Youanmi Gold Project Scoping Study
OCT OB ER 2022
Alex Passmore | Managing Director
==> picture [136 x 76] intentionally omitted <==
Cautionary Statement
==> picture [125 x 70] intentionally omitted <==
The Scoping Study referred to in this ASX release has been undertaken to evaluate the potential development of the Youanmi Gold Project (“Project”) near Mt Magnet, approximately 480 kilometres northeast of Perth, Western Australia. Rox Resources Limited (“Rox Resources, Rox, the Company”) owns 70% and is the operator of the Project. The Scoping Study is prepared based on a 100% basis and is a preliminary technical and economic study of the potential viability of the Youanmi Gold Project. It is based on low accuracy level technical and economic assessments that are not sufficient to support estimation of Ore Reserves. Infill drilling and evaluation work and appropriate studies are required before Rox Resources will be able to estimate Ore Reserves or to provide assurance of an economic development case. The Scoping Study has been completed to a level of accuracy of +/- 40%.
Of the Mineral Resources scheduled for extraction in this Scoping Study production target plan, approximately 79% are classified as Indicated and 21% as Inferred in the first three years and 63% are classified as Indicated and 37% as Inferred over the evaluation period. There is a low level of geological confidence associated with Inferred Mineral Resources, and there is no certainty that further exploration work will result in the determination of Indicated Mineral Resources or that the production target itself will be realised.
The Youanmi Gold Project has been mined successfully over four main campaigns since discovery of the original orebody in 1894, with approximately 667koz Au produced. The Company therefore considers the Youanmi Gold Project to be a very mature project which increases the confidence of converting the current Mineral Resources into Ore Reserves.
Rox Resources confirms that the Project is financially viable when excluding Inferred Resources in the production target schedule.
The Company believes that it has a reasonable basis for providing these forward-looking statements and the forecast financial information based on material assumptions outlined in this release. One of the key assumptions is that the funding for the Project will be available when required. While the Company considers all of the material assumptions to be based on reasonable grounds, there is no certainty that they will prove to be correct or that the range of outcomes indicated by the Scoping Study will be achieved.
To achieve the range of outcomes indicated in the Scoping Study, funding in the order of approximately $134m will likely be required comprising of approximately $99m in pre-production capital expenditure and approximately $35m in working capital and assumed financing charges. There is no certainty that the Company will be able to raise that amount of funding when needed. It is also possible that such funding may only be available on terms that may be dilutive to or otherwise affect the value of Rox Resources’ shares. It is also possible that Rox Resources could pursue other value realisation strategies such as a sale, partial sale or joint venture of the Youanmi Gold Project. If it does, this could materially reduce the Company’s proportionate ownership of the Project. Given the uncertainties involved, investors should not make any investment decisions based solely on the results of the Scoping Study.
2
Disclaimers and Competent Person Statement
==> picture [125 x 70] intentionally omitted <==
Forward-Looking Statements
This presentation has been prepared by Rox Resources Limited. This document contains background information about Rox Resources Limited current at the date of this presentation. The presentation is in summary form and does not purport to be all inclusive or complete. Recipients should conduct their own investigations and perform their own analysis in order to satisfy themselves as to the accuracy and completeness of the information, statements and opinions contained in this presentation.
This presentation is for information purposes only. Neither this presentation nor the information contained in it constitutes an offer, invitation, solicitation or recommendation in relation to the purchase or sale of shares in any jurisdiction.
This presentation may not be distributed in any jurisdiction except in accordance with the legal requirements applicable in such jurisdiction. Recipients should inform themselves of the restrictions that apply in their own jurisdiction. A failure to do so may result in a violation of securities laws in such jurisdiction.
This presentation does not constitute investment advice and has been prepared without taking into account the recipient's investment objectives, financial circumstances or particular needs and the opinions and recommendations in this presentation are not intended to represent recommendations of particular investments to particular persons. Recipients should seek professional advice when deciding if an investment is appropriate. All securities transactions involve risks, which include, amongst others, the risk of adverse or unanticipated market, financial or political developments.
To the fullest extent permitted by law, Rox Resources Limited, its officers, employees, agents and advisers do not make any representation or warranty, express or implied, as to the currency, accuracy, reliability or completeness of any information, statements, opinions, estimates, forecasts or other representations contained in this presentation. No responsibility for any errors or omissions from this presentation arising out of negligence or otherwise is accepted.
This presentation may include forward-looking statements. Forward-looking statements are only predictions and are subject to risks, uncertainties and assumptions which are outside the control of Rox Resources Limited. Actual values, results or events may be materially different to those expressed or implied in this presentation. Given these uncertainties, recipients are cautioned not to place reliance on forward looking statements. Any forward-looking statements in this presentation speak only at the date of issue of this presentation. Subject to any continuing obligations under applicable law and the ASX Listing Rules, Rox Resources Limited does not undertake any obligation to update or revise any information or any of the forwardlooking statements in this presentation or any changes in events, conditions or circumstances on which any such forward looking statement is based.
Refer to Rox Resources Limited ASX release 19 October 2022, for the Youanmi Gold Project Scoping Study details. Rox Resources Limited confirms that it is not aware of any new information or data that materially affects the information included in that release. All material assumptions and technical parameters underpinning that release continue to apply and have not materially changed.
Competent Person Statements
Exploration Results
The information in this report that relates to previous Exploration Results was prepared and first disclosed under the JORC Code 2012 and has been properly and extensively cross-referenced in the text to the date of the original announcement to the ASX.
Where reference is made to previous releases of exploration results in this announcement, the Company confirms that it is not aware of any new information or data that materially affects the information included in those announcements and all material assumptions and technical parameters underpinning the exploration results included in those announcements continue to apply and have not materially changed.
The information in this report that relates to previous Exploration Results was prepared and first disclosed under the JORC Code 2012 and has been properly and extensively cross-referenced in the text to the date of the original announcement to the ASX.
Resource Statements
The Statement of Estimates of Mineral Resources for the Youanmi Near Surface Resource was reported by Rox in accordance with ASX Listing Rule 5.8 in the announcement released to the ASX on 20th April 2022. Rox confirms it is not aware of any new information or data that materially affects the information included in the previous announcements and that all material assumptions and technical parameters underpinning the estimates in the previous announcements continue to apply and have not materially changed.
