Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

ROX RESOURCES LIMITED Capital/Financing Update 2014

May 26, 2014

65741_rns_2014-05-26_1de17e55-9cb8-4f46-90da-e7edc7eb1ab4.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

27 MAY 2014

==> picture [103 x 51] intentionally omitted <==

ASX ANNOUNCEMENT

Rox Resources Limited

MUSKET DRILLING UPDATE

ASX: RXL

Address: Level 1 30 Richardson Street WEST PERTH WA 6005

PO Box 1167 West Perth WA 6872

Ph: (61 8) 9226 0044 Fax: (61 8) 9325 6254 Email: [email protected]

Web: www.roxresources.com.au

ABN: 53 107 202 602

Projects:

Mt Fisher: nickel-gold (100%)

Reward: zinc-lead (49%)

Bonya: copper-silver (earning up to 70%)

  • Diamond drilling continues to intersect thick intervals of potentially ore grade nickel sulphide mineralisation

  • 16.9m @ 2.0% Ni, including 6.6m @ 2.6% Ni

  • 7.7m @ 1.8% Ni, including 3.0m @ 2.4% Ni

  • Mineralised zone now drilled to 300m below surface and still open to the north, south and at depth

Rox Resources Limited ( ASX: RXL ) (“ Rox ” or “ the Company ”) is pleased to report further solid drilling results from its diamond drilling program currently underway at the Musket nickel sulphide prospect near Mt Fisher, 500km north of Kalgoorlie, Western Australia.

Rox Managing Director, Mr Ian Mulholland said, “The latest results from Musket confirm that we have identified a coherent body of nickel sulphide mineralisation down to 300m depth that we haven’t closed off yet. True widths in some holes are over 10m thick and have grades of 2.0% Ni or better. These results augur well for the estimation of a significant maiden resource later this year.”

The suite of results from Musket to date is impressive, and includes these new results:

9.0m @ 1.9% Ni from 268.0m in hole MFED045

==> picture [141 x 193] intentionally omitted <==

  • 2.9m @ 1.6% Ni from 270.0m, and

  • 0.3m @ 13.3% Ni from 265.2m in hole MFED046

  • 7.4m @ 1.9% Ni from 295.6m, including

1.4m @ 2.5% Ni from 295.6m, and

3.1m @ 2.2% Ni from 299.9m in hole MFED047

  • 9.6m @ 1.2% Ni from 311.5m, including

  • 2.5m @ 2.1% Ni from 311.5m in hole MFED048

  • 16.9m @ 2.0% Ni from 352.1m, including

6.6m @ 2.6% Ni from 358.0m in hole MFED049

  • 7.7m @ 1.8% Ni from 361.0m, including

  • 3.0m @ 2.4% Ni from 363.0m in hole MFED050

RRL1330D-IM

ROX RESOURCES LIMITED - ASX RELEASE 27 May 2014

==> picture [103 x 52] intentionally omitted <==

As well as previously announced RC and diamond drilling results, such as:

17m @ 2.2% Ni , including

4m @ 3.2% Ni from 214m in hole MFEC059

14m @ 1.5% Ni from 191m in hole MFEC064

17m @ 2.2% Ni , including

2m @ 8.1% Ni from 227m in hole MFEC065

15.0m @ 2.7% Ni , including

0.9m @ 19.5% Ni from 264.7m in hole MFED042

16.2m @ 2.8% Ni , including

0.8m @ 19.0% Ni from 305.1m in hole MFED043, and

15.9m @ 2.1% Ni from 248.0m, including

10.2m @ 2.6% Ni from 252.2m in hole MFED044

Downhole EM surveying is being conducted in holes MFED047, 049 and 050. EM surveying has proved to be a valuable targeting tool and the results of this survey will be used in assist in future drill hole locations.

“The mineralisation we are delineating at Musket is much thicker than the 1.6Mt at 2.2% Ni (ASX:RXL 3 October 2013) Camelwood deposit 2km to the north. While Camelwood is a very good deposit, Musket is shaping up to add significant new tonnes to our overall project resource.”

“In particular, the massive sulphide zone at Musket consistently shows grades between 13% and 19% Ni, and the matrix and disseminated zones are generally 1.5% to 3.5% Ni. We’re starting to build a solid resource base now, and that bodes well for future project development” Mr Mulholland said.

Diamond drilling is ongoing, with further results anticipated over the coming weeks.

