HIGHLIGHTS
Fisher East Nickel Project, WA
-
Strong drilling results from Musket and Cannonball:
-
5m @ 4.1% Ni from Cannonball
-
5.3m @ 2.7% Ni from Cannonball, and
-
2.3m @ 4.1% Ni from Musket down hole EM target
-
Mineralisation at Cannonball and Musket is still open at depth and along strike
-
Down hole EM target at Musket successfully tested and extended
-
Ground EM anomalies defined at Cutlass
-
New ground acquired to the south of Musket – adds a further 10km of prospective strike
-
Metallurgical testwork indicates good recoveries and concentrate specifications for Camelwood and Musket ore types
-
Scoping Study commenced for Fisher East nickel project
Reward Zinc-Lead Project, NT
-
Continued drilling success at the Teena prospect:
-
34.4m @ 6.2% Zn+Pb, including 4.9m @ 11.8% Zn+Pb, 4.1m @ 10.4% Zn+Pb, and 2.5m @ 10.3% Zn+Pb
-
25.5m @ 9.1% Zn+Pb, including 14.7m @ 13.3% Zn+Pb
Bonya Copper Project, NT
-
Further excellent copper intersections at the Bonya Mine prospect:
-
8m @ 7.6% Cu, including 3m @ 12.0% Cu
-
13m @ 5.4% Cu, including 3m @ 12.8% Cu
-
9m @ 2.8% Cu
-
5m @ 9.1% Cu, including 3m @ 13.4% Cu, and
-
11m @ 3.9% Cu
-
Several other strong geochemical targets to test with drilling
Rox Resources Limited Level 1 30 Richardson Street WEST PERTH WA 6005
Telephone: (61 8) 9226 0044 Facsimile: (61 8) 9325 6254
ROX RESOURCES LIMITED QUARTERLY REPORT For Quarter Ended 31 December 2014
==> picture [103 x 51] intentionally omitted <==
INTRODUCTION
The fourth quarter of 2014 has continued to return outstanding exploration results for Rox Resources Limited (“Rox” or “the Company”). On 27 December 2014, The Australian newspaper listed Rox as one of only ten resource companies in its “Top 100 for investing in 2015”.
At the Fisher East nickel project in Western Australia:
-
Drilling has continued to intersect strong nickel sulphide mineralisation at Musket and Cannonball that will increase mineral resources.
-
Ground EM has defined strong anomalies for drilling at the Cutlass prospect.
-
Metallurgical testwork on Camelwood and Musket ore samples was completed and returned positive results.
-
A Scoping Study was commenced during the quarter to examine various development options for the project.
At the Reward zinc-lead project in the Northern Territory:
- Drilling has continued to define and delineate the large mineralised system at the Teena zinclead prospect, which now extends for over 1.9km in strike length and 0.8km width.
At the Bonya copper project in the Northern Territory:
-
RC and diamond drilling has continued to intersect zones of massive copper sulphide mineralisation at the Bonya Mine prospect. Follow-up drilling is planned for 2015.
-
Rox has earned a 51% interest in the project under a Farm-in Agreement with Arafura Resources NL (ASX:ARU) and has elected to increase its interest to 70% by expenditure of a further $1 million by December 2016.
==> picture [325 x 278] intentionally omitted <==
Figure 1: Rox Project Location Map
- 2 -
ROX RESOURCES LIMITED QUARTERLY REPORT For Quarter Ended 31 December 2014
==> picture [103 x 51] intentionally omitted <==
FISHER EAST NICKEL PROJECT, WA (Rox 100% & option to purchase 100%)
RC and Diamond Drilling
During the quarter final assays were received for RC (MFEC prefix) and diamond (MFED prefix) drill holes with significant new results, all outside of existing resources, including:
MFEC082: 9m @ 2.8% Ni from 154m, including 5m @ 4.1% Ni at Cannonball MFEC083: 4m @ 1.9% Ni from 191m at Cannonball MFEC085: 5m @ 2.1% Ni from 198m at Cannonball MFEC091: 3m @ 2.2% Ni from 229m at Camelwood MFEC092: 2m @ 3.0% Ni from 167m at Camelwood
MFED057: 5.3m @ 2.7% Ni from 255.3m, including 1.9m @ 4.8% Ni at Cannonball MFED058: 2.3m @ 4.1% Ni from 366.9m at Musket MFED062: 0.2m @ 13.0% Ni from 486.3m, and 5.1m @ 2.0% Ni from 490.0m at Musket MFED063: 1.8m @ 1.6% Ni from 414.2m, and 8.6m @ 1.4% Ni from 419.9m at Musket
Hole MFED058 tested the off-hole EM target at Musket (Figure 2) and defined ore grade mineralisation there. A downhole EM survey in hole MFED059 extended this EM anomaly at depth and further drilling is warranted. The results from the above drilling, and further follow-up drilling, will allow further extensions to the Musket mineral resource as well as a new additional mineral resource at Cannonball to be estimated.
Some additional RC drilling was also undertaken at Camelwood to better define near surface mineralisation. RC holes drilled at the Red Mulga and Cutlass prospects intersected anomalous nickel sulphide mineralisation which warrants follow-up.
Full results are included in Tables 1 and 2, and shown on Figures 2 and 3. (ASX:RXL 20 November 2014).
Ground EM Survey
A ground EM survey was completed over the Cutlass trend (Figure 4), plus Cannonball and Musket. Anomalies were defined at Musket and Cutlass, but final results are awaited. It is anticipated that the Cutlass EM anomalies will be tested with drilling in the next quarter. The Musket EM anomalies are coincident with known mineralisation.
New Ground Acquired Through Option
During the quarter Rox entered into a new Option Agreement to acquire 100% of two additional granted mineral tenements situated along strike to the south of the known nickel and gold mineralised zones on Rox’s tenements (Figure 5) (ASX:RXL 8 December 2014).
The first tenement, E53/1802, is located along strike to the south of Camelwood and Musket. The tenement covers a further 10km of the prospective ultramafic horizon, now providing Rox with a total 25km strike length of that favourable stratigraphy (Figure 6). Previous work has identified nickel and copper geochemical anomalies on E53/1802, but the area has not been effectively explored for nickel sulphides. Airborne geophysical surveys (VTEM and aero-magnetics) are planned to be flown in the next quarter to better define drilling targets for nickel sulphides.
- 3 -
ROX RESOURCES LIMITED QUARTERLY REPORT For Quarter Ended 31 December 2014
==> picture [103 x 51] intentionally omitted <==
The second tenement, E53/1788, is located along strike to the south of the 7km long gold-in-regolith anomaly currently held by Rox at the Dam and Dirks prospects (Figure 7), extending the potential gold-bearing corridor to more than 10km. A thorough data review of the new tenement has confirmed the presence of a number of significant gold mineralised zones that appear to be associated with the gold mineralised corridor to the north.
Metallurgical Testwork
Preliminary metallurgical testwork on disseminated and massive sulphide samples from Camelwood and Musket was completed during the quarter under the supervision of Strategic Metallurgy Pty Ltd. Preliminary comminution work indices were also determined for the Camelwood disseminated sample in order to assess the grinding requirements. These were a Bond Ball Mill Work Index of 10.9 kWh/tonne and a Bond Abrasion Index of 0.027.
Flotation testing was conducted to determine preliminary concentrate nickel grades and nickel recoveries for the different ore types.
Massive sulphide ore achieved 97 to 100% recovery, while the disseminated sulphide ore achieved 74 to 81% recovery, both at a nominal concentrate grade of 12% Ni, as listed in Table 1. Higher concentrate grades can be achieved but at slightly lower recoveries.
The quality of the overall concentrate will be more than acceptable for smelting, with individual Fe/MgO ratios shown in Table 1. Arsenic (As) was less than 100 ppm for each concentrate, and will therefore not pose any issues. It is unlikely that just one ore type would be processed at a time, rather, a “run of mine” (ROM) sample would be a mixture of these ore types.
