REGIS RESOURCES LIMITED Interim / Quarterly Report 2016

Jan 13, 2016

65733_rns_2016-01-13_918cab46-9bbc-4f2f-b97f-bd86dc1b2f00.pdf

Interim / Quarterly Report

Open in viewer

Opens in your device viewer

==> picture [17 x 22] intentionally omitted <==

----- Start of picture text -----

11
----- End of picture text -----

REGIS RESOURCES LTD

==> picture [128 x 108] intentionally omitted <==

DECEMBER 2015 QUARTERLY REPORT & EXPLORATION UPDATE

22

DISCLAIMER & COMPETENT PERSONS STATEMENT

This presentation contains only a brief overview of Regis Resources Limited and its associated entities (“Regis or RRL") and their respective activities and operations. The contents of this presentation, including matters relating to the geology of Regis’ projects, may rely on various assumptions and subjective interpretations which it is not possible to detail in this presentation and which have not been subject to any independent verification.

This presentation contains a number of forward-looking statements. Known and unknown risks and uncertainties, and factors outside of Regis’ control, may cause the actual results, performance and achievements of Regis to differ materially from those expressed or implied in this presentation. To the maximum extent permitted by law, Regis does not warrant the accuracy, currency or completeness of the information in this presentation, nor the future performance of Regis, and will not be responsible for any loss or damage arising from the use of the information. The information contained in this presentation is not a substitute for detailed investigation or analysis of any particular issue. Current and potential investors and shareholders should seek independent advice before making any investment decision in regard to Regis or its activities.

The information in this presentation that relates to Exploration Results and the updated Baneygo Resource is extracted from the ASX announcement released 14 January 2016 entitled “Exploration Update & Baneygo Resource ” and for which Competent Person’s consents were obtained. The Competent Person’s consents remain in place for subsequent releases by the Company of the same information in the same form and context, until the consent is withdrawn or replaced by a subsequent report and accompanying consent.

The information in this presentation that relates to Mineral Resources or Ore Reserves is extracted from the Mineral Resource and Ore Reserve Statement released to the Australian Securities Exchange (ASX) on 16 July 2015 and for which Competent Person’s consents were obtained. The Competent Person’s consents remain in place for subsequent releases by the Company of the same information in the same form and context, until the consent is withdrawn or replaced by a subsequent report and accompanying consent.

The Company confirms that it is not aware of any new information or data that materially affects the information included in the original ASX announcements released on 16 July 2015 and 14 January 2016 and, in the case of estimates or Mineral Resources or Ore Reserves, that all material assumptions and technical parameters underpinning the estimates in the original ASX announcements continue to apply and have not materially changed. The Company confirms that the form and context in which the Competent Person’s findings are presented have not been materially modified from the original ASX announcement.

ASX announcements are available on the Company’s website at www.regisresources.com.au

==> picture [720 x 48] intentionally omitted <==

33

REVIEW OF FY2016 Q2 OPERATIONS

PRODUCTION AT UPPER END OF GUIDANCE & DELIVERING STRONG CASHFLOW

Q2 Q1 OPERATIONS
Ore mined (Mbcm) 1.13 1.27 Q2 production 75,544 ounces
Run rate at upper end of FY2016 guidance of 275-305koz
Waste mined (Mbcm) 5.21 5.85 Q2 throughput consistent with Q1 & ≈ 10.3mtpa
Stripping ratio (w:o) 4.61 4.62 Q2 recovery 91%,3% - GW optimizing & more oxide
Q2 grade 1.00g/t - in line with Q1
Ore mined (Mtonnes) 2.62 3.00 Q2 Duketon strip ratio in line with Q1
Ore milled (Mtonnes) 2.58 2.56 GW continues to decrease to LOM average
Q2 reconciliation to reserve positive for Duketon
Head grade (g/t) 1.00 1.04 GW continuing to improve and Dec15 in line
COSTS
Recovery (%) 91 88 Q2 cash costs $789/oz –4% (Q1: $821/oz)
Gold production
(ounces ‘000)
76 75 Unit costs consistent
RMT cutback excluded
Cash cost (A$/oz) 789 821 Q2 AISC $918/oz -6% (Q1: $973/oz)
Below lower end of FY2016 guidance of $970 -
Cash cost inc royalty
(A$/oz)
All in Sustaining Cost
(A$/oz)1
861
918
888
973
$1,070/oz
Q2 operating cashflow $49.8m (Q1: $50.8m)
OPERATING CASH-FLOW

1 AISC calculated on a per ounce of production basis

==> picture [57 x 48] intentionally omitted <==

44 FY2016 Q2 OPERATING RESULTS

Moolart
Well
Rosemont
Garden
Well
Total
Ore mined (bcm )
336,847
298,844
496,224
1,131,915
Waste mined (bcm)
1,273,692
2,403,341
1,536,669
5,213,702
Stripping ratio (w:o)
3.8
8.0
3.1
4.6
Ore mined (tonnes)
691,834
694,357
1,236,819
2,623,011
Ore milled (tonnes)
726,088
608,178
1,248,141
2,582,406
Head grade (g/t)
0.90
1.36
0.89
1.00
Recovery (%)
91.5
92.9
89.0
90.9
Gold production (ounces)
19,208
24,622
31,714
75,544
Cash cost (A$/oz)
805
629
903
789
Cash cost inc royalty (A$/oz)
878
705
971
861
All in Sustaining Cost (A$/oz)
991
778
983
918

