RIVERSIDE RESOURCES INC.

MANAGEMENT DISCUSSION AND ANALYSIS

FOR THE YEAR ENDED SEPTEMBER 30, 2020

INTRODUCTION

The management discussion and analysis of financial condition and results of operations ("MD&A") focuses upon the activities, results of operations, liquidity and capital resources of Riverside Resources Inc. (the "Company" or "Riverside") for the year ended September 30, 2020. In order to better understand the MD&A, it should be read in conjunction with the audited financial statements and related notes for the year ended September 30, 2020. The Company's financial statements are prepared in accordance with International Financial Reporting Standards ("IFRS") and filed with appropriate regulatory authorities in Canada. This MD&A is current to January 28, 2021 and in Canadian dollars unless otherwise stated.

Additional information relating to the Company, including its Information Circular for the financial year ended September 30, 2020, is available under the Company's profile on SEDAR at www.sedar.com.

Forward-Looking Statements

Information set forth in this MD&A may involve forward-looking statements under applicable securities laws. Forwardlooking statements are statements that relate to future, not past, events. In this context, forward-looking statements often address expected future business and financial performance, and often contain words such as "anticipate", "believe", "plan", "estimate", "expect", and "intend", statements that an action or event "may", "might", "could", "should", or "will" be taken or occur, or other similar expressions. All statements, other than statements of historical fact, included herein including, without limitation; statements about the size and timing of future exploration on and the development of the Company's properties are forwardlooking statements. By their nature, forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the Company's actual results, performance or achievements, or other future events, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. Such factors include, among others, the following risks: the need for additional financing; operational risks associated with mineral exploration; fluctuations in commodity prices; title matters; environmental liability claims and insurance; reliance on key personnel; the volatility of our common share price and volume and other reports and filings with the TSX Venture Exchange and applicable Canadian securities regulations. Forward-looking statements are made based on management's beliefs, estimates and opinions on the date that statements are made and the Company undertakes no obligation to update forwardlooking statements if these beliefs, estimates and opinions or other circumstances should change, except as required by applicable securities laws. There can be no assurance that such statements will prove to be accurate, and future events and actual results could differ materially from those anticipated in such statements. Important factors that could cause actual results to differ materially from our expectations are disclosed in the Company's documents filed from time to time via SEDAR with the Canadian regulatory agencies to whose policies the Company is bound. Investors are cautioned against attributing undue certainty to forward-looking statements.

The users of this information, including but not limited to investors and prospective investors, should read it in conjunction with all other disclosure documents provided including but not limited to all documents filed on SEDAR (www.SEDAR.com).

CORPORATE OVERVIEW

The Company is a mineral exploration and evaluation company listed on the TSX Venture Exchange under the symbol "RRI" and is engaged in the acquisition, exploration and evaluation of exploration and evaluation assets in the Americas including Canada, the United States and Mexico where the technical team collectively has more than 100 years of exploration experience and has been part of more than five discoveries that have gone into production.

The Company combines the experience of mine discoverer John-Mark Staude (President, CEO, Director), Freeman Smith (Vice President Exploration), and Alberto Orozco (VP Corporate Development) with the finance and business management expertise of Rob Scott (CFO), Brian Groves (Director), James Clare (Director), Walter Henry (Director) and Carol Ellis (Director). Management has experience in developing significant shareholder value and they have assembled a team that can build a valuable and successful organization.

HIGHLIGHTS OF EVENTS OCCURING DURING AND SUBSEQUENT TO SEPTEMBER 30, 2020

Plan of Arrangement

On October 30, 2019, the Company incorporated a new subsidiary, Capitan Mining Inc. ("Capitan") and Rios DE Suerte S.A de C.V., another new subsidiary was incorporated on November 29, 2019 in order to facilitate a plan of arrangement ("Arrangement") whereby the Company's 100% interest in the Peñoles Project was spun out to Capitan.

On August 14, 2020, the Company transferred its 100% interest in the Peñoles Project and completed the Arrangement to spin out the shares of Capitan to the shareholders of Riverside. Pursuant to the Arrangement, holders of common shares of Riverside on August 13, 2020 received one new common share of Riverside (each, a "Riverside Share") and 0.2594 of a Capitan share (each, a "Capitan Share") for each common share held.

The carrying value of the net assets transferred to Capitan, pursuant to the Arrangement, consisted of the following assets:

Assets \$
Carrying value of exploration and evaluation 1,082,717
assets
Fair value of net assets transferred 3,500,000
Gain on transfer of spin-out assets 2,417,283

In accordance with IFRIC 17, Distribution of Non-cash Assets to Owners, the Company recognized the distribution of net assets to Riverside shareholders at fair value with the difference between that value and the carrying amount of the net assets recognized in the consolidated statement of comprehensive income (loss).

The Arrangement resulted in a reduction of share capital amounting to \$3,500,000.

Under the terms of the Arrangement, each issued and outstanding Riverside option and warrant has been adjusted to compensate the option and warrant holders for the assets spun-out. The exercise prices of the Riverside replacement stock options and warrants were adjusted based on the proportional market value of the two companies after completion of the Arrangement

Sale of short-term investments

On November 13, 2019, the Company sold 4,400,000 shares Arizona Metals Corp. for net proceeds of \$784,207

On May 1, 2020, the Company agreed and sold 900,000 shares of Arizona Metals Corp. to a third party for net proceeds of \$450,000.

On July 27, 2020, the Company sold all 1,000,000 shares of Silver Viper Minerals Corp. and 500,000 shares of Arizona Metals Corp for net proceed of \$748,326.

On January 5, 2021, the Company sold 700,000 shares of Arizona Metals Corp. for net proceeds of \$712,053.

Option payments and exploration advances

On June 17, 2020, the Company entered into a Definitive Option Agreement (the "Agreement") with Minera Hochschild Mexico, S.A. de C.V. ("Hochschild"), a wholly-owned subsidiary of Hochschild Mining PLC for the Company's 100% owned Los Cuarentas Gold-Silver Project (the "Project"). On July 20, 2020, the Company received US\$90,467 on signing the Agreement and to reimburse the Company for prepaid maintenance fees. Subsequently, the Company received US\$312,614 as exploration advances for the period from July to September 2020 generation exploration on July 27, 2020. On November 9, 2020, the Company received US\$228,699 as exploration advances for generation exploration during the period from October to November 2020. On January 6, 2021, the Company received US\$173,604 as the recovery of exploration expenditures incurred during the period from October to November 2020. Please refer to the section of "OPERATIONS" for details.

RIVERSIDE RESOURCES INC. (An Exploration Stage Enterprise) Management Discussion and Analysis For the year ended September 30, 2020

On July 15, 2020, the Company entered into a Definitive Option Agreement with Carlyle Commodities Corp. ("Carlyle") whereby Carlyle could acquire a 100% interest in the Cecilia Property, a silver-gold project, by paying \$200,000 in cash, issuing 1,500,000 common shares and 3,000,000 special warrants, and incurring exploration expenditures of \$2,500,000 over a threeyear period while retaining a 2.5% Net Smelter Royalty (NSR). On June 23, 2020, the Company received \$10,000 on signing of LOI. Subsequently, the Company received 1,500,000 common shares and 3,000,000 special warrants on July 13, 2020 as well as received \$40,000 as per Option Agreement on July 16, 2020. On August 17, 2020, the Company received \$150,000 as exploration advance for the general exploration during the period from July 15 to September 30, 2020. On November 24, 2020, the Company received \$200,000 as exploration advance for the general exploration during the period from October to December 2020. Additionally, the company received \$400,000 as exploration advance for the general exploration during the period from January to April 2021. Please refer to the section of "OPERATIONS" for details.

On December 9, 2020, the Company entered into an option agreement, signing a Definitive Agreement with Upper Canada Inc. ("Upper Canada") whereby Upper Canada could acquire up to 100% undivided interests in the La Silla Property, a silvergold project, by paying \$500,000 in cash, issuing 10,600,000 common shares and incurring exploration expenditures of \$20,000,000 over a four-year period. On September 11, 2020, the Company received 600,000 shares of Upper Canada with a fair market value of \$nil. On December 9, 2020, the Company received additional 5,000,000 common shares as per option agreement. Please refer to the section of "OPERATIONS" for details.

Options and warrants exercise

As of January 28, 2021, the Company issued 125,000 common shares for the exercise of warrants for net proceeds of \$21,250.

As of January 28, 2021, the Company issued 567,500 common shares for the exercise of options for net proceed of \$62,925.

CAPITAL STOCK

As at September 30, 2020, the Company had \$24,961,986 in capital stock and 68,127,131 common shares outstanding.

Shares issued for mineral property

On January 31, 2020, the Company issued 400,000 common shares with a fair value of \$56,000 to Gunpoint in accordance with the letter agreements for the completion of the Cecilia property purchase.

Options and Performance Bonus Shares

Stock option and performance bonus share activity for the year ended September 30, 2020 included the following:

  • (a) 723,000 stock options expired unexercised
  • (b) 1,265,000 options were granted, exercisable at a price of \$0.135 per common share for a period of 5 years.
  • (c) 150,000 options were granted, exercisable at a price of \$0.16 per common share for a period of 5 years.
  • (d) 667,000 options were exercised for net proceed of \$100,561

Stock option and performance bonus share activity for the year ended September 30, 2019 included the following:

  • (a) 140,500 options were forfeited.
  • (b) 785,000 options were granted, exercisable at a price of \$0.17 per common share for a period of 5 years.
  • (c) 265,000 bonus shares issued at a fair value of \$47,700 to certain executive officers and consultants.

Warrants

During the year ended September 30, 2020, the Company issued 4,218,943 common shares for the exercise of warrants for proceeds of \$898,112. As at the year ended September 30, 2020, there was \$13,750 in share subscription receivable for the exercise of warrants.

There were 13,297,932 share purchase warrants outstanding as September 30, 2020 (2019 – 17,516,875).

OPERATIONS

The Company's exploration team remains active in Mexico and Canada. The Company has added four gold projects in Ontario, Canada continuing to cost-effectively build a strong asset portfolio of gold, silver and copper exploration projects. The Company continues to focus on northern and central Mexico where it has exploration partners funding programs that focus on gold, silver and copper and is seeking new partnerships in Ontario, Canada where the company has added projects in the Beardmore Geraldton Greenstone Gold Belt.

Strategic Funding Agreement with BHP in Sonora, Mexico

On May 16, 2019, the Company signed of a two-year, US\$2,000,000 Exploration Financing Agreement with BHP Exploration Chile SpA ("BHP") for the funding of generative exploration in the copper producing belt of Mexico (the "Program"). The Program focuses on identifying and developing exploration opportunities for new large copper discoveries within an Area of Interest ("AOI") using Riverside's technical knowledge base of copper systems and strong generative exploration team strategically based in Hermosillo, Sonora. BHP and Riverside pool their data, including decades of historical work into an integrated database. Riverside leverages geophysical, geochemical and geological technical platforms into a new targeting synthesis to complete tenure acquisitions and this program continues.

BHP will fund US\$1,000,000 on an annual basis for a minimum of two (2) years for generative grass-roots exploration within northeastern Sonora in the region of many copper deposits and some very large copper operations. The exploration area being explored is in the central part of the Laramide Copper Belt that continues northward into Arizona and New Mexico, hosting numerous large, Tier 1 copper deposits. For example, the third largest copper mine in the world, the Buenavista del Cobre Operations in Cananea, is located within the AOI.

Properties that are identified and deemed to be of interest will become Defined Projects ("DPs"), which will move to a second phase of the Program whereby BHP would fund up to an additional US\$5,000,000 of exploration work and make success fee payments to Riverside on a per project basis (see "Exploration Funding Agreement" below).

Exploration Funding Agreement

Overview

The two-year, US\$2,000,000 Exploration Financing Agreement was signed on May 15, 2019. The Program will target projects containing primarily copper, with the objective of advancing quality copper prospects through three (3) distinct stages: Project Generation Phase, Project Operation Phase and Joint Venture Stage.