ENDS

For more information:

Shareholders/Investors

Ian Mulholland Managing Director Tel: +61 8 9226 0044 [email protected]

Media

Tony Dawe / Belinda Newman Professional Public Relations Tel: + 61 8 9388 0944 [email protected] / [email protected]

  • 2 -

ROX RESOURCES LIMITED - ASX RELEASE 27 May 2014

==> picture [103 x 52] intentionally omitted <==

Table 1: Musket Diamond Drilling Assay Results

Hole East North Depth
(m)
Dip Azimuth From
(m)
To
(m)
Interval Ni% m%
MFED042 356611 7033879 319.4 -62 268 264.7 279.7 15.0 2.72 40.8
Including 264.7 265.6 0.9 19.5
MFED043 356611 7033879 355.0 -68 275 305.1 321.3 16.2 2.84 46.0
Including 305.1 305.9 0.8 19.0
MFED044 356620 7033840 292.0 -59 270 248.0 263.9 15.9 2.12 33.7
Including 252.2 262.4 10.2 2.60
MFED045 356620 7033840 307.0 -66 266 268.0 277.2 9.2 1.87 17.2
MFED046 356670 7033800 330 -56 266 265.2 265.5 0.3 13.3 8.5
And 270.0 272.9 2.9 1.57
MFED047 356670 7033800 350 -63 268 295.6 303.0 7.4 1.90 14.1
Including 295.6 297.0 1.4 2.50
Including 299.9 303.0 3.1 2.24
MFED048 356600 7033920 352.2 -70 270 311.5 321.1 9.6 1.22 11.7
Including 311.5 314.0 2.5 2.10
MFED049 356600 7033920 401.8 -78 248 352.1 369.0 16.9 2.03 34.3
Including 358.0 364.6 6.6 2.59
MFED050 356700 7033880 401.6 -61 262 361.0 368.7 7.7 1.79 13.9
Including 363.0 366.0 3.0 2.37
MFED051 356450 7034600 450 -64 269 Pending
MFED052 356600 7033920 300 -60 270 Pending

Diamond Drill holes MFED042 to MFED044 (Table 1) have been reported previously (ASX:RXL 28 April 2014 and 6 May 2014).

Notes to Tables:

  • New results shown in bold .

  • Grid coordinates GDA94: Zone 51, collar positions determined by hand held GPS.

  • All holes nominal RL 542 +/- 1m AHD estimated from regional Digital Elevation Model.

  • Hole azimuths planned to be 270 degrees, but downhole deviations may result in hole paths slightly different to those intended.

  • RC drilling (hole prefix MFEC) by reverse circulation face sampling hammer, then 1 metre samples cone split and bagged.

  • Diamond drilling (hole prefix MFED) by HQ/NQ diamond core, with core cut in half and sampled to either significant geological boundaries or even metre intervals.

  • Diamond drill samples weighed in water and air to determine bulk density, and then crushed to 6.5mm

  • 3-5kg sample preparation by pulp mill to nominal P80/75um.

  • Ni analysis by Intertek Genalysis Perth method 4A/OE: Multi-acid digest including Hydrofluoric, Nitric, Perchloric and Hydrochloric acids in Teflon Tubes. Analysed by Inductively Coupled Plasma Optical (Atomic) Emission Spectrometry. For higher precision analyses (e.g. Ni > 1%), Intertek Genalysis Perth method 4AH/OE: Modified (for higher precision) multi-acid digest including Hydrofluoric, Nitric, Perchloric and Hydrochloric acids. Analysed by Inductively Coupled Plasma Optical (Atomic) Emission Spectrometry.

  • Certified Reference Standards and field duplicate samples were inserted at regular intervals to provide assay quality checks. Review of the standards and duplicates are within acceptable limits.

  • Cut-off grade for reporting of 1% Ni with up to 2m of internal dilution allowed.

  • Given the angle of the drill holes and the interpreted 60-65 degree easterly dip of the host rocks, reported intercepts will be slightly more than true width.

  • NSR = No Significant Result. Pending = Results not yet received from the laboratory.