==> picture [720 x 48] intentionally omitted <==

55

FY2016 Q2 OPERATING RESULTS

Moolart
Well
Rosemont
Garden
Well
Total
Ore mined (bcm ) 336,847 298,844
496,224
1,131,915
Waste mined (bcm) 1,273,692 2,403,341
1,536,669
5,213,702
Stripping ratio (w:o) 3.8 8.0
3.1
4.6
Ore mined (tonnes) 691,834 694,357
1,236,819
2,623,011
Ore milled (tonnes) 726,088 608,178
1,248,141
2,582,406
Head grade (g/t) 0.90 1.36
0.89
1.00
Recovery (%) 91.5 92.9
89.0
90.9
Gold production (ounces) 19,208 24,622
31,714
75,544
Cash cost (A$/oz) 805 629
903
789
Cash cost inc royalty (A$/oz) 878 705
971
861
All in Sustaining Cost
(A$/oz)
991 778
983
918

MOOLART WELL

 Production run rate in line with mid point of FY2016 guidance range

 Strip ratio slightly higher than guidance due to commencement of prestrip at Wellington pit

 All in sustaining cost $991/oz in line with guidance.

==> picture [720 x 48] intentionally omitted <==

66

MOOLART WELL

==> picture [720 x 455] intentionally omitted <==

77

FY2016 Q2 OPERATING RESULTS

Moolart
Well
Rosemont Garden
Well
Total
Ore mined (bcm )
336,847
298,844 496,224
1,131,915
Waste mined (bcm)
1,273,692
2,403,341 1,536,669
5,213,702
Stripping ratio (w:o)
3.8
8.0 3.1
4.6
Ore mined (tonnes)
691,834
694,357 1,236,819
2,623,011
Ore milled (tonnes)
726,088
608,178 1,248,141
2,582,406
Head grade (g/t)
0.90
1.36 0.89
1.00
Recovery (%)
91.5
92.9 89.0
90.9
Gold production (ounces)
19,208
24,622 31,714
75,544
Cash cost (A$/oz)
805
629 903
789
Cash cost inc royalty (A$/oz)
878
705 971
861
All in Sustaining Cost
(A$/oz)
991
778 983
918

ROSEMONT

  • Strip ratio lower than forecast – will commence catch up in Q3

  • Higher grade reflects positive reconciliation to reserve grade

  • Recovery in line with guidance

  • Throughput for quarter equates to annualised rate of 2.43Mtpa – top end of FY2016 guidance range

  • Production run rate above top of guidance range and AISC below bottom of guidance range

  • Cutback cost of $4.9m treated as expansionary capex (non AISC) as per FY2016 guidance

==> picture [720 x 48] intentionally omitted <==

88

ROSEMONT

==> picture [720 x 459] intentionally omitted <==

99

FY2016 Q2 OPERATING RESULTS

Moolart
Well
Rosemont
Garden
Well
Total
Ore mined (bcm )
336,847
298,844
496,224 1,131,915
Waste mined (bcm)
1,273,692
2,403,341
1,536,669 5,213,702
Stripping ratio (w:o)
3.8
8.0
3.1 4.6
Ore mined (tonnes)
691,834
694,357
1,236,819 2,623,011
Ore milled (tonnes)
726,088
608,178
1,248,141 2,582,406
Head grade (g/t)
0.90
1.36
0.89 1.00
Recovery (%)
91.5
92.9
89.0 90.9
Gold production (ounces)
19,208
24,622
31,714 75,544
Cash cost (A$/oz)
805
629
903 789
Cash cost inc royalty (A$/oz)
878
705
971 861
All in Sustaining Cost
(A$/oz)
991
778
983 918
Strip ratio reduced from 3.2 (Q1) to 3.1 and down sharply from 5.85 (Q4 2015)
Grade at 0.89g/t in line with reserve for areas mined in the quarter
Mining reconciliation continues improving and in line with reserve for Dec15
Incremental improvements in throughput and recovery as plant optimisation continues
Production 31,714oz at a run rate of 127kozpa in line with guidance mid-point
Cash cost $903/oz and AISC $983/oz consistent with Q1 and in line with guidance
GARDEN WELL

GARDEN WELL

  • Strip ratio reduced from 3.2 (Q1) to 3.1 and down sharply from 5.85 (Q4 2015)

  • Grade at 0.89g/t in line with reserve for areas mined in the quarter

  • Mining reconciliation continues improving and in line with reserve for Dec15

  • Incremental improvements in throughput and recovery as plant optimisation continues

  • Production 31,714oz at a run rate of 127kozpa in line with guidance mid-point

  • Cash cost $903/oz and AISC $983/oz consistent with Q1 and in line with guidance

