AI assistant
REGIS RESOURCES LIMITED — Investor Presentation 2017
Jun 26, 2017
65733_rns_2017-06-26_aec6f478-feaa-41bf-b1ba-481ce4391f73.pdf
Investor Presentation
Open in viewerOpens in your device viewer
==> picture [17 x 22] intentionally omitted <==
----- Start of picture text -----
11
----- End of picture text -----
REGIS RESOURCES LTD
==> picture [128 x 108] intentionally omitted <==
JUNE 2017
INVESTOR PRESENTATION
22
DISCLAIMER & COMPETENT PERSONS STATEMENT
This presentation contains only a brief overview of Regis Resources Limited and its associated entities (“Regis or RRL") and their respective activities and operations. The contents of this presentation, including matters relating to the geology of Regis’ projects, may rely on various assumptions and subjective interpretations which it is not possible to detail in this presentation and which have not been subject to any independent verification.
This presentation contains a number of forward-looking statements. Known and unknown risks and uncertainties, and factors outside of Regis’ control, may cause the actual results, performance and achievements of Regis to differ materially from those expressed or implied in this presentation. To the maximum extent permitted by law, Regis does not warrant the accuracy, currency or completeness of the information in this presentation, nor the future performance of Regis, and will not be responsible for any loss or damage arising from the use of the information. The information contained in this presentation is not a substitute for detailed investigation or analysis of any particular issue. Current and potential investors and shareholders should seek independent advice before making any investment decision in regard to Regis or its activities.
The information in this presentation that relates to Exploration Results is extracted from the ASX announcement released 21 April 2017 entitled “Quarterly Report to 31 March 2017” and for which Competent Person’s consents were obtained. The Competent Person’s consents remain in place for subsequent releases by the Company of the same information in the same form and context, until the consent is withdrawn or replaced by a subsequent report and accompanying consent.
The information in this presentation that relates to Mineral Resources or Ore Reserves is extracted from the Mineral Resource and Ore Reserve Statement released to the Australian Securities Exchange on 7 July 2016 and the ASX announcement released on 6 June 2017 entitled “Maiden Ore Reserve at Tooheys Well to Further Boost Duketon Production” and for which Competent Person’s consents were obtained. The Competent Person’s consents remain in place for subsequent releases by the Company of the same information in the same form and context, until the consent is withdrawn or replaced by a subsequent report and accompanying consent.
The Company confirms that it is not aware of any new information or data that materially affects the information included in the original ASX announcements released on 7 July 2016, 21 April 2017 and 6 June 2017 and, in the case of estimates or Mineral Resources or Ore Reserves, that all material assumptions and technical parameters underpinning the estimates in the original ASX announcements continue to apply and have not materially changed. The Company confirms that the form and context in which the Competent Person’s findings are presented have not been materially modified from the original ASX announcement.
ASX announcements are available on the Company’s website at www.regisresources.com.au
==> picture [720 x 48] intentionally omitted <==
33
CORPORATE
CAPITAL STRUCTURE
Shares on issue 501m Last price A$3.66 Market capitalisation A$1,834m Daily turnover (no. shares) 5.4m Unlisted options 10m
OPERATIONS SNAPSHOT
Duketon operations (WA) 10Mtpa for >300kozpa McPhillamys project (NSW) 2.2Moz resource Resources (total) 8.6Moz Reserves 2.1Moz
FINANCIALS
NPAT H1 FY17 A$61.0m Cash & bullion (31 Mar 17) A$114.5m 2017 Interim dividend 7cps (A$35m) 2016 Full year dividend 13cps (A$65m)
==> picture [354 x 173] intentionally omitted <==
==> picture [338 x 211] intentionally omitted <==
----- Start of picture text -----
SHARE PRICE & VOLUME
4.5 30
4
25
3.5
3 20
2.5
15
2
1.5 10
1
5
0.5
0 0
vOLUME (Millions)
SHARE PRICE A$)
