Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

RESOLUTION MINERALS LTD Capital/Financing Update 2018

Feb 4, 2018

65717_rns_2018-02-04_aebb598a-a8ff-46e5-a550-8032f34f997d.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

5 Februar 2018 y

ASX RELEASE

ASX: N27, N27O

FINAL 2017 RC DRILLING RESULTS

  • Step out drilling at Stanton cobalt resource confirms mineralisation open to south-east and north-west

  • Highlights include

  • 19 metres at 0.29% cobalt (Co) on southern extension to Stanton ResourceIncluding 1 metre @ 1.31% Co

  • 5 metres a 0.19% Co

  • 2 metres at 0.19% Co

  • Results from scout drillholes on regional targets to be combined with recent geophysics to define drilling planned in 2018.

  • Potential for up to 6 (six) Stanton style cobalt deposits at Running Creek, east of Running Creek, Stanton 2, Stanton 3, Archangel, and north of Stanton from regional results

  • Diamond drilling results due late March 2018

N27’s Wollogorang Cobalt Project is a sediment hosted cobalt mineralisation system which has potential for low CAPEX and OPEX options due to:

  • Non-refractory mineralisation (predominantly siegenite - a cobalt sulphide mineral)

  • Cobalt dominant mineralisation occurs from surface

  • Flat lying sediment hosted mineralisation - likely suitable for open pit operations

Stanton Cobalt Deposit

Northern Cobalt has drilled 70 RC and 10 diamond core holes on our existing Stanton Cobalt resource, aiming to upgrade the existing inferred Mineral Resource of 500,000 tonnes of 0.17% Co, 0.09% Ni, 0.11% Cu, and obtain material for metallurgy studies and use in scoping studies.

– WEBINAR Q&A with our Managing Director at 2PM TODAY (Melbourne time) register here…

CAPITAL STRUCTURE

Ordinary Shares Issued 38.9M

Options

Listed 7.4 M @ 20c Unlisted 12.3 M @ 25c

Performance Shares Class A 9.6 M Class B 3.6 M

Last Capital Raise 20 Sept 2017 $4.2M @ 20c (IPO)

BOARD

Len Dean - Chair Michael Schwarz - MD Duncan Chessell - Exec Dir Andrew Shearer - NED Jarek Kopias - Co Sec

WWW.NORTHERNCOBALT.COM.AU

EMAIL US

67 GOODWOOD ROAD WAYVILLE SA 5034 AUSTRALIA

ASX: N27, N27O

Figure 1. Recent and historical drilling over RTP 1VD magnetic image, Stanton Cobalt Deposit

Significant intersections from drilling at the Stanton Cobalt Deposit include:

  • 4 metres at 0.11% Co from 80 metres (Drill hole NC17RC057)

  • 5 metres at 0.19% Co from 5 metres (Drill hole NC17RC126) and

  • 19 metres at 0.29% Co from 11 metres (Drill hole NC17RC126); including o 1 metre of 1.31% Co

  • 2 metres at 0.19% Co from 1m, (Drill hole NC17RC127)

Importantly these results confirm that the Stanton Cobalt Deposit remains open to the south-east and north-west. A significant continuation of the magnetic low (purple area, Figure 1) occurs to the north-east of the currently defined mineralisation. This signature is associated with mineralisation at Stanton and indicates the significant potential for extensions of the resource in this direction.

2

ASX: N27, N27O

Figure 2. Modelled near surface cobalt distribution at the Stanton Cobalt Deposit

Regional cobalt potential

Prior to the onset of the wet season Northern Cobalt completed 57 drill holes on a broad spacing across a limited number of the previously identified targets. The spacing between most of the holes was ~100m, infill drilling was not possible due to the onset of the wet season. It is worth noting that the Stanton Deposit currently has a diameter of ~200m and that the spacing of the scout drilling will need to be infilled to best test the targets. Results from the regional drilling will be combined with the new geophysical and geochemical methods defined by Northern Cobalt to target the planned drilling in 2018.

Northern Cobalt has identified 6 (six) prospects, from recent and historical regional drilling, that have the potential to host cobalt mineralisation like the Stanton Cobalt Deposit. A further 15 targets were not tested last year due to the onset of the wet season.

3

ASX: N27, N27O

==> picture [479 x 435] intentionally omitted <==

----- Start of picture text -----

Figure 3. Comparison of cobalt distribution at the
Stanton Cobalt Deposit with regional drill holes
----- End of picture text -----

Please note: The “Stanton cobalt halo” overlain at other prospects is meant to demonstrate the potential for similar mineralisation and does not represent a drilled resource

Figure 2, shows the distribution of near surface cobalt at Stanton modelled from drilling. Regional drill holes with cobalt intersections above 500 ppm have been identified and compared with the distribution of cobalt at Stanton (Figure 3). The diagram shows that drill holes at Stanton 2 and Stanton 3 prospects both have numerous intersections above 500ppm cobalt and have the potential to define a mineralising system on the scale of Stanton. Drill holes at Running Creek, east of Running Creek, Archangel and to the north of Stanton also have this potential. The company is currently incorporating this information into the upcoming drill program early this year.

