Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

ROX RESOURCES LIMITED Regulatory Filings 2021

Jul 7, 2021

65741_rns_2021-07-07_939baa44-68da-4a9e-aa30-42c5404ae450.pdf

Regulatory Filings

Open in viewer

Opens in your device viewer

ASX ANNOUNCEMENT

8 July 2021

==> picture [69 x 29] intentionally omitted <==

----- Start of picture text -----

RRL1760D
----- End of picture text -----

Link Prospect emerges as key Youanmi Gold Project resource growth target

ROX RESOURCES LIMITED

ASX: RXL (9 July onwards )

ASX: RXLDB (deferred Settlement Trading until 9 July 2021)

Rox Resources Limited (ASX: RXL) is an Australian listed company with advanced gold and nickel projects in Western Australia: the Youanmi Gold Project, Mt Fisher Gold project, and the Fisher East and Collurabbie Nickel projects.

DIRECTORS

Highlights:

  • Assays received for 7 RC holes drilled at Link Prospect (May 2021). All holes intersected gold mineralisation.

  • Assaying of previously unsampled historical diamond core returns 6.1m @ 8.22g/t at Link. Re-sampling program continues.

  • High-grade mineralisation extended down plunge at Link. RXRC390: 5m @ 5.96g/t Au from 138m RXRC389: 4m @ 3.71g/t Au from 216m

RXRC386: 4m @ 2.98g/t Au from 162m

  • RC and diamond drilling continues at new high priority targets, Grace South, Link and Junction.

  • Assays pending for 8 RC holes and 9 diamond holes at Junction and Link areas.

Mr Stephen Dennis Chairman

Mr Alex Passmore Managing Director

Dr John Mair Non-Executive Director

Shares on Issue 157.6m Share Price $0.46 Market Cap. $72.5m Cash & Receivables $18.1m (incl $3.75m receivable, cash as at 31 Mar 2021)

Level 2, 87 Colin Street, West Perth WA 6005

+61 8 9226 0044

[email protected] www.roxresources.com.au

___________

Australian gold company, Rox Resources Limited (“Rox” or “the Company”) (ASX: RXL, which is currently trading on a deferred settlement basis: RXLDB ), in conjunction with its joint venture partner Venus Metals Corporation Limited (ASX: VMC) is pleased to provide an update on exploration activities at Youanmi Gold Project near Mt Magnet, WA, in the OYG JV area (Rox 70% and Manager, VMC 30%).

Drilling continues at Youanmi with an RC rig and two Diamond drill rigs operating on site. An additional diamond rig and an aircore rig are set to join the program shortly.

Assay results have been received for seven holes from the current RC program being undertaken at the Link Prospect (Figure 1). These holes were drilled during May. Results are awaited for eight RC and nine diamond holes with drilling ongoing.

The highlight of this round of results include 3m @ 4.42g/t Au from 101m and 5m @ 5.96g/t Au from 138m, including 2m @ 12.9g/t Au from 138m intersected in RXRC390 (Table 1, Figure 2).

Managing Director Alex Passmore commented: “Exploration at Youanmi continues to be very active with our rig count growing. These results from Link are from drilling completed in May as our exploration program on the ground was gathering pace. It’s highly encouraging to report new mineralised

Follow Rox:

==> picture [30 x 27] intentionally omitted <==

==> picture [25 x 24] intentionally omitted <==

1

positions previously unrecognised close to existing mine development. We look forward to updating the market as more drill results come to hand.”

The results define a zone of high-grade mineralisation within close proximity to both the base of historic open pits and in some cases close to existing underground development.

The current program testing depth extensions to high-grade ore shoots down plunge at Junction and Link. Additionally, step out drilling will test Rox’s exploration model with the aim of identifying recurring NW-plunging ore shoots within SW-plunging mineralised envelopes (Figure 1 and 2).

