REGIS RESOURCES LIMITED — Interim / Quarterly Report 2016
Apr 14, 2016
65733_rns_2016-04-14_3d692b2d-9d40-4740-9e7d-060c77742a2b.pdf
Interim / Quarterly Report
Open in viewerOpens in your device viewer
==> picture [17 x 22] intentionally omitted <==
----- Start of picture text -----
11
----- End of picture text -----
REGIS RESOURCES LTD
==> picture [128 x 108] intentionally omitted <==
MARCH 2016 QUARTERLY REPORT & EXPLORATION UPDATE
22
DISCLAIMER & COMPETENT PERSONS STATEMENT
This presentation contains only a brief overview of Regis Resources Limited and its associated entities (“Regis or RRL") and their respective activities and operations. The contents of this presentation, including matters relating to the geology of Regis’ projects, may rely on various assumptions and subjective interpretations which it is not possible to detail in this presentation and which have not been subject to any independent verification.
This presentation contains a number of forward-looking statements. Known and unknown risks and uncertainties, and factors outside of Regis’ control, may cause the actual results, performance and achievements of Regis to differ materially from those expressed or implied in this presentation. To the maximum extent permitted by law, Regis does not warrant the accuracy, currency or completeness of the information in this presentation, nor the future performance of Regis, and will not be responsible for any loss or damage arising from the use of the information. The information contained in this presentation is not a substitute for detailed investigation or analysis of any particular issue. Current and potential investors and shareholders should seek independent advice before making any investment decision in regard to Regis or its activities.
The information in this presentation that relates to Exploration Results is extracted from ASX announcements released 14 January 2016 entitled “Exploration Update & Baneygo Resource”; 14 March 2016 entitled “Further High Grade Results Extend Tooheys Well Gold Deposit and Point to Fresh Rock Potential” and 15 April 2016 entitled “Quarterly Report to 31 March 2016” and for which Competent Person’s consents were obtained. The Competent Person’s consents remain in place for subsequent releases by the Company of the same information in the same form and context, until the consent is withdrawn or replaced by a subsequent report and accompanying consent.
The information in this presentation that relates to Mineral Resources or Ore Reserves is extracted from the Mineral Resource and Ore Reserve Statement released to the Australian Securities Exchange (ASX) on 16 July 2015 and the ASX announcement on 14 January 2016 entitled “Exploration Update & Baneygo Resource” and the ASX announcement on 14 March 2016 entitled “Maiden Ore Reserves at Gloster and Baneygo Extend Duketon Mine Life” and for which Competent Person’s consents were obtained. The Competent Person’s consents remain in place for subsequent releases by the Company of the same information in the same form and context, until the consent is withdrawn or replaced by a subsequent report and accompanying consent.
The Company confirms that it is not aware of any new information or data that materially affects the information included in the original ASX announcements released on 16 July 2015, 14 January 2016, 14 March 2016 and 15 April 2016 and, in the case of estimates or Mineral Resources or Ore Reserves, that all material assumptions and technical parameters underpinning the estimates in the original ASX announcements continue to apply and have not materially changed. The Company confirms that the form and context in which the Competent Person’s findings are presented have not been materially modified from the original ASX announcement.