Further testwork is required to optimise the overall metallurgical performance, and will now focus on:
-
a) Improvements in recovery of disseminated ores due to the relatively high talc content, which would lead to a lowering of the MgO content (and increase of Fe/MgO ratio),
-
b) ROM samples which will more accurately represent material that would be presented to a processing plant from a mining operation,
-
c) Optimising grind size.
Table 1: Metallurgical Testwork Results
| Ore Type | Head Grade (Ni%) |
Primary Grind Size (um) |
Rougher Ni grade (%) |
Rougher Nickel Recovery (%) |
Nickel Recovery at 12% Concentrate Grade |
Fe/MgO | MgO% |
|---|---|---|---|---|---|---|---|
| Camelwood Primary Disseminated |
2.4 | 75 | 6.3 | 86.2 | 73.7 | 12:1 | 8.7 |
| Camelwood Primary Massive |
6.7 | 53 | 12.2 | 96.7 | 96.7 | 16:1 | 2.4 |
| Camelwood Transitional Semi- Massive |
5.4 | 32 | 11.7 | 79.9 | 79.7 | 4:1 | 6.1 |
| Musket Primary Disseminated |
2.1 | 75 | 10.3 | 84.2 | 81.2 | 4:1 | 8.0 |
| Musket Primary Massive |
20.0 | 75 | 23.0 | 99.7 | 100.0 | 111:1 | 0.3 |
- 4 -
ROX RESOURCES LIMITED QUARTERLY REPORT For Quarter Ended 31 December 2014
==> picture [103 x 51] intentionally omitted <==
Scoping Study
Given the mineral resource now defined at Fisher East (Camelwood and Musket), plus the positive metallurgical testwork results listed above, a Scoping Study was commenced during the quarter. This study will develop a preliminary mining schedule and examine various options including building a processing plant on-site at Fisher East, or toll milling at a nearby processing facility. Results are expected in the next quarter.
Next Quarter’s Activities
-
Completion of Fisher East Scoping Study.
-
Commencement of new drilling and geophysics programs.
==> picture [501 x 334] intentionally omitted <==
Figure 2: Musket-Cannonball Long-Section showing new drill results
- 5 -
ROX RESOURCES LIMITED QUARTERLY REPORT For Quarter Ended 31 December 2014
==> picture [103 x 51] intentionally omitted <==
==> picture [715 x 251] intentionally omitted <==
Figure 3: Camelwood-Musket South-North Drill Long Section, open at depth, and largely unexplored. The Indicated Mineral Resources shown in red are subsets of, and are included in the Total Mineral Resources shown in blue.
- 6 -
ROX RESOURCES LIMITED QUARTERLY REPORT For Quarter Ended 31 December 2014
==> picture [103 x 51] intentionally omitted <==
==> picture [410 x 654] intentionally omitted <==
Figure 4: Fisher East Ultramafic Belt – Prospect Locations over interpreted geology
- 7 -
ROX RESOURCES LIMITED QUARTERLY REPORT For Quarter Ended 31 December 2014
==> picture [103 x 51] intentionally omitted <==
==> picture [450 x 590] intentionally omitted <==
Figure 5: New Option Tenements, E53/1788 and E53/1802 (dark blue cross-hatch). Existing Rox 100% tenure shown in plain red, existing Option tenements shown in plain blue.
8
ROX RESOURCES LIMITED QUARTERLY REPORT For Quarter Ended 31 December 2014
==> picture [103 x 51] intentionally omitted <==
==> picture [453 x 595] intentionally omitted <==
Figure 6: E53/1802 (yellow outline) showing magnetics. Rox current tenure shown with red or blue outline, and nickel sulphide prospects and VTEM anomalies shown. Grid is 5km.
9
ROX RESOURCES LIMITED QUARTERLY REPORT For Quarter Ended 31 December 2014
==> picture [103 x 51] intentionally omitted <==
==> picture [392 x 638] intentionally omitted <==
Figure 7: E53/1788 showing maximum gold in hole, coloured (green = 1 to 3 g/tAu, red = 3-5 g/tAu, magenta = >5 g/tAu). Grid is 2.5km. E53/1061 and E53/1106 (grey shade) already 100% owned by Rox. Historic data compiled from Open file DMP reports.
10
ROX RESOURCES LIMITED QUARTERLY REPORT For Quarter Ended 31 December 2014
Table 2: RC Drilling Assay Results
==> picture [103 x 51] intentionally omitted <==
| Hole | East | North | Depth (m) |
Dip | Azimuth | From (m) |
To (m) |
Interval | Ni% | m% | Prospect |
|---|---|---|---|---|---|---|---|---|---|---|---|
| MFEC098 | 355950 | 7035900 | 220 | -60 | 274 | 189 | 190 | 1 | 1.26 | 1.3 | Camelwood Nth |
| MFEC097 | 355898 | 7035999 | 187 | -60 | 274 | 163 | 164 | 1 | 1.16 | 1.2 | Camelwood Nth |
| MFEC096 | 355899 | 7036046 | 202 | -60 | 274 | 176 | 177 | 1 | 0.94 | 0.9 | Camelwood Nth |
| MFEC095 | 358306 | 7028997 | 181 | -55 | 250 | NSR | Cutlass | ||||
| MFEC094 | 358283 | 7028406 | 126 | -55 | 250 | NSR | Red Mulga | ||||
| MFEC093 | 358960 | 7027397 | 156 | -60 | 245 | NSR | Red Mulga | ||||
| MFEC092 | 355922 | 7035950 | 187 | -60 | 272 | 167 | 169 | 2 | 2.99 | 6.0 | Camelwood |
| MFEC091 | 355990 | 7035846 | 241 | -60 | 270 | 229 | 232 | 3 | 2.23 | 6.7 | Camelwood |
| MFEC090 | 356122 | 7035199 | 217 | -60 | 275 | 206 | 207 | 1 | 0.95 | 1.0 | Camelwood Sth |
| MFEC089 | 356097 | 7035150 | 192 | -60 | 275 | NSR | Camelwood Sth | ||||
| MFEC088 | 356104 | 7035099 | 187 | -60 | 275 | 174 | 175 | 1 | 1.07 | 1.1 | Camelwood Sth |
| MFEC087 | 356087 | 7035049 | 163 | -60 | 275 | 141 | 142 | 1 | 1.34 | 1.3 | Camelwood Sth |
| MFEC086 | 356135 | 7034995 | 198 | -60 | 275 | 177 | 178 | 1 | 1.23 | 1.2 | Camelwood Sth |
| MFEC085 | 356310 | 7034654 | 222 | -58 | 268 | 198 | 203 | 5 | 2.10 | 10.5 | Cannonball |
| MFEC084 | 356232 | 7034750 | 213 | -55 | 270 | 190 | 191 | 1 | 1.49 | 1.5 | Cannonball |
| MFEC083 | 356263 | 7034682 | 228 | -65 | 274 | 191 | 195 | 4 | 1.85 | 7.4 | Cannonball |
| MFEC082 | 356237 | 7034651 | 173 | -55 | 272 | 154 | 163 | 9 | 2.75 | 24.7 | Cannonball |
| including | 155 | 160 | 5 | 4.12 |
RC Drill holes MFEC082 to MFEC085 (Table 2) have been reported previously (ASX:RXL 20 November 2014).