Project Generation Phase (I)

During the Project Generation Phase, Riverside will act as the operator and earn a monthly fee plus 10% on internal activities and 5% on third party external contractor work with an estimated US\$85,000/month for generative work. Riverside's technical team will carry out generative exploration and work up targets with the aim of moving prospects toward the Project Operation Phase (II).

Project Operation Phase (II)

RIVERSIDE RESOURCES INC. (An Exploration Stage Enterprise)

Management Discussion and Analysis For the year ended September 30, 2020

A prospect that is advanced to the Project Operation Phase will become a DP and will trigger a success fee of US\$200,000 payable to Riverside for each prospect so advanced. Riverside can earn a bonus of an extra US\$200,000 if at least three projects are progressed to DP making a total of US\$800,000 in DP success fees. BHP will fund up to US\$5,000,000 for drilling and further exploration on each DP, having the option to become the operator of such DP. Riverside has the option to contribute between 10% and 20% of the exploration expenditures ("Riverside's Contribution to Expenses") during this phase, with BHP funding the balance (80-90%) should Riverside elect to participate. BHP may discontinue funding with respect to a specific DP at any time in which case Riverside would be entitled to 100% interest in the project and depending on the funds expended to date, BHP may retain a net smelter returns royalty interest.

Joint Venture Stage (III)

BHP may elect to advance a DP to the Joint Venture Stage, at which time title to the project would be transferred to a joint venture company and the parties would enter into a formal joint venture partners' agreement. If Riverside's cash contribution reaches a minimum of 10% in Phase (II), the Company's deemed initial interest in the joint venture company will be 20%. If Riverside's Contribution to Expenses to a DP is less than 10%, Riverside will have no interest in the Joint Venture. For each DP that is advanced to the Joint Venture Stage, Riverside will be entitled to a success fee of US\$1,500,000 if Riverside's Contribution to Expenses to a DP is at least 10% and US\$300,000 if it is less than 10%. At the point of Joint Venture formation, with respect to a DP in which Riverside has at least a 10% interest, (a) Riverside may sell its interest earned as a result of its Contribution to Expenses to BHP at the rate of US\$100,000 for each 1% interest sold; and (b) BHP may purchase the difference between 20% and Riverside's actual Contribution to Expenses at the rate of US\$300,000 for each 1% interest purchased.

Operational Details

A Technical Committee ("TC") will be formed to approve Work Programs and Budgets during Phase (I) and (II). The TC will have two representatives from each of BHP and Riverside with equal voting powers for both groups for DP's operated by Riverside. For DP's operated by BHP, BHP will have the casting vote on the TC.

On January 29, 2020, the Company received an additional US\$195,000 as exploration advances for the refinement exploration from January to March 2020.

On June 22, 2020 Riverside announced the continuation of the Exploration Agreement with BHP Exploration Chile SpA ("BHP") for the funding of generative copper exploration in the copper producing belt of Sonora, Mexico (the "Program"). An increase of funding for the next six months from BHP to the level of providing to Riverside US\$720,000 to commence the first half of the second year of the Program to continue to grow the portfolio of copper projects. This is an increase of US\$220,000 from the initial plan and better captures the interest to progress toward a Defined Project. These funds fully cover the continued generative grass-roots copper exploration and project acquisitions within the Laramide copper belt. BHP will make the following US\$720,000 deposit at the next 6-month mark near the end of this calendar year.

The second year of the program provides BHP-Riverside with an opportunity to push ahead with drill targeting areas, evaluating staked mineral tenures and acquiring and exploring third party properties within the EFA ("Exploration Funding Agreement") framework. The new US\$720,000 generative funds will be supplemented by additional target specific funding based on technical merit that will be able to focus on expanding and de-risking the copper portfolio Riverside and BHP are building together in Sonora, Mexico. This year the program will progress towards drill decisions with provided funding made available towards drill testing.

On June 12, 2020, the Company received US\$720,000 as exploration advances for the generation exploration during the next six months (from July to December 2020) in the second year.

On September 2, 2020, the Company received US\$134,635 as exploration advance for the additional gravity survey project under the first High Value Work Program ("HVWP") for the exploration expenditures incurred from September to November 2020.

On December 16, 2020, the Company received US\$340,855 as exploration advance for the additional MT survey project under the second HVWP for the exploration expenditures incurred from December 2020 to March 2021.

Canada

As of the year ended September 30, 2020, the Company held 100% interest in the Kenora, Longrose, Oakes, Pichette, and Vincent projects in northwestern Ontario, Canada.

Oakes Gold Project, Northwestern Ontario

On July 29, 2019, the Company released news on staking and acquiring the Oakes Gold Project located in northwestern Ontario. Riverside's sampling at the Oakes Project has over time returned high-grade gold surface samples and integration of previous work has developed a series of drill ready targets on this road accessible project near the Trans Canada Highway 17 in the Oakes Township 2 km north of the town of Long Lac, Ontario.

Regional History

The Geraldton region has a long and rich mining history and has produced 4.1 million ounces of gold over the past 100 years including the combined MacLeod-Cockshutt Mine, which produced 1.5 million ounces of gold up to 1970. In December of 2020, the Hardrock Project held by Greenstone Gold Mines was involved in a 4 way transaction that saw Equinox Gold and Orion Finance take over Centerra Gold and Premier Gold Mines positions elevating attention to the area by announcing their intention to mine their gold resource near Geraldton, Ontario. The deposit is fully permitted with good surrounding infrastructure, First Nation benefit agreements in place, and a scalable top-quality project with significant upside. The future mine site contains a large gold reserve of 5.5 million ounces, according to a new and revised mineral calculation. The average head grade is 1.45 grams per tonne through the first five years of a projected 14-year mine life. The development will cost almost \$1 billion to build with an all-in-sustaining cost of \$618 per ounce. The Oakes Project is located 20 kilometers east of the Hardrock Deposit.

Riverside's Exploration Work

Riverside's first phase of work included 29 rock samples taken from both outcrops and old trenches. The 2019/2020 work confirmed three previously identified areas and three additional target zones. There are two predominant target orientations one which trends east-west and is associated with contact zones that have been delineated by VLF (Very Low-Frequency) and IP (Induced Polarization) chargeability geophysical surveys; and a second target zones trend at 340 degrees north-west that is defined by linear magnetic lows, field geology and soil geochemistry. The past magnetic surveys conducted by previous operators is also helpful in outlining diabase dikes and geological contacts where overburden masks the underlying bedrock. Most of the old drill collars could not be located in the field, but sampling of silicified and mineralized outcrop in the general area of the old drill collars returned anomalous (0.5-1.0 g/t) results for gold, suggesting the right geological environment and rationale for the historical drilling. Riverside's sampling program focused on the area of the soil anomalies and trenches conducted by Golden Chalice Resources in 2010-12.

Historical geophysical work appears to show a direct correlation with the WNW trend of the high-grade gold samples taken to date. VLF (Very Low-Frequency) work conducted in the 1990s was used to delineate linear features and outlined geological contacts, faults, and mineralized veins. At Oakes, the VLF anomalies trend east-west at about 100 degrees subparallel to geological contacts. This recent work appears to show that one of two holes drilled in 1993 intercepted the HG zone at a depth of 117 m below the surface showing. Hole (GL-93-2) drilled by Greater Lenora Resources Corp (GLR) in 1993 was located to test a soil geochem anomaly of 880 ppb Au. The hole was collared at dip -45 degrees at an azimuth of 180 degrees and drilled to a total depth of 154.9 m. This hole intersected a semi massive pod (approx. 8.2 m in core length) of pyrrhotite and pyrite (trace chalcopyrite) within a greater volume of quartz veins and silicification with 9 g/t gold assayed over 1.5 m within this 8.2 m interval.

The induced polarization (IP) work was conducted in 2010 following the soil sampling and drilling from the 1990s. The IP work produced a similar geophysical trend to the earlier VLF survey showing a 900 m long chargeability anomaly that aligns with Riverside's surface rock sampling. The geophysical survey work shows that the mineralization may extend both east and west along strike from Trench #1.

HG Target

Trench #1 in particular showed several shears, the largest being 3 m wide and exposed over an 80 m long strike within the trench. Two quartz-carbonate shears were sampled by Riverside in Trench #1. These shears are within mafic volcanic bedrock with sulphide mineralization primarily pyrrhotite and pyrite. Two of the five samples taken from this trench returned 19.7 and 31.9 g/t gold. Another sample 30 m to the east returned 6.9 g/t gold and an additional sample 275 m along trend returned 1 g/t gold. These Riverside samples are on trend with drill hole GL-93-2, drilled by Greater Lenora Resources Corp. in 1993 which returned >3 g/t gold within sheared metavolcanics rocks. Riverside believes this drill intercept and the trench samples demonstrate a 400 m strike length for the HG Target that could extend, based on interpretation of geology and geophysics for 2 km in total strike length, which will be confirmed with follow up field exploration studies. Subsequent mapping and sampling in 2020 indicate that the gold mineralization in Trench #1 likely continues along strike to the east to Trench #3, 600+m to the east. This conclusion is supported through coinciding anomalies in both VLF and IP geophysical surveys.

Brinklow Target

Similar parallel targets were delineated to the south of the more defined HG Target. These zones are oriented roughly east-west and coincident with VLF, IP chargeability and soil geochemistry anomalies. The Brinklow zone may align with the historical hole DDH50-01 which intersected anomalous gold (>3 g/t) within mafic volcanics at only 7.6 m downhole. Bedrock mapping in 2020 indicates that these anomalies coincide with a mostly covered shear within metavolcanic rocks.

Crib Target

The southernmost target roughly parallels the main access Crib Road closer to the southern boundary to the project. This largely geophysical anomaly coincides roughly with the geological boundary between metavolcanic and metasedimentary rocks and partially with a gold-in-soil anomaly. Bedrock mapping in this area in 2020 indicates the structural geology in this area is very complex being juxtaposed to the Croll Lake Stock and older ultramafic rocks. The contacts between the metavolcanic, metasedimentary, ultramafic, and granitic rocks show strong but limited alteration with silicification extending over a larger area.

Two other N-NW trending targets were also identified. One of these targets is identified by historical drill holes #1, #3 and #4, which all returned anomalous gold intercepts >3 g/t gold (OGS, website). One grab sample by Riverside south and on trend from these holes returned anomalous gold (0.7 g/t) and may define another target area. The trend of this zone is the same as another zone identified near the eastern boundary. This 'eastern structure' target is delineated by a strong linear magnetic low, interpreted as a fault, and a large, coincident north-south trending gold in soil anomaly. The bulk of this area is covered by thick organic and swamping ground.

The Third Phase of Oakes Work Reported February 2020:

On February 27, 2020 Riverside reported that the Company has doubled the land tenure at its Oakes Project and that it had reprocessed the geophysical IP data and completed an inversion study. The 2010 IP survey was followed by a trenching campaign that identified three mineralized shears coincident with VLF geophysical anomalies. Bedrock mapping in 2020 focused on traversing along the geophysical anomalies to ascertain the nature and possible reason (source) of the anomalies. In the case of the most defined target, the HG target, fieldwork indicates the IP/VLF anomaly is located on a large shear hosting quartz carbonate veins along the contact between metavolcanic and gabbroic rocks. Similarly, the Brinklow and Crib targets are located within shears at/along major geological contacts, part of the central panel of the Beardmore-Geraldton Greenstone Belt.

Longrose Gold Project, Northwestern Ontario

In February 2020 Riverside integrated the surface geochemistry with structural geology of the known mineralized structures and completed targeting work at the Project. The main shear zones are associated with anticlinal and synclinal hinges and axial planes similar to the near by former mine operations. At Longrose and elsewhere in the district the interbeds of banded iron formation provide a reductant trap for ore fluids and gold where structures cut the banded iron formation. Riverside's mapping at Longrose has been compiled and integrated into GIS which shows that folding is a key control and provides targets for near

RIVERSIDE RESOURCES INC. (An Exploration Stage Enterprise)

Management Discussion and Analysis For the year ended September 30, 2020

term drilling. Mineralization on surface is delineated through mapping and tracing within the subsurface through past drilling in the area along. Fold zones show silicification within the metasedimentary rock similar to that found at the Leitch Mine and more generally in the Greenstone Belts of Ontario.

