21 June 2016

Open pit mining to recommence at Resolute’s Ravenswood Gold Mine

Highlights

  • Open pit mining to recommence at the Nolans East open pit at the Ravenswood Gold Mine in July 2016.

  • Plant processing capacity to be increased from current 1.5Mtpa to 2.8Mtpa.

  • Mine life extended at the Ravenswood Gold Mine until at least October 2017.

  • Upfront capital cost of only $5m.

  • Mining at Nolans East expected to produce 2.7Mt @ 0.8g/t gold containing 71,000oz of gold.

  • Gold hedging program implemented which has resulted in forward gold sales of 36,000oz at an average price of A$1,800/oz . These forward gold sales of 3,000oz per month cover the period from November 2016 to October 2017 to match approximately 50% of the production from Nolans East.

  • Nolans East open pit to be the first stage of a long term return to large scale open pit mining at Ravenswood focused on the Sarsfield and Buck Reef West deposits.

Resolute Mining (“Resolute” or “the Company”) is pleased to announce open pit mining will recommence in July 2016 at its Ravenswood Gold Mine (“Ravenswood”) in Queensland. The commencement of mining at Nolans East is an important first step in the anticipated redevelopment of a long life large scale open pit mining operation at Ravenswood.

Nolans East represents an extension of the historic Sarsfield-Nolans pit which was mined by Resolute until 2009 prior to the commissioning of the underground mine at Mt Wright. Resolute’s current underground operations at Mt Wright are due to be completed in 2017.

The new mining operations at Nolans East will comprise:

  • Extraction of 2.7Mt @ 0.8g/t;

  • An average waste to ore ratio of 1.6:1;

  • Mining over a 15-month period, finishing in October 2017;

  • Processing at the adjacent Nolans processing plant, which will be reconfigured from its current 1.5Mtpa capacity to 2.8Mtpa;

  • Modest additional upfront capital requirement of only A$5m; and

  • All required approvals and permits are in place.

Nolans East forms a small part of the 1.2Moz open pit Ore Reserve at the Sarsfield-Nolans pit. The recommencement of open pit mining at Nolans East will assist in maintaining continuity of production as the Mt Wright underground mine prepares for closure in 2017. Mining at Nolans East is expected to be the first stage of the Ravenswood Extension Project (“REP”). A Feasibility Study for the REP is currently nearing completion. This study is examining the potential for a large open pit development with mining of the Sarsfield and Buck Reef West deposits expected to follow completion of operations at Nolans East.

==> picture [562 x 51] intentionally omitted <==

==> picture [553 x 70] intentionally omitted <==

The REP will utilise a number of innovative approaches to mine scheduling, tailings management, waste water treatment and open pit blasting practices in order to minimise initial capital costs and ensure best practice environmental and community outcomes are achieved. The Company is working closely with the Queensland Government and the Ravenswood community in developing its plans for the REP.

The decision to commence production from Nolans East has allowed the Company to implement a disciplined hedging program to manage gold price risk during the transition from underground to large scale open pit operations. Resolute has sold forward 36,000oz at an average price of A$1,800/oz. These forward gold sales of 3,000oz per month cover the period from November 2016 to October 2017 to match approximately 50% of the production from Nolans East.

Resolute’s Managing Director and CEO, Mr John Welborn, welcomed the decision to recommence open pit mining operations at Nolans East: “We are working hard to secure a long term future for Ravenswood beyond Mt Wright. Nolans East represents the start of the transition back to large scale open pit mining. The available open pit resources at Ravenswood constitute a major, and greatly underappreciated, asset of Resolute. The 1.2Moz Ore Reserve and 2.6Moz Mineral Resource are located immediately adjacent to our large operating mill and processing plant which requires only minor re-configuration to return to its former 5Mtpa capacity. In the current gold price environment these ounces offer a transformational opportunity for Resolute shareholders. The commencement of mining at Nolans East is the first step to realising that opportunity.”

“The Mt Wright underground mine at Ravenswood has been a hugely successful project for Resolute. We are owner operators of a Sub-Level Caving operation that has mined a 2.75g/t orebody down to 900m underground at an average cash cost of approximately A$830/oz. Prior to developing Mt Wright we operated Ravenswood at 5Mtpa mining the low grade Sarsfield orebody. We are hugely excited about the possibility of returning to the Sarsfield open pit operation with new vigour, innovation, and skillsets to create a further value boosting opportunity for our shareholders.”

“Resolute aims to be a partner of choice for governments in extracting enduring value from gold deposits. In focusing on extending the mine life at Ravenswood we are acutely aware of the importance of the mine to the regional economy in North Queensland and particularly the town of Ravenswood. The Company appreciates the support and assistance we are receiving from the Queensland Government and the Ravenswood Community as we work through the environmental and mining permitting approvals process.”

==> picture [444 x 129] intentionally omitted <==

==> picture [444 x 129] intentionally omitted <==

Figure 1: Sarsfield and Nolans pit looking South East with Buck Reef West deposit at bottom right

==> picture [164 x 13] intentionally omitted <==

2

==> picture [553 x 70] intentionally omitted <==

History of Mining at Ravenswood

Gold was first discovered at Ravenswood in Queensland, Australia in 1868. Ravenswood has been in operation since 1987 and was acquired by Resolute in 2004. Operations consisted of an upgraded 5Mtpa processing plant and were based on mining activity at the Sarsfield-Nolans pit. Mining at Sarsfield was completed in 2009 when the nearby Mt Wright underground mine was developed. The Nolans processing plant treated both Mt Wright ore and stockpiled Sarsfield ore until 2012. Since 2012 the plant has operated at circa 1.5Mtpa exclusively on Mt Wright ore producing approximately 100,000oz of gold per annum. The Mt Wright operation is nearing completion with the underground mine expected to close in June 2017 quarter. To date Ravenswood has produced over 4Moz of gold.

Ravenswood Geology and Resources

Nolans East is located at the eastern end of the Sarsfield-Nolans-Buck Reef West complex. Global Resources for this area are summarised below.

The geology of the region includes a number of different mineralisation styles hosted within a complex of predominantly felsic intrusive rocks. Deposit types include sulphide quartz shear lodes (Buck Reef West), narrow high grade veins (Buck Reef West and Sarsfield) large quartz stock-works (Sarsfield) and sheet vein complexes (Nolans and Nolans East).

==> picture [484 x 184] intentionally omitted <==

==> picture [484 x 185] intentionally omitted <==

Figure 2: Ravenswood geology and open pits

The Ravenswood deposits, excluding Mt Wright, have produced over 3.4Moz of gold, from several phases of operation. Despite this, very little deep drilling has been undertaken, and a number of attractive exploration targets remain in the immediate vicinity of the current resources.

==> picture [164 x 13] intentionally omitted <==

3

==> picture [553 x 70] intentionally omitted <==

Nolans East Pit reserves are as follows.