Table 3: Diamond Drilling Assay Results
| Hole | East | North | Depth (m) |
Dip | Azimuth | From (m) |
To (m) |
Interval | Ni% | m% | Prospect |
|---|---|---|---|---|---|---|---|---|---|---|---|
| MFED063 | 356768 | 7033836 | 462.7 | -70 | 268 | 414.2 | 416.0 | 1.8 | 1.55 | 15.0 | Musket |
| And | 419.9 | 428.5 | 8.6 | 1.42 | |||||||
| Including | 425.0 | 427.9 | 2.9 | 2.24 | |||||||
| MFED062 | 356802 | 7033917 | 522.7 | -66 | 261 | 486.3 | 486.5 | 0.2 | 13.0 | 12.7 | Musket |
| And | 490.0 | 495.1 | 5.1 | 2.00 | |||||||
| MFED061 | 356348 | 7034690 | 299.3 | -66 | 247 | 266.6 | 268.8 | 2.2 | 1.92 | 4.2 | Cannonball |
| MFED060 | 356168 | 7034897 | 207.6 | -60 | 275 | 189.3 | 191.3 | 2.0 | 1.41 | 2.8 | Camelwood Sth |
| MFED059 | 356704 | 7034030 | 474.9 | -70 | 264 | 450.4 | 451.8 | 1.4 | 1.44 | 2.0 | Musket |
| MFED058 | 356653 | 7034098 | 418.6 | -60 | 268 | 366.9 | 369.2 | 2.3 | 4.10 | 9.3 | Musket |
| MFED057 | 356351 | 7034696 | 296.8 | -60 | 261 | 255.3 | 260.6 | 5.3 | 2.69 | 14.2 | Cannonball |
| Including | 255.3 | 257.2 | 1.9 | 4.82 |
Diamond drill holes MFED057 and MFED061 (Table 3) have been reported previously (ASX:RXL 20 November 2014).
11
ROX RESOURCES LIMITED QUARTERLY REPORT For Quarter Ended 31 December 2014
Notes to Tables:
==> picture [103 x 51] intentionally omitted <==
-
New results shown in bold .
-
Grid coordinates GDA94: Zone 51, collar positions determined by hand held GPS.
-
All holes nominal RL 542 +/- 1m AHD estimated from regional Digital Elevation Model.
-
Hole azimuths generally planned as 270 degrees, downhole deviations result in hole paths slightly different to those intended.
-
RC drilling (hole prefix MFEC) by reverse circulation face sampling hammer, then 1 metre samples cone split and bagged.
-
Diamond drilling (hole prefix MFED) by HQ/NQ diamond core, with core cut in half and sampled to either significant geological boundaries or even metre intervals.
-
Diamond drill samples weighed in water and air to determine bulk density, and then crushed to 6.5mm. 3-5kg sample preparation by pulp mill to nominal P80/75um.
-
Ni analysis by Intertek Genalysis Perth method 4A/OE: Multi-acid digest including Hydrofluoric, Nitric, Perchloric and Hydrochloric acids in Teflon Tubes. Analysed by Inductively Coupled Plasma Optical (Atomic) Emission Spectrometry. For higher precision analyses (e.g. Ni > 1%), Intertek Genalysis Perth method 4AH/OE: Modified (for higher precision) multiacid digest including Hydrofluoric, Nitric, Perchloric and Hydrochloric acids. Analysed by Inductively Coupled Plasma Optical (Atomic) Emission Spectrometry.
-
Certified Reference Standards and field duplicate samples were inserted at regular intervals to provide assay quality checks. Review of the standards and duplicates are within acceptable limits.
-
Cut-off grade for reporting of 1% Ni with up to 2m of internal dilution allowed.
-
Given the angle of the drill holes and the interpreted 60-65 degree easterly dip of the host rocks, reported intercepts will be slightly more than true width.
12
ROX RESOURCES LIMITED QUARTERLY REPORT For Quarter Ended 31 December 2014
BONYA COPPER PROJECT, NT (Rox 51%, earning up to 70%)
==> picture [103 x 51] intentionally omitted <==
Follow-up Reverse Circulation (RC) drilling undertaken at the Bonya copper project, located 350km east of Alice Springs in the Northern Territory, continued to produce exceptional assay results (ASX:RXL 5 November 2014, 1 December 2014).
The massive copper sulphide mineralised body at the Bonya Mine prospect was intersected by a further four RC drill holes (Figure 8). Full results are listed in Table 4 and included:
BYRC014: 8m @ 7.6% Cu from 97m, including 3m @ 12.0% Cu from 101m, and 13m @ 5.4% Cu from 111m, including 3m @ 12.8% Cu from 119m
BYRC015: 9m @ 2.8% Cu from 100m, including 4m @ 3.9% Cu from 101m
BYRC018: 5m @ 9.1% Cu from 109m, including 3m @ 13.4% Cu from 109m, and 11m @ 3.9% Cu from 121m
These drilling results have defined massive copper sulphide mineralisation (Figure 9) over substantial widths and over a vertical interval of at least 100m. The high grades, including several 1m samples grading above 10% Cu are also very encouraging. Assays for silver (Ag) and gold (Au) were generally in the 1 - 2 g/t range for Ag, and 0.2 - 0.4 g/t range for Au, over the mineralised intervals.
Follow-up diamond drilling was undertaken late in the quarter, however significant hole deviations meant that the drill targets were not intersected as planned. The drilling seems to have intersected the edge of the mineralised system (evidenced by the hematite alteration present) which appears to be plunging to the west. Assay results were:
BYD001: 0.7m @ 1.5% Cu from 175.3m
BYD002: 0.3m @ 2.2% Cu from 153.8m, and 0.6m @ 2.1% Cu from 156.6m
Further drilling is planned for the next quarter aimed to intersect the interpreted westerly plunge as shown on Figure 8.
Drilling at three EM anomalies was also completed by RC holes BYRC001 to 007 inclusive. Some anomalous results were returned, with the best result being 2m @ 3.1% Cu in hole BYRC003 at EM Anomaly 03 (ASX:RXL 5 November 2014). Results are listed in Table 4.
In addition, a number of other prospects on the Bonya tenements (Figure 9) have strong outcrops of copper oxide mineralisation over 200-400m strike lengths (e.g. Green Hoard and Fat Cow), and have been prioritised for RC drilling in the next quarter.
During the quarter Rox satisfied the conditions to earn a 51% interest in EL29701 and elected to proceed to earn up to 70% by expenditure of a further $1 million over two years to 10 December 2016 (ASX:RXL 16 December 2014).
13
ROX RESOURCES LIMITED QUARTERLY REPORT For Quarter Ended 31 December 2014
==> picture [103 x 51] intentionally omitted <==
==> picture [444 x 625] intentionally omitted <==
Figure 8: Bonya Mine Prospect Long Section
14
ROX RESOURCES LIMITED QUARTERLY REPORT For Quarter Ended 31 December 2014
==> picture [103 x 51] intentionally omitted <==
==> picture [438 x 329] intentionally omitted <==
Figure 9: RC chips from hole BYRC018 – the brassy yellow mineral in abundance is the copper sulphide, chalcopyrite
==> picture [429 x 297] intentionally omitted <==
Figure 10: Bonya project tenements showing prospect locations
15
ROX RESOURCES LIMITED QUARTERLY REPORT For Quarter Ended 31 December 2014
==> picture [103 x 51] intentionally omitted <==
==> picture [362 x 483] intentionally omitted <==
Figure 11: Diamond drill core from hole BYD001. The light yellow mineral is chalcopyrite (copper sulphide), while the red-brown mineral is hematite (which is an alteration mineral associated with copper mineralisation), and the dark green mineral is probably chlorite and/or amphibolite. The white mineral near the holder’s thumb is quartz.