Integration of historical geophysics indicates a trend of structures subparallel to the strike of geological units generally southwest-northeast which fit regional controls in the belt. Geophysical magnetic lows parallel strong magnetic highs which is mapped as the southern iron formation and provides a target that can be tracked downward to illuminate folding controls. As well, a north-northwest trending low that intersects the magnetic high of the iron formation and another linear magnetic-low features that extend westward from the Leitch Mine provides another drill target on Longrose. Parts of the Longrose area are covered by swampy topographic lows and are believed to be associated with a recessive shear structure, part of the Beardmore Syncline. The drill targets at Longrose focus on the anticlinal hinges, cross structures and larger nonmineralized shears.

At Longrose, mineralized shear zones that host gold comprise sulfides and silicification zones that could be readily identified by a modern IP survey. IP geophysics data could be used in conjunction with the regional and detailed magnetic survey to define the four types of conceptual drilling targets developed by Riverside: (1) Strike-slip fault along which right-lateral displacement has disrupted thick iron formation units; inferred fault follows a regional volcanic-sedimentary contact, a prospective conduit for gold mineralization; (2) Trace of axial plane of westward-closing fold; possible site of shear fault that could host high-grade Au-quartz veining; (3) Trace of inferred shear structure that has evidently caused asymmetric 'drag-fold' defined by iron formation; and (4) Trace of possible shear structure denoted by 'kink' fold in iron formation

Pichette Gold Project, Northwestern Ontario

November 26, 2019, Riverside announced the progression of the Company's Canadian business growth model with the acquisition of the Pichette Gold Project (the "Project") near Jellicoe, part of the Beardmore-Geraldton Greenstone Gold Belt in northwestern Ontario. Pichette marks the third high-grade orogenic gold prospect generated by Riverside in 2019. Fieldwork at Pichette included prospecting, mapping and surface sampling of target regions traceable from regional aeromagnetic data and outcrop mapping. Pichette is located to the east of the former producing Hardrock Gold Mine ("Hardrock").

The Pichette Project is located in the Vincent Township at Nezah and Canadian National Highway 11 about 60 km west of the mining town of Geraldton, Ontario. The Project covers part of the well-endowed Beardmore-Geraldton Greenstone Belt region. The Vincent Township is 28 kilometers east of the Beardmore and the Leitch Mine which produced 850,000 ounces of gold at an average grade of about one ounce per ton[1] .

Riverside's first phase of work included reviewing the historical core and old gold workings in addition to prospecting, mapping and sampling. The recent work confirmed two previously identified gold mineralized areas in addition to new mineralized zones. There are two predominant target orientations on the project one which trends east-west and is associated with large shears related to banded iron formation and contact zones; and a second target trend that strikes at 030 degrees northeast and is defined by cross-cutting faults and/or dikes. Past magnetic surveys have been helpful in outlining banded iron formation, diabase dikes and geological contacts where overburden masks the underlying bedrock. Several of the old drill collars were located and the core from a 1983 diamond drilling campaign was reviewed at the Ministry of Northern Development and Mines core warehouse in Thunder Bay which is available for future review and sampling.

Pichette Targets Updated:

In 2020, additional work on Pichette by Riverside refined the two main areas of gold mineralization along the contact with metasedimentary rocks and banded iron formation. There are several 3m wide shear zones defined by strongly foliated (phyllitic) material which is undrilled and provides immediate targets. At Pichette gold is typically associated with larger folds. These folds plunge gently to the west within larger panels that dip to the south similar to the mineralization noted at the Hardrock Deposit in Geraldton. This similar structural setting at Pichette makes the Hardrock deposit a good analog for target modelling and for further studies.

[1] Ontario Geological Survey – Open File Report 5823

Mexico

Millrock Property Package, Sonora

On June 26, 2019, Riverside announced it had entered into a binding Letter Agreement, signed on June 25, 2019 to purchase a 100% undivided right, title and interest in five (5) projects from Millrock Resources Inc. Los Cuarentas, La Union, El Valle, Llano de Nogal and El Pmia were acquired by Riverside. Of these the priority project initially is Los Cuarentas which was then explored by Riverside and progressed toward a joint-venture spending partnership.

Los Cuarentas Gold-Silver Project

The Los Cuarentas Project is located 170 km northeast of Hermosillo and nearby Silver Crest Metal's Las Chispas Project and Premier Gold's Mercedes mine. Los Cuarentas is a low sulfidation epithermal Au and Ag target characterized by strong argillic and phyllic alteration surrounding low sulfidation epithermal veins that host gold and silver mineralization. Several target zones have been identified and most are ready for drilling such as: Santa Rosalia, Santa Rosalia Sur, El Sombrero and El Chapo.

La Union Gold Project

La Union in western Sonora is part of the orogenic gold belt and has chemistry and geology indicative of high potential new discoveries. The old mining areas have not been drill explored and the broader structures are wide open for further expansion. There are high grade structure for gold and base metals and the district has seen previous mining in this region of western Sonora, Mexico.

El Valle Gold-Silver Project

El Valle is north of Riverside's Ariel porphyry Cu project and is a volcanic related Au-Ag vein system with a large 28-metrewide quartz vein mined during the 1940s (small inlier claim). El Valle is located in northeastern Sonora, 26 km east of the La Caridad Mine operation complex which is Mexico's second largest copper operation and has been producing for over 100 years. This acquisition grows Riverside's tenure and progresses the Company's plan to consolidate the highest quality mineral districts to present to partners for joint venture.

Llano del Nogalo Copper Project

Llano del Nogalo is a series of claims that fit within an area where other companies are active. The porphyry Cu prospecting and nearby drilling has intersected geologically permissive rocks and Riverside will look to form a partnership to consolidate the district.

El Pima

El Pima is a concession inside of the Agnico Eagle owned Santa Gertrudis Mining Complex. Riverside will look to partner or sell the claim. El Pima contains mineralization on the tenement and requires further exploration around the sediment hosted gold mine and many open pits of Agnico Eagle.

Los Cuarentas Gold Project, Sonora, Mexico

On September 11, 2019 Riverside announced that the Millrock acquisition has been completed and summary of recent compilations and new work on the Los Cuarentas Project. Work at Los Cuarentas Project could be expanded from the previous results.

On June 17, 2020, the Company entered into a Definitive Option Agreement (the "Agreement") with Minera Hochschild Mexico, S.A. de C.V. ("Hochschild"), a wholly-owned subsidiary of Hochschild Mining PLC for the Company's 100% owned Los Cuarentas Gold-Silver Project (the "Project"). (please see full transaction details below after the targets summary)

Targets:

Santa Rosalia

The Santa Rosalia target is a mineralized structural zone extending for approximately 1 km (see press release January 20, 2020) and part of the uplifted northern block. The Santa Rosalia "vein zone" is defined as multiple sub-parallel mineralized silicainfilled fractures leading to formation of well-developed veins. Those veins can be seen in well-developed structural zones which could be as large as 8 m wide. The latest sampling program highlighted high-grade samples returning 18 g/t Au in a single 0.5 m wide vein, 2.3 g/t Au in quartz vein floats and 0.5 g/t Au along a 1 m channel sample across the entrance of an adit. Additional observation at Santa Rosalia show shallow, hydrothermal textures such as chalcedony quartz, suggesting most of the system has been preserved and likely extends to depth.

Santa Rosalia Sur

Similar to the Santa Rosalia target, the Santa Rosalia Sur target is part of the uplifted northern block. The latest mapping and sampling program highlighted and confirmed the presence of high-grade gold up to 14.8 g/t Au in hydrothermal breccia that extends 200 meters along strike. Laterally, the stockwork bordering the hydrothermal breccia returned 3 g/t Au. As previously described in the press release of January 20, 2020, the mineralized zone is affected by post-mineral faulting to the north, west and south. Although the mineralized bedrock has been dropped-down to the south, the alteration and lower grade gold (1-3 g/t) mineralization can still be traced for an additional 800 meters to the south along the trend.

El Sombrero

El Sombrero target can be defined as a northwest oriented zone of hydrothermally altered of volcanic package. High temperature alteration mineralogy as well as extensive silicification are primarily located along the El Sombrero structure and extend approximately 10 meters on each side of the fault. This observation makes El Sombrero a priority for deeper testing as it is identified as a possible feeder structure.

El Sombrero Norte

El Sombrero target is mostly covered by post-mineral andesite (see Figure 1 above), however windows of hydrothermal alteration as well as silicified rhyolite dikes indicate that historical samples have been taken along a structural feature, defined now as a new target. This structure is defined as a parallel splay of the Mine fault, which is the main host for the Santa Rosalia high-grade mineralization. Historical samples from Millrock 2017 sampling program returned the highest grade on the property 29.4 g/t Au and another 8.6 g/t Au.

El Sombrerito

El Sombrerito is a new discovery that includes old workings. Historical samples taken by Millrock in 2018 returned up to 16.5 g/t Au and 11 g/t Au from 0.5 m wide stacked veinlets. Mapping identified rhyolite dikes within a thick cover of post-mineral unit. Riverside's geologists defined the area as a new structural target, which shows potential as a parallel splay in between Santa Rosalia Sur and El Sombrero.

Santa Rosalia Norte

Approximately 450 meters to the north of Santa Rosalia additional old workings were discovered. Outcrops show steam-heated alteration mineralogy and the presence of silicified rhyolitic dikes. This area warrants more work to expand the size of the identified mineralized zone.

On January 20, 2020, Riverside reported on rock sampling and field work from the Project. Riverside rock samples from the Santa Rosalia Mine area s returned high grade gold grading greater than 5 g/t Au and up to 25.7 g/t Au and 119.7 g/t Ag (see Table 1). Riverside's exploration team mapped and sampled known historical work areas to validate the accuracy of the highgrade samples collected in the past and to confirm two of the primary targets at Santa Rosalia and Santa Rosalia Sur.

Sample # Au (ppm) Ag (ppm) Target Type Rock
RRI-5779 25.7 4.5 Santa Rosalia dump breccia
RRI-5782 10.2 9 Santa Rosalia select andesite/veinlets
RRI-5789 6.8 65.1 Santa Rosalia Sur 1-m channel sheeted vein
RRI-5784 6.27 119.7 Santa Rosalia float vein/breccia
RRI-5780 5.3 5.6 Santa Rosalia rock chip stockwork
RRI-5790 5.1 75 Santa Rosalia Sur rock chip sheeted vein

Table 1: Six Best Gold Assay Results from Riverside's Selective Sampling at Los Cuarentas

Early 2020 Further work on Cuarentas Targets:

Santa Rosalia

The Santa Rosalia mineralized zone consists of multiple sub-parallel gold-bearing low sulfide quartz veins following an eastwest trend called the Santa Rosalia Mine fault. This fault extends for approximately 1 km where gold values are significant and open. Flexure of the Santa Rosalia Mine fault and fault intersections host high-grade gold bearing veins and breccia shoots. Those well-developed structural zones are typically 1 to >3 m in width and as large as 8 metres in width, where Riverside's sample returned 25.7 g/t Au in vuggy quartz vein and 5.3 g/t Au in the vein-bounded stockwork. The vein material at surface shows evidence of hydrothermal boiling with bladed quartz after calcite.

Santa Rosalia Sur

Santa Rosalia Sur is characterized by a well-defined 800 m long strike structural zone showing evidence of hydrothermal alteration. The mineralized system outcrops on top of a reddish hill with a rhyolite dome similar to key mining districts in Mexico and the structure is a sheeted set of shallow dipping veins hosted in clay altered andesitic to dacitic rocks. The observed mineralization consists of stockwork, hydrothermal breccias and sheeted quartz veins formed by a multistage silica filling with near-boiling level textures such as banded quartz veins and commonly moss and lattice textures.

