27 July 2017
Outstanding FY17 production and cost results Gold production of 330koz at AISC of A$1,132/oz Average gold price received of A$1,717 per ounce Exceptional exploration results at Syama A$290M in cash, bullion and listed investments
Highlights
-
FY17 gold production of 329,834 ounces at an AISC of A$1,132 per ounce (US$853 per ounce) significantly better than original cost guidance of A$1,280 per ounce and revised guidance of A$1,150 per ounce.
-
Average gold price received of A$1,717 per ounce from total FY17 gold sales of 317,242 ounces.
-
Gold production for the June Quarter 2017 of 70,654 ounces achieved at an AISC of A$1,502 per ounce (US$1,127 per ounce).
-
FY18 gold production forecast of 300,000 ounces at an AISC of A$1,280 per ounce (US$960 per ounce).
-
Positive exploration results received from Nafolo, Tabakoroni and BA-01 have highlighted underground mining opportunities that have potential to complement the existing Syama mine plan.
-
Syama underground mine development progressing on schedule with completion of the sublevel cave development project expected in December 2018.
-
Cash, bullion and listed investments of A$290 million (US$223 million) as at 30 June 2017.
-
Gold in circuit inventory as at 30 June 2017 of 88,000 ounces worth A$142 million (US$109 million).
Resolute Mining Limited (Resolute or the Company) (ASX: RSG) is pleased to present its Quarterly Activities Report for the quarter ended 30 June 2017.
Managing Director and Chief Executive Officer, Mr. John Welborn, was delighted that strong operational performance and financial discipline has again resulted in the Company beating guidance. Mr Welborn was also enthused by the exciting exploration results generated during the quarter from exploration at Nafolo and the Syama satellite deposits:
“Resolute has again outperformed on gold production, All-In Sustaining Costs, and gold price received. I am particularly pleased we have delivered outstanding operating results at Ravenswood and Syama during a transition phase at both projects as we implement new long life mine plans. The progress of the Syama Underground mine and the Ravenswood Extension project is encouraging. At Syama we continue to benefit from the strong US dollar gold price with operating margins unaffected by a strengthening Australian dollar.
“The Company is in a robust position to deliver on our production growth pipeline at Syama, Ravenswood, and Bibiani. We remain focused on demonstrating industry leading discipline as we transform our business and deliver new low cost, long life mines which will generate exceptional returns for shareholders.”
==> picture [511 x 45] intentionally omitted <==
for the period ended 30 June 2017
Quarterly Summary
June Quarter 2017 production and costs (unaudited)
| June 2017 Quarter | Units | Syama Sulphide |
Syama Oxide |
Syama Total |
Ravens- wood |
GROUP Total |
|---|---|---|---|---|---|---|
| UG decline development | m | 1,557 | - | 1,557 | - | 1,557 |
| UG lateral development | m | - | - | - | - | - |
| UG vertical development | m | - | - | - | - | - |
| UG ore mined | t | 6,589 | - | 6,589 | 219,856 | 226,445 |
| UGgrade mined | g/t | 2.19 | - | 2.19 | 2.55 | 2.54 |
