DRILLING UPDATE - 64NORTH PROJECT, ALASKA

Summary

  • Hole 20AU003 has been completed on target A6 to a total depth of 615m at the Aurora Prospect

  • The hole was extended beyond the planned depth as favourable geology was intersected

  • The HQ core is currently being logged in Fairbanks and prepared for assay

  • The rig has moved to Target A13NE, adjacent to “Half Ounce Gulch” and commenced drilling

  • Drilling to continue through June and July – with 4 to 6 holes planned (2200m minimum)

  • Geophysical surveys (ZTEM & Magnetics) to commence next week

  • Assay results planned to be released upon program completion

Resolution Minerals Ltd ( RML or Company ) is pleased to provide an update on the second phase of drilling for 2020 is well underway at the compelling Aurora Prospect, West Pogo Block adjacent to Northern Star’s Pogo Gold Mine, Alaska. The first hole was completed on 23 June 2020 to a depth of 615m on Target A6 (Hole ID: 20AU003). The hole intersected the targeted rock type, a paragneiss, which is the same host rock as the Pogo Gold Mine and validated the CSAMT survey data used in targeting the remainder of the holes in this drilling campaign. The drilling was extended beyond the planned depth to adequately test a shear zone intersected at 585m depth.

==> picture [510 x 320] intentionally omitted <==

----- Start of picture text -----

Assays pending
----- End of picture text -----

Figure 1 CSAMT Section Line 6, Aurora Prospect, West Pogo Block.

CAPITAL STRUCTURE

Ordinary Shares Issued 206.4 M

Options and rights Listed options 6.1 M @ 10c Unlisted options 12.3 M @ 25c Unlisted options 13.4 M @ 6c Unlisted rights 7.5 M

==> picture [52 x 23] intentionally omitted <==

----- Start of picture text -----

BOARD
----- End of picture text -----

Performance Shares Len Dean - Chair Class A 9.6 M Duncan Chessell - MD Class B 3.6 M Andrew Shearer - NED Jarek Kopias - Co Sec Last Capital Raise February 2020 - Placement Level 4, 29-31 King William Street $4.5M @ 5c Adelaide SA 5000

==> picture [104 x 77] intentionally omitted <==

ASX RELEASE

The drill rig has now moved to Target A13NE and will continue to test targets as outlined on Figure 5. A decision to complete hole 20AU002 (partially completed in March 2020 before travel restrictions) will be made subject to results from the just completed hole, 20AU003. The geology team is continuing to assess all new results to optimise drill hole locations and maximise use of funds.

Further planned holes A14, A7SSW, A10 A8 on the Aurora Prospect are outlined on Figure 5, and will be tested in order of priority and re-ranking, as results come to hand from ongoing drilling operations. Drill targeting is undertaken by the 64North Project technical team, comprising of Resolution Minerals and project partner Millrock Resources geoscientists and consultants.

Next Drill Hole A13NE

The next drill target, A13NE will test a deeper conductor at 400m-800m depth, which is alongside an interpreted vertical feeder vein. This vertical feeder is likely to be the conduit of mineralised fluids from depth and the source of the high grade rock chips up to 13.85 g/t Au at surface at the “Half Ounce Gulch” gold occurrence. Our exploration targeting model is illustrated on the Pogo Style Mineralisation Model (Figure 3). Historic drill holes MR12-01 azimuth 153º and MR12-02 azimuth 94º drilled at a 45º dip and intersected narrow gold veins up to 1.71g/t Au but did not test the deeper flat lying conductive horizon. RML interprets this conductor to be the same host rock as Pogo (paragneiss) and is highly prospective for Pogo-style gold mineralisation. Interestingly the early exploration holes at the now Pogo Gold Deposit and Mine chased narrow near surface vertical veins, drilling inclined holes missing the flat lying thick and high grade gold deposit at depth. It was only later when explorers returned and pointed the rig near vertical, that the Pogo Gold Deposit was discovered. RML will drill a near vertical hole (A13NE) at an ~80º dip.