The mineralization extends at surface for at least 50 metres along a northwestern trend is 30 m in width and demonstrates highgrade gold samples averaging 1.8 g/t Au. Two samples within sheeted veins located 25 metres apart returned 1.9 and 6.8 g/t Au from 1 m channel samples. Historical results returned multiple high-grade samples in the same area up to 14.8 g/t Au. The outcropping vein zone is bounded to the south and to the east by post-mineral faults leading to possible vertical displacement of the mineralized body.

Santa Rosalia Sur encompasses a dozen small old workings. Most of them are located along the northern end of the hill and target high-grade sheeted veins. The extent of the old workings are not currently known.

On April 21, 2020 Riverside report results from the spring 2020 program of rock-chip sampling and target mapping at the Project. Riverside collected channel samples along the primary targets and developed a better understanding of the structural setting identifying two additional vein systems and finding surface exposures with high-grade gold. The new sampling results increase the Company's confidence in the potential for Los Cuarentas project to host a near-surface, high-grade gold vein system.

In addition to the assay results, the Company also completed permitting for drilling and obtained local access agreements with the surface ranch owners enabling the project to move ahead in a positive way in the coming months. The recent sampling program included 31 new rock-chip samples and Riverside geologists took the opportunity to update and create a new geological map. The new assay results show continuity along the principal mineralized zones and included five high-grades gold.

Sample ID Au (g/t) Target Zone Sample Type Rock Type
RRI-6023 18.00 Santa Rosalia rock chip vein
RRI-6010 12.30 Santa Rosalia Sur float vein/breccia
RRI-6014 7.19 Santa Rosalia Sur rock chip breccia/vein
RRI-6012 2.99 Santa Rosalia Sur rock chip andesite/stockwork
RRI-6019 2.29 Santa Rosalia float vein/andesite

Table 1: Top Five of 31 Gold Assay Results from Riverside's Second Sampling Program

Los Cuarentas Option Agreement with Hochschild Mining

On June 24, 2020 Riverside announced that it had entered into a Definitive Option Agreement (the "Agreement") with Minera Hochschild Mexico, S.A. de C.V. ("Hochschild"), a wholly-owned subsidiary of Hochschild Mining PLC for Riverside's 100% owned Los Cuarentas Gold-Silver Project (the "Project"). This Agreement enables the Project to immediately move ahead with a robust exploration program and reflects the belief, by both parties, of the potential for rapid discovery of new gold-silver deposits.

The intention for the program is to move rapidly toward drill testing and build upon the targeting work that Riverside has completed to-date. Los Cuarentas hosts historical mine workings and multiple know veins, multi-gram gold sampling at surface with no known drilling.

Riverside will act as the project operator during at least the first two years of the Agreement, with the option to extend for an additional year at Hochschild's request. As operator, Riverside will be entitled to collect administration fees of 10% on contracts of less than US\$100k and 5% on contracts or more than \$100k and will manage the exploration program.

Transaction Details:

Phase I Earn-In Option:

  • Hochschild paid Riverside US\$90,467 on signing the Agreement and to reimburse Riverside for prepaid maintenance fees;
  • Hochschild to incur expenditures as listed on the table below totaling at least US\$8,000,000 of qualifying exploration expenditures before the fifth anniversary of the effective date of the executed Agreement.
By June 17, 2021 Expenditure of US\$700,000
st anniversary of the Effective Date
1
By June 17, 2022 Expenditure of US\$1,000,000
By June 17, 2023 Expenditure of US\$1,000,000
By June 17, 2024 Expenditure of US\$2,300,000
By June 17, 2025 Expenditure of US\$3,000,000

Table 1: Phase I Earn-In Option (Qualifying Expenditures)

Phase II Earn-In Option:

In order to exercise the Phase II Earn-in Option, Hochschild shall pay for all Qualifying Expenditures incurred during the Phase 1 Earn-In periods and incur an additional US\$3,000,000 plus costs necessary to prepare a Feasibility Study (FS) in accordance with CIM standards before the eighth anniversary of the Effective Date.

June 2025 –
June 2026
Expenditure of US\$1,000,000
June 2026 –
June 2027
Expenditure of US\$1,000,000
June 2027 –
June 2028
Expenditure of US\$1,000,000
Feasibility Study (FS) Undefined Expenditure Amount

Table 2: Phase II Earn-In Option (Qualifying Expenditures)

Upon Hochschild's completion of the Phase II Earn-In and Riverside's acceptance, the parties can form a Joint Venture with Riverside having a 25% interest, and Hochschild having 75% interest. Riverside will have the option to sell its interest in the Project to Hochschild for US\$20,000,000, while retaining a 1% Net Smelter Royalty (NSR).

On October 8, 2020- Riverside announced results from the Cuarentas work program of high grade channel sampling and progressing toward drilling which would start later in October. The channel sampling was highlighted with 3.4m of 9 g/t Au at the Santa Rosalia target area. The Santa Rosalia will be the first and main initial focus for drilling at Cuarentas.

On October 27, 2020- Riverside announced the commencement of a drill program with Hochschild Mining fully funding the testing with 10 initial holes at the Santa Rosalia former mine area. The geology with complex fault structure would be tested with drill centers roughly 100m apart along 400m strike length of the Santa Rosalia vein system and Testarazo Shear Zone which is post-mineral and bounds some of the mineralization.

On December 7, trenching results were announced and summarized with high grade intercepts and complex fault structures exposed as drilling was continuing at the Cuarentas project.

Cecilia Gold Project, Sonora

The Cecilia project is located 40 km southwest of the Mexico-U.S.A. border town of Agua Prieta in Sonora, Mexico and is easily accessed by paved highway and dirt roads. The project is a low sulphidation epithermal Au-Ag rhyolite flow dome complex and is 6,897 ha (69 km2 ) in size. Riverside geologic team has completed mapping of targets on the main claim areas, worked on structural geology targeting for the high grade gold zones and integrated data from the as an on-going effort to complete updated cross sections, systematic targeting and three dimensional modeling.

Option Agreement with Carlyle Commodities

On July 15, 2020 Riverside announced that it has entered into a Definitive Option Agreement (the "Agreement") with Carlyle Commodities Corp ("Carlyle"), for Riverside's 100% owned Cecilia Gold-Silver Project (the "Project"). The Agreement grants Carlyle 100% undivided right, title, and ownership to the Cecilia Project for an aggressive work program, cash payments, shares and special warrants over-time and a 2.5% NSR with Riverside managing as operator. Riverside developed several targets after consolidating claims and expanding the Project further through the Mexican lottery to grow to a consolidated ~80km² full tenure package.

Please see the Transaction Details section below for more information on the Agreement. The planned work program with Carlyle Commodities Corp builds upon previous sampling, mapping, and structural work that the Company completed. The soil lines combined with the 3D modeling of past drill holes and projection of the surface mapped geology to depth begins to develop a range of precious metals targets that can be tested.

The Cecilia Project

In 2017 Riverside consolidated and acquired the Cecilia Gold-Silver Project located in NE Sonora, Mexico near the US/Mexico border. The Cecilia Project is a district scale gold and silver low sulfidation epithermal system centered on multiple mineralized rhyolitic flow-dome complexes. One of the workings at the Cerro Magallanes dome returned high grades up to 133.7 g/t Au and 335 g/t Ag.In addition to the rhyolite domes epithermal type mineralization the underlying sedimentary Cabullona group and Paleozoic limestone provide an additional environment for replacement style mineralization at depth.

Since the acquisition of the Project, Riverside has completed a number of sampling programs with impressive results, it has increased the size of the Project by nearly 10x from the initial size and has recently produced new maps and identified new mineralized zones and targets at Cecilia.

Management Discussion and Analysis For the year ended September 30, 2020

Transaction Details with Carlyle Commodities Corp

Table 1: Option Payment Schedule

Payment Date Cash Payment (\$C) Shares Special Warrants Cumulative
exploration
Expenditures
Upon execution of the LOI \$10,000
(Received)
- - -
Upon Closing \$40,000
(Received)
1,500,000(received) 3,000,000(received)
12 months from Closing \$50,000 - - \$750,000
24 months from Closing \$50,000 - - \$500,000
36 months from Closing \$50,000 - \$1,250,000
TOTAL: \$200,000 1,500,000 3,000,000 \$2,500,000

At Cerro Magallanes, one of the largest and central mineralized centers of the project work defines four main target areas with assay intervals with channel sampling including 305 samples ranging from <0.05 to 19.00 g/t Au. Sampling shows consistent gold from the top of Cerro Magallanes at the San Jose Target northeast along the Agua Prieta-North Breccia Target and through the Central and East Target areas.

Targets on Cerro Magallanes

San Jose (West Area)

The west area of Cerro Magallanes is bisected by a large northwest trending structural zone of up to 60 m wide and hosts more than half a dozen old gold mine workings. Mineralized structures show predominantly silica alteration and commonly dip steeply to the NE with widths of 10-30 m. Sampling by Cambior (1995) within the workings returned 47m @ 1.12 g/t Au along the structural zone, while sampling across the structure by Riverside returned 8m @ 1.50 g/t Au in cross cut #26. The San Jose Target strikes more than 700 m in length and has not yet been drilled, however, historical sampling by Cambior along the structure on surface returned 3 to 9 g/t gold in 2m chip channel samples. These veins show classic epithermal multigenerational opening and filling typical of feeder zones like those at the San Julian Mine in Chihuahua also of the same mid-Tertiary age.

North Breccia

The North Breccia is a wide breccia zone formed along the north margin of the main composite rhyolite dome with historic drill intercepts (Cambior DDH 138-95-08) of 30.4 m @ 1.41 g/t Au). Rock channel sampling by Riverside's returned 10m @ 3.34 g/t Au (both ends remain open).

The North Breccia extends upslope to the southwest more than 600 m merging with the Agua Prieta Zone and intersecting the San Jose NW trending Target Zone at the topographic peak of the dome complex. The North Breccia was historically rock chip channel sampled, returning good gold grades. The intersection of the North Breccia and the San Jose structure remain a top priority for drill testing. At the North Breccia and elsewhere on Cecilia the rhyolite dome is the main host unit where gold mineralization has been predominantly found in the breccia matrix. The North Breccia target is typical of dome margin breccias and is like deposits found in Peru, Bolivia, and Colorado where gold is largely hosted in the matrix. These deposit types are favorable hosts for bulk mining scenarios.

Agua Prieta Target (striking NE)

The Agua Prieta and North Breccia form a somewhat continuous zone of gold-bearing silicified breccia that extends northwest, downslope from its intersection with the San Jose target to mid-slope of Cerro Magallanes. Sampling on the dome margin here shows anomalous values and frequent higher-grade gold zones in silicified and brecciated rhyolitic rock. The new channel sampling has delineated the drill target that lies above the North Breccia. This target begins near surface and extends downward toward the subvolcanic conglomerate and sediments outcropping near the base of Cerro Magallanes. Cerro Magallanes overall appears analogous to the Pitarilla deposit in Durango, Mexico. Pitarilla hosts >500M Oz Ag grading approximately 100 g/t

RIVERSIDE RESOURCES INC. (An Exploration Stage Enterprise) Management Discussion and Analysis For the year ended September 30, 2020

silver. Pitarilla was discovered by the exploration team at Silver Standard (now SSR Mining Inc.), which included Ron Burk, Technical Advisor to Riverside Resources.

The Agua Prieta target has potential to host high-grade structural gold mineralization along the margins of the dome feeder zones and is supported by sampling at the North Breccia Target which returned: 10m @ 3.34 g/t Au and 5m @ 4.04 g/t Au.

Central Target area

The Central Target has undergone small-scale open pit and focused underground mining. Historical underground rock-chip channel sampling by Cambior (1995) in this area returned: 14m @ 2.44 g/t Au. Riverside surface channel sampling on the Central Target returned 3.5m @ 2.7 g/t Au and 11m @ 0.84 g/t Au. Geochemistry sampling by Riverside where prior work largely did not assay for trace elements shows elevated values in Te, As, F, Pb and Mo which is typical within highly magmatically evolved rhyolite domes. This geochemistry is similar to mining camps in Fresnillo, Zacatecas, and Guanajuato in the Mesa Central and Sierra Madre Occidental dome fields.