| OP operatingwaste | BCM | - | 1,072,372 | 1,072,372 | 304,297 | 1,376,669 |
| OP ore mined | BCM | - | 179,856 | 179,856 | 175,991 | 355,847 |
| OPgrade mined | g/t | - | 2.00 | 2.00 | 0.60 | 1.31 |
| Total ore mined | t | 6,589 | 362,313 | 368,902 | 701,737 | 1,070,639 |
| Total tonnesprocessed | t | 555,330 | 350,092 | 905,422 | 544,273 | 1,449,695 |
| Gradeprocessed | g/t | 2.03 | 2.30 | 2.13 | 1.45 | 1.88 |
| Recovery | % | 66.1 | 89.4 | 75.8 | 92.5 | 80.7 |
| Goldproduced | oz | 23,911 | 23,191 | 47,102 | 23,552 | 70,654 |
| Gold in circuit drawdown/(addition) | oz | (7,955) | (6,337) | (14,293) | 3,426 | (10,867) |
| Gold shipped | oz | 15,956 | 16,854 | 32,809 | 26,977 | 59,787 |
| Gold bullion in metal account movement(increase)/decrease |
oz | 25,798 | 27,393 | 53,191 | 34,184 | 87,375 |
| Gold sold | oz | 41,753 | 44,247 | 86,000 | 61,162 | 147,162 |
| Achievedgoldprice | A$/oz | 1,725 | 1,725 | 1,725 | 1,689 | 1,710 |
| US$/oz | 1,292 | 1,292 | 1,292 | 1,272 | 1,284 | |
| Cost Summary | ||||||
| Mining | A$/oz | 679 | 591 | 636 | 596 | 623 |
| Processing | A$/oz | 659 | 288 | 476 | 443 | 465 |
| Administration | A$/oz | 297 | 155 | 227 | 150 | 201 |
| Stockpile Adjustments | A$/oz | 588 | 43 | 320 | 70 | 236 |
| Amortisation/(Deferral) of stripping costs |
A$/oz | - | (102) | (50) | (15) | (38) |
| Transfer of underground development costs to development |
A$/oz | (625) | - | (317) | - | (212) |
| Cash Cost | A$/oz | 1,598 | 976 | 1,292 | 1,243 | 1,275 |
| US$/oz | 1,200 | 732 | 969 | 933 | 957 | |
| Royalties | A$/oz | 183 | 193 | 188 | 219 | 198 |
| By-product credits | A$/oz | - | - | - | (8) | (3) |
| Amortisation/(Deferral) of stripping costs |
A$/oz | 0 | 102 | 50 | 15 | 38 |
| Sustaining capital + others | A$/oz | (7) | 39 | 15 | (7) | 8 |
| Overhead costs | A$/oz | 13 | 12 | 13 | 10 | 12 |
| Reclassification of Nolans East open pit capital to growth projects capital |
A$/oz | - | - | - | (172) | (57) |
| Administration Costs | A$/oz | - | - | - | - | 31 |
| AISC | A$/oz | 1,786 | 1,322 | 1,558 | 1,300 | 1,502 |
| US$/oz | 1,340 | 991 | 1,168 | 974 | 1,127 | |
| Depreciation and amortisation | A$/oz | 61 | 25 | 43 | 53 | 46 |
Table 1: Detailed Production and Cost data June Quarter 2017
==> picture [164 x 12] intentionally omitted <==
2
for the period ended 30 June 2017
FY17 Summary
FY17 production and costs (unaudited)
| FY17 Summary | Units | Syama Sulphide |
Syama Oxide |
Syama Total |
Ravens- wood |
GROUP Total |
|---|---|---|---|---|---|---|
| UG decline development | m | 3,180 | - | 3,180 | - | 3,180 |
| UG lateral development | m | - | - | - | - | - |
| UG vertical development | m | - | - | - | - | - |
| UG ore mined | t | 8,289 | - | 8,289 | 1,001,067 | 1,009,356 |
| UGgrade mined | g/t | 2.15 | - | 2.15 | 2.51 | 2.51 |
| OP operatingwaste | BCM | 431,208 | 3,772,861 | 4,204,069 | 989,485 | 5,193,554 |
| OP ore mined | BCM | 441,933 | 689,864 | 1,131,797 | 328,325 | 1,460,122 |
| OPgrade mined | g/t | 2.44 | 2.29 | 2.35 | 0.63 | 1.96 |
| Total ore mined | t | 1,215,153 | 1,319,596 | 2,534,749 | 2,366,159 | 4,900,908 |
| Total tonnesprocessed | t | 2,106,371 | 1,340,097 | 3,446,468 | 1,995,292 | 5,441,760 |