16
ROX RESOURCES LIMITED QUARTERLY REPORT For Quarter Ended 31 December 2014
Table 4: Bonya RC Drilling Assay Results
==> picture [103 x 51] intentionally omitted <==
| Hole | East | North | RL | Depth (m) |
Dip | Azimuth | From (m) |
To (m) | Interval | Cu% | Prospect |
|---|---|---|---|---|---|---|---|---|---|---|---|
| BYRC018 | 609380 | 7486915 | 400 | 177 | -50 | 360 | 109 | 114 | 5 | 9.14 | Bonya Mine |
| including | 109 | 112 | 3 | 13.4 | |||||||
| And | 121 | 132 | 11 | 3.91 | |||||||
| And | 139 | 143 | 4 | 1.94 | |||||||
| including | 141 | 142 | 1 | 4.17 | |||||||
| BYRC017 | 609445 | 7487053 | 408 | 102 | -45 | 182 | NSR | Bonya Mine | |||
| BYRC016 | 609419 | 7487017 | 403 | 72 | -60 | 180 | 6 | 7 | 1 | 2.10 | Bonya Mine |
| And | 23 | 25 | 2 | 2.16 | |||||||
| And | 36 | 41 | 5 | 1.95 | |||||||
| including | 39 | 41 | 2 | 3.50 | |||||||
| And | 47 | 48 | 1 | 2.36 | |||||||
| BYRC015 | 609420 | 7487083 | 403 | 143 | -45 | 180 | 100 | 109 | 9 | 2.82 | Bonya Mine |
| including | 101 | 105 | 4 | 3.93 | |||||||
| BYRC014 | 609399 | 7487063 | 403 | 150 | -60 | 180 | 97 | 105 | 8 | 7.58 | Bonya Mine |
| including | 101 | 104 | 3 | 12.0 | |||||||
| And | 111 | 124 | 13 | 5.44 | |||||||
| including | 114 | 123 | 9 | 7.44 | |||||||
| including | 119 | 122 | 3 | 12.8 | |||||||
| BYRC013 | 609357 | 7487014 | 395 | 102 | -60 | 180 | NSR | Bonya Mine | |||
| BYRC012 | 609402 | 7487033 | 400 | 114 | -60 | 195 | 74 | 77 | 3 | 3.72 | Bonya Mine |
| And | 82 | 83 | 1 | 2.58 | |||||||
| And | 86 | 87 | 1 | 1.46 | |||||||
| And | 97 | 106 | 9 | 3.80 | |||||||
| including | 97 | 100 | 3 | 8.21 | |||||||
| BYRC011 | 609423 | 7487005 | 400 | 41 | -55 | 195 | 8 | 11 | 3 | 2.18 | Bonya Mine |
| including | 8 | 9 | 1 | 4.19 | |||||||
| And | 14 | 22 | 8* | 1.64 | |||||||
| BYRC010 | 609347 | 7487000 | 393 | 78 | -60 | 060 | 42 | 43 | 1 | 1.20 | Bonya Mine |
| BYRC009 | 609379 | 7486962 | 393 | 98 | -60 | 010 | 60 | 98 | 38 | 4.38 | Bonya Mine |
| including | 60 | 66 | 6 | 8.75 | |||||||
| including | 82 | 90 | 8 | 7.89 | |||||||
| BYRC008 | 609379 | 7486978 | 393 | 60 | -60 | 010 | 30 | 41 | 11 | 4.35 | Bonya Mine |
| including | 33 | 36 | 3 | 6.13 | |||||||
| BYRC007 | 608541 | 7486741 | 416 | 120 | -60 | 130 | NSR | EM Anom 05 | |||
| BYRC006 | 608554 | 7486707 | 416 | 84 | -60 | 130 | 74 | 76 | 2 | 0.48 | EM Anom 05 |
| BYRC005 | 608586 | 7486745 | 415 | 80 | -60 | 130 | NSR | EM Anom 05 | |||
| BYRC004 | 607483 | 7487304 | 450 | 115 | -60 | 180 | 69 | 70 | 1 | 1.21 | EM Anom 03 |
| BYRC003 | 607531 | 7487304 | 449 | 115 | -60 | 180 | 10 | 12 | 2 | 1.89 | EM Anom 03 |
| And | 55 | 57 | 2 | 3.14 | |||||||
| BYRC002 | 608805 | 7487484 | 423 | 108 | -60 | 045 | 61 | 65 | 4 | 0.26 | EM Anom 04 |
| BYRC001 | 608766 | 7487527 | 425 | 120 | -60 | 045 | 100 | 102 | 2 | 0.64 | EM Anom 04 |
RC Drill holes BYRC001 to BYRC018 (Table 4) have been reported previously (ASX:RXL 20 October 2014, 5 November 2014, 1 December 2014).
17
ROX RESOURCES LIMITED QUARTERLY REPORT For Quarter Ended 31 December 2014
Table 5: Bonya Diamond Drilling Assay Results
==> picture [103 x 51] intentionally omitted <==
| Hole | East | North | RL | Depth (m) |
Dip | Azimuth | From (m) |
To (m) | Interval | Cu% | Prospect |
|---|---|---|---|---|---|---|---|---|---|---|---|
| BYD002 | 609388 | 7487096 | 402 | 240.5 | -60 | 169 | 153.8 | 154.1 | 0.3 | 2.18 | Bonya Mine |
| And | 156.6 | 157.2 | 0.6 | 2.07 | |||||||
| BYD001 | 609380 | 7486895 | 402 | 260.0 | -50 | 005 | 175.3 | 176.0 | 0.7 | 1.54 | Bonya Mine |
Notes to Tables:
-
New results shown in bold .
-
Grid coordinates GDA94: Zone 53, collar positions and RL (in AHD) determined by hand held GPS.
-
Hole azimuths as shown, downhole deviations may result in hole paths slightly different to those intended.
-
RC drilling by reverse circulation face sampling hammer, then 1 metre samples cone split and bagged.
-
All RC samples used in calculation of intercepts are 1m except BYRC011 14-22m* which are 2m composite samples.
-
Diamond drilling (hole prefix BYD) by HQ/NQ diamond core, with core cut in half and sampled to either significant geological/ mineralogical boundaries or even metre intervals.
-
Diamond drill samples weighed in water and air to determine bulk density, and then crushed to 6.5mm. 3-5kg sample preparation by pulp mill to nominal P80/75um.
-
Cu analyses by Australian Laboratory Services Ltd., methods ME-ICP61 (0-1% Cu) and ME-OG62 (>1% Cu): Four acid digest with analysis by Inductively Coupled Plasma Optical (Atomic) Emission Spectrometry (ICP-AES).
-
Review of laboratory standards and duplicates are within acceptable limits. Certified Reference Standards and field duplicate samples were not inserted.
-
Cut-off grade for reporting of intercepts is 1.0% Cu; with up to 2m of internal dilution allowed.
-
Given the angle of the drill holes and the interpreted 80-85 degree dip of the mineralised system, reported intercepts will be more than true width.
18
ROX RESOURCES LIMITED QUARTERLY REPORT For Quarter Ended 31 December 2014
==> picture [103 x 51] intentionally omitted <==
REWARD ZINC-LEAD PROJECT, NT (Rox 49%, Teck 51% with option to increase to 70%)
Assay results from the remainder of the 2014 drilling program were received and have confirmed mineralisation at Teena now extends over approximately 1.9km in strike length (eastwest) and 0.8km in width (north-south) indicating a substantial body of mineralisation. There are a number of stacked mineralised zones which vary in thickness (see Table 6). A total of 6 holes for 4,822m were drilled during 2014 at Teena.
Results received during the quarter include:
TNDD014: 34.4m @ 6.2% Zn+Pb from 652.6m, including 4.1m @ 10.4% Zn+Pb from 657.0m 4.9m @ 11.8% Zn+Pb from 665.2m, and 2.5m @ 10.3% Zn+Pb from 676.5m TNDD015: 7.0m @ 4.3% Zn+Pb from 807.0m, and 3.1m @ 3.7% Zn+Pb from 825.9m TNDD017: 25.5m @ 9.1% Zn+Pb from 795.9m, including 14.7m @ 13.3% Zn+Pb from 801.0m, and 6.6m @ 6.6% Zn+Pb from 828.4m, including 3.6m @ 9.7% Zn+Pb from 828.4m
Hole TNDD013 was reported last quarter and intersected 35.0m @ 6.1% Zn+Pb from 665.0m, including 3.0m @ 10.1% Zn+Pb from 670.0m, and 7.7m @ 9.9% Zn+Pb from 678.0m.