4

ASX: N27, N27O

Next steps

Northern Cobalt is in the process of finalising drill targets and submitting documentation for drilling approvals for the upcoming drilling program early this year. The company has also purchased a portable XRF device which specialises in the direct detection of cobalt in surface and drilling samples. An extensive research and development program of testing and validation against recent drill samples and analyses will be undertaken prior to deployment in the field. This device will allow analysis of drill samples as they are collected and immediate detection of mineralisation as drilling progresses as opposed to the >1 month turn around for sample analysis in the previous drilling program.

Competent Person’s Statement

The information in this report that relates to Exploration Targets, Exploration Results, Mineral Resources or Ore Reserves is based on information compiled by Mr Michael Schwarz who is a member of the Australian Institute of Geoscientists. Mr Michael Schwarz is a full-time employee of the company and has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Michael Schwarz consents to the inclusion in the report of the matters based on his information in the form in which it is appears.

This report contains historical exploration results announced on 20 September 2017 as “Prospectus” (historical estimate). The Company confirms it is not in possession of any new information or data relating to the historical estimate that materially impacts on the reliability of the estimates or the Company’s ability to verify the historical estimate. Supporting information provided in the announcement of 20 September 2017 continues to apply and has not materially changed. This report also contains exploration results announced on 24 November 2017 as “High Grade First Drill Results - Stanton Cobalt Deposit”, and 29 November 2017 as “Further High-Grade Cobalt Results - Stanton Cobalt Deposit”, on 7 December 2017 “Stanton Cobalt Resource Remains Open in Multiple Directions”

5

ASX: N27, N27O

==> picture [393 x 347] intentionally omitted <==

----- Start of picture text -----

Location of Northern Cobalt’s projects
----- End of picture text -----

Project Location

The Wollogorang Cobalt Project occurs in the far north-eastern corner of the Northern Territory, a mining friendly jurisdiction. The Project area is 180 km to the south-east of the population centre of Borroloola. The capital city of Darwin is 870 km to the north-west and the McArthur River Mine is approximately 150 km to the west-northwest.

For further information please contact: Michael Schwarz Managing Director, Northern Cobalt Ltd M: +61 402 101 790 E: [email protected]

Please sign up to our newsletter via our website for invitations to webinars and important announcements www.northerncobalt.com.au

6

Appendix 1. Significant intersections from drill holes – Stanton Cobalt Resource

Note: Significant intercepts reported using a cut-off grade of 0.05 % Co (500ppm) with maximum internal dilution of 2m of average 0.02% Co (200ppm)

Hole_ID Prospect Easting Northing RL Dip Azimuth Total Intercept Intercept Interval (m) Co (%) Cu (%) Ni (%)
(MGAZ53)
(MGAZ53)
(MGAZ53) (mag) depth (m)
From (m)
To (m)
NC17RC001
Stanton
793620
8148511
75.7 -90
360
100
2
6 4 0.05 0.05 0.03
20 22 2 0.05 0.33 0.03
NC17RC002
Stanton
793620
8148490
75.9 -90
360
100
10
14 4 0.05 0.06 0.03
70 86 16 0.10 0.09 0.06
NC17RC003
Stanton
793620
8148470
76.1 -90
360
100
5
12 7 0.15 0.24 0.10
15 16 1 0.19 0.24 0.11
19 20 1 0.12 0.27 0.17
22 23 1 0.05 0.13 0.03
25 62 37 0.28 0.12 0.16
NC17RC004
Stanton
793620
8148450
76.3 -90
360
100
0
14 14 0.11 0.18 0.06
20 50 30 0.17 0.07 0.11
including 34 44 10 0.33 0.10 0.17
55 56 1 0.18 0.00 0.01
NC17RC005
Stanton
793620
8148430
76.4 -90
360
100
5
9 4 0.08 0.27 0.04
13 15 2 0.14 0.41 0.05
17 20 3 0.08 0.10 0.06
22 28 6 0.11 0.09 0.06
32 50 18 0.33 0.07 0.08
including 32 33 1 2.13 0.15 0.18
and 44 45 1 1.50 0.15 0.17
54 55 1 0.08 0.00 0.01
NC17RC005
Stanton
793620
8148430
76.4 -90
360
100
64
68 4 0.08 0.00 0.01
72 80 8 0.15 0.01 0.03
NC17RC006
Stanton
793620
8148410
76.6 -90
360
100
1
10 9 0.25 0.14 0.06
12 19 7 0.12 0.08 0.08
Hole_ID Prospect Easting Northing RL Dip Azimuth Total Intercept Intercept Interval (m) Co (%) Cu (%) Ni (%)
(MGAZ53)
(MGAZ53)
(MGAZ53) (mag) depth (m)
From (m)
To (m)
20 23 3 0.09 0.02 0.04
NC17RC007
Stanton
793600
8148390
77.4 -90
360
91
6
7 1 0.07 0.18 0.03
NC17RC008
Stanton
793600
8148410
77.0 -90
360
96
33
34 1 0.21 0.01 0.15
76 77 1 0.13 0.11 0.06
NC17RC009
Stanton
793600
8148430
76.7 -90
360
100
12
13 1 0.07 0.05 0.02
15 18 3 0.10 0.23 0.05
19 20 1 0.05 0.04 0.03
23 35 12 0.15 0.03 0.06
38 45 7 0.23 0.64 0.14
72 80 8 0.11 0.13 0.06
NC17RC010
Stanton
793599
8148450
76.4 -90
360
100
3
4 1 0.14 1.62 0.03
20 26 6 0.15 0.08 0.08
27 28 1 0.05 0.10 0.05
31 39 8 0.12 0.00 0.02
40 41 1 0.09 0.00 0.01
66 67 1 0.07 0.10 0.03
69 70 1 0.08 0.01 0.03
73 83 10 0.15 0.33 0.08
NC17RC011
Stanton
793600
8148470
76.2 -90
360
100
9
13 4 0.08 0.16 0.04
23 24 1 0.06 0.17 0.03
26 27 1 0.07 0.12 0.05
34 35 1 0.06 0.00 0.01
44 45 1 0.06 0.00 0.00
66 67 1 0.05 0.03 0.02
69 84 15 0.21 0.63 0.12
NC17RC012
Stanton
793600
8148490
76.1 -90
360
100
25
26 1 0.05 0.32 0.03
84 88 4 0.05 0.02 0.02
NC17RC013
Stanton
793600
8148510
76.1 -90
360
100
87
88 1 0.10 0.02 0.01
NC17RC014
Stanton
793580
8148470
76.6 -90
360
100
74
82 8 0.09 0.05 0.05