==> picture [496 x 337] intentionally omitted <==

Figure 2 CSAMT Line 3 Section with 45º dip historic holes MR12-01 Azimuth 153º and MR12-02 Azimuth 94º were not drilled on same plane as CSAMT (180º) and therefore has not tested the prospective conductive target zone at 400m to 1000m depth.

2

==> picture [104 x 77] intentionally omitted <==

ASX RELEASE

Aurora Prospect

The Aurora Prospect is a large-scale, high priority target zone (2km x 5km), with host rocks, surface geochemistry, structures and geophysical signature that make it a look-alike to the Goodpaster Prospect and Pogo Gold Mine (Figure 6). Drilling is the immediate priority for the Company on the Aurora Prospect.

==> picture [528 x 276] intentionally omitted <==

Figure 3 Pogo Gold Mine mineralisation model, (Larimer 2015).

Pogo-style mineralisation demonstrated

RML released comprehensive information on 14 May 2020 of our first exploration drilling program on the Aurora Prospect. Encouragingly the rock type, quartz veining, intense alteration and elevated arsenic, bismuth and tellurium correlating with gold are all typical of a Pogo-style gold system. Furthermore, the program demonstrated that the geophysical targets correlate with zones of alteration and anomalous gold results, highlighting the large-scale potential of the Aurora Prospect.

Figure 4 Hole ID 20AU001; cut ½ drill core 127.16m to 127.3m quartz veins, arsenopyrite, pyrite(s) in paragneiss. Grade 0.19g/t Au, >10,000ppm As, 9.4ppm Bi, 1.13ppm Te. Demonstrating a Pogo-style mineral system at RML’s Aurora Prospect.

3

==> picture [104 x 77] intentionally omitted <==

ASX RELEASE

==> picture [511 x 319] intentionally omitted <==

Figure 5 Aurora Prospect, West Pogo Block. Completed drill target locations (green dots), incomplete hole (blue dot) and planned further drill holes (orange dots). CSAMT Lines 3 and 6 (dashed black lines) running north-south.

About the 64North Project

The 64North Project is adjacent to Northern Star’s (ASX:NST) Pogo Gold Mine, 120km from Fairbanks, Alaska in the Tintina Gold Province. NST’s operating world class high grade Pogo Gold Mine has an endowment of 10Moz of gold and started production in 2006, producing approximately 300,000oz/year at over 13g/t Au through this time. Recent discovery success has been announced by NST within 450m of our tenement boundary and remains open in all directions at the Goodpaster Prospect. This demonstrates the highly prospective nature of the district and the immediate West Pogo drill targets on RML’s tenements. RML is earning into the project which is owned by Millrock Resources (TSXV:MRO) the details of which were announced 17 October 2019 by the Company.

Resolution is continuing to assess regional prospectivity and is will prioritise a pipeline of drill-ready prospects across the large 660km[2] land package (Figure 9), in parallel with its drilling program at West Pogo.

4

==> picture [104 x 77] intentionally omitted <==

ASX RELEASE

Echo Prospect

RML’s Echo Prospect in the north of the West Pogo Block is directly down dip from the Goodpaster Prospect and will be advanced in June with airborne geophysical surveys. A 200m line spaced ZTEM survey (250 line km) and 100m line spaced magnetics survey (500 line km) will be undertaken to define further drill collar sites. A single line of CSAMT survey data collected in 2019 identified numerous prospective drill targets, on a narrow corridor through the centre of the Echo Prospect. The airborne surveys will be a cost-effective means to widen the zone of potential drill targets. Ground preparation in July will allow RML to be drill ready for August (Figure 6).

Geophysics Survey June 2020

ZTEM (Z-Axis Tipper Electromagnetic System) is a passive electro-magnetic (EM) technique used to map subsurface resistivity and conductivity. ZTEM can penetrate conductive cover (often causing interference in other EM systems) to depths beyond 1km and is excellent for discriminating subtle resistivity contrasts. The heli-borne magnetic data will be used to define the likely structural controls for mineralisation within the prospect areas.