Hole TNDD016 was drilled to test mineralisation within the Bald Hills Fault Zone. The hole was lost in bad ground at 317.5m before it had fully tested the sequence.
Hole TNDD018 was drilled to test the Teena South prospect where an up-thrown block of prospective rocks was interpreted. The hole did not intersect any mineralisation.
Work planned for the next quarter includes completing a technical report on 2014 activities and results, planning the 2015 program, a core logging review focused on understanding structural and alteration aspects of the system, refinement of the 3D model, and re-logging historic holes from other prospects.
The Reward project is subject to an option/joint venture (JV) agreement between Rox (49%) and Teck Australia Pty Ltd (“Teck”) (51%), a subsidiary of Canada’s largest diversified resource company Teck Resources Limited. Teck have elected to exercise the option to increase their JV interest to 70% by expending up to $15 million in total by 31 August 2018.
Over the quarter Teck’s provisional unaudited expenditure was $1.3 million, bringing the total expenditure for 2014 to $3.0 million. Total expenditure by Teck on the project since commencement of the earn-in agreement is now approximately $9.8 million.
19
ROX RESOURCES LIMITED QUARTERLY REPORT For Quarter Ended 31 December 2014
==> picture [103 x 51] intentionally omitted <==
==> picture [483 x 448] intentionally omitted <==
Figure 12: Reward Project Tenement Plan showing prospect locations (Myrtle Mineral Resource, ASX:RXL 15 March 2010; McArthur River Mineral Resource, Leach et. al., 2005, Economic Geology 100[th] Anniversary Volume, pp561-607.
20
ROX RESOURCES LIMITED QUARTERLY REPORT For Quarter Ended 31 December 2014
==> picture [103 x 51] intentionally omitted <==
==> picture [483 x 415] intentionally omitted <==
Figure 13: Teena Prospect Drill Plan
21
ROX RESOURCES LIMITED QUARTERLY REPORT For Quarter Ended 31 December 2014
==> picture [103 x 51] intentionally omitted <==
==> picture [483 x 307] intentionally omitted <==
Figure 14: High grade stratiform sulphide mineralisation in drill core from hole TNDD017, 802 – 815m
22
ROX RESOURCES LIMITED QUARTERLY REPORT For Quarter Ended 31 December 2014
Table 6: Teena Diamond Drilling Results
==> picture [103 x 51] intentionally omitted <==
| Hole | North | East | RL | From | To | Interval | Zn% | Pb% | Zn+Pb% | Ag ppm |
|---|---|---|---|---|---|---|---|---|---|---|
| TNDD018 | 8181261 | 608462 | 50 | NSR | ||||||
| TNDD017 | 8182003 | 607509 | 57 | 795.9 | 821.4 | 25.5 | 7.90 | 1.23 | 9.13 | 0.4 |
| Including | 801.0 | 815.7 | 14.7 | 11.53 | 1.79 | 13.32 | 0.3 | |||
| And | 828.4 | 835.0 | 6.6 | 5.82 | 0.80 | 6.62 | 1.5 | |||
| Including | 828.4 | 832.0 | 3.6 | 8.32 | 1.33 | 9.65 | 1.5 | |||
| And | 975.0 | 977.0 | 2.0 | 2.93 | 0.06 | 2.99 | 0.5 | |||
| TNDD016 | 8183157 | 608470 | 110 | NSR | ||||||
| TNDD015 | 8181694 | 606683 | 52 | 807.0 | 814.0 | 7.0 | 4.13 | 0.16 | 4.29 | 0.3 |
| And | 825.9 | 829.0 | 3.1 | 3.09 | 0.62 | 3.71 | 1.4 | |||
| TNDD014 | 8182000 | 608085 | 65 | 652.6 | 687.0 | 34.4 | 5.42 | 0.78 | 6.20 | 0.5 |
| Including | 657.0 | 661.1 | 4.1 | 9.19 | 1.25 | 10.4 | 0.8 | |||
| and including | 665.2 | 670.1 | 4.9 | 10.23 | 1.55 | 11.8 | 0.8 | |||
| and including | 676.5 | 679.0 | 2.5 | 8.68 | 1.59 | 10.3 | 0.2 | |||
| And | 710.0 | 717.0 | 7.0 | 3.36 | 0.23 | 3.59 | 0.4 | |||
| And | 788.0 | 795.1 | 7.1 | 2.42 | 0.55 | 2.97 | 0.4 | |||
| And | 798.2 | 827.0 | 28.8 | 2.78 | 0.68 | 3.46 | 0.3 | |||
| And | 838.7 | 854.0 | 15.3 | 2.67 | 0.64 | 3.31 | 0.6 | |||
| And | 858.0 | 860.0 | 2.0 | 2.20 | 0.64 | 2.84 | 1.5 | |||
| TNDD013 | 8181842 | 607152 | 51 | 665.0 | 700.0 | 35.0 | 5.38 | 0.74 | 6.12 | 0.9 |
| Including | 670.0 | 673.0 | 3.0 | 8.83 | 1.23 | 10.06 | 0.7 | |||
| and including | 678.0 | 685.7 | 7.7 | 8.70 | 1.21 | 9.91 | 1.0 | |||
| And | 824.0 | 845.0 | 21.0 | 2.65 | 0.73 | 3.38 | 0.4 | |||
| And | 857.2 | 861.0 | 3.8 | 2.84 | 0.37 | 3.21 | 2.1 | |||
| And | 868.0 | 880.0 | 12.0 | 2.79 | 0.34 | 3.13 | 1.5 | |||
| TNDD012 | 8182035 | 607500 | 75 | 671.0 | 705.0 | 34.0 | 6.53 | 0.98 | 7.51 | |
| Including | 676.0 | 690.9 | 14.9 | 9.08 | 1.33 | 10.41 | ||||
| Including | 676.0 | 680.5 | 4.5 | 10.00 | 1.37 | 11.37 | ||||
| And | 684.9 | 690.9 | 6.0 | 12.55 | 2.02 | 14.58 | ||||
| And | 807.1 | 826.0 | 18.9 | 2.75 | 0.74 | 3.49 | ||||
| And | 836.2 | 848.0 | 11.8 | 2.78 | 0.56 | 3.34 | ||||
| TNDD011 | 8182035 | 607877 | 79 | 896.0 | 898.6 | 2.6 | 3.97 | 0.44 | 4.41 | 1.5 |
| And | 901.0 | 921.3 | 20.3 | 11.99 | 1.87 | 13.86 | 1.5 | |||
| Including | 905.0 | 921.3 | 16.3 | 14.26 | 2.25 | 16.51 | 1.7 | |||
| Including | 907.1 | 921.3 | 14.2 | 15.83 | 2.53 | 18.36 | 1.7 | |||
| And | 937.3 | 943.0 | 5.7 | 7.58 | 0.98 | 8.56 | 2.6 | |||
| Including | 937.3 | 939.0 | 1.7 | 11.06 | 2.13 | 13.18 | 2.8 | |||
| And | 1095.0 | 1098.0 | 3.0 | 3.01 | 0.01 | 3.02 | ||||
| And | 1111.0 | 1119.8 | 8.8 | 2.75 | 0.27 | 3.02 | ||||
| TNDD010 | 8182661 | 608278 | 75 | 908.0 | 925.1 | 17.1 | 2.55 | 0.46 | 3.01 | 1.8 |
| Including | 915.0 | 917.0 | 2.0 | 4.96 | 0.96 | 5.92 | 2.2 | |||
| And | 935.0 | 941.0 | 6.0 | 4.63 | 0.58 | 5.21 | 0.9 | |||
| And | 944.3 | 964.4 | 20.1 | 13.00 | 2.03 | 15.03 | 0.9 | |||
| Including | 951.5 | 964.0 | 12.5 | 16.78 | 2.68 | 19.46 | 1.1 | |||