  • 3 -

ROX RESOURCES LIMITED - ASX RELEASE 27 May 2014

==> picture [103 x 52] intentionally omitted <==

Table 2: Musket & Cannonball RC Drilling Assay Results

Hole East North Depth
(m)
Dip Azimuth From
(m)
To
(m)
Interval Ni% m% Prospect
MFEC034 356530 7033411 127 -60 270 NSR Musket
MFEC035 356484 7033605 104 -60 270 NSR Musket
MFEC036 356463 7033793 144 -60 270 55 64 9 1.32 11.8 Musket
MFEC037 356469 7033994 159 -60 270 129 132 3 3.13 9.4 Musket
including 129 131 2 4.01
MFEC038 356379 7034195 149 -60 270 NSR Cannonball
MFEC039 356293 7034398 150 -60 270 NSR Cannonball
MFEC040 356528 7033800 150 -60 270 129 136 7 1.84 12.9 Musket
MFEC041 356555 7033595 116 -60 270 NSR Musket
MFEC042 356220 7034600 150 -60 270 114 119 5 2.03 10.2 Cannonball
MFEC043 356186 7034699 164 -65 270 128 130 2 2.36 4.7 Cannonball
MFEC044 356037 7034435 99 -60 270 NSR Cannonball
MFEC045 356246 7034500 110 -60 270 84 88 4 2 8.0 Cannonball
MFEC046 356500 7033900 180 -60 270 NSR Musket
MFEC047 356555 7033700 143 -60 270 126 127 1 1.04 1.0 Musket
MFEC048 356570 7033800 216 -60 270 176 189 13 1.93 25.0 Musket
including 180 185 5 2.55
MFEC049 356270 7034600 186 -60 270 158 163 5 2.34 11.7 Cannonball
including 159 160 1 3.19
and 162 163 1 4.61
MFEC052 356238 7034700 200 -60 270 176 177 1 4.53 4.5 Cannonball
MFEC053 356315 7034600 210 -60 270 199 200 1 4.19 4.2 Cannonball
MFEC054 356290 7034500 150 -60 270 NSR Cannonball
MFEC055 356610 7033800 248 -60 270 220 231 11 1.77 19.4 Musket
including 225 228 3 2.35
MFEC056 356550 7033750 158 -60 270 127 133 6 1.49 9.0 Musket
MFEC057 356592 7033753 208 -60 270 188 189 3 1.54 4.6 Musket
MFEC058 356606 7033706 208 -60 270 185 186 1 1.34 1.3 Musket
MFEC059 356592 7033847 243 -60 270 214 231 17 2.22 37.7 Musket
including 214 218 4 3.19
including 215 216 1 6.23
and 225 229 4 2.50
MFEC063 356200 7034800 203 -60 270 189 190 1 3.00 3.0 Cannonball
MFEC064 356554 7033851 218 -60 270 191 205 14 1.52 21.3 Musket
MFEC065 356577 7033881 258 -57 270 227 244 17 2.17 36.9 Musket
including 227 235 8 3.34
including 227 229 2 8.14

RC Drill holes MFEC034 to MFEC065 (Table 2) have been reported previously (ASX:RXL 6 March 2014 and 27 March 2014).

  • 4 -

ROX RESOURCES LIMITED - ASX RELEASE 27 May 2014

==> picture [103 x 52] intentionally omitted <==

==> picture [454 x 561] intentionally omitted <==

Figure 1: Musket Drill Plan

  • 5 -

ROX RESOURCES LIMITED - ASX RELEASE 27 May 2014

==> picture [103 x 52] intentionally omitted <==

==> picture [456 x 555] intentionally omitted <==

Figure 2: Musket Long Section

  • 6 -

ROX RESOURCES LIMITED - ASX RELEASE 27 May 2014

==> picture [103 x 52] intentionally omitted <==

==> picture [344 x 497] intentionally omitted <==

Figure 3: Musket Drill Cross Section 7033880N

  • 7 -

ROX RESOURCES LIMITED - ASX RELEASE 27 May 2014

==> picture [103 x 52] intentionally omitted <==

==> picture [344 x 497] intentionally omitted <==

Figure 4: Musket Drill Cross Section 7033840N

  • 8 -

ROX RESOURCES LIMITED - ASX RELEASE 27 May 2014

==> picture [103 x 52] intentionally omitted <==

==> picture [344 x 394] intentionally omitted <==

Figure 5: Musket Drill Cross Section 7033800N

  • 9 -

ROX RESOURCES LIMITED - ASX RELEASE 27 May 2014

==> picture [103 x 52] intentionally omitted <==

About Rox Resources

Rox Resources Limited is an emerging Australian minerals exploration company. The company has four key assets at various levels of development with exposure to gold, nickel, zinc, lead, copper and phosphate, including the Mt Fisher Gold Project (WA), Myrtle/Reward Zinc-Lead Project (NT), the Bonya Copper Project (NT) and the Marqua Phosphate Project (NT).

Mt Fisher Gold-Nickel Project (100% + Option to Purchase $3.6 million)

The Mt Fisher gold project is located in the highly prospective North Eastern Goldfields region of Western Australia and in addition to being well endowed with gold the project hosts strong nickel potential. The total project area is 655km[2] , consisting of a 485km[2] area 100% owned by Rox and an Option to purchase 100% of a further 170km[2] .