Old workings on the northern slopes of Cerro Magallanes from the 1950-60s chased near surface high-grade structures but did not explore at depth. These old workings drifted-in along several different orientations near one another suggesting possible bulk tonnage targeting scenarios may exist. Riverside will be working to assess this scenario following the positive results of the rock channel sampling.

Other Target areas on the Cecilia Project include:

East Target area

The East Target comprises high-grade, fault-controlled, Ag-rich veins along the margin of the Puma Dome located east of Cerro Magallanes dome. Gold in chip channel samples by Riverside along the trace of a portion of the fault structures returned 11.5m @ 1.57 g/t Au. Grab samples from dump material in this area returned silver values of up to 200 g/t Ag. The East Target is 200 m lower in elevation than Cerro Magallanes peak and might be showing vertical zoning from gold high on Cerro Magallanes to silver lower down closer to the underlying Cretaceous sedimentary rocks.

Casa de Piedra target

The Casa de Piedra target is east of Cerro Magallanes on the recently added Riverside concession, Cecilia 1. The target zone comprises a 2 km long shear fault vein with abundant epithermal mineralization and textures. Casa de Piedra has not seen any exploration making it a high-profile drill target. This target was first identified through soil geochemistry in June 2018 where anomalous Pb, Cu, Te and Hg were noted. In the field the Casa de Piedra target is defined by a 30 m wide N-NE trending structural corridor of altered Cretaceous clastic sedimentary bedrock. Within the main mineralized structure, widespread sericitic, silica and kaolinitic alteration is common including buddingtonite alteration; buddingtonite being a clay often found in proximity to precious metal veins. The structural zone is infilled with quartz veining, quartz veinlets and stockwork and in some areas banded quartz, vuggy quartz and grey calcite. Textures in outcrop are dominated by intact-banded veins and silicified zones and only minor vein breccias. Transport of the clasts appears to be rotated but with minor displacement; anastomosing breccia veins are common in outcrop.

Later carbonates are noted, and some carbonate appears to be leached from the matrix surrounding the quartz, leaving a stringy, net texture with residue of the Mn-oxides and crustiform quartz. This mineralized structure is cross-cut by northwest-trending rhyolitic dikes that do not appear to influence mineralization. Rock sampling (24) in this area returned one sample that assayed 0.9 g/t Au and also included other elements typical of the upper parts of hydrothermal veins. This shear vein is not unique, a second large vein system, Los Llanos described below.

Los Llanos target

The Los Llanos target is located east of the Casa de Piedra vein shear structure east of the Cerro Magallanes peak. The Los Llanos target was first defined by reconnaissance and soil geochemistry where anomalous Pb, Cu and Zn were noted. In the field the Los Llanos target is defined by a 20-30 m wide structural corridor of altered sandstone presently mapped as being 1 km in strike length and trending northeast. Gold mineralization is found in narrow anastomosing veins sometimes as stockwork but primarily as a silicified zone marked by reddish-brown iron oxides. This corridor also hosts rhyolite dikes which are sometimes parallel to the mineralized zone but also cut the zone. To the best of our understanding no exploration work has been done in this area thus making it a newly discovered vein zone. Some evidence of placer mining was noted in the area suggesting gold may have come from this vein; further exploration work is warranted on the Llanos target.

Cruz Target

The Cruz target lies within a large structural corridor northeast of Cerro Magallanes within horst and graben structural terrain. This large northwest trending regional structure extends tens of kilometers and comes across the northeast portion of the Project, is visible on satellite images, and forms a major structural topographic feature in northeastern Sonora. At the outcrop level, mineralization is noted in veins and stockwork alteration zones of up to 100 meters wide. These zones comprise anastomosing quartz veins with breccia that generally strike N-NE (020) and dip vertical to steeply to the west. Within this 100 m wide zone stockwork show syntaxial and druzzy textures. Gold mineralization is associated with pervasive, widespread sericitic and silica alteration; sulphides are rare but noted in this area. Where these veins cut conglomerate bedrock wide areas of silicified material is noted, two out of seven samples taken from this area returned gold grades of 1.6 g/t and 2.3 g/t Au. These veins continue through the conglomerate into the adjacent granitic bedrock. Geochemistry in this area shows high Pb, Zn and Cu indicating mineralization in the northern portion of the concession may be lower down in a epithermal system.

Cruz II Target

The Cruz II Target is located in the eastern portion of the Cecilia 1 concession. This target is also a structural corridor of silicification and veining currently mapped at about 2 km in strike length. The structure/vein strikes N-NE (020-030) and cuts through several sedimentary geological units varying in width from several meters to 20 m. Mineralized areas include anastomosing, stockwork or parallel veins with breccias; breccia is sometimes rounded but often angular. Terraspec analysis of altered rock shows pervasive silica and sericite alteration with illite in some areas. In hand sample the alteration is dominated by silicification and Fe-oxides. Individual veinlets are up to 30 cm wide with 3 to 5 parallel veins within a larger 20 m corridor. Stockwork veining, where present, is typically orthogonal and made more obvious by the hematitzation of rare pyrite, sphalerite and galena. Two of eleven samples from Riversides first pass of this area returned gold values of 0.5 g/t Au. Rock geochemistry also shows elements typical of a low-sulphidation epithermal system.

On Sept 21, 2020- Riverside provided an update of high grade gold mineralization and exploration work that is filed on SEDAR and was published on the company website and distributed. These results raised the profile of the San Jose zone as a priority with high grade gold near surface and in old workings.

On November 5, 2020- Riverside updated investors and filed information on SEDAR and website about new geophysical induced polarity and drone magnetic airborne survey that was completed on the Cecilia project. This work refined the structural geology and provided insights for potential drill targeting in spring of 2021.

On November 18, 2020 – Riverside updated on the results from channel sampling at the San Jose target area which followed up from the geophysical work announced earlier in the month. With these efforts during the later part of 2020, Riverside poised the project to move ahead with drilling during 2021 with exploration partner Carlyle Commodities Corp providing funding and Riverside being a shareholder of Carlyle.

Tajitos Gold Project, Sonora

Located in north-western Sonora State, Mexico, the Tajitos Gold Project consists of two concession block areas. The core Tajitos claim group and the easterly lying El Tejo group of concessions make up the Project. The Project is strategically situated in the Caborca Orogenic Gold Province which includes the major gold mines at La Herradura, Noche Buena, Chinate and San Francisco Mines among other producers. The core claim at Tajitos covers a number of northwesterly striking gold-bearing quartz veins and shear faults that were exploited by small underground mines, now abandoned but still accessible. Riverside geologists conducted field work on the structural control of gold mineralization recently and the adjacent to the east Mexican gold producer.

The gold mineralization intersected in Riverside drill-holes occurs in fault zones and along lithologic contacts like major mines in the area. Due to the wide spacing of the drill-holes a reliable definition of the strike and dip orientations of the mineralized zones could not be refined yet and further drilling is warranted to better determine the extent and tenor of gold mineralization on the Tajitos property.

In addition to the eight boreholes drilled by Riverside on the Tajitos claim group, a program of reverse circulation drilling on the El Tejo claim group was also completed with partners. Twelve RC holes, totaling 1,728 meters, were drilled at Tejo to probe the bedrock lying beneath an extensive and thick cover of alluvial gravels. This work sets the project on a good position going forward to progress and build upon the geology and geochemistry developed previously. Tajitos in 2020 has seen field work, mapping, Leapfrog modeling, 3D mineralization model study, geochemistry, target work with the geophysics and discussions with parties for the project to progress.

La Silla Gold-Silver Project, Sinaloa

The La Silla Project east of Mazatlan in Sinaloa Mexico is a former mining operating district with high grade silver and gold mineralization on Riverside mineral tenure concessions. The project currently 100% owned and controlled by Riverside has had recent field work and mapping, sampling, targeting completed. Two adjoining concessions totaling 1,031.5 hectares are controlled by Riverside. In addition, another two concessions totaling 1,039.3 hectares make up a second target rich area for the project that Riverside controls. Veins on both concession blocks have been progressed at the Project and can move moved ahead with trenching and then drilling.

At the Ciruela and El Roble prospects rock-chip samples have delivered high grade metals and work in the field continues at these target areas. Riverside conducted data integration, review of geology, geochemistry and considerations for strategic steps during the year. The project continues to have interesting growth target potential.

The Company terminated in January 2020 the previously signed Definitive Agreement from a year earlier January 30, 2019, with Sinaloa Resources Corp. ("Sinaloa") whereby Sinaloa could acquire a 70% interest in the La Silla Property as Riverside had not received payment or required work on the project and the option was ended. Riverside took back control of the project and conducted its own exploration efforts during the year.

On December 9, 2020, the Company entered into an option agreement, signing a Definitive Agreement with Upper Canada Inc. ("Upper Canada") whereby Upper Canada could acquire up to 100% undivided interests in the La Silla Property, a silvergold project, by paying \$500,000 in cash, issuing 10,600,000 common shares and incurring exploration expenditures of \$20,000,000 over a four-year period as follows:

Due Date Cash Common shares Cumulative
exploration
expenditures
Percentage
Earned
September 11, 2020
(signing of LOI)
600,000 (received) - -
December 9, 2020 *\$50,000 5,000,000(received) - -
March 9, 2021 \$50,000 2,500,000 - -
June 9, 2021 \$75,000 2,500,000 - -
December 9, 2021 \$150,000 - \$ 5,000,000 51%
December 9, 2022 \$100,000 - \$2,000,000 60%
December 9, 2023 \$50,000 - \$7,500,000 -
December 9, 2024 \$25,000 - \$5,000,000 100%

*As at Jan 28, 2021, the Company has not received the \$50,000 cash payment and the Company is actively under negotiation with Upper Canada to ensure the Agreement is still in good standing.

Australia (Sandy) Gold Project, Sonora

The Sandy Gold Project is located in NW Sonora, Mexico within the prolific Sonora Megashear Gold Belt.

On March 21, 2019, the Company reported initial results from the Company's first-phase exploration program at the recently staked Sandy Project.

Riverside geologists completed surface sampling, mapping and geophysic interpretation work at the project. The project has potential for gold exploration and is in the prolific mineral belt south of gold mines operated by Fresnillo including the >5Moz Au producer, La Herradura Mine. Sample from old workings returned 38.8 g/t Au. Chip channel samples of 1.5 meter in length returned gold results of 9.3 g/t, 4.7 g/t and 3.7 g/t Au. A total of 71 samples have been analyzed so far and further work at Sandy is anticipated to continue to define the structural nature and intrusion association to the gold.

Higher gold grades appear to be associated with intersecting structures within strongly foliated granitic intrusive bedrock. Primary structures strike NW-SE and dip between 40 and 70 degrees to the east in a general structural character with similar orientation and style to some of the shear zone gold mines in the region. Other smaller faults are noted striking roughly north south and dipping steeply to the east which cut the main shear zone and could possibly hide extensive expansions of the gold system under shallow cover. The cross structures have been intruded by mafic dikes that show pervasive propylitic alteration indicating potential deeper intrusion related gold mineralization. The highest-grade gold material was found associated with a set of variously dipping felsic dikes which could be associated with the intrusive system. Silicification and minor quartz veining is noted associated with the structures and with through-going vein mineralization. The wall rock associated with these structures often shows sericites and silica alteration.

Of note while visiting the property are the vast placer-gold workings immediately north of the project area. The source of the placer gold has not been determined and may be derived from intrusive bedrock within the Sandy project.

Suaqui Verde and Suaqui Grande, Sonora

Riverside developed copper targets on both the Suaqui Verde and Suaqui Grande properties which are near each other and both have copper potential in the copper belt of central Sonora, Mexico. The Company conducted site work and progressed discussions for the district play. Copper growth areas were reviewed, and further work progressed.