Link Target Area

The Link target area is situated within the Northern Mineralised Envelope that hosts the high-grade United North, Kathleen and Rebel-Kurrajong open pits and Hill End underground mine. At Link, a strongly mineralised NorthSouth trending conjugate structure intersects the NW trending Mine Shear and forms multiple north plunging high-grade ore shoots (Figure 1).

The RC holes reported in this announcement (RXRC386: 4m @ 2.98g/t Au from 162m, RXRC389: 4m @ 3.71g/t Au from 216m, RXRC390: 3m @ 4.42g/t Au from 101m and 5m @ 5.96g/t Au from 138m, including 2m @ 12.9g/t Au from 138m) continue to demonstrate the Link area has strong potential to significantly enhance near mine gold inventory with close proximity to historical open pits and existing underground development (Figures 2 and 3).

The Link Target area, and similarly the Junction target area, are depth extension zones that have not previously been effectively explored, yet offer the potential to return significant depth extensions of surface mineralisation as has been previously delineated and mined in the Mine and Hill End mineralised envelopes (see Figure 1).

Recent Modelling Demonstrates Upside in Historically Unsampled Locations

As part of an ongoing review of historical Younanmi data, the Company has begun relogging and sampling of historic diamond core where insufficient or no sampling has previously occurred. Recent geological modelling of interpreted mineralised lodes by Rox has identified significant areas where mineral resource estimation may be possible simply using unsampled historical core.

Encouragingly, sampling of diamond hole 94KRCD0355 has extended an historic intersection to 6.1m @ 8.22g/t (previously 2m @ 15g/t Au, ASX: RXL 17 April 2019) beneath the Kathleen Pit at Link. This early result from the sampling of historic drill core validates Rox’s approach to the historical data review as a cost-effective initiative to improve both the geological and resource models and highlights the untapped potential at Youanmi.

Forward plan

The current diamond and RC drilling program will target the Junction and Link areas, which continue to show strong potential to enhance and grow near mine gold resource inventory. The economic prospects of the Youanmi resource are considered strong being close to existing underground development.

The Company will continue to update the market on further results of ongoing drilling programs as they come to hand.

ASX CODE: RXL

ROX RESOURCES LIMITED Level 2, 87 Colin Street, West Perth WA 6005 +61 8 9226 0044

2

E: [email protected] www.roxresources.com.au

==> picture [1068 x 509] intentionally omitted <==

Figure 1. Oblique view of the Youanmi Mine Area looking NE. Grey arrows show orientation of high-grade shallow NW plunging shoots within steeply plunging mineralised envelopes (dashed magenta lines).

3

==> picture [932 x 646] intentionally omitted <==

Figure 2. Link Target Area Long Section.

4

==> picture [485 x 445] intentionally omitted <==

Figure 3 Kathleen Cross Section.

5

Authorised for release to the ASX by Alex Passmore, Managing Director

* ENDS ***

For more information:

Alex Passmore Managing Director Rox Resources Limited Tel: +61 8 9226 0044 E: [email protected]

Matt Hogan Managing Director Venus Metals Corporation Limited Tel: +61 8 9321 7541