==> picture [720 x 48] intentionally omitted <==

1010

GARDEN WELL

==> picture [720 x 455] intentionally omitted <==

1111

CORPORATE

DECEMBER 2015 QUARTER

  • Paid 6cps fully franked dividend  $30m cash payment October 2015

  • $4.6m of income tax paid

  • Operating cashflow $49.8 million (Q1: $50.8m)

  • Cash and bullion holdings increased from $98.1m to $98.5m  $35m cash build allowing for dividend and tax

  • Debt unchanged at $20m

  • Gold sold 75,237oz at $1,567/oz (Q1: 74,799 @ $1,545)

  • Work progressing on securing infrastructure requirements for McPhillamys Gold Project in NSW

  • Continuing to review bolt on acquisition opportunities around Duketon

  • Board restructure

  • Paul Thomas COO joins board, Frank Fergusson retires

  • Nick Giorgetta retires as Chairman but remains non-exec director

  • Mark Clark becomes Exec Chairman, Mark Okeby Lead Independent Director

==> picture [720 x 48] intentionally omitted <==

1212

CASHFLOW WATERFALL

==> picture [613 x 332] intentionally omitted <==

Strong cash-flow from operations of $49.8m for Q2 and cash build after allowing for $30m dividend and $4.6m income tax paid in the quarter

==> picture [720 x 48] intentionally omitted <==

1313

CASHFLOW WATERFALL

==> picture [550 x 338] intentionally omitted <==

Business optimisations leading to trend of strong operating cash-flow and conversion to cash build

==> picture [720 x 48] intentionally omitted <==

1414

EXPLORATION UPDATE

SIGNIFICANT RESULTS AT DUKETON IN DEC15Q

  • Completed 41,582m of exploration drilling on 7 gold projects and prospects

  • Further significant gold results at a number of projects:

  • Baneygo – 12km south of Rosemont mill

    • Final RC drilling programme returned high grade results
  • Updated Indicated & Inferred Resource quoted 7.1MT @ 1.03g/t for 237,000 oz

  • Gloster – 26km west of Moolart Well

    • High grade results from 177 RC holes for 21,287m,
  • Resource estimation Jan 2016, Ore Reserve estimation later Mar 16Q

  • Idaho – 2.2km north of Baneygo

    • Infill 40m x 20m RC drilling – significant results

    • Early indications of potential for 10km shear north of Idaho to Rosemont

  • Tooheys Well – 2.5km south of Garden Well mill

    • RC drilling continued returning early very high grade results

    • Drilling to continue in Mar 16Q

  • Coopers – 11km south of Moolart Well mill

    • Significant results continue, resource estimation Mar 16Q

==> picture [720 x 48] intentionally omitted <==

15 15 GLOSTER GOLD DEPOSIT FAMOUS BLUE GEOLOGY

==> picture [332 x 130] intentionally omitted <==

----- Start of picture text -----

Felsic Volcanics
M38/1268
1km
----- End of picture text -----

INFILL & EXTENSIONAL DRILLING COMPLETE – RESOURCE UPDATE PENDING

  • Located 26km west of Moolart Well

  • Historic resource* at 0.5g/t lower cut:

==> picture [278 x 89] intentionally omitted <==

  • December 2015 RC drilling programme on 25m x 25m grid shown in Red

  • New Mining Licence M38/1268 granted in December 2015

  • 177 RC holes drilled in the Dec15Q for 21,287m

  • New Resource and maiden Ore Reserve estimations in March 2016Q

Basalt

Historical drilling grey. Regis drilling Dec 15Q in red

  • Compliant with 1996 JORC Code and Guidelines (refer ASX announcement 16 July 2015)

==> picture [57 x 48] intentionally omitted <==

16 16

GLOSTER DRILL RESULTS December 2015 Quarter

Hole No
Northing
(mN)
Easting
(mE)
Hole Depth
(m)
From
(m)
To
(m)
Interval
(m)
Gold
(g/t)
Hole No
Northing
(mN)
Easting
(mE)
Hole Depth
(m)
From
(m)
To
(m)
Interval
(m)
Gold
(g/t)
RRLGLRC012 6950658
408353
69
16
35
19
3.48
RRLGLRC028 6950772
408424
143
122
130
8
10.01
RRLGLRC031 6950463
408465
43
8
22
14
5.03
RRLGLRC056 6950749
408491
150
29
46
17
3.49
RRLGLRC064 6950693
408495
114
93
108
15
7.4
RRLGLRC067 6950724
408632
174
85
102
17
1.88
RRLGLRC069 6950693
408610
162
77
93
16
2.2
RRLGLRC077 6950755
408456
150
25
47
22
2.14
RRLGLRC078 6950766
408478
160
29
44
15
3.21
RRLGLRC082 6950647
408563
130
19
34
15
2.53
RRLGLRC088 6950636
408566
115
96
99
3
10.4
RRLGLRC091 6950482
408566
90
8
36
28
3.01
RRLGLRC091 6950482
408566
90
46
72
26
2.06
RRLGLRC092 6950492
408588
138
71
76
5
9.27
RRLGLRC093 6950503
408612
138
78
87
9
4.04
RRLGLRC096 6950534
408681
184
57
63
6
5.61
RRLGLRC097 6950542
408702
192
119
126
7
4.37
RRLGLRC104 6950409
408864
174
113
117
4
13.26
RRLGLRC113 6950395
408876
160
132
138
6
7.06
RRLGLRC144 6950437
408847
180
133
137
4
12.83
RRLGLRC148 6950497
408545
120
27
38
11
2.74
RRLGLRC149 6950507
408570
110
38
53
15
3.02
RRLGLRC150 6950551
408546
135
31
40
9
4.44
RRLGLRC154 6950565
408633
145
79
91
12
3.5
RRLGLRC155 6950575
408657
223
92
94
2
38.25
RRLGLRC158 6950517
408591
100
50
59
9
3.5
RRLGLRC160 6950522
408726
174
135
145
10
3.07
RRLGLRC163 6950453
408629
140
28
42
14
2.3
RRLGLRC166 6950489
408713
175
107
127
20
3.94

