Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

Resolute Mining Limited Regulatory Filings 2011

Jun 5, 2011

10548_rns_2011-06-05_56678d36-d189-4098-90f3-e070b244405c.pdf

Regulatory Filings

Open in viewer

Opens in your device viewer

==> picture [560 x 78] intentionally omitted <==

----- Start of picture text ----- ASX----- End of picture text -----

==> picture [560 x 78] intentionally omitted <==

----- Start of picture text ----- AnnouncementACN 097 088 6896 JUNE 2011 1----- End of picture text -----

SYAMA OPERATIONS UPDATE

Resolute Mining Limited (ASX: RSG, “Resolute”) advises that the scheduled maintenance shutdown of the sulphide section of the plant at its Syama operations in Mali has been completed. The maintenance was foreshadowed in Resolute’s March quarterly report.

Maintenance work, including inspection of the stack and refractory replacement and curing, has been successfully concluded and preheat of the roaster is now underway.

Treatment of direct leach material will continue until the roaster is fully operational after which the plant will revert to treatment of sulphide roast material.

Resolute Chief Executive Peter Sullivan said that since the completion of the Syama milling circuit shutdown in April the circuit has performed very reliably with minimal downtime.

“Combined with the successful completion of the maintenance work on the sulphide section, we expect to deliver further improvement in Syama’s operational performance.”

==> picture [83 x 43] intentionally omitted <==

PETER SULLIVAN Chief Executive Officer

About Resolute:

Resolute is an unhedged gold miner with three operating mines in Africa and Australia. The Company is the second largest gold producer by volume listed on the ASX. Resolute is targeting an increase in production from its flagship Syama project in Mali to 250,000oz of gold a year after an extended ramp-up and commissioning period. Resolute is currently investigating a number of opportunities to add value by increasing gold production and lowering operating costs at Syama and its Ravenswood operations in Queensland. The Company controls an extensive footprint in the highly prospective Syama Sheer and Greenstone Belts in Mali and Cote d’Ivoire. Resolute has identified a number of promising exploration targets at its Ravenswood operations and holds a number of exploration projects in Tanzania surrounding its Golden Pride mine.

Resolute Mining Limited 4th Floor, The BGC Centre, 28 The Esplanade, Perth, Western Australia 6000 Telephone: + 61 8 9261 6100 Facsimile: + 61 8 9322 7597 E-mail: [email protected] www.rml.com.au