REGIS RESOURCES LIMITED Capital/Financing Update 2020

Dec 13, 2020

65733_rns_2020-12-13_94c7d8a8-2264-4d5b-9704-a35b81b1dad0.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

ABN 28 009 174 761 www.regisresources.com

==> picture [131 x 35] intentionally omitted <==

14 December 2020

Manager Announcements Company Announcements Office Australian Securities Exchange Limited Level 4, 20 Bridge Street Sydney NSW 2000

Level 2, 516 Hay Street Subiaco WA 6008

PO Box 862 SUBIACO WA 6904

Ph: 08 9442 2200

REGIS APPROVES GARDEN WELL SOUTH UNDERGROUND MINE

HIGHLIGHTS

  • Regis’ Board has approved development of a new underground mine under the current Garden Well open pit based on a recently completed positive Feasibility Study (FS) on the Garden Well South (GWS) underground gold (Au) Project.

  • Maiden GWS underground Mineral Resource Estimate (MRE) of 2.4Mt at 3.6g/t Au for 270koz Au[1] .

  • Total material mined in the FS is 1.85Mt at 3.2 g/t Au for 190koz Au. This includes a Probable Ore Reserve of 900kt at 3.4g/t Au for 98koz Au[2] with the remainder from Inferred Mineral Resources.

  • Development to commence in the March 2021 quarter.

  • Processing of first underground development ore scheduled for the Dec 2021 quarter with stope production to commence in the June 2022 quarter.

  • Underground ore mining rates are scheduled to be at a rate of ~600kt/a once stoping activities stabilise.

  • Pre-production capital[3] is estimated at A$38 million.

  • Project AISC A$950-1,050/oz with Growth Capital A$15-20m.

  • Considerable opportunity exists for additional Resources down plunge of the existing GWS Resource.

  • A conference call relating to GWS development decision will be held on Monday 14 December 2020 at 1pm AWST. Details are provided on page 4 of this announcement.

Regis Managing Director, Mr Jim Beyer commented:

“The development decision for a second underground mine at our Duketon Operation is another major milestone in the Regis goal of delivering increased shareholder value through organic growth projects. This new underground mine will be a key element in achieving and maintaining our aim for the Duketon Operation to become a reliable 400koz per annum producer. Further, we believe that the approved Garden Well underground is not only a robust investment in its current form but just as importantly has the potential to increase life and value through down plunge exploration.”

Note that a proportion of the production target referred to in this announcement is based on Inferred Mineral Resources. There is a low level of geological confidence associated with Inferred Mineral Resources and there is no certainty that further exploration work will result in the determination of Indicated Mineral Resources or that the production target itself will be realised. The board has assessed this risk in the context of the geological and metallurgical knowledge gained in mining and processing the Garden Well open pit deposit over the last 6 years together with the existing mining and processing cost structures at the operation. Furthermore, the development of the current Mineral Resource is considered the most timely and cost-effective approach to the development and exploration of the target zones.

1 JORC Code compliant MRE inclusive of Indicated and Inferred Resources at a 1.8g/t cut-off grade

2 JORC Code compliant Ore Reserve using a 2.1g/t cut-off grade

3 Expenditure required until first stope ore production

4 All financial amounts are in Australian Dollars unless otherwise stated

Garden Well South Underground Mine Project Summary

The board of Regis has approved the development of an underground (UG) mining Project at the operating Garden Well open pit mine. This decision has been made based on a positive FS which assessed the mining of the maiden UG Mineral Resource at GWS. The Indicated Mineral Resource at GWS UG is estimated to contain 1.2Mt at 3.8g/t with a total MRE of 2.4 Mt at 3.6 g/t for 270koz Au at 1.8g/t Au cut-off grade. The MRE was completed internally by Regis and utilised high confidence mineralisation and lithological interpretations generated from extensive drilling completed at the Project.

The GWS UG FS concluded a maiden Probable Ore Reserve of 0.9Mt at 3.4g/t Au for 98koz Au, with a further 0.95Mt at 3.0g/t Au of the Inferred Mineral Resources proposed to be mined for an additional 92koz Au, see Table 1 below. Ore Reserves were tested and confirmed for financial viability on a standalone basis (excluding Inferred Mineral Resources) as part of the due diligence prior to declaring the Ore Reserve. The Ore Reserve has been estimated by external consultants Mining Plus Pty Ltd (Mining Plus) with material inputs and assumptions compiled from a variety of sources including Regis’ in-house knowledge and external contractors and consultants.

The GWS UG FS includes both Probable Ore Reserves and Inferred Mineral Resources prepared by competent persons in accordance with the requirements in Appendix 5A of the JORC Code per attached Table 1 Parts 1 to 4.

FS Material Mined Tonnage
(Mt)
Au (g/t) Au (koz)
Probable Ore Reserves 0.90 3.4 98
Inferred Mineral Resources 0.95 3.0 92
Total in FS 1.85 3.2 190

Table 1: GWS UG Material mined in FS by confidence level at 2.1g/t cut-off grade

The UG operation will extend mining of the Garden Well mineralisation below and to the south of the existing operational open pit. Development of the portal is to commence in the March 2021 quarter and will exploit the UG Mineral Resource as it is currently known, which extends to a depth of 500 metres below surface and 700 metres to the south of the Garden Well open pit. The mineralisation is considered to have strong potential to extend further down plunge and this will be explored once UG mining has been established.

The GWS UG Project is currently planned to be mined over four years using conventional Long Hole Open Stoping (LHOS) mining methods using a combination of selective cemented rock fill and mineralised (ore grade) pillars. Figure 1 illustrates the mining layout looking to the west and shows the early ore mining taking place in the higher confidence Indicated Mineral Resource (green shading) closest to the open pit, before moving to the predominantly Inferred Mineral Resources in the last 2 years of production.

2

==> picture [366 x 205] intentionally omitted <==

Figure 1: GWS UG mine layout showing Indicated Mineral Resources (green)

The development and stoping schedule across the life of mine (LOM) has been sequenced to allow for a relatively rapid extraction rate of the Mineral Resource, without a protracted low production “tail”. Annualised production rates of ~600kt/a are expected once stoping production is established. Mine production has not been levelled as the UG ore displaces lower grade open pit mill feed as it becomes available, facilitated by the much larger processing capacity of the ~5Mt/a Garden Well plant. A summary of the GWS UG Project can be seen in Table 2.

Physicals
Material mined 1.85Mt
Diluted mine gold grade 3.2g/t
In situ Au mined 190koz
Mill recovery 93%
Au produced 176koz
Capital cost
Preproduction capitalised development A$20m
Preproduction capital items A$18m
Development capital (post commercial production) A$38m
Total capital cost A$76m
Project AISC (commercial production)
Project All in Sustaining Costs A$950 - 1050/oz
Growth Capital (Commercial Production) A$15-20m

Table 2: Key Project Metrics

The estimation of Ore Reserves for the purposes of the FS was conducted based on a A$1,600/oz price.

3

Regis’ confidence in these numbers is strengthened by the fact that the FS and Ore Reserve Estimate has been prepared by external consultants with extensive on-site experience along with in-house expertise.

Regis believes there is significant potential for mineralised extensions down plunge of the current UG Mineral Resource that would lead to potential increase of the mine life. See Figure 2 below.

==> picture [394 x 258] intentionally omitted <==

Figure 2: Garden Well opportunities for UG Mineral Resource extension

The Company will conduct an investor webinar to discuss the contents of this announcement.

Details are as follows:

Date: Monday, 14 December 2020 Time: 1pm AWST Format: Managing Director, Mr Jim Beyer, will provide an introduction with a Q&A session to follow

To register for this event, please copy and paste the following link into your internet browser: https://us02web.zoom.us/webinar/register/WN_cmwcXKMcRR2KX82VWlDcCQ

4

ADDITIONAL MATERIAL INFORMATION

Garden Well Operations Background

The Garden Well deposit is located approximately 100km north of Laverton via unsealed roads in the Duketon Greenstone Belt (DGB). The deposit is located on approved mining leases M38/1251, M38/1249 and M38/283, although the Project and infrastructure also fall within M38/1250, M38/352 and M38/1257.

The Garden Well mine is a fully operational open pit gold mine which commenced production in March 2013, having stand-alone crushing, grinding, CIL processing and tailings storage facilities.

As at the end of March 2020, the Garden Well open pit Mineral Resources were estimated at 67Mt at 0.8g/t Au for 1,770 koz Au (at 0.4g/t Au cut off), inclusive of Ore Reserves.

Proven and Probable Ore Reserves (including stockpiles) for the Garden Well open pit as at the end of March 2020 was estimated at 17Mt at 0.9g/t Au for 490 koz Au. The current openpit mine and processing plant is expected to continue operating until late 2025.

The Garden Well deposit lies in the DGB in the north-eastern part of the Archean Yilgarn Craton of Western Australia. The DGB is characterised by a strong N-S structural trend defined by major faults and shear zones, regional folds and granite batholiths. Figure 3 presents the location of the Garden Well deposit and the geological trends of the DGB.

==> picture [267 x 414] intentionally omitted <==

Figure 3: Garden Well location with regional geology

5

Garden Well South Underground Mineral Resource Estimate (MRE)

The maiden GWS UG MRE was completed internally by Regis and reported here in compliance with the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’ prepared by the Joint Ore Reserves Committee of The Australasian Institute of Mining and Metallurgy, Australian Geoscientists and Minerals Council of Australia (The JORC Code 2012).

The total Mineral Resource for the GWS UG deposit, reported above a 1.8g/t Au cut-off grade, is estimated to be 2.4Mt at 3.6g/t Au for a total of 270koz of Au. The combined total for the Garden Well open pit and UG Mineral Resources is 68 Mt at 0.9g/t Au for a total of 1,930koz of Au, see Table 3 below.