20gm intersections are highlighted

All coordinates are AGD 84. All holes were drilled at -60° to 244°

All Intercepts calculated using a 0.5g/t lower cut, no upper cut, maximum 2m internal dilution. All assays determined on 1m split samples by fire assay

==> picture [55 x 47] intentionally omitted <==

16

17 17

GLOSTER SECTION 6950495mN

==> picture [708 x 398] intentionally omitted <==

----- Start of picture text -----

Base of Alluvium
500mRL
Top of Saprock
Diorite
450mRL
Top of Fresh Rock
Gloster Gold Project
Cross Section 6950495mN
Diorite Gold Mineralised Envelope
Au InterceGoldpt 18m @ 1.1g/t
400mRL
Clay oxidised Volcanics
Regis Drill Holes: GLRC091 Diorite
Intermediate Volcaniclastics
408500mE 408600mE 6950500mN 408700mE
----- End of picture text -----

==> picture [720 x 48] intentionally omitted <==

18 18 BANEYGO GOLD PROJECT

==> picture [101 x 21] intentionally omitted <==

----- Start of picture text -----

Section 6907677mN
Section 6907638mN
----- End of picture text -----

FIRST RESOURCE UPGRADE FROM THE 20KM ROSEMONT-BANEYGO SHEAR

  • Baneygo 12km south of Rosemont mine

==> picture [26 x 10] intentionally omitted <==

----- Start of picture text -----

1km
----- End of picture text -----

  • Gold hosted in Quartz Dolerite similar to Rosemont

  • Baneygo previous 2004 Resource 43koz Au in 4 small deposits

  • Regis drilled on 20m traverses 49 RC holes for 4,618m in Dec 15Q

  • Highly significant new gold mineralisation defined over 3km strike outside 2004 Resource

  • Diamond drilling completed for geotechnical and metallurgical purposes

Historical drilling grey. Regis drilling blue and Dec 15Q in red

  • Updated Resource estimation completed

==> picture [389 x 48] intentionally omitted <==

19 19

BANEYGO SECTIONS September 2015Q drilling

TOFR TOFR

==> picture [720 x 48] intentionally omitted <==

20

BANEYGO DRILL RESULTS December 2015 Quarter

Hole No Northing (mN)
Easting (mE)
Hole Depth
(m)
From (m)
To (m)
Interval (m)
Gold g/t
RRLBYRC332 6907484
431906
72
17
24
7
1.28
RRLBYRC332 6907484
431906
72
55
59
4
7.71
RRLBYRC333 6907485
431930
102
39
56
17
1.48
RRLBYRC333 6907485
431930
102
67
75
8
1.44
RRLBYRC335 6907755
431845
72
46
58
12
2.05
RRLBYRC336 6907645
431905
118
93
108
15
2.24
RRLBYRC338 6907634
431868
54
21
31
10
0.86
RRLBYRC341 6907771
431902
147
118
128
10
0.97
RRLBYRC342 6907766
431883
120
95
100
5
2.01
RRLBYRC344 6907728
431910
141
111
127
16
1.35
RRLBYRC345 6907723
431891
120
84
87
3
4.90
RRLBYRC347 6907713
431853
69
36
45
9
3.86
RRLBYRC350 6907690
431917
153
135
147
12
6.16
RRLBYRC352 6907650
431924
156
108
130
22
1.71
RRLBYRC352 6907650
431924
156
147
150
3
2.72
RRLBYRC355 6905841
432445
108
40
49
9
1.88
RRLBYRC356 6905801
432451
81
28
31
3
6.24
RRLBYRC357 6905807
432471
117
51
63
12
1.24
RRLBYRC359 6905847
432465
135
58
59
1
13.30
RRLBYRC359 6905847
432465
135
111
113
2
6.64
RRLBYRC362 6905926
432442
99
72
79
7
3.47
RRLBYRC364 6906147
432331
51
35
39
4
2.15
RRLBYRC365 6906152
432350
78
37
47
10
0.95
RRLBYRC368 6906477
432320
129
74
82
8
1.71
RRLBYRC368 6906477
432320
129
108
116
8
1.50
RRLBYRC370 6906511
432314
153
81
83
2
12.70
RRLBYRC370 6906511
432314
153
105
107
2
4.53
RRLBYRC370 6906511
432314
153
110
118
8
6.36
RRLBYRC372 6907681
431898
117
79
110
31
3.04
RRLBYRC376 6908251
431641
57
48
52
4
6.59