The Goodpaster Prospect and Pogo Gold Mine are structurally controlled, with alteration and associated gold and sulphide mineralised zones expressed as subtle resistivity contrasts (i.e. weakly conductive). Therefore, the combination of close spaced airborne ZTEM and magnetics data, with existing wide spaced ground acquired CSAMT lines will be a very powerful tool for defining drill targets within an IRGS setting. Furthermore, RML is collecting data across neighbouring Northern Star’s (ASX:NST) Goodpaster Prospect to allow for direct comparison with potential targets on RML’s ground (Figure 6).

Geophysics Survey Area June 2020

==> picture [511 x 364] intentionally omitted <==

Figure 6 June ZTEM / Magnetic Survey Area blue polygon outline; 200m line spacing ZTEM and 100m line spaced magnetics.

5

==> picture [104 x 77] intentionally omitted <==

ASX RELEASE

==> picture [466 x 312] intentionally omitted <==

Figure 7 Drill hole 20AU003 nearing completion (inside a bear protection fence), Aurora Prospect June 2020.

==> picture [468 x 313] intentionally omitted <==

Figure 8 Drill pad A13NE prepared ready to drill, June 2020, Half Ounce Gulch gold occurrence, Aurora Prospect 64N Project

6

==> picture [104 x 77] intentionally omitted <==

ASX RELEASE

==> picture [519 x 370] intentionally omitted <==

Figure 9 The 64North Project and neighbours’ tenement location map, June 2020; RML claims in blue, NST in golden yellow.

Resolution Minerals Ltd is a precious and battery metal mineral explorer with its gold focussed flagship 64North Project in Alaska, the Wollogorang Cu-Co Project in Australia (includes the Stanton Cobalt Deposit) and the Snettisham Ti-V-Fe (Magnetite) Project in southern Alaska.

For further information please contact the authorising officer:

Duncan Chessell Managing Director Resolution Minerals Ltd M: +61 414 804 055

E: [email protected]

Follow RML on LinkedIn or Twitter or visit our website www.resolutionminerals.com

==> picture [50 x 40] intentionally omitted <==

==> picture [40 x 40] intentionally omitted <==

This report includes results that have previously been released under JORC 2012 by the Company on 17 October 2019, “Binding agreement earning 80% of Gold Project in Alaska”, “Gold Symposium Conference Presentation” 24 October 2019, “AGM Presentation” 26 November 2019, “Initial Assays Hole 1 - 64North Project, Alaska” 27 April 2020 and “Exploration Update - 64North Project, Alaska” 14 May 2020. The Company is not aware of any new information or data that materially affects the information included in this announcement.

7

==> picture [104 x 77] intentionally omitted <==

==> picture [116 x 13] intentionally omitted <==

----- Start of picture text -----

ASX RELEASE
----- End of picture text -----

JORC Disclosure – historic results restated

These results were previously announced on 24 October 2019 “Gold Symposium Conference Presentation” (as ASX:N27 Northern Cobalt Ltd Resolution’s former Company Name) using a cut off of 1g/t Au (1ppm Au) for significant results shortly after the project was acquired. It is the Company’s view now that a more appropriate cut off grade in this context is 0.5g/t Au for significant intercepts, as detailed below and reflected in the figures elsewhere in this document.

Appendix 1. Summary table of (historic) drill hole details.

Table 1a: Summary of Historic drill intervals from the West Pogo Block, 64North Project, Alaska.