Nolans East Reserves (0.5g/t cut-off) Nolans East Reserves (0.5g/t cut-off) Nolans East Reserves (0.5g/t cut-off)
Category Mt Au g/t Koz
Proven 1.8 0.8 46
Probable 0.9 0.9 25
Total 2.7 0.8 71

Table 1: Nolans East Reserves

Nolans East Open Pit Mining Operation

Nolans East will be a small open pit extracting 2.7Mt of ore at a grade of 0.8g/t over 15 months at an average waste to ore ratio of 1.6:1. Mining will be carried out with a mining contractor utilising conventional truck and excavator operations. The majority of material will require drilling and blasting. The mining operation is located 300m from the Nolans processing plant. The key operating parameters for Nolans East are summarised below

Metric Unit Quantity
Ore BCM 1.0M
Waste BCM 1.7M
Strip Ratio W:O 1.6:1
Ore tonnes 2.7M
Grade g/t 0.8
Contained gold oz 71Koz
Processing rate tpa 2.8M
Process Recovery % 92.7
Expected Gold Production oz 66Koz
Upfront Capital A$ million $5.1

Table 2: Nolans East – key operating parameters

Ore from Nolans East will be treated at the adjacent Nolans processing plant. The plant is presently configured to treat 1.5Mtpa of Mt Wright ore. A minor reconfiguration of the plant, comprising the addition of secondary crushing plant will increase capacity to 2.8Mtpa. Incremental modifications to the crushing and leaching circuits will be required to further increase capacity to the 5Mpta rate previously in place and envisaged in the REP.

Forward Sales Program

As part of the decision to commence production from Nolans East, Resolute has initiated a new disciplined hedging program. The Company has sold forward 36,000oz at an average price of A$1,800/oz. These forward gold sales of 3,000oz per month cover the period November 2016 to October 2017 to match approximately 50% of the production from Nolans East.

Ravenswood Extension Project (REP)

Resolute is currently completing a Feasibility Study focused on extending operations for Ravenswood. The target for the REP is to define a project with the following characteristics:

  • Establish a ten-year mine life extension;

  • Maintain production in excess of 100,000oz of gold per annum;

  • Maintain robust cash margins; and

==> picture [164 x 13] intentionally omitted <==

4

==> picture [553 x 70] intentionally omitted <==

  • Ensure moderate and staged capital requirement.

Following the decision to commence open pit mining activity at Nolans East, and the consequent extension of the mine life at Ravenswood to at least October 2017, the REP Feasibility Study is now expected to be completed during the September 2016 quarter. Work is currently focused on the environmental and heritage approvals process to enable mining activity to recommence at Sarsfield and Buck Reef West.

The REP will utilise a number of innovative approaches to mine scheduling, tailings management, waste water treatment and open pit blasting practices in order to minimise initial capital costs and ensure best practice environmental and community outcomes are achieved. The Company is working closely with the Queensland Government and the Ravenswood community in developing its plans for the REP.

For further information, contact:

John Welborn

Managing Director and CEO

Resolute Mining Limited Telephone: +61 8 9261 6100 Email: [email protected] Web: www.rml.com.au

==> picture [164 x 13] intentionally omitted <==

641,582,994

A$1.15 as at 20 June, 2016 A$738m 315,000oz @AISC A$1,220/oz

5

==> picture [553 x 70] intentionally omitted <==

About Resolute

Resolute is a successful gold miner with more than 25 years of continuous production. The Company is an experienced explorer, developer, and operator having operated nine gold mines across Australia and Africa which have produced in excess of 7 million ounces of gold. The Company currently operates two mines, the Syama gold mine in Africa and the Ravenswood gold mine in Australia, and is one of the largest gold producers listed on the Australian Securities Exchange with FY16 guidance of 315,000 ounces of gold production at a cash cost of A$915/oz and All-in-sustaining-costs of A$1,220/oz.

Resolute’s flagship Syama gold mine in Mali is a robust long life asset benefitting from fully operational parallel sulphide and oxide processing plants. The move to underground mining will continue the asset’s history of strong cash generation and extend the mine life to out beyond 2028. The Ravenswood gold mine in Queensland demonstrates Resolute’s significant underground expertise in the ongoing success in mining the Mt Wright ore body. In Ghana, the Company is completing a feasibility study on the Bibiani gold project focused on the development of an underground operation requiring very low capital and using existing plant infrastructure. Resolute also controls an extensive exploration footprint along the highly prospective Syama Shear and greenstone belts in Mali and Cote d’Ivoire and is active in reviewing new opportunities to build shareholder value.

Competent Persons Statement

The information in this report that relates to the Exploration Results, Mineral Resources and Ore Reserves is based on information compiled by Mr Richard Bray who is a Registered Professional Geologist with the Australian Institute of Geoscientists and Mr Andrew Goode, a member of The Australasian Institute of Mining and Metallurgy. Mr Richard Bray and Mr Andrew Goode both have more than 5 years’ experience relevant to the styles of mineralisation and type of deposit under consideration and to the activity which they are undertaking to qualify as a Competent Person, as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Richard Bray and Mr Andrew Goode are full time employees of Resolute Mining Limited Group and each hold equity securities in the Company. They have consented to the inclusion of the matters in this report based on their information in the form and context in which it appears. This information was prepared and disclosed under the JORC code 2012 except where otherwise noted. Particular Reserves and Resources remain 2004 JORC compliant and not updated to JORC code 2012 on the basis that information has not materially changed since it was last reported.

==> picture [164 x 13] intentionally omitted <==

6

==> picture [800 x 71] intentionally omitted <==

Ravenswood Gold Mine Queensland – Nolans East Deposit. JORC Code, 2012 Edition – Table 1 report

Section 1 Sampling Techniques and Data

Criteria JORC Code explanation Commentary
Sampling
techniques

Nature and quality of sampling (e.g. cut
channels, random chips, or specific
specialized industry standard
measurement tools appropriate to the
minerals under investigation, such as
down hole gamma sondes, or handheld
XRF instruments, etc). These examples
should not be taken as limiting the broad
meaning of sampling.

Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any
measurement tools or systems used.

Aspects of the determination of
mineralisation that are Material to the
Public Report.

In cases where ‘industry standard’ work
has been done this would be relatively
simple (e.g. ‘reverse circulation drilling
was used to obtain 1 m samples from
which 3 kg was pulverised to produce a
30 g charge for fire assay’). In other cases
more explanation may be required, such
as where there is coarse gold that has
inherent sampling problems. Unusual
commodities or mineralisation types (e.g.
The mineral resource estimate was based on a combination of recent data (Carpentaria Gold 2003-2015)
collected from reverse circulation (RC) and diamond core (DD) drill holes, and historic data (MIM Exploration
1980-1999) RC, DD, open hole percussion (OHP) and air core (AC) drill holes.
Historic DD holes that had AC, OHP or RC precollars were classified as air core diamond (ACD), open
percussion diamond (OPD) or reverse circulation diamond (RCD) respectively.
For recent data each 1m RC interval was riffle split to obtain a 2-3.5 kg sample, which was sent to the laboratory
for pulverisation to produce a 200g sub-sample for analysis.
Historical RC holes were sampled at either 1m or 2m intervals to obtain a sample whose weight was not
recorded.
Recent diamond core were sampled at 1m intervals and cut in half to provide a 2-4kg sample which was sent to
the laboratory for crushing to 10mm, splitting and pulverising to 85% passing 75 microns, to provide a 30g charge
for analysis.
Historic diamond core was sampled at 1 or 2m intervals and halved and sent to the laboratory.
Historic OHP and AC cuttings were sampled at 1m or 2m riffle split intervals providing samples whose weight
was not recorded.
Sampling and sample preparation protocols for recent drilling are industry standard and are deemed appropriate
by the Competent Person.
Historical sampling preparation protocols were deemed appropriate at the time.