8

Hole_ID Prospect Easting Northing RL Dip Azimuth Total Intercept Intercept Interval (m) Co (%) Cu (%) Ni (%)
(MGAZ53)
(MGAZ53)
(MGAZ53) (mag) depth (m)
From (m)
To (m)
NC17RC015
Stanton
793580
8148450
76.7 -90
360
100
80
84 4 0.13 0.12 0.05
NC17RC016
Stanton
793580
8148430
76.9 -90
360
100 No significant intersection
NC17RC017
Stanton
793580
8148410
77.3 -90
360
100
10
14 4 0.05 0.11 0.02
NC17RC018
Stanton
793640
8148410
76.3 -90
360
100
3
9 6 0.40 0.28 0.04
including 4 5 1 1.10 0.26 0.07
12 17 5 0.20 0.10 0.09
20 24 4 0.07 0.03 0.04
27 30 3 0.49 0.09 0.20
NC17RC019
Stanton
793640
8148430
76.1 -90
360
100
0
2 2 0.12 0.13 0.03
4 6 2 0.20 0.78 0.03
27 28 1 0.08 0.07 0.04
32 35 3 0.14 0.08 0.04
41 46 5 0.14 0.06 0.07
NC17RC020
Stanton
793640
8148450
76.1 -90
360
100
1
6 5 0.16 0.34 0.05
10 15 5 0.37 0.94 0.11
21 22 1 0.17 0.18 0.03
25 26 1 0.10 0.13 0.02
40 41 1 0.06 0.11 0.03
42 53 11 0.19 0.20 0.07
NC17RC021
Stanton
793640
8148470
76.0 -90
360
100
5
14 9 0.35 0.19 0.09
including 8 9 1 1.10 0.16 0.06
16 23 7 0.29 0.19 0.11
27 47 20 0.31 0.10 0.16
NC17RC022
Stanton
793640
8148490
75.7 -90
360
100
0
2 2 0.18 0.11 0.02
16 23 7 0.11 0.05 0.05
75 83 8 0.10 0.03 0.06
NC17RC023
Stanton
793640
8148510
75.5 -90
360
100
17
21 4 0.06 0.13 0.04
76 81 5 0.17 0.18 0.08
NC17RC024
Stanton
793660
8148560
74.8 -90
360
100 No significant intersection

9

Hole_ID Prospect Easting Northing RL Dip Azimuth Total Intercept Intercept Interval (m) Co (%) Cu (%) Ni (%)
(MGAZ53)
(MGAZ53)
(MGAZ53) (mag) depth (m)
From (m)
To (m)
NC17RC025
Stanton
793660
8148530
75.1 -90
360
100
0
1 1 0.06 0.06 0.02
68 69 1 0.06 0.04 0.03
75 76 1 0.06 0.18 0.03
NC17RC026
Stanton
793661
8148510
75.2 -90
360
100
0
9 9 0.07 0.09 0.05
13 14 1 0.15 0.22 0.11
NC17RC027
Stanton
793660
8148490
75.4 -90
360
100
1
7 6 0.10 0.15 0.04
9 10 1 0.09 0.31 0.02
15 17 2 0.11 0.09 0.06
18 20 2 0.11 0.10 0.04
75 78 3 0.11 0.17 0.06
79 80 1 0.11 0.36 0.06
NC17RC028
Stanton
793660
8148470
75.6 -90
360
100
2
13 11 0.29 0.23 0.08
2 3 1 2.30 0.41 0.13
16 17 1 0.36 0.13 0.05
20 34 14 0.23 0.06 0.14
36 39 3 0.10 0.04 0.05
NC17RC029
Stanton
793660
8148450
75.8 -90
360
100
1
5 4 0.11 0.16 0.03
6 8 2 0.07 0.17 0.04
34 36 2 0.10 0.14 0.07
39 43 4 0.18 0.04 0.07
49 50 1 0.06 0.00 0.01
NC17RC030
Stanton
793660
8148430
75.8 -90
360
100
1
13 12 0.24 0.21 0.09
16 24 8 0.13 0.24 0.04
30 36 6 0.23 0.28 0.18
36 39 4 no sample return
39 40 1 0.60 0.44 0.76
41 50 9 0.34 0.07 0.15
including 41 42 1 2.33 0.45 1.01

