AI assistant
RIVERSGOLD LIMITED — Capital/Financing Update 2026
Feb 15, 2026
65694_rns_2026-02-15_502d6a67-4ffa-49c2-ad16-31998601e1e5.pdf
Capital/Financing Update
Open in viewerOpens in your device viewer
ASX: RGL Announcement 16 February 2026
==> picture [58 x 35] intentionally omitted <==
Drilling to Commence at Tambourah, Pilbara WA Targeting Known 12km Gold and Copper Trend
Highlights
-
A drilling program to validate and expand historical exploration results has been designed at the Hawkstone Prospect, part of RGL's 100% owned Tambourah Project.
-
The Hawkstone Prospect is in the centre of a 12km gold and copper trend where priority targets contain historical drilling and surface sampling (Figures 2 and 3) with[1] :
-
Drill intercepts including 30.5m at 1.1% Cu; and
-
High-grade rock chip results up to 21.78% Cu and up to 3.6 g/t Au.
-
-
This will mark the first exploration drilling for some 55 years, in an area where the historical drilling was never assayed for gold.
-
Drilling approvals are in place and timing for commencement of drilling is expected to be early March.
David Lenigas, RGL’s Chairman, stated:
“We are very excited to be back on the ground at our Tambourah Project now that the summer exploration hiatus is coming to an end. We have instructed our consultant geological crews to execute our designed drill program and we look forward to testing this large, relatively unexplored, copper and gold trend, which has seen no drilling since the 1970-1971 campaign, some 55 years ago. Historically, our focus here was on the lithium outcrops in the north, however we are very optimistic that this drill program will finally open up Tambourah's significant gold and copper potential. We are aiming to be drilling here in early March."
Riversgold Limited (ASX: RGL, RGLO, “Riversgold” or “the Company”) is pleased to announce that an exploration drilling program, designed to optimally target the anomalous gold and copper trend within the Hawkstone Prospect, is now being finalised at Tambourah and handed to the Company's exploration consultants at Apex Geoscience for imminent execution.
The Project, Figure 1 , is situated ~160km southeast of Port Hedland and comprises three granted tenements (100% RGL) that cover ~110km[2] .
Access to the Tambourah Project is excellent via the Great Northern Highway and the Hillside-Woodstock Road that passes straight through the Project itself.
Strategically, the Project is situated ~100km to the southwest of the 2.4Mtpa CIL Processing Plant at the Warrawoona Gold Project and ~120km east of the Golden Eagle Processing Plant at Nullagine ( Figure 1).
1 Riversgold Limited ASX announcement dated 30 September 2025 - “RGL Identifies New 12km Copper Target at Tambourah”
==> picture [596 x 9] intentionally omitted <==
A: Suite 23, 513 Hay Street, Subiaco WA 6008 P: +61 (8) 6143 6747 E: [email protected] W: www.riversgold.com.au
ASX: RGL Announcement 16 February 2026
==> picture [58 x 35] intentionally omitted <==
==> picture [452 x 643] intentionally omitted <==
Figure 1: Location of the Tambourah Project and Key Infrastructure
==> picture [596 x 9] intentionally omitted <==
A: Suite 23, 513 Hay Street, Subiaco WA 6008 P: +61 (8) 6143 6747 E: [email protected] W: www.riversgold.com.au
ASX: RGL Announcement 16 February 2026
==> picture [58 x 35] intentionally omitted <==
==> picture [559 x 412] intentionally omitted <==
Figure 2: Plan maps of the Tambourah Project illustrating the mineralised gold and copper trends
==> picture [842 x 9] intentionally omitted <==
A: Suite 23, 513 Hay Street, Subiaco WA 6008 P: +61 (8) 6143 6747 E: [email protected] W: www.riversgold.com.au
ASX: RGL Announcement 16 February 2026
==> picture [58 x 35] intentionally omitted <==
==> picture [480 x 379] intentionally omitted <==
Figure 3: Oblique view of the Hawkstone Prospect illustrating the mineralised gold and copper trend
-ENDS-
This announcement has been authorised for release by the Board of Riversgold Ltd.
For further information, please contact:
David Lenigas Executive Chairman P: +44 (0) 7881825378 E: [email protected]
Ed Mead Director P: 0407 445351 E: [email protected]
==> picture [596 x 9] intentionally omitted <==
A: Suite 23, 513 Hay Street, Subiaco WA 6008 P: +61 (8) 6143 6747 E: [email protected] W: www.riversgold.com.au
ASX: RGL Announcement 16 February 2026
==> picture [58 x 35] intentionally omitted <==
Competent Person’s Statement
The Information in this report that relates to exploration results is based on information compiled by Mr Edward Mead, who is a Fellow of the Australasian Institute of Mining and Metallurgy. Mr Mead is a director of Riversgold Limited and a consultant to the Company through Doraleda Pty Ltd. Mr Mead has sufficient experience which is relevant to the style of mineralisation and type of deposits under consideration and to the activity that he is undertaking to qualify as a Competent Person as defined in the 2012 edition of the `Australian Code for Reporting Exploration Results, Mineral Resources and Ore Reserves’ (the JORC Code). Mr Mead consents to the inclusion of this information in the form and context in which it appears in this report. The exploration results were previously reported in accordance with Listing Rule 5.7 on 30 September 2025 and the Company confirms it is not aware of any information that materially changes these results.
==> picture [596 x 9] intentionally omitted <==
A: Suite 23, 513 Hay Street, Subiaco WA 6008 P: +61 (8) 6143 6747 E: [email protected] W: www.riversgold.com.au