==> picture [164 x 13] intentionally omitted <==

7

==> picture [800 x 71] intentionally omitted <==

Criteria JORC Code explanation Commentary
submarine nodules) may warrant
disclosure of detailed information.
Drilling
techniques

Drill type (e.g. core, reverse circulation,
open-hole hammer, rotary air blast, auger,
Bangka, sonic, etc) and details (e.g. core
diameter, triple or standard tube, depth of
diamond tails, face-sampling bit or other
type, whether core is oriented and if so,
by what method, etc).
Drill types used include RC and diamond core of PQ, HQ and NQ sizes for recent data, historic drill types include
BQ, HQ, NQ and some unspecified sizes.
Drill core for recent data is oriented at 30m down hole intervals using spear method. It is unknown what method
was used for historic data.
Drill sample
recovery

Method of recording and assessing core
and chip sample recoveries and results
assessed.

Measures taken to maximise sample
recovery and ensure representative
nature of the samples.

Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential loss/gain of fine/coarse
material.
Diamond core interval recoveries are measured and logged for recent data; they are rarely logged for historical
data. RC, OHP and AC recoveries are not collected.
Appropriate measures are taken to maximise sample recovery and ensure the representative nature of the
samples.
Logging
Whether core and chip samples have
been geologically and geotechnically
logged to a level of detail to support
appropriate Mineral Resource estimation,
mining studies and metallurgical studies.

Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc) photography.
Recent and historic RC, AC, OHP and DD drill holes are geologically logged for colour, grainsize, lithology,
minerals and alteration. RC drill holes are logged on 1m intervals and DD drill holes are logged on geologically
domained intervals.
Historic RC, AC and OHP holes were logged to match the sampling interval of 1 or 2m.
Geotechnical, structure orientation, recovery and magnetic susceptibility data are measured and logged for
diamond core intervals.

==> picture [164 x 13] intentionally omitted <==

8

==> picture [800 x 71] intentionally omitted <==

Criteria JORC Code explanation Commentary

The total length and percentage of the
relevant intersections logged.
Diamond core is photographed (wet and dry) for recent data but there are few photographs available for historic
core; RC chips are occasionally photographed for recent data, RC, AC and OHP chips are not photographed for
historic data.
Recent Diamond core and RC chips are logged on a laptop computer either at the drill site (RC) or the core shed
(DD) into Excel, validated and imported into the drillhole database.
Historic logging was completed on paper templates at the core shed or drill rig and occasionally entered into the
computer database from an excel template.
Holes are logged in their entirety (100%).
Sub-sampling
techniques and
sample
preparation

If core, whether cut or sawn and whether
quarter, half or all core taken.

If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet
or dry.

For all sample types, the nature, quality
and appropriateness of the sample
preparation technique.

Quality control procedures adopted for all
sub-sampling stages to maximise
representivity of samples.

Measures taken to ensure that the
sampling is representative of the in situ
material collected, including for instance
results for field duplicate/second-half
sampling.

Whether sample sizes are appropriate to
the grain size of the material being
sampled.
Each 1m RC interval is riffle split (dry) to obtain a 2-3.5 kg sample, which is sent to the laboratory for
pulverisation.
A similar protocol was followed for historical RC, OHP and AC samples for either 1m or 2m intervals; however the
sampling details are not recorded.
Diamond core are sampled at 1m intervals and cut into half core to provide a 2-4kg sample which is sent to the
laboratory for crushing to 10mm, splitting and pulverising to 85% passing 75 microns.
A similar protocol was followed for historical DD samples and core was cut and halved for sampling at either 1m
or 2m intervals; however details of the sampling were not clearly recorded for induvial samples.
Field duplicates (RC) for recent data are collected every 1:30 samples at the same time using the same method
(riffle split) as the parent sample.
QC data is not available for the historical RC, AC or OHP type drilling.
Diamond core coarse duplicates were sampled and collected after crushing, by the laboratory, at a rate of 1:15
samples for recent drilling.
QC data is not available for the historical DD drilling.
Sampling, sample preparation and quality control protocols are industry standard and are deemed appropriate by
the Competent Person.

==> picture [164 x 13] intentionally omitted <==

9

==> picture [800 x 71] intentionally omitted <==

Criteria JORC Code explanation Commentary
Quality of assay
data and
laboratory tests

The nature, quality and appropriateness
of the assaying and laboratory procedures
used and whether the technique is
considered partial or total.

For geophysical tools, spectrometers,
handheld XRF instruments, etc., the
parameters used in determining the
analysis including instrument make and
model, reading times, calibrations factors
applied and their derivation, etc.

Nature of quality control procedures
adopted (e.g. standards, blanks,
duplicates, external laboratory checks)
and whether acceptable levels of
accuracy (i.e. lack of bias) and precision
have been established.
RC and DD samples are assayed for gold by ALS Global Townsville Au-AA25 method which is a 30gram fire
assay fusion with AAS instrument finish; the analytical method is appropriate for this style of mineralisation.
Methods for historic RC, AC, OHP and DD drilling included Au-AA25, FA50_Pb_AA, UN_UN and unknown
methods for gold by ALS_TNV and a number of unspecified laboratories in the Townsville region.
No geophysical tools were used to determine elemental concentrations used in resource estimations.
Quality control (QC) procedures for recent data include the use of certified standards (at a rate of 1:20 samples),
certified blanks (1:20), non-certified coarse blanks (1:15), field duplicates (RC) (1:30) and coarse crush duplicates
(DD) (1:15). QC samples are included in all dispatches to the laboratory and the results are routinely analysed for
accuracy and precision.
Quality control (QC) procedures for historic RC, AC, OHP, and DD drilling are assumed to have been carried out
to industry standard regarding QAQC procedures however the documentation is incomplete.
Umpire pulp analysis of selected pulps is performed by a second external laboratory in Townsville for recent data
There is no evidence of historic umpire sampling for any drill type.
Laboratory quality control data, including laboratory standards, blanks, duplicates, repeats and grind size results
are also captured into the database and analysed for accuracy and precision for recent data.
Analysis of the available QC sample assay results indicates that an acceptable level of accuracy and precision
has been achieved.
The level of accuracy and precision for historic data is unknown.
Verification of
sampling and
assaying

The verification of significant intersections
by either independent or alternative
company personnel.

The use of twinned holes.

Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.

Discuss any adjustment to assay data.
The verification of significant intersections has been completed by company personnel and the competent
persons.
No drill holes within the resource were twinned.
Recent drill holes are logged digitally into Excel templates with lookup codes, validated and then compiled into
relational SQL2008 database using DataShed data management software. The database is backed up on a daily
basis to the head office server.

==> picture [164 x 13] intentionally omitted <==

10

==> picture [800 x 71] intentionally omitted <==

Criteria JORC Code explanation Commentary
Historic drill holes were logged onto paper templates and partially transcribed onto an excel spreadsheet and
logged into the database as described above. Some historic drill logs are only partially loaded onto the database
with existing geotechnical and geological logs available as paper copies only.
Recent Assay files are reported by the laboratory in CSV format and are imported into the SQL database without
adjustment or modification.
Historic assay files were reported by the laboratory in CSV, SIF, text, paper and unknown formats and either
transcribed into appropriate electronic formats, or directly imported into the SQL database. It appears that no
adjustment was made to the assay data.
There were no adjustments to assay data.
Location of data
points

Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and
other locations used in Mineral Resource
estimation.

Specification of the grid system used.

Quality and adequacy of topographic
control.
Collar coordinates for recent drill holes are picked up in UTM by contract and staff surveyors using Leica 1203
DGPS (up to 10cm accuracy).
The survey pickup method is unknown for a large number of historic holes.
Down hole surveys are collected at 30m intervals using instruments including Gyro, Devi flex, single shot and
multi shot.
Coordinates and azimuth are reported in UTM AMG84 Zone 55
Coordinates are translated to local mine grid where appropriate.
Data spacing and
distribution

Data spacing for reporting of Exploration
Results.

