Highlights
Youanmi Gold Project - Drilling yields high grades and is ongoing
-
During the quarter Rox commenced the first major and systematic exploration program carried out at the Youanmi Gold Project since 1997
-
The Youanmi South Prospect returned significant results including:
-
RXRC063: 12m @ 12.7 g/t Au from 80m
-
RXRC064: 12m @ 8.5 g/t Au from 44m
-
RXRC053: 4m @ 11.2 g/t Au from 110m
-
RXRC066: 4m @ 7.6 g/t Au from 76m
-
The project Mineral Resource Estimate currently totals 12.4Mt at 2.97g/t Au for 1,190,600 ounces of gold[1] . This will be updated in due course with the incorporation of the results from the latest drilling program
-
Drilling is ongoing, and the Company is currently compiling data and further results are expected imminently
Currans Find JV
-
A three-stage drilling program was completed at the Currans Find Gold Project during the quarter (managed by Rox’s JV partner, Venus Metals (ASX:VMC)). Results included:
-
CFRC26 3m @ 32.58 g/t Au from 115m
-
CFRC31 3m @ 25.00 g/t Au from 109m
-
CFRC42 4m @ 9.25 g/t Au from 46m
-
Further drilling is currently underway, with results to be released to market as they become available
Agreement to form JV with Cullen on Northern Fisher East Tenure
-
Rox is to earn up to a 75% interest in a 290km[2] tenement package adjacent to, and along strike of the Fisher East Nickel Project. The acquisition/farm-in adds 40km of nickel prospective “basal contact” strike length to Rox’s exploration portfolio
-
This JV positions Rox to grow its existing 78,000t contained nickel resource[2] in the Fisher East region
1 Refer ASX 17 April 2019 | 2 Refer ASX 5 February 2016
1
New Director Appointment
- Subsequent to the end of the quarter Rox announced the appointment of well credentialed executive Dr John Mair to the Board as a Non-Executive Director
Corporate
- Rox is well funded with $5.38 million of cash and $3.92 million of other receivables and securities at the end of the quarter
==> picture [418 x 353] intentionally omitted <==
Figure 1: Rox Project Location Map
Youanmi Gold Project (50%, right to earn up to 70%)
Geology and Exploration Model
The Youanmi mine area greenstone belt consists of mafic and felsic volcanics, volcaniclastics, minor banded iron formations, cherts and both syn- and post- mineralisation dolerite dykes. The sequence is bounded to the west by the Rifle Range Fault and also a large circular layered mafic intrusion which is considered to be younger than the mine sequence. To the east the greenstone belt abuts the Youanmi Granite which shows both sheared and intrusive margins with the greenstone. The granite and the greenstone belt are sheared and faulted by the Main Lode
==> picture [270 x 45] intentionally omitted <==
2
Shear Zone which trends north-west from the larger north-east trending Youanmi Shear Zone at the southern end of the Youanmi Granite.
Displacement on the Main Lode Shear Zone is predominantly strike-slip sinistral (and dip-slip reverse) and is considered to be a very important control in relation to gold mineralisation at Younami. Areas of relatively low-pressure during displacement (i.e. “pressure shadows” or dilation zones) along the granite / greenstone contact, in proximity to the shear zone are particularly prospective (Figure 2). Much of the historical mineralisation at Youanmi is located in these zones where the granite/greenstone is oriented more east-west than north-south thereby supporting the thesis.
==> picture [418 x 410] intentionally omitted <==
Figure 2 – Youanmi Pits Overlain on Geology with RC Drill Collars (Figure also shows interpreted zones of relatively low pressure i.e. “pressure shadow” during displacement along Main Lode Shear Zone / gold mineralisation
==> picture [270 x 45] intentionally omitted <==
3
Rox Exploration Targeting
Rox is using the above interpretation, among other things, to develop its targeting at Youanmi. High density magnetic data (drone mag) surveys are currently underway to assist with identifying the granite/mafic contact. Rox is also investigating ground penetrating radar to further assist the targeting process.
