory |
Primary Assay Laboratory |
Check Assay Laboratory |
|---|---|---|---|
| 1972 | Unknown | Unknown | |
| 1982 | Kamloops Research Assay Lab (KRAL) |
KRAL, Kamloops | |
| 1988 | Min-En North Vancouver | Min-En North Vancouver | |
| 1989 | Min-En North Vancouver | Min-En North Vancouver | |
| 1990 | ACME, Vancouver | ACME, Vancouver | |
| 1991 | Vangeochem, Vancouver | Vangeochem, Vancouver | |
| 1992 | Unknown | Unknown | |
| 1994 | Min-En North Vancouver | Min-En North Vancouver | |
| 1996 | Min-En North Vancouver | Min-En North Vancouver | |
| 1997 | Min-En North Vancouver | Min-En North Vancouver | |
| 2005 | ACME, Vancouver | ACME, Vancouver | |
| 2006 | ACME, Vancouver | ACME, Vancouver | ACME, Vancouver |
| 2009 | ACME, Smithers, or Vancouver |
ACME, Vancouver | ALS Chemex, North Vancouver |
| 2010-2012 | ACME, Vancouver | ACME, Vancouver | ACME, Vancouver and ALS Minerals, North Vancouver |
| 2023 | Bureau Veritas, Vancouver | Bureau Veritas, Vancouver |
Historical Samples (Pre-2006)
Descriptions of the sample preparation or analytical protocols used by Cyprus in 1972, and in a few of the later year programs, are not mentioned in the available reports. Site security measures are also not mentioned in any of the available reports prior to the arrival of Amarc in 2009. It is assumed that sample preparation, analytical, and site security protocols consistent with industry standards of the day were in place during these programs.
Axcap Ventures Inc. – Newton Project
11-96
RockRidge Partnership & Associates
For the 1982 Taseko drilling, Kamloops Research & Assay Laboratory Limited (“KRAL”) performed the sample preparation and analytical work (Assessment Report-11001, 1982). Gold, silver, copper, and zinc were determined for drillholes 82-03 and 82-04; however, the procedures used by KRAL to perform the sample preparation and analysis work are not mentioned.
In 1988, 129 drill core samples (from 1972 Cyprus drill core) and 82 soil samples were collected and sent to Min-En Labs in North Vancouver (Assessment Report-18081, 1988). The core samples were crushed with a jaw crusher and pulverized by ceramic plated pulverizer or ring mill pulverizer. The soil samples were dried at 95°C and screened through an 80-mesh sieve to obtain the minus 80 mesh fraction for analysis. The gold content was determined by Min-En Labs using a special multi-acid digestion with Atomic Absorption Spectroscopy (“AAS”) finish. Silver, copper, lead, zinc, antimony, and arsenic were determined by Min-En Labs using aqua regia plus HClO4 digestion with Inductively Coupled Plasma – Atomic Emission Spectroscopy (ICP-AES) finish.
In 1992, 462 core samples were collected from five drillholes (hole 92-01 through 92-05) and assayed for gold and copper. The assay laboratory and the procedures are not mentioned in the available reports.
The core from the pre-2006 programs was likely split or sawn in half lengthwise, with one half sent for assay and the other half retained in the core box for archival purposes. Most historical samples are two metre in length. Table 11-1 lists the laboratories mentioned in the historical reports. In many cases, the laboratories and methods used are not described definitively and the original assay certificates are generally not available for review. Gold analysis on the drill core samples was likely by the fire assay fusion method on a one assay ton (30 g) sample followed by an AAS or gravimetric finish. Methods and laboratories used for analysis of drill core samples for other elements are also not fully documented. It seems that a variety of analytical methods, digestions, and finishes were used.
High Ridge Samples – 2006
In 2006, the drill core was logged, cut with a diamond saw, and stored on site near the top of Newton Hill. The core was cut in half lengthwise using a gas-powered core saw. Most mineralized core was sampled in two metre intervals with a few exceptions to accommodate structural and lithological changes.
Axcap Ventures Inc. – Newton Project
11-97
RockRidge Partnership & Associates
High Ridge used Acme Analytical Laboratories Ltd. (“Acme”) of Vancouver, British Columbia, to prepare and assay all core samples collected on the Newton Project. A total of 936 samples were assayed for multiple elements including gold, copper, and silver by Acme, which used an aqua regia digestion of a 0.5 g sample followed by an Inductively Coupled Plasma – Mass Spectroscopy (ICP-MS) finish (Acme method code: Group 1DX). In addition, 81 pulp samples were re-assayed by Acme using the same method. It should be noted that gold was not assayed by fire assay (except for two re-assay pulp samples numbered 925 and 927). For the 2006 High Ridge samples, gold was determined by the multi-element assay method described above.
The coarse reject and pulp samples from this program were discarded shortly after the assays were received by High Ridge.
Amarc Samples – 2009 Through 2012
The Amarc drill programs of 2009, 2010, 2011, and 2012 used the same sampling, sample preparation, analytical, site security, and sample storage protocols. Shipment security was expanded in the 2011 and 2012 programs.
The core was boxed at the rig and transported by truck to the logging facility on site where it was logged and sampled. The core was cut in half lengthwise using a diamond saw. One half was collected as an assay sample and the other half was retained in the core box. Most core samples are three metres in length with some exceptions made to accommodate structural and lithological changes. Core samples were placed in plastic sample bags, checked for sample sequence integrity, and then shipped along with external quality control (“QC”) samples (standards, blanks and duplicates) by commercial carrier to the laboratory. In the last two drill programs, samples and external QC samples were collected in white sacks and placed into a sealed wooden tote for shipment. The half core remaining after sampling was transported to a secure facility at Gibraltar Mine (to hole 59) and at Mueller Electric in Williams Lake (holes 60-88) for long term storage.
Samples were shipped to the Acme laboratory facility located in Vancouver, British Columbia, for sample preparation with the exception of 2009 holes 9003 through 9014 which were processed at the Acme facility located in Smithers, British Columbia. Acme was the primary analytical laboratory used, and ALS Minerals, North Vancouver, British Columbia, was the check laboratory. Both the Acme and ALS Minerals facilities are independent of Amarc.
Axcap Ventures Inc. – Newton Project
11-98
RockRidge Partnership & Associates
The following information regarding laboratory certification is published on the web site maintained by Acme:
Foreseeing the need for a globally recognized mark of quality in 1994, Acme began adapting its Quality Management System to an ISO 9000 model. Acme implemented a quality system compliant with the International Standards Organization (ISO) 9001 Model for Quality Assurance and ISO/IEC 17025 General Requirements for the Competence of Testing and Calibration Laboratories. On November 13, 1996, Acme became the first commercial geochemical analysis and assaying lab in North America to be registered under ISO 9001. The laboratory has maintained its registration in good standing since then. Vancouver expanded the scope of its registration to include the Smithers preparation facility in June of 2009, Yellowknife in April 2010, and Whitehorse in May 2010.
October 2011 the Vancouver laboratory received formal approval of its ISO/IEC 17025:2005 accreditation from Standards Council of Canada for the tests listed in the approved scope of accreditation (see link below). The lab will continue to add methods to this scope. The Santiago hub laboratory is also working toward ISO 17025:2005 accreditation and is expected to complete the accreditation process within the next year.
The following information regarding laboratory certification is published on the web site maintained by ALS Minerals:
ALS Minerals has developed and implemented at each of its locations a Quality Management System (QMS) designed to ensure the production of consistently reliable data. The system covers all laboratory activities and takes into consideration the requirements of ISO standards.
The QMS operates under global and regional Quality Control (QC) teams responsible for the execution and monitoring of the Quality Assurance (QA) and Quality Control programs in each department, on a regular basis. Audited both internally and by outside parties, these programs include, but are not limited to, proficiency testing of a variety of parameters, ensuring that all key methods have standard operating procedures (SOPs) that are in place and being followed properly, and ensuring that quality control standards are producing consistent results.
Axcap Ventures Inc. – Newton Project
11-99
RockRidge Partnership & Associates
Accreditation
Perhaps the most important aspect of the QMS is the process of external auditing by recognized organizations and the maintaining of ISO registrations and accreditations. ISO registration and accreditation provides independent verification for our clients that a QMS is in operation at the location in question. Most ALS Minerals laboratories are registered or are pending registration to ISO 9001:2008, and a number of analytical facilities have received ISO 17025 accreditations for specific laboratory procedures.
The half-core samples were crushed at Acme (Vancouver or Smithers) to greater than 80% passing 10 mesh (2 mm), then a 500 g sub-sample was split and pulverized to >85% passing 200 mesh (75 µm). Prior to hole 11045, a 250 g sub-sample was split and pulverized to >85% passing 200 mesh. The coarse rejects and pulps from the assay samples are retained at the secure, longterm storage facility of HDSI at Port Kells, British Columbia.
The gold content was determined by 30 g fire assay fusion with ICP-AES finish (Acme method code: 3B01). The concentrations of copper, silver and 32 additional elements were analyzed using a 1.0 g sample aqua regia digestion with ICP-AES or ICP-MS finish (Acme method code: 7AX). For hole 9001, the first 39 samples were also analyzed for multiple elements using 1.0 g sample digested in aqua regia with ICP-AES finish (Acme method code: 7AR). For hole 9007, the samples were also analyzed for multiple elements using a 1.0 g sample and four acid digestion with ICPAES or ICP-MS finish (Acme method code:7TX).
Duplicate samples were assayed by ALS Minerals using similar methods to those employed by Acme. The gold content was determined using a 30 g fire assay with ICP finish (ALS method code: Au-ICP21). The concentrations of copper, silver and 49 other elements were analyzed with a 0.5 g sample aqua regia digestion with ICP-AES/ICP-MS finish (ALS method code: ME-MS41).
Core sampling by Amarc included: 1,443 samples in 2009, 2,474 samples in the late 2010 to early 2011 program, 1,557 samples in the late 2011 program, and 3,613 samples in 2012. In addition, 145 pairs of in-line quarter core field duplicates were taken in the late 2010 and early 2011 program, 95 in-line duplicates (quarter core for hole 11044 and coarse rejects for remaining holes) in the late 2011 program, and 211 in-line reject duplicates in 2012. The quarter core duplicates
Axcap Ventures Inc. – Newton Project
11-100
RockRidge Partnership & Associates
(performed on all drillholes of late 2010 and early 2011 and hole 11044 of late 2011) and reject duplicates (hole 11045 onwards) were prepared and assayed by Acme using the same methods.
In addition, a total of 25 samples were selected from late 2011 Newton drill core rejects for determination of the gold content by the screen-metallics fire assay method (Acme method G602). A minimum 500 g of the coarse reject split was pulverized, weighed to the nearest gram and then sieved at 150 mesh (0.1 mm). The coarse fraction was weighed to the nearest 0.01 g, fire assayed in its entirety and the gold content weighed to the nearest 0.005 mg. A one assay ton aliquot of the fine fraction was subject to fire assay fusion with an ICP- AES finish, or a gravimetric finish if in excess of 30 ppm Au. The total gold in the coarse fraction, the fine-fraction gold concentration, and a weighted average gold concentration for the entire sample are reported in the results.
The sample preparation and analytical flow chart for the 2009 through 2012 drill programs is shown in Figure 11-1.
Axcap Ventures Inc. – Newton Project
11-101
RockRidge Partnership & Associates
==> picture [458 x 121] intentionally omitted <==
==> picture [458 x 120] intentionally omitted <==
==> picture [458 x 120] intentionally omitted <==
==> picture [458 x 120] intentionally omitted <==
==> picture [458 x 120] intentionally omitted <==
Figure 11-1 – SAMPLE PREPARATION AND ANALYTICAL FLOW CHART
Axcap Ventures Inc. – Newton Project
11-102
RockRidge Partnership & Associates
SUMMARY OF QUALITY ASSURANCE/QUALITY CONTROL MEASURES
Quality assurance (“QA”) is a set of systems and measures whose purpose is to assure that the results meet the standards of quality. QC is the use of processes and tools to check and ensure that the desired level of quality is achieved in the results. Since quality assurance and quality control are closely related, they are often referred as QA/QC.
Amarc implemented and maintained an effective external QA/QC system consistent with industry best practice from 2009 to 2012. This program is in addition to the QA/QC procedures used internally by the analytical laboratories. Table 11-2 describes the types of external QA/QC sample types used in this program.
Table 11-2 - SUMMARY OF EXTERNAL QA/QC SAMPLE TYPES USED
| QC Code | Sample Type | Description | Percent of Total |
|---|---|---|---|
| MS | Regular Mainstream | Regular samples submitted for preparation and analysis at the primary laboratory. |
90% |
| ST | Standard (Certified Reference Material or CRM) |
Mineralized material in pulverized form with a known concentration and distribution of element(s) of interest. Randomly inserted using pre-numbered sample tags. |
5% or 1 in 20 |
| DQ/DX | Duplicate or Replicate | An additional split taken from the remaining pulp reject (DP), coarse reject (DX), ¼ core (DQ) or ½ core remainder. Random selection using pre-numbered sample tags. |
5% or 1 in 20 |
| SD | Standard Duplicate | Standard reference sample submitted with duplicates and replicates to the check laboratory. |
<1% |
| BL | Blank | Basically, a standard with no appreciable grade used to test for contamination. |
1% |
Table 11-3 is a summary of the external QA/QC samples used by year.
HISTORICAL QA/QC (PRE-2006)
There is no mention of external QA/QC samples inserted along with core samples for the historical drilling prior to 2006 in the available reports.
Axcap Ventures Inc. – Newton Project
11-103
RockRidge Partnership & Associates
HIGH RIDGE 2006 DRILL PROGRAM QA/QC
For the 2006 drill program, High Ridge re-assayed 81 pulp samples (pulp duplicates) for external quality control purposes. No external standards or blanks were inserted to control the assay results. In addition, gold was not assayed by the fire assay method (with the exception of two reassay pulp samples - 925 and 927). Instead, gold was determined by digestion of a 0.5 g sample in Aqua Regia followed by an ICP-AES finish.
