AI assistant
RED MOUNTAIN MINING LIMITED — Investor Presentation 2017
Mar 29, 2017
65719_rns_2017-03-29_7340de16-b85b-47cb-b68c-51287489204e.pdf
Investor Presentation
Open in viewerOpens in your device viewer
==> picture [328 x 88] intentionally omitted <==
Red Valley Lithium Brines Project: Drilling Commencing Mukabe-Kasari Cobalt Project: Due Diligence Commencing
March, 2017
==> picture [91 x 25] intentionally omitted <==
As at 1st MARCH, 2017:
-
Shares on issue = 417,481,534
-
Market capitalisation (at 3.0 cents) = $12.5 million
-
Cash = circa $3 million
— includes recent injection of capital via oversubscribed
placement to sophisticated and professional investors
THE RED VALLEY PROJECT – UTAH
2
==> picture [91 x 25] intentionally omitted <==
Board of Directors
−Jeremy King
−Robert Parton
−Lincoln Ho
Corporate Advisor
−Xcel Capital
THE RED VALLEY PROJECT – UTAH
3
==> picture [91 x 25] intentionally omitted <==
Core focus on NEW ENERGY METALS & GOLD
Red Valley Lithium Brines Project Mokabe-Kasiri Cobalt-Copper Project (Utah, USA) (Katanga Province, DRC)
==> picture [334 x 284] intentionally omitted <==
==> picture [344 x 288] intentionally omitted <==
THE RED VALLEY PROJECT – UTAH
4
==> picture [91 x 25] intentionally omitted <==
- Red Valley Lithium Brines Project:
−Drilling of 3 Red Valley wells (expected commencement within 7 days)
- −Drilling updates (April/May)
−Drilling results of Red Valley (Q2 2017)
-
Mokabe-Kasiri Cobalt-Copper Project:
-
−Initial high-level assessment by CSA Global (April)
−Completion of DD and decision to proceed to phase 1 of earn-in (April)
−Phase 1 Earn-in commencement (if option taken): Q2 2017
THE RED VALLEY PROJECT – UTAH
5
6
==> picture [91 x 25] intentionally omitted <==
==> picture [683 x 377] intentionally omitted <==
THE RED VALLEY PROJECT – UTAH
==> picture [91 x 25] intentionally omitted <==
-
Clayton Valley, Nevada holds the FAMOUS Silver Peak Mine
-
Owned by Albermarle Corporation (NYSE: ALB, MC = $11+ Billion)
-
North America’s ONLY Lithium brine producer
-
50 years in production and COUNTING
==> picture [377 x 360] intentionally omitted <==
Lithium Brines operations are lower cost (Pablo Cortesego, SRK Consulting)
THE RED VALLEY PROJECT – UTAH
7
==> picture [91 x 25] intentionally omitted <==
• Red Mountain is chasing USA’s second CONVENTIONAL, ULTRA LONG-LIFE, LITHIUM BRINES PRODUCTION PROVINCE in a brand new territory
-
6,000 acre Red Valley land package now fully secured in western UTAH
-
Drilling to commence, full brine analysis for commercial Lithium enrichment to follow
THE RED VALLEY PROJECT – UTAH
8
==> picture [91 x 25] intentionally omitted <==
A REMARKABLE Clayton Valley lookalike:
==> picture [689 x 380] intentionally omitted <==
THE RED VALLEY PROJECT – UTAH
9
==> picture [91 x 25] intentionally omitted <==
==> picture [315 x 381] intentionally omitted <==
• Drilling a total of THREE 1,000 foot RC wells, located at strategic locations across 6,000 ACRE HOLDING
-
Estimated 25 day drilling programme
-
Eastern holes to be drilled first (Holes 1 & 2)
-
EXPERIENCED local drillers, Grimshaw Drilling, appointed as contractors
-
ALS Life Sciences & WETLAB AS laboratories engaged for brine analysis
Red Valley drillhole locations
THE RED VALLEY PROJECT – UTAH
10
==> picture [91 x 25] intentionally omitted <==
Following in the footsteps of early stage lithium exploration at Clayton Valley
==> picture [244 x 325] intentionally omitted <==
OPEN HOLE ROTARY DRILLING
-
swift and economic
-
useful in determining:
— upper & lower limits of aquifers
— potential economic concentrations of lithium
— sedimentary patterns of aquifers & aquiperms
Rotary drill rig -- Clayton Valley
THE RED VALLEY PROJECT – UTAH
11
==> picture [91 x 25] intentionally omitted <==
• Water and drill chip samples to be collected at every 10 feet
- 1300+ bottles expected to be used for sampling
• 15 - 20 business day turnaround expected for laboratory analysis
==> picture [332 x 322] intentionally omitted <==
Collecting brines samples -- Clayton Valley
THE RED VALLEY PROJECT – UTAH
12
==> picture [91 x 25] intentionally omitted <==
==> picture [305 x 382] intentionally omitted <==
==> picture [305 x 382] intentionally omitted <==
Red Valley project boundary markers