ASX announcements are available on the Company’s website at www.regisresources.com.au
==> picture [720 x 48] intentionally omitted <==
33
REVIEW OF FY2016 Q3 OPERATIONS
PRODUCTION AT UPPER END OF GUIDANCE & DELIVERING STRONG CASHFLOW
| Q3 | Q2 | OPERATIONS | |
|---|---|---|---|
| Ore mined (Mbcm) | 1.13 | 1.13 | Q3 product Run rate |
| Waste mined (Mbcm) | 5.37 | 5.21 | Fourth c Fourth c |
| Stripping ratio (w:o) | 4.74 | 4.61 | Q3 through |
| Ore mined (Mtonnes) | 2.62 | 2.62 | Q3 and YT COSTS |
| Ore milled (Mtonnes) | 2.57 | 2.58 | Q3 cash co |
| Unit cost | |||
| Head grade (g/t) | 1.02 | 1.00 | Moola |
| Recovery (%) | 90 | 91 | Fall in Fall in |
| Gold production (ounces ‘000) |
76 | 76 | RMT c Q3 AISC $ |
| Cash cost (A$/oz) | 696 | 789 | Below Fourth |
| Cash cost inc royalty (A$/oz) All in Sustaining Cost (A$/oz)1 |
762 856 |
861 918 |
Q3 operati Lower at A$ OPERATING C |
-
Q3 production 75,656 ounces Run rate at upper end of FY2016 guidance of 275-305koz Fourth consecutive quarter of production above 75koz Fourth consecutive quarter of increased production
-
Q3 throughput, recovery & grade consistent with H1 Q3 and YTD reconciliation to reserve positive
-
Q3 cash costs $696/oz – ↓ 9% (Q2: $789/oz)
-
Unit cost efficiencies
-
Moolart Well mining contract extension negotiation
-
Fall in diesel price
-
Fall in milling reagent costs
-
RMT cutback excluded
-
-
Q3 AISC $856/oz - ↓ 7% (Q2: $918/oz)
-
Below lower end of FY16 guidance of $970 - $1,070/oz
-
Fourth consecutive quarter of reduced costs
-
OPERATING CASH-FLOW
- Q3 operating cashflow $56.5m ↑13% (Q2: $49.8m) Lower costs per above & delivered gold price ↑5% at A$1,638/oz (Q2: A$1,567/oz)
==> picture [57 x 48] intentionally omitted <==
1 AISC calculated on a per ounce of production basis
44
DUKETON OPERATIONS
==> picture [651 x 386] intentionally omitted <==
==> picture [720 x 48] intentionally omitted <==
55
FY2016 Q3 OPERATING RESULTS
| Moolart Well Rosemont Garden Well Total Ore mined (bcm ) 389,935 245,201 498,053 1,133,189 Waste mined (bcm) 1,435,242 2,361,741 1,569,359 5,366,342 Stripping ratio (w:o) 3.7 9.6 3.2 4.7 Ore mined (tonnes) 786,985 612,198 1,220,373 2,619,556 Ore milled (tonnes) 731,949 588,856 1,253,100 2,573,905 Head grade (g/t) 0.83 1.50 0.88 1.02 Recovery (%) 89.8 92.5 89.0 90.0 Gold production (ounces) 17,508 26,347 31,801 75,656 Cash cost (A$/oz) 653 543 847 696 Cash cost inc royalty (A$/oz) 715 612 913 762 All in Sustaining Cost (A$/oz) 941 650 979 856 |
||
==> picture [720 x 48] intentionally omitted <==
66
FY2016 Q3 OPERATING RESULTS
| Moolart Well |
Rosemont Garden Well Total |
|
|---|---|---|
| Ore mined (bcm ) | 389,935 | 245,201 498,053 1,133,189 |
| Waste mined (bcm) | 1,435,242 | 2,361,741 1,569,359 5,366,342 |
| Stripping ratio (w:o) | 3.7 | 9.6 3.2 4.7 |
| Ore mined (tonnes) | 786,985 | 612,198 1,220,373 2,619,556 |
| Ore milled (tonnes) | 731,949 | 588,856 1,253,100 2,573,905 |
| Head grade (g/t) | 0.83 | 1.50 0.88 1.02 |
| Recovery (%) | 89.8 | 92.5 89.0 90.0 |
| Gold production (ounces) | 17,508 | 26,347 31,801 75,656 |
| Cash cost (A$/oz) | 653 | 543 847 696 |
| Cash cost inc royalty (A$/oz) | 715 | 612 913 762 |
| All in Sustaining Cost (A$/oz) |
941 | 650 979 856 |
MOOLART WELL
-
Q3 production run rate 7% lower than mid point of FY2016 guidance range due to lower scheduled grade
-
YTD production run rate in line with mid point of FY2016 guidance range
-
Strip ratio slightly higher than guidance - availability of bigger excavator to advance prestrip at Wellington
-
All in sustaining cost $941/oz in line with guidance – lower production offset by mining contract extension repricing efficiencies
==> picture [720 x 48] intentionally omitted <==
77
FY2016 Q3 OPERATING RESULTS
| Moolart Well |
Rosemont | Garden Well Total |
|---|---|---|
| Ore mined (bcm ) 389,935 |