| Gradeprocessed | g/t | 2.59 | 2.84 | 2.68 | 1.54 | 2.27 |
| Recovery | % | 69.8 | 83.2 | 75.3 | 93.1 | 79.7 |
| CEC RecoveryAdjustment* | oz | 13,834 | - | 13,834 | - | 13,834 |
| Goldproduced | oz | 136,000 | 101,830 | 237,830 | 92,004 | 329,834 |
| Gold in circuit drawdown/(addition) | oz | (20,163) | (4,407) | (24,569) | (410) | (24,979) |
| Gold shipped | oz | 115,837 | 97,423 | 213,261 | 91,594 | 304,854 |
| Gold bullion in metal account movement(increase)/decrease |
oz | 375 | 10,565 | 10,939 | 1,445 | 12,385 |
| Gold sold | oz | 116,212 | 107,988 | 224,200 | 93,042 | 317,242 |
| Achievedgoldprice | A$/oz | 1,720 | 1,720 | 1,720 | 1,708 | 1,717 |
| US$/oz | 1,296 | 1,296 | 1,296 | 1,291 | 1,295 | |
| Cost Summary | ||||||
| Mining | A$/oz | 368 | 476 | 414 | 668 | 485 |
| Processing | A$/oz | 452 | 265 | 372 | 463 | 397 |
| Administration | A$/oz | 182 | 107 | 150 | 174 | 157 |
| Stockpile Adjustments | A$/oz | 94 | (52) | 32 | 1 | 23 |
| Amortisation/(Deferral) of stripping |
A$/oz | 16 | 152 | 74 | (54) | 39 |
| ~~t~~ Transfer of underground development costs to development |
A$/oz | (255) | 0 | (146) | 0 | (105) |
| Cash Cost | A$/oz | 857 | 948 | 896 | 1,252 | 995 |
| US$/oz | 646 | 714 | 675 | 943 | 750 | |
| Royalties | A$/oz | 93 | 101 | 96 | 86 | 93 |
| By-product credits | A$/oz | 0 | 0 | 0 | (8) | (2) |
| Amortisation/(Deferral) of stripping costs |
A$/oz | (16) | (152) | (74) | 54 | (39) |
| Sustainingcapital + others | A$/oz | 55 | 50 | 53 | 13 | 42 |
| Overhead costs | A$/oz | 13 | 14 | 13 | 9 | 12 |
| Administration Costs | A$/oz | - | - | - | - | 30 |
| AISC | A$/oz | 1,001 | 960 | 984 | 1,406 | 1,132 |
| US$/oz | 755 | 725 | 742 | 1,059 | 853 | |
| Depreciation and amortisation | A$/oz | 56 | 22 | 42 | 107 | 60 |
Table 2: Detailed Production and Cost data FY17
*Increase in recoverable gold in Carbon Enriched Concentrates (CEC) arising from Project Reprise Low Carbon Roast recoveries
==> picture [164 x 12] intentionally omitted <==
3
for the period ended 30 June 2017
Mali
Operations
Syama, Mali
Sulphide Operations
| Ore Mined (t) |
Ore Milled (t) |
Head Grade (g/t) |
Recovery (%) |
Total Production (Gold oz) |
Cash Cost A$/oz |
AISC A$/oz |
|
|---|---|---|---|---|---|---|---|
| Jun Quarter | 6,589 | 555,330 | 2.03 | 66.1 | 23,911 | 1,598 | 1,786 |
| Mar Quarter | 360,323 | 503,139 | 2.62 | 65.4 | 41,510 | 664 | 767 |
| Dec Quarter | 803,923 | 527,539 | 2.91 | 72.8 | 35,850 | 644 | 687 |
| Sep Quarter | 44,318 | 520,363 | 2.83 | 73.4 | 34,729 | 798 | 1,048 |
| FY17 Total | 1,215,153 | 2,106,371 | 2.59 | 69.8 | 136,000 | 857 | 1,001 |
Table 3: Syama Sulphide Production and Cost Summary
Gold production at Syama was lower than previous quarters primarily due to lower head grade from the ore stockpiles processed. Overall recoveries were also affected by lower flotation recoveries from the A21 satellite pit sulphide ore stockpiles. Reduced sulphide mining from satellite open pits increased the ore stockpile drawdown and negatively affected All-In Sustaining Costs during the quarter. Quarterly cash costs were also affected by increased royalties arising from the high level of bullion sales during the quarter of gold produced in previous quarters.