The Statement of Estimates of Mineral Resources for the Youanmi Underground Resource was reported by Rox in accordance with ASX Listing Rule 5.8 in the announcement released to the ASX on 20th January 2022. Rox confirms it is not aware of any new information or data that materially affects the information included in the previous announcements and that all material assumptions and technical parameters underpinning the estimates in the previous announcements continue to apply and have not materially changed.
The Statement of Estimates of Mineral Resources that relates to gold Mineral Resources for the Mt Fisher project was reported by Rox in accordance with ASX Listing Rule 5.8 in the announcement released to the ASX on 11th July 2018. Rox confirms it is not aware of any new information or data that materially affects the information included in the previous announcements and that all material assumptions and technical parameters underpinning the estimates in the previous announcements continue to apply and have not materially changed.
International Financial Reporting Standards
This announcement contains certain financial measures relating to the Scoping Study that are not recognised under International Financial Reporting Standards (IFRS). Although the Company believes these measures provide useful information about the financial forecasts derived from the Scoping Study, they should not be considered in isolation or as a substitute for measures of performance or cash flow prepared in accordance with IFRS. As these measures are not based on IFRS, they do not have standardised definitions and the way the Company calculates these measures may not be comparable to similarly titled measures used by other companies. Consequently, undue reliance should not be placed on these measures.
Other
All financial results are provided in Australian dollars unless stated otherwise.
3
PROJECT OVERVIEW
Youanmi Gold Project
-
Rox holds a 70% interest in the Youanmi Gold Mine (OYG Joint Venture) and is Manager of the JV
-
Scoping Study outlines a production target of 569koz Au at an average AISC of $1,538/oz over 8 years
-
Pre-production capital cost of $99m
-
Leverages off existing infrastructure
-
• Gold and gold-in-concentrate production
-
NPV of $303m, IRR of 45% at a gold price of $2,450/oz
-
Further upside available with future expansions
==> picture [330 x 130] intentionally omitted <==
==> picture [330 x 174] intentionally omitted <==
Annual Payable Metal and AISC (100% basis)[1]
==> picture [333 x 131] intentionally omitted <==
----- Start of picture text -----
Payable Metal (koz) AISC ($/oz)
120 Annual Payable Metal AISC $2,500
100 $2,000
80
$1,500
60
$1,000
40
20 $500
56 60 60 66 84 98 78 67
0 $0
Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8
----- End of picture text -----
==> picture [125 x 70] intentionally omitted <==
==> picture [252 x 344] intentionally omitted <==
Notes:
1. Payable metal is recovered gold after payability and presented on 100% basis. Rox owns 70% of the OYG joint venture.
4
The Project Generates High Quality Outcomes at a Low Capital Cost
==> picture [125 x 70] intentionally omitted <==
==> picture [78 x 77] intentionally omitted <==
Mining Physicals
==> picture [59 x 129] intentionally omitted <==
Total Material LOM Payable Metal Processed 569koz over 8 years 3.9Mt @ 5.0g/t Au from 3.2Moz resource Annual Payable Metal C1 Cash Cost[1] 71koz pa $1,358/oz
==> picture [59 x 129] intentionally omitted <==
Plant Throughput 480ktpa AISC[2] $1,538/oz
==> picture [78 x 77] intentionally omitted <==
==> picture [78 x 77] intentionally omitted <==
Pre-Production Capex LOM Sustaining Capex Capital Requirement $99m $59m NPV IRR 5% Payback Period[4] (unleveraged and pre-tax) (unleveraged and pre-tax) (unleveraged and pre-tax) $303m 45% 3.0 years Financial Outcomes[3] Capital Intensity[5] NPV (unleveraged and pre-tax) / Pre-production Capital $1,386/oz 3.1
Notes:
1. C1 cash cost includes mining, processing, administration, concentrate charges and accounting adjustments for stockpile movements, and is calculated based on payable metal.
2. All-In Sustaining Cost (AISC) per ounce payable includes C1 cash cost, royalties and sustaining capital calculated based on payable metal. It does not include corporate cost, exploration cost and non-sustaining capital.
3. Financial results are unleveraged and pre-tax numbers calculated based on a 100% basis and in Australian dollars unless stated otherwise. Rox owns 70% of the OYG joint venture.
4. Payback period is calculated from the first month of the gold production target.
5. Capital intensity is calculated by dividing pre-production capital by annual payable metal.
5
Production Target and AISC
==> picture [125 x 70] intentionally omitted <==
Total payable metal produced is approximately 569koz with a low AISC of $1,538/oz over the life-of-mine
==> picture [870 x 363] intentionally omitted <==
----- Start of picture text -----
Annual Payable Metal and All-In Sustaining Cost (AISC) (100% basis) [1]
Payable Metal (koz) AISC ($/oz)
120 Indicated Inferred AISC 2,500
98
100
2,000
84
78
80
66 67 1,500
60 60
56
60
1,000
40
500
20
0 0
Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8
----- End of picture text -----
Notes:
6
1. Payable metal is recovered gold after payability and presented on a 100% basis. Rox owns 70% of the OYG joint venture.
Gold Concentrate Production
The Company has considered various options to develop the Project including producing only concentrates, building an Albion Process plant to produce bullion on site, or various combinations. It has determined that a combination of gold-in-concentrate and carbonin-leach bullion is the optimum commercialisation strategy for Youanmi.
==> picture [681 x 289] intentionally omitted <==
----- Start of picture text -----
Shorter Pre-Production Period
De-risk the Project
Lower Capital Requirement
Shorter Payback Period
----- End of picture text -----
==> picture [125 x 70] intentionally omitted <==
==> picture [141 x 459] intentionally omitted <==
----- Start of picture text -----
7
----- End of picture text -----
Gold Concentrate Production Advantages
==> picture [125 x 70] intentionally omitted <==
==> picture [115 x 82] intentionally omitted <==
----- Start of picture text -----
Main Ore Types
at Youanmi
----- End of picture text -----
==> picture [136 x 82] intentionally omitted <==
----- Start of picture text -----
Non - Sulphide
Sulphide
----- End of picture text -----
Readily extractible via CIL. Most of this material is in the near surface resource. Some material also within quartz rich lodes in the Underground.