245,201 | 498,053 1,133,189 |
| Waste mined (bcm) 1,435,242 |
2,361,741 | 1,569,359 5,366,342 |
| Stripping ratio (w:o) 3.7 |
9.6 | 3.2 4.7 |
| Ore mined (tonnes) 786,985 |
612,198 | 1,220,373 2,619,556 |
| Ore milled (tonnes) 731,949 |
588,856 | 1,253,100 2,573,905 |
| Head grade (g/t) 0.83 |
1.50 | 0.88 1.02 |
| Recovery (%) 89.8 |
92.5 | 89.0 90.0 |
| Gold production (ounces) 17,508 |
26,347 | 31,801 75,656 |
| Cash cost (A$/oz) 653 |
543 | 847 696 |
| Cash cost inc royalty (A$/oz) 715 |
612 | 913 762 |
| All in Sustaining Cost (A$/oz) 941 |
650 | 979 856 |
ROSEMONT
-
Higher grade reflects positive reconciliation to reserve grade
-
Strip ratio in line with schedule and forecast, higher than Q2 as waste mining catches up
-
Throughput and recovery in line with guidance
-
As in Q2, Q3 production run rate above top of guidance range and AISC below bottom of guidance range
-
Cutback cost of $5.0m treated as expansionary capex (non AISC) as per FY2016 guidance
==> picture [720 x 48] intentionally omitted <==
88
FY2016 Q3 OPERATING RESULTS
| Moolart Well Rosemont |
Garden Well |
Total | |
| Ore mined (bcm ) 389,935 245,201 |
498,053 | 1,133,189 | |
| Waste mined (bcm) 1,435,242 2,361,741 |
1,569,359 | 5,366,342 | |
| Stripping ratio (w:o) 3.7 9.6 |
3.2 | 4.7 | |
| Ore mined (tonnes) 786,985 612,198 |
1,220,373 | 2,619,556 | |
| Ore milled (tonnes) 731,949 588,856 |
1,253,100 | 2,573,905 | |
| Head grade (g/t) 0.83 1.50 |
0.88 | 1.02 | |
| Recovery (%) 89.8 92.5 |
89.0 | 90.0 | |
| Gold production (ounces) 17,508 26,347 |
31,801 | 75,656 | |
| Cash cost (A$/oz) 653 543 |
847 | 696 | |
| Cash cost inc royalty (A$/oz) 715 612 |
913 | 762 | |
| All in Sustaining Cost (A$/oz) 941 650 |
979 | 856 | |
| Strip ratio 3.2 in line with H1, significantly lower than in FY2015 Grade at 0.88g/t in line with mining schedule and reserve for areas mined in the quarter Throughput and recovery in line with Q2 reflecting steady state Production 31,801oz consistent with Q2 and run rate of 127kozpa in line with guidance mid-point Cash cost $847/oz and AISC $979/oz consistent with Q2 and in line with guidance GARDEN WELL |
GARDEN WELL
-
Strip ratio 3.2 in line with H1, significantly lower than in FY2015
-
Grade at 0.88g/t in line with mining schedule and reserve for areas mined in the quarter
-
Throughput and recovery in line with Q2 reflecting steady state
-
Production 31,801oz consistent with Q2 and run rate of 127kozpa in line with guidance mid-point
-
Cash cost $847/oz and AISC $979/oz consistent with Q2 and in line with guidance
==> picture [720 x 48] intentionally omitted <==
99
CORPORATE
MARCH 2016 QUARTER
-
Paid 4cps fully franked interim dividend $20m cash payment February 2016 (Q2: 6cps, $30m)
-
$8.2m of income tax paid
-
$1.4m spent on listed equity investments
-
Operating cashflow $56.5 million (Q2: $49.8m)
-
Cash and bullion holdings increased from $98.5m to $106.7m $38m cash build allowing for dividend, tax & investment (Q2:$35m)
-
Debt unchanged at $20m
-
Gold sold 69,721oz at $1,638/oz (Q1: 75,237 @ $1,567)
-
Work progressing on securing infrastructure requirements for McPhillamys Gold Project in NSW
-
Board movements
James Mactier joins board as NED Nick Giorgetta to retire end of April 2016
==> picture [720 x 48] intentionally omitted <==
1010
DUKETON DIESEL HEDGE
==> picture [415 x 299] intentionally omitted <==
REGIS HEDGE
| Volume per month 2 million litres 2 million litres |
Tenor 1 May 2016 to 31 April 2017 1 May2016to 31October 20 |
Price A$0.404/L $A0.419/L |
|---|---|---|
Oil price peaked at US$110/b in 2013 – now around US$40/b
Regis base diesel price peaked at A$0.95/litre, trending down since 2014 now around A$0.40/litre
- Significant impact on operating unit costs
Regis diesel hedge:
- Diesel is largest individual cost line in operating cost base.