Whether the data spacing and distribution
is sufficient to establish the degree of
geological and grade continuity
appropriate for the Mineral Resource and
Ore Reserve estimation procedure(s) and
classifications applied.

Whether sample compositing has been
applied.
The drill hole spacing is sufficient to demonstrate geological and grade continuity appropriate for the Mineral
Resource and the classifications applied under the 2012 JORC Code.
The appropriateness of the drill spacing is reviewed by the geological team and Competent Person.
No sample compositing is applied during the sampling process.

==> picture [164 x 13] intentionally omitted <==

11

==> picture [800 x 71] intentionally omitted <==

Criteria JORC Code explanation Commentary
Orientation of data
in relation to
geological
structure

Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this is
known, considering the deposit type.

If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to
have introduced a sampling bias, this
should be assessed and reported if
material.
Drill holes were drilled predominantly perpendicular to mineralised domains where possible.
No orientation based sampling bias has been identified in the data.
Sample security
The measures taken to ensure sample
security.
RC and diamond core samples are initially stored on site and then securely despatched to ALS Townsville
laboratory.
It is assumed that appropriate security protocols were taken for historical drill hole samples to be despatched to
the Laboratory.
Audits or reviews
The results of any audits or reviews of
sampling techniques and data.
External audits of procedures indicate protocols are within industry standards for recent drilling.
No evidence of external reviews has been supplied for historical drilling data.

Section 2 Reporting of Exploration Results

Criteria JORC Code explanation Commentary
Mineral tenement
and land tenure
status

Type, reference name/number, location
and ownership including agreements or
material issues with third parties such as
joint ventures, partnerships, overriding
royalties, native title interests, historical
sites, wilderness or national park and
environmental settings.
Exploration activity is conducted within QLD Government authorised tenure including exploration permits and
mining leases which are held by Carpentaria Gold Pty Ltd.
Formal individual agreements are negotiated with the traditional landowners and property owners for each of the
exploration prospects before carrying out exploration activities.
Exploration activities conducted within these leases are highly regulated and reports are routinely submitted to
the QLD government containing details of work conducted in the area and expenditure.

==> picture [164 x 13] intentionally omitted <==

12

==> picture [800 x 71] intentionally omitted <==

Criteria JORC Code explanation Commentary

The security of the tenure held at the time
of reporting along with any known
impediments to obtaining a licence to
operate in the area.
Exploration done
by other parties

Acknowledgment and appraisal of
exploration by other parties.
The Ravenswood area has a long history of mining and exploration. Gold was discovered in 1868 and alluvial
and shallow oxidised quartz-sulphide veins were worked in the initial gold rush. Carpentaria Gold Pty Ltd has
been exploring in the area since 1978.
Geology
Deposit type, geological setting and style
of mineralisation.
Mineralisation occurs in variably orientated tabular sulphide – quartz veins and mineralised shear zones and in a
number of vein stock works. Areas of weak veining separate the more strongly stock-worked areas into discrete
zones. Individual veins vary in width from hairline fractures up to im locally. Mineralisation extends from the
surface level and is essentially tested by drilling depth. The mineralisation remains open at depth.
The Jessop Creek Tonalite, an Early to Middle Devonian age unit of the Ravenswood Batholith, hosts the
mineralisation. In the project area the Jessop Creel Tonalite can be divided into diorite, quartz diorite and minor
gabbro. Boundaries between these units vary from sharp to indistinct and often show complex relationships
including stoping xenoliths and irregular dykes. No association between the host lithology and the gold
mineralisation has been established other than it is a suitable competent host that allowed the cross cutting
sulphide veins to develop.
The major commodity being sought is gold.
Drill hole
Information

A summary of all information material to
the understanding of the exploration
results including a tabulation of the
following information for all Material drill
holes:
o
easting and northing of the drill
hole collar
o
elevation or RL (Reduced Level
– elevation above sea level in
metres) of the drill hole collar
All information including easting, northing, elevation, dip, azimuth, coordinate system, drill hole length, intercept
length and depth are documented in the tabulated intercepts in the body of the report.
Detailed information in relation to the results from drilling used to calculate the Resource and Reserve is not
included in this release.
For completeness the following information is provided about the drill holes used in the resource calculation:
1.
Easting, Northing and RL of the drill hole collars are measured and recorded in UTM AMG84 (Zone
55).
2.
Dip is the inclination of the drill hole from horizontal. For example a drill hole drilled at -600is 600from
the horizontal.

==> picture [164 x 13] intentionally omitted <==

13

==> picture [800 x 71] intentionally omitted <==

Criteria JORC Code explanation Commentary
o
dip and azimuth of the hole
o
down hole length and
interception depth
o
hole length.

If the exclusion of this information is
justified on the basis that the information
is not Material and this exclusion does
not detract from the understanding of the
report, the Competent Person should
clearly explain why this is the case.
3.
Down hole length is the distance down the inclination of the hole and is measured as the distance
from the horizontal to end of hole.
4.
Intercept depth is the distance from the start of the hole down the inclination of the hole to the depth
of interest or assayed interval of interest.
The Competent Persons do not believe the listing of the entire drill hole data base used to calculate the
resources is relevant for this release.
Data aggregation
methods

In reporting Exploration Results,
weighting averaging techniques,
maximum and/or minimum grade
truncations (e.g. cutting of high grades)
and cut-off grades are usually Material
and should be stated.

Where aggregate intercepts incorporate
short lengths of high grade results and
longer lengths of low grade results, the
procedure used for such aggregation
should be stated and some typical
examples of such aggregations should be
shown in detail.

The assumptions used for any reporting
of metal equivalent values should be
clearly stated.
Reported intercepts quoted in the report are length weighted to the nearest metre.
No top cuts are applied.
Lower cut-off grade applied was 0.5g/t. Maximum consecutive 4m of internal dilution within a reported interval
was used. Maximum intercept length of 3m down hole.
Accuracy of the survey measurements is considered to meet acceptable industry standards.
Metal equivalent values are not used in reporting.
Relationship
between
mineralization

These relationships are particularly
important in the reporting of Exploration
Results.
Reporting of mineralisation width and intercepts are deemed acceptable by Competent Person.

==> picture [164 x 13] intentionally omitted <==

14

==> picture [800 x 71] intentionally omitted <==

Criteria JORC Code explanation Commentary
widths and
intercept lengths

If the geometry of the mineralisation with
respect to the drill hole angle is known, its
nature should be reported.

If it is not known and only the down hole
lengths are reported, there should be a
clear statement to this effect (e.g. ‘down
hole length, true width not known’).
As there was a combination of mineralised directions, drill holes were orientated to intersect this mineralisation
perpendicular to the drill direction.
Results are reported as down hole length.
Diagrams
Appropriate maps and sections (with
scales) and tabulations of intercepts
should be included for any significant
discovery being reported These should
include, but not be limited to a plan view
of drill hole collar locations and
appropriate sectional views.
Relevant maps, diagrams and tabulations of intercepts are included in the body of the report.
Balanced reporting
Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low and
high grades and/or widths should be
practiced to avoid misleading reporting of
Exploration Results.
Significant intercepts of new drill holes have been reported in this release.
Other substantive
exploration data

Other exploration data, if meaningful and
material, should be reported including
(but not limited to): geological
observations; geophysical survey results;
geochemical survey results; bulk samples
– size and method of treatment;
metallurgical test results; bulk density,
groundwater, geotechnical and rock
characteristics; potential deleterious or
contaminating substances.
Geophysical and geochemical data and any additional exploration information are reported regularly in annual
exploration tenement government reports, and monthly, quarterly and annual Resolute reporting.