Hole ID Prospect From To Interval Au (g/t)
MR-12-01 Money Rock 51.51 53.04 1.52 0.56
MR-12-01 Money Rock 165.51 166.73 1.22 1.71
MR-12-01 MoneyRock 199.03 200.56 1.52 1.67
MR-12-02 Money Rock 155.08 158.19 3.11 0.51
MR-12-02 MoneyRock 395.33 396.85 1.52 0.53
WP-1 Tourmaline Ridge 83.27 84.19 0.91 0.65
WP-1 Tourmaline Ridge 104.58 105.16 0.58 1.00
WP-1 Tourmaline Ridge 168.95 169.22 0.27 0.67
WP-1 Tourmaline Ridge 169.87 171.91 0.40 1.34
including Tourmaline Ridge 169.87 169.96 0.09 3.18
WP-12-01 Tourmaline Ridge 49.68 51.36 1.68 1.96
WP-12-01 Tourmaline Ridge 243.69 249.33 5.64 1.03
including Tourmaline Ridge 244.45 245.36 0.91 2.56
WP-12-02 Tourmaline Ridge 74.52 77.72 3.20 1.10
including Tourmaline Ridge 75.90 77.72 1.83 1.34
AGGP-1 Anglo Trench 12.60 14.05 1.45 0.61
AGGP-1 Anglo Trench 23.50 26.50 3.00 0.54
AGGP-1 Anglo Trench 32.60 34.20 1.60 1.78
including Anglo Trench 32.60 33.10 0.50 5.26
AGGP-1 Anglo Trench 40.00 41.13 1.13 0.68
AGGP-1 Anglo Trench 50.70 52.00 1.30 0.51
AGGP-1 Anglo Trench 56.20 58.00 1.80 0.50
AGGP-2 Anglo Trench NSI NSI NSI NSI
AGGP-3 Anglo Trench NSI NSI NSI NSI

All results are covered by the accompanying JORC table. These results were previously stated on 24 October 2019 using a cut off of 1g/t Au (1ppm Au) for significant results shortly after the project was acquired.

8

==> picture [104 x 77] intentionally omitted <==

ASX RELEASE

Table 1b: Historic drill collar location for the Money Rock, Tourmaline Ridge and Anglo Trench Prospects, West Pogo Block, 64North Project, Alaska.

Hole ID Easting Northing Elevation Azimuth Dip EOH
Depth
MR-12-01 594703 7149129 680 153 -45 400.51
MR-12-02 594703 7149129 680 94 -45 463.14
WP-1 593714 7148198 1134 335 -45 220.68
WP-12-01 593714 7148198 1134 51 -45 321.56
WP-12-02 594517 7148433 948 327 -45 288.65
AGGP-1 595500 7146685 823 180 -60 188.40
AGGP-2 595585 7147180 640 180 -60 452.80
AGGP-3 595500 7146430 649 180 -60 447.53

Notes for Tables 1a and 1b

  1. An accurate dip and strike and the controls on mineralisation are yet to be determined and the true width of the intercepts is not yet known.

  2. Coordinates are in NAD83, Zone 6.

  3. Elevation and Hole Depth are in metres.

  4. Azimuth is in Degrees Grid North.

  5. Dip is in degrees.

  6. g/t (grams per tonne), ppm (parts per million), ppb (parts per billion), NSI (no significant intercept).

  7. All drilling is NQ diamond core drilling, all of hole is sampled.

  8. Significant results are shown for intercepts >0.5g/t Au with no internal dilution.

Competent Persons Statement

The information in this report that relates to Exploration Targets, Exploration Results, Mineral Resources or Ore Reserves is based on information compiled by Mr Duncan Chessell who is a member of the Australasian Institute of Mining and Metallurgy. Mr Duncan Chessell is a full-time employee of the company and has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Duncan Chessell consents to the inclusion in the report of the matters based on his information in the form in which it is appears and confirms that the data reported as foreign estimates are an accurate representation of the available data and studies of the material mining project. This report includes results that have previously been released under JORC 2012 by the Company on 17 October 2019, “Binding agreement earning 80% of Gold Project in Alaska”, “Gold Symposium Conference Presentation” 24 October 2019, “AGM Presentation” 26 November 2019, “Operations Update at 64North Project, Alaska” 31 March 2020 and “Exploration Update - 64North Project, Alaska” 14 May 2020. The Company is not aware of any new information or data that materially affects the information included in this announcement.