8gm intersections are tabled

All coordinates are AGD 84. All holes were drilled at -60 ° to 254 °

All Intercepts calculated using a 0.5g/t lower cut, no upper cut, maximum 2m internal dilution. All assays determined on 1m split samples by fire assay

==> picture [55 x 47] intentionally omitted <==

21 21

BANEYGO GOLD PROJECT

DECEMBER 2015 RESOURCE UPDATE

  • Updated Resource estimated at a 0.4g/t gold lower cut:
Indicated Indicated Indicated Inferred Inferred Inferred Total Total Total
Tonnes
(MT)
Grade
(g/t)
Ounces
(‘000)
Tonnes
(MT)
Grade
(g/t)
Ounces
(‘000)
Tonnes
(MT)
Grade
(g/t)
Ounces
(‘000)
6.2 1.03 204 1.0 1.06 32 7.1 1.03 237

Errors of summation may occur due to rounding.

  • Fivefold increase in quoted Resource at Baneygo

  • Does not yet include Idaho or the sparsely drilled but mineralised 4km along strike to the south of Baneygo.

  • This resource will be used as the basis for an Ore Reserve estimate later in the March 2016 quarter.

  • Highlights the potential to add significant resource ounces along the highly prospective 20km Rosemont-Baneygo shear where previous drilling is sparse and largely ineffective (mostly less than 50m deep holes).

==> picture [720 x 48] intentionally omitted <==

22 22

ROSEMONT TO BANEYGO

REGIONAL SCALE OPPORTUNITY

==> picture [713 x 433] intentionally omitted <==

----- Start of picture text -----

REGIONAL SCALE OPPORTUNITY
Rosemont

Rosemont to Baneygo trend 20km
poorly tested.
 Quartz dolerite host rock at
Rosemont continues to Baneygo and
22m @ 2.6g/t, f 22m
10km
beyond to the south
Garden
King John

Well Recent RC drilling around historic
3m @ 7.7g/t, f 41m
4m @ 8.5g/t, f 28m Baneygo resource.

Significant gold intercepts from
Rosemont to Baneygo
10m @ 1.8g/t, f 22m
8m @ 1.9g/t, f 14m  New discovery Idaho
13m @ 4.9g/t, f 17m Idaho

20km corridor requires further drilling

33m @ 8.4g/t, f 50m Previous drilling max 100m deep with
11m @ 7.3g/t, f 21m
most only 50m deep
21m @ 9.3g/t, f 16m Erlistoun

Up to 800m gaps between drill lines
Baneygo
 Continue to test strike continuation north
22m @ 2.5g/t, f 26m to Rosemont on 400m traverses
5m @ 4.6g/t, f 7m
2m @ 12.6g/t, f 13m
----- End of picture text -----