Head grade will be managed in future quarters through blending the sulphide feed from existing sulphide stockpiles, mined ore from satellite deposits, and ore produced from the underground mine during development. Development ore production has commenced with pre-production underground ore of ~1.3Mt expected to be mined prior to completion of the sublevel cave development in December 2018. At the end of the quarter the sulphide ore stockpiles from the Syama open pit contained approximately 154,074oz (3.45Mt at 1.4g/t Au) while the sulphide ore stockpiled from the A21 satellite pit contained approximately 19,865oz (0.4Mt at 1.5g/t Au). Total sulphide ore stockpiles at Syama are approximately 173,939oz (3.85Mt at 1.4g/t Au).
Oxide Operations
| Ore Mined (t) |
Ore Milled (t) |
Head Grade (g/t) |
Recovery (%) |
Total Production (Gold oz) |
Cash Cost A$/oz |
AISC A$/oz |
|
|---|---|---|---|---|---|---|---|
| Jun Quarter | 362,313 | 350,092 | 2.30 | 89.4 | 23,191 | 976 | 1,322 |
| Mar Quarter | 180,068 | 351,405 | 2.75 | 89.4 | 27,784 | 841 | 1,103 |
| Dec Quarter | 300,179 | 307,451 | 3.54 | 74.8 | 26,151 | 936 | 451 |
| Sep Quarter | 477,036 | 331,149 | 2.85 | 81.4 | 24,704 | 1,054 | 983 |
| FY17 Total | 1,319,596 | 1,340,097 | 2.84 | 83.2 | 101,830 | 948 | 960 |
Table 4: Syama Oxide Production and Cost Summary
During the quarter Resolute continued mining the BA-01 satellite pit with grade control showing higher grades than the block model estimate. Quarterly cash costs were affected by increased royalties arising from the high level of bullion sales during the quarter of gold produced in previous quarters.
Underground Mine Development
At the end of the quarter underground mine development was on schedule with sublevel cave ore production expected to commence in December 2018. During the underground development phase a significant amount of development ore will be mined and is expected to augment the stockpiled sulphide material that is currently providing mill feed and gold production. The underground development has commenced on the first and second production levels (the 1130
==> picture [164 x 12] intentionally omitted <==
4
for the period ended 30 June 2017
and 1105 levels) and the incline and decline advanced simultaneously during the quarter. The current priority of the underground development is to establish the primary ventilation infrastructure. Lateral development rates continue to exceed expectations. As discussed above, underground ore development has commenced and will form a significant proportion of processed sulphide ore prior to the completion of the sublevel cave development expected in December 2018. Online readers can click on Figure 1 to launch Resolute’s interactive visualiser and view the underground mine development progress as at 30 June 2017. The interactive visualiser is also available on Resolute’s website at www.rml.com.au or at http://mapability.com.au/interactive/clients/rsg/syama. Figure 2 below shows the Syama underground development progress to plan.
==> picture [508 x 266] intentionally omitted <==
Figure 1: Syama Underground development progress as at 30 June 2017
==> picture [512 x 276] intentionally omitted <==
Figure 2: Syama Underground development progress
==> picture [164 x 12] intentionally omitted <==
5
for the period ended 30 June 2017
Health and Safety
The Syama operation had a single lost time injury during the quarter. The 12 month rolling LTI Frequency Rate at the end of the quarter was 0.68 and the 12 month rolling Total Recordable Injury Frequency rate was 1.58.
Outlook
Sulphide ore stockpiles will continue to be managed to maintain a consistent feed grade of greater than 2g/t Au to the sulphide plant. Open pit mining will continue at the BA-01 pit with ore supply increasing as the pit deepens. Mill feed grades are expected to increase from the current levels as an increasing amount of the sulphide feed is delivered from underground development ore. The underground development ore is expected to grade in a range of 2.5-3.0g/t Au. Higher sulphide feed grades will result in increases in recoveries.