Fine gold associated with Pyrite (75%); and gold associated with Arsenopyrite (25%) which is easily floatable in a simple proven process flow circuit. Concentrate cleaned to make an easily marketable low As saleable concentrate.
Payable Metal / Metal in Feed - Youanmi Sulphides
480 ktpa Plant Relative Capex and Opex (Relative Units)
==> picture [683 x 220] intentionally omitted <==
----- Start of picture text -----
(Unit) (%)
3.5 100%
Capex Opex
3.0
90% 3.6%
2.5
80%
2.0
1.5
70%
1.0
60%
0.5
0.0 50%
Sell Con UFG Albion POX Sell Con ** UFG Albion POX
----- End of picture text -----*
In today’s cost environment, with a keen focus on return for capital (capex reduction) concentrate sales presents as a compelling opportunity that was not available to sulphide ores previously.
Concentrates achieve very high metallurgical recoveries, and with high Au concentrate grades and low As impurity grades high payability is achievable – in the order of 95% gold content.
Combination of concentrate sales and CIL bullion production target preferred process pathway for Youanmi as there is a substantial capital and operating cost benefit in comparison with other options.
-
Based on 2021 testwork results refer ASX announcement 21[st] December 2021.
-
** Based on recent concentrate market public knowledge.
8
Capital Requirement
| Pre-Production Capital | 100% | RXL (70%) | |
|---|---|---|---|
| Site Infrastructure | $m | 6 | 5 |
| Processing Facilities | $m | 66 | 46 |
| Water Management | $m | 6 | 4 |
| Underground Development | $m | 19 | 12 |
| Open Pit | $m | 2 | 2 |
| Total Pre-Production | $m | 99 | 69 |
| Sustaining Capital – Life Of | Mine | ||
| Underground | $m | 38 | 27 |
| Other | $m | 21 | 14 |
| Total Sustaining Capital | $m | 59 | 41 |
| Pre-Production Capital | |||
| $99m |
==> picture [125 x 70] intentionally omitted <==
Attractive Value Proposition
$303m 3.1x $99m
$212m $173m Value Gap 5.4x
$39m Youanmi Gold Pre-Production Youanmi Gold RXL Enterprise Project NPV Capex (100%) Project NPV Value as at 17 (100%) Rox Resources October 2022 (70%)
9
Key Study Outcomes[1]
| Key Physicals Assumptions | Capital Costs | ||||
|---|---|---|---|---|---|
| Life Of Mine | years | 8.0 | Pre-production Capital | $m | 99 |
| Plant Throughput | ktpa | 480 | Sustaining Capital | $m | 59 |
| Open Pit Mining Production | Target | Total | $m | 158 | |
| Grade | g/t | 3.3 | |||
| Ounces Contained | koz | 35 | Operating Costs3 | ||
| Underground Mining Production Target | Mining Cost | $/oz | 690 | ||
| Mine Grade | g/t | 5.1 | Processing Cost | $/oz | 395 |
| Ounces Contained | koz | 592 | |||
| Site G&A | $/oz | 35 | |||
| Processing Physicals | |||||
| Transportation Charge | $/oz | 91 | |||
| Ore Processed | kt | 3,900 | |||
| Grade | g/t | 5.0 | Smelter Treatment Charge | $/oz | 147 |
| Ounces Contained | koz | 624 | C1 | $/oz | 1,358 |
| Payable Metal2 | koz | 569 | Royalty | $/oz | 81 |
| Gold-in-concentrate | koz | 510 | Sustaining Capital | $/oz | 99 |
| Gold bullion | koz | 59 | AISC | $/oz | 1,538 |
==> picture [125 x 70] intentionally omitted <==
| Key Financial Assumptions | ||
|---|---|---|
| Gold Price | $/oz | 2,450 |
| Discount Rate | % | 5 |
| Project Valuation | ||
| EBITDA | $m | 577 |
| Free Cash Flow(undiscounted and pre-tax) | $m | 418 |
| Project NPV(unleveraged and pre-tax) | $m | 303 |
| Project IRR(unleveraged and pre-tax) | % | 45 |
| Payback Period4 (unleveraged and pre-tax) | years | 3.0 |
| Capital Intensity5 | $/oz | 1,386 |
| NPV / Pre-production Capital | ratio | 3.1 |
Notes:
1. All numbers are presented on a 100% basis and in Australian dollars unless stated otherwise. Rox owns 70% of the OYG joint venture.
2. Payable metal is recovered gold after payability.
3. Operating costs are calculated based on payable metal.
4. Payback period is calculated from the first month of gold production.
5. Capital intensity is calculated by dividing pre-production capital by the annual production target.
10
Attractive Value Proposition
==> picture [125 x 70] intentionally omitted <==
==> picture [837 x 322] intentionally omitted <==
----- Start of picture text -----
$303m
$212m
3.1x
$173m Value Gap
5.4x
$99m
$39m
Youanmi Gold Project NPV (100%) Pre-Production Capex (100%) Youanmi Gold Project NPV RXL Enterprise Value as at 17
Rox Resources (70%) October 2022
----- End of picture text -----
Notes:
1. Financial results are unleveraged and pre-tax numbers calculated based on a 100% basis and in Australian dollars unless stated otherwise. Rox owns 70% of the OYG joint venture.
11
Project Sensitivity Analysis
==> picture [125 x 70] intentionally omitted <==
The Project shows robust financial returns under various downside scenarios. NPV is most sensitive to movements in gold price and more resilient to the rest of the variables.