6

Table 1 – Significant Intersections

Hole ID Prospect **Drill type ** From to Interval Aug/t Aug.m
RXRC386 Link RC 125 127 2 1.82 3.64
RXRC386 Link RC 162 166 4 2.98 11.92
RXRC387 Link RC 144 145 1 2.5 2.5
RXRC388 Link RC 117 118 1 1.84 1.84
RXRC388 Link RC 122 123 1 1.19 1.19
RXRC388 Link RC 131 132 1 0.62 0.62
RXRC388 Link RC 134 138 4 1.13 4.52
RXRC388 Link RC 142 144 2 0.53 1.06
RXRC388 Link RC 164 168 4 0.63 2.52
RXRC389 Link RC 174 175 1 2.68 2.68
RXRC389 Link RC 216 220 4 3.71 14.84
RXRC389 Link RC 263 267 4 1.06 4.24
RXRC389 Link RC 270 271 1 1.26 1.26
RXRC390 Link RC 36 40 4 0.7 2.8
RXRC390 Link RC 101 104 3 4.42 13.26
RXRC390 Link RC 109 111 2 1.83 3.66
RXRC390 Link RC 122 126 4 1.3 5.2
RXRC390 Link RC 138 143 5 5.96 29.8
RXRC391 Link RC 0 4 4 0.59 2.36
RXRC391 Link RC 91 92 1 0.65 0.65
RXRC391 Link RC 97 105 8 1.23 9.84
RXRC391 Link RC 112 113 1 0.53 0.53
RXRC391 Link RC 115 120 5 0.64 3.2
RXRC391 Link RC 125 126 1 0.58 0.58
RXRC391 Link RC 130 131 1 0.99 0.99
RXRC392 Link RC 48 52 4 0.63 2.52
RXRC392 Link RC 92 96 4 0.76 3.04
RXRC392 Link RC 128 134 6 1.29 7.74
94KRCD0355 Link DD 102.9 109 6.1 8.22 50.11

Table 2 - Collar Locations and Drilling Details

Hole ID Prospect Drill
**Type **
East North RL Depth Dip Azi Comments
RXRC386 Link RC 679708 6834135 469 180 -71 65
RXRC387 Link RC 679685 6834214 476 200 -80 65
RXRC388 Link RC 679409 6834453 468 192 -60 65
RXRC389 Link RC 679253 6834418 465 276 -60 65
RXRC390 Link RC 679349 6834641 468 170 -60 65
RXRC391 Link RC 679341 6834685 470 144 -60 65
RXRC392 Link RC 679283 6834675 468 177 -60 65
RXRC393 Link RC 679228 6834650 469 256 -60 65 Assays pending
RXRC394 Link RC 679242 6834621 469 252 -65 65 Assays pending
RXRC395 Junction RC 679770 6833599 459 205 -60 65 Assays pending

7

RXRC396 Junction RC 679925 6833407 457 270 -54 65 Assays pending
RXRC397 Youanmi S RC 680233 6833198 455 282 -60 91 Assays pending
RXRC398 Junction RC 679789 6833570 456 263 -57 65 Assays pending
RXRC400 Junction RC 679807 6833509 455 300 -53 67 Assays pending
RXRC402 Link RC 679342 6834561 467 200 -60 65 Assays pending
RXDD011 Link DD 679208 6834416 465 352 -63 62 Assays pending
RXDD012 Link DD 679105 6834158 464 478 -60 65 Assays pending
RXDD014 Junction DD 679528 6833528 461 706 -60 65 Assays pending
RXDD014W1 Junction DD 679528 6833528 461 670 -60 65 Assays pending
RXDD016 Junction DD 679836 6833480 457 505 -60 65 Assays pending
RXDD017 Junction DD 679797 6833547 456 345 -50 65 Assays pending
RXDD018 Link DD 679204 6834480 465 353 -60 62 Assays pending
RXDD019 Link DD 678935 68343500 468 548 -60 59 Assays pending
RXDD021 Link DD 679104 6834517 466 327 -61 62 Assays pending
94KRCD0355 Link DD 679167 6834883 670 110 -70 64

8

Competent Person Statements

Exploration Results

The information in this report that relates to Data and Exploration Results is based on information compiled and reviewed by Mr Gregor Bennett a Competent Person who is a Member of the Australian Institute Geoscientists (AIG) and Exploration Manager at Rox Resources. Mr Bennett has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the activity which he has undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for the Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Bennett consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

Where reference is made to previous releases of exploration results in this announcement, the Company confirms that it is not aware of any new information or data that materially affects the information included in those announcements and all material assumptions and technical parameters underpinning the exploration results included in those announcements continue to apply and have not materially changed.