23 23

IDAHO GOLD PROSPECT

IDAHO DISCOVERY FURTHER CONFIRMS PROSPECTIVITY OF ROSEMONT-BANEYGO TREND

500m

Section 6909156mN Section 6908944mN

  • 10km south of Rosemont and 2.2km north of Baneygo

  • Gold hosted in Quartz Dolerite similar to Rosemont and Baneygo

  • No historical resource - new discovery

  • Regis drilled on 40m traverses 36 RC holes for 2,993m in Dec 15Q

  • Highly significant new gold mineralisation defined over 650m strike

Historical drilling grey. Regis drilling blue and Dec 15Q in red

==> picture [720 x 48] intentionally omitted <==

24

IDAHO DRILL RESULTS

December 2015 Quarter

Hole No
Northing
(mN)
Easting
(mE)
Hole Depth
(m)
From
(m)
To
(m)
Interval
(m)
Gold
(g/t)
Hole No
Northing
(mN)
Easting
(mE)
Hole Depth
(m)
From
(m)
To
(m)
Interval
(m)
Gold
(g/t)
RRLIHRC018 6908707
431463
60
28
42
14
0.94
RRLIHRC021 6908778
431421
24
15
18
3
8.73
RRLIHRC023 6908819
431420
48
40
46
6
4.27
RRLIHRC024 6908825
431440
78
30
52
22
1.39
RRLIHRC025 6908852
431435
78
29
65
36
1.35
RRLIHRC025 6908852
431435
78
75
78
3
16.04
RRLIHRC026 6908901
431413
66
36
62
26
1.43
RRLIHRC027 6908906
431433
102
53
77
24
1.25
RRLIHRC027 6908906
431433
102
97
99
2
8.15
RRLIHRC028 6909009
431389
90
49
65
16
0.73
RRLIHRC030 6909161
431336
108
62
71
9
3.00
RRLIHRC030 6909161
431336
108
81
83
2
4.24
RRLIHRC034 6909391
431270
78
50
56
6
3.02
RRLIHRC038 6909468
431248
66
45
56
11
1.11
RRLIHRC043 6908843
431414
54
32
34
2
13.80
RRLIHRC043 6908843
431414
54
42
49
7
4.55
RRLIHRC044 6908667
431461
33
9
16
7
2.22
RRLIHRC051 6908942
431408
81
46
64
18
1.13
RRLIHRC051 6908942
431408
81
70
75
5
11.79
RRLIHRC052 6908948
431428
135
63
93
30
4.34
RRLIHRC058 6909042
431363
81
22
26
4
2.16
RRLIHRC058 6909042
431363
81
42
56
14
0.60
RRLIHRC059 6909048
431383
111
61
83
22
1.63
RRLIHRC062 6909085
431366
120
51
58
7
1.52
RRLIHRC062 6909085
431366
120
61
69
8
2.45
RRLIHRC064 6909119
431342
99
45
58
13
1.21
RRLIHRC064 6909119
431342
99
73
75
2
5.22
RRLIHRC065 6909124
431362
140
72
91
19
2.03
RRLIHRC066 6909165
431359
159
73
96
23
2.21
RRLIHRC068 6909195
431318
75
5
7
2
5.19
RRLIHRC068 6909195
431318
75
47
50
3
3.37
RRLIHRC069 6909230
431292
63
30
44
14
0.75
RRLIHRC070 6909235
431312
88
41
55
14
1.81
RRLIHRC072 6909544
431225
75
48
68
20
1.92
RRLIHRC074 6909107
431304
45
29
34
5
2.19

8gm intersections are tabled

All coordinates are AGD 84. All holes were drilled at -60 ° to 254 °

All Intercepts calculated using a 0.5g/t lower cut, no upper cut, maximum 2m internal dilution. All assays determined on 1m split samples by fire assay

==> picture [55 x 47] intentionally omitted <==

25 25

IDAHO SECTIONS December 2015 Results

450mRL
431350mE
431400mE 6908950mN 6908950mN k

NEW GOLD DISCOVERY AT IDAHO
Significant new gold mineralisation
defined Dec 15Q holes
RRIHRC051 18m @ 1.13g/t from 46m
RRIHRC051 5m @ 11.79g/t from 70m
RRIHRC052 30m @ 4.34g/t from 63m
Highly significant new gold
mineralisation defined over 650m
strike
Further drilling planned in March
2016Q and maiden Resource to
follow
400mRL To
Top of
p of
Fre
Saproc
sh Rock
350mRL 431450mE

Idaho Gold Pr
Gold Mineralise
Cross Section 6908
oje
ct
velope
4mN
d En
94
~~Gold~~
Au Intercept 5m
@ 1.08g/t

26

IDAHO GOLD PROSPECT

Idaho Gold Prospect

New Gold Discovery Idaho 2.2km North of Baneygo

Baneygo Gold Deposit

North

Block Model g/t Au

==> picture [87 x 97] intentionally omitted <==

==> picture [98 x 45] intentionally omitted <==

==> picture [720 x 48] intentionally omitted <==

2727

TOOHEYS WELL DRILL RESULTS

17m @ 1.54g/t
12m @ 3.34g/t
7m @ 5.03g/t
200m
8m @ 5.47g/t
16m @ 3.23g/t
22m @ 3.15g/t
~~S~~ection 6909340mN
35m @ 1.1g/t
44m @ 1.18g/t
19m @ 1.34g/t
24m @ 1.78g/t
54m @ 3.6g/t
50m @ 2.76g/t
48m @ 2.38g/t
23M @ 2.26G/T
A BOLT ON FOR GARDEN WELL

Gold shear zones hosted by chert and
shale

2013 RC drilling returned significant go
intercepts on the Western shear

Regis drilled on 40m traverses, 30 RC
for 3,908m in Dec 15Q

Recent 2015 drilling has defined a
parallel Eastern shear:
Eastern Shear high grade and ope
south for 600m
• December 15Q gold results in red

Eastern Shear open to the north and s

Western Shear open to the south

Further drill testing planned in Mar 16Q

Resource estimation to follow
  • 2013 RC drilling returned significant gold intercepts on the Western shear

  • Regis drilled on 40m traverses, 30 RC holes for 3,908m in Dec 15Q

  • Eastern Shear high grade and open to south for 600m

  • Eastern Shear open to the north and south

  • Western Shear open to the south

  • Further drill testing planned in Mar 16Q

2828

TOOHEYS WELL DRILL RESULTS December 2015 Quarter

Hole No Northing
(mN)
Easting
(mE)
Hole Depth
(m)
From
(m)
To
(m)
Interval
(m)
Gold
(g/t)
RRLTWRC046 6909340
437840
148
55
82
27
2.48
RRLTWRC046 6909340
437840
148
85
135
50
2.75
RRLTWRC047 6909340
437860
178
46
57
11
1.60
RRLTWRC047 6909340
437860
178
72
88
16
1.42
RRLTWRC047 6909340
437860
178
95
122
27
1.38
RRLTWRC047 6909340
437860
178
134
147
13
3.03
RRLTWRC048 6909300
437860
145
70
118
48
2.38
RRLTWRC048 6909300
437860
145
122
145
23
2.26
RRLTWRC050 6909140
437860
98
60
78
18
0.89
RRLTWRC051 6909140
437900
148
92
99
7
1.83
RRLTWRC054 6909060
437900
138
82
94
12
1.13
RRLTWRC054 6909060
437900
138
97
103
6
1.74
RRLTWRC057 6909380
437780
93
59
63
4
5.15
RRLTWRC058 6909380
437800
68
55
68
13
2.50
RRLTWRC059 6909060
437940
168
81
90
9
2.04
RRLTWRC059 6909060
437940
168
125
135
10
0.88