Au Au Measured Measured Indicated Indicated Inferred Inferred Total Resource Total Resource Total Resource
Cut-Off
Tonnes

Au
Au Tonnes Au Au Tonnes Au Au Tonnes Au Au
Project (g/t) (Mt) Grade Metal (Mt) Grade Metal (Mt) Grade Metal (Mt) Grade Metal
(g/t) (koz) (g/t) (koz) (g/t) (koz) (g/t) (koz)
Garden Well OP2 0.4 8 0.8 200 52 0.8 1,350 5 0.7 110 66 0.8 1,660
GWS UG3 1.8 - - - 1 3.8 140 1 3.4 130 2 3.6 270
Garden Well Total 8 0.8 200 53 0.9 1,490 6 1.2 240 68 0.9 1,930

Table 3: Garden Well open pit and GWS UG Mineral Resources[1 ]

  • 1 Small discrepancies may occur due to rounding

  • 2 The Garden Well open pit Mineral Resource (as at 31 March 2020) has now been adjusted to account for the overlap with the Maiden GWS UG MRE contained in this statement.

  • 3 Refer to attached JORC Code Table 1 at the end of this report.

Informing Data

Extensive aircore drilling (AC), reverse circulation drilling (RC) and diamond drilling (DD) programs have been carried out across the Garden Well deposit. Drilling was completed on a 40m x 40m grid oriented north-south, with holes drilled at an azimuth of 270° and a dip of - 60°. Infill drilling was then completed in part of the Mineral Resource to reduce the spacing to a maximum of 40m by 20m. A summary of all RC and DD at Garden Well and the drill holes used as informing data for the GWS UG Mineral Resource are presented in Table 4 below. Note that ~70% of the holes drilled were diamond drilled.

RC RC DD DD RC/DD RC/DD Total Total
Holes Metres Holes Metres Holes Metres Holes Metres
Database 1,254 176,255 189 75,687 25 9,942 1,468 261,884
Resource 54 412 129 747 6 50 189 1,209

Table 4: All Garden Well drill holes, and those used for the GWS UG Mineral Resource

Regis drill hole collar locations were picked up by an independent registered consulting surveyor or by site-based authorised surveyors using Trimble RTK GPS. Downhole surveying was measured by the drilling contractors using Reflex EZ-Shot Downhole Survey Instruments or a North Seeking Gyro, with the surveys completed every 30m down each drill hole.

The DD sample intervals were typically 1m with some lengths above and below this determined by geological constraints. HQ diameter diamond coring has been used through chert and has been whole-core sampled, NQ2 diameter coring has been used through ultramafic and shale and half-core sampled with half of the core being kept in storage. RC samples were collected at the drill as 1m samples after being split at 80:20 using a cone splitter. All gold assaying was completed by external commercial laboratories, crushed and pulverised to achieve 85% passing 75µm and assayed by fire assay analysis with Atomic Absorption finish or Aqua Regia Digest with Atomic Absorption finish.

6

Regis has established a comprehensive Quality Assurance/Quality Control program which is used for all drilling programs. For the GWS UG drill program, field duplicates and certified standards were used to monitor the accuracy of field and laboratory sampling and assaying. The field duplicates were taken at regular intervals and results accurately reflected the original assay. The Quality Assurance/Quality Control results confirm the suitability of the drilling data for use in the MRE.

Bulk density values were determined by Regis using the Archimedes method after resin coating of DD core. The values were extracted from the database and assigned a material type based on the host rock type (chert or shaley chert) and whether the sample is mineralised or waste. A total of 553 samples relevant to the GWS Mineral Resource were used to determine the average bulk densities for each of the material types.

Geology and Mineralisation Interpretation

The geology of GWS UG consists of a sequence of folded sedimentary and volcanic rocks. The sequence can be differentiated into fine grained siltstones, lapilli and tuff volcaniclastics, sedimentary breccias, black shales, banded iron formation, chert, interbedded chert/shale and a footwall basalt unit. All of the units strike NNW at approximately 340-350[o] . Folding is tight and plunges approximately 20[o ] to the SSE. Primary mineralisation is present as pyrite beds and veinlets within the western limb of the syncline, hosted by siderite-altered chert.

Mineralisation at GDW is strongly controlled by lithological rock type. Detailed lithological interpretation was completed by the Regis exploration team and used as a guide for mineralisation trends. Mineralisation wireframes were constructed using cross-sectional interpretations based on mineralised envelopes with an approximate 1g/t Au cut-off. A minimum downhole intercept of 2m was applied and where internal dilution could not be delineated, a maximum of 2m internal dilution was used. A total of 5 mineralisation lodes were set as solids after being validated using Gemcom’s Surpac software. A typical crosssection displaying the rock types and location of mineralisation at GWS is presented in Figure 4 below.

7

==> picture [447 x 343] intentionally omitted <==

Figure 4: GWS cross-section @ 6,911,680mM +/- 12.5m

Grade Estimation

Samples from within the mineralisation wireframes were used to conduct sample length analysis and demonstrated that the majority of samples were 1m in length. Surpac software was then used to extract fixed length 1m down hole composites constrained within the mineralisation shapes. Analysis of the statistics and log probability plots for all lodes suggested that a top-cut for Au was not required.

The composites were checked for spatial correlation with the lodes and individual composite files were created for each of the individual lodes in the wireframe models and imported into Snowden’s Supervisor software for analysis and modelling.

A Surpac block model was then created to encompass the full extent of the deposit. A block size of 20m (Y) by 5m (X) by 5m vertical was used with sub-blocks of 5m by 1.25m by 1.25m. The ordinary kriging algorithm was selected for grade interpolation and orientated ‘ellipsoid’ search ellipses were used to select data for interpolation. The ellipse was oriented to the average strike, dip and plunge of the mineralised lodes and varied accordingly for each object. The estimation for each element was carried out in three passes, with a first pass radius of 60m, a second pass radius of 90m and a third of 180m.

A three-step process was used to validate the grade estimate, including visually slicing sections through the block model in positions coincident with drilling. Quantitative assessment was then completed by comparing the average grades of the sample file input against the block model output for each lode. For each lode, variations between the average grade for the input files and the block model estimated averages were between 5 to 9%, which is a good result. Comparisons were also made between the interpolated blocks to the sample composite data for northing and elevation as trend plots. The validation plots show good correlation between the sample grades and the block model grades for the comparison by northing and elevation.

8

Mineral Resource Classification and Reporting

The geological and mineralisation continuity has been demonstrated with sufficient confidence to allow the GWS UG Mineral Resource to be classified as Indicated where the drill spacing is at a maximum of 40m along strike and 20m across strike. Where the drill spacing is greater, or there are insufficient informing composites to allow for confident grade estimation, the Mineral Resource is classified as Inferred.

The GWS UG MRE is reported at a cut-off of 1.8g/t Au which is considered a viable grade for potential economic extraction. The Garden Well open pit ore has been mined and processed by Regis over many years and is therefore well understood as to metallurgical recovery and processing costs. Material types are identified within the model to allow for metallurgical discrimination between rock types as required.

To allow for the portion of the Garden Well open pit Mineral Resource included in the UG Mineral Resource, the open pit Mineral Resource was reduced where overlap was encountered. The UG Mineral Resource contained within the A$2,000 shell defined as part of the reporting of the March 2020 Garden Well open pit Mineral Resource (refer to ASX statement titled “Resources and Reserves Statement and Organic Growth Update” released on 24 August 2020) was removed from the total Garden Well open pit Mineral Resources. Adjusted values and the overall total Mineral Resources for Garden Well can be referred to in Table 3 above. Regis is not aware of any new information or data that materially affects the information included in that announcement and that all material assumptions and technical parameters underpinning the MRE continue to apply and have not materially changed.

Figure 5 shows the extent of the GWS Resource drilling, Mineral Resource outline and the Indicated portion of the Mineral Resource. Drilling in the upper half of the GWS UG Mineral Resource was prioritised to facilitate scheduling of higher confidence (Indicated) mineralisation early in the mine schedule.

==> picture [416 x 271] intentionally omitted <==

Figure 5: GWS UG Mineral Resource with drilling and open pit, looking west

9

Garden Well South Underground Ore Reserve

The GWS UG FS includes Probable Ore Reserves that have been prepared by competent persons in accordance with the requirements in Appendix 5A of the JORC Code. See Table 5 below.

Ore Reserves are based on the GWS UG FS Long Hole Open Stoping (LHOS) scenario using a A$1,600/oz Au price. The basis for the Ore Reserves are detailed in the attached Table 1, Part 4.

Au Proved Probable Probable Total Ore Reserve Total Ore Reserve Total Ore Reserve
Cut-Off Tonnes
Au Grade
Au Metal Tonnes
Au Grade
Au Metal Tonnes Au Grade Au Metal
Project
(g/t) (Mt) (g/t) (koz) (Mt) (g/t) (koz) (Mt) (g/t) (koz)
GWS UG 2.1 - - - 0.9 3.4 98 0.9 3.4 98

Table 5: GWS UG Ore Reserve as at 3 Dec 2020

The GWS UG Ore Reserve is based on the FS design layout and all recovery and dilution parameters used in the Ore Reserves estimation are as per the FS inputs summarised in Table 6.