----- End of picture text -----
==> picture [720 x 48] intentionally omitted <==
44
REVIEW OF FY2017 Q3 OPERATIONS
DUKETON CONTINUES TO DELIVER STRONG CASHFLOW
| Q3 | Q2 | OPERATIONS | |
|---|---|---|---|
| FY17 | FY17 | Q3 gold production 79,223 ounces | |
| Ore mined (Mbcm) | 1.0 | 1.1 | Run rate above FY16 and in upper half of FY17 guidance of 300-330koz |
| Waste mined (Mbcm) | 6.4 | 7.3 | Excellent result given mining & haulage days lost to rain |
| Stripping ratio (w:o) | 6.6 | 6.5 | Q3 throughput (-10%) & recovery (+2%) v Q2 Throughput affected by lower oxide ore supply |
| Ore mined (Mtonnes) | 2.3 | 2.8 | Will improve as Gloster, Erlistoun & RMT South come on |
| Major mill shuts at both GW & RMT in Q3 | |||
| Ore milled (Mtonnes) | 2.25 | 2.50 | Q3 grade of 1.17g/t: 8% higher than Q2 |
| Head grade (g/t) | 1.17 | 1.08 | Positive impact of grade from Gloster & Erlistoun |
| COSTS | |||
| Recovery (%) | 94 | 92 | Q3 cash costs $798/oz & AISC $1,024/oz |
| Gold production (ounces ‘000) |
79 | 80 | AISC at mid-point of FY17 guidance range 8% higher than Q2 – start up strip ratio (39:1) at |
| Cash cost (A$/oz) | 798 | 804 | Erlistoun and completed cutback at Rosemont |
| Cash cost inc royalty (A$/oz) |
872 | 874 | Q3 operating cashflow $57.8m (Q2: $64.5m) OPERATING CASH-FLOW |
| All in Sustaining Cost (A$/oz)1 |
1,024 | 951 | Continued strong operating cashflow underpinning cash build and dividends |
- Will improve as Gloster, Erlistoun & RMT South come on
==> picture [57 x 48] intentionally omitted <==
1 AISC calculated on a per ounce of production basis 2 operating cash flow is quoted under the Appendix 5B classification protocol and as such does not include payments for pre-strip and deferred mining costs as these are classified as investing activities.
55
DUKETON FY2017 Q3
==> picture [720 x 459] intentionally omitted <==
66
CASHFLOW WATERFALL
==> picture [597 x 387] intentionally omitted <==
----- Start of picture text -----
Cash & Gold on Hand Movements – Q3 FY17 Year to Date
$350.0m
$181.9m
$300.0m
$250.0m
($80.1m)
$200.0m
($39.1m)
$150.0m ($20.5m)
$123.3m ($19.2m) $114.5m
$100.0m ($27.2m) ($4.8m)
$50.0m
Strong cash-flow from operations of $182m for YTDQ3
Cash build of $71m after allowing for payment of dividend of $80m.
Significant expenditures in Q3 above usual run rate – expect to reduce in coming quarters
Development spend ($15.8m) includes Erlistoun start up & completion of Rosemont cutback
Exploration ($9.4m) for major drill-outs at Tooheys Well & McPhillamys
----- End of picture text -----
==> picture [720 x 48] intentionally omitted <==
77
STRONG PERFORMANCE ON ALL PROFIT MEASURES
==> picture [660 x 391] intentionally omitted <==
==> picture [57 x 48] intentionally omitted <==
1 FY2014 NPAT, EBITDA & EPS adjusted to underlying result by excluding $202.7m after tax impairment charge
88
DIVIDENDS
==> picture [173 x 13] intentionally omitted <==
----- Start of picture text -----
Earnings & Dividend Per Share
----- End of picture text -----
==> picture [556 x 236] intentionally omitted <==
----- Start of picture text -----
25
22.4
20
17.4
15
13
12.2
11.0
10
7
6
5
0
0
FY2014 FY2015 FY2016 FY2017 (H1)
EPS Dividend per Share
Cents per Share
----- End of picture text -----
Fully franked interim dividend of 7cps ($35.1m) declared and paid in Q3
-
Increase on FY16 interim dividend of 4cps
-
Payout ratio 14% of revenue and 57% of NPAT
-
c4% dividend yield (c6% grossed up for franking credits) at current share price $3.66
-
Regis is committed to dividends and delivering industry leading dividend metrics
==> picture [720 x 48] intentionally omitted <==
99
OPERATIONS OUTLOOK
2017 – 2019 DUKETON PROJECT PRODUCTION GUIDANCE & TARGETS
==> picture [576 x 369] intentionally omitted <==
----- Start of picture text -----
380,000
370,000
360,000 350,000 2019
TARGET
340,000 2018
330,000 340,000
TARGET
320,000 2017
320,000
GUIDANCE
300,000
2016 300,000
ACTUAL
280,000
305,084
260,000
240,000
220,000
200,000
2016 2017 2018 2019
Organic growth at Duketon to deliver increasing production profile over medium term
GOLD PRODUCTION (OUNCES)
----- End of picture text -----
Midpoint of cumulative 2017-2019 production guidance/target range is based on 98% Probable Ore Reserves and 2% Inferred Mineral Resources (IMR). No Exploration Targets included.