==> picture [55 x 47] intentionally omitted <==

8gm intersections are tabled. ° ° All coordinates are AGD 84. All holes were drilled at -60 to 270 . All Intercepts calculated using a 0.5g/t lower cut, no upper cut, maximum 2m internal dilution. All assays determined on 1m split samples by fire assay.

29 29

==> picture [720 x 516] intentionally omitted <==

----- Start of picture text -----

29
TOOHEYS WELL GOLD PROSPECT
December 2015 Results
500mRL
450mRL
Top of Saprock
Top of Fresh Rock
400mRL
Tooheys Well Gold Project
Cross Section 6909340mN
Gold Mineralised Envelope
Gold Intercept 11m @ 1.59g/tGold
350mRL
Chert
Black Sulphidic Shale
Banded Iron Formation
Shear Zone
43770mE 43780mE 43790mE
----- End of picture text -----

30

COOPERS GOLD PROSPECT

2
9m @ 3.
5m @ 5.4
5m @ 1
11m @
2
9m @ 3.
5m @ 5.4
5m @ 1
11m @
2
9m @ 3.
5m @ 5.4
5m @ 1
11m @
00m 00m 00m 00m .28g/t
@ 49.3g/t
6934420mN
@ 2.78g/t

n
t
.68g/t
5.73/t
9.0g/t
Gold mineralisation over 500m strike

N-S trending moderately W dipping gold
mineralised shear zone

Discovered under a thin palaeochannel

Defined to 100m depth in oxidised
dolerite and diorite

Defined in Aircore and RC drilling on 40m
and 80m spaced E-W sections
Regis drilled on 40m traverses 50 RC
holes for 4,4628m in Dec 15Q
Gold results for most holes expected in
Mar 16Q

December 15Q gold results in red
Resource estimation in March 16Q
ANOTHER BOLT ON FOR MOOLART WELL
11m @ 2.05/t
9m @ 3. 46g/t
5m @ 1 4.1g/t
5m @ 5.4 9g/t
Coopers
Proje
Coopers Gold
Gold
ct
Project
8m @ 2 .28g/t

31 31

COOPERS GOLD PROSPECT

==> picture [492 x 402] intentionally omitted <==

----- Start of picture text -----

50m
BOCO
TOFR
----- End of picture text -----

==> picture [720 x 48] intentionally omitted <==

3232

RECAP OF PRESENTATION

  • FY2016 Q2 gold production 75,544 ounces at AISC of A$918/oz

  • Production run rate at upper end of FY16 guidance 275-305koz

  • AISC below lower end of FY16 guidance of $970-1,070/oz

  • Consistent production and cost performance at all operations

  • Rosemont operations continue to outperform

  • Reconciliation to reserve positive for Duketon and in line for GW by Dec15

  • Cash-flow from operations $49.8m for Q2 (Q1: $50.8m)

  • 6cps fully franked dividend paid Oct15

  • Cash and bullion increased to $98.5m (net cash position $78.5m)

    • $35m cash build allowing for dividend and income tax paid
  • Work continuing to secure infrastructure required for McPhillamys project