10

Hole_ID Prospect Easting Northing RL Dip Azimuth Total Intercept Intercept Interval (m) Co (%) Cu (%) Ni (%)
(MGAZ53)
(MGAZ53)
(MGAZ53) (mag) depth (m)
From (m)
To (m)
NC17RC031
Stanton
793680
8148430
75.6 -90
360
100
3
10 7 0.11 0.48 0.03
14 16 2 0.13 0.14 0.06
19 31 12 0.06 0.01 0.02
47 68 21 0.11 0.02 0.07
73 84 11 0.07 0.09 0.04
NC17RC032
Stanton
793680
8148450
75.5 -90
360
100
0
1 1 0.10 0.11 0.02
6 10 4 0.21 0.10 0.05
13 14 1 0.05 0.13 0.04
15 16 1 0.32 0.86 0.07
21 23 2 0.07 0.04 0.04
29 31 2 0.13 0.00 0.01
68 72 4 0.14 0.05 0.08
NC17RC033
Stanton
793680
8148470
75.3 -90
360
100
1
5 4 0.06 0.22 0.07
11 12 1 0.08 0.10 0.03
14 15 1 0.19 0.13 0.03
16 21 5 0.19 0.11 0.13
22 23 1 0.06 0.02 0.02
32 37 5 0.13 0.02 0.03
46 50 4 0.06 0.00 0.01
71 75 4 0.10 0.06 0.05
NC17RC034
Stanton
793680
8148490
75.1 -90
360
100
0
9 9 0.10 0.09 0.04
14 17 3 0.20 0.48 0.06
68 76 8 0.07 0.02 0.02
NC17RC035
Stanton
793680
8148510
74.9 -90
360
100
20
21 1 0.16 0.00 0.00
NC17RC036
Stanton
793680
8148530
74.7 -90
360
100
38
39 1 0.06 0.00 0.01
NC17RC037
Stanton
793720
8148620
73.4 -90
360
100 No significant intersection
NC17RC038
Stanton
793700
8148560
74.1 -90
360
100
1
2 1 0.05 0.06 0.02
NC17RC039
Stanton
793700
8148510
74.5 -90
360
100
0
1 1 0.06 0.05 0.01
7 8 1 0.05 0.04 0.01

11

Hole_ID Prospect Easting Northing RL Dip Azimuth Total Intercept Intercept Interval (m) Co (%) Cu (%) Ni (%)
(MGAZ53)
(MGAZ53)
(MGAZ53) (mag) depth (m)
From (m)
To (m)
NC17RC040
Stanton
793700
8148470
75.0 -90
360
100
4
18 14 0.18 0.30 0.06
NC17RC041
Stanton
793700
8148450
75.2 -90
360
100
0
4 4 0.08 0.10 0.04
9 10 1 0.09 0.58 0.03
13 20 7 0.18 0.16 0.03
NC17RC042
Stanton
793700
8148430
75.4 -90
360
100
0
8 8 0.09 0.11 0.04
60 64 4 0.05 0.00 0.03
68 72 4 0.06 0.02 0.03
NC17RC043
Stanton
793720
8148430
75.1 -90
360
100
0
8 8 0.10 0.14 0.10
32 36 4 0.06 0.00 0.02
64 70 6 0.12 0.02 0.07
NC17RC044
Stanton
793720
8148470
74.8 -90
360
100
0
6 6 0.13 0.08 0.03
67 68 1 0.07 0.05 0.04
71 76 5 0.07 0.02 0.03
NC17RC045
Stanton
793720
8148490
74.5 -90
360
100
0
2 2 0.06 0.06 0.02
7 8 1 0.07 0.27 0.02
NC17RC046
Stanton
793720
8148510
74.3 -90
360
100
0
1 1 0.07 0.07 0.02
NC17RC047
Stanton
793760
8148560
73.3 -90
360
100 No significant intersection
NC17RC048
Stanton
793740
8148510
74.0 -90
360
100 No significant intersection
NC17RC049
Stanton
793740
8148490
74.3 -90
360
100
0
2 2 0.08 0.08 0.02
NC17RC050
Stanton
793760
8148470
74.2 -90
360
100 No significant intersection
NC17RC051
Stanton
793740
8148470
74.4 -90
360
100
1
3 2 0.11 0.09 0.02
72 76 4 0.07 0.00 0.03
NC17RC052
Stanton
793740
8148450
74.5 -90
360
100
3
4 1 0.05 0.04 0.05
5 6 1 0.11 0.09 0.04
72 76 4 0.05 0.01 0.03
NC17RC053
Stanton
793760
8148410
74.7 -90
360
100 No significant intersection
NC17RC054
Stanton
793600
8148360
77.4 -90
360
100 No significant intersection
NC17RC055
Stanton
793580
8148390
77.4 -90
360
100 No significant intersection
NC17RC056
Stanton
793520
8148430
77.8 -90
360
100 No significant intersection