Recent drilling at the Camelwood nickel prospect has defined a JORC 2012 Mineral Resource (ASX:RXL 3 October 2013) of 1.6Mt grading 2.2% nickel reported at 1.0% Ni cut-off (Indicated Mineral Resource: 0.6Mt grading 2.4% Ni, Inferred Mineral Resource: 1.0Mt grading 2.1% Ni) comprising massive and disseminated nickel sulphide mineralisation, and containing 34,600 tonnes of nickel. A higher grade core of 520,000 tonnes grading 3.1% nickel reported at a 2.5% Ni cut-off (Indicated Mineral Resource: 240,000 tonnes grading 3.2% Ni, Inferred Mineral Resource: 280,000 tonnes grading 3.0% Ni) is present. The mineralisation is still open in all directions. The nickel Mineral Resource occurs partly on tenements under Option to Purchase to Rox, with an exercise price payable as follows: $1.1 million by 30 June 2014, $0.2 million by 31 December 2014, and $2.3 million by 30 June 2015.

Drilling by Rox has also defined numerous high-grade gold targets and a JORC 2004 Measured, Indicated and Inferred Mineral Resource (ASX:RXL 10 February 2012) of 973,000 tonnes grading 2.75 g/t gold reported at a 0.8 g/tAu cut-off exists for 86,000 ounces of gold (Measured: 171,900 tonnes grading 4.11 g/t Au, Indicated: 204,900 tonnes grading 2.82 g/t Au, Inferred: 596,200 tonnes grading 2.34 g/t Au) aggregated over the Damsel, Moray Reef and Mt Fisher deposits.

Reward Zinc-Lead Project (49% + Farm-out Agreement)

Rox has signed an Earn-In and Joint Venture Agreement with Teck Australia Pty Ltd. (“Teck”) to explore its highly prospective 670km[2] Myrtle/Reward zinc-lead tenements, located 700km south-east of Darwin, Northern Territory, adjacent to the McArthur River zinc-lead mine.

The Myrtle zinc-lead deposit has a current JORC 2004 Mineral Resource (ASX:RXL 15 March 2010) of 43.6 Mt @ 5.04% Zn+Pb reported at a 3.0% Zn+Pb cut-off (Indicated: 5.8 Mt @ 3.56% Zn, 0.90% Pb; Inferred: 37.8 Mt @ 4.17% Zn, 0.95% Pb).

Recent drilling at the Teena zinc-lead prospect intersected 26.4m @ 13.3% Zn+Pb including 16.2m @ 17.2% Zn+Pb, and 20.1m @ 15.0% Zn+Pb including 12.5m @19.5% Zn+Pb , and together with historic drilling has defined significant high grade zinc-lead mineralisation over a strike length of at least 1.5km.

Under the terms of the Agreement, Teck has now met the expenditure requirement for a 51% interest, with Rox holding the remaining 49%. Teck has elected to increase its interest in the project to 70% by spending an additional A$10m (A$15m in total) by 31 August 2018 (ASX:RXL 21 August 2013).

Bonya Copper Project (Farm-in Agreement to earn up to 70%)

In October 2012 Rox signed a Farm-in Agreement with Arafura Resources Limited to explore the Bonya Copper Project located 350km east of Alice Springs, Northern Territory. Outcrops of visible copper grading up to 34% Cu and 27 g/t Ag are present. Under the Agreement Rox can earn a 51% interest in the copper, lead, zinc, silver, gold, bismuth and PGE mineral rights at Bonya by spending $500,000 within the first two years. Rox can then elect to earn a further 19% (for 70% in total) by spending a further $1 million over a further two years. Once Rox has earned either a 51% or 70% interest it can form a joint venture with Arafura to further explore and develop the area.

  • 10 -

ROX RESOURCES LIMITED - ASX RELEASE 27 May 2014

==> picture [103 x 52] intentionally omitted <==

Appendix

The following information is provided to comply with the JORC (2012) requirements for the reporting of the Musket diamond drilling results on tenement E53/1318.