The Company’s exploration focus for the current program is gold mineralisation hosted in:
-
Sheared greenstone / granite contact (e.g. Main Lode Shear Zone)
-
Stock work mineralisation in the Youanmi Granite (e.g. Plant Zone)
-
Dilational jogs and shears outside the Main Lode Shear Zone (e.g. Commonwealth)
Historical mining at Youanmi has centred on the Main Lode Shear Zone deposits situated in and around old workings. Plant Zone (Granite hosted mineralisation), Commonwealth (distal dilational jog) and Youanmi South (Main Lode Style) are unmined with mineralisation occurring from near surface in all cases.
Drilling Program Progress
Rox has drilled over 11,000 metres since the program commenced in August and has received results for around 80% of this amount. Planned drilling is in the order of 16,500 metres.
==> picture [451 x 300] intentionally omitted <==
Photo looking south east along the line of lode at Youammi. Drill rig in the foreground
==> picture [270 x 45] intentionally omitted <==
4
High Grade Results – Drilling ongoing
Over the course of the quarter the Company has announced high-grade results from several prospects with the most encouraging area encountered, to date, being the Youanmi South Prospect.
The Youanmi South Prospect is an unmined, shear zone related area of mineralisation and extends from the south eastern end of the Main Pit along the Main Lode Shear Zone potentially to the juncture of the Youanmi Fault Zone and the Main Lode Shear Zone around 1.2km to the south (Figure 3).
Highlights from the drilling to date include (ASX: 9 and 24 September 2019) Youanmi South:
-
RXRC024 - 4m @ 8.17 g/t Au from 96m
-
RXRC063: 12m @ 12.7 g/t Au from 80m
-
RXRC064: 12m @ 8.5 g/t Au from 44m
-
RXRC053: 4m @ 11.2 g/t Au from 110m
-
RXRC066: 4m @ 7.6 g/t Au from 76m
Commonwealth:
-
RXRC050 - 2m @ 23.67 g/t Au from 76m
-
RXRC049 - 4m @ 6.57 g/t Au from 64m
United North:
-
RXRC013 – 5m @ 5.59 g/t Au from 81m including an intersection of 1m @ 23 g/t Au
-
RXRC014 - 9m @ 3.77 g/t Au from 58m including an intersection of 5m @ 5.93 g/t Au.
Plant Zone:
-
RXRC038: 4m @ 5.6 g/t Au from 24m
-
RXRC047: 30m @ 1.0 g/t Au from 96m
-
RXRC046: 14m @ 1.7 g/t Au from 70m
==> picture [270 x 45] intentionally omitted <==
5
==> picture [260 x 371] intentionally omitted <==
Figure 3a – Aerial photo showing Youanmi South and recent drilling
==> picture [262 x 371] intentionally omitted <==
Figure 3b – Recent and planned drilling on magnetics with interpreted structures / splays off Youanmi Fault Zone
6
Currans Find (45%)
Rox and its JV partner, Venus Metals, each hold a 45% interest in the high-grade historic Currans Find Gold Prospect located in the centre of the Youanmi Gold Project (ASX: 10 April 2019).
Venus will be the manager of the joint ventures until Rox elects to move to 70% ownership of the OYG Joint Venture covering the Youanmi Gold Mine.
Project Background
The Currans Find project area is located within the Youanmi Greenstone Belt and situated approximately 5 km north-northwest of the historical Penny West gold mine (Figure 4). Highgrade gold mineralization is associated with quartz veins that generally plunge to the southwest and steeply dip to the southeast. The mineralization is hosted by mafic rocks (amphibolite), ultramafics (talc-tremolite schist) and diorite. Similar rocks are host to the gold mineralisation at Penny West.
==> picture [363 x 423] intentionally omitted <==
Figure 4 Gold Mineralisation and Demagnetised Horizons running NNW through the belt to Currans Find Prospect
7
Currans Find North Prospect
RC drilling (3 stages) confirmed the presence of two stacked lodes at Currans North and shows an increase in gold grade and width in the Upper Lode (Figure 5). The results also demonstrate ‐ that the gold mineralization remains open at depth and down plunge.