Input Value
Geotechnical Inputs
Maximum Stope Hydraulic Radius 10
Dilution and Recovery Factors
Waste Development Dilution 10%
Ore Development Dilution 0%
Development Recovery 100%
Stope Dilution 1.5 m
ELOS
Stope Recovery 90%

Table 6: GWS UG Key FS Inputs

Ore development dilution is set at 0% to prevent overestimation of ore tonnage. Stope dilution has been estimated by including skins (equivalent linear overbreak slough) of 0.5m and 1.0m (footwall and hangingwall respectively) of dilution to the Mining Shape Optimiser (MSO) stope shapes. As a consequence, waste dilution accounts for around 18% or the stated Ore Reserves, at an average grade of 0.5g/t Au.

Only JORC Code compliant Indicated Mineral Resources have been used to estimate the GWS UG Ore Reserves. The Ore Reserve case design is a sub-set of the FS design and evaluation. To achieve this some minor changes were made to the FS design to access Indicated material only (ignoring Inferred material), however development not required to mine the Inferred portion was removed from the schedule.

Ore Reserve financial modelling was carried out on a global basis. Costs and cashflows were not assessed on a level by level basis, however, filtering of MSO shapes to exclude “stranded” uneconomic stopes was carried out on the mine design as a whole prior to the Ore Reserve assessment. Approximately 10% of the mined Au ounces come from ore development with the remaining coming from open stopes.

10

Underground Mine Design and Scheduling

The GWS UG Project will establish a portal and decline off the western wall of the Garden Well open pit approximately 130m below surface (mbs). This location sits around midway between the natural surface and the final planned depth of the Garden Well open pit of ~265mbs. A return air way and escapeway will be established by mining vertical raises from the base of the local portal area and then extending laterally with the decline to depth. Figure 6 below shows an oblique view of the planned UG mine looking down and to the North East. The development access decline has been positioned in the footwall of the orebody.

==> picture [454 x 274] intentionally omitted <==

Figure 6: Oblique view of GWS UG design looking North East

Mine development will be carried out using conventional twin boom jumbos to mine approximately 11.5km of waste and ore development over the 4 year life, peaking at 2 jumbos in months 15 to 20 as shown in Figure 7 below.

==> picture [348 x 220] intentionally omitted <==

----- Start of picture text -----

Development Metres
600
500
400
300
200
100
-
0 3 6 9 12 15 18 21 24 27 30 33 36 39 42 45 48
Period (Months)
Capital Operating Backfill
Metres (m)
----- End of picture text -----

Figure 7: GWS development schedule

11

The stoping schedule includes both Ore Reserves and Inferred material and has been sequenced to allow for a relatively rapid extraction rate of the resource, without a protracted low production “tail”, as seen in Figure 8 below.

==> picture [383 x 226] intentionally omitted <==

----- Start of picture text -----

Mining Schedule
Probable Ore Reserves + Inferred Mineral Resources
80,000 5.0
70,000
60,000 4.0
50,000
40,000 3.0
30,000
20,000 2.0
10,000
- 1.0
0 3 6 9 12 15 18 21 24 27 30 33 36 39 42 45 48
Period (Months)
Production Development Mined Grade
Tonnes (t)
Mined Grade (Au g/t)
----- End of picture text -----

Figure 8: GWS production schedule

Annualised production rates hit ~600kt/a once stoping operations stabilise. Mine production has not been levelled as the UG ore displaces lower grade open pit mill feed as it becomes available, facilitated by the much larger processing capacity of the ~5Mt/a Garden Well plant.

Table 7 below outlines the mining rates used in the schedule and costings. The rates used have been determined using information provided by an independent third party contractor or are considered standard industry practice.

Activity Rate
Jumbo development, multi heading 320m/month
Decline advance rate 100m/month
Ore drive advance rate 60m/month
Stope bogging 1,500t/day
Production drilling 260m/day
Stope cut-off gold grade 2.1g/t
Development cut-off gold grade 1.3g/t
Tonnes per production drill metre (<8m stope width)
6t/drm
Tonnes per production drill metre (>8m stope width)
10t/drm
Cablebolt metres per turnout 10 x 6.0m
grouted cable

Table 7: GWS UG Key FS Inputs

Geotechnical

Regis engaged the services of Peter O’Bryan and Associates to carry out a geotechnical assessment of the GWS UG Project including classification of rock domains, stability analysis, modelling of defect sets, Rock Mass Rating (RMR) and Q-value calculations.

12

The majority of stoping takes place in the very solid Chert rock unit which has a very favourable hydraulic radius of +10, thus allowing for relatively large open stopes whilst retaining a high resource extraction rate.

Processing and Metallurgy

The existing Garden Well processing plant will be utilised to treat the material mined from the underground operation using conventional crush/grind/CIL processing route.

A metallurgical recovery of 93% Au has been adopted based on metallurgical testwork that has been carried out across diamond core samples from the UG Mineral Resource. This testwork has augmented the already significant experience gained processing the Garden Well open pit ore over the last few years with respect to throughput rates, metal recovery and processing costs.

Capital Costs

A summary of the preproduction capital cost items is shown in Table 8 below. Capital costs have been derived from vendor and contractor quotes wherever possible, coupled with Regis’ in-house experience gained from recent capital works at Duketon.

Pre-Production Capital Items Cost (A$M)
Capitalised development 20.0
Camp expansion, surface buildings 6.9
Surface power reticulation 2.6
Conveyor magnet 0.7
Primary ventilation 1.3
Primary pump system 2.5
Portal, heavy vehicle area, workshop, temporary power 1.7
UG services 1.3
Miscellaneous 0.8
Total 37.8

Table 8: Breakdown of key capital items

Operating costs

Operating costs have been developed using a variety of sources, including:

  • Mining contractor costs were obtained from Barminco Ltd who have used the GWS UG FS designs and mining schedules. Barminco Ltd are the incumbent UG mining contractor at Regis’ neighbouring Rosemont UG Mine.

  • Mine administration and technical costs have been based on Regis’ experience operating the Rosemont UG mine.

  • Where available, actual costs have been used, namely processing, general & administrative, transport, power supply and fuel supply.

  • Processing costs applied in the Ore Reserves analysis are based on historical costs from processing ore at Garden Well.

13

  • Royalties are payable to both the Western Australian State Government (2.5%) and a third party (2%) which have been included in the analysis of the Ore Reserve.

The Project average All In Sustaining Cost (AISC) per ounce over the commercial life of mine has been calculated at A$950 – 1,050/oz, along with a Growth Capital estimate of A$15-20m over the same period. These figures use the reserve calculation gold price of A$1,600/oz for royalty calculations and also assume commercial production commences in month 13 after the commencement of development mining.

The GWS UG FS and Ore Reserve estimate has been carried out by external consultants Mining Plus Pty Ltd and has been substantially informed by the work of other experts, including geology and resource modelling (Regis), contractor mining costs (Barminco Ltd), geotechnical evaluation (Peter O’Bryan and Associates), hydrogeological modelling (EMM Consulting Pty Ltd), dewatering infrastructure (Carrick Consulting Pty Ltd), metallurgical test work (Regis), surface infrastructure costs (Regis, ECG Engineering Pty Ltd, KPS Power Generation/Pacific Energy Pty Ltd) and surface buildings (tendered package to suppliers/builders).

All other aspects relating to approvals, tenement security, and infrastructure requirements are in progress and not considered to be an impediment to the Project.

Key Risks

With the exception of the key external risks being the Au price and the AUD/USD exchange rate, Regis considers the key risks for the GWS UG Project to be:

  • The Mineral Resource Estimate and reliance on Inferred material. Regis has controlled this risk through the use of high quality drilling (diamond drilling represents a high proportion of the total drilling) and resource estimation practices, subsequently audited by an external consultant. This risk is also mitigated by the higher confidence Probable Ore Reserves comprising the majority of gold mined in the first two years of the project.

  • Potential for high groundwater inflows from the chert rockmass. The risk of excessive groundwater inflows has been studied and substantially understood by using the considerable historical database for the dewatering of the Garden Well open pit coupled with hydrogeological modelling over the LOM of the Project. This data has helped identify strategies for scheduling the mine along with the design and costing of the UG dewatering network.

  • Sufficiently resourcing the Project with skilled personnel in the current, relatively heated mining environment in Western Australia. The sourcing of skilled personnel for the Project is considered a risk for the UG mining industry in general, to which Regis has worked to mitigate by way of early engagement with experienced mining contractor Barminco Ltd (currently contracted at Regis’ nearby Rosemont UG operation), coupled with advanced hiring of key technical and managerial personnel for the Regis team.

Opportunity for underground life extension and growth potential

The maiden GWS UG MRE is estimated from the initial target zone at GWS and extends over 700m down plunge to a depth of 500 meters below natural surface. See Figure 9 below. The MRE is open down plunge and is largely untested. Regis consider this a long term growth opportunity and future drill testing for extension at depth, and infill drilling to reach Indicated Mineral Resources for the deeper portion of the deposit will be completed from UG positions.

14

==> picture [390 x 256] intentionally omitted <==

Figure 9: GWS UG Long Projection showing drill intercepts and MRE

In addition to resource growth at GWS, there are numerous high-grade intercepts to the north, below that provide further opportunity to define new high-grade ore shoots to add to the UG Mineral Resource, see Figure 10. The drilling density to the north is currently insufficient to accurately define the orientation, continuity and volumes of mineralisation domains. The existing open pit excavation, operations and infrastructure inhibit drilling some targeted holes from the most ideal collar positions; however the northern portion is immediately accessible and is a high priority target for infill and extensional drilling to add to the maiden Mineral Resource. This work is active and ongoing.

==> picture [454 x 171] intentionally omitted <==

Figure 10: Garden Well Long Projection showing potential resource targets to north of GWS UG

15

Competent Persons Statement

The information in this statement that relates to the Mineral Resources is based on work compiled by Mrs Vanessa O’Toole. Vanessa is a full-time employee of Regis Resources Limited and is a Member of The Australasian Institute of Mining and Metallurgy. Vanessa has sufficient experience which is relevant to the style of mineralisation and types of deposits under consideration and to the activity which they have undertaken to qualify as a Competent Person as defined in the JORC Code 2012. Vanessa consents to the inclusion in this report of the matters based on their information in the form and context in which it appears.