Section 1 Sampling Techniques and Data

Criteria JORC Code explanation
Commentary
Sampling techniques Nature and quality of sampling (e.g. cut channels,
random chips, or specific specialised industry
standard measurement tools appropriate to the
minerals under investigation, such as down hole
gamma sondes, or handheld XRF instruments, etc).
These examples should not be taken as limiting the
broad meaning of sampling.
RC hole diameter was 5.5" (140 mm) reverse circulation
percussion (RC). Sampling of RC holes was undertaken by
collecting 1m cone split samples at intervals.
Diamond drill hole core size is NQ2 size diameter through the
mineralisation. Sampling of diamond holes was by cut half
core as described further below.
Drill holes were generally angled at -600towards grid west
(but see Table for individual hole dips and azimuths) to
intersect geology as close to perpendicular as possible.
Include reference to measures taken to ensure
sample
representivity
and
the
appropriate
calibration of any measurement tools or systems
used
Drillhole locations were picked up by handheld GPS. Logging
of drill samples included lithology, weathering, texture,
moisture and contamination (as applicable). Sampling
protocols and QAQC are as per industry best practice
procedures.
Aspects of the determination of mineralisation that
are Material to the Public Report. In cases where
‘industry standard’ work has been done this would
be relatively simple (e.g. ‘reverse circulation drilling
was used to obtain 1 m samples from which 3 kg
was pulverised to produce a 30 g charge for fire
assay’). In other cases more explanation may be
required, such as where there is coarse gold that
has
inherent
sampling
problems.
Unusual
commodities
or
mineralisation
types
(e.g.
submarine nodules) may warrant disclosure of
detailed information
Diamond core is dominantly NQ2 size, sampled on geological
intervals, with a minimum of 0.1 m up to a maximum of 1.5 m.
NQ2 core is cut into half, or quarter for HQ holes. RC
drillholes were sampled on 1m intervals using riffle or cone
splitter units. Samples were sent to Intertek Genalysis in
Kalgoorlie, crushed to 10mm, dried and pulverised (total prep)
in LM5 units (Some samples > 3kg were split) to produce a
sub-sample. The pulps were then sent to Perth for analysis by
four acid digest with a multi-element ICP-OES finish (code:
4A/OE-multi element). Au, Pt and Pd were analysed by 50
gram fire assay with a mass spectrometer finish. Internal
laboratory QA uses CRM's, blanks, splits and replicates, along
with 10% repeats.
Drilling techniques Drill type (e.g. core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic, etc)
and details (e.g. core diameter, triple or standard
tube, depth of diamond tails, face-sampling bit or
other type, whether core is oriented and if so, by
what method, etc).
Drilling techniques were Reverse Circulation (RC) and diamond
core (DD). The RC hole diameter was 140mm face sampling
hammer. Hole depths range from 98m to 258m.
DD hole diameter was mostly NQ2 with 5 ¼ inch mud rotary
pre-collar and HQ upper hole portions. Hole depths range
from 319.4m to 401.8m. The core was orientated using a
Camtech orientation tool.
Drill sample recovery Method of recording and assessing core and chip
sample recoveries and results assessed
Diamond drill core recoveries were logged and recorded in the
database. Overall recoveries were >95%, and there were no
significant core loss or recovery problems.
RC drill recoveries were high (>90%).
Measures taken to maximise sample recovery and
ensure representative nature of the samples
Diamond core was reconstructed into continuous sample runs
on an angle iron used for orientation marking. Depths are
measured and checked against marked depths on the core
blocks.
RC samples were visually checked for recovery, moisture and
contamination and notes made in the logs.
Whether a relationship exists between sample
recovery and grade and whether sample bias may
have occurred due to preferential loss/gain of
fine/coarse material.
Most of the samples used in the Mineral Resource estimate
come from diamond core drilling which had high recoveries.
There is no observable relationship between recovery and
grade, and therefore no sample bias.
  • 11 -

ROX RESOURCES LIMITED - ASX RELEASE 27 May 2014

==> picture [103 x 52] intentionally omitted <==

Criteria JORC Code explanation Commentary Logging Whether core and chip samples have been geologically and geotechnically logged to a level of Resource estimate. detail to support appropriate Mineral Resource estimation, mining studies and metallurgical studies.

Detailed geological logs have been carried out on all RC drill holes, but no geotechnical data have been recorded (or is possible to be recorded due to the nature of the sample). The geological data would be suitable for inclusion in a Mineral Resource estimate.

Detailed geological and geotechnical logs were carried out on all diamond drill holes for recovery, RQD, structures etc. which included structure type, dip, dip direction, alpha angle, beta angle, texture, shape, roughness, fill material, and this data is stored in the database.

Logging of diamond core and RC chips recorded lithology, mineralogy, mineralisation, structure (DD only), weathering, colour, and other sample features. Core was photographed and is stored in plastic core trays. RC chips are stored in plastic RC chip trays.