Cautionary statement: there is a low level of geological confidence associated with IMR and there is no certainty that further exploration work will result in the determination of Indicated Mineral Resources or that the production target itself will be realised.
==> picture [57 x 48] intentionally omitted <==
1010
DELIVERING ORGANIC GROWTH OPPORTUNITIES
==> picture [360 x 391] intentionally omitted <==
MINE LIVES @ 31/3/16
| MINE LIVES@ 31/3/16 | |
|---|---|
| Project Mine Life |
Mill tpa |
| Garden Well 7 years |
≈ 5 MT |
| Rosemont 6 years |
≈ 2 MT |
| Moolart Well 5 years |
≈ 3 MT |
SATELLITES EXTENDING MINE LIFE
| Project | Reserves at 31/3/16 |
|---|---|
| Gloster | 7.0Mt @ 1.00g/t for 226koz1 |
| Erlistoun | 3.8Mt @ 1.48g/t for 181koz1 |
| Baneygo | 3.6Mt @ 1.16g/t for 136koz1 |
| Tooheys Well | 7.1Mt @ 1.61g/t for 366koz2 |
-
Proximity to mill capacity
-
Known gold hosting structures
-
Shallow & poorly tested
-
Strong extensions expected to continue
==> picture [57 x 48] intentionally omitted <==
1 Reserve as at 31/3/2016 2 Maiden Reserve as at 1/3/17
11 11
SATELLITE DEPOSITS FAMOUS BLUE GEOLOGY
GLOSTER
-
26km west of Moolart Well
-
Mining commenced Q1, milling Q2
-
Processed 300kt ore at 1.35g/t in Q3
-
Processed 590kt ore at 1.26g/t YTD
-
Adds 3+ years of mill feed to MW
-
Grade increases production & recovery
ERLISTOUN
-
9km south of Garden Well
-
Mining commenced Q2, milling Q3
-
Processed 130kt ore at 1.2g/t in Q3
-
Adds 4+ years of mill feed to GW
-
Grade increases production & recovery
OUTLOOK
-
Proving the quality & simplicity of strategy
-
Full year production & falling strip in FY18
-
Tooheys Well, Baneygo etal to follow
==> picture [362 x 187] intentionally omitted <==
==> picture [362 x 187] intentionally omitted <==
==> picture [720 x 48] intentionally omitted <==
1212
TOOHEYS WELL GOLD PROJECT
MAIDEN RESERVE REPLACES REGIS FY17 PRODUCTION
==> picture [423 x 343] intentionally omitted <==
-
Located only 2.5km south of GW
-
Gold shear zones hosted by chert, shale and BIF
-
Extensive drill-out in 2015 and 16 culminated in maiden resource July 16
-
Maiden Reserve quoted June 17:
| Tonnes | Grade | Gold | |
|---|---|---|---|
| (Mt) | (g/t) | (koz) | |
| 0.5g/t lower cut | 7.1 | 1.61 | 366 |
-
Replaces Duketon FY17 gold production
-
Discovery cost of $24 per reserve ounce
-
Mining to commence March18 quarter
-
Production to commence Dec18 quarter
-
Approx 2MTpa for 90kozpa
-
Will increase group production due to higher grade than displaced ore from GW
==> picture [720 x 48] intentionally omitted <==
1313
EXPLORATION UPDATE
DUKETON - SIGNIFICANT RESULTS IN Q3
Completed 32,943m (Q2: 49,223m) of drilling on 4 gold projects
-
Lower metres in Q3 due to weather, rig availability & limited RMT pit access
-
Tooheys Well – 2.5km S of Garden Well
-
547,000 oz resource estimated in Q1
-
28,561m RC in Q3 completes resource drill-out
-
Infill drilling continues to return high grades
-