Development
Project 85
Project 85 is targeting an increase in overall recovery levels to above 85% based on the average feed grade of the underground ore. At the end of the June Quarter 2017 the project design, procurement and construction remained on schedule with construction now 60% completed. The staged commissioning of the project remains on track for the end of March 2018.
Project Reprise (Low Carbon Roast)
Project Reprise involves reclaiming the carbon enriched concentrate (CEC) and processing with the innovative Low Carbon Roast (LCR) technology. The LCR technology will deliver a significant reduction in the preg-robbing organic carbon content of the CEC. The LCR is estimated to increase the overall recoveries from the CEC to circa 90% (up from circa 60%). During the quarter Outotec progressed the detailed design of the Low Carbon Roast tie-ins and procurement of the tie-in equipment. The staged commissioning of Project Low Carbon Roast remains on track for mid-2019.
Australia
Operations
Ravenswood, Australia
| Ore Mined (t) |
Ore Milled (t) |
Head Grade (g/t) |
Recovery (%) |
Total Production (Gold oz) |
Cash Cost A$/oz |
AISC A$/oz |
|
|---|---|---|---|---|---|---|---|
| Jun Quarter | 701,737 | 544,273 | 1.45 | 92.5 | 23,552 | 1,243 | 1,300 |
| Mar Quarter | 711,397 | 485,880 | 1.35 | 91.8 | 19,328 | 1,444 | 1,626 |
| Dec Quarter | 656,695 | 549,129 | 1.77 | 93.6 | 29,223 | 1,097 | 1,276 |
| Sep Quarter | 296,330 | 416,011 | 1.58 | 94.6 | 19,901 | 1,302 | 1,508 |
| FY17 Total | 2,366,159 | 1,995,293 | 1.54 | 93.1 | 92,004 | 1,252 | 1,406 |
Table 5: Ravenswood Production and Cost Summary
An improved head grade for the quarter was a result of a higher proportion of Mt Wright ore compared to the March Quarter 2017. Gold recoveries improved in line with the increased proportion of Mt Wright ore and milled tonnes increased to maximum levels for the current blend. Quarterly cash costs were affected by increased royalties resulting from the high level of bullion sales during the quarter of gold produced in previous quarters.
==> picture [164 x 12] intentionally omitted <==
6
for the period ended 30 June 2017
Ore production from Nolans East was 481,881 t @ 0.60 g/t Au for 9,248oz (March 2017: 481,383 t @ 0.63 g/t Au for 9,793oz). Ore production from Mt Wright was 219,856 t @ 2.55 g/t Au for 18,019oz (March 2017: 230,014 t @ 2.34 g/t Au for 17,305oz). Mined ore tonnes from Mt Wright improved as the number of available draw points increased.
Health & Safety
The Ravenswood operation had a single lost time injury during the quarter. The 12 month rolling LTI Frequency Rate at the end of the quarter was 2.45 and the 12 month rolling Total Recordable Injury Frequency Rate was 7.35.
Outlook
Mined ore tonnes from Mt Wright are expected to reduce as the number of available drawpoints decreases over the remaining life of the underground mine. Mine production and processing from Nolans East is expected to continue at current levels until the Nolans East open pit is completed in late-2017. During the current financial year ore feed will be sourced from Nolans East stockpiles, existing Sarsfield stockpiles, and remaining production ore from Mt Wright. Resolute continues to work collaboratively with the Queensland government on required regulatory approvals for the Ravenswood Extension Project and will advise the market on progress in due course.
Exploration
Mali
Nafolo
Results released from the Nafolo discovery (refer to ASX announcement dated 11 July 2017) have extended the mineralisation a further 100m south and delivered the highest grade Nafolo intercept to date. The intercept [10m @ 8.3g/t Au from 394m on section 22500N] is the southernmost hole to date into Nafolo and augers well for the deeper drilling planned for this section over the coming weeks. The drilling has now defined an initial strike length of greater than 300m and is continuing to deliver consistent, broad intersections with similar characteristics to Syama.