==> picture [164 x 13] intentionally omitted <==

15

==> picture [800 x 71] intentionally omitted <==

Criteria JORC Code explanation Commentary
Further work
The nature and scale of planned further
work (e.g. tests for lateral extensions or
depth extensions or large-scale step-out
drilling).

Diagrams clearly highlighting the areas of
possible extensions, including the main
geological interpretations and future
drilling areas, provided this information is
not commercially sensitive.
Further work is planned to evaluate exploration opportunities that extend the known mineralisation at the Nolans
East / Sarsfield deposit and improve the confidence of the model.

Section 3 Estimation and Reporting of Mineral Resources

Criteria
Database integrity
JORC Code explanation Commentary

Measures taken to ensure that data has
not been corrupted by, for example,
transcription or keying errors, between
its initial collection and its use for
Mineral Resource estimation purposes.

Data validation procedures used.
Data have been compiled into a relational SQL database. The setup of this database precludes the loading of
data which do not meet the required validation protocols. The data is managed using DataShedTMdrill hole
management software (Maxwell Geoservices) using SQL database techniques. Validation checks are conducted
using SQL and DataShed relational database standards. Data has also been checked against original hard
copies for 75% of the data, and where possible, loaded from original data sources.
Carpentaria Gold Pty Ltd carried out the following basic validation checks on the data supplied prior to resource
estimation:

Drill holes with overlapping sample intervals.

Sample intervals with no assay data. Duplicate records.

Assay grade ranges.

Collar coordinates ranges.

Valid hole orientation data.
There are no significant issues with the data.

==> picture [164 x 13] intentionally omitted <==

16

==> picture [800 x 71] intentionally omitted <==

Criteria JORC Code explanation Commentary
Site visits
Comment on any site visits undertaken
by the Competent Person and the
outcome of those visits.

If no site visits have been undertaken
indicate why this is the case.
The Competent Persons have conducted numerous site visits to the Ravenswood Project Qld.
All aspects of drilling, sampling and mining are considered by the Competent Persons to be of a high industry
standard.
Geological
interpretation

Confidence in (or conversely, the
uncertainty of) the geological
interpretation of the mineral deposit.

Nature of the data used and of any
assumptions made.

The effect, if any, of alternative
interpretations on Mineral Resource
estimation.

The use of geology in guiding and
controlling Mineral Resource
estimation.

The factors affecting continuity both of
grade and geology.
Nolans East / Sarsfield Deposit lies within the northern part of the Thomson fold belt which form part of the
Charters Towers province, in a tight cluster of calc-alkaline intrusives of Ordovician to Devonian age known as
the Ravenswood Batholiths. Individual intrusive compositions vary from adamellites to diorite: - granite and
granodiorite are the most common. The Nolans East / Sarsfield gold deposit is located within and around the
junction of three prominent fault systems.
The deposits outcrop over a 500 by 200 metre area with mineral resources defined to a depth of 300 metres. A
weathered zone persists to an average of 15 metres below surface. Supergene effects are restricted to a
discontinuous horizon within a partially oxidised zone less than 5 metres thick.
At least 95% of gold is located within a network of flatly dipping sulphide-quartz veins. Movement on the faults
has controlled dilation within the veins, and at least 17 different structural movements and alteration events have
reactivated the vein. Veins (20mm to 250mm thick) are typically associated with a phyllic alteration selvedge up
to 500mm wide. Vein mineralogy is sulphide dominant with quartz and calcite constituting the major gangue
phases. Total sulphide content of the ore is less than 5% with the most common phases being pyrite, pyrrhotite,
sphalerite and chalcopyrite. Gold occurs as mostly sub 50 micron free milling grains on fractures and sulphide
mineral boundaries.
Historic production figures from 1870 to 1918 and then 1987 to 2005 indicate approximately 400 koz of gold was
recovered from underground mining methods.
Geologically, Nolans East / Sarsfield resource modelling was divided into several domains based on geological
structures/ lithologies and gold distribution; named as Area 2, Area 4, Buckreef and Nolans zones. Nolans East
is the remaining portion east of Nolans pit.
Dimensions
The extent and variability of the Mineral
Resource expressed as length (along
strike or otherwise), plan width, and
The Nolans East / Sarsfield study area covers a region of approximately 900 metres x 900 metres. The Mineral
Resource is limited in depth to 600 metres from the surface.

==> picture [164 x 13] intentionally omitted <==

17

==> picture [800 x 71] intentionally omitted <==

Criteria JORC Code explanation Commentary
depth below surface to the upper and
lower limits of the Mineral Resource.
Estimation and
modelling
techniques

The nature and appropriateness of the
estimation technique(s) applied and key
assumptions, including treatment of
extreme grade values, domaining,
interpolation parameters and maximum
distance of extrapolation from data
points. If a computer assisted
estimation method was chosen include
a description of computer software and
parameters used.

The availability of check estimates,
previous estimates and/or mine
production records and whether the
Mineral Resource estimate takes
appropriate account of such data.

The assumptions made regarding
recovery of by-products.

Estimation of deleterious elements or
other non-grade variables of economic
significance (e.g. sulphur for acid mine
drainage characterization).

In the case of block model interpolation,
the block size in relation to the average
The method of Multiple Indicator Kriging (MIK) was used to estimate gold into model blocks. MIK modelling
methods of gold grades, use indicator variography based on the resource composite sample grades within
distinct mineralised populations, defined by wire-frames.
Within each domain gold grade continuity was characterised by indicator variograms at 14 indicator thresholds
spanning the global range of grades based on 2m down hole composites of the Nolans East / Sarsfield
exploration drilling.
Data viewing, compositing and wire-framing were performed using Micromine software. Exploratory data
analysis, variogram calculation and modelling, and resource estimation have been performed using FSSI
Consultant (Australia) Pty Ltd GS3MTMsoftware. GS3MTMis designed specifically for estimation of recoverable
resources using MIK.
MIK was used as the preferred method for estimation of gold at Nolans East / Sarsfield as the approach has
been demonstrated to work well in a large number of deposits of diverse geological styles. The gold
mineralisation seen at Nolans East / Sarsfield is typical of that seen in most structurally controlled gold deposits
and where the MIK method has been found to be of most benefit.
Open pit and underground mining has occurred at Nolans East / Sarsfield by previous owners of the project.
The current resource estimate takes into account historic production using wireframes that represent the open
cut pit and the stopes mined underground.
No by-products or deleterious elements are modelled.
Block dimensions used were 20mE by 20mN by 5mRL and chosen due to this dimension approximates the
average drill spacing in the modelled resource areas. A three pass octant search strategy was used to define
the local neighbourhood data used in the kriging to produce the three modelled resource confidence categories.
The highest confidence blocks are estimated using search radii of 30mE by 30mN by 15mRL and a minimum of
8 data coming from a minimum of 4 octants. The second and third pass estimates were estimated using an
expanded search of 50% with 16 and 8 minimum data and 4 and 2 minimum octants, respectively. All estimation
passes use a maximum of 48 data.

==> picture [164 x 13] intentionally omitted <==

18

==> picture [800 x 71] intentionally omitted <==

Criteria JORC Code explanation Commentary
sample spacing and the search
employed.

Any assumptions behind modelling of
selective mining units.

Any assumptions about correlation
between variables.

Description of how the geological
interpretation was used to control the
resource estimates.

Discussion of basis for using or not
using grade cutting or capping.