The information in this statement that relates to the Ore Reserves is based on work compiled by Mr Nigel Bennett. Nigel is a full-time employee of Mining Plus Pty Ltd and is a Member of The Australasian Institute of Mining and Metallurgy. Nigel has sufficient experience which is relevant to the style of mineralisation and types of deposits under consideration and to the activity which they have undertaken to qualify as a Competent Person as defined in the JORC Code 2012. Nigel consents to the inclusion in this report of the matters based on their information in the form and context in which it appears.

Forward Looking Statements

This ASX announcement may contain forward looking statements that are subject to risk factors associated with gold exploration, mining and production businesses. It is believed that the expectations reflected in these statements are reasonable but they may be affected by a variety of variables and changes in underlying assumptions which could cause actual results or trends to differ materially, including but not limited to price fluctuations, actual demand, currency fluctuations, drilling and production results, Reserve estimations, loss of market, industry competition, environmental risks, physical risks, legislative, fiscal and regulatory changes, economic and financial market conditions in various countries and regions, political risks, project delay or advancement, approvals and cost estimates.

Forward-looking statements, including projections, forecasts and estimates, are provided as a general guide only and should not be relied upon as an indication or guarantee of future performance and involve known and unknown risks, uncertainties and other factors, many of which are outside the control of Regis Resources Limited. Past performance is not necessarily a guide to future performance and no representation or warranty is made as to the likelihood of achievement or reasonableness of any forward looking statements or other forecast.

16

APPENDIX 1 GARDEN WELL UNDERGROUND JORC Code 2012 Edition – Table 1

Section 1 - Sampling Techniques and Data

Criteria JORC Code explanation Commentary
Sampling
techniques
Nature and quality of sampling (e.g. cut channels, random chips, or specific
specialised industry standard measurement tools appropriate to the minerals
under investigation, such as down hole gamma sondes, or handheld XRF
instruments, etc). These examples should not be taken as limiting the broad
meaning of sampling.
Resource definition drilling consists of Reverse Circulation (RC – 1,270 holes for
157,361m), and Diamond (DD – 141 holes for 51,821m) drill holes producing
mainly 1m samples on a nominal 40m east spaced holes on 40m north grid
spacing, which were drilled angled -60° to 270° degrees. Further drilling was
completed during 2020 to reduce spacing to 40m by 20m in the central portion of
the Resource.
Include reference to measures taken to ensure sample representivity and the
appropriate calibration of any measurement tools or systems used.
Regis drill hole collar locations were picked up an independent registered
consulting surveyor or by site-based authorised surveyors using Trimble RTK
GPS. Downhole surveying was measured by the drilling contractors using Reflex
EZ-Shot Downhole Survey Instrument or North Seeking Gyro based tool for DD
and RC. The surveys were completed every 30m down each drill hole.
DD core is aligned and measured by tape, comparing back to down hole core
blocks consistent with industry practice.
RRL drill hole sampling had certified standards and blanks inserted every 25th
sample to assess the accuracy and methodology of the external laboratories, and
field duplicates (RC only) were inserted every 20th sample to assess the
repeatability and variability of the gold mineralisation. Laboratory duplicates were
also completed approximately every 15th sample to assess the precision of the
laboratory as well as the repeatability and variability of the gold mineralisation.
Results of the QAQC sampling were considered acceptable.
Aspects of the determination of mineralisation that are Material to the Public
Report. In cases where ‘industry standard’ work has been done this would be
relatively simple (e.g. ‘reverse circulation drilling was used to obtain 1 m samples
from which 3 kg was pulverised to produce a 30 g charge for fire assay’). In other
cases more explanation may be required, such as where there is coarse gold
that has inherent sampling problems. Unusual commodities or mineralisation
types (e.g. submarine nodules) may warrant disclosure of detailed information.
RC samples were obtained by cone splitter (2.5kg – 3.0kg), diamond core was
used for geotechnical and density measurements as well as lithology logging and
assaying. HQ diameter diamond coring has been used through chert and has
been whole core sampled, NQ2 diameter coring has been used through ultramafic
and shale and half core sampled with half of the core being kept in storage. The
core has predominantly been sampled at 1m intervals, with some sampling on
geological intervals (0.2m – 1.0m).
The resource drilling samples were dried, crushed and pulverised to get 85%
passing 75µm and were all Fire Assayed using either a 30g, 40g or 50g charge.
Assaying of GC samples has involved the crushing and pulverising completed
onsite, with the resulting pulp then sent to Aurum Perth for assaying using 50g
charge Fire Assay.
Drilling
techniques
Drill type (e.g. core, reverse circulation, open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc) and details (e.g. core diameter, triple or standard tube,
RC drilling completed with a 139mm diameter face sampling hammer.
Surface diamond drilling carried out by using either HQ or NQ2.

17

Criteria JORC Code explanation Commentary
depth of diamond tails, face-sampling bit or other type, whether core is oriented
and if so, by what method, etc).
Core is routinely orientated by REFLEX ACT III tool.
Drill sample
recovery
Method of recording and assessing core and chip sample recoveries and results
assessed.
RC recovery was visually assessed, with recovery being excellent except in some
wet intervals which are recorded on logs.
DD core was measured and compared to the drilled intervals, and recorded as a
percentage recovery. Recovery is excellent in the mineralised zones.
Measures taken to maximise sample recovery and ensure representative nature
of the samples.
RC samples were visually checked for recovery, moisture and contamination. The
drilling contractor utilised a cyclone and splitter to provide uniform sample size,
and these were cleaned routinely (cleaned at the end of each rod and more
frequently in wet conditions). A booster was also used in conjunction with the RC
drill rig to ensure dry samples are achieved.
For DD the target mineralised zones are located in competent fresh rock, where
the DD method provided high recovery.
Whether a relationship exists between sample recovery and grade and whether
sample bias may have occurred due to preferential loss/gain of fine/coarse
material.
Sample recoveries for diamond and RC holes are high, especially within the
mineralised zones. No significant bias is expected although no recovery and grade
correlation study was completed.
Logging Whether core and chip samples have been geologically and geotechnically
logged to a level of detail to support appropriate Mineral Resource estimation,
mining studies and metallurgical studies.
Lithology, alteration, veining, mineralisation, magnetic susceptibility, recovery,
RQD, density and geotechnical information were all logged for the DD and saved
in the database. Core photographs were taken, and all half core is retained in a
core yard for future reference.
Lithology, alteration, veining, mineralisation and on some holes magnetic
susceptibility were logged from the RC chips and saved in the database. Chips
from every interval are also placed in chip trays and stored in a designated building
at site for future reference.
Whether logging is qualitative or quantitative in nature. Core (or costean,
channel, etc) photography.
All logging is qualitative except for density and magnetic susceptibility. Both wet
and dry core photography was completed prior to sampling.
The total length and percentage of the relevant intersections logged. All drill holes are logged in full.
Sub-sampling
techniques
and sample
preparation
If core, whether cut or sawn and whether quarter, half or all core taken. Core was half cut with an almonte diamond core saw with the same half always
sampled and the surplus retained in core trays.
If non-core, whether riffled, tube sampled, rotary split, etc and whether sampled
wet or dry.
The RC drilling utilised a cyclone and cone splitter to consistently produce 2.5kg
to 3.0kg dry samples

18

Criteria JORC Code explanation Commentary
For all sample types, the nature, quality and appropriateness of the sample
preparation technique.
Samples are dried, crushed to 10mm, and then pulverised to 85% passing 75µm.
This is considered acceptable.
Quality control procedures adopted for all sub-sampling stages to maximise
representivity of samples.
Field duplicates (AC and RC) were inserted every 20th sample to assess the
repeatability and variability of the gold mineralisation. Laboratory duplicates were
also completed roughly every 15th sample to assess the repeatability and
variability of the gold mineralisation.
Measures taken to ensure that the sampling is representative of the in situ
material collected, including for instance results for field duplicate/second-half
sampling.
Field RC duplicates (RC, AC) were taken at the rig from a second chute on the
cone splitter allowing for the duplicate and main sample to be the same size and
sampling technique. Field duplicates are taken every 20th sample. Laboratory
duplicates (sample preparation split) were also completed roughly every 15th
sample.
Field duplicates on core, i.e. other half of cut core, have not been routinely
assayed.
Whether sample sizes are appropriate to the grain size of the material being
sampled.
Sample sizes (1.5kg to 3kg) at Garden Well are considered to be a sufficient size
to accurately represent the gold mineralisation based on the mineralisation style
(hypogene associated with shearing and supergene enrichment), the width and
continuity of the intersections, the sampling methodology, the coarse gold
variability and the assay ranges for the gold.
Field duplicates have routinely been collected to ensure monitoring of the sub-
sampling quality. Acceptable precision and accuracy is noted in the field
duplicates albeit the precision is marginally acceptable and consistent with a
coarse gold deposits.
Quality of
assay data
and
laboratory
tests
The nature, quality and appropriateness of the assaying and laboratory
procedures used and whether the technique is considered partial or total.
All gold assaying was completed by external commercial laboratories (Bureau
Veritas for resource drilling and Aurum for grade control drilling), crushed and
pulverised to get 85% passing 75µm and assayed using either a 30g, 40g or 50g
charge for fire assay analysis with AAS finish or 40g charge Aqua Regia Digest
with AAS finish. These techniques are industry standard for gold and considered
appropriate.
For geophysical tools, spectrometers, handheld XRF instruments, etc, the
parameters used in determining the analysis including instrument make and
model, reading times, calibrations factors applied and their derivation, etc.
A handheld magnetic susceptibility meter (KT-10) was used to measure magnetic
susceptibility for some RC and diamond samples, and is recorded in the logging
spread sheets.
Nature of quality control procedures adopted (e.g. standards, blanks, duplicates,
external laboratory checks) and whether acceptable levels of accuracy (ie lack of
bias) and precision have been established.
Certified Reference Material (CRM or standards) and blanks were inserted every
25th sample to assess the assaying accuracy of the external laboratories. Field
duplicates were inserted every 20th sample to assess the repeatability from the
field and variability of the gold mineralisation. Laboratory duplicates were also
completed approximately every 15th sample to assess the precision of assaying.