Project NPV (unleveraged and pre-tax) Sensitivity Analysis[1]
Scenario Analysis – Various Gold Price Assumptions
| Project NPV (unleveraged and pre-tax) Sensitivity Analysis1 Scenario Analysis – Various Gold Price Assumptions |
||
|---|---|---|
| ($m) $288 $284 $241 $196 $317 $323 $365 $410 $150 $200 $250 $300 $350 $400 $450 Capex (+/-10%) Discount Rate (+/- 1%) Opex (+/-10%) Gold Price (+/-10%) NPV (unleveraged and pre-tax) ($m) Gold Price (A$/oz) $2,000 $2,100 $2,200 $2,300 $2,400 $2,450 $2,500 $2,600 $2,700 NPV $m 106 150 193 237 281 303 325 368 412 IRR % 20 26 32 37 43 45 48 54 59 Payback2 Years 4.9 4.6 4.0 3.7 3.2 3.0 2.8 2.5 2.3 Annual EBITDA $m 41 48 55 62 69 72 76 82 89 LOM EBITDA $m 329 384 439 494 549 577 604 659 714 LOM Free Cash Flow $m 171 226 281 336 391 418 446 500 555 Base Case |
Base Case |
|
| $288 $284 $241 $196 $317 $323 $365 $410 $150 $200 $250 $300 $350 $400 $450 Capex (+/-10%) Discount Rate (+/- 1%) Opex (+/-10%) Gold Price (+/-10%) NPV (unleveraged and pre-tax) ($m) |
||
| $2,450 | $2,500 $2,600 $2,700 |
|
| 303 | 325 368 412 |
|
| 45 | 48 54 59 |
|
| 3.0 | 2.8 2.5 2.3 |
|
| 72 | 76 82 89 |
|
| 577 | 604 659 714 |
|
| 418 | 446 500 555 |
Notes:
1. Financial results are unleveraged and pre-tax numbers calculated based on a 100% basis and in Australian dollars unless stated otherwise. Rox owns 70% of the OYG joint venture. 2. Payback period is calculated from the first month of the gold production target.
12
Attractive All-In Sustaining Cost
==> picture [125 x 70] intentionally omitted <==
The Project has an attractive LOM All-In Sustaining Cost (AISC) given the current inflationary cost environment in the mining industry.
LOM C1 Cash Cost and AISC Breakdown[1]
($/oz)
==> picture [857 x 302] intentionally omitted <==
Notes:
1. C1 cash cost and AISC are calculated based on payable metal and in Australian dollars unless stated otherwise . C1 cash cost includes mining, processing, administration, concentrate charges and accounting adjustments for stockpile movements, and is calculated based on payable metal. All-In Sustaining Cost (AISC) per ounce payable includes C1 cash cost, royalties and sustaining capital calculated based on payable metal. It does not include corporate cost, exploration cost and non-sustaining capital.
13
Outstanding Project EBITDA
==> picture [125 x 70] intentionally omitted <==
At a conservative gold price of A$2,450/oz, the Project is forecast to generate a healthy EBITDA of $577m over the life-of-mine
==> picture [867 x 350] intentionally omitted <==
----- Start of picture text -----
Cumulative EBITDA and Gold Production Target (100% basis) [1]
Cumulative EBITDA ($m) Cumulative Payable Metal (koz)
$800 1,000
Cumulative EBITDA Cumulative Gold Production Target
800
$577
$600
$505
600
$416
$400
$283 400
$185
$200
$125 200
$84
$33
$0 0
Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8
----- End of picture text -----
Notes:
14
1. Numbers are presented after payability on a 100% basis and in Australian dollars unless stated otherwise. Rox owns 70% of the OYG joint venture.
Upside and Growth Options
==> picture [125 x 70] intentionally omitted <==
In the current market environment, the Scoping Study has focused on high quality outcomes at a low capital cost. The following factors offer potential medium-term upside to the Scoping Study outcomes.
==> picture [74 x 74] intentionally omitted <==
Growth in Near Surface Resource
==> picture [73 x 74] intentionally omitted <==
Underground Resource Growth
==> picture [73 x 74] intentionally omitted <==
Regional Exploration
-
Currently 1.0Moz at 1.74g/t of Au[1]
-
Not fully captured in this Scoping Study (only 3% of the Near Surface Mineral Resource is included in mining production target (see next slide)) to lower capital and operating costs given current external market pressures on costs
-
Underground produces strong cash flows which can de-risk the project and be used to assist with funding the expansion to include open pits
-
Currently 2.2Moz at 6.89g/t of Au[1] ; however, only 27% of the Underground Mineral Resource is included in mining production target (see next slide)
-
Link Area is open down plunge
-
Resource remains open down dip and along strike
-
Maximum depth of the Mine Lode interpretation is to approx. -600mRL, 1,060m below the natural surface
-
50km strike of Youanmi Shear Zone largely untested by historic drilling
-
Follow up drilling (Aircore and RC) planned along strike and down dip of newly identified mineralization
-
Regional target generation ongoing on 50km of strike of the Youanmi Shear Zone
-
Further exploration potential to increase near surface resource
Notes
15
1. Refer ASX announcement 20 April 2022.
Potential Upside Beyond Production Target
==> picture [125 x 70] intentionally omitted <==
Potential Upside – Open Pit
Potential Upside – Underground
Potential Upside Beyond Production Target
(koz)
==> picture [24 x 12] intentionally omitted <==
----- Start of picture text -----
(koz)
----- End of picture text -----
(koz)
==> picture [924 x 339] intentionally omitted <==
----- Start of picture text -----
Indicated Inferred Indicated Inferred Indicated Inferred
3,500 3,500 3,500
3,199koz
3,000 3,000 3,000
2,500 2,500 2,500
2,194koz
1,903koz
2,000 2,000 2,000 Potential Upside
1,500 1,500 1,450koz Potential Upside 1,500
1,004koz 20% of the
1,000 1,000 27% of the 1,000 Global
453koz 592koz UG Mineral 627koz Mineral
Potential Upside Resource 1,296koz Resource
500 500 229koz 500 231koz
3% of the 744koz
552koz OP Mineral
35koz 362koz 396koz
Resource
0 0 0
Mineral Resource 1 Mining Production Target 2 Mineral Resource 1 Mining Production Target 2 Mineral Resource 1 Mining Production Target 2
----- End of picture text -----
Notes
1. Refer ASX announcement 20 April 2022 and Supporting Schedules (slide 25)
2. Mining Production Target is mined ounces which is higher than the payable metal of 569koz as the payable metal is after metallurgical recovery and payability.