Table 11-3 - EXTERNAL QA/QC SUMMARY BY YEAR
| Year | MS | DP | DQ/DX | SD | ST | BL | ST% |
|---|---|---|---|---|---|---|---|
| Pre-2006 | 672 | - | - | - | - | - | - |
| 2006 | 934 | 81 | 236* | - | - | - | - |
| 2009 | 1,443 | 75 | 5 | 77 | 23 | 5 | |
| Late 2010 - Early 2011 | 2,474 | 145 | 145* | 11 | 144 | 108 | 5 |
| Late 2011 | 1,557 | 95 | 95 | 7 | 93 | 73 | 6 |
| 2012 | 3,613 | 203 | 211 | 15 | 216 | 170 | 6 |
| ALL | 10,693 | 599 | 687 | 38 | 530 | 374 | 4 |
- Quarter core samples taken by Amarc for gold fire assay and multi-element analysis.
AMARC 2009 DRILL PROGRAM QA/QC
For the 2009 drill program, Amarc implemented a rigorous QA/QC program. Mr. C. Mark Rebagliati, P. Eng., a Qualified Person as defined under NI 43-101, supervised the drilling, quality assurance and quality control program. This program was in addition to the QA/QC procedures used internally by the analytical laboratories.
During this period, a total of 77 standards, 80 check duplicates, including 75 coarse reject duplicates (DX) and five standard duplicates (SD), and 23 coarse granitic blanks (BL) were included with the regular assay samples for external QC purposes (Table 11-3). In 2009, Amarc took 236 quarter core duplicate samples from some of the half core remaining from the 2006 High Ridge sampling program for re-analysis by a gold fire assay fusion method at Acme.
AMARC LATE 2010 AND EARLY 2011 DRILL PROGRAM QA/QC
For the late 2010 and early 2011 drill program, Amarc continued with a similar QA/QC program to 2009. The major difference was that a field duplicate was taken from a quarter core sample instead of the coarse reject. During the period, a total of 144 standards, 145 duplicates and 108
Axcap Ventures Inc. – Newton Project
11-104
RockRidge Partnership & Associates
blanks were included with the regular assay samples for external QC purposes. The blanks consisted of 61 certified pulp blanks and 47 coarse granitic blanks.
AMARC LATE 2011 DRILL PROGRAM QA/QC
For the late 2011 drill program, Amarc continued with a similar QA/QC program. During this phase, a total of 93 standards (ST), 95 in-line quarter core duplicates (DQ) and coarse reject duplicates (DX), 95 inter-laboratory pulp duplicates (DP), and 73 blanks (BL) were included with the regular assay samples for external quality control purposes. The blanks consisted of 35 certified pulp blanks and 38 coarse granitic blanks.
In addition, 25 samples were selected from late 2011 Newton drill core rejects for gold fire assay screen analysis at 150 mesh (0.1 mm) to provide an indication of the “metallic” gold component. Eleven samples from drillhole 11055 were selected because they had higher than anticipated variability in the original in-line duplicate results. The remaining 14 samples were randomly selected. A scatter plot of the results of the gold metallics assays and the original gold assays is shown in Figure 11-2. The plus 150 mesh gold component of the total gold assay for the 25 samples is shown in red in Figure 11-3. The metallic gold component ranges from 0.4% to 23.9% with a median value of 5.4% for the samples in this study.
A scatter plot of the results of the gold metallics assays and the original gold assays is shown in Figure 11-2. The metallic gold component of the total gold assay for 25 samples is shown in red in Figure 11-3.
Axcap Ventures Inc. – Newton Project
11-105
RockRidge Partnership & Associates
==> picture [468 x 520] intentionally omitted <==
Figure 11-2 - SCATTER PLOT OF METALLIC Au VS. ORIGINAL Au ASSAY
As shown in Figure 11-2, two notable outliers occurred: 7.7 vs. 3.2 and 5.4 vs. 0.3 are from 11052950731 and 11045-950182, respectively. They may indicate small gold “nuggets” were found in
Axcap Ventures Inc. – Newton Project
11-106
RockRidge Partnership & Associates
the original assay pulp, but not in the 500-gram metallic assay pulp. The reverse situation did not occur, presumably because the test population is quite limited. Most pairs, including the highest value pair in the test group (12.5 vs. 12.9) from 11045-950163, match quite closely. Ongoing inline duplicate gold results should be monitored to determine if any further metallic gold analyses are needed.
==> picture [470 x 114] intentionally omitted <==
==> picture [470 x 114] intentionally omitted <==
==> picture [470 x 114] intentionally omitted <==
Figure 11-3 - METALLIC GOLD COMPONENT (RED)
AMARC 2012 DRILL PROGRAM QA/QC
In the 2012 drilling program, a total of 216 standards (ST), 211 in-line coarse reject duplicates (DX), and 170 blanks (BL) were inserted and assayed along with the regular assay samples for external quality control purposes. The blanks consisted of 103 certified pulp blanks and 67 coarse granitic blanks.
Axcap Ventures Inc. – Newton Project
11-107
RockRidge Partnership & Associates
STANDARDS
Table 11-4 provides a list of the standards that were used in the 2012 exploration program. Monitoring of the results from the regular assay results for gold was controlled based on a statistical analysis determined from the round-robin analysis of the standards at a number of independent laboratories as follows:
Mean ± 3 Standard Deviations
During the course of the regular assaying of the drill core samples, a standard is deemed to have failed when the gold result falls outside the control limits for the element of interest. The laboratory is notified, and the affected range of the samples is re-run for that element until the included standard passes (falls within the control limits). The silver analyses were not subjected to the same level of scrutiny as were the gold values, consequently the range of these values will be larger.
In respect of silver, only one of the selected standards shown in Table 11-4 had a certified recommended value for silver. Consequently, a recommended value was determined using the assay data received from the Acme laboratory. The mean silver value was determined after first removing significant outlier results. The upper and lower control limits were set at ± 12% of the mean silver value.
In summary, RPA concluded that the QA/QC methods used by Amarc met the current industry best practices. RPA recommended that the QA/QC protocols for the Newton Project be updated in future drilling and that sampling programs include certified reference materials for silver and monitor the results for departures from the recommended values.
Table 11-4 - STANDARDS USED IN THE 2012 DRILL PROGRAM
| Standard | Times Used | Au (g/t) | Ag (g/t) |
|---|---|---|---|
| CM-7 | 30 | 0.427 | 2.42* |
| CM-8 | 10 | 0.91 | 3.60* |
| CM-11A | 46 | 1.014 | 1.89* |
| CM-12 | 54 | 0.686 | 4.04* |
| CM-13 | 8 | 0.74 | 3.38* |
| CM-17 | 6 | 1.37 | 14.90 |
| CGS-29 | 62 | 0.228 | 1.96* |
Axcap Ventures Inc. – Newton Project
11-108
RockRidge Partnership & Associates
Figure 11-4 and Figure 11-5 show the standard control charts after re-runs.
==> picture [448 x 95] intentionally omitted <==
==> picture [448 x 95] intentionally omitted <==
==> picture [448 x 95] intentionally omitted <==
Figure 11-4 - GOLD QUALITY CONTROL CHART (AMARC 2009-2012)
Axcap Ventures Inc. – Newton Project
11-109
RockRidge Partnership & Associates
==> picture [449 x 95] intentionally omitted <==
==> picture [449 x 96] intentionally omitted <==
==> picture [449 x 95] intentionally omitted <==
Figure 11-5 - SILVER QUALITY CONTROL CHART (AMARC 2009-2012)
BLANKS
During the 2012 drilling program, a total of 170 external blanks, including 67 barren rock blanks (coarsely crushed granodiorite), and 103 commercial pulp blanks (BL-7 and BL-9), were inserted with the regular assay samples to monitor potential contamination. The assay results (Figure 11-6 and Figure 11-7) indicate that no significant cross-contamination occurred during sample preparation and assay.
Axcap Ventures Inc. – Newton Project
11-110
RockRidge Partnership & Associates
==> picture [470 x 93] intentionally omitted <==
==> picture [470 x 93] intentionally omitted <==
==> picture [470 x 92] intentionally omitted <==
Figure 11-6 - GOLD MONITORING CHART OF BLANKS (AMARC 2009-2012)
Axcap Ventures Inc. – Newton Project
11-111
RockRidge Partnership & Associates
==> picture [476 x 285] intentionally omitted <==
Figure 11-7 - SILVER MONITORING CHART OF BLANKS (AMARC 2009-2012)
DUPLICATES
During 2012, 211 in-line reject duplicates (DX) were inserted and assayed along with the regular assay samples to monitor the repeatability (precision) of the primary assay laboratory. The results are shown in Figure 11-8 and Figure 11-9. Analyses of the inter-laboratory duplicate samples were performed for gold and 51 additional elements on original pulps by ALS Minerals in Vancouver using similar analytical methods to Acme.
Axcap Ventures Inc. – Newton Project
11-112
RockRidge Partnership & Associates
==> picture [437 x 498] intentionally omitted <==
Figure 11-8 - SCATTER PLOT OF GOLD IN-LINE DUPLICATE SAMPLES (AMARC 2012)
Axcap Ventures Inc. – Newton Project
11-113
RockRidge Partnership & Associates
==> picture [447 x 471] intentionally omitted <==
Figure 11-9 - SCATTER PLOT OF SILVER IN-LINE DUPLICATE SAMPLES (AMARC 2012)
Axcap Ventures Inc. – Newton Project
11-114
RockRidge Partnership & Associates
DENSITY DATA
A total of 1,494 bulk density (or specific gravity, SG) measurements have been taken by site personnel using the water immersion method since 2010.
The procedures of the water immersion method are as follows:
-
Dry, whole core samples, typical of the surrounding rock selected
-
Weigh sample in air (Ma)
-
Weight sample suspended in water (Mw)
-
Read Mw quickly after balance stabilizes to minimize water incursion into rock pores
-
Calculation of the specific gravity as per the formula: SG = Ma/(Ma – Mw)
A summary of the original density results is shown in Table 11-5.
Table 11-5 - SUMMARY OF DENSITY READINGS
| Year | Number of Samples |
SG Median |
|---|---|---|
| Pre-2010 | - | - |
| 2010 | 384 | 2.69 |
| 2011 | 425 | 2.7 |
| 2012 | 685 | 2.68 |
| Overall | **1,494 ** | 2.69 |
DATA ENVIRONMENT
All drill logs and surface exploration samples collected on the project site are compiled in an SQL database with tables that are compatible with Microsoft Access.
Drillhole logs are entered into notebook computers running the Amarc Access data entry module for the Newton Project at the core logging area on site. The core logging computers are synchronized on a daily basis with the master site entry database at the site geology office. Core photographs are also transferred to the site geology office computer on a daily basis. In the geology office, the logs are printed, reviewed, and validated and initial corrections made.
Drillhole data from the project site is transmitted to the Vancouver office on a weekly basis. There, the logging data are imported into the master SQL drillhole database and merged with digital
Axcap Ventures Inc. – Newton Project
11-115
RockRidge Partnership & Associates
assay results provided by the analytical laboratories. A further printing, validation and verification step follows after import.
Edits to the drill logs are submitted to the site office for correction. Analytical re-runs are submitted to the analytical laboratories and corrections to analytical results within the database are made in the Vancouver office. Compiled data are exported to the site entry database, to resource modelling and other users.
DATA PROCESSING
Project data are processed so that they can be rapidly assessed with respect to the requirements of ongoing exploration and timely disclosure of material information by Amarc management. In this regard, compiled drill data and assay results are made available to Amarc management, the technical team, and project consultants advancing the project immediately after the initial error trapping and analytical QA/QC appraisal processes are completed. The data are then subjected to more extensive, through-going validation, verification, QA/QC, and error correction processes. The findings of these longer-term reviews are assessed as to their impact on previously released data and the necessity for further disclosure if there is a material change.
CARLYLE 2023 DRILL AND METALLURGICAL SAMPLING PROGRAM QA/QC
During the Phase 1 drill program, 672 half core samples and 35 QA/QC samples were submitted for assay to Bureau Veritas in Vancouver, BC.
During the Phase 2 drill program 282 half core samples and 20 QA/QC samples were submitted for assay to Bureau Veritas in Vancouver, BC.
All samples from the Phase 1 and 2 drill programs were geochemically analyzed according to a fire assay fusion Au by ICP-ES method (FA330-Au) and a 1:1:1 Aqua Regia digestion ICPES/ICP-MS analysis method (AQ270). Bureau Veritas is an independent ISO 9001: 2008 certified lab, for gold, silver and base metal analysis using Inductivity Coupled Plasma (ICP), and Fire Assay (FA) methods.
QAQC samples inserted included standard reference materials, and blanks. Standards were sourced from CDN Labs of Langley, BC and included CDN-ME-42, CDN-GS-P8H, and CDN-BL10. No issues with standard performance were noted during quality checks prior to interval reporting.
Axcap Ventures Inc. – Newton Project
11-116
RockRidge Partnership & Associates
The remaining half core from both phases of the 2023 drill program after sampling was placed back into wooden core boxes, stacked on pallets, and is currently stored at the KiNiKiNiK Lodge facility, at coordinates 52.126480N, 123.689135W.
The Company submitted a master composite consisting of primarily felsic volcanic material of continuous drill core intervals from three of the 2023 drillholes for testing, which is the primary host rock of the Newton mineralization. Testing was carried out and supervised by Base Metallurgical Laboratories (BaseMet), Kamloops, B.C. under test program BL1338. The objective of the program was to conceptualize a preliminary process flowsheet that would produce gold and silver doré, and to evaluate the metallurgical performance of the mineralization. The testwork included gravity concentration, Whole-ore-leach (WOL) and flotation at various grind sizes followed by leach of the rougher concentrate and tailings. Jeremy Hanson, P.Geo the Qualified Person for Carlyle supervised and the submitted the material sampling and delivery of the material for metallurgical testing. Metallurgical tests were completed using industry standard methods and procedures by Base Metallurgical Laboratories Ltd. Basemet is an independent metallurgical laboratory in Kamloops. BC. QA/QC is conducted in-house using certified reference standards and blanks, together with in-house metallurgical balance controls. Suitably trained technicians and professionals in the field of metallurgical testing completed and supervised the testing.