The scientific and technical data contained in the property descriptions pertaining to the Company's portfolio were reviewed by Freeman Smith, P.Geo. who is responsible for ensuring that the geologic information provided in this section of the Management Discussion and Analysis is accurate and acts as a "qualified person" under National Instrument 43-101 Standards of Disclosure for Mineral Project.

SELECTED ANNUAL INFORMATION

The following table sets forth selected consolidated information of the Company at September 30, 2020 and for each of the prior two fiscal years prepared in accordance with IFRS. The selected consolidated financial information should be read in conjunction with the audited consolidated financial statements of the Company.

Canadian Dollars 2020 2019 2018
Finance, property and other income \$
108,871
\$
1,348,584
\$
176,702
Net income (loss) 2,631,544 (1,310,831) (1,462,695)
Net income (loss)
per share, basic and fully diluted
0.04 (0.02) (0.03)
Cash and cash equivalent and short-term investments 6,051,890 5,143,379 2,868,824
Total assets 12,211,722 12,341,457 8,869,608

REVIEW OF OPERATIONS AND FINANCIAL RESULTS

Three-month period ended September 30, 2020

For the three months ended September 30, 2020, the Company had a net income of \$2,338,398, resulting in an earning per share of \$0.03. The income was mainly related to a gain on spin out of exploration and evaluation (Penoles) and the recovery of professional fees of \$192,670 in connection with the completion of arrangement with Capitan as well as a realized gain on short-term investments of \$365,449 which were partially offset by the increases in investor relations, general and administration and the unrealized loss on short-term investments. The decreases (recoveries) in the consulting fees, investor relations, professional fees and general and administration as well as the property investigation and evaluation expenses were mainly contributed to the costs of strategic reorganization that the Company had billed back and received all the related spin-out transaction costs after the completion of Capitan's listing on TSX-Venture exchange.

Year ended September 30, 2020

For the year ended September 30, 2020, the Company had a net income of \$2,631,544, resulting in an earning per share of \$0.04. The gain was mainly related to a gain on spin out of exploration and evaluation (Penoles) f \$2,417,283 in connection with the completion of arrangement with Capitan. Besides, the Company recorded finance income of \$39,250, other income of \$69,621 and the unrealized gain on short-term investment of \$1,166,407 mainly due to a significant increase on Arizona Metals Corp. fair market value as at September 30, 2020. During the year-ended September 30, 2020, the Company sold 5,800,000 common shares from Arizona Metal Corp. for net proceed \$1,543,309 and the Company also sold 1,000,000 Silver Viper Mineral Corp. common shares for net proceed \$439,224, therefore, the company overall recognized a realized gain on shortterm investment of \$191,155 on sales of short-term investments. The net income was partially offset by the operating expense of \$1,056,712.

Three-month period ended September 30, 2019

For the three months ended September 30, 2019, the Company had a net loss of \$1,625,043, resulting in a loss per share of \$0.03. The gain was related to finance income of \$15,927, other income of \$331,391 as a result of the Company sold 55,087 common shares from E3 Metals Corp for net proceeds \$23,363 and recognized the gain on Arizona Metal Inc's shares as at the trading date. which were offset by an accrual provision tax penalty of \$1,131,026, an unrealized loss on short-term investment of \$339,689, operating expenses of \$192,599, and a realized loss on short-term investment of \$341,898.

Year ended September 30, 2019

For the year ended September 30, 2019, the Company had a net loss of \$1,310,831, resulting in a loss per share of \$0.02. The gain was related to finance income of \$42,591, other income of \$1,305,993 as a result of the Company received overall 7,300,000 penalty shares from Croesus Gold Corp due to the certain provisions of the agreement, and the Company received 1,000,000 common shares from Sinaloa Resources Corp ("Sinaloa") as per option agreement for La Silla property. Furthermore, there is a gain on debt settlement of \$26,846 which were offset by operating expenses of \$1,015,031, provision tax penalty of \$1,131,026, unrealized loss on short-term investments of \$339,689 a realized loss on short-term investments of \$137,304 and write-off of exploration and evaluation assets \$96,062.

Exploration and evaluation assets

Year ended September 30, 2020

The Company capitalizes all exploration costs relating to its resource interests whereas pre-exploration costs are expensed as incurred. During the year ended September 30, 2020, the Company recorded \$1,244,978 in acquisition and exploration of its properties as follows:

Mexico
o Peñoles \$143,496
o Tajitos \$139,979
o La Silla \$ 61,375
o Australia \$ 21,722
o Ariel \$ 18,379
o Cecilia \$231,805
o Teco \$ 29,436
o Suaqui Verde \$
2,275
o Cuarentas \$168,646
o La Union \$ 46,341
o El Valle, Llano & Pima \$ 2,620
  • Canada
  • o Western Ontario \$ 378,904

The Company acquired a 100% interest in the Australia Project which is made up of two concessions: Sandy and Sandy 2 on February 28 and October 12, 2018 respectively.

The Company acquired a 100% interest in Suaqui Verde Property on December 18, 2018.

The Company acquired a 100% interest in the Oakes, Longnose, Vincent projects in western Ontario, Canada on April 1, 2019. Subsequently, the Company acquired a 100% interest in Kenora project in western Ontario, Canada in July 2020.

On June 24, 2019, the Company entered into a binding letter agreement ("Letter Agreement") with Millrock to acquire a 100% undivided right, title, and interest in five projects, including Los Cuarentas, La Union, El Valle, Llano del Nogalo and El Pima, at a purchase price of \$35,000 cash (paid) and 150,000 common shares (issued at a fair market value of \$24,000). As at September 30, 2020, the Company has officially obtained ownership of the properties of Llano del Nogalo and EI Valle.

On January 31, 2020, the Company paid \$125,000 in cash and issued 400,000 common shares at a fair value of \$56,000 for Cecilia property as per option agreement with Gunpoint Exploration Ltd.

On June 23, 2020, the Company received \$10,000 on signing on the LOI agreement with Carlyle Commodities Corp. Subsequently, the Company entered into a Definitive Option Agreement of Cecilia Project with Carlyle Commodities Corp and received 1,500,000 common shares at a fair value of \$450,000 and 3,000,000 special warrants at a fair value of \$nil on July 13, 2020 as well as \$40,000 option payment on July 15, 2020.

On August 14, 2020, the Company completed the Arrangement and transferred its 100% interest of the gold-silver resource at the Peñoles Project to Capitan as previously mentioned in Note 2. In connection with the Arrangement, the Company recognized a gain on spin-out of Peñoles of \$2,417,283 in consideration for 17,500,000 common shares of Capitan with a value of \$3,500,000. There were \$1,082,717 historical capitalized costs associated with this project transferred to Capitan.

On September 11, 2020, the Company entered into a Letter of Intent ("LOI") and received 600,000 shares at a deemed value at \$nil per share with Upper Canada Mining Inc. ("Upper Canada") whereby Upper Canada could acquire up to 100% interest in La Silla Property.

During the year ended September 30, 2020, the Company terminated the option with Sinaloa Resources Corp. for La Silla property as a result of Sinaloa failed to commit the clauses of the option agreement as at January 28, 2020. Therefore, Sinaloa has not further obligation with respect to La Silla projects.

RIVERSIDE RESOURCES INC.

(An Exploration Stage Enterprise) Management Discussion and Analysis For the year ended September 30, 2020

Year ended September 30, 2019

The Company capitalizes all exploration costs relating to its resource interests whereas pre-exploration costs are expensed as incurred. During the year ended September 30, 2019, the Company recorded \$1,656,823 in acquisition and exploration of its properties as follows:

Mexico

o Peñoles \$ 334,416
o Tajitos \$ 297,764
o La Silla \$ 106,964
o Australia \$
7,832
o Thor \$ 30,717
o Ariel \$ 20,696
o Cecilia \$ 589,745
o Teco \$ 31,849
o Suaqui Verde \$ 24,181
o Cuarentas \$ 68,947
o La Union \$
5,126

Canada
o Western Ontario \$ 138,586

The Company recovered \$141,213 of the acquisition and exploration expenditures for land taxes reimbursement on the Penoles property from the Government of Mexico and the Company also recovered \$139,000 of the acquisition and exploration expenditures through an option agreement with Sinaloa on La Silla property during the year ended September 30, 2019, which reduced the cumulative exploration costs.

The Company acquired a 100% interest in the Australia Project which is made up of two concessions: Sandy and Sandy 2 on February 28 and October 12, 2018, respectively.

The Company acquired a 100% interest in Suaqui Verde Property on December 18, 2018.

The Company acquired a 100% interest in the Oakes, Longnose and Vincent projects in western Ontario, Canada on April 1, 2019.

During the year ended September 30, 2019, the Company terminated the option with the underlying concession holder and has not further obligation with respect to Thor projects. There were \$96,062 historical capitalized costs associated with these projects have been wrote off.

Full particulars of the deferred exploration costs are shown in Note 9 to the Consolidate Financial Statements.

Recoveries and Other Income

Year ended September 30, 2020

Starting from February 2019, the Company agreed to share their office space with First Helium Inc. ("First Helium"), a company with a common officer with the Company. During the year ended September 30, 2020 the Company recognized rental recovery of \$24,000 from First Helium, which was recorded in other income. As well, the Company recognized the exploration equipment and vehicle rentals recovery of \$36,548 from the BHP alliance program. Finance income and other income for the year ended September 30, 2020 were \$39,250 and \$69,621, respectively.

As at September 30, 2020, the Company wrote down the 1,000,000 shares of Sinaloa Resources Corps to its fair market value of \$nil based on the current status of Sinaloa's financial position.

Year ended September 30, 2019

During the year ended September 30, 2019, the Company received recoveries of \$141,213 in cash with respect to the refunds on land taxes on Peñoles property and \$139,000 of the acquisition and exploration expenditures through an option agreement with Sinaloa on La Silla property. Finance income and other income for the year ended September 30, 2019 were \$42,591 and \$1,305,993 respectively.

As at September 30, 2019, the Company had received an additional 4,300,000 shares from Arizona Metal Corp. (formerly Croesus Gold Corp.), a private company, as a result of certain provisions in the agreement with the Company. As a result, the Company recognized \$1,289,993 in other income during the year ended September 30, 2019.

On February 20, 2019, the Company received 1,000,000 shares from Sinaloa Resources Corp. at the fair market value of \$100,000 as per option agreement for La Silla property as exploration recovery.

Other income consists of revenue from receiving option payment by common shares, exploration equipment and vehicle rentals to the alliance and work programs.

Expenses

Year ended September 30, 2020

During the year ended September 30, 2020, the Company incurred \$58,972 in depreciation, \$189,745 in consulting fees, \$36,000 in directors' fees, \$325,198 in investor relations fees, \$95,460 in professional fees, \$228,800 in share-based compensation, and \$155,692 in general and administrative expenses. In addition, the Company incurred \$80,294 in rent. The Company earned \$39,250 in finance income, \$69,621 in other income, and \$2,417,283 gain on sale of mineral property in connection with the completion of strategic reorganization with Capitan, \$1,166,407 in unrealized gain on changes of shortterm investments, \$191,155 in realized gain on sales of short-term investments as well as \$100,000 write-down of short-term investment.

Year ended September 30, 2019

During the year ended September 30, 2019, the Company incurred \$21,701 in depreciation, \$288,237 in consulting fees, \$39,000 in directors' fees, \$246,946 in investor relations fees, \$148,486 in professional fees, \$96,397 in share-based compensation, and \$107,822 in general and administrative expenses. In addition, the Company incurred \$77,392 in rent. The company also recognized the provision tax penalty of \$1,131,026 due to the settlement of taxes liability against with the Government of Mexico. The Company earned \$42,591 in finance income, \$1,305,993 in other income, and \$26,846 gain on debt settlement, offset by \$137,304 realized loss on sale of short-term investments and \$339,689 in unrealized loss on sale of short-term investments.