9

==> picture [104 x 77] intentionally omitted <==

ASX RELEASE

Appendix 2. The following tables are provided to ensure compliance with the JORC Code (2012) requirements for the reporting of the exploration results for the 64North Project – Alaska.

Section 1 Sampling Techniques and Data

(Criteria in this section apply to all succeeding sections.)

Criteria JORC Code explanation Commentary Commentary
Sampling Nature and quality of sampling (e.g. cut No drilling or sampling has been
techniques channels, random chips, or specific
specialised industry standard measurement
undertaken by Resolution Minerals
on the historic Money Rock (MR),
tools appropriate to the minerals under Tourmaline Ridge (TR) and Anglo
investigation, such as down hole gamma Trench (AT) Prospects, although
sondes, or handheld XRF instruments, etc.). limited historical drilling and
These examples should not be taken as sampling exists.
limiting the broad meaning of sampling. Historical sampling was undertaken
Include reference to measures taken to using standard industry practices.
ensure sample representivity and the Historical drill hole co-ordinates are
appropriate calibration of any measurement in UTM grid (NAD83 Z6N & NAD27
tools or systems used. Z6N) and have been measured by
Aspects of the determination of mineralisation hand-held GPS with a lateral
that are Material to the Public Report. accuracy of ±4 metres and a vertical
In cases where ‘industry standard’ work has accuracy of ±5 metres.
been done this would be relatively simple Mineralised intersections were
(e.g. ‘reverse circulation drilling was used to encountered, but have not been
obtain 1 m samples from which 3 kg was reported as true widths due to
pulverised to produce a 30 g charge for fire insufficient data spacing and
assay’). In other cases, more explanation may orientation relationship knowledge.
be required, such as where there is coarse Au
that has inherent sampling problems. Unusual
commodities or mineralisation types (e.g.
submarine nodules) may warrant disclosure
of detailed information.
Drilling Drill type (e.g. core, reverse circulation, open- Historic exploration drilling includes:
techniques hole hammer, rotary air blast, auger, Bangka,
sonic, etc.) and details (e.g. core diameter,
Diamond: EA00-01 – 05 (Hyder,
2000), BND01-05 (Western Keltic,
triple or standard tube, depth of diamond tails, 2001), WP-1 & AGGP-01 – 03
face-sampling bit or other type, whether core (AngloGold, 2002), ER03-01 – 06
is oriented and if so, by what method, etc.). (AngloGold, 2003), ER04-07 – 09 &
EA04-01 – 09 (AngloGold, 2004),
CN07002 – 004 , BG07-01, BV07-
01, CN07-01 & BND07-06
(Rimfire/Rubicon, 2007), NH0805 –
07 (Rimfire/Rubicon, 2008), MR-12-
01, MR-12-02, WP-12-01, WP-12-02
(Alix, 2012).
Additional details from historic
drilling are unknown.
Drill sample Method of recording and assessing core and No drilling has been undertaken by
recovery chip sample recoveries and results assessed.
Measures taken to maximise sample recovery

Resolution Minerals on the Money
Rock (MR), Tourmaline Ridge (TR)
and ensure representative nature of the and Anglo Trench (AT) Prospects
samples. following the acquisition of the
Whether a relationship exists between sample project announced on 17 October
2019,although limited historical