The QP believes that the sample preparation, security, analytical procedures, and quality control practices of Carlyle meet or exceed industry standards and that the data from the Carlyle drillholes are therefore acceptable for the estimation of mineral resources. Furthermore, the data collected by the previous owner, Amarc, also has the reliability needed for use in resource estimates.
Axcap Ventures Inc. – Newton Project
11-117
RockRidge Partnership & Associates
12. DATA VERIFICATION
Introduction
Other than the drilling carried out by Carlyle in 2023, There had been no drilling and sampling since 2012, and the previous verifications carried out in 2012 remain relevant to determine if the data is of sufficient quality to support this Technical Report.
Additional verification was carried out in 2021 and 2023.
Michael F O’Brien P.Geo. is the QP for this section.
Data Verification 2012 – Amarc
For the 2009 through 2012 drill programs, the following data verification and validation steps were completed by HDI staff during the preparation of the drillhole database:
-
Print and review the merged sampling, analytical and QA/QC information as assay results are returned from the laboratory.
-
Generate downhole charts with lithologic and selected assay element columns, for visual comparison and identification of possible errors.
-
Generate external QA/QC charts to monitor standard performance, identify failures and request re-runs.
-
Generate blank monitoring charts to identify possible contamination.
-
Generate duplicate monitoring charts to monitor assay reproducibility.
-
Correct mis-labelled and mis-entered data entries, keypunching errors, typos and any other errors found; and
-
Verify SG data from the 2010 and 2011 drill programs against downhole plots and core photos and identify outliers.
Axcap Ventures Inc. – Newton Project
12-118
RockRidge Partnership & Associates
Data Verification 2012 – RPA
DRILLING, LOGGING AND SAMPLING PROCEDURES
During 2012, while the most recent drilling campaign was still underway, Mr. Reno Pressacco, Principal Consulting Geologist with RPA, carried out a site visit on June 19 and 20, 2012, accompanied by Ms. Elena Guszowaty and Mr. Fraser Adams. During the site visit, Mr. Pressacco examined existing site infrastructure and access. He visited the location of several surface drillhole collars and discussed diamond drilling procedures with the project geologist. RPA reported that the drilling at the Newton Project has been carried out to the highest industry standards employed at that time.
A small program of check assaying was carried out by RPA where a total of 10 samples of fresh half core from drillholes 12083 and 12072 were selected.
RPA carried out a program of validating the digital drillhole database by means of spot checking a selection of drillholes that intersected the mineralized material. Approximately 10% of the drillhole database was selected for validation. RPA discovered no material discrepancies in the drillhole database.
Data Verification 2021 – RockRidge
A site inspection was conducted by the QP, Michael F O’Brien, MSc., P. Geo on June 24, 2021. During the field visit to the Property, traversed the central portion of the deposit on foot and examined float material from rehabilitated trenches and drill collars. The QP reviewed drill cores at the warehouse facility located at Williams Lake.
The locations of some drill collars were verified in the field, drill core reviewed from selected core intervals and assay intervals identified and related to the drill logs.
Site Inspection and Drillhole Collar Verification
The QP, Michael F O’Brien, Jeremy Hanson (of Hardline Exploration) and Andrew Strain (Professional Photographer) were transported by helicopter from Williams Lake Airport to the site. The helicopter was able to land safely close to the summit of Newton Hill. The team traversed
Axcap Ventures Inc. – Newton Project
12-119
RockRidge Partnership & Associates
along access tracks and examined outcrops and old trench lines. The trenches have been rehabilitated, so outcrop is obscured but float provided evidence of various volcanic rock types, including tuffs, agglomerates and vesicular felsic volcanics with a bleached and altered appearance.
==> picture [467 x 95] intentionally omitted <==
==> picture [467 x 94] intentionally omitted <==
==> picture [467 x 94] intentionally omitted <==
Figure 12-1 - VIEW NORTHWEST OF NEWTON HILL
Axcap Ventures Inc. – Newton Project
12-120
RockRidge Partnership & Associates
==> picture [467 x 95] intentionally omitted <==
==> picture [467 x 94] intentionally omitted <==
==> picture [467 x 95] intentionally omitted <==
Figure 12-2 - VIEW FROM NEWTON HILL TOWARDS SCUM LAKE (ROCKRIDGE, 2021)
Four drillhole collar positions (wooden posts with and without collar identity tags) were checked in the field during the visit using a Garmin GPS Map 66i.
Axcap Ventures Inc. – Newton Project
12-121
RockRidge Partnership & Associates
==> picture [465 x 117] intentionally omitted <==
==> picture [465 x 117] intentionally omitted <==
==> picture [465 x 117] intentionally omitted <==
Figure 12-3 – COLLAR OF DH12057 (ROCKRIDGE, 2021)
Table 12-1 compares the collar locations against the drillhole collar database. The average difference is less than 3 meters which is an acceptable level of precision for coordinates and elevations derived using handheld commercial-grade GPS units.
Table 12-1 – FIELD CHECKS – COLLAR LOCATIONS
| BHID | xcollar | ycollar | zcollar | calibrated z |
XCOLLAR | YCOLLAR | ZCOLLAR | dx | dy | dz |
|---|---|---|---|---|---|---|---|---|---|---|
| 10019 | 457352 | 5738997 | 1308 | 1330.6 | 457353.6 | 5738997.7 | 1322.9 | -1.6 | -0.7 | 7.7 |
| 11036 | 457354 | 5738812 | 1280 | 1302.6 | 457355.0 | 5738808.6 | 1296.7 | -1.0 | 3.4 | 5.9 |
| 11044 | 457446 | 5738801 | 1270 | 1292.6 | 457445.2 | 5738799.5 | 1284.8 | 0.8 | 1.5 | 7.8 |
| **12057 ** | 457447 | 5738840 | 1279 | 1301.6 | 457446.8 | 5738838.7 | 1290.0 | 0.2 | 1.3 | 11.6 |
| **Average ** | -0.4 | 1.4 | 8.2 |
Axcap Ventures Inc. – Newton Project
12-122
RockRidge Partnership & Associates
Core Verification
A core inspection was conducted by the QP, Mr. Michael F O’Brien, MSc., P. Geo on June 24, 2021, at the core storage facility (Mueller Electrical) at Williams Lake.
==> picture [470 x 119] intentionally omitted <==
==> picture [470 x 118] intentionally omitted <==
Figure 12-4 – SELECTED CORE INSPECTION (ROCKRIDGE, 2021
==> picture [469 x 103] intentionally omitted <==
==> picture [469 x 102] intentionally omitted <==
Figure 12-5 – STACKED CORE ALONG BERM OF STORAGE YARD (ROCKRIDGE, 2021)
Axcap Ventures Inc. – Newton Project
12-123
RockRidge Partnership & Associates
The cores are stacked inside a partially fenced industrial facility managed by Mueller Electrical. Despite being within a controlled perimeter which is locked at night, the cores at Williams Lake are not well secured as they are stacked outdoors (see Figure 12-5) in a general industrial area with several different activities are taking place and where they are at risk of disturbance by heavy industrial equipment and vehicles. The lids of most wooden core boxes have been removed, presumably during previous inspections and consequently the core has deteriorated due to weathering. Many boxes have rotted to the extent that they cannot be moved without a risk of disintegration and loss of material. The identifying markings on many boxes and sampling tags are no longer legible shows a typical example of core box labeling.
An unknown number of cores are stored at Gibraltar Mine and were not seen by the QP in 2021.
==> picture [452 x 116] intentionally omitted <==
==> picture [452 x 117] intentionally omitted <==
Figure 12-6 – K-SILICATE ALTERATION IN MAFIC FLOW (HOLE 11052)
Axcap Ventures Inc. – Newton Project
12-124
RockRidge Partnership & Associates
==> picture [452 x 88] intentionally omitted <==
==> picture [452 x 87] intentionally omitted <==
Figure 12-7 – ARGILLIC ALTERATION IN MONZONITE (HOLE 9004)
==> picture [444 x 111] intentionally omitted <==
==> picture [444 x 111] intentionally omitted <==
Figure 12-8 – BANDED TUFF WITH OXIDIZED SULPHIDES (HOLE 11052)
Selected runs of five drillholes (9004, 11048, 11052, 12068 and 12079), a total of 1,404 metres were laid out and reviewed in the storage facility (see, Figure 12-6, Figure 12-7 and Figure 12-8, inclusive and Table 12-2).
Axcap Ventures Inc. – Newton Project
12-125
RockRidge Partnership & Associates
Table 12-2 – REVIEW HOLE RUNS
| Hole | From | To |
|---|---|---|
| 9004 | 110 | 220.0 |
| 11048 | 0 | 350.0 |
| 11052 | 0 | 534.0 |
| 12068 | 0 | 210.0 |
| 12079 | 0 | 200.0 |
Core box labeling, distance markers, and assay tags were in poor condition. Some boxes had no legible identifying marks, and the core position was inferred from the adjacent boxes.
The geological data as logged was compared with the database record and visually inspected and in the QP’s opinion, the identifiable cores and database are comparable.
Data Verification 2024 – RockRidge
A site inspection was conducted by the QP, Michael F O’Brien, MSc., P. Geo on October 8th, 2024. During the field visit to the Property, in the company of Jeremy Hanson (of Hardline Exploration), Blake Mclaughlin of Axcap and Morgan Good of Carlyle, the QP traversed the central portion of the deposit by vehicle and on foot and examined float material from rehabilitated trenches and drill collars. The QP reviewed drill cores and inspected the current core storage facility located next to the Alexander MacKenzie Highway (BC 20 52° 7'34.62"N, 123°41'20.24"W).
Database Grade Verification
The QP reviewed the grade database against Acme Labs Assay Certificates. In 2021, a selection of 1114 sample numbers from the 2012 assay certificates were selected at random and these compared with the drilling database. This comparison represents a total of 1,094 samples, which equates to approximately 10% of the total assay data in the database. 33 gold assays in the data base showed discrepancies with the assay certificates. The most significant discrepancies are
Axcap Ventures Inc. – Newton Project
12-126
RockRidge Partnership & Associates
eight samples (956646 to 956654, inclusive excluding 956650) from drillhole 12084 from 309m to 330m depth.
Verification of 2012 Sampling
Two complete drillholes (Hole 11045 and 11052, Figure 12-9) were check assayed by quarter coring (diamond saw) during the site visit undertaken by the QP in June 2021.
On receipt of the the check sampling assays, the checks and primary assay data were compared by means of tables and graphs.
==> picture [471 x 236] intentionally omitted <==
Figure 12-9 – LOCATION OF TWO HOLES USED IN CHECK ASSAYS
An analysis after merging the original assay table and the check assays shows that the check and original samples are correlated considering they are equivalent to coarse duplicates, and they do not show significant bias. A scatter plot showing gold is presented in Figure 12-10 and silver in Figure 12-11.
Axcap Ventures Inc. – Newton Project
12-127
RockRidge Partnership & Associates
==> picture [329 x 329] intentionally omitted <==
Figure 12-10 – SCATTERPLOT OF AU VALUES.
Axcap Ventures Inc. – Newton Project
12-128
RockRidge Partnership & Associates
==> picture [315 x 315] intentionally omitted <==
Figure 12-11 - SCATTERPLOT OF AG VALUES.
Grade profiles showing grade vs. check assay grade is presented below for hole 11045 (Figure 12-12) and hole 11052 (Figure 12-13).
==> picture [471 x 183] intentionally omitted <==
Figure 12-12 – DOWNHOLE ASSAY PROFILES FOR HOLE 11045
Axcap Ventures Inc. – Newton Project
12-129
RockRidge Partnership & Associates
==> picture [471 x 181] intentionally omitted <==
Figure 12-13 - DOWNHOLE ASSAY PROFILES FOR HOLE 11052
Verification of Pre-2012 Data
The cores of the older holes have suffered extensive weathering and loss in transport between various storage facilities. Comparative re-sampling and quarter coring is not practicable and would be unlikely to provide unbiased comparison. Verification of pre-2012 vintage exploration holes has been restricted to checking of drill collar locations on plan and in the field and review of drill logs and assay sheets. No material discrepancies were identified by review of drill logs and location data, but the QP recognises that the verification of the pre-2012i sampling is lacking and should be ameliorated through twin drilling and sampling next to selected older drill holes (see Item 26, Phase 1).
Topography Verification
Topography data publicly available for the drilled portion of the property and sourced from the Shuttle Radar Topography Mission (“SRTM”) was downloaded. This topography was used to build a digital terrain model, and 546 points were compared with the topography provided by the issuer that was used for geological modelling. A bias of +3.6 meters was noted with the SRTM appearing to be higher than the topography model used for geological modelling. The QP does not believe that a bias of 3.6 m is material at this stage of project development. A weathering surface modeled from downhole logs was used to terminate blocks in the model. This surface is located a significant
Axcap Ventures Inc. – Newton Project
12-130
RockRidge Partnership & Associates
distance below the topography surface and therefore the volumetric impact of the topography surface is nil.
Conclusions
Based on the data verification, the QP considers the geological logging, and assay data to be adequate to support a mineral resource estimate.
Axcap Ventures Inc. – Newton Project
12-131
RockRidge Partnership & Associates
13. MINERAL PROCESSING AND METALLURGICAL TESTING
In 2023 Carlyle submitted a master composite consisting of primarily felsic volcanic material of continuous drill core intervals from three drillholes for testing (Table 13-1). The drill holes intersect the resource model along the eastern edge of the deposit. Testing was carried out and supervised by Base Metallurgical Laboratories (“BaseMet”), Kamloops, B.C. under test program BL1338. The objective of the program was to conceptualize a preliminary process flowsheet that would produce gold and silver doré, and to evaluate the metallurgical performance of the mineralization. The information in this section is a summary of the testwork completed under BL1338 for Carlyle.