  • Continued exciting exploration results at Duketon

  • Including Baneygo, Idaho, Tooheys Well & Coopers

  • Pointing to extensions of mine life at all three operations

==> picture [720 x 48] intentionally omitted <==

3333

JORC COMPLIANT MINERAL RESOURCES 31 MARCH 2015

Group Mineral Resources

Group Mineral Resources Group Mineral Resources Group Mineral Resources Group Mineral Resources Group Mineral Resources Group Mineral Resources Group Mineral Resources Group Mineral Resources Group Mineral Resources Group Mineral Resources Group Mineral Resources Group Mineral Resources
as at 31 March 2015
Gold Measured Indicated Inferred Total Resource Competent
Person4
Project Type Cut-Off
(g/t)
Tonnes
(Mt)
Gold Grade
(g/t)
Gold Metal
(koz)
Tonnes
(Mt)
Gold Grade
(g/t)
Gold Metal
(koz)
Tonnes
(Mt)
Gold Grade
(g/t)
Gold Metal
(koz)
Tonnes
(Mt)
Gold Grade
(g/t)
Gold Metal
(koz)
Moolart Well1 Open-Pit 0.4 3.0 0.89 87 29.2 0.75 706 15.0 0.62 300 47.3 0.72 1,093 A
Garden Well1 Open-Pit 0.4 2.7 0.63 54 73.8 0.90 2,131 10.2 0.88 288 86.7 0.89 2,473 B
Rosemont1 Open-Pit 0.4 5.4 1.31 228 20.1 1.27 824 2.8 1.78 160 28.3 1.33 1,212 B
Duketon Main Deposits Sub Total 11.1 1.03 369 123.2 0.92 3,661 28.0 0.83 748 162.3 0.92 4,777
Erlistoun Open-Pit 0.4 - - - 5.7 1.34 247 1.1 1.00 37 6.9 1.28 284 A
Dogbolter Open-Pit 0.4 - - - 2.8 1.11 102 0.4 1.02 13 3.2 1.10 115 A
Petra Open-Pit 0.4 - - - 1.2 1.08 42 0.1 1.09 2 1.3 1.08 44 A
Anchor Open-Pit 0.4 - - - 0.2 1.75 9 0.1 0.95 2 0.2 1.53 11 A
King John3 Open-Pit 1.0 - - - - - - 0.7 3.19 72 0.7 3.20 72 C
Russells Find3 Open-Pit 1.0 - - - - - - 0.4 3.86 55 0.4 4.28 55 C
Baneygo3 Open-Pit 0.5 - - - - - - 0.8 1.67 43 0.8 1.67 43 C
Reichelts Find3 Open-Pit 1.0 - - - 0.1 3.69 17 - - - 0.1 3.69 17 C
Duketon Satellite Deposits Sub Total - - - 10.1 1.28 416 3.6 1.96 223 13.6 1.46 640
Duketon Total 11.1 1.03 369 133.2 0.95 4,077 31.5 0.96 971 175.9 0.96 5,417
McPhillamys Total 0.4 - - - 69.2 0.94 2,087 3.9 0.98 123 73.2 0.94 2,210 B
Regis Grand Total 11.1 1.03 369 202.5 0.95 6,164 35.5 0.96 1,094 249.1 0.95 7,627

Notes

The above data has been rounded to the nearest 100,000 tonnes, 0.01 g/t gold grade and 1,000 ounces. Errors of summation may occur due to rounding.

All Mineral Resources are reported inclusive of Ore Reserves to JORC Code 2012 unless otherwise noted

  1. Mineral Resources and Ore Reserves are reported inclusive of ROM Stockpiles at cut-off grade of 0.4 g/t

  2. Reported under JORC Code 2004

  3. Refer to Group Competent Person Notes

  4. 5 As this table is quoted at 31 March 2015 the updated Baneygo resource referred to in the body of this presentation has not been updated. It will be updated as part of the next full annual update

==> picture [720 x 48] intentionally omitted <==

3434

JORC COMPLIANT ORE RESERVES 31 MARCH 2015

Group Ore Reserves

Group Ore Reserves Group Ore Reserves Group Ore Reserves Group Ore Reserves Group Ore Reserves Group Ore Reserves Group Ore Reserves Group Ore Reserves Group Ore Reserves
as at 31 March 2015
Gold Proved Probable Total Ore Reserve Competent
Person3
Project Type Cut-Off
(g/t)2
Tonnes
(Mt)
Gold Grade
(g/t)
Gold Metal
(koz)
Tonnes
(Mt)
Gold Grade
(g/t)
Gold Metal
(koz)
Tonnes
(Mt)
Gold Grade
(g/t)
Gold Metal
(koz)
Moolart Well1 Open-Pit > 0.4 2.7 0.93 79 3.9 0.92 115 6.5 0.92 194 D
Garden Well1 Open-Pit > 0.4 2.7 0.63 54 31.9 0.93 955 34.5 0.91 1,009 D
Rosemont1 Open-Pit > 0.4 4.4 1.34 188 8.9 1.36 387 13.2 1.35 574 D
Duketon Main Deposits Sub Total 9.7 1.03 321 44.6 1.02 1,456 54.3 1.02 1,777
Erlistoun Open-Pit > 0.5 - - - 3.8 1.48 181 3.8 1.48 181 D
Dogbolter Open-Pit > 0.5 - - - 0.3 1.57 16 0.3 1.57 16 D
Petra Open-Pit > 0.5 - - - 0.6 1.26 25 0.6 1.26 25 D
Anchor Open-Pit > 0.5 - - - 0.1 2.07 6 0.1 2.07 6 D
Duketon Satellite Deposits Sub Total - - - 4.8 1.47 229 4.8 1.47 229
Regis Grand Total 9.7 1.03 321 49.4 1.06 1,685 59.1 1.06 2,006

Notes

The above data has been rounded to the nearest 100,000 tonnes, 0.01 g/t gold grade and 1,000 ounces. Errors of summation may occur due to rounding.

  1. Mineral Resources and Ore Reserves are reported inclusive of ROM Stockpiles at cut-off grade of 0.4 g/t

  2. Cutoff grades vary according to oxidation and lithology domains. Refer to Group Ore Reserves Lower Cut Notes

  3. Refer to Group Competent Person Notes

==> picture [720 x 48] intentionally omitted <==