The process of validation, the checking
process used, the comparison of model
data to drill hole data, and use of
reconciliation data if available.
The selective mining unit at Nolans East / Sarsfield is expected to be at the scale of the model blocks so no
further subdivision is required.
Gold is the only economic metal estimated in the current model.
Mineralised domain wire-frames developed at nominal 0.1 g/t Au cut-off and used to flag resource composites
and code domain proportions to the block model. A further division of the model domains into oxide and fresh
rock is applied by triangulated surfaces interpreted from the logging of the drill samples.
Statistical analysis showed the gold population in each domain to be highly skewed and generally having
moderate to high coefficient of variation. Selection of the median as the average grade of the highest indicator
threshold was used to reduce the influence of extreme composite grades on the model gold estimates.
Visual validation of grade trends and gold distributions was carried out.
Moisture
Whether the tonnages are estimated on
a dry basis or with natural moisture,
and the method of determination of the
moisture content.
All tonnages are estimated on a dry basis.
Cut-off parameters
The basis of the adopted cut-off
grade(s) or quality parameters applied.
The mineral resources were reported at a 0.5 g/t Au grade cut-off for Nolans East / Sarsfield. This cut off was
chosen as the insitu marginal cut- grade estimation, using current Ravenswood economic parameters, indicates
that this is applicable for open cut mining methods.
Mining factors or
assumptions

Assumptions made regarding possible
mining methods, minimum mining
dimensions and internal (or, if
applicable, external) mining dilution. It
is always necessary as part of the
Mining methods for the extraction of gold at Nolans East / Sarsfield has primarily been by open pit and
underground methods. It is anticipated that large scale open pit mining methods will be applied for the remaining
resources. Grade control of ore blocking will be based on sampling from high quality reverse circulation drilling
spaced at approximately 5mE by 12.5mN with samples taken at 1.5 metre intervals down-hole.

==> picture [164 x 13] intentionally omitted <==

19

==> picture [800 x 71] intentionally omitted <==

Criteria JORC Code explanation Commentary
process of determining reasonable
prospects for eventual economic
extraction to consider potential mining
methods, but the assumptions made
regarding mining methods and
parameters when estimating Mineral
Resources may not always be rigorous.
Where this is the case, this should be
reported with an explanation of the
basis of the mining assumptions made.
Nolans East / Sarsfield pit was mined historically using standard open pit mining methods with a backhoe type
excavator to excavate benches. Below the open cut, underground open stope underground mining methods
were used historically dating back to 1870.
Historically, (1870-1918) + recent (1987-2005) production, totaled around 400koz of high grade gold.
Metallurgical
factors or
assumptions

The basis for assumptions or
predictions regarding metallurgical
amenability. It is always necessary as
part of the process of determining
reasonable prospects for eventual
economic extraction to consider
potential metallurgical methods, but the
assumptions regarding metallurgical
treatment processes and parameters
made when reporting Mineral
Resources may not always be rigorous.
Where this is the case, this should be
reported with an explanation of the
basis of the metallurgical assumptions
made.
Crushing at Nolans East / Sarsfield will be either single stage or in three stages depending on the gold grade of
the material to be crushed.
Some minor adjustments to the current circuit used for Mt Wright ore will be required.
Gold is recovered using single-stage crushing, milling (SAG + ball), gravity circuit (Knelson Concentrator), and a
CIL circuit.
Gold is recovered from loaded carbon in a four tonne capacity AARL elution plant. Gold is then deposited on to
stainless steel cathodes in an electrolytic circuit.
Gold will be poured into dore bars, containing approximately 80% gold and 20% silver.
Environmental
factors or
assumptions

Assumptions made regarding possible
waste and process residue disposal
options. It is always necessary as part
of the process of determining
reasonable prospects for eventual
economic extraction to consider the
potential environmental impacts of the
The Nolans-Sarsfield operation at Ravenswood is centred on the Nolans plant site. Ore from the Mt Wright
underground mine is currently trucked to the plant for extraction and refining of gold. The tailings from this
mineral processing are discharged into the Sarsfield Open Pit. These tailings are potentially acid forming and
subaqueous settlement beneath a pit lake (water cover) prevents the oxidation of the stored tailings.
It is envisaged a future restart of mining at the Nolans East / Sarsfield will incorporate the Sarsfield Open Pit
tailings storage facility currently being used.

==> picture [164 x 13] intentionally omitted <==

20

==> picture [800 x 71] intentionally omitted <==

Criteria JORC Code explanation Commentary
mining and processing operation. While
at this stage the determination of
potential environmental impacts,
particularly for a greenfield project, may
not always be well advanced, the status
of early consideration of these potential
environmental impacts should be
reported. Where these aspects have
not been considered this should be
reported with an explanation of the
environmental assumptions made.
Some waste rock from future mining of a cut-back at Nolans East / Sarsfield may be potentially-acid forming
while the majority of waste rock will be non-acid forming. Waste rock dumping has been scheduled, along with
encapsulation designs and optimization determined to minimize the risk of acid forming conditions from the
waste rock dumping landform. The rehabilitation plan of that landform is also a key control.
Tailings generated from the overall life of mining from a Nolans East / Sarsfield cutback would not have a net
acid forming potential and will be placed in the current regulated storage facility.
Bulk density
Whether assumed or determined. If
assumed, the basis for the
assumptions. If determined, the method
used, whether wet or dry, the frequency
of the measurements, the nature, size
and representativeness of the samples.

The bulk density for bulk material must
have been measured by methods that
adequately account for void spaces
(vugs, porosity, etc), moisture and
differences between rock and alteration
zones within the deposit.

Discuss assumptions for bulk density
estimates used in the evaluation
process of the different materials.
A substantial body of rock density (SG) measurements for the Nolans East / Sarsfield deposits were collected by
BPB Slimline Services in 2 campaigns during 1995-1996. Gamma-gamma density logging was collected from a
total of 14 drill holes with samples taken at 10cm intervals over a combined total length of 2,900 metres.
A total of 2,551 readings were made of fresh rock from which an average value of 2.781 was calculated.

Minimum Value 2.365

Maximum Value 3.002

Average Value 2.781

Median Value 2.78

Std. Deviation 0.05019
A Bulk Density of 2.78 has been used for this study.
Classification
The basis for the classification of the
Mineral Resources into varying
confidence categories.
The gold estimates within each block have been classified according to the distribution of sampling in the kriging
neighbourhood. This classification scheme takes into account the uncertainty in the estimates related to the
proximity and distribution of the informing composites.

==> picture [164 x 13] intentionally omitted <==

21

==> picture [800 x 71] intentionally omitted <==

Criteria JORC Code explanation Commentary

Whether appropriate account has been
taken of all relevant factors (i.e. relative
confidence in tonnage/grade
estimations, reliability of input data,
confidence in continuity of geology and
metal values, quality, quantity and
distribution of the data).

Whether the result appropriately
reflects the Competent Person’s view of
the deposit.
A progressively less stringent three pass search strategy produces the three categories of confidence. The
highest confident estimate uses a search ellipse of approximately the same dimension of the block dimension
and a significant number of resource composites selected from within an octant constraint. The search radii are
expanded and sample criteria relaxed for the second and third categories.
Audits or reviews
The results of any audits or reviews of
Mineral Resource estimates.
No audits or independent reviews have been undertaken on the current Mineral Resource estimates.
Discussion of
relative accuracy/
confidence

Where appropriate a statement of the
relative accuracy and confidence level
in the Mineral Resource estimate using
an approach or procedure deemed
appropriate by the Competent Person.
For example, the application of
statistical or geostatistical procedures
to quantify the relative accuracy of the
resource within stated confidence limits,
or, if such an approach is not deemed
appropriate, a qualitative discussion of
the factors that could affect the relative
accuracy and confidence of the
estimate.