EM survey nearing completion to target extensional drilling
-
Rosemont South & Main
-
Strong intercepts outside current reserves
-
Opportunity to add O/P & U/G inventory
-
Limited Q3 drilling (3,301m) as available RC drill focused on completing TW drill-out
-
Programme recommenced in Q4
==> picture [354 x 314] intentionally omitted <==
Proximity to 10mtpa milling infrastructure presents excellent exploration opportunity
==> picture [720 x 48] intentionally omitted <==
14 14
ROSEMONT SOUTH & MAIN UNDERGROUND OPPORTUNITIES
==> picture [639 x 323] intentionally omitted <==
3D long section from south east showing planned Rosemont South & Main drilling, phase 1 and 2
Phase 1 drill programmes underway at Rosemont South and below Rosemont Main Pit: Returning numerous high grade intercepts Drilling to continue in Q4 and beyond
==> picture [720 x 48] intentionally omitted <==
15 15
ROSEMONT MAIN PIT
UNDERGROUND PROJECT
==> picture [631 x 286] intentionally omitted <==
POTENTIAL FOR UNDERGROUND MINING INVENTORY EXTENSION
-
Testing high grade shoots 100-200m vertically below ultimate open pit design depth
-
Early holes drilled to date are encouraging for underground opportunities
-
Approx 10,000m drilling remaining in phase 1 programme
-
Only 3,301m of RC drilled in Q3 as available rigs used at TW, drilling underway again in Q4
==> picture [720 x 48] intentionally omitted <==
DRILL OUTS COMPLETE SO FOCUS 16 16 RETURNS TO REGIONAL EXPLORATION
==> picture [293 x 391] intentionally omitted <==
NEXT 6 SIGNIFICANT SCALE REGIONAL TARGETS
-
Post successful delivery of Maiden Reserve at Tooheys Well, focus has returned to generating next suite of regional exploration targets.
-
6 new regional targets generated from data review and field investigations
-
Each has between 1 – 2.5km of untested greenstone strike
-
Targets based on combination of structure, lag anomalies, magnetics and no or ineffective previous drilling
-
Total untested strike in this suite of targets ≈12km
-
Targets have been ground-truthed and are ready to drill
Proposed first pass drilling:
-
224 holes to approx. 120m depth
-
27,000 metres over 16 lines
-
Generally 200m spaced lines over targets
-
6 months of work
Continued generation of significant scale targets within trucking distance of Regis mills
==> picture [720 x 48] intentionally omitted <==
17 17
REGIONAL TARGETS
| Prospect | Location | Target | Untested Strike |
Planned Drilling |
|---|---|---|---|---|
| Camel Hump | 32km S of GW | Soil anomaly over prospective structure No previous drilling |
2km | 18 AC holes to 120m 1 line of holes |
| Mt Varden | 33km S of GW | Soil anomaly over prospective structure Anomalous nearby drilling |
2.5km | 66 AC holes to 120m 5 lines x 200m |
| Corktree North | 41km S of GW | Target under tertiary cover Over prospective structure |
1km | 26 AC holes to 120m 2 lines x 200m |
| Cuthbert Bore | 15km SW of GW | Soil anomaly over prospective structure Ineffective earlier drilling |