A total of five intervals from N23-089, N23-090 and N23-091 drill core were submitted, and a subsequent master composite was generated through combination. The testwork included gravity concentration, whole-ore-leach (“WOL”) and flotation at various grind sizes followed by leach of the rougher concentrate and tailings.
Table 13-1 – DRILL CORE INTERVALS
| Hole | Composite ID | Interval | ||
|---|---|---|---|---|
| From | To | Length | ||
| N23-089 | A | 140 | 203 | 63 |
| B | 380 | 446 | 66 | |
| N23-090 | C | 101 | 158 | 57 |
| N23-091 | D | 29 | 89 | 60 |
| E | 275 | 347 | 72 |
Composites A through E each contributed approximately 1/5[th] of the total 67 kg used to create the Master Composite. The head grades for each of the drill core segments ranged from 0.55 g/t Au to 0.95 g/t Au and the Master Composite average head grade measured 0.72 g/t Au (Table 13-2).
Axcap Ventures Inc. – Newton Project
13-132
RockRidge Partnership & Associates
Table 13-2 – MASTER COMPOSITE HEAD GRADE
| Sample | **Assays ** | ||||||
|---|---|---|---|---|---|---|---|
| Cu | Fe | S | Au | Ag | CuOx | CuCN | |
| Master Composite Hd 1 Master Composite Hd 2 Average |
0.045 0.045 0.045 |
2.92 3.00 2.96 |
2.65 2.62 2.64 |
0.66 0.78 0.72 |
2.7 2.6 2.7 |
0.001 0.001 0.001 |
0.005 0.006 0.006 |
| Method | FAAS | FAAS | LECO | FAAS | ICP | FAAS | FAAS |
| Units | % | % | % | g/t | g/t | % | % |
Gravity test results
Two initial gravity concentration tests using a Mozley table were conducted on the master composite at 80% passing (P80) 75 and 150 microns. The highest recovery was at the coarser grind size with approximately 22.8% of the gold being recovered at a grade of 211.8 g/t (Table 13-3).
Table 13-3 – GRAVITY TEST RESULTS
| Test | µm K80 | Mass | Grade - | g/t | Recovery - % | Recovery - % |
|---|---|---|---|---|---|---|
| % | Au | Ag | Au | Ag | ||
| 4 | 150 | 0.088 | 211.8 | 147 | 22.8 | 5.0 |
| 5 | 75 | 0.083 | 112.6 | 146 | 14.1 | 4.7 |
Initial Whole Ore Leach (“WOL”) test results
A preliminary WOL investigation was completed at three grind sizes. The results for the material tested show that a primary grind size in the range of P80 75 microns provided the best results with 73.2% of the gold and 43.2% of the silver extracted (Table 13-4). To investigate the gold losses a 3-Stage Diagnostic leach test was completed on Test 3 WOL tailings. The results indicated that some of the gold may be locked in sulphide minerals and gangue requiring additional liberation.
Axcap Ventures Inc. – Newton Project
13-133
RockRidge Partnership & Associates
Table 13-4 – WOL TEST RESULTS
| Test | µm K80 | NaCN ppm |
pH | Reagent Cons kg/t |
Reagent Cons kg/t |
48 hr Extraction % |
48 hr Extraction % |
Residue Assay g/t |
Residue Assay g/t |
|---|---|---|---|---|---|---|---|---|---|
| NaCN | Lime | Au | Ag | Au | Ag | ||||
| 1 | 2700 | 1000 | 10.5 | 0.8 | 1.5 | 42.5 | 28.8 | 0.42 | 2.0 |
| 2 | 150 | 1000 | 10.5 | 1.0 | 1.5 | 71.0 | 42.7 | 0.23 | 1.5 |
| 3 | 75 | 1000 | 10.5 | 1.7 | 1.7 | 73.2 | 43.2 | 0.20 | 1.5 |
Flotation + Leach Results
To provide better liberation and improve overall gold extraction a flotation/leach flowsheet was tested at P80 75 and 150 microns. At the coarser primary grind size approximately 81% of the gold and 72.5% of the silver was recovered to the rougher concentrate. With the finer primary grind the results improved with 88.5% of the gold and 82.6% of the silver recovered to a rougher concentrate. To investigate the potential overall recovery with cyanidation of the rougher concentrate and tailings a subsequent test at a primary grind of P80 75 was completed. Approximately 11.1% of the feed mass and 89.8% of the gold was recovered to the rougher concentrate. The rougher concentrate was reground to approximately P80 15 microns prior to a 2- hour pre-oxidation and 48-hour cyanide leach. The rougher tailings were leached at the target primary grind of P80 75 microns and achieved the maximum gold extraction after 24-hours. The overall gold and silver extraction for the master composite tested was 80.3% and 32.7%, respectively (Table 13-5).
Table 13-5 - FLOTATION AND LEACH RESULTS
| Product | Weight % |
Assay - % or g/t | Assay - % or g/t | Assay - % or g/t | Distribution - % | Distribution - % | Distribution - % | Leach Unit **Extraction ** |
Leach Unit **Extraction ** |
Overall **Extraction ** |
Overall **Extraction ** |
|---|---|---|---|---|---|---|---|---|---|---|---|
| Au | Ag | S | Au | Ag | S | Au | Ag | Au | Ag | ||
| Ro Con | 11.1 | 7.8 | 19.0 | 19.7 | 89.8 | 82.6 | 86.3 | 80.5 | 35.4 | 72.3 | 29.2 |
| Rougher Tail | 88.9 | 0.11 | 0.50 | 0.39 | 10.2 | 17.4 | 13.7 | 78.4 | 20.1 | 8.0 | 3.5 |
| TOTAL | 80.3 | 32.7 |
Conclusions
Based on the preliminary metallurgical testwork on the Master Composite created from a few samples of Newton mineralization completed in 2024, the float/leach flowsheet resulted in an
Axcap Ventures Inc. – Newton Project
13-134
RockRidge Partnership & Associates
overall gold and silver extraction of 80.3% and 32.7%, respectively. The master composite was created from a limited number of drill holes and the metallurgical testwork may not represent all styles of mineralization and the mineral deposit as a whole. Testwork on additional samples of continuous segments of drill core that range in head grade and spatially represent the material to be mined is recommended in the next stage of engineering to optimize the flowsheet and provide confidence in the recoveries. Based on the very limited testwork to date, there is insufficient data to comment on any processing factors or deleterious elements that could have a significant effect on potential economic extraction.
Axcap Ventures Inc. – Newton Project
13-135
RockRidge Partnership & Associates
14. MINERAL RESOURCE ESTIMATES
Summary
The previous resource estimate for Carlyle, completed in 2022 by RockRidge, was primarily based on the historical database compiled in 2012, with additional grade data from four holes assayed after the 2012 estimate by RPA. This mineral resource estimate can be regarded as a historical estimate.
The current mineral resource estimate is an updated version, following an exploration program completed by Carlyle in the spring of 2022.
Mineralized material was classified into the Inferred Mineral Resource category based on data density, variography-derived search ellipses, lithological and structural modeling constraints, and an increased understanding of the deposit type. The resource volume was constrained by an optimized pit shell to meet the requirement for “reasonable prospects for eventual economic extraction.” The mineral resource is summarized in Table 14-1, with a highlighted cut-off grade of 0.25 g/t Au.
Table 14-1 – SUMMARY OF MINERAL RESOURCES – NEWTON
| Resource in Optimized Pit (Inferred) |
Resource in Optimized Pit (Inferred) |
Grade | Metal Content | Metal Content | ||
|---|---|---|---|---|---|---|
| Cut Off Au |
Mass t |
Au (g/t) |
Ag (g/t) |
AuEQ³ (g/t) |
Au (t. oz) |
Ag (t. oz) |
| 0.25 | 41,071,100 | 0.64 | 3.41 | 0.68 | 842,900 | 4,506,100 |
Notes
-
Differences may occur in totals due to rounding.
-
CIM Definition Standards for Mineral Resources and Mineral Reserves (May 2014) and CIM Estimation of Mineral Resources and Mineral Reserves Best Practice Guidelines (November 2019) were used for mineral resource estimation.
-
Metal prices used are US$1950/Oz for Gold and US$25/Oz for Silver.
-
Recovery factors used are 80.3% for Au and 32.7% for Ag.
-
Prices are in US$ per Troy ounce.
-
Effective date for the Mineral Resource December 1, 2024.
Axcap Ventures Inc. – Newton Project
14-136
RockRidge Partnership & Associates
Descriptions of the Database
The database was provided by the issuer in the form of an Access database file. The records were verified to ensure the presence of assay, survey, and collar data for each drillhole. An audit of the database was conducted to create master data tables in CSV format. After excluding invalid data, the final dataset comprised 36,417 meters of drilling across 138 drillholes. Of these, 128 were drilled by previous operators and 10 by Carlyle. The dataset within the model footprint includes 31,659 meters of drilling from 106 holes, with 9 drilled by Carlyle. The model area contains 10,481 gold (Au) samples spanning a total drilling length of 29,896 meters, and 9,942 silver (Ag) samples over 28,731 meters.
For statistical analysis and grade estimation, missing assay data were treated as absent values. The database incorporates historical drilling data collected by previous operators prior to the exploration campaigns conducted by Amarc and Carlyle. The drillhole data are provided in the UTM NAD83, Zone 10 coordinate system.
A plan view showing the drillhole locations in the resource boundary is presented in Figure 14-1
==> picture [451 x 284] intentionally omitted <==
Figure 14-1 – DRILLHOLE LOCATIONS
Axcap Ventures Inc. – Newton Project
14-137
RockRidge Partnership & Associates
Geological Domain Interpretation
The deposit has been reinterpreted using lithological logs from the 2023-2024 drilling campaign in the drillhole database, along with the updated surface geological map and vertical section interpretations. While the new model is primarily based on the drilling data from the previous estimate, it provides an updated understanding of the distribution and controls of mineralization at Newton.
The initial structural model was created using implicit modeling with Leapfrog Geo software. Lithological solids were then modeled by flagging the drillhole data with a code to isolate specific portions of each drillhole with unique identifiers. Significant effort was dedicated to refining and updating the wireframe solids to accurately reflect interpreted lithological and tectonic boundaries. An updated topography digital terrain model was also added using DEM data from the SRTM mission. More lithological units were modeled compared to the previous model, and the volumes of the modeled lithology solids represent an update of the 2022 model.
Key modeling elements in the deposit model are:
Structure (see Figure 14-2.)
-
Newton Hill Fault : a major fault with a ≈ 370m displacement downdip to the west.
-
South Graben Fault : a major fault with a ≈ 600-650m north down displacement truncating mineralization to the south.
-
Ruby Fault : a fault with a ≈ 170m sinistral displacement moving mineralized blocks to the northwest.
-
Roxanne Fault : a major fault with a ≈ 450m displacement truncating mineralization to the east.
Lithology (see Figure 14-4)
-
Felsic wireframe solids - consists of solids for the main felsic flows and tuffs, and minor felsic ignimbrites that coalesce and bifurcate.
-
Epiclastic solids - consists of solids of the supracrustal epiclastic rocks, volcanic wackes, conglomerates and mafic epiclastics.
-
Mafic volcanic solids - consists of solids of the supracrustal mafic volcanic package.
Axcap Ventures Inc. – Newton Project
14-138
RockRidge Partnership & Associates
-
Intermediate dyke solids - consists of solids of the plagioclase phyric porphyry intrusives, mostly monzonitic and quartz monzonite dykes.
-
Quartz Feldspar porphyry solids - consists of solids of the intrusive quartz-feldspar porphyry units.
A wireframe surface of the overburden contact was also created from drill logs and was used to inform the block model.
==> picture [471 x 278] intentionally omitted <==
Figure 14-2 – NEWTON STRUCTURE MODEL
Modeling of the structure provided fault-bounded blocks which were used to compartmentalise the lithology model. Structure modeling generated eight separate fault blocks. Only three of the fault blocks (FB1, FB4 and FB7) contained significant gold grades within three large blocks of felsic volcanic rocks displaced by the west-dipping Newton Hill fault as well as some lateral displacement on the Ruby fault. The models honour the lithologic and tectonic information documented in the drillhole logs. (Figure 14-3)
Axcap Ventures Inc. – Newton Project
14-139
RockRidge Partnership & Associates
==> picture [471 x 285] intentionally omitted <==
Figure 14-3 – NEWTON FAULT BLOCKS
==> picture [472 x 124] intentionally omitted <==
==> picture [472 x 123] intentionally omitted <==
Figure 14-4 – SECTION N5738700 OF LITHOLOGY MODEL
Axcap Ventures Inc. – Newton Project
14-140
RockRidge Partnership & Associates
The felsic units contain almost all the significant gold and silver mineralization. Figure 14-5 and Figure 14-6 illustrates the high grades in the felsic units by means of box plots showing grades for gold and silver per lithologic unit.
Figure 14-5 – BOXPLOT OF GOLD PER LITHOLOGIC UNIT
Figure 14-6 – BOXPLOT OF SILVER PER LITHOLOGIC UNIT
Axcap Ventures Inc. – Newton Project
14-141
RockRidge Partnership & Associates
There are several syn- to post-mineralization dykes that intersect the three blocks of felsic volcanic material. Within the felsic lithological units, three domains were established using a grade shell (or numeric interpolant) method, with the trend aligned to the observed mineralization trend and a nominal gold mineralization cut-off grade of 0.4 g/t (Figure 14-7). Additionally, three more domains were created outside the 0.4 g/t grade domains, regardless of lithology.
==> picture [471 x 329] intentionally omitted <==
Figure 14-7 – GRADE DOMAINS IN FELSIC UNITS
Inspection of the geometry of lithological and mineralized units revealed compelling evidence to support three dimensional palinspastic reconstructions of the Newton Hill and Ruby fault displacements (Figure 14-8). Palinspastic reconstruction is an un-faulting technique that translates geological units along observed vectors back to pre-deformed (faulting or folding) position. The same translational vectors were used to project the drillhole composites to their predeformed positions.