10

==> picture [104 x 77] intentionally omitted <==

ASX RELEASE

Criteria JORC Code explanation Commentary Commentary
recovery and grade and whether sample bias drilling exists.
may have occurred due to preferential Additional details from historic
loss/gain of fine/coarse material. drillingare unknown.
Logging Whether core and chip samples have been No drilling has been undertaken by
geologically and geotechnically logged to a Resolution Minerals on the Money
level of detail to support appropriate Mineral Rock (MR), Tourmaline Ridge (TR)
Resource estimation, mining studies and and Anglo Trench (AT) Prospects
metallurgical studies. following the acquisition of the
Whether logging is qualitative or quantitative project announced on 17 October
in nature. Core (or costean, channel, etc.) 2019, although limited historical
photography. drilling exists.
The total length and percentage of the Additional details from historic
relevant intersections logged. drillingare unknown.
Sub- If core, whether cut or sawn and whether No drilling has been undertaken by
sampling
techniques
quarter, half or all core taken.
If non-core, whether riffled, tube sampled,
rotary split, etc. and whether sampled wet or
Resolution Minerals on the Money
Rock (MR), Tourmaline Ridge (TR)
and Anglo Trench (AT) Prospects
and sample
preparation
dry.
For all sample types, the nature, quality and
appropriateness of the sample preparation
following the acquisition of the
project announced on 17 October
2019, although limited historical
technique. drilling exists.
Quality control procedures adopted for all Additional details from historic
sub-sampling stages to maximise drilling are unknown.
representivity of samples.
Measures taken to ensure that the sampling
is representative of the in situ material
collected, including for instance results for
field duplicate/second-half sampling.
Whether sample sizes are appropriate to the
grain size of the material being sampled.
Quality of The nature, quality and appropriateness of No drilling has been undertaken by
assay
and
data the assaying and laboratory procedures used
and whether the technique is considered
partial or total.
Resolution Minerals on the Money
Rock (MR), Tourmaline Ridge (TR)
and Anglo Trench (AT) Prospects
laboratory
tests
For geophysical tools, spectrometers,
handheld XRF instruments, etc., the
parameters used in determining the analysis
following the acquisition of the
project announced on 17 October
2019, although limited historical
including instrument make and model, drilling exists.
reading times, calibrations factors applied and
Additional details from historic
their derivation, etc. drilling are unknown.
Nature of quality control procedures adopted
(e.g. standards, blanks, duplicates, external
laboratory checks) and whether acceptable
levels of accuracy (i.e. lack of bias) and
precision have been established.
Verification The verification of significant intersections by No drilling has been undertaken by
of sampling
and
either independent or alternative company
personnel.
The use of twinned holes.
Resolution Minerals on the Money
Rock (MR), Tourmaline Ridge (TR)
and Anglo Trench (AT) Prospects
assaying Documentation of primary data, data entry
procedures, data verification, data storage
following the acquisition of the
project announced on 17 October
(physical and electronic) protocols. 2019, although limited historical
Discuss any adjustment to assay data. drilling exists.

11

==> picture [104 x 77] intentionally omitted <==

ASX RELEASE

Criteria JORC Code explanation Commentary Commentary
Additional details from historic
drillingare unknown.
Location of Accuracy and quality of surveys used to All maps and locations are in UTM
data points locate drill holes (collar and down-hole
surveys), trenches, mine workings and other
grid (NAD83 Z6N) and have been
measured by hand-held GPS with a
locations used in Mineral Resource lateral accuracy of ±4 metres and a
estimation. vertical accuracy of ±10 metres.
Specification of the grid system used.
Quality and adequacy of topographic control.
Data Data spacing for reporting of Exploration No drilling or sampling has been
spacing and
distribution
Results.
Whether the data spacing, and distribution is
sufficient to establish the degree of geological
undertaken by Resolution Minerals
on the Money Rock (MR),
Tourmaline Ridge (TR) and Anglo
and grade continuity appropriate for the Trench (AT) Prospects following the
Mineral Resource and Ore Reserve acquisition of the project announced
estimation procedure(s) and classifications on 17 October 2019, although
applied. limited historical drilling exists.
Whether sample compositing has been Data spacing is insufficient to
applied. establish the degree of geological
and grade continuity required for a
Mineral Resource estimation.
Orientation Whether the orientation of sampling achieves No drilling has been undertaken by
of data
relation
in
to
unbiased sampling of possible structures and
the extent to which this is known, considering
the deposit type.
Resolution Minerals on the Money
Rock (MR), Tourmaline Ridge (TR)
and Anglo Trench (AT) Prospects
geological
structure
If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to have
following the acquisition of the
project announced on 17 October
2019, although limited historical
introduced a sampling bias, this should be drilling exists.
assessed and reported if material. The relationship between the drilling
orientation and the orientation of key
mineralised structures has not been
confirmed.
Sample The measures taken to ensure sample No drilling has been undertaken by
security security. Resolution Minerals on the Money
Rock (MR), Tourmaline Ridge (TR)
and Anglo Trench (AT) Prospects
following the acquisition of the
project announced on 17 October
2019, although limited historical
drilling exists.
Additional details from historic
drillingare unknown.
Audits or The results of any audits or reviews of No drilling has been undertaken by
reviews sampling techniques and data. Resolution Minerals on the Money
Rock (MR), Tourmaline Ridge (TR)
and Anglo Trench (AT) Prospects
following the acquisition of the
project announced on 17 October
2019, although limited historical
drilling exists.
No review has been undertaken at
this time.