Whether logging is qualitative or quantitative in mineralogy, mineralisation, structure (DD only), weathering, nature. Core (or costean, channel, etc) colour, and other sample features. Core was photographed photography. and is stored in plastic core trays. RC chips are stored in plastic RC chip trays. The total length and percentage of the relevant All holes were logged in full except for the rock roller bit intersections logged diamond hole pre-collars (0-120m in most cases). Sub-sampling Drill core was cut in half on site using a core saw. All samples If core, whether cut or sawn and whether quarter, techniques and were collected from the same side of the core, preserving the half or all core taken. sample preparation orientation mark in the kept core half. RC samples were collected on the drill rig using a cone splitter. If non-core, whether riffled, tube sampled, rotary If any mineralised samples were collected wet these were split, etc and whether sampled wet or dry. noted in the drill logs and database. The sample preparation followed industry best practice. This For all sample types, the nature, quality and involved oven drying, coarse crushing of diamond core to appropriateness of the sample preparation ~10mm, followed by pulverisation of the entire sample in an technique. LM5 or equivalent pulverising mill to a grind size of 85% passing 75 micron. Field QC procedures involve the use of Certified Reference Quality control procedures adopted for all sub- Materials (CRM’s) as assay standards, along with duplicates sampling stages to maximise representivity of and barren waste samples. The insertion rate of these was samples. approximately 1:20. Measures taken to ensure that the sampling is No diamond core field duplicates were taken. For RC drilling representative of the in situ material collected, field duplicates were taken on a routine basis at an including for instance results for field approximate 1:20 ratio using the same sampling techniques duplicate/second-half sampling. (i.e. cone splitter) and inserted into the sample run.

All holes were logged in full except for the rock roller bit diamond hole pre-collars (0-120m in most cases).

Drill core was cut in half on site using a core saw. All samples were collected from the same side of the core, preserving the orientation mark in the kept core half.

RC samples were collected on the drill rig using a cone splitter. If any mineralised samples were collected wet these were noted in the drill logs and database.

The sample preparation followed industry best practice. This involved oven drying, coarse crushing of diamond core to ~10mm, followed by pulverisation of the entire sample in an LM5 or equivalent pulverising mill to a grind size of 85% passing 75 micron.

Field QC procedures involve the use of Certified Reference Materials (CRM’s) as assay standards, along with duplicates and barren waste samples. The insertion rate of these was approximately 1:20.

The sample sizes are considered more than adequate to ensure that there are no particle size effects relating to the grain size of the mineralisation which lies in the percentage range.

The sample sizes are considered more than adequate to
Whether sample sizes are appropriate to the grain ensure that there are no particle size effects relating to the
size of the material being sampled. grain size of the mineralisation which lies in the percentage
range.
Quality of assay data The analytical technique involved a four acid digest followed
and laboratory tests The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or total.
by multi-element ICP/OES analysis (Intertek analysis code
4A/OE). The four acid digest involves hydrofluoric, nitric,
perchloric and hydrochloric acids and is considered a
“complete” digest for most material types, except certain
chromite minerals.
For geophysical tools, spectrometers, handheld XRF
instruments,
etc,
the
parameters
used
in
determining the analysis including instrument make
and model, reading times, calibrations factors
No geophysical or portable analysis tools were used to
determine assay values stored in the database.
applied and their derivation, etc.
Nature of quality control procedures adopted (e.g.
standards, blanks, duplicates, external laboratory
checks) and whether acceptable levels of accuracy
(i.e. lack of bias) and precision have been
established.
Internal laboratory control procedures involve duplicate
assaying of randomly selected assay pulps as well as internal
laboratory standards. All of these data are reported to the
Company and analysed for consistency and any discrepancies.
Check assays were undertaken at an independent third party
assay laboratory and correlated extremely well.
Verification of
sampling and
assaying
The verification of significant intersections by either
independent or alternative company personnel.
Senior technical personnel from the Company (Managing
Director and Exploration Manager) have visually inspected and
verified the significant drill intersections.
  • 12 -