| Including | 954.0 | 959.0 | 5.0 | 21.80 | 3.62 | 25.42 | 1.0 | |||
| And | 967.6 | 970.1 | 2.5 | 3.69 | 0.57 | 4.26 | 0.5 | |||
| And | 988.8 | 996.6 | 7.8 | 7.43 | 1.28 | 8.71 | 0.6 | |||
| Including | 988.8 | 995.0 | 6.2 | 8.50 | 1.48 | 9.98 | 0.7 |
23
==> picture [103 x 51] intentionally omitted <==
ROX RESOURCES LIMITED QUARTERLY REPORT For Quarter Ended 31 December 2014
| Including | Including | Including | Including | 988.8 | 992.0 | 3.2 | 10.73 | 2.00 | 12.73 | 1.0 |
|---|---|---|---|---|---|---|---|---|---|---|
| And | 1116.0 | 1119.0 | 3.0 | 3.19 | 1.05 | 4.24 | 0.3 | |||
| And | 1124.0 | 1133.7 | 9.7 | 4.04 | 1.61 | 5.65 | 1.1 | |||
| Including | 1125.4 | 1128.2 | 2.9 | 7.64 | 2.70 | 10.35 | 1.9 | |||
| Including | 1125.4 | 1127.0 | 1.7 | 8.76 | 3.04 | 11.80 | 2.6 | |||
| And | 1149.0 | 1151.0 | 2.0 | 2.09 | 0.72 | 2.81 | 1.8 | |||
| And | 1157.0 | 1166.0 | 9.0 | 2.54 | 0.93 | 3.47 | 1.8 | |||
| And | 1169.0 | 1191.0 | 22.0 | 3.09 | 0.81 | 3.90 | 1.2 | |||
| Including | 1177.0 | 1179.0 | 2.0 | 4.07 | 1.45 | 5.52 | 1.1 | |||
| And | 1212.2 | 1232.0 | 19.8 | 2.13 | 0.57 | 2.70 | 0.8 | |||
| And | 1244.0 | 1246.0 | 2.0 | 3.38 | 0.07 | 3.45 | 3.0 | |||
| And | 1251.0 | 1255.0 | 4.0 | 2.81 | 0.07 | 2.88 | 2.2 | |||
| TNDD009 | 8182793 | 608474 | 72 | 1012.0 | 1018.0 | 6.0 | 2.81 | 0.36 | 3.17 | 3.2 |
| And | 1020.6 | 1039.0 | 18.4 | 3.14 | 0.56 | 3.70 | 2.0 | |||
| Including | 1022.0 | 1024.0 | 2.0 | 4.87 | 0.80 | 5.67 | 3.2 | |||
| Including | 1028.0 | 1031.0 | 3.0 | 4.59 | 0.77 | 5.37 | 2.9 | |||
| And | 1049.0 | 1056.0 | 7.0 | 4.83 | 0.57 | 5.40 | 0.7 | |||
| And | 1060.1 | 1086.5 | 26.4 | 11.59 | 1.73 | 13.32 | 0.8 | |||
| Including | 1060.1 | 1068.2 | 8.1 | 7.74 | 0.98 | 8.71 | 0.6 | |||
| And including | 1070.3 | 1086.5 | 16.2 | 14.91 | 2.32 | 17.23 | 1.0 | |||
| Including | 1071.0 | 1079.0 | 8.0 | 18.36 | 2.87 | 21.24 | 0.9 | |||
| And | 1089.5 | 1092.3 | 2.8 | 3.50 | 0.42 | 3.92 | 0.7 | |||
| And | 1121.0 | 1127.9 | 6.9 | 7.97 | 0.95 | 8.92 | 1.0 | |||
| Including | 1121.0 | 1126.0 | 5.0 | 9.48 | 1.21 | 10.70 | 1.1 | |||
| And | 1276.1 | 1281.0 | 4.9 | 2.89 | 0.91 | 3.80 | 2.0 | |||
| Including | 1278.1 | 1281.0 | 2.9 | 3.77 | 1.22 | 4.99 | 2.9 |
Diamond drill holes TNDD009 – TNDD018 (Table 6) have been reported previously (ASX:RXL 5 August 2013, 26 August 2013, 18 September 2013, 11 October 2013, 27 October 2014, 10 November 2014, 15 December 2014).
Hole Collar Coordinates
| Hole | North | East | RL | Dip | Azimuth | Total Depth (m) |
|---|---|---|---|---|---|---|
| TNDD018 | 8181261 | 608462 | 50 | -75 | 343 | 359.4 |
| TNDD017 | 8182003 | 607509 | 57 | -65 | 335 | 1320.8 |
| TNDD016 | 8183157 | 608470 | 110 | -70 | 170 | 317.6 |
| TNDD015 | 8181694 | 606683 | 52 | -70 | 350 | 858.0 |
| TNDD014 | 8182000 | 608085 | 65 | -75 | 351 | 961.0 |
| TNDD013 | 8181842 | 607152 | 51 | -72 | 349 | 1005.5 |
| TNDD012 | 8182000 | 607500 | 75 | -85 | 355 | 1005.8 |
| TNDD011 | 8182035 | 607877 | 79 | -70 | 340 | 1221.6 |
| TNDD010 | 8182661 | 608278 | 75 | -75 | 174 | 1383.3 |
| TNDD009 | 8182793 | 608474 | 70 | -80 | 175 | 1302.0 |
24
ROX RESOURCES LIMITED QUARTERLY REPORT For Quarter Ended 31 December 2014
Notes:
==> picture [103 x 51] intentionally omitted <==
-
Grid coordinates GDA94: Zone 53, Collar positions & RL’s variably determined by hand held GPS and/or DGPS.
-
Correct projected average lateral positions of down hole intercepts are shown on the Figures.
-
Hole dip and azimuth determined at collar by compass and clinometer.
-
Diamond drilling by HQ and NQ diamond core, with core cut in half and sampled to either logged significant geological boundaries or even 1 metre intervals. Core recovery generally exceeded 98%.
-
Duplicate core samples were quarter cut.
-
Cut core samples were crushed to nominal 2mm size, then a 3kg split pulverised to nominal 85% passing 75um.
-
Samples sent to Bureau Veritas, Mount Isa, with assay by oxidative fusion with XRF analysis (XF001). This method is considered to completely extract Pb and Zn and is a ISO17025 certified method.
-
3 Certified Reference Materials that range from low grade to high grade Zn (30%) were included in the dispatch at a rate of at least 1 sample in 20, with a higher frequency in mineralized intervals. Field duplicates were included in the dispatch and were sent to the laboratory blind. Blanks were included in the dispatch at a rate of 1 in 40 samples.
-
All quality control data has been assessed to be within an acceptable level of accuracy and precision.
-
Independent assay verification has not yet been completed.
-
Weighted average grade by sample interval quoted using a cut-off grade of 2.5% Zn+Pb over a minimum width of 2m, with up to 2m of internal dilution allowed. Internal higher grade zones are selected at a 6% Zn+Pb cut-off grade or higher.
-
Reported intercepts may exceed the true width; no sampling bias is believed to have been introduced however. Based on structural measurements and downhole surveys, for hole TNDD009 true thickness is believed to be about 60% of downhole thickness, for holes TNDD010 - TNDD017 true thickness is 80-90% of downhole thickness.
25
ROX RESOURCES LIMITED QUARTERLY REPORT For Quarter Ended 31 December 2014
CORPORATE
==> picture [103 x 51] intentionally omitted <==
Cash at the end of the quarter was approximately $2.9 million.
Dated this 28[th] day of January 2015.