Hedged volume over 12 month period is approx 2/3 of total annual usage at Duketon operations (mining & milling)
-
12 & 18 month hedges undertaken at close to the lowest ever base diesel price recorded at Duketon to date
-
Strong medium term risk management and value creation opportunity
==> picture [720 x 48] intentionally omitted <==
1111
CASHFLOW WATERFALL
==> picture [613 x 341] intentionally omitted <==
----- Start of picture text -----
Cash & Gold on Hand - Q3 Movements
$180.0m
$56.5m
$160.0m
$140.0m
($20.0m)
$120.0m ($6.7m)
($4.8m)
($5.7m)
$100.0m ($8.2m) ($1.4m) ($1.7m) $106.7m
$98.5m
$80.0m
$60.0m
$40.0m
$20.0m
- - - - - - -
-
-
----- End of picture text -----
Strong cash-flow from operations of $56.5m for Q3 and cash build after allowing for payment of $20m dividend, $8.2m income tax & $1.4m investments in the quarter
==> picture [720 x 48] intentionally omitted <==
1212
RESERVE GROWTH
MAIDEN ORE RESERVES AT GLOSTER AND BANEYGO
- Q3 estimations added 361,000 ounces to gold reserves at Duketon.
| Project | Tonnes | Gold Grade | Gold Metal |
|---|---|---|---|
| (Mt) | (g/t) | (koz) | |
| Gloster | 7.0 | 1.00 | 226 |
| Baneygo | 3.6 | 1.16 | 136 |
-
This increase in Duketon gold reserves more than replaces expected 2016FY production.
-
Simple projects within trucking distance to existing mills.
-
Compliant with 2012 JORC Code and Guidelines (refer ASX announcement 12 March 2016)
==> picture [57 x 48] intentionally omitted <==
13 13 GLOSTER GOLD DEPOSIT FAMOUS BLUE GEOLOGY
PURCHASE TO RESERVE
==> picture [331 x 130] intentionally omitted <==
----- Start of picture text -----
Felsic Volcanics
M38/1268
1km
----- End of picture text -----
-
Located 26km west of Moolart Well
-
Purchased for $1.5m + royalty
-
Mining Licence granted in December 2015
-
177 RC holes drilled in the Dec15Q for 21,287m
-
New Resource and Maiden Ore Reserve estimations announced
Basalt
Historical drilling grey. Regis drilling Dec 15Q in red
==> picture [57 x 48] intentionally omitted <==
14 14
GLOSTER GOLD DEPOSIT FAMOUS BLUE GEOLOGY
RESOURCE UPDATE COMPLETE AND MAIDEN RESERVE ESTIMATED
==> picture [536 x 287] intentionally omitted <==
-
Maiden Ore Reserve at Gloster estimated at 7.0Mt at 1.00g/t Au for 226,000 ounces of gold*
-
Updated JORC Resource of 21.3Mt at 0.77g/t Au for 528,000 ounces of gold*, an increase of 45% for contained ounces from the previous Resource
-
Further drilling underway to test along strike extensions
-
Compliant with 2012 JORC Code and Guidelines (refer ASX announcement 12 March 2016)
==> picture [57 x 48] intentionally omitted <==
15 15 GLOSTER GOLD DEPOSIT FAMOUS BLUE GEOLOGY
MOVING TOWARDS PRODUCTION
==> picture [383 x 226] intentionally omitted <==
-
Mining tenement granted
-
Clearing permit granted
-
Mining proposal submitted
-
Road construction contract awarded
-
Mining at Gloster is expected to commence in the Sep 2016 quarter
-
Simple low strip open cut mining and road haulage operation
-
70% of reserve within 80m of surface in the oxide
-
Utilise Moolart team and facilities
-
Low capex
-
In the order of 3 years additional mill feed to the Moolart Well processing plant.