2km | 40 AC holes to 120m 3 lines x 200m |
| Steer Creek | 13km SW of RMT | Soil anomaly over prospective structure Ineffective earlier drilling |
2km | 40 AC holes to 120m 4 lines x 200m |
| Speights | 5km NE of RMT | Soil anomaly over prospective structure No previous drilling |
2.5km | 34 AC holes to 120m 2 lines x 200m |
==> picture [720 x 48] intentionally omitted <==
18 18
REGIONAL TARGETS
==> picture [651 x 398] intentionally omitted <==
----- Start of picture text -----
2km 2,000m 2.5km 8,000m
Camel Hump Mt Varden
strike Aircore strike Aircore
----- End of picture text -----
==> picture [720 x 48] intentionally omitted <==
19 19
REGIONAL TARGETS
==> picture [628 x 398] intentionally omitted <==
----- Start of picture text -----
1km 3,000m 2km 5,000m
Corktree North Cuthbert Bore
strike Aircore strike Aircore
----- End of picture text -----
==> picture [720 x 48] intentionally omitted <==
20 20
REGIONAL TARGETS
==> picture [646 x 398] intentionally omitted <==
----- Start of picture text -----
2km 5,000m 2.5km 4,000m
Steer Creek Speights
strike Aircore strike Aircore
----- End of picture text -----
==> picture [720 x 48] intentionally omitted <==
2121
McPHILLAMYS (NSW)
==> picture [295 x 394] intentionally omitted <==
INFILL DRILLING UNDERWAY FOR PFS
-
Located Central-West NSW
-
Well established gold mining district
-
Cadia, Cowal, Northparkes+45Moz*
-
Gold resource 2.2Moz - 100% Regis owned
-
Infill Drilling Underway
-
25,000m programme - 5 diamond & 1 RC rigs working
-
Reduce drill pattern to 50x25m (nominal)
-
55 holes (18,060m) drilled in Q3.
-
Significant results include:
-
279m @ 1.45g/t Au from 192m
-
246m @ 1.20g/t Au from 199m
-
207m @ 1.27g/t Au from 178m
-
192m @ 1.20g/t Au from 140m
-
211m @ 1.69g/t Au from 187m
-
130m @ 1.44g/t Au from 85m
-
-
Phase 2 programme of 14,000m underway
-
Basis for resource update & ultimately reserve estimate
-
Moving towards PFS
-
Focus on securing key infrastructure
-
Advancing other long lead PFS/EIS works
==> picture [57 x 48] intentionally omitted <==
- Recent quoted resources from public information
2222
McPHILLAMYS (NSW)
EXPANDING MCPHILLAMYS RESOURCES AND FOOTPRINT
==> picture [326 x 350] intentionally omitted <==
-
Entered into binding agreement to acquire the Blayney Gold Project for A$3.25m
- Subject to one remaining condition precedent
-
Tenement lies contiguous to the McPhillamys project licence and hosts two quoted Mineral Resource Estimates*:
-
Discovery Ridge:13.84Mt at 1.1g/t for 501koz
-
Bald Hill: 37.0Mt at 0.5g/t for 595koz
-
Acquisition expands the McPhillamys Gold Project footprint by 493 km[2]
-
Discovery Ridge deposit located 32km away from the McPhillamys Gold Project by a major highway
-
Economics of Discovery Ridge will be studied with a view to generating a satellite operation to be developed with the McPhillamys Project
==> picture [57 x 48] intentionally omitted <==
2323
RECAP OF PRESENTATION
Q3 gold production 79,223 ounces at AISC of A$1,024/oz