19

Criteria JORC Code explanation Commentary
Evaluation of both the Regis submitted standards, and the internal laboratory
quality control data, indicates assaying to be accurate and without significant drift
for significant time periods. Excluding obvious errors, the vast majority of the CRM
assaying report shows no consistent positive or negative overall mean bias.
Duplicate assaying show high levels of correlation and no apparent bias between
the duplicate pairs. Field duplicate samples show marginally acceptable levels of
correlation and no relative bias.
Results of the QAQC sampling were considered acceptable for the GDW deposit.
Substantial focus has been given to ensuring sampling procedures met industry
best practise to ensure acceptable levels of accuracy and precision were achieved
in a coarse gold environment.
Verification of
sampling and
assaying
The verification of significant intersections by either independent or alternative
company personnel.
No independent personnel have visually inspected the significant intersections in
RC chips. Numerous highly qualified and experienced company personnel from
exploration and production positions have visually inspected the significant
intersections in RC chips and core.
The use of twinned holes. Areas of close spaced drilling supports the location (width) and grade of the
mineralised zone.
Documentation of primary data, data entry procedures, data verification, data
storage (physical and electronic) protocols.
All geological and field data is entered into LogChiefTMor excel spreadsheets with
lookup tables and fixed formatting (and protected from modification) thus only
allowing data to be entered using the Regis geological code system and sample
protocol. Logchief data is validated and uploaded directly to the Datashed
database.
Discuss any adjustment to assay data. Any samples not assayed (i.e. destroyed in processing, listed not received) have
had the assay value converted to a -9 in the database. Any samples assayed
below detection limit (0.01ppm Au) have been converted to 0.005ppm (half
detection limit) in the database.
Location of
data points
Accuracy and quality of surveys used to locate drill holes (collar and down-hole
surveys), trenches, mine workings and other locations used in Mineral Resource
estimation.
Pre 2012 Regis drill hole collar locations were picked up using a Sokkia DGPS
localised to onsite datum (expected accuracy 300mm). 2012 onwards Regis drill
hole collar locations were picked up by site-based authorized surveyors using
Trimble RTK GPS, calibrated to a base station (expected accuracy of 20mm).
Downhole surveying (magnetic azimuth and dip of the drill hole) was measured by
the drilling contractors in conjunction with Regis personnel using Reflex EZ-Shot
Downhole Survey Instrument or North Seeking Gyro based tool for DD and RC
holes. The surveys were completed every 30m down each drill hole. Magnetic
azimuth is converted to AMG azimuth in the database, and AMG azimuth is used
in the Mineral Resource estimation.

20

Criteria JORC Code explanation Commentary
Specification of the grid system used. The grid system is AMG Zone 51 (AGD 84) for surveying pickups, as well as any
modelling.
Quality and adequacy of topographic control. The topographic surface has been derived from a combination of the primary drill
hole pickups, pit pickups and the pre-existing photogrammetric contouring.
Data spacing
and
distribution
Data spacing for reporting of Exploration Results. 40 metres (east) by 80 metres (north), reduced to 20m by 40m in the central portion
of the Resource.
Whether the data spacing and distribution is sufficient to establish the degree of
geological and grade continuity appropriate for the Mineral Resource and Ore
Reserve estimation procedure(s) and classifications applied.
The data spacing and distribution is sufficient to demonstrate spatial and grade
continuity of the mineralised domains to support the definition of Inferred and
Indicated Mineral Resources under the 2012 JORC code once all other modifying
factors have been addressed.
Whether sample compositing has been applied. No sample compositing has been applied in the field within the mineralised zones.
Orientation of
data in
relation to
geological
structure
Whether the orientation of sampling achieves unbiased sampling of possible
structures and the extent to which this is known, considering the deposit type.
Drilling is orientated to best suit the mineralisation to be closely perpendicular to
both the strike and dip of the mineralisation. Intercepts are close to true-width in
most cases.
If the relationship between the drilling orientation and the orientation of key
mineralised structures is considered to have introduced a sampling bias, this
should be assessed and reported if material.
Drilling orientation has not introduced a sampling bias.
Sample
security
The measures taken to ensure sample security. Samples are securely sealed and stored onsite, until delivery to Perth via contract
freight Transport, who then deliver the samples directly to the laboratory. Sample
submission forms are sent with the samples as well as emailed to the laboratory,
and are used to keep track of the sample batches.
Audits or
reviews
The results of any audits or reviews of sampling techniques and data. No audits on sampling techniques and data have been completed.

21

Section 2 - Reporting of Exploration Results


Criteria

JORC Code explanation
Commentary
Mineral
tenement and
land tenure
status
Type, reference name/number, location and ownership including agreements or
material issues with third parties such as joint ventures, partnerships, overriding
royalties, native title interests, historical sites, wilderness or national park and
environmental settings.
The security of the tenure held at the time of reporting along with any known
impediments to obtaining a licence to operate in the area.
The Garden Well surface and underground gold mine comprises M38/1250,
M38/352, M38/1249, M38/1257, M38/283 and M38/1251, an area of 46km2(4,632
hectares). Current registered holders of the tenements are Regis Resources Ltd.
The Garden Well open pit Resource is already an operating mine site.
Normal Western Australian state royalties apply and a further 2% NSR royalty
exists to a third party.
Regis Resources Ltd has 100% interest in all tenements listed above. There are
no registered Native Title Claims.
Exploration
done by other
parties
Acknowledgment and appraisal of exploration by other parties. Minor amounts of drilling was completed by Ashton Mining and Johnson’s Well
Mining although it was mainly shallow and not extensive enough to properly define
the mineralisation.
Geology Deposit type, geological setting and style of mineralisation. Gold is hosted in a moderate east to steeply dipping shear zone trending N-S. Gold
mineralisation within chert, shale and BIF is associated with brecciated zones
including elevated sulphides and quartz veins.
Drill hole
Information
A summary of all information material to the understanding of the exploration
results including a tabulation of the following information for all Material drill
holes:
easting and northing of the drill hole collar
elevation or RL (Reduced Level – elevation above sea level in metres) of the
drill hole collar
dip and azimuth of the hole
down hole length and interception depth
hole length.
If the exclusion of this information is justified on the basis that the information is
not Material and this exclusion does not detract from the understanding of the
report, the Competent Person should clearly explain why this is the case.
Not applicable as there are no exploration results reported as part of this
statement.
Other relevant drill hole information can be found in Section 1 – “Sampling
techniques, “Drilling techniques” and “Drill sample recovery”.
Data
aggregation
methods
In reporting Exploration Results, weighting averaging techniques, maximum
and/or minimum grade truncations (e.g. cutting of high grades) and cut-off grades
are usually Material and should be stated.
Where aggregate intercepts incorporate short lengths of high grade results and
_longer lengths of low grade results, the procedure used for such aggregation _
This release is in relation to a Mineral Resource estimate, with no exploration
results being reported.

22

Criteria JORC Code explanation Commentary
should be stated and some typical examples of such aggregations should be
shown in detail.
The assumptions used for any reporting of metal equivalent values should be
clearly stated.
Relationship
between
mineralization
widths and
intercept
lengths
These relationships are particularly important in the reporting of Exploration
Results.
If the geometry of the mineralisation with respect to the drill hole angle is known,
its nature should be reported.
If it is not known and only the down hole lengths are reported, there should be a
clear statement to this effect (e.g. ‘down hole length, true width not known’).
The Garden Well drilling was designed to intersect the mineralisation at an angle
that is roughly perpendicular to the overall trend for both strike and dip. Previously
reported drill intersections approximate true mineralised width.
Diagrams Appropriate maps and sections (with scales) and tabulations of intercepts should
be included for any significant discovery being reported These should include,
but not be limited to a plan view of drill hole collar locations and appropriate
sectional views.
This release is in relation to a Mineral Resource estimate, with no exploration
results being reported, therefore no diagrams have been produced.
Balanced
reporting
Where comprehensive reporting of all Exploration Results is not practicable,
representative reporting of both low and high grades and/or widths should be
practiced to avoid misleading reporting of Exploration Results.
Not applicable as there are no exploration results reported as part of this
statement.
Other
substantive
exploration
data
Other exploration data, if meaningful and material, should be reported including
(but not limited to): geological observations; geophysical survey results;
geochemical survey results; bulk samples – size and method of treatment;
metallurgical test results; bulk density, groundwater, geotechnical and rock
characteristics; potential deleterious or contaminating substances.
No other material exploration data to report.
Further work The nature and scale of planned further work (e.g. tests for lateral extensions or
depth extensions or large-scale step-out drilling).
The resource remains open at depth and to the south (down plunge).
Diagrams clearly highlighting the areas of possible extensions, including the main
geological interpretations and future drilling areas, provided this information is not
commercially sensitive.
This release is in relation to a Mineral Resource estimate, with no exploration
results being reported.