Every hole drilled to date at Nafolo has intersected gold mineralisation. The discovery remains open at depth and to the south. A significant area under the southern waste dump is still to be tested and has the potential to host a large ore system similar to the 8Moz Syama orebody. Figure 3 shows the location of the Nafolo discovery to the south of the Syama underground mine development and separate from the Syama orebody.
The Nafolo discovery is located 250m south of the current underground mine design at Syama and has potential to be accessed in the early years of the underground mine. The Nafolo discovery is likely to expand the existing 6Moz resource and 3Moz reserve at Syama. Drilling is ongoing with two diamond drill rigs currently situated on the waste dump. An understanding of the full potential of the Nafolo discovery is a high priority in order to assess its potential to enhance the mine plan at Syama. Further drilling results will be released over the coming quarters. A maiden resource for the Nafolo discovery will be estimated during the course of the current financial year.
Significant drill results from the recent Nafolo drilling are listed below:
o SYDD450 14m @ 3.5 g/t Au from 251m o SYDD451 19m @ 3.7 g/t Au from 407m o SYDD454 33m @ 3.0 g/t Au from 405m o SYRD456 10m @ 8.3 g/t Au from 394m o SYDD462 25m @ 3.3 g/t Au from 287m
==> picture [164 x 12] intentionally omitted <==
7
for the period ended 30 June 2017
==> picture [510 x 291] intentionally omitted <==
Figure 3: Longitudinal projection showing location of new diamond drillhole pierce points, results and designed underground development
Tabakoroni
An initial 15-hole deep reverse circulation (RC) drill program undertaken at Tabakoroni during the quarter focused on extending the high grade sulphide shoots at depth and investigating the potential for a future underground mine. The results were outstanding with greater than 100 gram metre intersections in five of the 15 holes completed in the program. These initial results suggest the potential exists for a future underground mine or an extension of the open pit mine life at Tabakoroni.
Better results from the Tabakoroni drilling program include:
o TARC532 20m @ 18.3 g/t Au from 117m o TARC542 23m @ 9.6 g/t Au from 140m o TARC543 25m @ 8.1 g/t Au from 160m o TARC549 12m @ 8.4 g/t Au from 203m o TARC551 14m @ 16.7 g/t Au from 89m
Figure 4 shows a longitudinal projection of the Tabakoroni deposit with grade-tonnage contours showing high grade extensions to mineralisation below the current open pit design. The Tabakoroni deposit comprises high grade mineralisation delineated over a total strike length of greater than 1km and a number of discreet high grade shoots remain open at depth. The initial results have confirmed the excellent long term sulphide potential of Tabakoroni and follow up drilling of the sulphide targets will be undertaken later in 2017.
==> picture [164 x 12] intentionally omitted <==
8
for the period ended 30 June 2017
==> picture [518 x 239] intentionally omitted <==
Figure 4: Tabakoroni longitudinal projection showing location of new drillhole pierce points, results and planned open pit outline
BA-01
A program of RC drilling was recently completed at BA-01 to test the interpreted high grade sulphide shoots. The initial program has returned excellent grades in many of the drillholes and has reinforced the potential for delineating additional high grade mineable sulphide resources in the northern satellite pits. Drilling programs are planned for Alpha and Beta and follow up drilling is planned for BA-01 over the coming quarters. These programs are focused on understanding the potential for sulphide mine life extensions of the northern satellite operations.