ROX RESOURCES LIMITED - ASX RELEASE 27 May 2014

==> picture [103 x 52] intentionally omitted <==

Criteria JORC Code explanation
Commentary
The use of twinned holes.
No holes have been twinned at this stage.
Documentation of primary data, data entry
procedures, data verification, data storage (physical
and electronic) protocols.
Primary data was collected using a standard set of Excel
templates on Toughbook laptop computers in the field. These
data are transferred to Geobase Pty Ltd for data verification
and loading into the database.
Discuss any adjustment to assay data.
No adjustments or calibrations have been made to any assay
data.
Location of data
points
Accuracy and quality of surveys used to locate
drillholes (collar and down-hole surveys), trenches,
mine workings and other locations used in Mineral
Resource estimation.
Not applicable. A hand held GPS has been used to determine
collar locations at this stage.
Specification of the grid system used.
The grid system is MGA_GDA94, zone 51 for easting, northing
and RL.
Quality and adequacy of topographic control.
The topographic surface was generated from digital terrain
models generated from low level airborne geophysical
surveys.
Data spacing and
distribution
Data spacing for reporting of Exploration Results.
The drill hole spacing varies 40-100 metres between drill
sections, with some areas at 40 metre drill section spacing.
Some sections (but not all) have had more than one hole
drilled. Down dip step out distance varies 40-60 metres.
Whether the data spacing and distribution is
sufficient to establish the degree of geological and
grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s)
and classifications applied.
The mineralisation and geology shows very good continuity
from hole to hole and will be sufficient to support the
definition of a Mineral Resource or Ore Reserve and the
classifications contained in the JORC Code (2012 Edition) in
due course.
Whether sample compositing has been applied.
No sample compositing has occurred for diamond core
drilling. Sample intervals are based on geological boundaries
with even one metre samples between.
For RC samples, sample compositing occurred over 4 metre
intervals for non-mineralised material, but all mineralised
intervals were sampled at a one metre interval.
Orientation of data
in relation to
geological structure
Whether the orientation of sampling achieves
unbiased sampling of possible structures and the
extent to which this is known, considering the
deposit type.
The deposit strikes at about 345 degrees and dips to the east
at between -60 to -70 degrees. The drill orientation was
planned to be 270 degrees, so slightly oblique to the
perpendicular direction, however, some drill holes have
swung slightly south (to about 260 degrees) so were drilling
essentially perpendicular to strike. This is confirmed in
structural logging of mineralised zones.
If the relationship between the drilling orientation
and the orientation of key mineralised structures is
considered to have introduced a sampling bias, this
should be assessed and reported if material.
No sampling bias is believed to have been introduced.
Sample security The measures taken to ensure sample security.
Sample security is managed by the Company. After
preparation in the field samples are packed into polyweave
bags and despatched to the laboratory. For a large number of
samples these bags were transported by the Company directly
to the assay laboratory. In some cases the sample were
delivered to a transport contractor who then delivered the
samples to the assay laboratory. The assay laboratory audits
the samples on arrival and reports any discrepancies back to
the Company. No such discrepancies occurred.
Audits or reviews The results of any audits or reviews of sampling
techniques and data.
A review of previous sampling techniques and data was
carried out by Optiro as part of the Camelwood Mineral
Resource estimate(ASX:RXL 3 October 2013). The database is
considered by Optiro to be of sufficient quality to support a
Mineral Resource estimate. In addition, from time to time, the
Company carries out its own internal data audits.
  • 13 -

ROX RESOURCES LIMITED - ASX RELEASE 27 May 2014

==> picture [103 x 52] intentionally omitted <==

Section 2 Reporting of Exploration Results

Criteria JORC Code explanation
Commentary
Mineral tenement
and land tenure
status
Type,
reference
name/number,
location
and
ownership including agreements or material issues
with
third
parties
such
as
joint
ventures,
partnerships, overriding royalties, native title
interests, historical sites, wilderness or national
park and environmental settings.
The mineralisation is located within Exploration License
E53/1318. Rox Resources holds an option to purchase
E53/1318 (among other tenements) from Gerard Victor
Brewer payable in three instalments; $1.1 million payable by
30 June 2014, $0.2 million payable by 31 December 2014, and
$2.3 million payable by 30 June 2015.
The security of the tenure held at the time of
reporting along with any known impediments to
obtaining a licence to operate in the area.
The tenement/s is/are in good standing and no known
impediments exist.
Exploration done by
other parties
Acknowledgment and appraisal of exploration by
other parties.
No previous exploration for nickel has been done at the
Cannonball or Musket prospects.
Geology Deposit type, geological setting and style of
mineralisation.
The geological setting is of Archaean aged komatiite system,
bounded by hangingwall basaltic rocks and footwall felsic
metasediments. Mineralisation is mostly situated at the
(eastern) basal ultramafic - felsic contact. The rocks are
strongly talc-carbonate altered. Metamorphism is mid-upper
Greenschist. The deposit is analogous to Kambalda style nickel
sulphide deposits.
Drill hole
Information
A summary of all information material to the
understanding of the exploration results including a
tabulation of the following information for all
Material drill holes:

easting and northing of the drill hole
collar

elevation or RL (Reduced Level –
elevation above sea level in metres) of
the drill hole collar