-
Supplement production in the order of 70,000 ounces per year for three years
-
Cost estimates in line with other Duketon deposits (forecast to be between $970-1,070 per ounce for 2015/16)
==> picture [720 x 48] intentionally omitted <==
16 16
BANEYGO GOLD PROJECT
==> picture [353 x 397] intentionally omitted <==
MAIDEN RESERVE
-
Maiden Ore Reserve at Baneygo estimated at 3.6 million tonnes at
-
1.16g/t Au for 136,000 ounces of gold*
-
0.4g/t cutoff oxide and transitional, 0.5g/t in fresh
-
Updated Resource* estimated in January 2016 gave a fivefold increase in Resource ounces (7.1MT @ 1.03g/t for 237,000 oz)
-
Further drilling underway to test along strike extensions
-
Does not yet include Idaho or the sparsely drilled (but mineralised) 4km to the south of Baneygo
==> picture [55 x 47] intentionally omitted <==
- Compliant with 2012 JORC Code and Guidelines (refer ASX announcements 14 January 2016 and 15 March 2016)
17 17
BANEYGO GOLD DEPOSIT FAMOUS BLUE GEOLOGY
==> picture [298 x 403] intentionally omitted <==
MAIDEN RESERVE
-
Mining of the Baneygo deposit will be scheduled with other satellite deposits
-
Simple open cut mining and short road haul
-
Similar geology and metallurgy as Rosemont
-
On a granted mining lease
-
Utilise Garden Well team and facilities
-
Baneygo 6km from Garden Well
-
Low capex
-
Supplement production in the order of 70,000 ounces per year for two years
-
Cost estimates in line with other Duketon deposits (forecast to be between $9701,070 per ounce for 2015/16)
==> picture [720 x 48] intentionally omitted <==
1818
EXPLORATION UPDATE
SIGNIFICANT RESULTS AT DUKETON IN MAR16Q Completed 30,418m (YTD: 117,517m) of drilling on 8 gold projects
-
Gloster – 26km W of Moolart Well
-
Extensional drilling underway
-
Idaho – 2.2km north of Baneygo
-
Infill 40x20m RC drilling – significant results
-
Early indications of potential of 10km shear north of Idaho to Rosemont
-
Tooheys Well – 2.5km S of Garden Well
-
RC drilling continued returning very high grade results, drilling to continue in Q3
-
Resource estimate to follow
-
Coopers – 11km south of Moolart Well • Final three holes of Q2 programme completed, further significant results
-
Resource estimation Jun16Q
Proximity to 10mtpa milling infrastructure presents excellent exploration opportunity
==> picture [720 x 48] intentionally omitted <==
19 19
ROSEMONT TO BANEYGO
==> picture [713 x 435] intentionally omitted <==
----- Start of picture text -----
REGIONAL SCALE OPPORTUNITY
Rosemont
Rosemont to Baneygo trend 20km
Quartz dolerite host rock at Rosemont
continues to Baneygo and beyond to
the south
22m @ 2.6g/t, f 22m
Recent RC drilling north of Baneygo
Garden
King John
turning up significant gold intercepts
Well
3m @ 7.7g/t, f 41m
4m @ 8.5g/t, f 28m New discovery Idaho 2km from
Baneygo with first step out drilling
20km corridor requires further drilling
10m @ 1.8g/t, f 22m
8m @ 1.9g/t, f 14m Idaho • Previous drilling max 100m deep
13m @ 4.9g/t, f 17m with most only 50m deep
•
33m @ 8.4g/t, f 50m Up to 800m gaps between drill
11m @ 7.3g/t, f 21m lines
21m @ 9.3g/t, f 16m Erlistoun
Continue to test strike continuation
Baneygo
north to Rosemont on 400m traverses
22m @ 2.5g/t, f 26m
5m @ 4.6g/t, f 7m
2m @ 12.6g/t, f 13m
----- End of picture text -----
20 20
IDAHO SECTIONS March 2016Q Results
==> picture [423 x 357] intentionally omitted <==
NEW GOLD DISCOVERY AT IDAHO
-
10km south of Rosemont and
-
2.2km north of Baneygo
-
No historical resource - new discovery
-
Significant further gold mineralisation defined Q3 holes
-
RRIHRC093 33m @ 2.33g/t from 101m
-
RRIHRC086 12m @ 2.54g/t from 40m
-
RRIHRC026 26m @ 1.43g/t from 36m
-
RRIHRC027 24m @ 1.25g/t from 53m
-
Significant new gold mineralisation defined over 650m strike
-
Further drilling in Q4 and maiden Resource to follow
==> picture [720 x 48] intentionally omitted <==
2121
TOOHEYS WELL DRILL RESULTS
==> picture [485 x 389] intentionally omitted <==
A BOLT ON FOR GARDEN WELL
-
Gold shear zones hosted by chert, shale and BIF
-
Early shallow AC holes ineffective
-
2013 RC drilling returned significant gold intercepts on the Western shear
-
Recent drilling defined a parallel Eastern shear
-
Eastern Shear high grade and open to south for 600m
-
Open to the north & south
-