Production in line with Q2 (80,090oz) despite significant rainfall impact on operations
Production run rate in upper half of FY17 guidance
Gloster & Erlistoun making contribution & will increase in coming quarters
Q3 AISC at midpoint of guidance range
High strip at start up of Erlistoun and completion of cutbacks at Rosemont
Cash-flow from operations $57.8m for Q3 (Q2: $64.5m)
-
Cash and bullion holdings $114.6m (Q2: $129.7m)
-
$20m cash build after $35.1m paid in dividends
Maiden Tooheys Well reserve 366koz – replaces FY17 Duketon production
6 new regional targets at Duketon - 12km of strike, 27,000m first pass programme
- Major infill drill programme completed at McPhillamys – strong results to date
Pushing project towards PFS
==> picture [720 x 48] intentionally omitted <==
2424
APPENDIX 1 JORC COMPLIANT ORE RESERVE ESTIMATES 31 MARCH 2016*
Group Ore Reserves
as at 31 March 2016
| Gold | Gold | Gold | Proved | Proved | Proved | Probable | Probable | Probable | Total Ore Reserve | Total Ore Reserve | Total Ore Reserve | Competent Person3 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Project | Type | Cut-Off (g/t)2 |
Tonnes (Mt) |
Gold Grade (g/t) |
Gold Metal (koz) |
Tonnes (Mt) |
Gold Grade (g/t) |
Gold Metal (koz) |
Tonnes (Mt) |
Gold Grade (g/t) |
Gold Metal (koz) |
|
| Moolart Well1 | Open-Pit | > 0.4 | 1.6 | 0.77 | 39 | 3.3 | 1.00 | 105 | 4.8 | 0.93 | 144 | D |
| Garden Well1 | Open-Pit | > 0.4 | 2.9 | 0.58 | 55 | 25.9 | 0.93 | 772 | 28.8 | 0.89 | 827 | D |
| Rosemont1 | Open-Pit | > 0.4 | 3.4 | 1.45 | 157 | 8.3 | 1.53 | 407 | 11.6 | 1.51 | 564 | D |
| Duketon Main Deposits | Sub Total | 7.9 | 0.99 | 251 | 37.4 | 1.07 | 1,284 | 45.3 | 1.05 | 1,535 | ||
| Gloster | Open-Pit | > 0.5 | - | - | - | 7.0 | 1.00 | 226 | 7.0 | 1.00 | 226 | D |
| Erlistoun | Open-Pit | > 0.5 | - | - | - | 3.8 | 1.48 | 181 | 3.8 | 1.48 | 181 | D |
| Baneygo | Open-Pit | > 0.4 | - | - | - | 3.6 | 1.16 | 136 | 3.6 | 1.16 | 136 | D |
| Petra | Open-Pit | > 0.5 | - | - | - | 0.6 | 1.26 | 25 | 0.6 | 1.26 | 25 | D |
| Dogbolter | Open-Pit | > 0.5 | - | - | - | 0.3 | 1.57 | 16 | 0.3 | 1.57 | 16 | D |
| Anchor | Open-Pit | > 0.5 | - | - | - | 0.1 | 2.07 | 6 | 0.1 | 2.07 | 6 | D |
| Duketon Satellite Deposits | Sub Total | - | - | - | 15.5 | 1.18 | 590 | 15.5 | 1.18 | 590 | ||
| Regis | Grand Total | 7.9 | 0.99 | 251 | 52.9 | 1.10 | 1,874 | 60.8 | 1.09 | 2,125 |
Notes
The above data has been rounded to the nearest 100,000 tonnes, 0.01 g/t gold grade and 1,000 ounces. Errors of summation may occur due to rounding.
-
Mineral Resources and Ore Reserves are reported inclusive of ROM Stockpiles at cut-off grade of 0.4 g/t.
-
Cutoff grades vary according to oxidation and lithology domains. Refer to Group Ore Reserves Lower Cut Notes.
-
Refer to Group Competent Person Notes.
==> picture [57 x 48] intentionally omitted <==
- A maiden Ore Reserve estimate was quoted for Tooheys Well Gold Project as at 1 March 2017 – refer Appendix 3.