Signed on behalf of the Board of Rox Resources Limited.
==> picture [140 x 61] intentionally omitted <==
IAN MULHOLLAND Managing Director
Competent Person Statements:
The information in this report that relates to new Exploration Results for the Mt Fisher and Bonya Projects is based on information compiled by Mr Ian Mulholland BSc (Hons), MSc, FAusIMM, FAIG, FSEG, MAICD, who is a Fellow of The Australasian Institute of Mining and Metallurgy and a Fellow of the Australian Institute of Geoscientists. Mr Mulholland has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration, and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Mulholland is a full time employee and Managing Director of the Company and consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.
The information in this report that relates to nickel Mineral Resources for the Mt Fisher project was reported to the ASX on 3 October 2013 and 4 September 2014. Rox confirms that it is not aware of any new information or data that materially affects the information included in the announcements of 3 October 2013 and 4 September 2014, and that all material assumptions and technical parameters underpinning the estimates in the announcements of 3 October 2013 and 4 September 2014 continue to apply and have not materially changed.
The information in this report that relates to previous Exploration Results and Mineral Resources for the Reward Zinc-Lead, and Bonya Copper projects and for the gold Mineral Resource defined at Mt Fisher, was either prepared and first disclosed under the JORC Code 2004 or under the JORC Code 2012, and has been properly and extensively cross-referenced in the text. In the case of the 2004 JORC Code Exploration Results and Mineral Resources, they have not been updated to comply with the JORC Code 2012 on the basis that the information has not materially changed since it was last reported.
All reports are based on information compiled by Mr Ian Mulholland BSc (Hons), MSc, FAusIMM, FAIG, FSEG, MAICD, who is a Fellow of The Australasian Institute of Mining and Metallurgy and a Fellow of the Australian Institute of Geoscientists. Mr Mulholland has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration, and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 and 2012 Editions of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Mulholland is a full time employee of the Company and consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.
26
ROX RESOURCES LIMITED QUARTERLY REPORT For Quarter Ended 31 December 2014
==> picture [103 x 51] intentionally omitted <==
About Rox Resources
Rox Resources Limited is an emerging Australian minerals exploration company. The company has four key assets at various levels of development with exposure to gold, nickel, zinc, lead, copper and phosphate, including the Mt Fisher Gold Project (WA), Myrtle/Reward Zinc-Lead Project (NT), the Bonya Copper Project (NT) and the Marqua Phosphate Project (NT).
Mt Fisher Gold-Nickel Project (100% + Option to Purchase $2.5 million to pay)
The Mt Fisher gold project is located in the highly prospective North Eastern Goldfields region of Western Australia and in addition to being well endowed with gold the project hosts strong nickel potential. The total project area is 655km[2] , consisting of a 485km[2] area 100% owned by Rox and an Option to purchase 100% of a further 170km[2] .
Recent drilling at the Camelwood and Musket nickel prospects has defined a JORC 2012 Mineral Resource (ASX:RXL 3 October 2013 and 4 September 2014) of 3.6Mt grading 2.0% nickel reported at 1.0% Ni cut-off (Indicated Mineral Resource: 1.8Mt grading 2.2% Ni, Inferred Mineral Resource: 1.9Mt grading 1.8% Ni) comprising massive and disseminated nickel sulphide mineralisation, and containing 72,100 tonnes of nickel. Higher grade mineralisation is present in both deposits (refer to ASX announcements above), and is still open at depth beneath each deposit. The nickel Mineral Resource occurs partly on tenements under Option to Purchase to Rox, with an exercise price payable as follows: $0.2 million by 31 December 2014, and $2.3 million by 30 June 2015.
Drilling by Rox has also defined numerous high-grade gold targets and a JORC 2004 Measured, Indicated and Inferred Mineral Resource (ASX:RXL 10 February 2012) of 973,000 tonnes grading 2.75 g/t gold reported at a 0.8 g/tAu cut-off exists for 86,000 ounces of gold (Measured: 171,900 tonnes grading 4.11 g/t Au, Indicated: 204,900 tonnes grading 2.82 g/t Au, Inferred: 596,200 tonnes grading 2.34 g/t Au) aggregated over the Damsel, Moray Reef and Mt Fisher deposits.
Reward Zinc-Lead Project (49% + Farm-out Agreement)
Rox has signed an Earn-In and Joint Venture Agreement with Teck Australia Pty Ltd. (“Teck”) to explore its highly prospective 670km[2] Myrtle/Reward zinc-lead tenements, located 700km south-east of Darwin, Northern Territory, adjacent to the McArthur River zinc-lead mine.
The Myrtle zinc-lead deposit has a current JORC 2004 Mineral Resource (ASX:RXL 15 March 2010) of 43.6 Mt @ 5.04% Zn+Pb reported at a 3.0% Zn+Pb cut-off (Indicated: 5.8 Mt @ 3.56% Zn, 0.90% Pb; Inferred: 37.8 Mt @ 4.17% Zn, 0.95% Pb).
Recent drilling at the Teena zinc-lead prospect intersected 26.4m @ 13.3% Zn+Pb including 16.2m @ 17.2% Zn+Pb, and 20.1m @ 15.0% Zn+Pb including 12.5m @19.5% Zn+Pb , and together with historic drilling has defined significant high grade zinc-lead mineralisation over a strike length of at least 1.5km (ASX:RXL 5 August 2013, 26 August 2013, 18 September 2013, 11 October 2013).
Under the terms of the Agreement, Teck has now met the expenditure requirement for a 51% interest, with Rox holding the remaining 49%. Teck has elected to increase its interest in the project to 70% by spending an additional A$10m (A$15m in total) by 31 August 2018 (ASX:RXL 21 August 2013).
Bonya Copper Project (Farm-in Agreement to earn up to 70%)
In October 2012 Rox signed a Farm-in Agreement with Arafura Resources Limited (ASX:ARU) to explore the Bonya Copper Project located 350km east of Alice Springs, Northern Territory. Outcrops of visible copper grading up to 34% Cu and 27 g/t Ag are present, with the style of mineralisation similar to the adjacent Jervois copper deposits (see ASX:KGL). EM surveys defined a number of anomalies that could represent sulphide mineralisation at depth (ASX:RXL 5 August 2014). Drill testing has intersected visible copper mineralisation at three prospects, with massive copper sulphides intersected at the Bonya Mine prospect, including 38m @ 4.4% Cu and 11m @ 4.4% Cu (ASX:RXL 20 October 2014).
Under the Farm-in Agreement Rox can earn a 51% interest in the copper, lead, zinc, silver, gold, bismuth and PGE mineral rights at Bonya by spending $500,000 by December 2014. Rox can then elect to earn a further 19% (for 70% in total) by spending a further $1 million by December 2016. Once Rox has earned either a 51% or 70% interest it can form a joint venture with Arafura to further explore and develop the area.
