RAND MINING LIMITED Interim / Quarterly Report 2015

Jan 8, 2015

65721_rns_2015-01-08_046938af-d6b2-483d-8635-818767dcf835.pdf

Interim / Quarterly Report

Open in viewer

Opens in your device viewer

==> picture [379 x 135] intentionally omitted <==

The Listing Manager Australian Securities Exchange Level 4 20 Bridge Street SYDNEY NSW 2000

January 9, 2015

Monthly Production Report for December 2014

End of Month Status Raleigh – Production

==> picture [463 x 250] intentionally omitted <==

Pegasus, Rubicon, Hornet – Development and Production

==> picture [464 x 142] intentionally omitted <==

green indicates new developments

MINE PRODUCTION
Raleigh Rubicon & Hornet Pegasus
Ore t 4,267 44,460 7,306
Grade g/t Au 6.7 9.8 7.4
Gold oz 923 14,007 1,750
Rand’s Entitlement % 12.50 12.25 12.25
Grade
g/t Au
6.7
9.8
7.4
Gold
oz
923
14,007
1,750
Rand’s Entitlement
%
12.50
12.25
12.25
Grade
g/t Au
6.7
9.8
7.4
Gold
oz
923
14,007
1,750
Rand’s Entitlement
%
12.50
12.25
12.25
Grade
g/t Au
6.7
9.8
7.4
Gold
oz
923
14,007
1,750
Rand’s Entitlement
%
12.50
12.25
12.25
Grade
g/t Au
6.7
9.8
7.4
Gold
oz
923
14,007
1,750
Rand’s Entitlement
%
12.50
12.25
12.25
Grade
g/t Au
6.7
9.8
7.4
Gold
oz
923
14,007
1,750
Rand’s Entitlement
%
12.50
12.25
12.25
MINE OPERATING COSTS
Total Cost$M Raleigh* Pegasus Unit Cost Rubicon & Hornet
December 14 0.863 1.257 $/t ore 116
November 14 1.610 0.000 $/ozgold 370
*
includes rehabilitation costs
MINE DEVELOPMENT
Raleigh Rubicon & Hornet Pegasus
Capital Decline m 0.0 49.4 131.2
Secondary m 0.0 85.2 155.9
Operating Waste m 0.0 0.0 0.0
Ore m 5.3 270.9 92.4
Past Fill m 12.0 42.0 0.0
End of monthposition RL(m) below surface(m)
Raleigh Decline bottom 5618 727
Rubicon Decline bottom 5999 344
Hornet Incline top 6244 99
Hornet Decline bottom 5876 467
Pegasus Incline top 6136 207
Pegasus Decline bottom 6101 242
Hornet Incline
top
Hornet Decline
bottom
Pegasus Incline
top
Pegasus Decline
bottom
Hornet Incline
top
Hornet Decline
bottom
Pegasus Incline
top
Pegasus Decline
bottom
6244
5876
6136
6101
99
467
207
242
End of month EKJV STOCKPILES
ROMpad Ore Source Ore Grade
t g/t Au
Raleigh Raleigh 4,554 6.3
Rubicon Rubicon & Hornet 7,654 9.0
Pegasus Pegasus 388 15.1
Kanowna Belle Rubicon & Hornet 28,981 10.2
Kanowna Belle Pegasus 8,832 7.5

Toll Processing

During the month, 2,954 t (wet) of Raleigh ore, 64,658 t (wet) of Rubicon & Hornet ore and 8,920 t (wet) of Pegasus ore were hauled to the Kanowna Belle Plant and 62,862 t of EKJV ore was processed.

Toll Processing
During the month, 2,954 t (wet) of Raleigh ore, 64,658 t (wet) of Rubicon & Hornet ore and 8,920 t
(wet) of Pegasus ore were hauled to the Kanowna Belle Plant and 62,862 t of EKJV ore was processed.
Toll Processing
During the month, 2,954 t (wet) of Raleigh ore, 64,658 t (wet) of Rubicon & Hornet ore and 8,920 t
(wet) of Pegasus ore were hauled to the Kanowna Belle Plant and 62,862 t of EKJV ore was processed.
Toll Processing
During the month, 2,954 t (wet) of Raleigh ore, 64,658 t (wet) of Rubicon & Hornet ore and 8,920 t
(wet) of Pegasus ore were hauled to the Kanowna Belle Plant and 62,862 t of EKJV ore was processed.
Toll Processing
During the month, 2,954 t (wet) of Raleigh ore, 64,658 t (wet) of Rubicon & Hornet ore and 8,920 t
(wet) of Pegasus ore were hauled to the Kanowna Belle Plant and 62,862 t of EKJV ore was processed.
Bullion accredited to RAND and TRIBUNE Accounts from Kanowna Belle
Month Gold(oz) Silver(oz) Rand’s sharegold
December 14 9,321.316 2,151.751 2,330.329
November 14 10,699.134 2,806.185 2,674.784