Better results from the BA-01 drilling program include:
o BARC120 6m @ 14.9 g/t Au from 36m o BARC124 7m @ 13.1 g/t Au from 85m o BARC126 9m @ 11.1 g/t Au from 70m o BARC136 10m @ 9.2 g/t Au from 115m o BARC138 11m @ 14.9 g/t Au from 43m
Corporate
Board Renewal
During the quarter Resolute announced the appointment of Mr Marthinus (Martin) Botha as Chairman and the appointments of Ms Yasmin Broughton and Mr Mark Potts as Non-Executive Directors. Mr Botha, an existing NonExecutive Director of Resolute, takes over as Chairman from Mr Peter Huston who was appointed a Director of the Company in 2000 and served as Chairman for more than 15 years. Ms Yasmin Broughton is a lawyer with significant experience working in legal, financial, and executive management in the energy, infrastructure, resources and community sectors. Mr Mark Potts is a leading global technology executive who for more than 25 years has consistently combined innovation, strategy, vision, technology, team-building and execution to drive business results and improvement for a range of international organizations.
==> picture [164 x 12] intentionally omitted <==
9
for the period ended 30 June 2017
Gold Forward Sales Contracts
As at 30 June 2017, Resolute had 12,000oz (March 2017: 21,000oz) of forward sales contracts at an average price of A$1,800/oz for delivery between July 2017 and October 2017.
Gold in Circuit
As at 30 June 2017, Resolute had an estimated recoverable Gold in Circuit “GIC” inventory of approximately 88,000oz of gold with a market value of approximately A$142M.
Borrowings
Total borrowings at quarter end were A$35M compared with A$9M at 31 March 2017. These balances relate to the bank overdraft of Resolute’s Malian subsidiary. At 30 June 2017, Resolute’s net cash balance, after bullion and debt, was A$248M.
Cash, Bullion and Listed Investments
| Description | Jun ’17 Quarter (A$M) |
Mar ’17 Quarter (A$M) |
|---|---|---|
| Cash | 282.1 | 139.6 |
| Bullion | 0.4 | 142.3 |
| Cash and Bullion Sub-Total | 282.5 | 281.9 |
| Listed investments* | 7.3 | 9.0 |
| Total Cash, Bullion and Listed Investments | 289.8 | 290.9 |
Table 6: Total Cash, Bullion and Listed Investments
* Listed investments includes equity accounted investments at end of quarter market value
The principal movements in the market value of cash and bullion balances during the quarter were as follows:
| Jun '17 Quarter (A$M) |
Mar '17 Quarter (A$M) |
|
|---|---|---|
| Operating Cash Flows | ||
| Gross operatingcash flows from Syama and Ravenswood | 33.9 | 54.6 |
| Royalty payments | (10.7) | (3.8) |
| Overheads and operational support costs | (1.3) | (1.2) |
| Exploration expenditure | (9.0) | (7.2) |
| Interest expense/income net cash flows | 0.5 | 0.3 |
| Income taxespaid | - | (0.6) |
| Workingcapital movements | 5.4 | 4.9 |
| Investing Cash Flows | ||
| Development expenditure, incl. Syama UG development, feasibility studies, resource development and otherprojects |
(42.6) | (24.9) |
| Operational sustainingcapital expenditure | 2.3 | (3.8) |
| Bibianiproject care and maintenance | (2.4) | (2.2) |
| Other investingactivities | 0.1 | 0.3 |
| Financing Cash Flows | ||
| Capital raising (net of costs) | - | - |
| Dividendpayments | - | - |
| Existingdebt facilityinflows/(outflows) | 25.8 | (11.8) |
| Foreign exchange fluctuations and market value changes of bullion on hand | (1.4) | 2.7 |
| Net cash inflows | 0.6 | 7.2 |
| Opening cash and bullion | 281.9 | 274.7 |
| Closing cash and bullion | 282.5 | 281.9 |
Table 7: Movements in Cash and Bullion balances
==> picture [164 x 12] intentionally omitted <==
10
for the period ended 30 June 2017
Outlook – FY18 Production and Expenditure Guidance
-
Gold production forecast of 300,000 ounces.
-
All-In Sustaining Cost forecast of A$1,280 per ounce (US$960 per ounce).
-
Capital expenditure for growth projects at Syama Underground and Ravenswood Expansion Project of A$162 million (US$122 million).