12

==> picture [104 x 77] intentionally omitted <==

ASX RELEASE

Section 2 Reporting of Exploration Results

(Criteria listed in the preceding section also apply to this section.)

Criteria Criteria JORC Code explanation Commentary Commentary
Mineral Type, reference name/number, location and Resolution Minerals Ltd executed a
tenement
and
land
ownership including agreements or material
issues with third parties such as joint
ventures, partnerships, overriding royalties,
binding agreement with Millrock
Resources to acquire, via joint
venture earn-in, up to 80% interest
tenure native title interests, historical sites, of the 64North Project in Alaska
status wilderness or national park and environmental
settings.
(ASX:RML Announcement
16/12/2019).
The security of the tenure held at the time of The total tenement area comprising
reporting along with any known impediments the 64North Project consists of
to obtaining a licence to operate in the area. 1176 State of Alaska claims
(66,050 hectares).
The 64North Project is located
approximately 120km east of
Fairbanks.
The tenure is in good standing and
no known impediments exist.
Exploration
done
by
Acknowledgment and appraisal of exploration
by other parties.


Previous exploration work
includes;
Surface Geochemical Sampling:
other parties Pan concentrates, fine silts, silts,
soils & rock chips. Airborne
Geophysics: EM, LiDAR,
Radiometric & Magnetics.
Ground Geophysics: Magnetics,
Radio-metrics, EM, VLF-EM,
NSAMT & CSAMT.
Exploration Drilling: 46 Diamond.
Geology Deposit type, geological setting and style of Resolution Minerals Ltd is primarily
mineralisation. exploring for Intrusion Related Gold
mineralisation (e.g. Pogo-style)
within the Yukon-Tanana Terrane
of the northernCordillera,Alaska.
Drill hole A summary of all information material to the No drilling has been undertaken by
Information understanding of the exploration results
including a tabulation of the following
Resolution Minerals on the Money
Rock (MR), Tourmaline Ridge (TR)
information for all Material drill holes: and Anglo Trench (AT) Prospects
o easting and northing of the drill hole collar following the acquisition of the
o elevation or RL (Reduced Level – project announced on 17 October
elevation above sea level in metres) of the 2019, although limited historical
drill hole collar drilling exists.
o dip and azimuth of the hole See Appendix 1 summary table of
o down hole length and interception depth historic drill hole results.
o hole length. An accurate dip and strike and the
If the exclusion of this information is justified controls on mineralisation are yet
on the basis that the information is not to be determined and the true
Material and this exclusion does not detract width of the intercepts is not yet
from the understanding of the report, the known.
Competent Person should clearly explain why