Further drilling planned in Q4 then resource estimate
==> picture [720 x 48] intentionally omitted <==
22 22
TOOHEYS WELL GOLD PROSPECT
==> picture [464 x 374] intentionally omitted <==
DRILLING CROSS SECTION 6909340mN
-
Steep E dipping high grade gold shear
-
Chert BIF and shale host rocks
-
Weathered 80-160m
-
Significant intercepts
-
39m @ 2.86g/t from 53m
-
17m @1.90g/t from 95m
-
27m @ 2.48g/t from 55m
-
50m @ 2.75g/t from 85m
-
27m @ 1.37g/t from 95m
-
17m @ 1.92g/t from 155m
==> picture [720 x 48] intentionally omitted <==
23 23
TOOHEYS WELL GOLD PROSPECT
==> picture [472 x 381] intentionally omitted <==
DRILLING CROSS SECTION 6909220mN
-
RRLTWRC079 high grade intercept ended in gold mineralisation
-
Intercept 72m @ 2.73g/t is mostly in fresh rock confirming high gold grades in fresh rock
-
Good widths at depth
OUTLOOK
-
Drilling to continue in Q4:
-
Test continuity of shear zone 600m to the south
-
Target gold mineralisation in fresh rock zone
-
RC and diamond drilling
-
Metallurgical testing
==> picture [720 x 48] intentionally omitted <==
24 24
VIEW FROM TOOHEYS WELL LOOKING NORTH
==> picture [578 x 410] intentionally omitted <==
==> picture [720 x 48] intentionally omitted <==
2525
RECAP OF PRESENTATION
-
FY2016 Q3 gold production 75,656 ounces at AISC of A$856/oz
-
Production run rate at upper end of FY16 guidance 275-305koz
-
• AISC below lower end of FY16 guidance of $970-1,070/oz
-
Consistent production and cost performance at all operations
-
Rosemont operations continue to outperform
-
Cash-flow from operations $56.5m for Q3 (Q2: $49.8m)
-
4cps fully franked interim dividend paid Feb16 (Q2: 6cps 2015 final)
-
Cash and bullion increased by $8.2m to $106.7m (net cash position $86.8m)
-
$38m cash build allowing for payment of dividend, income tax & investments
-
Diesel hedge at 12 month base price of approx. A$0.41/L for two thirds of usage
-
Maiden reserves at Gloster & Baneygo add 362koz
-
More than replacing forecast FY16 production
-
Continued exciting exploration results at Duketon
-
Including Tooheys Well & Idaho
-
Pointing to further mine life extensions
==> picture [720 x 48] intentionally omitted <==
2626
APPENDIX 1 JORC COMPLIANT MINERAL RESOURCE AND ORE RESERVE ESTIMATES FOR GLOSTER AND BANEYGO 1 MARCH 2016
Gloster and Baneygo Mineral Resource Estimates
as at 1 March 2016
| Gold | Gold | Gold | Measured | Measured | Measured | Indicated | Indicated | Indicated | Inferred | Inferred | Inferred | Total Resource | Total Resource | Total Resource | Competent Person1 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Project | Type | Cut-Off (g/t) |
Tonnes (Mt) |
Gold Grade (g/t) |
Gold Metal |
Tonnes |
Gold Grade |
Gold Metal |
Tonnes |
Gold Grade |
Gold Metal |
Gold Grade |
Gold Metal (koz) |
||
| Tonnes |
|||||||||||||||
| (koz) | (Mt) | (g/t) | (koz) | (Mt) | (g/t) | (koz) | (Mt) | (g/t) | |||||||
| Gloster | Open-Pit | 0.4 | - | - | - | 14.7 | 0.79 | 374 | 6.6 | 0.73 | 154 | 21.3 | 0.77 | 528 | A |
| Baneygo | Open-Pit | 0.4 | - | - | - | 6.2 | 1.03 | 203 | 1.0 | 1.06 | 32 | 7.1 | 1.03 | 236 | A |
Notes
The above data has been rounded to the nearest 100,000 tonnes, 0.01 g/t gold grade and 1,000 ounces. Errors of summation may occur due to rounding.
All Mineral Resources are reported inclusive of Ore Reserves to JORC Code 2012 unless otherwise noted
- Refer to Competent Person Statement
Gloster and Baneygo Ore Reserve Estimates
as at 1 March 2016
| Gold | Gold | Gold | Proved | Proved | Proved | Probable | Probable | Probable | Total Ore Reserve | Total Ore Reserve | Total Ore Reserve | Competent Person2 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Project | Type | Cut-Off (g/t)1 |
Tonnes | Tonnes |
Gold Grade |
Gold Metal (koz) |
||||||
| Gold d |
Gold | Gold | Gold l |
|||||||||
| l | Tonnes | d | ||||||||||
| (Mt) | Grae /t |
Meta k |
Grae | Meta | ||||||||
| (Mt) | /t | k | (Mt) | (g/t) | ||||||||
| (g) | (oz) | (g) | (oz) | |||||||||
| Gloster | Open-Pit | > 0.5 | - | - | - | 7.0 | 1.00 | 226 | 7.0 | 1.00 | 226 | B |
| Baneygo | Open-Pit | > 0.4 | - | - | - | 3.6 | 1.16 | 136 | 3.6 | 1.16 | 136 | B |
Notes
The above data has been rounded to the nearest 100,000 tonnes, 0.01 g/t gold grade and 1,000 ounces. Errors of summation may occur due to rounding.