12

Hole_ID Prospect Easting Northing RL Dip Azimuth Total Intercept Intercept Interval (m) Co (%)
Cu (%)
Ni (%)
(MGAZ53)
(MGAZ53)
(MGAZ53) (mag) depth (m)
From (m)
To (m)
NC17RC057
Stanton
793540
8148510
76.8 -90
360
100
72
76 4 0.06
0.01
0.03
80 84 4 0.11
0.07
0.05
NC17RC058
Stanton
793700
8148490
74.9 -90
360
25
0
2 2 0.06
0.03
0.01
NC17RC059
Stanton
793701
8148491
74.8 -90
360
100
0
2 2 0.09
0.04
0.01
10 11 1 0.06
0.36
0.03
Running
NC17RC060
Creek
795334
8149193
62.7 -90
360
80 No significant intersection
Running
NC17RC061
Creek
795334
8149111
62.5 -90
360
80 No significant intersection
Running
NC17RC062
Creek
795331
8148987
59.6 -90
360
80 No significant intersection
Running
NC17RC063
Creek
795335
8148891
58.4 -90
360
80 No significant intersection
Running
NC17RC064
Creek
795226
8148891
58.5 -90
360
80 No significant intersection
Running
NC17RC065
Creek
795133
8148890
58.6 -90
360
80 No significant intersection
Running
NC17RC066
Creek
795039
8148895
58.8 -90
360
80 No significant intersection
Running
NC17RC067
Creek
795328
8148788
57.2 -90
360
80 No significant intersection
Running
NC17RC068
Creek
795236
8148789
57.5 -90
360
80 No significant intersection
Running
NC17RC069
Creek
795223
8148695
56.5 -90
360
80 No significant intersection
Running
NC17RC070
Creek
795222
8148597
55.1 -90
360
80 No significant intersection
Running
NC17RC071
Creek
795222
8148515
53.8 -90
360
80 No significant intersection
Running
NC17RC072
Creek
795438
8148504
52.5 -90
360
78 No significant intersection

13

Hole_ID Prospect Easting Northing RL Dip Azimuth Total Intercept Intercept Interval (m) Co (%)
Cu (%)
Ni (%)
(MGAZ53)
(MGAZ53)
(MGAZ53) (mag) depth (m)
From (m)
To (m)
Running
NC17RC073
Creek
795618
8148195
51.3 -90
360
80 No significant intersection
Running
NC17RC074
Creek
795814
8148080
49.9 -90
360
80 No significant intersection
Running
NC17RC075
Creek
795918
8148174
49.8 -90
360
80 No significant intersection
Running
NC17RC076
Creek
796012
8148277
49.7 -90
360
80 No significant intersection
Running
NC17RC077
Creek
795914
8148279
50.4 -90
360
80 No significant intersection
Running
NC17RC078
Creek
795822
8148286
50.9 -90
360
80 No significant intersection
Running
NC17RC079
Creek
795721
8148477
53.3 -90
360
80 No significant intersection
Running
NC17RC080
Creek
795723
8148576
54.5 -90
360
80 No significant intersection
Running
NC17RC081
Creek
795576
8148584
54.9 -90
360
80 No significant intersection
Running
NC17RC082
Creek
795725
8148683
56.0 -90
360
80
1
2 1 0.05
0.10
0.02
Running
NC17RC083
Creek
795833
8148880
57.3 -90
360
78 No significant intersection
Running
NC17RC084
Creek
795836
8148974
57.9 -90
360
78 No significant intersection
Running
NC17RC085
Creek
795836
8149080
58.5 -90
360
80 No significant intersection
Running
NC17RC086
Creek
795935
8149078
57.5 -90
360
80 No significant intersection
Running
NC17RC087
Creek
796029
8149077
56.2 -90
360
78 No significant intersection

14

Hole_ID Prospect Easting Northing RL Dip Azimuth Total Intercept
Intercept
Interval (m) Co (%)
Cu (%)
Ni (%)
(MGAZ53)
(MGAZ53)
(MGAZ53) (mag) depth (m)
From (m)

To (m)
Running
NC17RC088
Creek
796139
8149178
55.2 -90
360
80 No significant intersection
Running
NC17RC089
Creek
796133
8148977
54.3 -90
360
80 No significant intersection
Running
NC17RC090
Creek
796032
8148977
55.4 -90
360
80 No significant intersection
Running
NC17RC091
Creek
795937
8148978
56.7 -90
360
84 No significant intersection
Running
NC17RC092
Creek
795738
8149082
59.7 -90
360
80 No significant intersection
Running
NC17RC093
Creek
795631
8148978
59.6 -90
360
80 No significant intersection
NC17RC094
NE Stanton
793928
8148819
69.6 -90
360
80 No significant intersection
NC17RC095
NE Stanton
794023
8148814
69.0 -90
360
80 No significant intersection
NC17RC096
NE Stanton
794027
8149014
68.0 -90
360
80 No significant intersection
NC17RC097
NE Stanton
794134
8148914
67.5 -90
360
74 No significant intersection
NC17RC098
NE Stanton
794127
8148717
68.2 -90
360
80 No significant intersection
NC17RC099
NE Stanton
793923
8148719
70.4 -90
360
80 No significant intersection
NC17RC100
SW Stanton