‐ Significant high grade gold intersections from the drilling undertaken during the quarter (ASX releases 13 & 24 June 2019, 5 & 27 August 2019 and 5 September 2019) include:
CFRC14: 2m @ 13.34 g/t Au from 61m including 1m @ 25.38 g/t Au from 61m CFRC16: 3m @ 27.5 g/t Au from 39m including 1m @ 72.67 g/t Au from 39m
- CFRC26: 3m @ 32.58 g/t Au from 115m including 1m @ 76.03 g/t Au from 115m
(previously reported 8m @ 7.81g/t Au from 112m (ASX: 5 August 2019) CFRC31: 3m @ 25.00 g/t Au from 109m including 1m @ 57.15 g/t Au from 110m CFRC32: 1m @ 39.61 g/t Au from 94m CFRC42: 4m @ 9.25 g/t Au from 46m including 2m @ 16.05 g/t Au from 48m CFRC46: 1m @ 13.32 g/t Au from 110m and 2m @ 3.84 g/t Au from 128m
CFRC47: 4m @ 5.28 g/t Au from 90m including 1m @15.30 g/t Au from 92m and 2m @ 5.05 g/t Au from 111m
Further RC drilling is in progress and will explore the down ‐ plunge and along ‐ strike extensions ‐ of the high grade gold mineralization that was intersected in previous drilling phases.
==> picture [396 x 270] intentionally omitted <==
Figure 5 Currans Find North Long Section - Stack lodes and intersections at pierce points
==> picture [270 x 45] intentionally omitted <==
8
Mt Fisher Gold Project (100%)
Following the completion of the 6,000m RC program in the June quarter and the receipt of all assays the Company is undertaking mineralisation modelling and exploration targeting.
The Mt Fisher Gold Project is located close to several gold plants which are currently underutilised and seeking additional ore sources. The Company is investigating the potential for resources to meet that demand.
Fisher East Nickel Project (100%)
Drill planning is underway, with drilling commencement likely early in CY2020 following the campaign at Youanmi.
Rox-Cullen Mt Eureka JV - Nickel and Gold Tenure Expanded
During the Quarter, Rox entered into a binding terms sheet with Cullen Exploration Pty Ltd (a subsidiary of Cullen Resources Limited (“Cullen”), ASX: CUL) which allows Rox to earn up to a 75% interest in Cullen’s Mt Eureka tenements.
The Mt Eureka Nickel and Gold Project is located in the Northern Goldfields, about 600km northeast of Kalgoorlie (about 120km east of Wiluna) and immediately to the north of Rox Resources’ Mt Fisher Gold and Fisher East Nickel Projects (Figures 6 below).
The Fisher East Nickel Project, discovered by Rox , comprises :
-
mineral deposits with JORC resources at Camelwood, Cannonball and Musket, containing high grade, high tenor nickel sulphide mineralistion
-
Sabre mineralisation where numerous drill holes have hit nickel sulphide mineralisation
-
Mt Tate drill target where nickel sulphide was encountered in an exploratory aircore drill hole
-
several other compelling drill targets.
Some of the better intersections seen at Rox’s Fisher East Project include (ASX: 30 July 2014):
-
MFEC071: 4m @ 8.4% Ni from 178m, including 2m @ 14.7% Ni
-
• MFEC072: 5m @ 8.4% Ni from 205m, including 3m @ 12.1% Ni,
The Mt Eureka Greenstone belt represents the northernmost 40 strike km of the contiguous Mt Fisher – Mt Eureka belt. The strike length of prospective ultramafic stratigraphy on the Mt Eureka Group of tenements is extensive with the prospective basal contact unit extended from Rox’s tenure onto the Mt Eureka tenure.
==> picture [270 x 45] intentionally omitted <==
9
==> picture [458 x 646] intentionally omitted <==
Figure 6 – Rox and Cullen Tenure on Magnetics. Nickel Prospective Horizon Highlighted
==> picture [270 x 45] intentionally omitted <==
10
Key terms of the agreement are as follows:
-
Rox may earn a 51% interest by spending $1m on exploration expenditure within a three-year period from satisfaction of certain conditions precedent (Stage 1 Earn In).