27
ROX RESOURCES LIMITED QUARTERLY REPORT For Quarter Ended 31 December 2014
APPENDIX 5B
==> picture [103 x 51] intentionally omitted <==
Mining Exploration Entity Quarterly Report
Name of entity
ROX RESOURCES LIMITED ACN or ARBN 107 202 602 Consolidated statement of cash flows
| ACN or ARBN 107 202 602 Consolidated statement of cash flows |
Quarter ended (“current quarter”) | Quarter ended (“current quarter”) |
|---|---|---|
| 31 December 2014 | ||
| Cash flows related to operating activities 1.1 Receipts from product sales and related debtors 1.2 Payments for: (a) exploration and evaluation (b) development (c) production (d) administration 1.3 Dividends received 1.4 Interest and other items of a similar nature received 1.5 Interest and other costs of finance paid 1.6 Income taxes paid 1.7 Other Net Operating Cash Flows |
Current Quarter A$’000 |
Year to Date (6 months) $A’000 |
| - (1,306) - - (424) - 21 - - - |
- (2,894) - - (699) - 32 - - - |
|
| (1,709) | (3,561) | |
| Cash flows related to investing activities 1.8 Payment for purchases of: (a) prospects (b) equity investments (c) other fixed assets 1.9 Proceeds from sale of: (a) prospects (b) equity investments (c) other fixed assets 1.10 Loans to other entities 1.11 Loans repaid by other entities 1.12 Other - Net investing cash flows 1.13 Total operating and investing cash flows (carried forward) |
(303) - (16) - - - - - - |
(303) - (16) - - - - - - |
| (319) | (319) | |
| (2,028) | (3,880) |
28
ROX RESOURCES LIMITED QUARTERLY REPORT For Quarter Ended 31 December 2014
==> picture [103 x 51] intentionally omitted <==
| 1.13 Total operating and investing cash flows (brought forward) |
(2,028) | (3,880) |
|---|---|---|
| Cash flows related to financing activities 1.14 Proceeds from issues of shares (net of costs) 1.15 Proceeds from sale of forfeited shares 1.16 Proceeds from borrowings 1.17 Repayment of borrowings 1.18 Dividends paid 1.19 Other Net financing cash flows |
- - - - - - |
4,241 - - - - - |
| - | 4,241 | |
| Net increase (decrease) in cash held 1.20 Cash at beginning of quarter/year to date 1.21 Exchange rate adjustments to 1.20 1.22Cash at end of quarter |
(2,028) 4,947 - |
361 2,558 - |
| 2,919 | 2,919 |
Payments to directors of the entity and associates of the directors Payments to related entities of the entity and associates of the related entities
| s | |
|---|---|
| 1.23 Aggregate amount of payments to the parties included in item 1.2 1.24 Aggregate amount of loans to the parties included in item 1.10 |
Current quarter $A’000 |
| 131 | |
| - |
- 1.25 Explanation necessary for an understanding of the transactions
N/A
Non-cash financing and investing activities
- 2.1 Details of financing and investing transactions which have had a material effect on consolidated assets and liabilities but did not involve cash flows
Nil
- 2.2 Details of outlays made by other entities to establish or increase their share in projects in which the reporting entity has an interest
During the quarter Teck Australia Pty Ltd expended $1.3 million towards its earn-in on the Reward Joint Venture in Northern Territory.
29
ROX RESOURCES LIMITED QUARTERLY REPORT For Quarter Ended 31 December 2014
Financing facilities available
==> picture [103 x 51] intentionally omitted <==
Add notes as necessary for an understanding of the position.
| 3.1 Loan facilities 3.2 Credit standby arrangements |
Amount available $A’000 |
Amount used $A’000 |
|---|---|---|
| - | - | |
| - | - |
Estimated cash outflows for next quarter
| Estimated cash outflows for next quarter | |
|---|---|
| 4.1 Exploration and evaluation 4.2 Development 4.3 Production 4.4 Administration |
$A’000 |
| 500 | |
| - | |
| - | |
| 300 | |
| Total | 800 |
Reconciliation Of Cash
| Reconciliation Of Cash | ||
|---|---|---|
| Reconciliation of cash at the end of the quarter (as shown in the consolidated statement of cash flows) to the related items inthe accountsis asfollows. |
Current quarter $A’000 |
Previous quarter $A’000 |
| 5.1 Cash on hand and at bank 5.2 Deposits at call 5.3 Bank overdraft 5.4 Other (provide details) |
891 | 2,439 |
| 2,028 | 2,508 | |
| - | - | |
| - | - | |
| Total: cash at end of quarter(item 1.22) | 2,919 | 4,947 |
Changes in interests in mining tenements – Refer to Annexure 1 for list of all mining tenements.
| Tenement reference |
Nature of Interest |
Interest at beginning of quarter |
Interest at end of quarter |
|
|---|---|---|---|---|
| 6.1 Interest in mining tenements relinquished, reduced or lapsed 6.2 Interest in mining tenements acquired or increased |
- | - | - | - |
| E53/1788 E53/1802 EL29701 |
Option Option JV |
- - - |
- - 51% |
30
ROX RESOURCES LIMITED QUARTERLY REPORT For Quarter Ended 31 December 2014
Issued and quoted securities at end of current quarter
==> picture [103 x 51] intentionally omitted <==
Compliance statement
| Compliance statement | ||||
|---|---|---|---|---|
| Total number | Number quoted |
Issue price per security (cents) |
Amount paid up per security (cents) |
|
| 7.1Preference securities (description) 7.2 Changes during quarter |
- | |||
| - | ||||
| 7.3Ordinary securities 7.4 Changes during quarter - Issued - Options exercised |
849,673,095 | 849,673,095 | ||
| - - |
- - |
|||
| 7.5Convertible debt securities (description and conversion factor) 7.6 Changes during quarter |
- | |||
| - | ||||
| 7.7Options (description and conversion factor) |
6,000,000 1,250,000 21,437,301 17,500,000 |
Nil Nil Nil Nil |
Exercise Price $0.025 $0.057 $0.08 $0.056 |
Expires 30 Nov 2015 28 Feb 2017 31 Mar 2017 30 Nov 2017 |
| 7.8 Issued during quarter |
17,500,000 | Nil | $0.056 | 30 Nov 2017 |
| 7.9 Exercised during quarter |
- | - | - | - |
| 7.10 Expired during quarter |
550,000 | Nil | $0.047 | 30 Nov 2014 |
| 7.11Debentures (totals only) |
- | - | - | - |
| 7.12Unsecured notes (totals only) |
- | - |
31
ROX RESOURCES LIMITED QUARTERLY REPORT For Quarter Ended 31 December 2014
Compliance Statement
==> picture [103 x 51] intentionally omitted <==
-
This statement has been prepared under accounting policies which comply with accounting standards as defined in the Corporations Law or other standards acceptable to ASX.
-
This statement does give a true and fair view of the matters disclosed.
Sign here:
Date: 28 January 2015
==> picture [108 x 43] intentionally omitted <==
Company Secretary
Print Name: Brett Dickson
32
ROX RESOURCES LIMITED QUARTERLY REPORT For Quarter Ended 31 December 2014
Annexure 1 – Mining Tenements
==> picture [103 x 51] intentionally omitted <==
| Project | Tenement Number | Interest | Interest Held |
|---|---|---|---|
| Reward, NT | EL10316 | All Minerals | 49% |
| EL26406* | All Minerals except Diamonds | 49% | |
| EL27541 | All Minerals | 49% | |
| EL30042* | All Minerals except Diamonds | 49% |
Teck Australia Pty Ltd is earning a 70% interest in all of the Reward project tenements
- Legend International Holdings has rights to diamonds on EL26406 and portions of EL30042
| Mt Fisher, WA E53/1061 | Mt Fisher, WA E53/1061 | All Minerals | 100% |
|---|---|---|---|
| E53/1106 | All Minerals | 100% | |
| E53/1218 | All Minerals | 100% | |
| E53/1219 | All Minerals | 100% | |
| E53/1250 | All Minerals | 100% | |
| E53/1716 | All Minerals | 100% | |
| M53/09 | All Minerals | 100% | |
| P53/1625 | All Minerals | 100% | |
| Rox Resources holds an option to acquire 100% of the following Mt Fisher tenements | |||
| E53/1318 | All Minerals | - | |
| E53/1319 | All Minerals | - | |
| E53/1465 | All Minerals | - | |
| E53/1788 | All Minerals | - | |
| E53/1802 | All Minerals | - | |
| P53/1496 | All Minerals | - | |
| P53/1497 | All Minerals | - | |
| M53/127 | All Minerals | - | |
| Bonya | EL29701** | Cu, Pb, Zn, Au, Ag, Bi, PGE’S | 51% |
| EL29599 | All Minerals | 100% |
** Rox may earn up to a 70% interest in this tenement