The information in this report that relates to previous Exploration Results, was either prepared and first disclosed under the JORC Code 2004 or under the JORC Code 2012 and has been properly and extensively cross-referenced in the text to the date of the original announcement to the ASX. In the case of the 2004 JORC Code Exploration Results and Mineral Resources, they have not been updated to comply with the JORC Code 2012.

Resource Statements

The information in this report that relates to gold Mineral Resources for the Youanmi Project was reported to the ASX on 23 June 2021 (JORC 2012). Rox confirms that it is not aware of any new information or data that materially affects the information included in the announcement of 23 June 2021, and that all material assumptions and technical parameters underpinning the estimates in the announcement of 23 June 2021 continue to apply and have not materially changed.

The information in this report that relates to gold Mineral Resources for the Mt Fisher project was reported to the ASX on 11 July 2018 (JORC 2012). Rox confirms that it is not aware of any new information or data that materially affects the information included in the announcement of 11 July 2018, and that all material assumptions and technical parameters underpinning the estimates in the announcement of 11 July 2018 continue to apply and have not materially changed.

The information in this report that relates to nickel Mineral Resources for the Fisher East project was reported to the ASX on 5 February 2016 (JORC 2012). Rox confirms that it is not aware of any new information or data that materially affects the information included in the announcement of 5 February 2016, and that all material assumptions and technical parameters underpinning the estimates in the announcement of 5 February 2016 continue to apply and have not materially changed.

The information in this report that relates to nickel Mineral Resources for the Collurabbie project was reported to the ASX on 18 August 2017 (JORC 2012). Rox confirms that it is not aware of any new information or data that materially affects the information included in the announcement of 18 August 2017, and that all material assumptions and technical parameters underpinning the estimates in the announcement of 18 August 2017 continue to apply and have not materially changed.

ForwardLooking Statements

‐ ‐ This document may include forward looking statements. Forward looking statements include, but are not limited to, statements concerning Rox Resources Limited planned exploration program(s) and other statements that are not historical facts. When used in this document, the words such as "could," "plan," "estimate," "expect," "intend," "may”, "potential," "should," and similar expressions are forward looking statements.

9

About Rox Resources

Rox Resources (ASX:RXL) is a West Australian focused gold exploration and development company. It is 70 per cent owner and operator of the historic Youanmi Gold Project near Mt Magnet, approximately 480 kilometres northeast of Perth, and wholly-owns the Mt Fisher Gold project approximately 140 kilometres southeast of Wiluna. Youanmi has a Total Mineral Resource of 1,656 koz of contained gold, with potential for further expansion with the integration of existing prospects into the Resource and further drilling. Youanmi was a high-grade gold mine and produced 667,000ozof gold (at 5.47 g/t Au) before it closed in 1997. Youanmi is classified as a disturbed site and is on existing mining leases which has significant existing infrastructure to support a return to mining operations.