dip and azimuth of the hole

down hole length and interception depth

hole length.
Refer to drill results Table/s and the Notes attached thereto.
Data aggregation
methods
In
reporting
Exploration
Results,
weighting
averaging techniques, maximum and/or minimum
grade truncations (e.g. cutting of high grades) and
cut-off grades are usually Material and should be
stated.
All reported assay intervals have been length weighted. No
top cuts have been applied. A lower cutoff of 1% is applied
with up to 2m of internal dilution allowed. See Notes to
Table/s.
Where aggregate intercepts incorporate short
lengths of high grade results and longer lengths of
low grade results, the procedure used for such
aggregation should be stated and some typical
examples of such aggregations should be shown in
detail.
High grade massive sulphide intervals internal to broader
zones of mineralisation are reported as included intervals. See
Table/s.
The assumptions used for any reporting of metal
equivalent values should be clearly stated.
No metal equivalent values have been used or reported.
Relationship
between
mineralisation
widths and intercept
lengths
These relationships are particularly important in the
reporting of Exploration Results.
If the geometry of the mineralisation with respect
to the drill hole angle is known, its nature should be
reported.
If it is not known and only the down hole lengths
are reported, there should be a clear statement to
this effect (e.g. ‘down hole length, true width not
known’).
The mineralisation is moderately east dipping throughout the
deposit. Drillhole azimuths were planned at 2700and holes
generally inclined at -600west (but see Table 1). Given the
angle of the drill holes and the interpreted dip of the host
rocks and mineralisation (see Figures 2-4), reported intercepts
will be more than true width.
Diagrams Appropriate maps and sections (with scales) and
tabulations of intercepts should be included for any
significant discovery being reported These should
include, but not be limited to a plan view of drill
hole collar locations and appropriate sectional
views.
Refer to Figures and Table in the text.
  • 14 -

ROX RESOURCES LIMITED - ASX RELEASE 27 May 2014

==> picture [103 x 52] intentionally omitted <==

Criteria JORC Code explanation Commentary
Balanced reporting Where comprehensive reporting of all Exploration
Results is not practicable, representative reporting At this stage only likely mineralised intervals have been
of both low and high grades and/or widths should analysed. Full assays are underway and will be reported in due
be practiced to avoid misleading reporting of course.
Exploration Results.
Other substantive All core samples are measured for bulk density by the
exploration data Other exploration data, if meaningful and material, laboratory using the water displacement method. Multi
should be reported including (but not limited to): element assaying on all samples was carried out for a suite of
geological observations; geophysical survey results; potentially deleterious elements such as Arsenic and
geochemical survey results; bulk samples – size and Magnesium.
method of treatment; metallurgical test results;
bulk density, groundwater, geotechnical and rock Geotechnical data was collected from all diamond drillholes
characteristics;
potential
deleterious
or
including recovery and RQD. Structural information was
contaminating substances. recorded; structure type, thickness, lithology, and alpha/beta
angles (dip and dip direction).
Further work The nature and scale of planned further work (e.g.
tests for lateral extensions or depth extensions or Further work (RC and diamond drilling) is being planned to
large-scale step-out drilling). locate extensions to mineralisation both at depth and along
Diagrams clearly highlighting the areas of possible strike. In addition further geophysics may be considered as a
extensions,
including
the
main
geological
targeting tool if appropriate.
interpretations and future drilling areas, provided
this information is not commercially sensitive
  • 15 -

ROX RESOURCES LIMITED - ASX RELEASE 27 May 2014

==> picture [103 x 52] intentionally omitted <==

Competent Person Statements:

The information in this report that relates to nickel Exploration Results for the Mt Fisher Project is based on, and fairly represents information and supporting documentation compiled by Mr Ian Mulholland BSc (Hons), MSc, FAusIMM, FAIG, FSEG, MAICD, who is a Fellow of The Australasian Institute of Mining and Metallurgy and a Fellow of the Australian Institute of Geoscientists. Mr Mulholland has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration, and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Mulholland is a full time employee and Managing Director of the Company and consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

The information in this report that relates to nickel Mineral Resources for the Mt Fisher project was reported to the ASX on 3 October 2013. Rox confirms that it is not aware of any new information or data that materially affects the information included in the announcement of 3 October 2013, and that all material assumptions and technical parameters underpinning the estimates in the announcement of 3 October 2013 continue to apply and have not materially changed.

The information in this report that relates to Exploration Results and Mineral Resources for the Reward Zinc-Lead, Bonya Copper and Marqua Phosphate projects and for the gold Mineral Resource defined at Mt Fisher, was prepared and first disclosed under the JORC Code 2004. It has not been updated since to comply with the JORC Code 2012 on the basis that the information has not materially changed since it was last reported, and is based on information compiled by Mr Ian Mulholland BSc (Hons), MSc, FAusIMM, FAIG, FSEG, MAICD, who is a Fellow of The Australasian Institute of Mining and Metallurgy and a Fellow of the Australian Institute of Geoscientists. Mr Mulholland has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration, and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Mulholland is a full time employee of the Company and consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

  • 16 -