Compared to the previous year, increases in net income was primarily due to an increase in unrealized gain on short-term investment by \$1,146,096 by recognizing the fair market value of Arizona Metal Corp's common shares as per IFRS 9 Financial Instrument's requirement and the gain in sale of mineral property of \$2,417,283, partially offset by an increase in share-based compensation by \$39,716 and increases in investor relations by \$78,252 and general and administration by \$48,913 with respect to some costs of plan of arrangement .There were no significant variations in other operating expenses over the comparative years.

General and administrative expenses consist of filing fees, director's fees, rent, general office expenses and administrative services related to maintaining the Company's exchange listing and complying with securities regulations. Rent and general office expenses decreased compared to the same period in the prior year as the Company spent less funds on promotional and marketing activities, financial advisory and investor relations services and the Company entered into a new contract of rental agreement of Canadian office, resulting in reduced costs in rent.

Share-based payments increased as a result of more share option grants. During the year ended September 30, 2020, the Company recorded share-based payments of \$228,800 (2019 - \$96,397) for the vested portion of the options granted and during the year. Share-based payments expense recorded in the comparative period of the previous fiscal year was lower as there were less options granted during that year.

RISKS AND UNCERTAINTIES

In conducting its business, the Company faces a number of risks and uncertainties related to the mineral exploration industry. Some of these risk factors include risks associated with land titles, exploration and development, government and environmental regulations, permits and licenses, competition, dependence on key personnel, fluctuating mineral and metal prices, the requirement and ability to raise additional capital through future financings and price volatility of publicly traded securities.

Property Risks

Title to exploration and evaluation asset interests involves certain inherent risks due to the difficulties of determining the validity of certain claims as well as the potential for problems arising from the frequently ambiguous conveyance history of many mineral claims. The Company has investigated title to all of its exploration and evaluation asset interests and, to the best of its knowledge, title to all of its interests are in good standing. The exploration and evaluation asset interests in which the Company has committed to earn an interest are located in Canada, Mexico and the United States.

Title Risks

Although the Company has exercised due diligence with respect to determining title to the properties in which it has a material interest, there is no guarantee that title to such properties will not be challenged or impugned. Third parties may have valid claims underlying portions of the Company's interests, and the permits or tenures may be subject to prior unregistered agreements or transfers or native land claims and title may be affected by undetected defects. If a title defect exists, it is possible that the Company may lose all or part of its interest in the properties to which such defects relate.

Exploration and Development

Resource exploration and development is a highly speculative business, characterized by a number of significant risks including, among other things, unprofitable efforts resulting not only from the failure to discover mineral deposits but also from finding mineral deposits that, though present, are insufficient in quantity and quality to return a profit from production. Substantial expenses are required to establish reserves by drilling, sampling and other techniques and to design and construct mining and processing facilities. Whether a mineral deposit will be commercially viable depends on a number of factors, including the particular attributes of the deposit (i.e. size, grade, access and proximity to infrastructure), financing costs, the cyclical nature of commodity prices and government regulations (including those relating to prices, taxes, currency controls, royalties, land tenure, land use, importing and exporting of minerals, and environmental protection). The effect of these factors or a combination thereof cannot be accurately predicted but could have an adverse impact on the Company.

Environmental Regulations Permits and Licenses

The Company's operations may be subject to environmental regulations promulgated by government agencies from time to time. Environmental legislation provides for restrictions and prohibitions on spills, releases or emissions of various substances produced in association with certain mining industry operations, such as seepage from tailings disposal areas that would result in environmental pollution. A breach of such legislation may result in the imposition of fines and penalties. In addition, certain types of operations require the submission and approval of environmental impact assessments. Environmental legislation is evolving in a manner that means standards are stricter, and enforcement, fines and penalties for noncompliance are more stringent. Environmental assessments of proposed projects carry a heightened degree of responsibility for companies and directors, officers and employees. The cost of compliance with changes in governmental regulations has a potential to reduce the profitability of operations. We intend to comply fully with all environmental regulations.

The current or future operations of the Company, including development activities and commencement of production on our properties, require permits from various federal, state or territorial and local governmental authorities, and such operations are and will be governed by laws and regulations governing prospecting, development, mining, production, exports, taxes, labour

RIVERSIDE RESOURCES INC. (An Exploration Stage Enterprise) Management Discussion and Analysis For the year ended September 30, 2020

standards, occupational health, waste disposal, toxic substances, land use, environmental protection, mine safety and other matters. Such operations and exploration activities are also subject to substantial regulation under applicable laws by governmental agencies that may require that we obtain permits from various governmental agencies. There can be no assurance, however, that all permits that the Company may require for the operations and exploration activities will be obtainable on reasonable terms or on a timely basis or that such laws and regulations will not have an adverse effect on any mining project which the Company might undertake.

Failure to comply with applicable laws, regulations, and permitting requirements may result in enforcement actions thereunder, including orders issued by regulatory or judicial authorities causing operations to cease or be curtailed, and may include corrective measures requiring capital expenditures, installation of additional equipment, or remedial actions. Parties engaged in mining operations may be required to compensate those suffering loss or damage by reason of mining activities and may have civil or criminal fines or penalties imposed for violations of applicable laws or regulations and, in particular, environmental laws.

Competition

The mining industry is intensely competitive in all its phases, and the Company competes with other companies that have greater financial and technical resources. Competition could adversely affect the Company's ability to acquire suitable properties or prospects in the future.

Dependence on Key Personnel

The success of the Company is currently largely dependent on the performance of the directors and officers. There is no assurance that the Company will be able to maintain the services of the directors and officers or other qualified personnel required to operate its business. The loss of the services of these persons could have a material adverse effect on the Company and the prospects.

Fluctuating Mineral and Metal Prices

Factors beyond our control may affect the marketability of metals discovered, if any. Metal prices have fluctuated widely, particularly in recent years. The effect of these factors on the exploration activities cannot be predicted. For example, gold prices are affected by numerous factors beyond the Company's control, including central bank sales, producer hedging activities, the relative exchange rate of the U.S. dollar with other major currencies, global and regional demand and political and economic conditions. Worldwide gold production levels also affect gold prices. In addition, the price of gold has on occasion been subject to rapid short-term changes due to speculative activities.

Future Financings

The Company's continued operation will be dependent upon the ability to generate operating revenues and to procure additional financing. There can be no assurance that any such revenues can be generated or that other financing can be obtained on acceptable terms. Failure to obtain additional financing on a timely basis may cause the Company to postpone development plans, forfeit rights in some or all of the properties or joint ventures or reduce or terminate some or all of the operations.

Price Volatility of Publicly Traded Securities

In recent years, the securities markets in the United States and Canada have experienced a high level of price and volume volatility, and the market prices of securities of many companies have experienced wide fluctuations in price that have not necessarily been related to the operating performance, underlying asset values or prospects of such companies. There can be no assurance that continual fluctuations in price will not occur. It may be anticipated that any quoted market for the Common Shares will be subject to market trends and conditions generally, notwithstanding any potential success of the Corporation in creating revenues, cash flows or earnings. The value of securities distributed hereunder will be affected by market volatility.

Risks Related to COVID-19

In March 2020, the World Health Organization declared COVID-19 a global pandemic. This contagious disease outbreak, which has continued to spread, and any related adverse public health developments, has adversely affected workforces, economies, and financial markets globally, potentially leading to an economic downturn. It is not possible for the Company to predict the duration or magnitude of the adverse results of the outbreak and its effects on the Company's business or ability to raise funds.

The Company continues to closely monitor developments in the novel coronavirus ("COVID-19") pandemic, including the potential impact on the Company's operations.

SUMMARY OF QUARTERLY RESULTS

The following table sets forth selected quarterly consolidated financial information for each of the last eight quarters with the figures for each quarter in Canadian dollars.

Unrealized Earnings (Loss)
gain/(loss) on per share
Property and short-term (basic & fully
Quarter end Finance income other income investments Net income (loss) diluted)
30-Sep-20 2,195 19,987 385,851 2,338,398 0.03
30-Jun-20 1,652 11,077 (561,520) 284,187 0.01
31-Mar-20 22,748 32,557 354,541 (677,235) (0.01)
31-Dec-19 12,655 6,000 (1,345,279) 686,194 0.01
30-Sep-19 15,927 331,391 339,689 (1,625,043) (0.03)
30-Jun-19 16,273 439,666 78,323 80,672 0.00
31-Mar-19 6,868 209,936 186,084 81,900 0.00
31-Dec-18 3,523 325,000 (59,813) 151,640 0.00

During the three months ended September 30, 2020, the net income was primarily due to the Company recognized a gain on spin-out of Penoles of \$2,417,283 in consideration for 17,500,000 common shares of Capitan with a value of \$3,500,000. As well, the sales of 500,000 Arizona Metals Corp's common shares and 1,000,000 Silver Viper Minerals Corp's common shares for recognizing a realized gain on short-term investment of \$365,449.

During the three months ended June 30, 2020, the net income was primarily due to the Company recognized an unrealized gain on short-term investments of \$561,520 that was mainly triggered by a significant increase in the fair market value of Arizona Metals Corp's common shares as at June 30, 2020. As well, the sale of 4,400,000 Arizona Metals Corp's common shares for recognizing a realized gain on short-term investment of \$210,820.

During the three months ended March 31, 2020, the net loss was primarily due to the Company recognized a realized loss on short-term investments of \$354,541 that was mainly triggered by a significant decrease in the fair market value of Arizona Metals Corp's common shares as at March 31, 2020. As well, an increase in the professional fee of \$197,277 as a result of the Company incurred additional legal, accounting and compliance services with respects to the strategic reorganization of its exploration business. Subsequent to the period ended March 31, 2020, the Company billed and received all the related spin out costs in connection with the strategic reorganization was completed on August 14, 2020.

During the three months ended December 31, 2019, the net income was primarily due to the Company recognized an unrealized gain on short-term investments of \$1,345,279 that was mainly triggered by a significant increase on the fair market value of Arizona Metals Corp's common shares as at December 31, 2019.

During the three months ended September 30, 2019, the increase in net loss was primarily due to the Company recognized the provision tax penalty of \$1,131,026 in connection with the lawsuit against with the Government of Mexico. Also, the Company sold all 55,087 shares of E3 Metals Corp for net proceeds \$23,363 and recorded the unrealized loss on short-term investments of \$339,689.

RIVERSIDE RESOURCES INC. (An Exploration Stage Enterprise) Management Discussion and Analysis For the year ended September 30, 2020

During the three months ended June 30, 2019, the increase in property and other income was primarily due to the Company received additional 2,000,000 common shares of Arizona Metals, for a fair market value of \$433,340 as a result of certain provisions in the previous agreement with the Company in 2016.

During the three months ended March 31, 2019, the net income was primarily due to the Company received 1,000,000 shares of Sinaloa, for the fair market value of \$100,000 as per option agreement for La Silla property. The Company also recognized 800,000 shares from Croesus, for the fair market value of \$174,334, as a penalty per the amended option agreement.

During the three months ended December 31, 2018, the net income was primarily due to the Company received 1,500,000 shares of Arizona Metal, for the fair market value of \$325,000, as per the terms of the Sugarloaf Peak option agreement and amending agreement that the Company entered into in December 2014 and 2015, respectively. Croesus issued 1,500,000 common shares to the Company because Arizona Metal did not complete a public listing within 36 months of the amendment date.

LIQUIDITY AND CAPITAL RESOURCES

The Company relies on equity financings and exploration alliances for its working capital requirements and to fund its planned exploration and development activities. Management ensures the Company has sufficient cash in its treasury to maintain underlying option payments and keep claims in good standing. Increase in cash and cash equivalents for the year ended September 30, 2020 was \$1,144,582. Working capital as at September 30, 2020 was \$4,145,690. The Company has sufficient funds to meet ongoing corporate activities and planned exploration programs for the ensuing year.

Increase in cash and cash equivalents for the year ended September 30, 2019 was \$1,383,918. Working capital as at September 30, 2019 was \$3,452,397. The Company has sufficient funds to meet ongoing corporate activities and planned exploration programs for the ensuing year.