-
Cullen will receive $40,000 cash upon satisfaction of one of the conditions precedent.
-
• If Rox earns a 51% interest, it can elect to earn a further 24% interest by expending a further $1m on exploration expenditure over a three-year period, commencing at the end of the Stage 1 Earn In.
-
Rox must spend a minimum of $333,334 and ensure the Cullen tenements are in good standing on a daily pro rata basis before it may withdraw.
-
Upon Rox earning 51% or, if it earns the additional 24%, upon Rox earning 75%, the parties will be associated in an unincorporated Joint Venture in relation to the Joint Venture Tenements, which will include certain Rox tenements and applications (see the Schedule and Fig.5 above).
-
If Rox earns a 75% interest, Cullen will be free-carried, with no liability for any Joint Venture costs, until completion of a Pre-Feasibility Study.
-
If Rox only earns a 51% interest, or earns 75% and completes a Pre-Feasibility Study, thereafter Cullen must contribute to Joint Venture costs pro-rata or dilute under a standard dilution formula.
-
If a Participant’s interest falls to 10% or less, that Participant’s interest will be converted to a Net Smelter Return Royalty of 1% on those Cullen tenements already subject to a royalty and 2.5% on the balance of the Joint Venture Tenements.
Collurabbie (100%)
No significant field activity was undertaken during the quarter. The Company has been informally approached by several parties interested in acquiring the project. Early stage due diligence work is being carried out by these parties.
Corporate
Capital Raising to Accelerate Drilling at Gold and Nickel Projects
During the quarter Rox undertook an equity raising via share placement to sophisticated and institutional shareholders. This raised gross proceeds of A$4.0m with Taylor Collison acting as sole Lead Manager and Bookrunner to the Placement.
Proceeds from the Placement enabled Rox to accelerate its exploration campaigns across both its Gold and Nickel projects and to:
-
Further define the high-grade, near-surface gold mineralisation at the Youanmi Gold Project; and
-
Implement its exploration plans at the Company’s 100% owned Fisher East Nickel Project and the recently announced Mt Eureka JV
A total of 166.6 million fully paid ordinary shares were issued at a price of $0.024 per share. The Company welcomed several new institutional investors to its share register, providing a strong endorsement for the Company’s growth strategy in both gold and nickel.
==> picture [270 x 45] intentionally omitted <==
11
New Director Appointment
Subsequent to the end of the quarter the Company announced the appointment of Dr John Mair as a non-executive independent director.
Dr Mair is an economic geologist with extensive international experience across technical, managerial and corporate fields. He holds a PhD in economic geology (UWA) and held the position of post-doctoral research fellow at the Mineral Deposit Research Unit, UBC, Canada.
Dr Mair brings a deep understanding of a range of gold deposits types from experience working in Western Australia, NSW, Alaska, Yukon, British Columbia amongst other places. He has authored numerous papers in leading scientific journals on the geology of gold deposits.
Dr Mair is the Managing Director of Greenland Minerals Limited who is developing the globally significant Kvanefjeld rare earths project in Greenland.
Financial
As of 30 September 2019, the Company’s cash balance was $5.38 million. A payment of A$3.75 million is due by 15 February 2023 from Teck Australia. In addition, the Company holds 14,527,205 Thor Mining Plc CDI’s which have a current market value of $0.18 million. In total, the Company’s cash, liquids (shares) and receivables are $9.3 million.
Major items of note during the quarter were $1.7 million of exploration expenditure and $4.0 million gross proceeds received from the Company’s capital raising.
For more information:
Alex Passmore Managing Director Tel: +61 8 9226 0044 [email protected]
==> picture [270 x 45] intentionally omitted <==
12
Competent Person Statements:
Resource Statements
The information in this report that relates to nickel Mineral Resources for the Fisher East project was reported to the ASX on 5 February 2016 (JORC 2012). Rox confirms that it is not aware of any new information or data that materially affects the information included in the announcement of 5 February 2016, and that all material assumptions and technical parameters underpinning the estimates in the announcement of 5 February 2016 continue to apply and have not materially changed.