Axcap Ventures Inc. – Newton Project
14-142
RockRidge Partnership & Associates
Geo-statistical examination as well as block model Interpolation was carried out in the predeformed positions. Interpolated blocks were transformed back to the current faulted positions. This approach assumes that deformation occurred after mineralization. Variography modelling in pre-deformed space is more likely to reflect the pre-deformed spatial uncertainty.
==> picture [471 x 329] intentionally omitted <==
Figure 14-8 – SECTION SHOWING DISPLACED HIGH-GRADE MINERALIZATION
Interpretation of the observed geometry indicates approximately 370m of normal displacement along the Newton Hill fault and 165m of sinistral strike slip movement along the Ruby fault, with corresponding vectors to locate domains and data into pre- and post-faulted space. (See Figure 14-9 and Figure 14-10).
Using the pre-deformed model, the 3 fault block domains (Dom1,4 and 7) inside the 0.4g/t Au grade shells align to form a single coherent volume assumed to represent the position of the mineralization prior to faulting. The other three poorly mineralized domains located outside of the
Axcap Ventures Inc. – Newton Project
14-143
RockRidge Partnership & Associates
0.4g/t Au grade shells inside fault blocks 1,4 and 7 also formed a single coherent volume after reconstruction. For estimation purposes, the two domains were coded “IN” and “OUT”. The result is two final domains that exist in un-faulted space in which gold and silver estimates could be completed before translating back to the current spatial configuration (See Figure 14-11).
The QP believes that the palinspastic reconstruction approach has improved the estimation process and is appropriate for the deposit.
==> picture [470 x 90] intentionally omitted <==
==> picture [470 x 90] intentionally omitted <==
==> picture [470 x 90] intentionally omitted <==
Figure 14-9 – UN-FAULTING OF DOMAIN IN FAULT BLOCK 1
Axcap Ventures Inc. – Newton Project
14-144
RockRidge Partnership & Associates
==> picture [470 x 90] intentionally omitted <==
==> picture [470 x 90] intentionally omitted <==
==> picture [470 x 89] intentionally omitted <==
Figure 14-10 - UN-FAULTING OF DOMAIN IN FAULT BLOCK 4
==> picture [470 x 90] intentionally omitted <==
==> picture [470 x 89] intentionally omitted <==
==> picture [470 x 90] intentionally omitted <==
Figure 14-11 – RELATIVE POSITIONS AFTER PALINSPASTIC RECONSTRUCTION
Axcap Ventures Inc. – Newton Project
14-145
RockRidge Partnership & Associates
Compositing Methodology
The drillhole database was coded per interpreted domain such that only data falling within the domain boundaries was composited to homogenize sample support. The method of equalizing sample length is not the only criteria for standardizing sample support.
An analysis of the distribution of the sample lengths for the gold samples (Figure 14-12) indicated that a nominal three metre core length was most appropriate in calculating the composites. This was the predominant sample length and allowed the original features of the deposit as it relates to data resolution to be incorporated into the estimate.
Target composite length of 3m was employed which permitted composite lengths to change on a hole-by-hole basis to ensure all data within a mineralized domain was made available to the estimate and that very short composites were eliminated without discarding data. Un-sampled intervals were not assigned a default value. The QP believes that the compositing procedure is appropriate for the data and the deposit and is an adequate basis for mineral resource estimation.
==> picture [356 x 303] intentionally omitted <==
Figure 14-12 – HISTOGRAM OF SAMPLE LENGTH
Axcap Ventures Inc. – Newton Project
14-146
RockRidge Partnership & Associates
Grade Capping
The impact of high-grade assays must be evaluated and adjusted to minimize the risk of overestimation caused by high-grade outlier values. The composite values were examined for the potential influence of high grades, which were then adjusted through capping prior to estimation.
Restricting the effect of extreme grades is considered more appropriate than completely excluding the outliers from estimation, if these values are not the result of sampling or assay errors and represent a legitimate part of the sample distribution.
To determine the appropriate capping values for gold and silver in each of the four domains, a combination of cumulative coefficient of variation plots and log probability plots as well as decile analyses (Figure 14-13 and Figure 14-14) was used.
Decile analysis is an empirical approach used for mineral resource datasets to assess grade distribution and guide cutting decisions. The dataset is divided into deciles, and the “40/10” rule is applied: cutting is recommended if the last decile contains more than 40% of the total metal and the last percentile holds more than 10%. A typical cutting limit is the highest value from the previous percentile.
For the Newton dataset:
-
In the Au-IN domain , the last decile holds 31% of the metal, and the last percentile contains 9%, so no cutting was applied.
-
In the Au-OUT domain , the last decile accounts for 37%, and the last percentile holds 12%. After cutting, these were reduced to 36% and 11%, respectively.
-
The Ag-IN domain initially had 41% in the last decile and 13% in the last percentile. After cutting, these values decreased to 40% and 10%.
-
The Ag-Out domain showed 42% in the last decile and 12% in the last percentile, which were reduced to 40% and 9% post-cutting.
Axcap Ventures Inc. – Newton Project
14-147
RockRidge Partnership & Associates
==> picture [470 x 120] intentionally omitted <==
==> picture [470 x 120] intentionally omitted <==
==> picture [470 x 120] intentionally omitted <==
==> picture [470 x 120] intentionally omitted <==
==> picture [387 x 10] intentionally omitted <==
----- Start of picture text -----
Figure 14-13 – CV, LOG PROBABLILITY and DECILE ANALYSIS PLOTS FOR GOLD
----- End of picture text -----
Axcap Ventures Inc. – Newton Project
14-148
RockRidge Partnership & Associates
==> picture [470 x 120] intentionally omitted <==
==> picture [470 x 120] intentionally omitted <==
==> picture [470 x 120] intentionally omitted <==
==> picture [470 x 119] intentionally omitted <==
Figure 14-14 - CV, LOG PROBABLILITY and DECILE ANALYSIS PLOTS FOR SILVER
Summaries of the gold and silver capping grades are presented in Table 14-2., Table 14-3 and Table 14-4 detailing the impact that grade cutting had on the values of gold and silver for the two domains of the Newton Project. The QP believes that the capping strategy is appropriate for mineral resource estimation of this deposit.
Axcap Ventures Inc. – Newton Project
14-149
RockRidge Partnership & Associates
Table 14-2 – SUMMARY OF CUTTING VALUES
| Domain | Cutting Value (g/t) | No of Samples Cut | Percent Samples Cut |
|---|---|---|---|
| Au_IN | 11.15 | 1 | 0.002% |
| **Au_OUT ** | 3.11 | 11 | 1.4% |
| Ag_IN | 41.10 | 9 | 2.7% |
| **Ag_OUT ** | 16.20 | 13 | 2.5% |
Table 14-3 – DESCRIPTIVE STATISTICS FOR GOLD
| Gold (g/t) | Domain Au Inside | Domain Au Inside | Domain Au Inside | Domain Au Outside | Domain Au Outside | Domain Au Outside |
|---|---|---|---|---|---|---|
| Raw Data | Composite Data |
Cut Composite |
Raw Data | Composite Data |
Cut Composite |
|
| Count | 1559 | 1734 | 1734 | 7290 | 6670 | 6670 |
| Mean | 0.873 | 0.804 | 0.804 | 0.155 | 0.153 | 0.151 |
| SD | 1.001 | 0.823 | 0.823 | 0.300 | 0.248 | 0.208 |
| CV` | 1.147 | 1.024 | 1.024 | 1.938 | 1.620 | 1.382 |
| Variance | 1.003 | 0.677 | 0.677 | 0.090 | 0.061 | 0.043 |
| Minimum | 0.001 | 0.104 | 0.104 | 0.001 | 0.001 | 0.001 |
| Q1 | 0.458 | 0.434 | 0.434 | 0.044 | 0.049 | 0.049 |
| Q2 | 0.616 | 0.578 | 0.578 | 0.096 | 0.100 | 0.100 |
| Q3 | 0.952 | 0.855 | 0.855 | 0.192 | 0.192 | 0.193 |
| Maximum | 16.56 | 11.152 | 11.150 | 11.19 | 7.11 | 3.11 |
Table 14-4 - DESCRIPTIVE STATISTICS FOR SILVER
| Silver (g/t) | Domain Ag Inside | Domain Ag Inside | Domain Ag Inside | Domain Ag Outside | Domain Ag Outside | Domain Ag Outside |
|---|---|---|---|---|---|---|
| Raw Data | Composite Data |
Cut Composite |
Raw Data | Composite Data |
Cut Composite |
|
| Count | 1558 | 1733 | 1733 | 6832 | 6364 | 6364 |
| Mean | 4.320 | 4.084 | 3.948 | 1.307 | 1.285 | 1.254 |
| SD | 8.378 | 6.775 | 5.245 | 2.420 | 2.075 | 1.662 |
| CV | 1.939 | 1.659 | 1.328 | 1.852 | 1.615 | 1.325 |
| Variance | 70.188 | 45.898 | 27.507 | 5.858 | 4.307 | 2.763 |
| Minimum | 0.250 | 0.250 | 0.250 | 0.050 | 0.050 | 0.050 |
| Q1 | 1.400 | 1.433 | 1.433 | 0.250 | 0.250 | 0.250 |
| Q2 | 2.400 | 2.436 | 2.436 | 0.700 | 0.713 | 0.711 |
| Q3 | 4.400 | 4.233 | 4.233 | 1.500 | 1.526 | 1.523 |
| Maximum | 221.60 | 131.06 | 41.10 | 93.20 | 59.83 | 16.20 |
Axcap Ventures Inc. – Newton Project
14-150
RockRidge Partnership & Associates
Bulk Density
The Newton database included 1,782 density measurements in total. Values that were unmistakably erroneous were deleted from the data set. Clearly erroneous values were removed from the dataset. Specific gravities were estimated using an inverse distance squared method with an anisotropic search oriented horizontally. The search range was adequate to ensure that a value could be estimated for every block in the project area. A histogram of specific gravity (SG) values is shown in Figure 14-15.
The QP believes that the density data has been appropriately prepared in an industry standard manner and is adequate to allow the estimation of the bulk density in this deposit.
==> picture [436 x 379] intentionally omitted <==
Figure 14-15 – HISTOGRAM OF DENSITY MEASUREMENTS
Axcap Ventures Inc. – Newton Project
14-151
RockRidge Partnership & Associates
Trend Analysis
Before modeling experimental variograms, an analysis of the general continuity of mineralization trends in three dimensions was conducted. Radial basis function (RBF) interpolation was employed to create volumetric fields from the irregularly spaced metal grade data. The RBF interpolant was generated in Leapfrog software using gold grades, without applying any trends. A 3-dimensional contour map of gold grades was produced, with fixed grade intervals of 0.2 g/t.
Slices were taken through the RBF interpolant in east-west and north-south orientations as well as horizontally. Example sections are presented in Figure 14-16, Figure 14-17 and Figure 14-18. Overall, the gold values are distributed as relatively large zones bordered by faults with grades of less than 1 g/t Au that enclose areas of slightly elevated gold grades. Although poorly defined, a major trend could be observed in all three planes with a general orientation that is roughly parallel to the Newton-Hill fault dipping at about 25 ⁰ with a long axis at a strike of roughly NNW-SSE.
==> picture [469 x 296] intentionally omitted <==
Figure 14-16- GOLD CONTOURS AT SECTION 5738700N
Axcap Ventures Inc. – Newton Project
14-152
RockRidge Partnership & Associates
==> picture [457 x 288] intentionally omitted <==
Figure 14-17 – GOLD CONTOURS AT SECTION 457450E
==> picture [457 x 288] intentionally omitted <==
Figure 14-18 – GOLD CONTOURS AT BENCH 1180m
Axcap Ventures Inc. – Newton Project
14-153
RockRidge Partnership & Associates
Variography
Experimental semi-variograms were calculated and modeled for gold and silver in each reconstructed domain. One or two structure spherical models were fitted. All domains had enough samples to create stable experimental semi-variograms. Mild anisotropy was observed for the most part and therefore directional variogram models were considered applicable for this study.
The nugget values (i.e., the sample variability at very close distance) were established from downhole variograms. The determined nugget values average 37% of the total sill value for gold in the IN domain and 62% in the OUT domain. The silver nugget values were 15% for the IN domain and 45% for the OUT domain. Note that the sill represents the sample variability at a distance beyond which there is no significant correlation. The variogram continuity models created for gold and silver in both domains are presented in Figure 14-19, Figure 14-20, Figure 14-21 and Figure 14-22.
==> picture [445 x 132] intentionally omitted <==
==> picture [445 x 131] intentionally omitted <==
Figure 14-19 – VARIOGRAM MODELS FOR Au_IN DOMAIN
Axcap Ventures Inc. – Newton Project
14-154
RockRidge Partnership & Associates
==> picture [445 x 132] intentionally omitted <==
==> picture [445 x 131] intentionally omitted <==
Figure 14-20 - VARIOGRAM MODELS FOR Au_OUT DOMAIN
==> picture [445 x 131] intentionally omitted <==
==> picture [445 x 132] intentionally omitted <==
Figure 14-21 - VARIOGRAM MODELS FOR Ag_IN DOMAIN
Axcap Ventures Inc. – Newton Project
14-155
RockRidge Partnership & Associates
==> picture [445 x 132] intentionally omitted <==
==> picture [445 x 131] intentionally omitted <==
Figure 14-22 - VARIOGRAM MODELS FOR Ag_OUT DOMAIN
The variogram model parameters used for grade estimation of gold and silver are summarized below in Table 14-5.