792706

8147845
82.2 -90
360
80 No significant intersection
NC17RC101
SW Stanton

792805

8147841
82.8 -90
360
80 No significant intersection
NC17RC102
SW Stanton

792912

8147733
83.8 -90
360
80 No significant intersection
NC17RC103
Stanton
793418
8148227
80.8 -90
360
80 No significant intersection
NC17RC104
Stanton
793517
8148224
79.6 -90
360
76 No significant intersection
NC17RC105
Stanton
793519
8148318
78.7 -90
360
80 No significant intersection
NC17RC106
SE Stanton
793909
8147722
73.1 -90
360
80 No significant intersection
NC17RC107
SE Stanton
793907
8147814
73.4 -90
360
80 No significant intersection
NC17RC108
SE Stanton
793809
8147813
75.9 -90
360
80 No significant intersection
NC17RC109
Stanton
793621
8148117
79.0 -90
360
80 No significant intersection
NC17RC110
East Felix
795788
8146673
60.1 -90
360
80 No significant intersection
NC17RC111
East Felix
795683
8146782
60.1 -90
360
80 No significant intersection

15

Hole_ID Prospect Easting Northing RL Dip Azimuth Total Intercept Intercept Interval (m) Co (%)
Cu (%)
Ni (%)
(MGAZ53)
(MGAZ53)
(MGAZ53) (mag) depth (m)
From (m)
To (m)
NC17RC112
East Felix
795693
8146681
60.9 -90
360
80 No significant intersection
NC17RC113
East Felix
795590
8146876
59.9 -90
360
80 No significant intersection
NC17RC114
East Felix
795584
8146782
61.0 -90
360
84 No significant intersection
NC17RC115
East Felix
795585
8146680
62.0 -90
360
80 No significant intersection
NC17RC116
East Felix
795484
8146687
63.0 -90
360
80 No significant intersection
NC17RC117
East Felix
795288
8146589
67.0 -90
360
80 No significant intersection
NC17RC118
East Felix
795293
8146689
65.2 -90
360
80 No significant intersection
NC17RC119
East Felix
795187
8146795
63.9 -90
360
80 No significant intersection
NC17RC120
East Felix
795089
8146701
65.9 -90
360
80 No significant intersection
NC17RC121
Stanton
793760
8148429
74.5 -90
360
48
6
8 2 0.08
0.10
0.03
NC17RC122
Stanton
793780
8148410
74.3 -90
360
48
0
1 1 0.09
0.09
0.02
NC17RC123
Stanton
793740
8148410
75.0 -90
360
48 No significant intersection
NC17RC124
Stanton
793657
8148394
76.2 -90
360
60
4
5 1 0.06
0.13
0.05
8 10 2 0.06
0.15
0.05
NC17RC125
Stanton
793640
8148382
76.6 -90
360
60
9
10 1 0.07
0.09
0.02
NC17RC126
Stanton
793660
8148413
76.1 -90
360
78
0
5 5 0.19
0.10
0.04
7 8 1 0.05
0.09
0.01
11 30 19 0.29
0.07
0.09
including 13 14 1 1.31
0.20
0.07
39 40 1 0.05
0.18
0.12
42 43 1 0.06
0.35
0.17
53 60 7 0.08
0.00
0.05
70 71 1 0.08
0.17
0.03
NC17RC127
Stanton
793680.4
8148407
75.9 -90
360
60
1
3 2 0.19
0.11
0.04
8 9 1 0.06
0.18
0.01
18 19 1 0.08
0.00
0.00

16

Appendix 2. The following tables are provided to ensure compliance with the JORC Code (2012) requirements for the reporting of the exploration results for the Wollogorang Cobalt Project

Section 1 Sampling Techniques and Data (Criteria in this section apply to all succeeding sections.)