10

JORC Table 1 - Section 1 Data and Sampling Techniques

Criteria JORC Code explanation
Commentary
Sampling
techniques
Nature and quality of sampling (e.g. cut channels,
random chips, or specific specialised industry standard
measurement tools appropriate to the minerals under
investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc). These examples
should not be taken as limiting the broad meaning of
sampling.
RC hole diameter was 5.5" (140 mm) reverse circulation
percussion (RC). Sampling of RC holes was undertaken by
collecting 1m cone split samples at intervals.
Diamond drill hole core size is NQ2 size diameter through
the mineralisation. Sampling of diamond holes was by cut
half core as described further below.
Drill holes were generally angled at -650towards grid
northeast (but see Table for individual hole dips and
azimuths) to intersect geology as close to perpendicular as
possible.
Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used
Drillhole locations were picked up by differential GPS.
Logging of drill samples included lithology, weathering,
texture, moisture and contamination (as applicable).
Sampling protocols and QAQC are as per industry best
practice procedures.
Aspects of the determination of mineralisation that are
Material to the Public Report. In cases where ‘industry
standard’ work has been done this would be relatively
simple (e.g. ‘reverse circulation drilling was used to
obtain 1 m samples from which 3 kg was pulverised to
produce a 30 g charge for fire assay’). In other cases
more explanation may be required, such as where
there is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation
types (e.g. submarine nodules) may warrant disclosure
of detailed information
RC drillholes were sampled on 1m intervals using a cone
splitter.
Diamond core is dominantly NQ2 size, sampled on
geological intervals, with a minimum of 0.2 m up to a
maximum of 1.2 m. HQ and NQ2 holes were cut in half, with
one half sent to the lab and one half retained.
Samples were sent to Intertek Genalysis in Perth, crushed
to 10mm, dried and pulverised (total prep) in LM5 units
(Some samples > 3kg were split) to produce a sub-sample.
RC and diamond pulps were analysed by 50g Fire Assay
with ICP-OES (Intertek code FA50/OE).
Drilling
techniques
Drill type (e.g. core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic, etc)
and details (e.g. core diameter, triple or standard tube,
depth of diamond tails, face-sampling bit or other type,
whether core is oriented and if so, by what method,
etc).
Drilling technique was Reverse Circulation (RC) and
diamond core (DD). The RC hole diameter was 140mm face
sampling hammer. Hole depths reported range from 50m to
250m for RC and 350m to 700m for diamond.
Drill sample
recovery
Method of recording and assessing core and chip
sample recoveries and results assessed
RC drill recoveries were high (>90%).
Measures taken to maximise sample recovery and
ensure representative nature of the samples
Samples were visually checked for recovery, moisture and
contamination and notes made in the logs.
Whether a relationship exists between sample
recovery and grade and whether sample bias may
have occurred due to preferential loss/gain of
fine/coarse material.
There is no observable relationship between recovery and
grade, and therefore no sample bias.

Samples were sent to Intertek Genalysis in Perth, crushed to 10mm, dried and pulverised (total prep) in LM5 units (Some samples > 3kg were split) to produce a sub-sample. RC and diamond pulps were analysed by 50g Fire Assay with ICP-OES (Intertek code FA50/OE).

11

Criteria JORC Code explanation
Commentary
Logging Whether core and chip samples have been geologically
and geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining
studies and metallurgical studies.
Detailed geological logs have been carried out on all RC,
but no geotechnical data have been recorded (or is possible
to be recorded due to the nature of the sample).
Detailed geological and geotechnical logs were carried out
on all diamond drill holes for recovery, RQD, structures etc.
which included structure type, dip, dip direction, alpha
angle, beta angle, texture, shape, roughness, fill material,
and this data is stored in the database.
The geological data would be suitable for inclusion in a
Mineral Resource estimate.
Whether logging is qualitative or quantitative in nature.
Core (or costean, channel, etc) photography.
Logging of diamond core and RC chips recorded lithology,
mineralogy, mineralisation, weathering, colour, and other
sample features. RC chips are stored in plastic RC chip
trays.
The total length and percentage of the relevant
intersections logged
All holes were logged in full.
Sub-sampling
techniques and
sample
preparation
If core, whether cut or sawn and whether quarter, half
or all core taken.
Drill core was cut in half on site using a core saw. All
samples were collected from the same side of the core,
preserving the orientation mark in the kept core half.
If non-core, whether riffled, tube sampled, rotary split,
etc and whether sampled wet or dry.
RC samples were collected on the drill rig using a cone
splitter. If any mineralised samples were collected wet these
were noted in the drill logs and database.
For all sample types, the nature, quality and
appropriateness of the sample preparation technique.
The sample preparation followed industry best practice.
Fire Assay samples were dried, coarse crushing to ~10mm,
followed by pulverisation of the entire sample in an LM5 or
equivalent pulverising mill to a grind size of 85% passing 75
micron.
Quality control procedures adopted for all sub-
sampling stages to maximise representivity of samples.
Field QC procedures involve the use of Certified Reference
Materials (CRM’s) as assay standards, along with
duplicates and blank samples. The insertion rate of these
was approximately 1:20.
Measures taken to ensure that the sampling is
representative of the in situ material collected,
including for instance results for field duplicate/second-
half sampling.
For RC drilling field duplicates were taken on a routine basis
at an approximate 1:20 ratio using the same sampling
techniques (i.e. cone splitter) and inserted into the sample
run. No diamond core field duplicates were taken.
Whether sample sizes are appropriate to the grain size
of the material being sampled.
The sample sizes are considered more than adequate to
ensure that there are no particle size effects relating to the
grain size of the mineralisation which lies in the percentage
range.
Quality of assay
data and
laboratory tests
The nature, quality and appropriateness of the
assaying and laboratory procedures used and whether
the technique is considered partial or total.
The analytical technique involved Fire Assay 50g.
For geophysical tools, spectrometers, handheld XRF
instruments, etc, the parameters used in determining
the analysis including instrument make and model,
reading times, calibrations factors applied and their
derivation, etc.
No geophysical or portable analysis tools were used to
determine assay values stored in the database.