Axcap Ventures Inc. – Newton Project
14-156
RockRidge Partnership & Associates
Table 14-5 – VARIOGRAM MODEL PARAMETERS
| PARAMETER | PARAMETER | PARAMETER | GOLD DOMAIN | GOLD DOMAIN | SILVER DOMAIN | SILVER DOMAIN |
|---|---|---|---|---|---|---|
| General | Variogram Name Variance Nugget Normalised Nugget |
Au_IN | Au_OUT | Ag_IN | Ag_OUT | |
| 0.566 | 0.060 | 30.322 | 2.664 | |||
| 0.051 | 0.038 | 1.819 | 0.912 | |||
| 0.090 | 0.630 | 0.060 | 0.343 | |||
| Direction | Dip Dip Azi. Pitch |
25 | 25 | 25 | 25 | |
| 280 | 280 | 280 | 280 | |||
| 20 | 20 | 20 | 20 | |||
| Structure 1 | Sill | 0.040 | 0.022 | 3.942 | 1.097 | |
| Normalised sill | 0.07 | 0.37 | 0.13 | 0.4117 | ||
| Structure | Spherical | Spherical | Spherical | Spherical | ||
| Range (m) |
Major | 42 | 120 | 42 | 120 | |
| Semi-major | 14 | 80 | 14 | 80 | ||
| Minor | 8 | 36 | 8 | 36 | ||
| Structure 2 | Sill | 0.0453 | 5.7612 | |||
| Normalised sill | 0.08 | 0.19 | ||||
| Structure | Spherical | Spherical | ||||
| Range (m) |
Major | 80 | 80 | |||
| Semi-major | 54 | 54 | ||||
| Minor | 33 | 33 |
The QP believes that the variography used for grade estimation is appropriate for this deposit.
Block Model Construction
An orthogonal block model was created within each domain wireframe to encompass the full extent of the Newton mineralization. The block model was not rotated, but a sub-blocking approach was utilized to accurately represent the volume of each domain. A block size of 15mX x 15mY x 3mZ was chosen to best reflect the data density, deposit shape, and composite length, while also minimizing the number of blocks lacking data support. As a general guideline, it is undesirable to have more than five unsupported blocks between data points, which was mostly achieved, except along the outer edges of the models where data density was lower. The basic geometrical parameters of the block model are summarized in Table 14-6.
Axcap Ventures Inc. – Newton Project
14-157
RockRidge Partnership & Associates
Table 14-6 – BLOCK MODEL PARAMETERS
| Type | Easting (X) | Northing (Y) | Elevation (Z) |
|---|---|---|---|
| Minimum Coordinates | 456600 | 5738270 | 560 |
| Maximum Coordinates | 457725 | 5739335 | 1400 |
| Number of Blocks | 75 | 71 | 280 |
| Parent Block Size | 15 | 15 | 3 |
Sub-blocks to a minimum size of 3m in X, and Y were applied to fill the domain wireframes. Parent blocks were estimated using ordinary kriging. Parent cells were discretized at 3X, 3Y and 1Z. Sub-block grades were assigned from parent blocks. Estimation into irregular volume sub-blocks was avoided to eliminate risk of variable change of support for the estimates.
The metal grade estimation work involved two successive steps for the “IN” domains and one for the “OUT” domains. The first step used with the “IN” domain considered a search ellipsoid which was equal to the variogram range. This was doubled in size for the second step and tripled for the third step. A minimum of eight composites from two different drillholes were required to estimate a block in the first step. In the second step the requirement was six composites from two drillholes and the third step requires four samples from two drillholes. The “OUT” domains were estimated with two steps which used the variogram range and eight composites from two drillholes in the first pass and twice the variogram range with six composites for the second pass. The search orientation ellipses were defined based on the orientation of the ellipsoids in the zones as modelled during the variogram modelling process. (See Table 14-7).
The selection of the search radii was guided by modelled ranges from variography and was established to estimate a large portion of the blocks within the modelled area with limited extrapolation. The parameters were established by conducting repeated test resource estimates and reviewing the results as a series of plan views and sections.
“Hard” domain boundaries were used along the contacts of the un-faulted mineralized domains. Only data contained within the respective domain was allowed to be used to estimate the grades of the blocks within the domain in question, and only those blocks within the domain limits were allowed to receive grade estimates. An example cross section is presented in Figure 14-23.
Axcap Ventures Inc. – Newton Project
14-158
RockRidge Partnership & Associates
Table 14-7 – SEARCH PARAMETERS
| Table 14-7 – SEARCH PARAMETERS | Table 14-7 – SEARCH PARAMETERS | |||||
|---|---|---|---|---|---|---|
| General | Domain Inside | Domain | Outside | |||
| Pass 1 | Pass 2 | Pass 3 | Pass 1 | Pass 2 | ||
| Ellipsoid Ranges | Major | 80 | 160 | 240 | 120 | 240 |
| Intermediate | 54 | 108 | 160 | 80 | 160 | |
| Minor | 33 | 66 | 72 | 36 | 72 | |
| Ellipsoid Directions |
Dip | 25 | 25 | 25 | 25 | 25 |
| Dip Azi. | 280 | 280 | 280 | 280 | 280 | |
| Pitch | 20 | 20 | 20 | 20 | 20 | |
| Number of Samples |
Minimum | 8 | 6 | 4 | 8 | 6 |
| Maximum | 16 | 16 | 16 | 16 | 16 | |
| Drillhole Limit | Samples/Hole | 5 | 4 | 3 | 5 | 4 |
==> picture [471 x 324] intentionally omitted <==
Figure 14-23 – SECTION 5738700N SHOWING BLOCK MODEL
Axcap Ventures Inc. – Newton Project
14-159
RockRidge Partnership & Associates
Block Model Validation
The resource block model was validated through a series of visual inspections, comparing the interpolated block model grades with the drillhole composite grades, which included:
-
A comparison of block grades with the composites within those blocks; and
-
A comparison of average assay grades with average block estimates across various directions, using swath plots.
Figure 14-24 presents a comparison of gold block estimates versus gold assay grades from the composites within those blocks for all mineralized domains combined. On average, the estimated block grades closely match the assay data, with a strong correlation of 0.751 R², which is typical for this deposit type. It should be noted that the block estimated grades are smoother than the assay data. Conditional bias is evident from the regression line in the scatterplot, where estimates tend to be slightly higher at lower composite grades and marginally lower at higher composite grades. This is a normal result of ordinary kriging for this deposit type.
A second validation was performed by comparing the average assay grades from the drillholes with the average block estimates along different directions in the block model. De-clustered average assay grades were calculated and compared with the average block estimates along east-west, north-south, and horizontal swaths. The results were found to be satisfactory. (See Figure 14-25, Figure 14-26 and Figure 14-27).
Axcap Ventures Inc. – Newton Project
14-160
RockRidge Partnership & Associates
==> picture [438 x 438] intentionally omitted <==
Figure 14-24 – SCATTERPLOT OF Au BLOCK ESTIMATES VS. COMPOSITES
Axcap Ventures Inc. – Newton Project
14-161
RockRidge Partnership & Associates
Figure 14-25 - SWATH PLOT OF Au IN X
Figure 14-26 - SWATH PLOT OF Au IN Y
Axcap Ventures Inc. – Newton Project
14-162
RockRidge Partnership & Associates
==> picture [406 x 289] intentionally omitted <==
Figure 14-27 – SWATH PLOT OF Au IN Z
Mineral Resource Classification
The Newton mineral resources were classified in accordance with the CIM Definition Standards for Mineral Resources and Mineral Reserves (May 2014). All mineralized material within each domain was categorized as an Inferred Mineral Resource, based on factors such as data density, search ranges, grade continuity observed from variography, and a conceptual Lerchs-Grossman pit shell constraining volume (Figure 14-28). Additionally, the classification was informed by experience with similar deposits.
Axcap Ventures Inc. – Newton Project
14-163
RockRidge Partnership & Associates
==> picture [471 x 324] intentionally omitted <==
Figure 14-28 – SECTION OF BLOCK MODEL SHOWING PIT OUTLINE
RESPONSIBILITY FOR ESTIMATION
Mr. Michael F O’Brien, P. Geo is the QP for this section.
Mineral Resource Statement
CIM Definition Standards for Mineral Resources and Mineral Reserves (May 2014) defines a mineral resource as:
“a concentration or occurrence of solid material of economic interest in or on the Earth’s crust in such form, grade or quality and quantity that there are reasonable prospects for eventual economic extraction. The location, quantity, grade or quality, continuity and other geological characteristics of a Mineral Resource are
Axcap Ventures Inc. – Newton Project
14-164
RockRidge Partnership & Associates
known, estimated or interpreted from specific geological evidence and knowledge, including sampling”.
CIM Definition Standards for Mineral Resources and Mineral Reserves (May 2014) defines an inferred mineral resource as:
“that part of a Mineral Resource for which quantity and grade or quality are estimated on the basis of limited geological evidence and sampling. Geological evidence is sufficient to imply but not verify geological and grade or quality continuity.
An Inferred Mineral Resource has a lower level of confidence than that applying to an Indicated Mineral Resource and must not be converted to a Mineral Reserve. It is reasonably expected that the majority of Inferred Mineral Resources could be upgraded to Indicated Mineral Resources with continued exploration”.
The reader is cautioned that a portion of the resource estimates are in the Inferred category, which category may be considered geologically speculative. The known mineralization has not yet been determined to be economic ore and there is no guarantee that the resources will be upgraded to reserve status.
CIM Definition Standards for Mineral Resources and Mineral Reserves (May 2014) defines an indicated mineral resource as:
“That part of a Mineral Resource for which quantity, grade or quality, densities, shape and physical characteristics are estimated with sufficient confidence to allow the application of Modifying Factors in sufficient detail to support mine planning and evaluation of the economic viability of the deposit.
Geological evidence is derived from adequately detailed and reliable exploration, sampling and testing and is sufficient to assume geological and grade or quality continuity between points of observation. An Indicated Mineral Resource has a lower level of confidence than that applying to a Measured Mineral Resource and may only be converted to a Probable Mineral Reserve”.
All the Newton mineral resources is classified as inferred resources.
Axcap Ventures Inc. – Newton Project
14-165
RockRidge Partnership & Associates
CIM Definition Standards for Mineral Resources and Mineral Reserves (May 2014) defines a measured mineral resource as:
“That part of a Mineral Resource for which quantity, grade or quality, densities, shape, and physical characteristics are estimated with confidence sufficient to allow the application of Modifying Factors to support detailed mine planning and final evaluation of the economic viability of the deposit.
Geological evidence is derived from detailed and reliable exploration, sampling and testing and is sufficient to confirm geological and grade or quality continuity between points of observation.
A Measured Mineral Resource has a higher level of confidence than that applying to either an Indicated Mineral Resource or an Inferred Mineral Resource. It may be converted to a Proven Mineral Reserve or to a Probable Mineral Reserve”.
No resources were classified as measured or indicated. The “reasonable prospects for economic extraction” requirement generally imply that the quantity and grade estimates meet certain economic thresholds and that the mineral resources are reported at an appropriate cut-off grade considering extraction scenarios and processing recoveries. The QP considers that the Newton mineralization is amenable to open pit extraction. The mineral resources are reported at a cut-off grade considering the likely open pit mining extraction scenario that would be used to mine this mineralization. The pit optimization utilized is based on assumed offsite costs, metal recovery, and metal prices presented in Table 14-8.
Table 14-8 – PIT OPTIMIZATION INPUT PARAMETERS
| PARAMETER | UNIT | VALUE |
|---|---|---|
| Gold Price | US$/ounce | $1,950.00 |
| Silver Price | US$/ounce | $25.00 |
| Pit slope | Degrees | 50⁰ |
| Gold Recovery | % | 80.3 |
| Silver Recovery | % | 32.7 |
| Ore mining cost | $/t | $2.20 |
| Waste mining cost | $/t | $2.00 |
| **Overburden removal ** | $/t | $1.50 |
| **Processing plus G&A ** | $/t | $12.00 |
Axcap Ventures Inc. – Newton Project
14-166
RockRidge Partnership & Associates
The classified mineral resource estimates for the Newton deposit are reported for a cut-off of 0.25 g/t and are presented in Table 14-9 The block estimates are presented at a range of cut-offs to demonstrate sensitivity to cut off grades.
Table 14-9 – GRADE AND TONNAGE SENSITIVITY
| Cut Off Sensitivity | Cut Off Sensitivity | Grade | Grade | Metal Content | Metal Content | |
|---|---|---|---|---|---|---|
| Cut Off Au |
Mass t |
Au (g/t) |
Ag (g/t) |
AuEQ³ (g/t) |
Au (t. Oz) |
Ag (t. Oz) |
| 0.20 | 51,345,300 | 0.56 | 3.08 | 0.59 | 916,200 | 5,089,400 |
| 0.25 | 41,071,100 | 0.64 | 3.41 | 0.68 | 842,900 | 4,506,100 |
| 0.30 | 35,728,700 | 0.69 | 3.68 | 0.74 | 796,100 | 4,221,400 |
| 0.35 | 32,354,400 | 0.73 | 3.92 | 0.78 | 760,700 | 4,077,900 |
| 0.40 | 30,483,900 | 0.75 | 4.07 | 0.81 | 738,300 | 3,990,900 |
Notes
-
Differences may occur in totals due to rounding.
-
Metal price used are US$1950/Oz for Gold and US$25/Oz for Silver
-
Recovery factors used are 80.3% for Au and 32.7% for Ag
-
All prices are in US$ / troy. Oz.
Table 14-10 shows the block estimates inside pit shells generated at different Au prices to demonstrate sensitivity to metal prices.
Table 14-10 – SENSITIVITY TO METAL PRICE
| Metal Price Sensitivity | Metal Price Sensitivity | Grade | Metal Content | ||||
|---|---|---|---|---|---|---|---|
| Au | Mass | Au | Ag | AuEQ³ | Au | Ag | AgEQ |
| $Au/Oz | t | (g/t) | (g/t) | (g/t) | (t. Oz) | (t. Oz) | (t. Oz) |
| $1850 | 40,316,300 | 0.642 | 3.443 | 0.686 | 831,900 | 4,462,600 | 889,376 |
| $1950 | 41,071,100 | 0.638 | 3.413 | 0.682 | 842,900 | 4,506,100 | 900,237 |
| $2050 | 46,658,200 | 0.627 | 3.247 | 0.669 | 941,000 | 4,870,500 | 1,003,007 |
| $2150 | 48,401,000 | 0.624 | 3.192 | 0.665 | 970,900 | 4,967,500 | 1,034,706 |
Notes
-
Differences may occur in totals due to rounding.
-
Metal price used for Silver is US$25/Oz
-
Recovery factors used are 80.3% for Au and 32.7% for Ag
-
All prices are in US$ / troy. Oz.