Criteria JORC Code explanation
Commentary
Sampling
techniques
Nature and quality of sampling (eg cut
channels, random chips, or specific
specialised industry standard
measurement tools appropriate to the
minerals under investigation, such as
down hole gamma sondes, or
handheld XRF instruments, etc).
These examples should not be taken
as limiting the broad meaning of
sampling.
Include reference to measures taken
to ensure sample representivity and
the appropriate calibration of any
measurement tools or systems used.
Aspects of the determination of
mineralisation that are Material to the
Public Report.
In cases where ‘industry standard’
work has been done this would be
relatively simple (eg ‘reverse
circulation drilling was used to obtain 1
m samples from which 3 kg was
pulverised to produce a 30 g charge
for fire assay’). In other cases, more
explanation may be required, such as
where there is coarse gold that has
inherent sampling problems. Unusual
commodities or mineralisation types
(eg submarine nodules) may warrant
disclosure of detailed information.
•Reverse Circulation (RC) drilling
using standard equipment.
•Sampling was undertaken at one
metre intervals when mineralisation
was visually identified and as four
metre composites when not.
•Drilling was designed to intersect the
mineralised ore zone based
historical drilling
Drilling
techniques
Drill type (eg core, reverse circulation,
open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc) and details
(eg core diameter, triple or standard
tube, depth of diamond tails, face-
sampling bit or other type, whether
core is oriented and if so, by what
method, etc).
•Reverse circulation percussion (RC)
Drill sample
recovery
Method of recording and assessing
core and chip sample recoveries and
results assessed.
Measures taken to maximise sample
recovery and ensure representative
nature of the samples.
Whether a relationship exists between
•Recovery generally good, with poor
recovery in a small number of
samples due to groundwater.
Criteria JORC Code explanation
Commentary
sample recovery and grade and
whether sample bias may have
occurred due to preferential loss/gain
of fine/coarse material.
Logging Whether core and chip samples have
been geologically and geotechnically
logged to a level of detail to support
appropriate Mineral Resource
estimation, mining studies and
metallurgical studies.
Whether logging is qualitative or
quantitative in nature. Core (or
costean, channel, etc) photography.
The total length and percentage of the
relevant intersections logged.
•Drilling logged in detail on a metre
by metre basis.
•Lithology, alteration and oxidation
logged qualitatively.
•Sulphide content and type logged
quantitatively and qualitatively.
Sub-
sampling
techniques
and sample
preparation
If core, whether cut or sawn and
whether quarter, half or all core taken.
If non-core, whether riffled, tube
sampled, rotary split, etc. and whether
sampled wet or dry.
For all sample types, the nature,
quality and appropriateness of the
sample preparation technique.
Quality control procedures adopted for
all sub-sampling stages to maximise
representivity of samples.
Measures taken to ensure that the
sampling is representative of the in-
situ material collected, including for
instance results for field
duplicate/second-half sampling.
Whether sample sizes are appropriate
to the grain size of the material being
sampled.
•RC drill samples split using a rig
mounted cone splitter.
•Sample duplicates collected, and
standards used to confirm
representivity of sampling.
Quality of
assay data
and
laboratory
tests
The nature, quality and
appropriateness of the assaying and
laboratory procedures used and
whether the technique is considered
partial or total.
For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the
analysis including instrument make
and model, reading times, calibrations
factors applied and their derivation,
etc.
Nature of quality control procedures
adopted (eg standards, blanks,
duplicates, external laboratory checks)
and whether acceptable levels of
accuracy (ie lack of bias) and precision
have been established.
•Sample Preparation - The samples
have been sorted and dried. Primary
preparation has been by crushing
the whole sample. The samples
have been split with a riffle splitter to
obtain a sub-fraction which has then
been pulverised in a vibrating
pulveriser.
•Analytical Methods - The samples
have been analysed by Firing a 40 g
(approx) portion of the sample.
Lower sample weights may be
employed for samples with very high
sulphide and metal contents. This is
the classical fire assay process and
will give total separation of Gold
Platinum and Palladium in the
sample.
•Au,Pt,Pd determined byInductively

18

Criteria JORC Code explanation
Commentary
Coupled Plasma (ICP) Optical
Emission Spectrometry.
•The sample(s) have been digested
and refluxed with a mixture of acids,
including Hydrofluoric, Nitric,
Hydrochloric and Perchloric Acids.
This extended digest approaches a
Total digest for many elements,
however, some refractory minerals
are not completely attacked.
•Ca, Cr, Fe, K, Mg, Mn, Na, P, S, V,
Co, Cu, Ni and Zn determined by
Inductively Coupled Plasma (ICP)
Optical Emission Spectrometry. The
sample(s) have been digested and
refluxed with a mixture of acids
including Hydrofluoric, Nitric,
Hydrochloric and Perchloric Acids.
This extended digest approaches a
Total digest for many elements
however some refractory minerals
are not completely attacked.
•Ag, As, Ba, Bi, Cd, Li
, Mo, Pb,
U, Th
•Standards (OREAS 181), blanks and
duplicates have all been applied in
the QAQC methodology. Sufficient
accuracy and precision have been
establish for the type of
mineralisation encountered.
Verification
of sampling
and
assaying
The verification of significant
intersections by either independent or
alternative company personnel.
The use of twinned holes.
Documentation of primary data, data
entry procedures, data verification,
data storage (physical and electronic)
protocols.
Discuss any adjustment to assay data.
•An electronic database containing
collars, geological logging and
assays is maintained by the
Company
Location of
data points
Accuracy and quality of surveys used
to locate drill holes (collar and down-
hole surveys), trenches, mine workings
and other locations used in Mineral
Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic
control.
•Holes have been surveyed using
Differential GPS (DGPS).
•UTM grid MGA94 Zone 53 was used
•A majority of holes have had down
hole surveys completed.
Data
spacing and
distribution
Data spacing for reporting of
Exploration Results.
Whether the data spacing, and
distribution is sufficient to establish the
degree of geological and grade
•Drill hole spacing approximately
every 20m on a grid across the
existing mineral resource.
•Spacing and distribution is
considered to be appropriate.

19

Criteria JORC Code explanation
Commentary
continuity appropriate for the Mineral
Resource and Ore Reserve estimation
procedure(s) and classifications
applied.
Whether sample compositing has been
applied.
Orientation
of data in
relation to
geological
structure
Whether the orientation of sampling
achieves unbiased sampling of
possible structures and the extent to
which this is known, considering the
deposit type.
If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to
have introduced a sampling bias, this
should be assessed and reported if
material.
•Sample relationship to mineralisation
and structure is unknown at this
stage.
Sample
security
The measures taken to ensure sample
security.
•Samples are bagged and sealed on
pallets on site and transported to the
analytical laboratories by commercial
transport companies.
Audits or
reviews
The results of any audits or reviews of
sampling techniques and data.
•No audits undertaken at this stage
as the drilling program has only
recently commenced.

20

Section 2 Reporting of Exploration Results

(Criteria in this section apply to all succeeding sections.)