2525
APPENDIX 2 JORC COMPLIANT MINERAL RESOURCES 31 MARCH 2016*
| Group Mineral Resources as at 31 March 2016 |
Group Mineral Resources as at 31 March 2016 |
Group Mineral Resources as at 31 March 2016 |
Group Mineral Resources as at 31 March 2016 |
Group Mineral Resources as at 31 March 2016 |
Group Mineral Resources as at 31 March 2016 |
Group Mineral Resources as at 31 March 2016 |
Group Mineral Resources as at 31 March 2016 |
Group Mineral Resources as at 31 March 2016 |
Group Mineral Resources as at 31 March 2016 |
Group Mineral Resources as at 31 March 2016 |
Group Mineral Resources as at 31 March 2016 |
||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Gold | Measured | Indicated | Inferred | Total Resource | Competent Person2 |
||||||||||
| Project | Type | Cut-Off (g/t) |
Tonnes (Mt) |
Gold Grade (g/t) |
Gold Metal (koz) |
Tonnes (Mt) |
Gold Grade (g/t) |
Gold Metal (koz) |
Tonnes (Mt) |
Gold Grade (g/t) |
Gold Metal (koz) |
Tonnes (Mt) |
Gold Grade (g/t) |
Gold Metal (koz) |
|
| Moolart Well1 | Open-Pit | 0.4 | 1.9 | 0.72 | 45 | 24.9 | 0.74 | 596 | 9.3 | 0.62 | 184 | 36.1 | 0.71 | 825 | A |
| Garden Well1 | Open-Pit | 0.4 | 2.9 | 0.58 | 55 | 64.8 | 0.89 | 1,859 | 8.0 | 0.89 | 228 | 75.8 | 0.88 | 2,141 | B |
| Rosemont1 | Open-Pit | 0.4 | 4.5 | 1.42 | 204 | 20.5 | 1.42 | 938 | 3.0 | 1.95 | 189 | 28.0 | 1.48 | 1,331 | B |
| Duketon Main Deposits | Sub Total | 9.4 | 1.01 | 303 | 110.2 | 0.96 | 3,393 | 20.3 | 0.92 | 600 | 139.8 | 0.96 | 4,297 | ||
| Tooheys Well3 | Open-Pit | 0.0 | - | - | - |
- | - | - | 14.6 | 1.16 | 547 | 14.6 | 1.16 | 547 | A |
| Gloster | Open-Pit | 0.4 | - | - | - | 14.7 | 0.79 | 374 | 6.6 | 0.73 | 154 | 21.3 | 0.77 | 528 | A |
| Baneygo | Open-Pit | 0.4 | - | - | - |
9.2 | 0.96 | 283 | 1.9 | 0.95 | 57 | 11.1 | 0.96 | 340 | A |
| Erlistoun | Open-Pit | 0.4 | - | - | - | 5.7 | 1.34 | 247 | 1.1 | 1.00 | 37 | 6.9 | 1.28 | 284 | A |
| Dogbolter | Open-Pit | 0.4 | - | - | - | 3.5 | 1.11 | 128 | 0.5 | 1.02 | 16 | 4.0 | 1.10 | 144 | A |
| Russells Find | Open-Pit | 0.4 | - | - | - | 2.1 | 1.07 | 71 | 0.3 | 0.90 | 10 | 2.4 | 1.05 | 81 | A |
| Petra | Open-Pit | 0.4 | - | - | - | 1.2 | 1.08 | 42 | 0.1 | 1.09 | 2 | 1.3 | 1.08 | 44 | A |
| KingJohn | Open-Pit | 0.4 | - | - | - | - | - | - | 0.8 | 1.56 | 42 | 0.8 | 1.56 | 42 | A |
| Reichelts Find | Open-Pit | 0.4 | - | - | - | - | - | - | 0.8 | 1.11 | 28 | 0.8 | 1.11 | 28 | A |
| Anchor | Open-Pit | 0.4 | - | - | - | 0.2 | 1.75 | 9 | 0.1 | 0.95 | 2 | 0.2 | 1.53 | 11 | A |
| Duketon Satellite Deposits | Sub Total | - | - | - | 36.6 | 0.98 | 1,155 | 26.8 | 1.04 | 895 | 63.4 | 1.01 | 2,049 | ||
| Duketon | Total | 9.4 | 1.01 | 303 | 146.8 | 0.96 | 4,548 | 47.1 | 0.99 | 1,495 | 203.2 | 0.97 | 6,346 | ||
| McPhillamys | Total | 0.4 | - | - | - | 69.2 | 0.94 | 2,087 | 3.9 | 0.98 | 123 | 73.2 | 0.94 | 2,210 | B |
| Regis | Grand Total | 9.4 | 1.01 | 303 | 216.0 | 0.96 | 6,635 | 51.0 | 0.99 | 1,618 | 276.4 | 0.96 | 8,556 |
Notes
The above data has been rounded to the nearest 100,000 tonnes, 0.01 g/t gold grade and 1,000 ounces. Errors of summation may occur due to rounding. All Mineral Resources are reported inclusive of Ore Reserves to JORC Code 2012 unless otherwise noted.