The statement should specify whether it
relates to global or local estimates, and,
if local, state the relevant tonnages,
which should be relevant to technical
and economic evaluation.
The relative accuracy of the Mineral Resource estimate is reflected in the reporting of Measured, Indicated and
Inferred.
The resource’s relative accuracy is based on data quality, data quantity, geological confidence and the
estimation accuracy.
The precision of the estimation is globally acceptable with the assumption that at a mining level more detailed
grade control drilling will be undertaken.
The geostatistical techniques applied to estimate the Nolans East / Sarsfield deposit are deemed appropriate for
the anticipated bulk mining method proposed.

==> picture [164 x 13] intentionally omitted <==

22

==> picture [800 x 71] intentionally omitted <==

Criteria JORC Code explanation Commentary
Documentation should include
assumptions made and the procedures
used.

These statements of relative accuracy
and confidence of the estimate should
be compared with production data,
where available.

Section 4 Estimation and Reporting of Ore Reserves

Criteria JORC Code explanation Commentary
Mineral Resource
estimate for
conversion to Ore
Reserves
Description of the Mineral Resource estimate used
as a basis for the conversion to an Ore Reserve.
Clear statement as to whether the Mineral
Resources are reported additional to, or inclusive
of, the Ore Reserves.
Resources and Reserves at Nolans East / Sarsfield are reported above a 0.5 g/t cut-off. This was calculated as a
marginal cut off utilising open pit mining methods.
Material below this cut-off is not considered in the resource.
Ore Reserves are the material reported as a sub-set of the resource, that which can be extracted from the mine and
processed with an economically acceptable outcome.
Reported Ore Reserves are exclusive to the Resources.
Site visits Comment on any site visits undertaken by the
Competent Person and the outcome of those visits.
If no site visits have been undertaken indicate why
this is the case.
Mr Richard Bray who is a Registered Professional Geologist with the Australian Institute of Geoscientists and Mr
Andrew Goode, a member of The Australasian Institute of Mining and Metallurgy are the Competent Persons. Both
have conducted regular site visits to the Ravenswood Project location.
Study status The type and level of study undertaken to enable
Mineral Resources to be converted to Ore
Reserves.
The Code requires that a study to at least Pre-
Feasibility Study level has been undertaken to
convert Mineral Resources to Ore Reserves. Such
studies will have been carried out and will have
determined a mine plan that is technically
achievable and economically viable, and that
Pit optimisations were completed using the Lerchs-Grossman (LG) algorithm to calculate the optimal pit at specified
input parameters that were determined prior to the study. A wireframe pit shell for each gold price considered was
the resultant output. One of these was selected as the base for the new pit design.

==> picture [164 x 13] intentionally omitted <==

23

==> picture [800 x 71] intentionally omitted <==

Criteria JORC Code explanation Commentary
material Modifying Factors have been considered.
Cut-off
parameters
The basis of the cut-off grade(s) or quality
parameters applied.
Cut-off grades for the mine design were calculated using current budget cost models, including contractor estimates
and actual cost data. Processing recovery and other factors were determined from actual current performance, or
historic/estimated data. The mine design was completed using the output from the LG algorithm.
Mining factors or
assumptions
The method and assumptions used as reported in
the Pre-Feasibility or Feasibility Study to convert
the Mineral Resource to an Ore Reserve (i.e. either
by application of appropriate factors by
optimization or by preliminary or detailed design).
The choice, nature and appropriateness of the
selected mining method(s) and other mining
parameters including associated design issues
such as pre-strip, access, etc.
The assumptions made regarding geotechnical
parameters (e.g. pit slopes, stope sizes, etc.),
grade control and pre-production drilling.
The major assumptions made and Mineral
Resource model used for pit and stope
optimization (if appropriate).
The mining dilution factors used.
The mining recovery factors used.
Any minimum mining widths used.
The manner in which Inferred Mineral Resources
are utilized in mining studies and the sensitivity of
the outcome to their inclusion.
The infrastructure requirements of the selected
mining methods.
The open pit mine design is based on normal sequential bench mining methods. The orebody comprises quartz
veins and some disseminated mineralisation hosted within a granodiorite batholith. Mining incorporates a single
access ramp into the pit, 10m bench height mined as a series of four flitches.
Orebody cut offs are applied during the pit optimisation process. Only Measured and Indicated ore has been used to
compile the pit shell and associated design.
A minimum mining width of 40m has been applied. Ramp widths are set at 26m (double lane – 777 haulage truck)
for the upper sections and then narrowed to single lane
Mining dilution and recovery are addressed in the model method (MIK) and the utilisation of flitch mining.
There are currently no Inferred Resources included in the life of mine plan or Ore Reserves.
Grade control will be based on sampling from high quality reverse circulation drilling spaced at approximately 5mE
by 12.5mN with samples taken at 1.5 metre intervals down-hole.
All Grade Control sampling assays are determined on a PAL system on the mine site. Standard QAQC protocols
will be applied which comprise of 1 in every 10 samples.
Existing geotechnical parameters, used in previous mining and validated through external consultant studies, have
been applied;
Oxide – Single 10m bench height with a batter face angle of 60°and berm width of 8m
Fresh - Double stacked 10m high benches (20m overall height) with a batter face angle of 80°and 7m berm width.
Inferred resources are not considered within the pit design process.
Minimal infrastructure is required for the selected mining method with the exception of new ramp access into the
existing void. Other required infrastructure is already in place. The waste dump will require expansion but sufficient
space exists within the lease to do this.

==> picture [164 x 13] intentionally omitted <==

24

==> picture [800 x 71] intentionally omitted <==

Criteria JORC Code explanation Commentary
Metallurgical
factors or
assumptions
The metallurgical process proposed and the
appropriateness of that process to the style of
mineralization.
Whether the metallurgical process is well-tested
technology or novel in nature.
The nature, amount and representativeness of
metallurgical test work undertaken, the nature of
the metallurgical domaining applied and the
corresponding metallurgical recovery factors
applied.
Any assumptions or allowances made for
deleterious elements.
The existence of any bulk sample or pilot scale test
work and the degree to which such samples are
considered representative of the ore body as a
whole.
For minerals that are defined by a specification,
has the ore reserve estimation been based on the
appropriate mineralogy to meet the specifications?
Gold is recovered using single-stage crushing, milling (SAG + ball), gravity circuit (Knelson Concentrator), and a CIL
circuit.
The metallurgical process is well-tested technology. The processing plant has been operating in its current
configuration for several years and no significant changes to the circuit are anticipated.
No deleterious elements have been experienced to date and are not expected.
No bulk samples were deemed necessary due to the current successful metallurgical performance of the extraction
methods applied.
Environmental The status of studies of potential environmental
impacts of the mining and processing operation.
Details of waste rock characterization and the
consideration of potential sites, status of design
options considered and, where applicable, the
status of approvals for process residue storage
and waste dumps should be reported.
The Ravenswood Project is in the mature phase of its operating life. Its environmental management is permitted by
an Environmental Authority and supported by an Environmental Management Plan.
The rock formations have a very low permeability and the mine is a net user of water for operational purposes. An
acid base accounting study was conducted on the Nolans East / Sarsfield open pit mine’s ore and waste,
determining the waste to be non-acid forming and the ore to be potentially acid forming. Process plant tailings is
stored in an approved storage facility.
Infrastructure The existence of appropriate infrastructure:
availability of land for plant development, power,
water, transportation (particularly for bulk
commodities), labour, accommodation; or the ease
with which the infrastructure can be provided, or
accessed.
The site is currently serviced by mains power, a water supply line from the Burdekin River and accessed by sealed
roads.
There are two mains power feeds available in the event that one becomes unserviceable.
The site is located approximately 120km from Townsville and 90km from Charters Towers. A bus service operates
twice a day to and from Charters Towers and serviced camp style accommodation is available to all employees in
Ravenswood. Some employees live in Ravenswood.