Criteria JORC Code explanation Commentary
Mineral
tenement
and land
tenure
status
Type, reference name/number,
location and ownership including
agreements or material issues with
third parties such as joint ventures,
partnerships, overriding royalties,
native title interests, historical sites,
wilderness or national park and
environmental settings.
The security of the tenure held at the
time of reporting along with any known
impediments to obtaining a licence to
_operate inthe area. _
•Wollogorang Cobalt Project
exploration area occurs on EL 31272
which is 100% owned by Mangrove
Resources Pty Ltd a wholly owned
subsidiary to Northern Cobalt Ltd.
•The licence is currently in good
standing with the relevant authorities.
Exploration
done by
other
parties
Acknowledgment and appraisal of
exploration by other parties.
•The Stanton Cobalt deposit and
surrounding prospects were
discovered by CRA Exploration Pty
Ltd in the period 1990-1996 period
under a farm in arrangement with W J
(Joe) Fisher.
Geology Deposit type, geological setting and
style of mineralisation.
•The local geology is dominated by the
Gold Creek Volcanics of the Tawallah
Group. This formation is a series of
basaltic lavas and shallow intrusives,
interlayered with thin oxidised
sandstone, carbonate and siltstone
units. It is conformably underlain by
reduced sedimentary facies of the
Wollogorang Formation, which
includes dolostones, sandstones and
carbonaceous shales. A regional
dolerite sill, the Settlement Creek
Dolerite, was emplaced synchronous
with effusion of the Gold Creek
Volcanics. The Wollogorang
Formation and Settlement Creek
Dolerite do not outcrop on the Stanton
prospect area, but are however
intersected in a number of drill holes
on the tenement. Within the district,
the Gold Creek Volcanics are
disconformably overlain by a felsic
volcanic package that includes a
rhyolitic rheoignimbrite sheet
(Hobblechain Rhyolite), proximal
epiclastics (Pungalina Member) and
distal reworked clastics (Echo
Sandstone).
•Mineralisation is interpreted to be
largely controlled by stratigraphy
within the flat lyinginterbedded

21

Criteria JORC Code explanation Commentary
sediment and volcanic rock units of
the Proterozoic Gold Creek Volcanics.
Brecciation and faulting has a strong
control on the intensity and limits of
mineralisation. In fresh rock the
cobalt-nickel is located in
disseminated siegenite (cobalt-nickel
sulphide). Chalcocite and pyrite are
also noted. Weathering to a variable
depth of approximately 30m has
resulted in cobalt oxide secondary
mineralisation in a large proportion of
the deposit.
Drill hole
Information
A summary of all information material
to the understanding of the exploration
results including a tabulation of the
following information for all Material
drill holes:
o easting and northing of the drill hole
collar
o elevation or RL (Reduced Level –
elevation above sea level in metres)
of the drill hole collar
o dip and azimuth of the hole
o down hole length and interception
depth
o hole length.
If the exclusion of this information is
justified on the basis that the
information is not Material and this
exclusion does not detract from the
understanding of the report, the
Competent Person should clearly
_explain why this is the case. _
•See Appendix 1.
Data
aggregation
methods
In reporting Exploration Results,
weighting averaging techniques,
maximum and/or minimum grade
truncations (eg cutting of high grades)
and cut-off grades are usually Material
and should be stated.
Where aggregate intercepts
incorporate short lengths of high grade
results and longer lengths of low grade
results, the procedure used for such
aggregation should be stated and
some typical examples of such
aggregations should be shown in
detail.
The assumptions used for any
reporting of metal equivalent values
should be clearly stated.
•Simple length weighted averages
were used for reporting of significant
drill intercepts with a cut-off grade of
0.05% (500ppm) Co and a maximum
internal dilution of 1m.

22

Criteria JORC Code explanation Commentary
Relationship
between
mineralisatio
n widths and
intercept
lengths
These relationships are particularly
important in the reporting of
Exploration Results.
If the geometry of the mineralisation
with respect to the drill hole angle is
known, its nature should be reported.
If it is not known and only the down
hole lengths are reported, there should
be a clear statement to this effect (eg
‘down hole length, true width not
_known’). _
•Any observations made are down hole
length and true width is not known.
Diagrams Appropriate maps and sections (with
scales) and tabulations of intercepts
should be included for any significant
discovery being reported These should
include, but not be limited to a plan
view of drill hole collar locations and
_appropriate sectional views. _
•See this release and Appendix 1.
Balanced
reporting
Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low
and high grades and/or widths should
be practiced to avoid misleading
_reporting of Exploration Results. _
•All significant drill intersections have
been reported and it has been noted
when no significant intersection has
been encountered.
Other
substantive
exploration
data
Other exploration data, if meaningful
and material, should be reported
including (but not limited to): geological
observations; geophysical survey
results; geochemical survey results;
bulk samples – size and method of
treatment; metallurgical test results;
bulk density, groundwater,
geotechnical and rock characteristics;
potential deleterious or contaminating
_substances. _
•No other relevant data to report.
Further work The nature and scale of planned
further work (eg tests for lateral
extensions or depth extensions or
large-scale step-out drilling).
Diagrams clearly highlighting the areas
of possible extensions, including the
main geological interpretations and
future drilling areas, provided this
information is not commercially
sensitive.
•Planned further work detailed in this,
and previous releases, and in figures.
This work includes comprises drill
testing along a significant portion of
the surface geochemical anomaly.

23