OFF-BALANCE SHEET ARRANGEMENTS

The Company has no undisclosed off-balance sheet arrangements or off-balance sheet financing structures in place.

TRANSACTIONS WITH RELATED PARTIES

Related party transactions are in the normal course of operations and are recorded at their exchange amount which is the price agreed to between the Company and the directors and officers.

RIVERSIDE RESOURCES INC.

(An Exploration Stage Enterprise) Management Discussion and Analysis For the year ended September 30, 2020

Payee / Payer Nature of
transactions
Year ending
September 30,
Fees
(Income)
(\$)
Shares
(\$)
Amount payable
(receivable) at year
end (\$)
Arriva Management and 2020 249,997 Nil 7,736
Management Inc. consulting fees (i) 2019 250,440 18,000 45,603
GSBC Financial Management and 2020 96,000 Nil Nil
Management Inc. consulting fees (i) 2019 96,000 9,000 Nil
Alberto Orozco Consulting fees (i) 2020 93,468 Nil Nil
2019 68,750 Nil Nil
Omni Resource Consulting fees (i) 2020 120,000 Nil Nil
Consulting Ltd. 2019 107,500 9,000 16,699
Brian Groves Director fees(ii) 2020 12,000 Nil Nil
2019 12,000 Nil Nil
James Clare Director fees(ii) 2020 Nil Nil Nil
2019 3,000 Nil Nil
Carol Ellis Director fees(ii) 2020 12,000 Nil Nil
2019 12,000 Nil Nil
Walter Henry Director fees(ii) 2020 12,000 Nil Nil
2019 12,000 Nil Nil
First Helium Inc. Rent (iii) 2020 (24,000) Nil (2,100)
2019 (16,000) Nil (16,800)

The Company entered into the following transactions with related parties:

Key management personnel include those persons having authority and responsibility for planning, directing and controlling the activities of the Company as a whole. The Company has determined that key management personnel consist of executive and non-executive members of the Company's Board of Directors and corporate officers. The remuneration of directors and key management personnel during the year ended September 30, 2020 and 2019 are as follows:

2020 2019
Directors' fees (ii) \$
36,000
\$
39,000
Management and consulting fees (i) 559,465 522,690
Performance bonus shares - 36,000
Share-based payments 131,506 66,012
\$
726,971
\$
663,702

(i) Management and consulting fees of the key management personnel for the period were allocated as follows: \$108,000 (2019 - \$108,000) expensed to consulting fees, \$344,068 (2019 - \$414,690) capitalized to exploration and evaluation assets and \$107,397 (2019 - \$nil) capitalized to exploration work performed for alliances that will be reimbursed.

(ii) Starting from January 1, 2019, James Clare, director, agreed not to receive director fees from the Company and waived \$26,846 in amounts owed to him from the Company. As a result, the Company recognized a gain on debt settlement of \$26,846 during the year-ended September 30, 2019.

(iii) Starting from February 2019, the Company agreed to share their office space with First Helium Inc. ("First Helium"), a company with a common officer with the Company. During the year ended September 30, 2020, the Company recognized rental recovery of \$24,000 (2019- \$16,000) from First Helium, which was recorded in other income.

On November 30, 2019, the Company received 300,000 pre-consolidated shares of First Helium Inc. to settle \$21,000 in debt. On September 8, 2020, the Company acquired an additional 472,500 pre-consolidated shares of First Helium Inc. at \$0.04 per share by paying cash of \$18,900.

PROPOSED TRANSACTIONS

Please refer to the "HIGHLIGHTS OF EVENTS OCCURING DURING AND SUBSEQUENT TO SEPTEMBER 30, 2020" note for details regarding the Arrangement.

CRITICAL ACCOUNTING POLICIES AND ESTIMATES

The Company's accounting policies are described in Note 4 to the consolidated financial statements for the year ended September 30, 2020. Management considers the following to be the most critical in understanding the judgments that are involved in preparing the Company's financial statements and the uncertainties that could impact its results of operations, financial condition and future cash flow.

Financial instruments

Financial assets

The Company classifies its financial assets in the following categories: at fair value through profit or loss ("FVTPL"), at fair value through other comprehensive income ("FVTOCI") or at amortized cost. The determination of the classification of financial assets is made at initial recognition. Equity instruments that are held for trading (including all equity derivative instruments) are classified as FVTPL; for other equity instruments, on the day of acquisition the Company can make an irrevocable election (on an instrument-by-instrument basis) to designate them as at FVTOCI.

The Company's accounting policy for each of the categories is as follows:

Financial assets at FVTPL: Financial assets carried at FVTPL are initially recorded at fair value and transaction costs are expensed as incurred. Realized and unrealized gains and losses arising from changes in the fair value of the financial assets held at FVTPL are recognized in profit or loss.

Financial assets at FVTOCI: Investments in equity instruments at FVTOCI are initially recognized at fair value plus transaction costs. Subsequently they are measured at fair value, with gains and losses arising from changes in fair value recognized in other comprehensive income (loss).

Financial assets at amortized cost: A financial asset is measured at amortized cost if the objective of the business model is to hold the financial asset for the collection of contractual cash flows, and the asset's contractual cash flows are comprised solely of payments of principal and interest. They are classified as current assets or non-current assets based on their maturity date and are initially recognized at fair value and subsequently carried at amortized cost less any impairment.

Impairment of financial assets at amortized cost: The Company assesses all information available, including on a forwardlooking basis, the expected credit losses associated with its assets carried at amortized cost. The impairment methodology applied depends on whether there has been a significant increase in credit risk. To assess whether there is a significant increase in credit risk, the Company compares the risk of a default occurring on the asset as at the reporting date, with the risk of default as at the date of initial recognition, based on all information available, and reasonable and supportive forward-looking information.

Financial liabilities

The Company classifies its financial liabilities into one of two categories, depending on the purpose for which the liability was acquired. The Company's accounting policy for each category is as follows:

Fair value through profit or loss - This category comprises derivatives, or liabilities acquired or incurred principally for the purpose of selling or repurchasing it in the near term. They are carried in the statement of financial position at fair value with changes in fair value recognized in profit or loss.

Other financial liabilities - This category comprises liabilities initially recognized at fair value less directly attributable transaction costs. Subsequently, they are measured at amortized cost using the effective interest method.

The following table shows the classification of the Company's financial assets and liabilities:

Financial asset or liability IFRS 9 Classification
Cash and cash equivalents FVTPL
Short-term investments FVTPL
Receivables Amortized cost
Accounts payable and accrued liabilities Amortized cost
Government loan Amortized cost

New Accounting Policies Adopted

IFRS 16 - Leases (new; replaces IAS 17)

On October 1, 2019, the Company adopted IFRS 16, which supersedes IAS 17- Leases ("IAS 17"). The standard provides a single lessee accounting model, requiring lessees to recognize assets and liabilities for all leases unless the lease term is 12 months or less or the underlying asset has a low value. Lessors continue to classify leases as operating or finance, with IFRS 16's approach to lessor accounting substantially unchanged from its predecessor, IAS 17.

IFRS 16 requires lessees to recognize a right of use of asset and a lease obligation at the lease commencement date. The Company has assessed its monthly office rent payments and concluded that it does not meet the definition of a lease in the context of IFRS 16. As such, the adoption of the standard did not have an impact on the Company's consolidated financial statements.

IFRIC 23 - Uncertainty over Income Tax Treatments

On October 1, 2019, the Company adopted IFRIC 23, which is a new standard to clarify the accounting for uncertainties in income taxes. The interpretation provides guidance and clarifies the application of the recognition and measurement criteria in IAS 12 "Income Taxes" when there is uncertainty over income tax treatments. The adoption of this standard did not have a significant impact on the Company's consolidated financial statements.

Financial instruments

Financial instruments measured at fair value are classified into one of three levels in the fair value hierarchy according to the relative reliability of the inputs used to estimate the fair values. The three levels of the fair value hierarchy are:

  • Level 1 Unadjusted quoted prices in active markets for identical assets or liabilities;
  • Level 2 Inputs other than quoted prices that are observable for the asset or liability either directly or indirectly; and
  • Level 3 Inputs that are not based on observable market data.

The fair value of the Company's receivables, accounts payable, accrued liabilities and government loan approximate carrying value, which is the amount recorded on the statements of financial position. The fair value of the Company's other financial instruments, cash and cash equivalents and short-term investments, under the fair value hierarchy are based on level 1 quoted prices in active markets for identical assets and liabilities.

The Company's risk exposures and the impact on the Company's financial instruments are summarized below:

Credit risk

Credit risk is the risk of loss associated with a counterparty's inability to fulfill its payment obligations. The Company's cash and cash equivalents are held with major financial institutions in Canada and Mexico which management believes the risk of loss to be remote. Receivables consist of tax refunds from the Federal Government of Canada and Mexico, in which regular collection occurs, and land tax recovery. The Company believes its credit risk is equal to the carrying value of this balance.

Liquidity risk

The Company's approach to managing liquidity risk is to ensure that it will have sufficient liquidity to meet liabilities when due. As at September 30, 2020, the Company had cash and cash equivalents of \$4,588,578 to settle current liabilities of \$2,626,074. The Company believes it has sufficient funds to meet its current liabilities as they become due.

Interest rate risk

The Company has interest-bearing cash balances. The interest earned on cash balances approximates fair value rates, and the Company is not at a significant risk to fluctuating interest rates. The Company's current policy is to invest excess cash in investment-grade short-term deposit certificates issued by its banking institutions. The Company periodically monitors the investments it makes and is satisfied with the credit ratings of its banks. As of September 30, 2020, the Company had investments in short-term deposit certificates of \$23,000.

Price risk

The Company is exposed to price risk with respect to commodity and equity prices. Equity price risk is defined as the potential adverse impact on the Company's earnings due to movements in individual equity prices or general movements in the level of the stock market. Commodity price risk is defined as the potential adverse impact on profit or loss and economic value due to commodity price movements and volatilities. The Company closely monitors commodity prices of gold, silver and copper, individual equity movements, and the stock market to determine the appropriate course of action to be taken by the Company.

The Company currently maintains short-term investments, which include marketable securities. There can be no assurance that the Company can exit these positions if required, resulting in proceeds approximating the carrying value of these securities.

Foreign currency risk

The Company is exposed to foreign currency risk on fluctuations related to cash and cash equivalents, receivables, and accounts payable and accrued liabilities that are denominated in US dollars (US) and Mexican pesos.

Sensitivity analysis

The Company operates in Mexico and is exposed to risk from changes in the US dollar and the Mexican peso. During the year ended September 30, 2020, a simultaneous 10% fluctuation in the US dollar and Mexican peso against the Canadian dollar would affect loss for the year by \$445,089.

The Company holds marketable securities and is exposed to risk from changes in the share price of the marketable securities. During the year ended September 30, 2020, a simultaneous 15% fluctuation in share prices would affect short-term investments and profit or loss for the year by approximately \$219,497.

OUTSTANDING SHARE DATA

The authorized capital of the Company consists of an unlimited number of common shares and an unlimited number of preferred shares. No preferred shares have been issued to date. An aggregate of 68,819,631 common shares were issued and outstanding as of the date of this MD&A.

RIVERSIDE RESOURCES INC.

(An Exploration Stage Enterprise) Management Discussion and Analysis For the year ended September 30, 2020

The Company has 13,235,432 share purchase warrants outstanding as of the date of this MD&A.

The following summarizes information about the stock options outstanding as of the date of this MD&A:

Expiry date
(mm/dd/yyyy)
Number of
options
outstanding
Weighted average
remaining life
in years
Exercise
price
Number of
options
exercisable
12/16/2021 935,000 0.88 \$
0.32
935,000
11/03/2022 688,000 1.76 \$
0.21
688,000
01/08/2024 560,000 2.95 \$
0.13
585,000
11/15/2024 955,000 3.80 \$
0.11
955,000
03/27/2025 150,000 4.16 \$
0.12
112,500
10/19/2025 1,330,000 4.73 \$
0.30
-
4,618,000 3.08 3,250,500