The mineral resource for the Newton Deposit is summarized in Table 14-11.
Axcap Ventures Inc. – Newton Project
14-167
RockRidge Partnership & Associates
Table 14-11 – SUMMARY OF MINERAL RESOURCES – NEWTON
| Resource in Optimized Pit (Inferred) |
Resource in Optimized Pit (Inferred) |
Grade | Metal Content | Metal Content | Metal Content | ||
|---|---|---|---|---|---|---|---|
| Cut Off Au |
Mass t |
Au (g/t) |
Ag (g/t) |
AuEQ³ (g/t) |
Au (t. Oz) |
Ag (t. Oz) |
AuEQ³ (t. Oz) |
| 0.25 | 41,071,100 | 0.64 | 3.41 | 0.68 | 842,900 | 4,506,100 | 900,200 |
Notes
-
Differences may occur in totals due to rounding.
-
CIM Definition Standards for Mineral Resources and Mineral Reserves (May 2014) and CIM Estimation of Mineral Resources and Mineral Reserves Best Practice Guidelines (November 2019) were used for mineral resource estimation.
-
Metal price used are US$1950/Oz for Gold and US$25/Oz for Silver
-
Recovery factors used are 80.3% for Au and 32.7% for Ag
-
Prices are in US$ per Troy ounce.
-
Effective date for the Mineral Resource Update December 1, 2024
The QP has considered various factors, including environmental, permitting, legal, title, taxation, socio-economic, marketing, political, and other relevant issues, when considering the Mineral Resource estimates. At this time, the company has no reason to believe that these factors will materially affect the Mineral Resources. Given the current stage of exploration and discovery at the Newton deposit, no studies have been conducted to assess whether mining, infrastructure, or other relevant factors could materially impact the Mineral Resources. Since the previous estimate metallurgical testing has been completed and the data was used in the pit shells that constrain the mineral resource estimate.
The Qualified Person (QP) believes that the mineral resource estimates for the Newton project were generated using industry-standard methods, and that the results are reasonable and appropriate for this technical report.
Axcap Ventures Inc. – Newton Project
14-168
RockRidge Partnership & Associates
15. MINERAL RESERVE ESTIMATES
There are no Mineral Reserves on the Newton Property.
Axcap Ventures Inc. – Newton Project
15-169
RockRidge Partnership & Associates
16. MINING METHODS
This section is not applicable.
Axcap Ventures Inc. – Newton Project
16-170
RockRidge Partnership & Associates
17. RECOVERY METHODS
This section is not applicable.
Axcap Ventures Inc. – Newton Project
17-171
RockRidge Partnership & Associates
18. PROJECT INFRASTRUCTURE
This section is not applicable.
Axcap Ventures Inc. – Newton Project
18-172
RockRidge Partnership & Associates
19. MARKET STUDIES AND CONTRACTS
This section is not applicable.
Axcap Ventures Inc. – Newton Project
19-173
RockRidge Partnership & Associates
20. ENVIRONMENTAL STUDIES, PERMITTING AND SOCIAL OR COMMUNITY IMPACT
This section is not applicable.
Axcap Ventures Inc. – Newton Project
20-174
RockRidge Partnership & Associates
21. CAPITAL AND OPERATING COSTS
This section is not applicable.
Axcap Ventures Inc. – Newton Project
21-175
RockRidge Partnership & Associates
22. ECONOMIC ANALYSIS
This section is not applicable.
Axcap Ventures Inc. – Newton Project
22-176
RockRidge Partnership & Associates
23. ADJACENT PROPERTIES
Taseko Mines’ New Prosperity copper-gold project and Prosperity Deposit is located 40 km to the south of the Newton deposit but adjacent to Carlyle’s property holdings.
In late 2019, the T ŝ ilhqot’in National Government and Taseko entered into a confidential dialogue, with the involvement of the Province of British Columbia, in order to obtain a long-term resolution of the conflict regarding Taseko’s proposed New Prosperity copper-gold mine, acknowledging Taseko’s commercial interests and the T ŝ ilhqot’in Nation’s opposition to the project.
This dialogue has been supported by the parties’ agreement, beginning December 2019, to a series of one-year standstills on certain outstanding litigation and regulatory matters relating to Taseko’s tenures and the area in the vicinity of Teẑtan Biny. The standstill agreement was extended for a fourth one-year term in December 2022, with the goal of providing time and opportunity for the T ŝ ilhqot’in Nation and Taseko to negotiate a final resolution (https://www.tasekomines.com/properties/new-prosperity/#timeline).
As of the effective date of this technical report Taseko and the T ŝ ilhqot’in Nation have not been able to reach an agreement on any proposed future development of the New Prosperity Deposit, nor has Taseko received the necessary provincial or federal permits required to proceed with development.
The QP has been unable to independently verify the information on the New Prosperity property, but the New Prosperity mineralization is unlikely to be related to the mineralization on the Newton Property.
Axcap Ventures Inc. – Newton Project
23-177
RockRidge Partnership & Associates
24. OTHER RELEVANT DATA AND INFORMATION
No additional information or explanation is necessary to make this Technical Report understandable and not misleading.
Axcap Ventures Inc. – Newton Project
24-178
RockRidge Partnership & Associates
25. INTERPRETATION AND CONCLUSIONS
The QPs believe exploration on the Newton Property to date has successfully identified a mineralized system that exhibits characteristics typical of bulk-tonnage, strata-bound, low to intermediate sulphidation epithermal gold-silver deposits. The mineralisation (disseminated gold and associated base metals) is primarily hosted by thick sequences of late Cretaceous-aged permeable felsic volcaniclastics and flows and contemporaneous felsic intrusions, emplaced into a structurally active graben environment. The host rocks show strong, widespread sericite- quartz alteration with variable siderite and several percent pyrite and/or marcasite. Additional mineralization is hosted to a lesser degree by intrusive rocks of intermediate and felsic composition. Initial studies suggest that the gold occurs predominantly as high fineness electrum and is preferentially associated with marcasite-bearing alteration.
The drilling completed to date has outlined a significant, gold-silver deposit over an area of approximately 800 m by 800 m and to a depth of approximately 560 m from surface. The deposit is coincident with a NW trending magnetic low and occupies a restricted area within an extensive, plus seven square kilometre hydrothermal system (as indicated by the outline of the 8 MV/V contour of the IP chargeability anomaly) that exhibits widespread metal enrichment, and which remains to be fully explored. Drill results to date not only indicate that there is potential to expand the current bulk-tonnage gold resource but also suggest that there are possibilities to discover structurally controlled zones of higher-grade gold mineralization and copper-gold porphyry-style mineralization in proximity to, and possibly genetically related to the Newton mineralized system.
Given the association of gold mineralization with felsic units, there are other mapped occurrences of felsic volcanic rock units to the northwest of the deposit and south of the NHF that have not received the same level of drilling as the main resource area. This association would prompt a recommendation for a thorough investigation of all interpreted or mapped felsic volcanic occurrences on the Property.
The QP has reviewed the QA/QC programs employed by Amarc and Carlyle during the most recent drilling campaigns and assaying programs and found them to meet current industry best practices.
Axcap Ventures Inc. – Newton Project
25-179
RockRidge Partnership & Associates
During the 2022 site visit, discrepancies were noted between collar elevations in the drillhole database and the current topographic data. Although these discrepancies were not deemed to have a material impact on the mineral resource estimate, any further work will benefit from a new high resolution topographic data set.
The QP has applied grade caps to the estimation domains that were used to prepare this Inferred Mineral Resource estimate. Review of the distribution of gold and silver grades suggested that capping is warranted.
Examination of contour plots of gold grades for selected sections and benches through the deposit reveal that a weak but discernable mineralization trend appears to be present in the data examined. A grade-block model was prepared using the modeled domains to ensure proper coding of the model. “Hard” domain boundaries were used along the contacts of the mineralized domain model. Only data contained within the respective domain models were allowed to be used to estimate the grades of the blocks within the domain in question, and only those blocks within the domain limits were allowed to receive grade estimates. Only the capped, composited grades of the drillhole intersections were used to derive an estimate of a block’s grade.
A series of domain wireframe solids were created in three-dimensional modeling software that outlined those portions of the deposit that demonstrate continuity of mineralization. These threedimensional solids were used as one of the constraints in the preparation of the Inferred Mineral Resource estimate.
A conceptual pit shell was generated using a Lerchs-Grossmann optimizer as an additional constraint in the preparation of this Inferred Mineral Resource estimate. A 50° overall pit wall slope angle was applied.
The Inferred Mineral Resources in this Technical Report were estimated in accordance with the definitions contained in the CIM Definition Standards on Mineral Resources and Mineral Reserves (CIM definitions) that were prepared by the CIM Standing Committee on Reserve Definitions and adopted by the CIM Council on May 10, 2014.
The mineralized material for each domain was classified by the QP into the Inferred Mineral Resource category based on the search ellipse ranges obtained from the variography study, the
Axcap Ventures Inc. – Newton Project
25-180
RockRidge Partnership & Associates
application of an open pit shell along with a constraining volume, and previous experience with precious metal deposits.
The Inferred Mineral Resources are presented in Table 25-1. At a cut-off grade of 0.25 g/t Au, a total of 41,071,100 tonnes are estimated to be present at an average Au equivalent grade of 0.68 g/t (842,900 contained oz Au) and (4,506,100 contained oz Ag).
Table 25-1 - SUMMARY OF MINERAL RESOURCES
| Resource in Optimized Pit (Inferred) |
Resource in Optimized Pit (Inferred) |
Grade | Metal Content | Metal Content | ||
|---|---|---|---|---|---|---|
| Cut Off Au |
Mass t |
Au (g/t) |
Ag (g/t) |
AuEQ³ (g/t) |
Au (t. oz) |
Ag (t. oz) |
| 0.25 | 41,071,100 | 0.64 | 3.41 | 0.68 | 842,900 | 4,506,100 |
Notes
-
Differences may occur in totals due to rounding.
-
CIM Definition Standards for Mineral Resources and Mineral Reserves (May 2014) and CIM Estimation of Mineral Resources and Mineral Reserves Best Practice Guidelines (November 2019) were used for mineral resource estimation.
-
Metal prices used are US$1950/Oz for Gold and US$25/Oz for Silver.
-
Recovery factors used are 80.3% for Au and 32.7% for Ag.
-
Prices are in US$ per Troy ounce
-
Effective date for the Mineral Resource December 1, 2024.
EXPLORATION POTENTIAL
Much of the large Newton sulphide-bearing alteration zone, as defined by Amarc’s 2010 IP survey, has not been thoroughly explored. There is a clear relationship between the felsic volcanoclastic units and disseminated gold mineralization at the Newton Gold Deposit. Felsic volcaniclastic units mapped on surface and modeled in 3D based on historic drilling indicate that these felsic units persist at depth but have only received a limited amount of drilling. Of the widely spaced drilling completed NW of the most intensely drilled portion of the Newton Deposit, 9 of the 10 drillholes completed in 1972 by Cyprus, intersected intervals of felsic volcaniclastic rocks. Of these 9 holes, 5 were not analyzed for gold and/or silver, and 4 were partially sampled and analyzed for gold only. At that time, Cyprus was primarily interested in the copper potential at Newton, and they did not conduct any gold analyses. Of the partially sampled holes, drillhole 7206 contains two high grade intersections. Of particular note is drillhole 72-03 which intersected a 211m interval of felsic volcaniclastic rock and although there are indications this interval was
Axcap Ventures Inc. – Newton Project
25-181
RockRidge Partnership & Associates
sampled, likely for copper, gold analyses were not conducted. In 1987, Rea Gold resampled the 1972 drill core, but details and results of this sampling could not be found.
The main part of the Newton deposit is also coincident with a NW trending magnetic low that extends from the eastern side of the resource model, approximately 1km to the northwest (See Figure 25-2).
The Newton Deposit and felsic volcaniclastic units immediately NW of the most intensely drilled portion of the Newton Deposit are coincident with this NW trending magnetic low. As part of the recommendation in their 2022 technical report (O’Brien et al, 2022), RockRidge recommended further drilling be carried out in this area to confirm mineralization identified in historical drilling. In 2023, Carlyle completed seven drillholes, northwest and north of the Newton Deposit. Based on favourable gold results from this drilling, Carlyle outlined two new target areas, Halo and Sunrise (See Figure 25-2).
At Halo, three drillholes (N23-93 to 95) were completed approximately 400 metres north of the Newton resource confirming and extending gold mineralization identified in historic drillhole 10030. A fourth drillhole (N23-96) was completed north of the Newton resource and approximately 200m south of Halo intersected mineralization suggesting that the mineralization at Halo may extend to the south toward the Newton Deposit. Further drilling is recommended to define the extent of mineralization at Halo (Carlyle News Release, February 21, 2024, Dube, 2024).
At Sunrise, Carlyle completed a short exploration drillhole (N23-98) in a sparsely drilled area northwest of the Newton Deposit and peripheral to a broad area with elevated gold in soil and chargeability anomalies that correlate with untested felsic volcanics. Drillhole N23-98 intersected anomalous gold mineralization hosted in strongly altered felsic intrusive rocks (Carlyle News Release, February 21, 2024, Dube, 2024).
The Newton Deposit and the felsic volcaniclastic units located immediately northwest of its most extensively drilled section remain priority targets. This is due to mineralization identified in historical drilling, as well as the presence of a magnetic low and felsic units, which have been shown to host higher-grade mineralization. A drill plan recommendation consisting of 12 drillholes northwest of the Newton resource totalling 4500m is shown in Figure 25-1 and up to 9 infill
Axcap Ventures Inc. – Newton Project
25-182
RockRidge Partnership & Associates
drillholes have been budgeted totalling 2,900m. Further drilling is also recommended to investigate both Halo and Sunrise target areas consisting of four holes totalling 1,600m.
Significant risk factors to the mineral resource project and available ameliorations are summarized in Table 25-2. Any or all of these items could cause the project to fail.