23

Section 3 - Estimation and Reporting of Mineral Resources


Criteria

JORC Code explanation
Commentary
Database integrity Measures taken to ensure that data has not been corrupted by, for example,
transcription or keying errors, between its initial collection and its use for
Mineral Resource estimation purposes.
Geological metadata is centrally stored in a SQL database managed using
Maxgeo’s DataShed Software. Regis Resources employ a database administrator
responsible for the integrity of data imported and modified within the system. All
geological and field data is entered into LogChiefTMor excel spread sheets with
lookup tables and fixed formatting (and protected from modification) thus only
allowing data to be entered using the RRL geological code system and sample
protocol. Data is then emailed to the RRL database administrator for validation
and importation into a SQL database using Datashed. Sample numbers are
unique and pre-numbered calico sample bags are used.
Data validation procedures used. Following importation, the data goes through a series of digital and visual checks
for duplication and non-conformity, followed by manual validation by a company
geologist and database administrator.
Site visits Comment on any site visits undertaken by the Competent Person and the
outcome of those visits.
The competent person has made site visits to Garden Well. No issues have been
noted and all procedures were considered to be of industry standard.
In addition to the above site visits, all exploration and resource development drilling
programs are subject to review by experienced senior Regis technical staff. These
reviews have been completed from the commencement of drilling and continue to
the present.
If no site visits have been undertaken indicate why this is the case. Not applicable.
Geological
interpretation
Confidence in (or conversely, the uncertainty of) the geological interpretation
of the mineral deposit.
The confidence in the geological interpretation is high. Locally at Garden Well the
shear zone is located on the footwall side of an east dipping sedimentary package
underlain by an ultramafic unit. The shear zone is several hundred metres wide
and dips moderately to steeply east and is sub-parallel to the sedimentary contact.
The intense shearing along the sedimentary contact is contained within a mixed
ultramafic-sedimentary package that is the host unit for the gold mineralisation. In
the southern extension the mineralisation takes a slight jog to the east and is
predominantly within a thin shale horizon along the hanging wall of the sedimentary
package, and also within a chert unit that overlies the sedimentary package.
Mining to date supports the original geological constraints and this model has been
updated with the knowledge gained during the mining at Garden Well.
Nature of the data used and of any assumptions made. The geological data used to construct the geological model includes regional and
detailed surface mapping, in pit wall mapping, and logging of RC/diamond core
drilling, and to a lesser degree multi-element assaying, has been applied in
generating the mineralisation constraints incorporating the geological controls. A
nominal 1g/t Au lower cut-off grade was applied to the mineralisation model
generation. Broad mineralisation zones have been defined that represent a

24

Criteria JORC Code explanation Commentary
combination of lithology and structural zones above the selected lower cut-off
grade.
The effect, if any, of alternative interpretations on Mineral Resource
estimation.
The relationship between geology and gold mineralisation of the deposit is
relatively clear, and the interpretation is considered robust. There is no apparent
alternative to the interpretation in the company’s opinion.
The use of geology in guiding and controlling Mineral Resource estimation. A model of the lithology and weathering was generated prior to the mineralisation
domain interpretation commencing enabling it to be used as a guide. The
mineralisation geometry has a very strong relationship with the lithological
interpretation and structure.
The factors affecting continuity both of grade and geology. A broad zone of shearing localises and controls the gold mineralisation in the
hypogene-controlled fresh horizons
Dimensions The extent and variability of the Mineral Resource expressed as length
(along strike or otherwise), plan width, and depth below surface to the upper
and lower limits of the Mineral Resource.
The approximate dimensions of the underground deposit are 900m along strike
(N-S), 200m across (E-W), and 380m depth from 360mRL to -20m RL.
Estimation and
modeling
techniques
The nature and appropriateness of the estimation technique(s) applied and
key assumptions, including treatment of extreme grade values, domaining,
interpolation parameters and maximum distance of extrapolation from data
points. If a computer assisted estimation method was chosen include a
description of computer software and parameters used.
The Mineral Resource estimate has been generated via Ordinary Kriging (OK) with
no change of support. The OK estimation was constrained within Gemcom’s
Surpac software generated 1g/t Au mineralisation domains defined from the
resource drill hole datasets, and guided by a geological model created in Surpac.
OK is considered an appropriate grade estimation method for Garden Well
mineralisation given current drilling density and mineralisation style, which has
allowed the development of robust and high confidence estimation constraints and
parameters.
The grade estimate is based on 1m down-the-hole composites of the resource
dataset created in Surpac each located by their mid-point co-ordinates and
assigned a length weighted average gold grade. The composite length of 1m was
chosen because it is a multiple of the most common sampling interval (1.0 metre).
No high grade cuts have been applied to composites to limit the influence of higher
grade data.
Detailed statistical and geostatistical investigations have been completed on the
captured estimation data set (1m composites). This includes exploration data
analysis, boundary analysis and grade estimation trials. The variography applied
to grade estimation has been generated using Snowden’s Supervisor software.
These investigations have been completed on each ore domain separately. KNA
analysis has also been conducted in Supervisor in various locations on the
domains to determine the optimum block size, minimum and maximum samples
per search and search distance.

25

Criteria JORC Code explanation Commentary
The availability of check estimates, previous estimates and/or mine
production records and whether the Mineral Resource estimate takes
appropriate account of such data.
No check estimate has been completed as part of the current study.
The assumptions made regarding recovery of by-products. No by-products are present or modelled.
Estimation of deleterious elements or other non-grade variables of economic
significance (e.g. sulphur for acid mine drainage characterisation).
No deleterious elements have been estimated or are important to the project
economics\planning at Garden Well.
In the case of block model interpolation, the block size in relation to the
average sample spacing and the search employed.
Block dimensions are 5m (east) by 20m (north) by 5m (elevation) (with sub-
blocking of 1.25m by 5m by 1.25m) and was chosen as it approximates
approximately half the drill hole density. The 5m elevation is a factor of the
expected stope height (20m). The interpolation utilised 3 estimation passes, with
category 1 adopting a 60m search in the major direction and 15m in the minor
direction, 8 minimum/30 maximum composites used and a maximum of 3
composites per drill hole. Category 2 uses a 90m maj/15m min search distance, 8
minimum/30 maximum composites, 3 maximum per hole. Category 3 uses a 120m
maj/15m min search distance but 4 minimum/30 maximum composites, 3
maximum per hole. Minor domains used the same parameters.
Any assumptions behind modelling of selective mining units. No selective mining units were assumed in this estimate.
Any assumptions about correlation between variables. No correlated variables have been investigated or estimated.
Description of how the geological interpretation was used to control the
resource estimates.
The grade estimate is based on mineralisation constraints which have been
interpreted based on a lithological and weathering interpretation, and a nominal
1g/t Au lower cut-off grade. The mineralisation constraints have been used as
hard boundaries for grade estimation wherein only composite samples within that
domain are used to estimate blocks coded as within that domain.
To allow for the portion of the GW OP Mineral Resource included in the UG Mineral
Resource, the OP Mineral Resource was reduced where overlap was
encountered. The UG Mineral Resource contained within the AUD$2,000 shell
defined during the March 2020 MRE process for GW OP was reduced from the
total GW OP Mineral Resources.
Discussion of basis for using or not using grade cutting or capping. A review of the composite data captured within the mineralisation constraints was
completed to assess the need for high grade cutting (capping). This assessment
was completed both statistically and spatially to determine if the high grade data
clusters or were isolated. On the basis of the investigation it was decided that no
top-cuts were required.

26

Criteria JORC Code explanation Commentary
The process of validation, the checking process used, the comparison of
model data to drill hole data, and use of reconciliation data if available.
The grade estimate was checked against the input drilling/composite data both
visually on section (cross and long section) and in plan, and statistically on swath
plots. Production data was seen as the most meaningful form of validation, which
the model was compared to throughout the estimation process to ensure an
accurate estimation was created.
Moisture Whether the tonnages are estimated on a dry basis or with natural moisture,
and the method of determination of the moisture content.
The Mineral Resource tonnage is reported using a dry bulk density and therefore
represents dry tonnage excluding moisture content. Bulk density was estimated in
to the model using inverse distance methodologies.
Cut-off
parameters
The basis of the adopted cut-off grade(s) or quality parameters applied. The cut-off grade of 1.8g/t for the stated Mineral Resource estimate is determined
from standardised parameters used to generate the preliminary underground
designs that the Mineral Resource is quoted above, and reflects potential
underground mining practices.
Mining factors or
assumptions
Assumptions made regarding possible mining methods, minimum mining
dimensions and internal (or, if applicable, external) mining dilution. It is
always necessary as part of the process of determining reasonable
prospects for eventual economic extraction to consider potential mining
methods, but the assumptions made regarding mining methods and
parameters when estimating Mineral Resources may not always be rigorous.
Where this is the case, this should be reported with an explanation of the
basis of the mining assumptions made.
The Resource model assumes underground mining is completed and a moderate
to high level of mining selectivity is achieved in mining. It is been assumed that
high quality grade control will aid delineation of ore/waste using diamond drilling,
or similar, at a nominal spacing of 10m (north – along strike) and 10m (east –
across strike), and applying a pattern sufficient to ensure adequate coverage of
the mineralisation zones.
Metallurgical
factors or
assumptions
The basis for assumptions or predictions regarding metallurgical amenability.
It is always necessary as part of the process of determining reasonable
prospects for eventual economic extraction to consider potential
metallurgical methods, but the assumptions regarding metallurgical
treatment processes and parameters made when reporting Mineral
Resources may not always be rigorous. Where this is the case, this should
be reported with an explanation of the basis of the metallurgical assumptions
made.
Processing of all material at GW South is well understood given the processing of
material from the GW open pit Resource.
Environmental
factors or
assumptions
Assumptions made regarding possible waste and process residue disposal
options. It is always necessary as part of the process of determining
reasonable prospects for eventual economic extraction to consider the
potential environmental impacts of the mining and processing operation.
While at this stage the determination of potential environmental impacts,
particularly for a greenfields project, may not always be well advanced, the
status of early consideration of these potential environmental impacts should
be reported. Where these aspects have not been considered this should be
reported with an explanation of the environmental assumptions made.
It has been assumed that current or similar operational approaches, protocols and
facilities applied to environmental factors at Garden Well continue for the duration
of the project life.