16
Project Potential – Underground Resource
==> picture [125 x 70] intentionally omitted <==
Small Mining Envelope Relative to Underground Mining Resource
Potential Upside Beyond Production Profile - UG
==> picture [575 x 311] intentionally omitted <==
==> picture [278 x 312] intentionally omitted <==
----- Start of picture text -----
(koz)
Total Underground
Mineral Resource
2,194koz [1]
Indicated
305koz
Unmined Potential
1,221koz
Inferred
Unmined
PotentialInferred
548koz
1,602koz
Unmined Potential
382koz
Indicated
Production Target
Scoping Study 229koz
Inferred
Underground
Production Target 362koz Production Target
Indicated
592koz
----- End of picture text -----
Underground Mineral Resource 1
Notes
1. Refer ASX announcement 20 April 2022 and Supporting Schedules (slide 25)
17
Additional Potential Opportunities to Extend Project Life / Increase Production Rate
==> picture [125 x 70] intentionally omitted <==
OPEN PITS OPTIMISE WELL FOR LOWER TREATMENT COSTS OPTIMISED STOPES TO NORTH REGIONAL GREENFIELDS TARGETS LIGHTING UP EXTENSION OF UNDERGROUND MIDWAY LODE IN MINE POTENTIAL HANGINGWALL IN ALL DIRECTIONS
18
Next Steps
==> picture [60 x 258] intentionally omitted <==
Inferred to Indicated Resource Conversion
Youanmi Gold Project Resource Update Further Drilling and Studies (Resource, PFS) to quote reserves Exploration and Drilling at Youanmi Regional Tenure and Mt Fisher
==> picture [125 x 70] intentionally omitted <==
2119
ABOUT ROX RESOURCES
Corporate Information
Rox Resources Limited (ASX: RXL) is a West Australian focused gold exploration and development Company. It is 70% owner and operator of the historic Youanmi Gold Project near Mt Magnet, approximately 480km northeast of Perth, and wholly owns the Mt Fisher Gold Project approximately 150km from Jundee.
Capital Structure
| Capital Structure | |
|---|---|
| ASX Code | RXL |
| Shares on Issue | 168.9m |
| Share Price (as at 17 October 2022) | $0.23 |
| Unlisted Options | 20.6m |
| Market Capitalisation | $38.9m |
| Cash (as at 30 June 2022) | $4.4m |
| Debt | Nil |
Shareholders
==> picture [213 x 150] intentionally omitted <==
----- Start of picture text -----
Hawke’s Point
Directors &
13% Management
3%
Retail & 84%
Other
----- End of picture text -----
==> picture [212 x 44] intentionally omitted <==
----- Start of picture text -----
Top 20 Holders 31%
Top 70 Holders 44%
Institutional Shareholders 22%
----- End of picture text -----
RXL Share Price History
==> picture [125 x 70] intentionally omitted <==
Board & Management
Stephen Dennis Chairman Alex Passmore Managing Director John Mair Non-Executive Director Robert Ryan Non-Executive Director Chris Hunt Chief Financial Officer Matt Antill General Manager – Operations Gregor Bennett Exploration Manager
$1.40 $1.20 $1.00 $0.80 $0.60 $0.40 $0.20 $0.00 Jan 20 Apr 20 Jul 20 Oct 20 Jan 21 Apr 21 Jul 21 Oct 21 Jan 22 Apr 22 Jul 22 Oct 22
20
Comparable Gold Companies
==> picture [125 x 70] intentionally omitted <==
EV / Attributable Measured & Indicated Resource Ounces vs Grade for Comparable Gold Companies[1]
(Bubble size represents attributable measured & indicated resource ounces)
==> picture [857 x 376] intentionally omitted <==
----- Start of picture text -----
$400 GMD
Average = $276/oz
$350
$300 MGV
$250
AME
$200
$150 Average = $53/oz
KIN BC8 MEK High quality and
large resource
$100 AUC
HRN with compelling
STN
HRZ valuation
$50
RXL = $38/oz
$0
-$50
0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0
Measured & Indicated Resource Grade (g/t Au)
($/oz)
EV / Attributable Measured & Indicated Resource ounces
----- End of picture text -----
==> picture [122 x 19] intentionally omitted <==
----- Start of picture text -----
Notes
1. Refer Appendix 1 for support.
----- End of picture text -----
21
Comparable Gold Companies[1]
==> picture [125 x 70] intentionally omitted <==
Market Capitalisation (as at 17 October 2022)
==> picture [857 x 348] intentionally omitted <==
----- Start of picture text -----
($m)
$450
$400
$350
$300
$250
High quality and
$200 large resource
with compelling
$150 valuation
$100
$50
$0
GMD MGV AUC KIN BC8 MEK HRN RXL HRZ AME STN
----- End of picture text -----
Notes
22
1. Refer Appendix 1 for support.
ESG Program
==> picture [125 x 70] intentionally omitted <==
We are pleased to align our reporting to the United
Nations Sustainable Development Goals (SDG’s), the Global Reporting Initiative’s (GRI ) Standards and the Task Force for Climate-related Financial Disclosures (TCFD).