The information in this report that relates to nickel Mineral Resources for the Collurabbie project was reported to the ASX on 18 August 2017 (JORC 2012). Rox confirms that it is not aware of any new information or data that materially affects the information included in the announcement of 18 August 2017, and that all material assumptions and technical parameters underpinning the estimates in the announcement of 18 August 2017 continue to apply and have not materially changed.
The information in this report that relates to gold Mineral Resources for the Mt Fisher project was reported to the ASX on 11 July 2018 (JORC 2012). Rox confirms that it is not aware of any new information or data that materially affects the information included in the announcement of 28 March 2018, and that all material assumptions and technical parameters underpinning the estimates in the announcement of 28 March 2018 continue to apply and have not materially changed.
The information in this report that relates to gold Mineral Resources for the Youanmi project was reported to the ASX on 17 April 2019 (JORC 2012). Rox confirms that it is not aware of any new information or data that materially affects the information included in the announcement of 17 April 2019, and that all material assumptions and technical parameters underpinning the estimates in the announcement of 17 April 2019 continue to apply and have not materially changed.
Exploration Results
The information in this report that relates to previous Exploration Results, was either prepared and first disclosed under the JORC Code 2004 or under the JORC Code 2012 and has been properly and extensively cross-referenced in the text to the date of original announcement to ASX. In the case of the 2004 JORC Code Exploration Results and Mineral Resources, they have not been updated to comply with the JORC Code 2012 on the basis that the information has not materially changed since it was last reported.
==> picture [270 x 45] intentionally omitted <==
13
About Rox Resources
Rox Resources Limited is an emerging Australian minerals exploration company. The company has a number of key assets at various levels of development with exposure to gold, nickel, copper and platinum group elements (PGE’s). The 1.2Moz Youanmi Gold Project and the Fisher East Nickel Project (78kt Ni) being the most advanced projects with exploration ongoing at the Mt Fisher Gold Project and the Collurabbie Nickel-Copper-PGE Project.
Youanmi Project (50% and option to increase to 70%)
The Youanmi Gold Mine is located 480 km to the northeast of Perth, Western Australia. The Youanmi Mining Centre has produced an estimated 667,000 oz of gold (at 5.47 g/t Au) since discovery in 1901 during three main periods: 1908 to 1921, 1937 to 1942, and 1987 to 1997.
The project is situated in the Youanmi Greenstone Belt, within the Southern Cross Province of the Archaean Yilgarn Craton in Western Australia. The structure of the Youanmi Project is dominated by the north-trending Youanmi Fault Zone. Most of the gold mineralisation seen at the project is hosted within north-northwest splays off the northnortheast trending Youanmi Fault.
Fisher East Nickel Project (100%)
The Fisher East nickel project is located in the North Eastern Goldfields region of Western Australia and hosts several nickel sulphide deposits. The total project area is ~350km2.
Discovery of, and drilling at the Camelwood, Cannonball and Musket nickel prospects has defined a JORC 2012 Mineral Resource (ASX:RXL 5 February 2016) of 4.2Mt grading 1.9% Ni reported at 1.0% Ni cut-off (Indicated Mineral Resource: 3.7Mt grading 1.9% Ni, Inferred Mineral Resource: 0.5Mt grading 1.5% Ni) comprising massive and disseminated nickel sulphide mineralisation, and containing 78,000 tonnes of nickel. Higher grade mineralisation is present in all deposits (refer to ASX announcement above) and is still open at depth beneath each deposit. Additional nickel sulphide deposits continue to be discovered (e.g. Sabre) and these will add to the resource base. Exploration is continuing to define further zones of potential nickel sulphide mineralisation.