27

Criteria JORC Code explanation Commentary
Bulk density Whether assumed or determined. If assumed, the basis for the assumptions.
If determined, the method used, whether wet or dry, the frequency of the
measurements, the nature, size and representativeness of the samples.
The bulk density values were derived from 372 measurements taken on the core.
74 were taken by an independent laboratory (ALS) via water immersion method
with wax coating used on porous samples, with the remaining 298 being taken
onsite on transitional and fresh samples via water immersion method without wax
coating. The non-oxidised mineralised zone has low porosity, but as a check a
final measurement was taken after water immersion to see if the sample had taken
water. The average weight difference pre and post immersion was under 1%. The
independent measurements confirm that the onsite measurements are accurate
and representative.
The bulk density for bulk material must have been measured by methods
that adequately account for void spaces (vugs, porosity, etc), moisture and
differences between rock and alteration zones within the deposit.
Oxide horizon and porous transitional horizon samples have all been measured by
external laboratories using wax coating to account for void spaces, whereas
competent samples have been completed both by the external laboratory and
onsite. The independent laboratory measurements confirm that the onsite
measurements are accurate and representative, therefore the applied density
values are considered reasonable and representative.
Discuss assumptions for bulk density estimates used in the evaluation
process of the different materials.
Bulk density values were estimated in to the model, there is little variation within
the fresh mineralisation.
Classification The basis for the classification of the Mineral Resources into varying
confidence categories.
The data spacing and distribution is sufficient to demonstrate spatial and grade
continuity of the mineralised domains to support the definition of Inferred and
Indicated Mineral Resources under the 2012 JORC code once all other modifying
factors have been addressed.
The GDW Resource was classified on the basis of sample spacing and continuity
of the interpreted zones. The deposit shows reasonable continuity of
mineralisation within well-defined geological constraints. The drill hole spacing
throughout the project is approximately 40m along strike with some 20m infill
drilling. Drill spacing down dip is approximately 20 to 30m. The drill spacing is
sufficient to allow the grade intersections to be modelled into coherent wireframes
for the main mineralisation domains. Reasonable consistency is evident in the
thickness and grade of the domains and internal waste delineated where
appropriate.
The geological and mineralisation continuity has been demonstrated with sufficient
confidence to allow the GW South deposit to be classified as Indicated Mineral
Resource where the drill spacing is at a maximum of 40m along strike and 20m
across strike. Where the drill spacing is greater, or there are insufficient informing
composites to allow for confident grade estimation, the Resource is classified as
Inferred. One domain (domain 5) is considered“mineralisation potential”due to

28

Criteria JORC Code explanation Commentary
only having one informing drill hole. The extrapolation of the lodes along strike and
‘down dip’ has been limited to a distance equal to half the previous section drill
spacing or to 10m.
To allow for the portion of the GW OP Mineral Resource included in the UG Mineral
Resource, the OP Mineral Resource was reduced where overlap was
encountered. The UG Mineral Resource contained within the AUD$2,000 shell
defined during the March 2020 MRE process for GW OP was reduced from the
total GW OP Mineral Resources.
Whether appropriate account has been taken of all relevant factors (ie
relative confidence in tonnage/grade estimations, reliability of input data,
confidence in continuity of geology and metal values, quality, quantity and
distribution of the data).
The Mineral Resource classification method which is described above has also
been based on the quality of the data collected (geology, survey and assaying
data), the density of data, the confidence of the geological model and
mineralisation model, and the grade estimation quality.
Whether the result appropriately reflects the Competent Person’s view of the
deposit.
The reported Mineral Resource estimate is consistent with the Competent
Person’s view of the deposit.
Audits or reviews The results of any audits or reviews of Mineral Resource estimates. An external review of the MRE was completed by Haren Consulting which found
no material flaws in the approach and overall grade estimate.
Discussion of
relative accuracy/
confidence
Where appropriate a statement of the relative accuracy and confidence level
in the Mineral Resource estimate using an approach or procedure deemed
appropriate by the Competent Person. For example, the application of
statistical or geostatistical procedures to quantify the relative accuracy of the
resource within stated confidence limits, or, if such an approach is not
deemed appropriate, a qualitative discussion of the factors that could affect
the relative accuracy and confidence of the estimate.
Confidence in the Mineral Resource estimate is high. The Resource has been
classified based on the quality of the data collected, the density of data, the
confidence of the geological model and mineralisation model, and the grade
estimation quality. No relative statistical or geostatistical confidence or risk
measure has been generated or applied.
The statement should specify whether it relates to global or local estimates,
and, if local, state the relevant tonnages, which should be relevant to
technical and economic evaluation. Documentation should include
assumptions made and the procedures used.
The reported Mineral Resources for GWS UG are estimated globally at a cut-off of
1.8g/t Au.
These statements of relative accuracy and confidence of the estimate should
be compared with production data, where available.
The competent person is of the opinion that the global underground Resource will
continue to perform in line with industry standard tolerances for Indicated
Resources.

29

Section 4 – Estimation and Reporting of Ore Reserves

Criteria JORC Code explanation Commentary
Mineral
Resource
estimate for
conversion to
Ore Reserves
Description of the Mineral Resource estimate used as a basis for the
conversion to an Ore Reserve.
Clear statement as to whether the Mineral Resources are reported
additional to, or inclusive of, the Ore Reserves.
• The Mineral Resource estimate used as a basis for conversion to an Ore
Reserve is described in Section 3 of Table 1.
• The 2020 Mineral Resource is inclusive of the 2020 Ore Reserve.
• Indicated Mineral Resources are inclusive of those Mineral Resources
modified to produce the Ore Reserves. There are no Measured Mineral
Resources.
Site visits Comment on any site visits undertaken by the Competent Person and the
outcome of those visits.
If no site visits have been undertaken indicate why this is the case.
• The author and engineer for the FS and Ore Reserve estimation visited the
site in August 2019, inspected the active surface mining areas and viewed
diamond drill core from the Garden Well Underground orebody.
• The competent person, Nigel Bennett, has not conducted a site visit but has
reviewed the Ore Reserve estimate.
Study status The type and level of study undertaken to enable Mineral Resources to be
converted to Ore Reserves.
The Code requires that a study to at least Feasibility Study level has been
undertaken to convert Mineral Resources to Ore Reserves. Such studies will
have been carried out and will have determined a mine plan that is
technically achievable and economically viable, and that material
Modifying Factors have been considered.
• The study work undertaken for the proposed underground mine is of
Feasibility level. The site has years of surface mining operating experience
with respect to mineral resource reconciliation and metallurgical recovery
performance. Actual costs for ore processing and G&A are known.
• Regis Resources engaged third parties to conduct geotechnical,
hydrogeological and metallurgical test work to a level of detail commensurate
with Feasibility. Their findings and recommendations have been incorporated
into the mining study.
• The study includes appropriate Modifying Factors and indicates a technically
achievable and economically viable project.
• Mining Plus undertook the mining component of the FS, and produced stope
optimisations, designs and cost models for two scenarios; a paste filling and
open stoping scenario. The open stoping scenario was the most viable, and
was the case used to declare an ore reserve. This scenario had two cases, a
base case comprising the inclusion of Inferred mineral resources, and an
indicated only case for the reporting of Ore Reserves. Both cases are
considered technically feasible and economically viable under the
assumptions used in the study.

30

Criteria JORC Code explanation Commentary
Cut-off
parameters
The basis of the cut-off grade(s) or quality parameters applied. • Economic evaluation is undertaken using a financial model that includes:
-
Revenue
-
Operating and capital costs
-
Metal prices
-
Metallurgical recovery
-
Treatment and refining costs
-
General and administrative costs
-
Royalty payments
• Mining costs were taken from the mining contractor cost schedule which was
provided by Barminco using the FS schedule quantities.
• Processing, transport and general and administrative costs are based on
historical actual costs.
• A 2.1 g/t Au cut-off grade was applied for the purpose of estimating the Ore
Reserve. This cut off incorporates capital and operating development and
production costs, grade control, haulage, milling, G&A and royalties.
• A development cut-off grade (1.25 g/t Au) was included in the Ore Reserve
estimate, which covers rehandle, processing and administration costs, while
not displacing higher grade open pit material.
Mining factors
or assumptions
The method and assumptions used as reported in the Feasibility or
Feasibility Study to convert the Mineral Resource to an Ore Reserve (i.e.
either by application of appropriate factors by optimisation or by
preliminary or detailed design).
The choice, nature and appropriateness of the selected mining method(s)
and other mining parameters including associated design issues such as
pre-strip, access, etc.
The assumptions made regarding geotechnical parameters (eg pit slopes,
stope sizes, etc), grade control and pre-production drilling.
The major assumptions made and Mineral Resource model used for pit and
stope optimisation (if appropriate).
The mining dilution factors used.
The mining recovery factors used.
Any minimum mining widths used.
The manner in which Inferred Mineral Resources are utilised in mining
• A Scoping Study completed in 2020 identified Longhole open stoping as the
preferred mining method. A trade-off was conducted comparing paste fill and
stoping with pillars. LHOS with pillars was identified as the recommended
mining method, and was the preferred method in the FS and Ore Reserve.
• Detailed development and stoping plans and schedules have been prepared
for the entirety of the Ore Reserve estimate.
• A geotechnical study was undertaken by Peter O’Bryan and Associates to
determine appropriate stable stope spans and ground support requirements.
A maximum stable HR of 10m was recommended which was used in the Ore
Reserve design.
• Planned dilution of 0.5 m footwall and 1.0m hangingwall has been
incorporated into the stope design shapes.
• Mining recovery and dilution factors used for ore and waste development and
stoping are summarised in the table below:

31

Criteria JORC Code explanation Commentary Commentary
studies and the sensitivity of the outcome to their inclusion.
The infrastructure requirements of the selected mining methods.
