==> picture [164 x 13] intentionally omitted <==

25

==> picture [800 x 71] intentionally omitted <==

Criteria JORC Code explanation Commentary
Being close to major centres, one of which with an International Airport ensures easy and quick supply of parts and
materials.
Carpentaria Gold has sufficient area on its leases to cater for its planned land requirements.
Costs The derivation of, or assumptions made, regarding
projected capital costs in the study.
The methodology used to estimate operating costs.
Allowances made for the content of deleterious
elements.
The derivation of assumptions made of metal or
commodity price(s), for the principal minerals and
co- products.
The source of exchange rates used in the study.
Derivation of transportation charges.
The basis for forecasting or source of treatment
and refining charges, penalties for failure to meet
specification, etc.
The allowances made for royalties payable, both
Government and private.
The operating history of the mine has validated the capital requirements. Projected capital costs are made up of
forecast capital spend for the known capital expenditure requirements. The capital estimate is determined by the
needs of the site as required to continue to produce in a safe and efficient manner and comply with all environmental
requirements.
Operating costs have been calculated from first-principles using both fixed and variable components. Recent
operating history and performance against budget costs has validated the cost assumptions.
Assumed gold prices have been derived by reference to recent AUD spot gold prices.
All revenue and cost estimates have been made in AUD, so exchange rate assumptions have not been necessary.
Transportation charges have been derived from existing contractual arrangements.
Refining charges have been derived from existing contractual arrangements.
Current Queensland Government royalties equal to 5% of sales proceeds are included in the cost model. There are
no other royalties or Joint Venture agreements.
Revenue factors The derivation of, or assumptions made regarding
revenue factors including head grade, metal or
commodity price(s) exchange rates, transportation
and treatment charges, penalties, net smelter
returns, etc.
The derivation of assumptions made of metal or
commodity price(s), for the principal metals,
minerals and co-products.
It has been assumed that gold will be sold at the prevailing spot gold price. All revenue and cost estimates have
been made in AUD, so exchange rate assumptions have not been necessary. Transportation charges have been
derived from existing contractual arrangements. Refining charges have been derived from existing contractual
arrangements.
Assumed gold prices have been derived by reference to recent AUD spot gold prices.
Market
assessment
The demand, supply and stock situation for the
particular commodity, consumption trends and
factors likely to affect supply and demand into the
future.
There is a transparent quoted market for the sale of gold.

==> picture [164 x 13] intentionally omitted <==

26

==> picture [800 x 71] intentionally omitted <==

Criteria JORC Code explanation Commentary
A customer and competitor analysis along with the
identification of likely market windows for the
product.
Price and volume forecasts and the basis for these
forecasts.
For industrial minerals the customer specification,
testing and acceptance requirements prior to a
supply contract.
Economic The inputs to the economic analysis to produce the
net present value (NPV) in the study, the source
and confidence of these economic inputs including
estimated inflation, discount rate, etc.
NPV ranges and sensitivity to variations in the
significant assumptions and inputs.
A variety of gold price points and discount rates were used to assess the robustness of the project, likely payback
periods, the breakeven point and the projected internal rate of return. In the estimate, a discount rate of 10% was
used and a gold price of A$1,575 per oz.
Social The status of agreements with key stakeholders
and matters leading to social license to operate.
The Resolute group has a good relationship with neighbouring stakeholders, including engagement with the local
pastoralists. Part of the tenure held by the Company is located on leasehold pastoral land with compensation
agreements in place with the local pastoralist. Granted mining leases cover all of the proposed mining and
processingassets and there are no Native title claimspending.
Other To the extent relevant, the impact of the following
on the project and/or on the estimation and
classification of the Ore Reserves:
Any identified material naturally occurring risks.
The status of material legal agreements and
marketing arrangements.
The status of governmental agreements and
approvals critical to the viability of the project, such
as mineral tenement status, and government and
statutory approvals. There must be reasonable
grounds to expect that all necessary Government
approvals will be received within the timeframes
anticipated in the Pre-Feasibility or Feasibility
study. Highlight and discuss the materiality of any
unresolved matter that is dependent on a third
party on which extraction of the reserve is
Events such as cyclones and fires present a risk, although due to risk mitigants, these naturally occurring risks, have
not impacted the estimation or classification of the Ore Reserves.

==> picture [164 x 13] intentionally omitted <==

27

==> picture [800 x 71] intentionally omitted <==

Criteria JORC Code explanation Commentary
contingent.
Classification The basis for the classification of the Ore Reserves
into varying confidence categories.
Whether the result appropriately reflects the
Competent Person’s view of the deposit.
The proportion of Probable Ore Reserves that
have been derived from Measured Mineral
Resources (if any).
Only Measured Resources are converted to Proved Reserves
Only Indicated Resources are converted to Probable Reserves
Inferred Resources are not included in the Ore Reserves
The Resource to Reserve conversions was deemed appropriate for the Nolans East Ore Reserve estimates by the
Competent Persons.
Audits or reviews The results of any audits or reviews of Ore
Reserve estimates.
No external audits of resources / reserves were undertaken. Due to the success and maturity of the processes
applied, the company has deemed this unnecessary. However, periodic reviews of the mining methods have been
undertaken and reported as very successful.
Discussion of
relative accuracy/
confidence
Where appropriate a statement of the relative
accuracy and confidence level in the Ore Reserve
estimate using an approach or procedure deemed
appropriate by the Competent Person. For
example, the application of statistical or
geostatistical procedures to quantify the relative
accuracy of the reserve within stated confidence
limits, or, if such an approach is not deemed
appropriate, a qualitative discussion of the factors
which could affect the relative accuracy and
confidence of the estimate.
The statement should specify whether it relates to
global or local estimates, and, if local, state the
relevant tonnages, which should be relevant to
technical and economic evaluation. Documentation
should include assumptions made and the
procedures used.
Accuracy and confidence discussions should
extend to specific discussions of any applied
Modifying Factors that may have a material impact
on Ore Reserve viability, or for which there are
remaining areas of uncertainty at the current study
stage.
_It is recognized that this may not be possible or _
Recent historic operational performance against the mine plan for tonnage produced and production head grade,
indicate the assumptions used to generate the Ore Reserves, are valid.
There has been over the life of the Sarsfield / Nolans Project strong mine to mill reconciliations. The updated Ore
Reserves, are the same mineralisation being mined with similar sized mining equipment being used.
The same mining and grade control methods will be applied and the ore will continue to be processed through the
existing facility.
Assuming all QA/QC standards are applied in the drilling, mining and processing, then it is reasonable to expect
similar levels of operating margins, experienced in previous years.
All the parameters assumed and adopted along with financial modelling and analysis have been subject to internal
peer review.

==> picture [164 x 13] intentionally omitted <==

28

==> picture [800 x 71] intentionally omitted <==

Criteria JORC Code explanation Commentary
appropriate in all circumstances. These statements
of relative accuracy and confidence of the estimate
should be compared with production data, where
available.

==> picture [164 x 13] intentionally omitted <==

29