==> picture [26 x 26] intentionally omitted <==
==> picture [90 x 89] intentionally omitted <==
SDGs that Rox Contributes to
==> picture [91 x 91] intentionally omitted <==
==> picture [92 x 92] intentionally omitted <==
==> picture [92 x 90] intentionally omitted <==
==> picture [27 x 26] intentionally omitted <==
==> picture [92 x 91] intentionally omitted <==
2022 Goals & Progress
==> picture [43 x 37] intentionally omitted <==
==> picture [42 x 39] intentionally omitted <==
==> picture [42 x 38] intentionally omitted <==
==> picture [42 x 44] intentionally omitted <==
==> picture [42 x 42] intentionally omitted <==
Produce our Inaugural Sustainability insert within our Annual Report Conduct an ESG gap analysis on company policies, standards and action where required Establish baseline measurements for our material topic Develop our Employer Value Proposition (EVP) Commence preliminary studies into our carbon management plan
==> picture [32 x 216] intentionally omitted <==
23
SUPPORTING SCHEDULES
Youanmi Gold Project - Supporting Schedules
==> picture [330 x 130] intentionally omitted <==
==> picture [330 x 130] intentionally omitted <==
==> picture [330 x 130] intentionally omitted <==
==> picture [125 x 70] intentionally omitted <==
==> picture [252 x 344] intentionally omitted <==
24
Mineral Resources
==> picture [125 x 70] intentionally omitted <==
Youanmi Mineral Resources
(ASX: RXL 20 Apr 2022)
| Resource Growth | Resource Growth | Resource Growth | Resource Growth | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Area | Classification | Cut-off (g/t) | Tonnes (dmt) | Au Grade (g/t) | Au Metal (oz) | ||||||||||||
| (Moz) | |||||||||||||||||
| Near Surface | Indicated | 0.51 | 9,070,000 | 1.89 | 552,000 | 3.5 | 3.2Moz | ||||||||||
| Underground | Indicated | 3.0 | 3,060,000 | 7.55 | 744,000 | 3.0 | 167% Growth in Resource over 4 years |
3.0Moz | |||||||||
| Sub-total Near Surface Underground |
Indicated Inferred Inferred |
0.51 3.0 |
12,130,000 8,930,000 6,840,000 |
3.32 1.58 6.59 |
1,296,000 453,000 1,450,000 |
2.0 2.5 |
1.7Moz | 1.2Moz | 1.3Moz | Indicated | |||||||
| Sub-total | Inferred | 15,770,000 | 3.75 | 1,903,000 | 1.5 | 1.2Moz | 0.7Moz | ||||||||||
| Near Surface | Ind + Inf | 0.51 | 18,000,000 | 1.74 | 1,004,000 | 1.0 | 0.5Moz | 1.8Moz | 1.9Moz | Inferred | |||||||
| Underground | Ind + Inf | 3.0 | 9,900,000 | 6.89 | 2,194,000 | 0.5 | 0.7Moz | 0.9Moz | |||||||||
| Total | Ind + Inf | 27,900,000 | 3.57 | 3,199,000 | 0.0 | ||||||||||||
| Notes | May 2018 | June 2021 | January 2022 | April 2022 | |||||||||||||
| 1. Grace 1.5g/t cutoff. |
Total Resource Total Resource Total Resource Total Resource |
Competent Person Statements
Resource Statement
The Statement of Estimates of Mineral Resources for the Youanmi Near Surface Resource was reported by Rox in accordance with ASX Listing Rule 5.8 in the announcement released to the ASX on 20th April 2022. Rox confirms it is not aware of any new information or data that materially affects the information included in the previous announcements and that all material assumptions and technical parameters underpinning the estimates in the previous announcements continue to apply and have not materially changed.
The Statement of Estimates of Mineral Resources for the Youanmi Underground Resource was reported by Rox in accordance with ASX Listing Rule 5.8 in the announcement released to the ASX on 20th January 2022. Rox confirms it is not aware of any new information or data that materially affects the information included in the previous announcements and that all material assumptions and technical parameters underpinning the estimates in the previous announcements continue to apply and have not materially changed.
25
Youanmi Ounces per Vertical Metre
==> picture [125 x 70] intentionally omitted <==
==> picture [928 x 458] intentionally omitted <==
26
Mining – Design
==> picture [125 x 70] intentionally omitted <==
Small Open Pits mined in Year 1
-
First stage for Kathleen and Hill End Pits
-
• Grace Stage 1, followed by a second Stage including Pollard.
-
Total volume 1.9 mil bcms mined over 6 months using 2x 100t fleets.
-
331kt at 3.3g/t Au for 35koz 96% indicated
-
Simple metallurgy free milling gold
Underground Mine Design
-
Rehab 1990s decline at Mine area
-
Decline access in footwall (5.5mW x 5.5mH at 1 in 7)
-
15m sublevel uphole bench retreat 64mm production holes – sill and selective pillar placement upper levels and full extraction using paste fill lower levels.
-
Min mining width 2.5m with 0.3m HW and 0.2m FW dilution assumed and 15% material loss additional to strategically placed sill pillars.
-
3 to 4 production areas over 1,500 metres of strike.
UNIT OPERATING COSTS
Open Pit $63/t ore mined Underground $102/t ore mined Processing $58/t treated Concentrate Related $359/t of concentrate
Diamond Drill Platform in HW
-
Incorporated into mine design
-
• 600 metres below surface
27
Mining – Schedule
==> picture [125 x 70] intentionally omitted <==
==> picture [42 x 42] intentionally omitted <==
----- Start of picture text -----
•
----- End of picture text -----
Mining Schedule
-
Mine 3 small open pits (Kathleen, Hill End, and Grace Stage 1) and a second stage on Grace / Pollard in the first 6 months (YR0 Q2 to Q4)
-
Commence underground mining in second month (one month after open pits commence).
-
First 4 months of feed is from open pits (initially standard CIL), first feed material from underground development and stoping is in month 5 from the Hill End area.
-
Underground production ramps up to over 40,000 tonnes per month by month 12 and is maintained mostly for the life of mine, with the last 4 months ramping down when stope paste filling impacts steady state production.
==> picture [43 x 42] intentionally omitted <==
----- Start of picture text -----
•
----- End of picture text -----
Processing Schedule
-
Processing commences in month 8 initially at a higher rate of 55,000 tonnes per month for open pit softer feed, and then settles back to nameplate production rate of 40,000 tonnes per month. The underground feed comprises of around 5 to 10kt per month from single boom jumbo strike drive development, leaving the balance to make up around 40kt per month from stoping from an average 3 producing areas.
-
This requires that approximately 12 production rings be fired per week (based on average stope geometry) from each of three production areas.
==> picture [42 x 42] intentionally omitted <==
----- Start of picture text -----
•
----- End of picture text -----
Grade
-
Open Pit average grade mined is 3.3g/t Au.
-
Undeground average grade mined is 5.1g/t Au.
-
Average gold head grade for the life of mine achieved is 4.9g/t Au, with mined gold grades averaging 3.6g/t Au in the first 2 years increasing to 5.1g/t Au on average for the last 2 years.