-
Exploration budget of A$38 million (US$29 million).
| Gold Production (oz)* |
AISC (A$/oz) |
AISC (US$/oz)** |
|
|---|---|---|---|
| Syama Sulphide | 130,000 | 1,050 | 788 |
| Syama Oxide | 90,000 | 1,260 | 945 |
| Ravenswood | 80,000 | 1,520 | 1,145 |
| Total | 300,000 | 1,280 | 960 |
Table 8: FY18 Production and Costs Guidance
- Gold production metric for FY18 will be based on gold poured to provide greater transparency and direct reconciliation with gold sold *Guidance assumes AUD/USD exchange rate of 0.75
For further information, contact:
John Welborn | Managing Director and CEO
Telephone : +61 8 9261 6100 Email : [email protected]
Conference Call Details
Resolute advises Managing Director and CEO, Mr John Welborn, will host a Conference Call for investors and media at 07:30AM AWST / 09:30AM AEST this morning to discuss the Quarterly Activities Report. The Conference Call will conclude with a question and answer session.
Toll-free local dial-in number: 1800 123 296
Toll-free international access numbers:
| Canada | 1855 5616 766 | New Zealand | 0800 452 782 |
|---|---|---|---|
| China | 4001 203 085 8008 702 411 |
Singapore | 800 616 2288 |
| HongKong | 800 908 865 | United Kingdom | 0808 234 0757 |
| India | 1800 3010 6141 | United States | 1855 293 1544 |
| Japan | 0120 477 087 |
For other countries use international access toll number: +61 2 8038 5221
Conference ID: 6072 2755
Please dial in five minutes prior to the conference start time and provide the operator with your name and the Conference ID as shown above. To ask a question, please dial “*1” (star, 1) on your telephone keypad.
Alternatively, the Resolute teleconference will be streamed live at: http://www.openbriefing.com/OB/2593.aspx
==> picture [164 x 12] intentionally omitted <==
11
for the period ended 30 June 2017
About Resolute
Resolute is a successful gold miner with more than 25 years of continuous production. The Company is an experienced explorer, developer, and operator having operated nine gold mines across Australia and Africa which have produced in excess of 7 million ounces of gold. Resolute currently operates two mines, the Syama Gold Mine in Africa and the Ravenswood Gold Mine in Australia, and is one of the largest gold producers listed on the Australian Securities Exchange with FY18 guidance of 300,000 ounces of gold production at All-In Sustaining Costs of A$1,280/oz (US$960/oz).
Resolute’s flagship Syama Gold Mine in Mali is a robust long life asset comprising parallel sulphide and oxide processing plants. The move to underground mining is expected to extend the mine life beyond 2028.
The Ravenswood Gold Mine in Queensland demonstrates Resolute’s significant underground expertise in successfully mining the Mt Wright ore body, where operations are expected to cease in FY18. The Company’s next stage of development in Queensland is the return to large scale open pit mining at the Ravenswood Expansion Project which will extend the Company’s local operations for a further 13 years to at least 2029.
In Ghana, the Company has completed a feasibility study on the Bibiani Gold Project focused on the development of an underground operation requiring modest capital and using existing plant infrastructure. Resolute is also exploring over 6,600km[2] of potential world class tenure in West Africa and Australia with active drilling programs in Mali, Ghana, Cote d’Ivoire and Queensland, Australia. The Company is focused on growth through exploration and development and is active in reviewing new opportunities to build shareholder value.
ASX: RSG Capital Summary
Fully Paid Ordinary Shares: 736,982,768 Current Share Price: A$1.05, 26 July, 2017 Market Capitalisation: A$777 Million FY18 Guidance: 300,000oz @ AISC A$1,280/oz
Board of Directors
Mr Martin Botha Non-Executive Chairman Mr John Welborn Managing Director & CEO Mr Peter Sullivan Non-Executive Director Mr Mark Potts Non-Executive Director Mr Bill Price Non-Executive Director Ms Yasmin Broughton Non-Executive Director