-
Mineral Resources and Ore Reserves are reported inclusive of ROM Stockpiles at cut-off grade of 0.4 g/t.
-
Refer to Group Competent Person Notes.
-
As reported 29th July 2016
-
An updated Mineral Resource Estimate was quoted for Tooheys Well Gold Project as at 1 March 2017 – refer Appendix 3.
==> picture [57 x 48] intentionally omitted <==
2626
APPENDIX 3 – TOOHEYS WELL ONLY*
UPDATED JORC COMPLIANT MINERAL RESOURCES & ORE RESERVES 1 MARCH 2017
Tooheys Well Mineral Resource Estimate
as at 1 March 2017
| Gold | Measured | Measured | Measured | Indicated | Inferred | Total Resource | Total Resource | Total Resource | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Project | Type | Cut-Off (g/t) |
Tonnes (Mt) |
Gold Grade (g/t) |
Gold Metal (koz) |
Tonnes (Mt) |
Gold Grade (g/t) |
Gold Metal (koz) |
Tonnes (Mt) |
Gold Grade (g/t) |
Gold Metal (koz) |
Tonnes (Mt) |
Gold Grade (g/t) |
Gold Metal (koz) |
Competent Person1 |
||||
| Tooheys Well |
Open-Pit | 0.4 | - | - | - | 15.9 | 1.17 | 598 | 1.1 | 0.89 | 31 | 17.0 | 1.16 | 630 | A |
Notes
The above data has been rounded to the nearest 100,000 tonnes, 0.01 g/t gold grade and 1,000 ounces. Errors of summation may occur due to rounding.
All Mineral Resources are reported inclusive of Ore Reserves to JORC Code 2012 unless otherwise noted
- Refer to Competent Person Statement
Tooheys Well Ore Reserve Estimate
| Tooheys Well Ore Reserve Estimate | Tooheys Well Ore Reserve Estimate | Tooheys Well Ore Reserve Estimate | Tooheys Well Ore Reserve Estimate | Tooheys Well Ore Reserve Estimate | Tooheys Well Ore Reserve Estimate | Tooheys Well Ore Reserve Estimate | Tooheys Well Ore Reserve Estimate | Tooheys Well Ore Reserve Estimate | Tooheys Well Ore Reserve Estimate | Tooheys Well Ore Reserve Estimate | Tooheys Well Ore Reserve Estimate | Tooheys Well Ore Reserve Estimate |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| as at 1 March 2017 | ||||||||||||
| Gold | Proved | Probable | Total Ore Reserve | Competent Person2 |
||||||||
| Project | Type | Cut-Off (g/t)1 |
Tonnes (Mt) |
Gold Grade (g/t) |
Gold | Gold | Gold | Gold | Gold Metal (koz) |
|||
| Metal (koz) |
Tonnes (Mt) |
Grade (g/t) |
Metal (koz) |
Tonnes (Mt) |
Grade (g/t) |
|||||||
| Tooheys Well |
Open-Pit | B | ||||||||||
| > 0.5 | - | - | - | 7.1 | 1.61 | 366 | 7.1 | 1.61 | 366 | |||
| Notes |
The above data has been rounded to the nearest 100,000 tonnes, 0.01 g/t gold grade and 1,000 ounces. Errors of summation may occur due to rounding.
-
Cutoff grades vary according to oxidation and lithology domains. Refer to Ore Reserve Lower Cut-off Grade Note in Material Information Summary.
-
Refer to Competent Person Statement
| Project | Profile | Domain | Lower Cut (g/t) |
|---|---|---|---|
| Tooheys Well | Oxide | 0.5 | |
| Transitional | 0.6 | ||
| Fresh | Low Recovery | 0.8 | |
| Fresh | 0.6 |
- For the Tooheys Well Gold Project only these tables update the Mineral Resource and Ore Reserve estimates quoted as at 31 March 2016 in Appendices 1 and 2.
==> picture [57 x 48] intentionally omitted <==