Mined Tonnes and Grade
==> picture [920 x 229] intentionally omitted <==
----- Start of picture text -----
Ore Mined (t) Overall Gold Grade (g/t Au)
Pit Tonnes Underground Development Tonnes Underground Stope Tonnes Overall Grade
300,000 8.0
7.0
250,000
6.0
200,000
5.0
150,000 4.0
3.0
100,000
2.0
50,000
1.0
0 0.0
YR0 Q2 YR0 Q3 YR0 Q4 YR1 Q1 YR1 Q2 YR1 Q3 YR1 Q4 YR2 Q1 YR2 Q2 YR2 Q3 YR2 Q4 YR3 Q1 YR3 Q2 YR3 Q3 YR3 Q4 YR4 Q1 YR4 Q2 YR4 Q3 YR4 Q4 YR5 Q1 YR5 Q2 YR5 Q3 YR5 Q4 YR6 Q1 YR6 Q2 YR6 Q3 YR6 Q4 YR7 Q1 YR7 Q2 YR7 Q3 YR7 Q4 YR8 Q1 YR8 Q2 YR8 Q3 28
----- End of picture text -----
Underground Production Target Schedule
==> picture [125 x 70] intentionally omitted <==
==> picture [136 x 158] intentionally omitted <==
----- Start of picture text -----
Year on year
graphical
underground
production
target schedule
colour coded by
Au Grade
----- End of picture text -----
==> picture [24 x 72] intentionally omitted <==
1.5 – 3.0 g/t Au 3.0 – 6.0 g/t Au 6.0 – 10.0 g/t Au 10.0 to 15.0 g/t Au > 15.0 g/t Au
==> picture [761 x 448] intentionally omitted <==
----- Start of picture text -----
Month 2 – 12 Month 13 – 24 Month 25 – 36
Month 37 – 48 Month 49 – 60 Month 61 – 72
Month 73 – 84 Month 85 – 96 Month 97 – 100
----- End of picture text -----
29
Process Flowsheet
==> picture [125 x 70] intentionally omitted <==
==> picture [170 x 65] intentionally omitted <==
----- Start of picture text -----
Process Flowsheet
----- End of picture text -----
- The process flow builds on a standard CIL circuit to include a sulphide flotation circuit which captures most of the gold bearing mineralisation into a concentrate which is then cleaned to optimise final gold grade. The concentrate is dried to a suitable moisture content, loaded into 1 tonne bulk bags which are stacked into standard 20-foot sea containers and trucked using triple road trains to Perth (Fremantle Port) where 95% payment is received. From there ships are loaded and make way to final destinations (depending on purchaser).
Overall Flowsheet
Concentrate Logistics
==> picture [265 x 334] intentionally omitted <==
==> picture [476 x 319] intentionally omitted <==
30
Processing Plant Layout and Location
==> picture [125 x 70] intentionally omitted <==
Processing Facilities
-
480kt p.a Carbon-in-Leach plant and sulphide flotation circuit
-
Existing TSF has 8-month capacity remaining, then a new dam will be built with 2-year capacity stages.
Processing Facilities Location
Processing Plant Layout
==> picture [380 x 315] intentionally omitted <==
==> picture [531 x 314] intentionally omitted <==
31
Mineralogy
Mineralogy
Underground Resource
-
The Youanmi Underground Resource has a small percentage of its content that requires more than just standard CIL to extract the gold.
oGold is associated with Pyrite (75%) and Arsenopyrite (25%) and is easily floatable in a simple proven process flow circuit. -
Gold associated with Arsenopyrite makes up around one quarter of the sulphide material. Without special treatment the standard CIL process depending on the grind will achieve between 60 to 75% gold extraction.
-
The arsenopyrite associated gold can be easily extracted using the Albion Process which lifts the overall extraction to 94% - potential future application of Albion circuit
Open Pit Resource
- Grace Stage 1 Open Pit mineralogy is simple with high Au metal recoveries of 95% through standard CIL circuit.
==> picture [125 x 70] intentionally omitted <==
==> picture [665 x 382] intentionally omitted <==
32
Other Infrastructure
==> picture [135 x 83] intentionally omitted <==
==> picture [117 x 79] intentionally omitted <==
==> picture [134 x 61] intentionally omitted <==
Evaporation Ponds and Water Management
Power and Other Services
Village
-
Existing facilities include 51 rooms, and with planned expansion adds 28 x 4 room dongas for 112 additional rooms to take site capacity to 173 rooms. The
-
There is allowance made to undertake some remediation works to existing evaporation ponds to meet the license conditions.
-
Gas power generation provided on site by a power generation contactor, likely 8 x Caterpillar 3512H 1500kW gensets + 2 x Cummins 850kW dual fuel gensets as standby power.
-
Other evaporation infrastructure includes a spray network positioned around the Mine Pit crest.
-
expansion cost includes upgrade of septic system, 3 laundries, and refurbishment of existing messing, pool, and bar facilities.
-
The contractor will provide all hardware on site and manage logistics of trucked gas delivery.
-
Water infrastructure items include the pumping system from Mine Pit to evaporation ponds and the UG mining planned infrastructure of pump stations located every 120m vertically.
==> picture [135 x 82] intentionally omitted <==
Airstrip
- The Youanmi airstrip was recently refurbished by Ramelius Resources and is capable of taking suitably sized aircraft for FIFO operations, and in the longer term if a sealed strip becomes available at the Penny site (30km to the south of Youanmi), then that would be considered for use also.
==> picture [125 x 70] intentionally omitted <==
==> picture [135 x 81] intentionally omitted <==
==> picture [132 x 60] intentionally omitted <==
Site Roads and Site Offices and Carparks Communication
- The existing road • New site office will be network requires little placed on site to work to bring into accommodate site operational status, and administration there exists suitable function, process plant material on site in the function, mining form of underground technical services, and development waste UG crews. rock from the 1990s • Grace Stage 1 Pit operations which can contractors will run out be cheaply turned into of the existing fixed various engineered plant workshop. products including • Two-way radio comms road-base, cracker dust is planned to be a and rip-rap material. standard customized VHF system incorporating a leaky feeder network underground. Open Pits will run on over the counter UHF two-way systems.