12

Criteria JORC Code explanation
Commentary
Nature of quality control procedures adopted (e.g.
standards, blanks, duplicates, external laboratory
checks) and whether acceptable levels of accuracy (i.e.
lack of bias) and precision have been established.
Internal laboratory control procedures involve duplicate
assaying of randomly selected assay pulps as well as
internal laboratory standards. All of these data are reported
to the Company and analysed for consistency and any
discrepancies.
Verification of
sampling and
assaying
The verification of significant intersections by either
independent or alternative company personnel.
Senior personnel from the Company have visually
inspected mineralisation within significant intersections.
The use of twinned holes.
Two twin RC holes have been completed at the Grace
Prospect and confirm reliability of previous results.
Documentation of primary data, data entry procedures,
data verification, data storage (physical and electronic)
protocols.
Primary data was collected using a standard set of Excel
templates on Toughbook laptop computers in the field.
These data are transferred to Geobase Pty Ltd for data
verification and loading into the database.
Discuss any adjustment to assay data.
No adjustments or calibrations have been made to any
assay data.
Location of data
points
Accuracy and quality of surveys used to locate
drillholes (collar and down-hole surveys), trenches,
mine workings and other locations used in Mineral
Resource estimation.
Drill hole locations have been established using a field GPS
unit.
Specification of the grid system used.
The grid system is MGA_GDA94, zone 50 for easting,
northing and RL.
Quality and adequacy of topographic control.
The topography of the mined open pits is well defined by
historic monthly survey pickups
Data spacing and
distribution

Data spacing for reporting of Exploration Results.
RC and diamond drill hole spacing varies 40-200 metres
between drill sections, with some areas at 40 metre drill
section spacing. Down dip step-out distance varies 20-100
metres.
Whether the data spacing and distribution is sufficient
to establish the degree of geological and grade
continuity appropriate for the Mineral Resource and
Ore
Reserve
estimation
procedure(s)
and
classifications applied.
Data spacing and distribution are sufficient to establish the
degree of geological and grade continuity appropriate for
JORC(2012) classifications applied.
Whether sample compositing has been applied.
No sample compositing has occurred for diamond core
drilling. Sample intervals are based on geological
boundaries with even one metre samples between.
For RC samples, 1m samples through target zones were
sent to the laboratory for analysis. The remainder of the hole
was sampled using 4m composite samples. For 4m
composite samples >0.2g/t Au, 1m samples were collected
and sent to the laboratory for analysis.
Orientation of
data in relation
to geological
structure
Whether the orientation of sampling achieves unbiased
sampling of possible structures and the extent to which
this is known, considering the deposit type.
The mineralisation strikes generally NNW-SSE and dips to
the west at approximately -50 degrees. The drill orientation
was 065 and 245 degrees and -60 to -90 dip. Drilling is
believed to be generally perpendicular to strike.
If the relationship between the drilling orientation and
the orientation of key mineralised structures is
considered to have introduced a sampling bias, this
should be assessed and reported if material.
No sampling bias is believed to have been introduced.