Collurabbie Gold-Nickel Project (100%)
The Collurabbie project is located in the highly prospective North Eastern Goldfields region of Western Australia and is prospective for gold and nickel. The project area of ~123km2 hosts the Olympia nickel sulphide deposit and a number of other prospects for nickel sulphide mineralisation. A JORC 2012 Inferred Mineral Resource of 573,000t grading 1.63% Ni, 1.19% Cu, 0.082% Co, 1.49g/t Pd, 0.85g/t Pt has been defined at Olympia (ASX:RXL 18 August 2017). The style of nickel sulphide mineralisation is different to that at Fisher East, with a significant copper and PGE component at Collurabbie, and has been compared to the Raglan nickel deposits in Canada (>1Mt contained nickel). In addition, there is potential for gold mineralisation, with several strong drilling intersections including 2m @ 2.4g/t Au from the Naxos prospect.
Mt Fisher Gold Project (100%)
The Mt Fisher gold project is located in the North Eastern Goldfields region of Western Australia, adjacent to the Fisher East nickel project, and hosts several gold deposits. The total project area is ~220km2.
Drilling by Rox has defined numerous high-grade gold targets and a JORC 2012 Measured, Indicated and Inferred Mineral Resource (ASX:RXL 11 July 2018) of 1.0 million tonnes grading 2.7 g/t Au reported at a 0.8 g/tAu cut-off exists for 89,000 ounces of gold (Measured: 170,000 tonnes grading 4.1 g/t Au, Indicated: 220,000 tonnes grading 2.7 g/t Au, Inferred: 630,000 tonnes grading 2.3 g/t Au) aggregated over the Damsel, Moray Reef and Mt Fisher deposits.
==> picture [270 x 45] intentionally omitted <==
14
Appendix 5B Mining Exploration Entity Quarterly Report
==> picture [102 x 43] intentionally omitted <==
Appendix 5B
Name of entity ROX RESOURCES LIMITED
| ABN | ABN | Quarter ended("currentquarter") | Quarter ended("currentquarter") |
|---|---|---|---|
| 53 107 202 602 | 30-Sep-19 | ||
| Consolidated statement of cash flows | Current quarter $A’000 |
Year to date (3 months) $A’000 |
|
| 1 Cash flows from operating activities 1.1 Receipts from customers 1.2 Payments for (a) exploration & evaluation (b) development (c) production (d) staff costs (e) administration and corporate costs 1.3 Dividends received 1.4 Interest received 1.5 Interest and other costs of finance paid 1.6 Income taxes paid 1.7 Research and development refunds 1.8 Other 1.9 Net cash from / (used in) operating activities |
- - (1,674) - - (248) (367) - 10 - - - - |
- - (1,674) - - (248) (367) - 10 - - - - |
|
| (2,279) | (2,279) | ||
| 2 Cash flows from investing activities 2.1 Payments to acquire: (a) property, plant and equipment (b) tenements (see item 10) (c) investments (d) other non-current assets 2.2 Proceeds from the disposal of: (a) property, plant and equipment (b) tenements (see item 10) (c) investments (d) other non-current assets 2.3 Cash flows from loans to other entities 2.4 Dividends received (see note 3) 2.5 Other 2.6 Net cash from / (used in) investing activities |
(8) - - - - - - - - - - |
(8) - - - - - - - - - - |
|
| (8) | (8) |
1
www.roxresources.com.au
Appendix 5B Mining Exploration Entity Quarterly Report
==> picture [102 x 43] intentionally omitted <==
| Consolidated statement of cash flows | Current quarter $A’000 |
Year to date (3 months) $A’000 |
|---|---|---|
| 3 Cash flows from financing activities 3.1 Proceeds from issues of shares 3.2 Proceeds from issue of convertible notes 3.3 Proceeds from exercise of share options 3.4 ...... 3.5 Proceeds from borrowings 3.6 Repayment of borrowings 3.7 Transaction costs related to loans and borrowings 3.8 Dividends paid 3.9 Other (provide details if material) 3.10 Net cash from / (used in) financing activities Transaction costs related to issues of shares, convertible notes or options |
4,000 - - - - - (248) - - |
4,000 - - - - - (248) - - |
| 3,752 | 3,752 | |
| 4 ........ 4.1 4.2 ...... 4.3 ...... 4.4 ...... 4.5... 4.6 Cash and cash equivalents at end of period Net increase / (decrease) in cash and cash equivalents for the period Cash and cash equivalents at beginning of period Effect of movement in exchange rates on cash held Net cash from / (used in) operating activities (item 1.9 above) Net cash from / (used in) investing activities (item 2.6 above) Net cash from / (used in) financing activities (item 3.10 above) |