Activity Tonnage
Recovery
Metal
Recovery
Lateral Development - Capital 110% 100%
Lateral Development – Ore Development 100% 100%
Vertical Development - Capital 110% 100%
Stopes 90% 90%
Metallurgical
factors or
assumptions
The metallurgical process proposed and the appropriateness of that process
to the style of mineralisation.
Whether the metallurgical process is well-tested technology or novel in
nature.
The nature, amount and representativeness of metallurgical test work




The existing Garden Well processing facility will be utilised to treat the Ore
Reserve.
Metallurgical testwork has been completed on the Garden Well Underground
Resource, the results of which have been used to determine a recovery factor
of:

32

Criteria JORC Code explanation Commentary
undertaken, the nature of the metallurgical domaining applied and the
corresponding metallurgical recovery factors applied.
Any assumptions or allowances made for deleterious elements.
The existence of any bulk sample or pilot scale test work and the degree to
which such samples are considered representative of the orebody as a
whole.
For minerals that are defined by a specification, has the Ore Reserve
estimation been based on the appropriate mineralogy to meet the
specifications?
-
92.6% for chert hosted mineralisation, and
-
92.8% for chert/shale hosted mineralisation
• Results from the metallurgical testwork show that deleterious elements such
as Arsenic (As), antimony (Sb) and tellurium (Te) are present in all samples,
but at low levels and should not present any recovery issues.
Environmental The status of studies of potential environmental impacts of the mining and
processing operation. Details of waste rock characterisation and the
consideration of potential sites, status of design options considered and,
where applicable, the status of approvals for process residue storage and
waste dumps should be reported.
• Environmental studies have been completed for the existing surface mining
operation at Garden Well. A clearing permit has been issued over the
necessary areas and consideration has been given to potential heritage
issues.
• Underground mining approvals are in the process of being submitted, no
impediment to approval are expected.
• Waste rock and tailings characterisation studies have been completed with
no issues noted.
Infrastructure The existence of appropriate infrastructure: availability of land for plant
development, power, water, transportation (particularly for bulk
commodities), labour, accommodation; or the ease with which the
infrastructure can be provided, or accessed.
• The Garden Well surface operations are already in commercial production
and infrastructure to support the Garden Well open pit operations includes:
-
Ore processing and tailings storage facilities
-
Workshops
-
Accommodation facility
-
Power, water and other services distribution
-
Explosives storage
-
Site access roads
-
Airstrip facilities
• Costs to extend this infrastructure for the commencement of underground
operations has been included in the cost estimate.
Costs The derivation of, or assumptions made, regarding projected capital costs
in the study.
The methodology used to estimate operating costs.
Allowances madefor the content of deleterious elements.
• Mining costs were taken from the underground mining contract provided by
an experienced mining contractor based on the FS mine schedule quantities.
• Where available, actual costs have been used (processing, G&A, transport,
power,fuel).

33

Criteria JORC Code explanation Commentary
The derivation of assumptions made of metal or commodity price(s), for the
principal minerals and co- products.
The source of exchange rates used in the study.
Derivation of transportation charges.
The basis for forecasting or source of treatment and refining charges,
penalties for failure to meet specification, etc.
The allowances made for royalties payable, both Government and private.
• No deleterious elements have been identified and so no costs have been
allowed for same.
• Revenue was based on a gold price of AUD $1,600/oz
• All financial analyses and gold price have been expressed in Australian dollars,
no direct exchanges rates have been applied.
• Ore will be delivered directly from the underground mine to the ROM beside
the existing plant. Gold transportation costs to the Mint are included in the
processing costs used in the study.
• Processing costs applied in the Ore Reserves analysis are based on historical
costs from processing ore at Garden Well.
• Royalties payable to both the Western Australian State Government and a
third party have been considered in the analysis of the Ore Reserve:
-
Western Australian State royalty: 2.5%
-
Third party royalty: 2%
Revenue
factors
The derivation of, or assumptions made regarding revenue factors including
head grade, metal or commodity price(s) exchange rates, transportation
and treatment charges, penalties, net smelter returns, etc.
The derivation of assumptions made of metal or commodity price(s), for the
principal metals, minerals and co-products.
• Revenue was based on a gold price of AUD $1,600/oz
• Processing costs applied in the Ore Reserves analysis are based on historical
costs from processing open pit ore coupled with comminution and
metallurgical testwork.
Market
assessment
The demand, supply and stock situation for the particular commodity,
consumption trends and factors likely to affect supply and demand into the
future.
A customer and competitor analysis along with the identification of likely
market windows for the product.
Price and volume forecasts and the basis for these forecasts.
For industrial minerals the customer specification, testing and acceptance
requirementsprior to a supply contract.
• It is assumed all gold is sold directly to market at the gold price of AUS
$1,600/oz
• There is a well-established market for gold dorè.
Economic The inputs to the economic analysis to produce the net present value (NPV)
in the study, the source and confidence of these economic inputs including
estimated inflation, discount rate, etc.
NPV ranges and sensitivity to variations in the significant assumptions and
inputs.
• The Ore Reserves have been evaluated through a standard financial model.
All operating and capital costs as well as revenue factors were included in the
financial model. The process has demonstrated the estimated Ore Reserves
have a positive economic value.
• A discount rate of 5% has been applied.
• A sensitivityanalysis was conducted independentlyongoldprice,capital and

34

Criteria JORC Code explanation Commentary
operating costs (all ± 20%) in the cost model. This process has demonstrated
the estimated Ore Reserves have a positive economic value.
Social The status of agreements with key stakeholders and matters leading to
social licence to operate.
• The Garden Well operation is located on lease-hold pastoral land in Central
Western Australia. A compensation agreement has been made with the local
pastoralist for operation of the mine and the relevant local Aboriginal
community have been engaged during the licensing of the project for
operation.
• There is no current Registered Native Title claims on the project area.
• The entire project and the mine is covered by Mining tenure.
Other To the extent relevant, the impact of the following on the project and/or on
the estimation and classification of the Ore Reserves:
Any identified material naturally occurring risks.
The status of material legal agreements and marketing arrangements.
The status of governmental agreements and approvals critical to the
viability of the project, such as mineral tenement status, and government
and statutory approvals. There must be reasonable grounds to expect that
all necessary Government approvals will be received within the timeframes
anticipated in the Feasibility or Feasibility study. Highlight and discuss the
materiality of any unresolved matter that is dependent on a third party on
which extraction of the reserve is contingent.
• The Garden Well operation holds the permits, certificates, licenses, and
agreements required to conduct its current operations.
Classification The basis for the classification of the Ore Reserves into varying confidence
categories.
Whether the result appropriately reflects the Competent Person’s view of
the deposit.
The proportion of Probable Ore Reserves that have been derived from
Measured Mineral Resources (if any).
• The classification of the Garden Well Underground Ore Reserve has been
carried out in accordance with the recommendations of the JORC code 2012.
• The Ore Reserves classification reflects the Competent Person’s view of the
deposit.
• Probable Ore Reserves have been derived from Indicated Resources only, no
Proven Ore Reserves have been declared.
• No Measured Resource metal is included in the Ore Reserve estimate.
Audits or
reviews
The results of any audits or reviews of Ore Reserve estimates. • The Ore Reserve estimate has been reviewed by Regis Resources and Mining
Plus in their peer review process, but has not been subjected to an
independent external audit.

35

Criteria JORC Code explanation Commentary
Discussion of
relative
accuracy/
confidence
Where appropriate a statement of the relative accuracy and confidence
level in the Ore Reserve estimate using an approach or procedure deemed
appropriate by the Competent Person. For example, the application of
statistical or geostatistical procedures to quantify the relative accuracy of
the reserve within stated confidence limits, or, if such an approach is not
deemed appropriate, a qualitative discussion of the factors which could
affect the relative accuracy and confidence of the estimate.
The statement should specify whether it relates to global or local estimates,
and, if local, state the relevant tonnages, which should be relevant to
technical and economic evaluation. Documentation should include
assumptions made and the procedures used.
Accuracy and confidence discussions should extend to specific discussions of
any applied Modifying Factors that may have a material impact on Ore
Reserve viability, or for which there are remaining areas of uncertainty at
the current study stage.
It is recognised that this may not be possible or appropriate in all
circumstances. These statements of relative accuracy and confidence of the
estimate should be compared withproduction data, where available.
• It is the opinion of the Competent Person that the Ore Reserve estimate is
supported by appropriate design, scheduling and costing work reported to a
Feasibility Study level of detail. As such there is a reasonable expectation of
achieving the reported Ore Reserves commensurate with the Probable
classification.
• No statistical procedures were carried out to quantify the accuracy of the Ore
Reserve estimate.
• The Ore Reserve estimate is best described as global.
• It is the opinion of the Competent Person that Modifying Factors used in this
study are accurate to a Feasibility level study of detail. Modifying factors can
be calibrated to actual mine performance once production commences.

36