-
Cutoff grades vary according to oxidation and lithology domains. Refer to Ore Reserve Lower Cut-off Grade Note in Material Information Summary.
-
Refer to Competent Person Statement
==> picture [720 x 48] intentionally omitted <==
2727
APPENDIX 2
JORC COMPLIANT MINERAL RESOURCES 31 MARCH 2015
Group Mineral Resources
| Group Mineral Resources | Group Mineral Resources | Group Mineral Resources | Group Mineral Resources | Group Mineral Resources | Group Mineral Resources | Group Mineral Resources | Group Mineral Resources | Group Mineral Resources | Group Mineral Resources | Group Mineral Resources | Group Mineral Resources | ||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| as at 31 March 2015 | |||||||||||||||
| Gold | Measured | Indicated | Inferred | Total Resource | Competent Person4 |
||||||||||
| Project | Type | Cut-Off (g/t) |
Tonnes (Mt) |
Gold Grade (g/t) |
Gold Metal (koz) |
Tonnes (Mt) |
Gold Grade (g/t) |
Gold Metal (koz) |
Tonnes (Mt) |
Gold Grade (g/t) |
Gold Metal (koz) |
Tonnes (Mt) |
Gold Grade (g/t) |
Gold Metal (koz) |
|
| Moolart Well1 | Open-Pit | 0.4 | 3.0 | 0.89 | 87 | 29.2 | 0.75 | 706 | 15.0 | 0.62 | 300 | 47.3 | 0.72 | 1,093 | A |
| Garden Well1 | Open-Pit | 0.4 | 2.7 | 0.63 | 54 | 73.8 | 0.90 | 2,131 | 10.2 | 0.88 | 288 | 86.7 | 0.89 | 2,473 | B |
| Rosemont1 | Open-Pit | 0.4 | 5.4 | 1.31 | 228 | 20.1 | 1.27 | 824 | 2.8 | 1.78 | 160 | 28.3 | 1.33 | 1,212 | B |
| Duketon Main Deposits | Sub Total | 11.1 | 1.03 | 369 | 123.2 | 0.92 | 3,661 | 28.0 | 0.83 | 748 | 162.3 | 0.92 | 4,777 | ||
| Erlistoun | Open-Pit | 0.4 | - | - | - | 5.7 | 1.34 | 247 | 1.1 | 1.00 | 37 | 6.9 | 1.28 | 284 | A |
| Dogbolter | Open-Pit | 0.4 | - | - | - | 2.8 | 1.11 | 102 | 0.4 | 1.02 | 13 | 3.2 | 1.10 | 115 | A |
| Petra | Open-Pit | 0.4 | - | - | - | 1.2 | 1.08 | 42 | 0.1 | 1.09 | 2 | 1.3 | 1.08 | 44 | A |
| Anchor | Open-Pit | 0.4 | - | - | - | 0.2 | 1.75 | 9 | 0.1 | 0.95 | 2 | 0.2 | 1.53 | 11 | A |
| King John3 | Open-Pit | 1.0 | - | - | - | - | - | - | 0.7 | 3.19 | 72 | 0.7 | 3.20 | 72 | C |
| Russells Find3 | Open-Pit | 1.0 | - | - | - | - | - | - | 0.4 | 3.86 | 55 | 0.4 | 4.28 | 55 | C |
| Baneygo3,5 | Open-Pit | 0.5 | - | - | - | - | - | - | 0.8 | 1.67 | 43 | 0.8 | 1.67 | 43 | C |
| Reichelts Find3 | Open-Pit | 1.0 | - | - | - | 0.1 | 3.69 | 17 | - | - | - | 0.1 | 3.69 | 17 | C |
| Duketon Satellite Deposits | Sub Total | - | - | - | 10.1 | 1.28 | 416 | 3.6 | 1.96 | 223 | 13.6 | 1.46 | 640 | ||
| Duketon | Total | 11.1 | 1.03 | 369 | 133.2 | 0.95 | 4,077 | 31.5 | 0.96 | 971 | 175.9 | 0.96 | 5,417 | ||
| McPhillamys | Total | 0.4 | - | - | - | 69.2 | 0.94 | 2,087 | 3.9 | 0.98 | 123 | 73.2 | 0.94 | 2,210 | B |
| Regis | Grand Total | 11.1 | 1.03 | 369 | 202.5 | 0.95 | 6,164 | 35.5 | 0.96 | 1,094 | 249.1 | 0.95 | 7,627 |
Notes
The above data has been rounded to the nearest 100,000 tonnes, 0.01 g/t gold grade and 1,000 ounces. Errors of summation may occur due to rounding.