3,913 (2,279) (38) 3,752 - |
3,913 (2,279) (38) 3,752 - |
| 5,348 | 5,348 | |
| 5 5.1 5.2 5.3 5.4 5.5 ...... Call deposits Other (provide details) Cash and cash equivalents at end of quarter (should equal item 4.6 above) Bank overdrafts Reconciliation of cash and cash equivalents at the end of the quarter (as shown in the consolidated statement of cash flows) to the related items in the accounts Bank balances |
Current quarter $A’000 |
Previous quarter $A’000 |
| 5,299 79 - - |
2,834 1,079 - - |
|
| 5,378 | 3,913 |
2
www.roxresources.com.au
Appendix 5B Mining Exploration Entity Quarterly Report
==> picture [102 x 43] intentionally omitted <==
| 6 6.1 6.2 ...... Aggregate amount of payments to these parties included in item 1.2 Aggregate amount of cash flow from loans to these parties included in item 2.3 Payments to directors of the entity and their associates |
Current quarter $A'000 (149) - |
|---|---|
| 6.1 6.2 ...... |
Aggregate amount of payments to these parties included in item 1.2 Aggregate amount of cash flow from loans to these parties included in ite |
|---|---|
| 6.3 | Include below any explanation necessary to understand the transactions |
| ...... | included in items 6.1 and 6.2 |
Includes salaries, fees and superannuation to executive and non-executive directors.
| 7 7.1 7.2 ...... 7.3 ...... Aggregate amount of payments to these parties included in item 1.2 Include below any explanation necessary to understand the transactions included in items 7.1 and 7.2 Payments to related entities of the entity and their associates Aggregate amount of cash flow from loans to these parties included in item 2.3 |
Current quarter $A'000 |
|---|---|
| - | |
| - | |
n/a
| 8 8.1 Loan facilities 8.2 Credit standby arrangements 8.3 Other (please specify) Add notes as necessary for an understanding of the position Financing facilities available |
Total facility amount at quarter end $A’000 |
Amount drawn at quarter end $A’000 |
|---|---|---|
| - | - | |
| - | - | |
| - | - |
8.4 Include below a description of each facility above, including the lender, interest rate and whether ...... it is secured or unsecured. If any additional facilities have been entered into or are proposed to be ......... entered into after quarter end, include details of those facilities as well.
n/a
3
www.roxresources.com.au
Appendix 5B Mining Exploration Entity Quarterly Report
==> picture [102 x 43] intentionally omitted <==
| . 9 9.1 Exploration and evaluation 9.2 Development 9.3 Production 9.4 Staff costs 9.5 Administration and corporate costs 9.6 Other (Acquisition) 9.7 Estimated cash outflows for next quarter Total estimated cash outflows |
. 9 9.1 Exploration and evaluation 9.2 Development 9.3 Production 9.4 Staff costs 9.5 Administration and corporate costs 9.6 Other (Acquisition) 9.7 Estimated cash outflows for next quarter Total estimated cash outflows |
. 9 9.1 Exploration and evaluation 9.2 Development 9.3 Production 9.4 Staff costs 9.5 Administration and corporate costs 9.6 Other (Acquisition) 9.7 Estimated cash outflows for next quarter Total estimated cash outflows |
. 9 9.1 Exploration and evaluation 9.2 Development 9.3 Production 9.4 Staff costs 9.5 Administration and corporate costs 9.6 Other (Acquisition) 9.7 Estimated cash outflows for next quarter Total estimated cash outflows |
$A’000 | $A’000 |
|---|---|---|---|---|---|
| - 675 - 176 156 - |
|||||
| 1,007 | |||||
| 10 ..... |
Changes in tenements (items 2.1(b) & 2.2(b) above) |
Tenement reference and location |
Nature of interest | Interest at beginning of quarter |
Interest at end of quarter |
| 10.1 ..... |
Interests in mining tenements lapsed, relinquished or reduced |
E53/2068 (Withdrawn) . P53/1496 (Amalgamated) |
All Minerals |
Application . 100% |
0% |
| 10.2 ..... |
Interests in mining tenements acquired or increased |
E36/948 E53/2002 E53/2018 E53/2062 E53/2075 E53/2090 E53/2095 E53/2102 |
All Minerals | 0% | 100% 100% 100% Application Application Application Application Application |
Refer to Annexure 1 for full list of mining tenements.