THE RED VALLEY PROJECT – UTAH
13
==> picture [91 x 25] intentionally omitted <==
-
Voted TOP 10 mining jurisdiction in the world, 2015
-
BACKYARD OF TESLA, Faraday electric car plants in Nevada
-
Tesla seeking to source lithium EXCLUSIVELY from North America
-
Power, high-quality roads, workforce, rail, all on doorstep to project
==> picture [341 x 350] intentionally omitted <==
THE RED VALLEY PROJECT – UTAH
14
==> picture [91 x 25] intentionally omitted <==
- Last year, RMX was FULLY FUNDED for ‘TRY BEFORE YOU BUY’ phase
1. DRILL
2. GET RESULTS
3. THEN, CHOICE TO ACQUIRE
-
Recent injection of capital provides RMX ability to acquire major interest in Red Valley project AND fund follow-up work:
-
51% OF RED VALLEY PROJECT FOR US$250,000
-
OPPORTUNITY TO EARN-IN UP TO 80% BY $$$ IN THE GROUND
THE RED VALLEY PROJECT – UTAH
15
==> picture [91 x 25] intentionally omitted <==
Bill Feyerabend (B.Sc Geology)
- Arizona-based certified professional geologist for over 40 years
• Vast experience within the global Lithium Sector
-
Author of expert reports for Clayton Valley players:
-
Lithium-X (mc: c$100m)
==> picture [329 x 304] intentionally omitted <==
On-site at the Red Valley Project
- Pure Energy (mc: c$52m)
THE RED VALLEY PROJECT – UTAH
16
==> picture [91 x 25] intentionally omitted <==
==> picture [329 x 329] intentionally omitted <==
Brendan Borg (B.Sc Geology)
-
Masters in Hydrogeology (2006)
-
Director & Principal Consultant of Borg Geoscience
-
Technical Consultant for a number of ASX-listed lithium companies
THE RED VALLEY PROJECT – UTAH
17
==> picture [91 x 25] intentionally omitted <==
==> picture [38 x 44] intentionally omitted <==
==> picture [38 x 43] intentionally omitted <==
==> picture [38 x 44] intentionally omitted <==
==> picture [39 x 43] intentionally omitted <==
==> picture [31 x 30] intentionally omitted <==
==> picture [31 x 31] intentionally omitted <==
==> picture [31 x 30] intentionally omitted <==
Securing large land tenure footprint Performing required local archeological survey Lodge required drill permit applications Drill permit approval
Commencement of drilling on Red Valley ground Submit assays to independent laboratories Purchase of 51% on project (at RMX’s election)
THE RED VALLEY PROJECT – UTAH
==> picture [720 x 540] intentionally omitted <==
----- Start of picture text -----
Mukabe-Kasari Cobalt Project (DRC)
THE RED VALLEY PROJECT – UTAH
----- End of picture text -----
==> picture [91 x 25] intentionally omitted <==
High Grade Cobalt Project
-
Total project area comprising 350km[2]
-
~50km north of world famous Tenke Fungurume Cu-Co Mine
-
~110km north-west of Kolwezi Cu-Co Mine
-
Good infrastructure -- roads, power & water
==> picture [474 x 425] intentionally omitted <==
THE RED VALLEY PROJECT – UTAH
==> picture [91 x 25] intentionally omitted <==
==> picture [303 x 371] intentionally omitted <==
-
Average grade of Co from analysis of unwashed grab samples between 3 - 7% Cobalt & 4 - 22% Copper
-
Initial exploration work mainly pitting & trenching of 40+ holes
-
Holes dug until ore body reached - vary between 10 to 23 metres from ground level
==> picture [272 x 138] intentionally omitted <==
THE RED VALLEY PROJECT – UTAH
==> picture [91 x 25] intentionally omitted <==
- The DRC holds the
world’s largest supply source of cobalt
• Roughly 63% of global cobalt supply originates in the DRC
==> picture [445 x 328] intentionally omitted <==
THE RED VALLEY PROJECT – UTAH
==> picture [91 x 25] intentionally omitted <==
-
Attractive terms negotiated
-
6 week DD period, THEN option to earn-in
-
CSA Global engaged to perform due diligence – HIGHLY EXPERIENCED in the region
-
Staged deal terms provide OPTIONALITY for RMX
==> picture [688 x 171] intentionally omitted <==
THE RED VALLEY PROJECT – UTAH
==> picture [91 x 25] intentionally omitted <==
RMX
market capitalisation ~ $12 million
Red Valley Lithium Brines Project
Mukabe-Kasari Cobalt-Copper Project
-
Opportunity to CONTROL next lithium brine province in USA
-
350km[2 ] in world class geo-metallic domain
-
Large acreage position staked
-
Scout drilling campaign imminent
-
~50km from world famous cobalt mine
-
High cobalt grades
-
Attractive deal terms
-
DD before earn-in
THE RED VALLEY PROJECT – UTAH
24