13

==> picture [104 x 77] intentionally omitted <==

ASX RELEASE

Criteria Criteria JORC Code explanation Commentary Commentary
this is the case.
Data In reporting Exploration Results, weighting No drilling has been undertaken by
aggregation
methods
averaging techniques, maximum and/or
minimum grade truncations (e.g. cutting of
high grades) and cut-off grades are usually
Resolution Minerals on the Money
Rock (MR), Tourmaline Ridge (TR)
and Anglo Trench (AT) Prospects
Material and should be stated. following the acquisition of the
Where aggregate intercepts incorporate short project announced on 17 October
lengths of high-grade results and longer 2019, although limited historical
lengths of low-grade results, the procedure drilling exists.
used for such aggregation should be stated Historic sample length weighted
and some typical examples of such averaging was used to calculate
aggregations should be shown in detail. the historic aggregated intervals of
The assumptions used for any reporting of significant mineralisation. A cut off
metal equivalent values should be clearly of 0.5 g/t Au has been applied for
stated. significant intersections. No top cut
has been applied. No internal
dilution has been applied.
No metal equivalents have been
used.
Relationship These relationships are particularly important No drilling has been undertaken by
between
mineralisati
in the reporting of Exploration Results.
If the geometry of the mineralisation with
respect to the drill hole angle is known, its
Resolution Minerals on the Money
Rock (MR), Tourmaline Ridge (TR)
and Anglo Trench (AT) Prospects
on widths nature should be reported. following the acquisition of the
and If it is not known and only the down hole
lengths are reported, there should be a clear
project announced on 17 October
2019, although limited historical
intercept statement to this effect (e.g. ‘down hole drilling exists.
lengths length, true width not known’). Historic down hole length has been
reported, as true width is not
known, as insufficient work has
been undertaken to understand the
true width of intervals.
“Down hole length, true width not
known” is stated in the notes to
Table 1a.
Diagrams Appropriate maps and sections (with scales) No drilling has been undertaken by
and tabulations of intercepts should be Resolution Minerals on the Money
included for any significant discovery being Rock (MR), Tourmaline Ridge (TR)
reported These should include, but not be and Anglo Trench (AT) Prospects
limited to a plan view of drill hole collar following the acquisition of the
locations and appropriate sectional views. project announced on 17 October
2019, although limited historical
drilling exists.
Plan view of historic drill collar
locations have been included in the
body of this report.
A cross section for the two MR
(Money Rock) drill holes has been
provided but is not provided for
Anglo Trench (AT) and Tourmaline
Ridge (TR) Prospects at this stage
as not material to this
announcement.

14

==> picture [104 x 77] intentionally omitted <==

ASX RELEASE

Criteria JORC Code explanation Commentary Commentary
Balanced Where comprehensive reporting of all No drilling has been undertaken by
reporting Exploration Results is not practicable,
representative reporting of both low and high
Resolution Minerals on the Money
Rock (MR), Tourmaline Ridge (TR)
grades and/or widths should be practiced to and Anglo Trench (AT) Prospects
avoid misleading reporting of Exploration following the acquisition of the
Results. project announced on 17 October
2019, although limited historical
drilling exists.
The reporting is considered
balanced.
Comprehensive reporting of all
drilling, trench, soil samples has
occurred in historical reports and
reported when appropriate here.
Other Other exploration data, if meaningful and No other substantive exploration
substantive
exploration
material, should be reported including (but not
limited to): geological observations;
geophysical survey results; geochemical
data has been collected on the
Money Rock (MR), Tourmaline
Ridge (TR) and Anglo Trench (AT)
data survey results; bulk samples – size and Prospects by Resolution Minerals.
method of treatment; metallurgical test Millrock Resources completed a
results; bulk density, groundwater, CSAMT survey. See TSX.V: MRO
geotechnical and rock characteristics; announcement, released on the
potential deleterious or contaminating 9/10/2019 for details.
substances.
Further The nature and scale of planned further work A range of exploration techniques
work (e.g. tests for lateral extensions or depth
extensions or large-scale step-out drilling).
are being considered to progress
exploration including drilling.
Diagrams clearly highlighting the areas of The Company has commenced
possible extensions, including the main drilling a HQ Diamond Core hole
geological interpretations and future drilling close to the historic Money Rock
areas, provided this information is not Prospect (MR) drill holes as
commercially sensitive. indicated in figures in this release.

15