Compliance statement
-
This statement has been prepared in accordance with accounting standards and policies which
-
1 comply with Listing Rule 19.11A.
-
2 This statement gives a true and fair view of the matters disclosed.
Sign here:
==> picture [145 x 46] intentionally omitted <==
Date: 30 October 2019
(Company secretary)
Print name: Brett Dickson
4
www.roxresources.com.au
Appendix 5B Mining Exploration Entity Quarterly Report
==> picture [102 x 43] intentionally omitted <==
Appendix 1 - Mining Tenements
| Project | Tenement Number |
Interest | Interest Held |
|---|---|---|---|
| Mt Fisher, WA | E53/1061 | All Minerals | 100% |
| E53/1106 | All Minerals | 100% | |
| E53/1836 | All Minerals | 100% | |
| E53/1319 | All Minerals | 100% | |
| M53/09 | All Minerals | 100% | |
| M53/127 | All Minerals | 100% | |
| E53/1788 | All Minerals | 100% | |
| Fisher East, WA | E36/948 | All Minerals | 100% |
| E53/1218 | All Minerals | 100% | |
| E53/1716 | All Minerals | 100% | |
| E53/1802 | All Minerals | 100% | |
| E53/1318 | All Minerals | 100% | |
| E53/1884 | All Minerals | 100% | |
| E53/1885 | All Minerals | 100% | |
| E53/1886 | All Minerals | 100% | |
| E53/1887 | All Minerals | 100% | |
| E53/1950 | All Minerals | 100% | |
| E53/2002 | All Minerals | 100% | |
| E53/2018 | All Minerals | 100% | |
| E53/2062 | All Minerals | Application | |
| E53/2075 | All Minerals | Application | |
| E53/2090 | All Minerals | Application | |
| E53/2095 | All Minerals | Application | |
| E53/2102 | All Minerals | Application | |
| Collurabbie, WA | E38/2009 | All Minerals | 100% |
| E38/2912 | All Minerals | 100% | |
| E38/3193 | All Minerals | 100% | |
| Youanmi Gold Project | E57/1121 | All Minerals | Application |
| E57/1122 | All Minerals | Application | |
| E57/1123 | All Minerals | Application | |
| Youanmi - OYG JV | M57/10 | All Minerals | 50% |
| M57/51 | All Minerals | 50% | |
| M57/75 | All Minerals | 50% | |
| M57/97 | All Minerals | 50% | |
| M57/109 | All Minerals | 50% | |
| M57/135 | All Minerals | 50% | |
| M57/160A | All Minerals | 50% | |
| M57/164 | All Minerals | 50% | |
| M57/165 | All Minerals | 50% | |
| M57/166 | All Minerals | 50% | |
| M57/167 | All Minerals | 50% | |
| Youanmi - Sandstone JV | E57/985 | Gold Rights | Earning 45% |
| E57/986 | Gold Rights | Earning 45% | |
| E57/1011-I | Gold Rights | Earning 45% | |
| P57/1365 | Gold Rights | Earning 45% | |
| P57/1366 | Gold Rights | Earning 45% | |
| Youanmi - VMC JV | E57/982 | Gold Rights | Earning 50% |
| E57/1018 | Gold Rights | Earning 50% | |
| E57/1019 | Gold Rights | Earning 50% | |
| E57/1023-I | Gold Rights | Earning 50% | |
| E57/1078 | Gold Rights | Earning50% | |
| Youanmi - Currans JV | M57/641 | All Minerals | 45% |
| M57/642 | All Minerals | 45% |
5