33
Experienced Consultants Team
==> picture [125 x 70] intentionally omitted <==
==> picture [867 x 393] intentionally omitted <==
----- Start of picture text -----
Geology
Mining Technical
Turner Mining and Geotechnical
In Association with
Peter O’Bryan and Associates
Metallurgy and
Processing
Costing
Heritage and
Environment
----- End of picture text -----
34
Scoping Study Summary
Mining
ESG
-
Detailed mining schedules and operating costs
oSmall open pits mining in the first 6 monthsoUnderground mining commencing in month 2 -
Flora Fauna and Lake Noondie Ecology surveys in progress
-
Heritage survey in progress
-
LOM average gold head grade of 5.0g/t Au
-
Native title discussions commence
Initial Financial Evaluation
Processing
==> picture [125 x 70] intentionally omitted <==
- **Attractive Project with robust economics**
- **Significant upside from current resource base and regional exploration (Youanmi Regional)**
-
Accuracy within ±40%
-
Plant throughput 480ktpa
-
Standard CIL circuit and sulphide flotation circuit
-
• Annual production target 71koz for 8.0 years → total production target 569koz
-
Low LOM AISC of $1,538/oz
-
• Attractive NPV of $303m, IRR of 45% and payback period of 3.0 years at a conservative gold price of $2,450/oz
-
Low capital intensity ($1,386/oz)
Infrastructure
-
Gas power provided on site
-
Evaporation ponds and water management considered
-
Existing facilities including airstrip and site roads
-
Capital cost to expand existing village facilities and site office included
Next Steps
-
Complete more drilling at Youanmi to convert inferred to indicated resource and update resource
-
• Further Drilling and Studies (Resource, PFS) to quote reserves
-
Exploration and drilling at Youanmi Regional and Mt Fisher
2435
Appendix 1 - Comparable Gold Companies
==> picture [125 x 70] intentionally omitted <==
Companies selected are considered comparable to Rox Resources as they are in exploration and/or study phase
| Measured Resources - 100% | Indicated Resources - 100% | Inferred Resources - 100% | Total Resources - 100% | M&I Resources - 100% | Attributable | ||
|---|---|---|---|---|---|---|---|
| Ticker Name Ownership Development Stage |
Tonnage (Mt) Grade (g/t Au) Contained Gold (koz) |
Tonnage (Mt) Grade (g/t Au) Contained Gold (koz) |
Tonnage (Mt) Grade (g/t Au) Contained Gold (koz) |
Tonnage (Mt) Grade (g/t Au) Contained Gold (koz) |
Tonnage (Mt) Grade (g/t Au) Contained Gold (koz) |
M&I (koz) EV/M&I oz ($/oz) |
Source |
| MGV Musgrave Minerals Ltd 100% Pre-feasibility Study |
5.1 2.6 435.0 |
7.2 2.1 492.0 |
12.3 2.3 927.0 |
5.1 2.6 435.0 |
435.0 249 |
Annual Report 2022 - ASX Announcement on 07/10/2022 |
|
| GMD Genesis Minerals Ltd 100% Resource |
0.8 5.3 135.0 |
19.7 1.6 1,025.0 |
18.8 1.4 857.0 |
39.3 1.6 2,017.0 |
20.5 1.8 1,160.0 |
1,160.0 354 |
Perfectly Positioned Corporate Presentation - ASX Announcement on 10/10/2022 |
| AUC Ausgold Ltd 100% Definitive Feasibility Study |
19.0 1.3 800.0 |
26.8 1.1 984.0 |
9.5 1.0 370.0 |
56.0 1.2 2,160.0 |
45.8 1.2 1,784.0 |
1,784.0 42 |
Sydney Mining Club Presentation - ASX Announcement on 06/10/2022 |
| AME Alto Metals Ltd 100% Resource |
3.0 1.7 159.0 |
9.4 1.6 476.0 |
12.4 1.6 635.0 |
3.0 1.7 159.0 |
159.0 225 |
Annual Report 2022 - ASX Announcement on 30/09/2022 |
|
| KIN Kin Mining NL 100% Definitive Feasibility Study |
0.8 1.3 31.0 |
17.8 1.4 803.4 |
15.9 1.1 572.5 |
34.5 1.3 1,406.9 |
18.6 1.4 834.4 |
834.4 90 |
Investor Update - ASX Announcement on 14/10/2022 |
| HRZ Horizon Minerals Ltd 100% Pre-feasibility Study |
1.5 1.3 62.9 |
13.9 1.8 791.2 |
7.5 1.7 386.2 |
22.6 1.7 1,240.3 |
15.4 1.7 854.1 |
854.1 38 |
Gold Resources Increase to 1.24Moz - ASX Announcement on 28/09/2022 |
| BC8 Black Cat Syndicate Ltd 100% Definitive Feasibility Study |
0.4 5.6 66.0 |
11.1 2.5 881.0 |
13.0 2.5 1,055.0 |
24.5 2.5 2,000.0 |
11.5 2.6 947.0 |
947.0 52 |
New Coyote Geological Model Driving High- Grade Success - ASX Announcement on 10/10/2022 |
| STN Saturn Metals Ltd 100% Pre-feasibility Study |
41.0 0.6 760.0 |
35.0 0.6 710.0 |
76.0 0.6 1,469.0 |
41.0 0.6 760.0 |
760.0 32 |
Investor Presentation Gold Forum Americas - ASX Announcement on 21/09/2022 |
|
| MEK Meeka Gold Ltd 100% Pre-feasibility Study |
0.2 11.4 55.0 |
7.9 2.7 670.0 |
5.2 2.4 390.0 |
13.1 2.6 1,115.0 |
8.0 2.8 725.0 |
725.0 86 |
Drilling and Pre-Feasibility Study Update - ASX Announcement on 30/09/2022 |
| HRN Horizon Gold Ltd 100% Resource |
24.3 1.5 1,149.4 |
12.5 1.6 644.2 |
36.8 1.5 1,793.6 |
24.3 1.5 1,149.4 |
1,149.4 36 |
High Grades and Wide Gold Intercepts Returned from RC Drilling - ASX Announcement on 19/09/2022 |
|
| Other inputs Input date Source Cash and cash equivalents balances 30 June 2022 Appendix 5B Cash Flow Report – Quarter Ended 30 June 2022 Market capitalisation 17 October 2022 Australian Stock Exchange RXL Rox Resources Ltd 70% Scoping Study 12.1 3.3 1,296.0 15.8 3.8 1,903.0 27.9 3.6 3,199.0 12.1 3.3 1,296.0 907.2 38 Annual Report 2022 - ASX Announcement on 28/09/2022 |
Notes:
Attributable figures have been calculated by multiplying the total input with the project ownership percentage. M&I: Measured and Indicated
36
==> picture [227 x 149] intentionally omitted <==
ASX : RXL
Thank You
Rox Resources Limited Level 2, 87 Colin Street, West Perth, WA 6005
T: (08) 9226 0044 E: [email protected] W: www.roxresources.com.au
Follow Rox:
==> picture [40 x 40] intentionally omitted <==
==> picture [40 x 40] intentionally omitted <==
==> picture [47 x 48] intentionally omitted <==