Table 25-2 - MINERAL RESOURCE PROJECT RISK FACTORS
| Risk Factor | Potential Impact (high/moderate/low) |
Management and Amelioration |
|---|---|---|
| Metal Prices | high | External factors, to be ameliorated by prudent development planning. |
| Tonnage and Grade | moderate | Current categorization of the mineral resource as inferred flags the level of uncertainty. Infill drilling and improved geology and evaluation modelling should address the risk and opportunity. |
| Metal recovery | moderate | Metallurgical testwork and geo- metallurgical modelling |
| Environmental and Community | moderate | Prudent environmental monitoring and engagement with stakeholders |
Axcap Ventures Inc. – Newton Project
25-183
RockRidge Partnership & Associates
==> picture [545 x 105] intentionally omitted <==
==> picture [545 x 105] intentionally omitted <==
==> picture [545 x 105] intentionally omitted <==
==> picture [545 x 105] intentionally omitted <==
Figure 25-1 – RECOMMENDED DRILL PROGRAM
Axcap Ventures Inc. – Newton Project
25-184
RockRidge Partnership & Associates
==> picture [561 x 105] intentionally omitted <==
==> picture [561 x 106] intentionally omitted <==
==> picture [561 x 106] intentionally omitted <==
==> picture [561 x 105] intentionally omitted <==
Figure 25-2 – EXPLORATION POTENTIAL
Axcap Ventures Inc. – Newton Project
25-185
RockRidge Partnership & Associates
26. RECOMMENDATIONS
Pending the completion of the Company’s transaction to acquire a 100% interest in the Newton Project, the authors recommend the Company carry out a two-phase program consisting of an initial phase focussing on resource expansion drilling concurrent with a comprehensive metallurgical testwork program based on a larger, more representative sample of the Newton Deposit mineralization. The estimated cost of the proposed Phase 1 program would be approximately $4,100,000.
The Phase 1 resource expansion and infill drilling program would be designed to accomplish a number of objectives including:
-
Expanding upon known mineralized zones and new discoveries of gold systems on the Property beyond the current resource limits
-
Increasing the currently delineated gold-silver resource by improving the grade definition and upgrading the resource classification through infill drilling and twin drilling of selected pre-2012 holes.
-
Obtaining a larger and more representative sample for follow up metallurgical and geotechnical testwork
The Phase 1 drill program would potentially consist of:
-
Drill testing areas within or immediately adjacent to the significant plus seven square kilometre hydrothermal system as outlined by the 8MV/V contour of the IP chargeability anomaly where felsic volcanic units are projected, or have the potential, to occur, including areas where felsic volcanic units are projected, or have the potential to occur, the Halo and Sunrise target areas (approximately 6,100m).
-
Infill diamond drilling to further delineate potentially economic mineralization and twindrilling for selected pre-2012 holes (approximately 2,900m).
-
Additional detailed structural modelling completed within and proximal to the currently defined resource to assess the potential presence, and projected location, of zones of high-density veins and/or mineralized fractures. Such zones have the potential to host
Axcap Ventures Inc. – Newton Project
26-186
RockRidge Partnership & Associates
higher-grade, structurally controlled mineralization that would increase the tenor of the resource. As part of this exercise, detailed three-dimensional modelling of vein and fracture density is recommended to develop possible vectors toward prospective structural settings. Resulting targets should then be tested by diamond drillholes oriented appropriately to the projected plane of the controlling structures.
- Generation of sample material for an expanded metallurgical and geotechnical testwork program.
Prior to commencing any further drilling, the following actions are also recommended.
-
Acquisition of a detailed current digital terrain model to better define the topography is recommended using Lidar or detailed RPAS survey.
-
Other mapped felsic volcanic occurrences surrounding the Newton deposit should be fully evaluated either on surface or by drilling, particularly NW of the footprint of the current resource model in the Halo and Sunrise target areas where felsic units have been mapped on surface and coincident with the NW trending magnetic low NW of the Newton Deposit. Much of this area has yet to receive an equivalent level of drilling as the main resource area.
-
The Authors recommend continuing with the QA/QC protocols previously recommended by RPA in 2012 for the Newton Project in relation to future drilling so that sampling programs include certified reference materials for silver and, in accordance with established protocols, the results be monitored for departures from the recommended values with respect to the silver standards.
A budget of $4,100,000 is estimated for the Phase 1 program and is presented in Table 26-1 below.
Axcap Ventures Inc. – Newton Project
26-187
RockRidge Partnership & Associates
Table 26-1 – PROPOSED PHASE 1 RESOURCE EXPANSION DRILLING AND METALLURGICAL TESTWORK BUDGET
| TESTWORK BUDGET | |
|---|---|
| Item | C$ |
| Resource Expansion and Infill Drilling (9,000m @ $400/metre) | $3,600,000.00 |
| Detailed Topography | $50,000.00 |
| Metallurgical Testwork | $350,000.00 |
| Structural Modeling | $15,000.00 |
| Permitting/Community Relations/Environmental Studies | $35,000.00 |
| **General and Administration ** | $50,000.00 |
| TOTAL | $4,100,000.00 |
Based on the outcome of the Phase 1 Resource Expansion and Infill Drill Program, a follow-up Phase 2 program is proposed and would include an update of the Newton mineral resource incorporating the results of the Phase 1 drilling and metallurgical testwork. Utilizing the parameters derived from the updated mineral resource estimate and metallurgical testwork, RockRidge recommends the Company proceeds to undertake a full PEA of the Newton Deposit. The total Phase 2 budget would be approximately $350,000.
Axcap Ventures Inc. – Newton Project
26-188
RockRidge Partnership & Associates
27. REFERENCES
Amarc Resources Ltd., 2020, Amarc to Divest of Newton Gold Property, December 9, 2020, News Release, 2p., available at www.sedar.com.
Armstrong, T., Brown, F., and Puritch, E., 2011, Technical Report and Updated resource Estimate on the Snowfield Property, NI 43-101 Technical Report, 90 p., available at www.sedar.com.
Bordet, E., Hart, C, and McClenaghan, L., 2011, Epithermal-style Au-Ag mineralization in Cretaceous to Eocene felsic volcanic complexes, central British Columbia, western Canada. Society for Geology Applied to Mineral Deposits, Antofagasta, Chile. Abstract.
Carlyle Resource Corporation, 2020, Carlyle acquires Isaac Mining Corp., the Newton Gold Project and over $2,000,000 in cash, December 17, 2020, News Release, 5p., available at www.sedar.com.
Carlyle Resource Corporation, 2024, Carlyle Drills 0.75 g/t Au Over 39m at Newton Gold & Silver Project – Confirms New Higher-Grade, Near Surface Zone North of the Current Inferred Resource, February 21, 2024, News Release, 10p., available at www.sedar.com.
Carlyle Resource Corporation, 2024, Carlyle Recovers 80% gold in preliminary Newton Metallurgical Testing, March 1, 2024, News Release, 4p., available at www.sedar.com.
Carlyle Resource Corporation, 2024, Carlyle Commodities and Miramis Mining Enter Into Amalgamation Agreement, Carlyle Announces Quesnel Option Agreement and Proposed Sale of Newton Project, September 27, 2024, News Release, 9p., available at www.sedar.com.
Christopher, P. A., 2012, Technical report Tennyson porphyry gold-copper property, British Columbia. 66 p., internal company report.
Dube, G., 2023, Technical – Report for December 2023 Drilling on the Newton Project, Omineca Mining Division, British Columbia. 154p, ARIS BC Report 41282
Dube G., 2024, Report for December 2023 Drilling on the Newton Project, Omineca Mining Division, British Columbia. 129p, ARIS BC Report 41789
Axcap Ventures Inc. – Newton Project
27-189
RockRidge Partnership & Associates
Durfeld, R. M., 1994, Geophysical (Magnetic) and Geochemical (Soil) Report on the Newton Mineral Claims, Assessment Report 23660, December 1994, 15 p.
Ghaffari, H., et al., 2011, Kerr-Sulphurets-Mitchell (KSM) Prefeasibility Study Update 2011, NI 43101 Technical Report, 679 p., available at www.sedar.com
Gregory, M. J., 2011, Gold Deportment Characteristics of the Newton Gold Deposit, British Columbia, Canada, Internal report to Amarc Resources, 9 p.
Hantelmann, J. J., 2007, Assessment Report on the 2006 Drilling Program for the Newton Hill Mineral Claims, Assessment Report 29088, April 2007, 14 p.
Jones, I. W. O., 2012, Pretium Resources Inc., Brucejack Project, Mineral Resources Update Technical Report, NI 43-101 Technical Report, 143 p., available at www.sedar.com.
Jones, S., 2009, Taseko Mines Limited, Technical Report on the 344 Million tonne Increase in Mineral Reserves at the Prosperity Gold-Copper Project, Effective Date November 2, 2009, Report Date December 17, 2009, NI 43-101 Technical Report, 167p., available at www.sedar.com.
Kemp, R., 2002, Summary Report on the Tide property, NI 43-101 Technical Report, 54 p., available at www.sedar.com.
Lang, J. R., 2012, Tennyson Project – Magmatic-Hydrothermal Highlights, Private Report to Brigade Resources, 16 p.
McClenaghan, L., 2013, Geology and Genesis of the Newton Bulk-Tonnage Gold-Silver Deposit, Central British Columbia, M.Sc. Thesis Western University, March 2013, 205p.
McClenaghan, L., and Hart, C. 2010, Newton Hill Gold Prospect, Field Work Report September 2010, Mineral Deposit Research Unit (MDRU).
McClenaghan, L., 2012, Re-Os Age Dating of Molybdenite, Amarc Resources Ltd., Internal Report, 2 p.
Axcap Ventures Inc. – Newton Project
27-190
RockRidge Partnership & Associates
McClenaghan, L., Gregory, M., and Hart, C. J. R., 2011, Alteration Mineral Associations in the Newton Gold Deposit, British Columbia. Extended Abstract, Society of Geology Applied to Ore Deposits Conference, Antofagasta, Chile, 4 p.
O’Brien, M. F., Turnbull, D., 2022, Technical Report on the Updated Mineral Resource Estimate for the Newton Project, Central British Columbia, Canada on behalf of Carlyle Commodities, 180p.
Oliver, J. L., 2010, Geological Overview – Amarc Resources 2009, Drill Program, Internal Technical Report to Amarc Resources Ltd., 48 p., Revised, July 2, 2010.
Oliver, J. L., 2012, Newton Hill Au-Cu Deposit, Stratigraphic and Structural Interpretations: Implications for Exploration, Internal Report to Amarc Resources, 23 p.
Pressacco, R, 2012, Technical Report on the Initial Mineral Resource Estimate for the Newton Project, Central British Columbia, Roscoe Postle and Associates on behalf of Amarc, November 2012, 160 p.
Riddell, J. M., 2006, Geology of the Southern Nechako Basin NTS 92N, 92O, 93B, 93C, 93F, 93G, Petroleum Geology Map 2006-1. Ministry of Energy, Mines and Petroleum Resources, Oil & Gas Division, Resource Development and Geoscience Branch.
Riesterer, J. W., Mahoney, J. B., and Link, P. K., 2001, The Conglomerate of Churn Creek: Late Cretaceous Basin Evolution along the Insular–Intermontane Superterrane Boundary, southern British Columbia, Canadian Journal of Earth Sciences, vol. 38 (1), pp. 59–73.
Rowland, J. V., and Simmons, S. F., 2012, Hydrologic, Magmatic, and Tectonic Controls on Hydrothermal Flow, Taupo Volcanic Zone, New Zealand: Implications for the Formation of Epithermal Veins, Economic Geology, Volume 107, pp. 427–458.
Sillitoe, R. H., and Hedenquist, J. W., 2003, Linkages between Volcanotectonic Settings, Orefluid Compositions, and Epithermal Precious Metal Deposits, Society of Economic Geologists Special Publication 10, pp. 315–343.
Simpson, R. G., 2012, Technical report, Blackwater Gold Project, Omineca Mining Division, British Columbia, Canada, NI 43-101 Technical Report, 78 p., available at www.sedar.com.
Axcap Ventures Inc. – Newton Project
27-191
RockRidge Partnership & Associates
28. DATE AND SIGNATURE PAGE
This Technical Report titled “Technical Report on the Updated Mineral Resource Estimate for the Newton Project, Central British Columbia, Canada” and effective dated December 1, 2024, was prepared and signed by the following authors:
Dated at Pit Meadows, B.C. "Michael O' Brien"
March 28, 2025 Michael O’Brien M.Sc., P.Geo.
Consulting Geologist
Dated at Lake Country, B.C.
"Kelly McLeod"
March 28, 2025 Kelly McLeod B.Eng., P.Eng.
Metallurgical Engineer
Dated at Haliburton, Ont.
March 28, 2025
"Douglas Turnbull"
Douglas Turnbull, H.B.Sc., P.Geo.
Consulting Geologist
Michael O’Brien, P. Geo was the QP responsible for sections 11-12 and 14. Kelly McLeod, P.Eng. was the QP responsible for Section 13, Douglas Turnbull, P. Geo was the QP responsible for Section 1-10 and 15-27
Axcap Ventures Inc. – Newton Project
28-192
RockRidge Partnership & Associates
CERTIFICATE OF QUALIFIED PERSON
==> picture [468 x 178] intentionally omitted <==
==> picture [468 x 178] intentionally omitted <==
"Douglas Turnbull"
Axcap Ventures Inc. – Newton Project
28-193
RockRidge Partnership & Associates
CERTIFICATE OF QUALIFIED PERSON
==> picture [453 x 147] intentionally omitted <==
==> picture [453 x 147] intentionally omitted <==
==> picture [453 x 147] intentionally omitted <==
"Michael F. O'Brien"
Axcap Ventures Inc. – Newton Project
28-194
RockRidge Partnership & Associates
==> picture [468 x 202] intentionally omitted <==
==> picture [468 x 203] intentionally omitted <==
==> picture [468 x 203] intentionally omitted <==
----- Start of picture text -----
"Kelly S. McLeod"
----- End of picture text -----
Axcap Ventures Inc. – Newton Project
28-195