-
All Mineral Resources are reported inclusive of Ore Reserves to JORC Code 2012 unless otherwise noted
-
Mineral Resources and Ore Reserves are reported inclusive of ROM Stockpiles at cut-off grade of 0.4 g/t
-
Reported under JORC Code 2004
-
Refer to Group Competent Person Notes
-
The Baneygo resource in the above table is quoted as at 31 March 2015 and has not been updated to reflect the Baneygo Resource referred in the body of this presentation which was recalculated and restated as at 1 March 2016 compliant with 2012 JORC Code and Guidelines (refer ASX announcement 15 March 2016). A seprate table is included in the presentation which details the updated Resource details. This table will be updated as part of the next full annual update
==> picture [720 x 48] intentionally omitted <==
2828
APPENDIX 3 JORC COMPLIANT ORE RESERVES 31 MARCH 2015
Group Ore Reserves
| Group Ore Reserves | Group Ore Reserves | Group Ore Reserves | Group Ore Reserves | Group Ore Reserves | Group Ore Reserves | Group Ore Reserves | Group Ore Reserves | Group Ore Reserves | ||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| as at 31 March 2015 | ||||||||||||
| Gold | Proved | Probable | Total Ore Reserve | Competent Person3 |
||||||||
| Project | Type | Cut-Off (g/t)2 |
Tonnes (Mt) |
Gold Grade (g/t) |
Gold Metal (koz) |
Tonnes (Mt) |
Gold Grade (g/t) |
Gold Metal (koz) |
Tonnes (Mt) |
Gold Grade (g/t) |
Gold Metal (koz) |
|
| Moolart Well1 | Open-Pit | > 0.4 | 2.7 | 0.93 | 79 | 3.9 | 0.92 | 115 | 6.5 | 0.92 | 194 | D |
| Garden Well1 | Open-Pit | > 0.4 | 2.7 | 0.63 | 54 | 31.9 | 0.93 | 955 | 34.5 | 0.91 | 1,009 | D |
| Rosemont1 | Open-Pit | > 0.4 | 4.4 | 1.34 | 188 | 8.9 | 1.36 | 387 | 13.2 | 1.35 | 574 | D |
| Duketon Main Deposits | Sub Total | 9.7 | 1.03 | 321 | 44.6 | 1.02 | 1,456 | 54.3 | 1.02 | 1,777 | ||
| Erlistoun | Open-Pit | > 0.5 | - | - | - | 3.8 | 1.48 | 181 | 3.8 | 1.48 | 181 | D |
| Dogbolter | Open-Pit | > 0.5 | - | - | - | 0.3 | 1.57 | 16 | 0.3 | 1.57 | 16 | D |
| Petra | Open-Pit | > 0.5 | - | - | - | 0.6 | 1.26 | 25 | 0.6 | 1.26 | 25 | D |
| Anchor | Open-Pit | > 0.5 | - | - | - | 0.1 | 2.07 | 6 | 0.1 | 2.07 | 6 | D |
| Duketon Satellite Deposits | Sub Total | - | - | - | 4.8 | 1.47 | 229 | 4.8 | 1.47 | 229 | ||
| Regis | Grand Total | 9.7 | 1.03 | 321 | 49.4 | 1.06 | 1,685 | 59.1 | 1.06 | 2,006 |
Notes
The above data has been rounded to the nearest 100,000 tonnes, 0.01 g/t gold grade and 1,000 ounces. Errors of summation may occur due to rounding.
-
Mineral Resources and Ore Reserves are reported inclusive of ROM Stockpiles at cut-off grade of 0.4 g/t
-
Cutoff grades vary according to oxidation and lithology domains. Refer to Group Ore Reserves Lower Cut Notes
-
Refer to Group Competent Person Notes
==> picture [720 x 48] intentionally omitted <==
2929
APPENDIX 4 MONTHLY OPERATING AND COST STATISTICS
1. Moolart Well
-
Rosemont
-
Garden Well
==> picture [720 x 48] intentionally omitted <==
3030
MOOLART WELL
==> picture [652 x 387] intentionally omitted <==
==> picture [720 x 48] intentionally omitted <==
3131
ROSEMONT
==> picture [652 x 387] intentionally omitted <==
==> picture [720 x 48] intentionally omitted <==
3232
GARDEN WELL
==> picture [658 x 391] intentionally omitted <==
==> picture [720 x 48] intentionally omitted <==