13

Criteria JORC Code explanation Commentary
Sample security is managed by the Company. After
preparation in the field samples are packed into polyweave
bags and despatched to the laboratory. For a large number
of samples these bags were transported by the Company
Sample security The measures taken to ensure sample security. directly to the assay laboratory. In some cases the sample
were delivered by a transport contractor the assay
laboratory. The assay laboratory audits the samples on
arrival and reports any discrepancies back to the Company.
No such discrepancies occurred.
Audits or
reviews
The results of any audits or reviews of sampling
techniques and data.
No audits have yet been completed.

JORC Table 1 - Section 2 Reporting of Exploration Results

Criteria JORC Code explanation
Commentary
Mineral tenement
and land tenure
status
Type, reference name/number, location and ownership
including agreements or material issues with third
parties such as joint ventures, partnerships, overriding
royalties,
native
title
interests,
historical
sites,
wilderness or national park and environmental settings.
Rox Resources Ltd is in a Joint Venture Agreement with
Venus Metals Corporation Ltd under which it has a 70%
interest in the Youanmi Gold Mine Joint Venture (OYG Joint
Venture).
Tenements in the JV consist of the following mining leases:
M 57s /10, 51,76,97,109, 135, 160A, 164, 165, 166 and 167.
The security of the tenure held at the time of reporting
along with any known impediments to obtaining a
licence to operate in the area.
The tenement is in good standing and no known
impediments exist.
Exploration done
by other parties
Acknowledgment and appraisal of exploration by other
parties.
Significant previous exploration has been carried out
throughout the project by various companies, including
AC/RAB, RC drilling and diamond drilling
1971-1973 WMC: RAB, RC and surface diamond drilling
1976
Newmont:
10
surface
diamond
drillholes
(predominantly targeting base metals).
1980-1986 BHP: RAB, RC and surface diamond drilling
(predominantly targeting base metals).
1986-1993 Eastmet: RAB, RC and surface diamond drilling.
1993-1997 Goldmines of Australia: RAB, RC and surface
diamond drilling. Underground mining and associated
underground diamond drilling.
2000-2003 Aquila Resources Ltd: Shallow RAB and RC
drilling
2004-2005 Goldcrest Resources Ltd: Shallow RAB and RC
drilling; data validation.
2007- 2013 Apex Minerals NL: 9 diamond holes targeting
extensions to the Youanmi deeps resource.

14

Criteria JORC Code explanation
Commentary
Geology Deposit
type,
geological
setting
and
style
of
mineralisation.
The Youanmi Project straddles a 40km strike length of the
Youanmi Greenstone Belt, lying within the Southern Cross
Province of the Archaean Yilgarn Craton in Western
Australia. The greenstone belt is approximately 80km long
and 25km wide, and incorporates an arcuate, north-trending
major crustal structure termed the Youanmi Fault Zone. This
structure separates two discordant greenstone terrains, with
the stratigraphy to the west characterised by a series of
weakly deformed, layered mafic complexes (Windimurra,
Black Range, Youanmi and Barrambie) enveloped by
strongly deformed, north-northeast trending greenstones.
Gold mineralisation is developed semi-continuously in shear
zones over a strike length of 2,300m along the western
margin of the Youanmi granite.
The Youanmi gold lodes are invariably associated with a high
pyrite and arsenopyrite content and the primary ore is
partially to totally refractory.
There are a series of major fault systems cutting through the
Youanmi trend mineralisation that have generated some
significant off-sets.
The Youanmi Deeps project area is subdivided into three
main areas or fault blocks by cross-cutting steep south-east
trending faults; and these are named Pollard, Main, and Hill
End from south to north respectively.
Granite hosted gold mineralisation occurs at several sites,
most notably Grace and the Plant Zone Prospects. Gold
mineralization occurs as free particles within quartz-sericite
altered granite shear zones.
The Commonwealth-Connemarra mineralised trend is
centred 4km northwest of the Youanmi plant. The geology
comprises a sequence of folded mafic and felsic volcanic
rocks intercalated with BIF and intruded by granite along the
eastern margin. Gold mineralisation is developed over a
600m strike length, associated with a north trending and
steeply west dipping shear zone that traverses the northwest
trending succession.
Drill hole
Information
A summary of all information material to the
understanding of the exploration results including a
tabulation of the following information for all Material drill
holes:

easting and northing of the drill hole collar

elevation or RL (Reduced Level – elevation
above sea level in metres) of the drill hole
collar

dip and azimuth of the hole

down hole length and interception depth

hole length.
Refer to drill results Table/s and the Notes attached thereto.
Data aggregation
methods
In reporting Exploration Results, weighting averaging
techniques,
maximum
and/or
minimum
grade
truncations (e.g. cutting of high grades) and cut-off
grades are usually Material and should be stated.
All reported assay intervals have been length weighted. No
top cuts have been applied. A lower cut-off of 0.5g/t Au was
applied for RC and diamond core.
Where aggregate intercepts incorporate short lengths of
high-grade results and longer lengths of low-grade
results, the procedure used for such aggregation should
be stated and some typical examples of such
aggregations should be shown in detail.
Mineralisation over 0.5g/t Au has been included in
aggregation of intervals for RC and diamond core.

15

Criteria JORC Code explanation Commentary
The assumptions used for any reporting of metal
equivalent values should be clearly stated.
No metal equivalent values have been used or reported.
Relationship These relationships are particularly important in the
between reporting of Exploration Results. The mineralisation strikes generally NNW-SSE and dips to
mineralisation the west at approximately -50 degrees. The drill orientation
widths and If the geometry of the mineralisation with respect to the was 065 and 245 degrees and -60 to -90 dip. Drilling is
intercept lengths drill hole angle is known, its nature should be reported. believed to be generally perpendicular to strike. Given the
angle of the drill holes and the interpreted dip of the host
If it is not known and only the down hole lengths are rocks and mineralisation (see Figures in the text), reported
reported, there should be a clear statement to this effect intercepts approximate true width.
(e.g. ‘down hole length, true width not known’).
Diagrams Appropriate maps and sections (with scales) and
tabulations of intercepts should be included for any
significant discovery being reported These should Refer to Figures and Table in the text.
include, but not be limited to a plan view of drill hole
collar locations and appropriate sectional views.
Balanced Where comprehensive reporting of all Exploration
reporting Results is not practicable, representative reporting of
both low and high grades and/or widths should be
practiced to avoid misleading reporting of Exploration
Representative reporting of both low and high grades and
widths is practiced.
Results.
Other Other exploration data, if meaningful and material,
substantive should be reported including (but not limited to):
exploration data geological observations; geophysical survey results;
geochemical survey results; bulk samples – size and All meaningful and material information has been included in
method of treatment; metallurgical test results; bulk the body of the announcement.
density,
groundwater,
geotechnical
and
rock
characteristics; potential deleterious or contaminating
substances.
Further work The nature and scale of planned further work (e.g. tests
for lateral extensions or depth extensions or large-scale
step-out drilling). Further work (RC and diamond drilling) is justified to locate
Diagrams clearly highlighting the areas of possible extensions to mineralisation both at depth and along strike.
extensions, including the main geological interpretations
and future drilling areas, provided this information is not
commercially sensitive

16