RAND MINING LIMITED Interim / Quarterly Report 2014

Dec 7, 2014

65721_rns_2014-12-07_8e0e2366-9cf4-4d54-8317-c3318183c68f.pdf

Interim / Quarterly Report

Open in viewer

Opens in your device viewer

==> picture [379 x 135] intentionally omitted <==

The Listing Manager Australian Securities Exchange Level 4 20 Bridge Street SYDNEY NSW 2000

December 8, 2014

Monthly Production Report for November 2014

The production rate at Raleigh will increase as the new stoping front is established. Again, the production schedule at Rubicon and Hornet has been re‐optimized, using some of the resources from Raleigh, to minimize the production shortfall at Raleigh due to the February earthquake. Pegasus is producing development ore.

End of Month Status Raleigh – Production

==> picture [432 x 204] intentionally omitted <==

Rubicon – Development and Production

==> picture [437 x 137] intentionally omitted <==

green indicates new developments

MINE PRODUCTION
Raleigh U/G Rubicon U/G Pegasus U/G
Ore t 4,253 39,064 13,201
Grade g/t Au 10.0 9.6 3.8
Gold oz 1,367 12,111 1,622
Rand’s Entitlement % 12.50 12.25 12.25
Rand’s Entitlement %
12.50
%
12.50
12.25
12.25
MINE OPERATING COSTS
Total Cost$M Raleigh Unit Cost Rubicon
November 14 * 1.610 $/t ore 108
October 14 * 1.328 $/ozgold 347
  • includes rehabilitation costs
MINE DEVELOPMENT
Raleigh Rubicon Pegasus
Capital Decline m 0.0 87.5 139.9
Secondary m 0.0 60.4 155.1
Operating Waste m 0.0 0.0 0.0
Ore m 0.0 310.7 76.3
Past Fill m 0.0 54.0 0.0
End of monthposition RL(m) below surface(m)
Raleigh Decline bottom 5618 727
Rubicon Decline bottom 6004 339
Hornet Incline top 6244 99
Hornet Decline bottom 5879 464
Pegasus Incline top 6127 216
Pegasus Decline bottom 6111 232
Hornet Incline
Hornet Decline
Pegasus Incline
Pegasus Decline
top
6244
bottom
5879
top
6127
bottom
6111
top
6244
bottom
5879
top
6127
bottom
6111
99
464
216
232
End of month EKJV STOCKPILES
ROMpad Ore Source Ore Grade
t g/t Au
Raleigh Raleigh 3,274 10.9
Rubicon Rubicon 20,653 7.4
Pegasus Pegasus 5,663 6.2
Kanowna Belle Rubicon 26,582 9.9

Toll Processing

During the month, 6,805 tonnes (wet) of Raleigh ore and 54,582 tonnes (wet) of Rubicon ore were hauled to the Kanowna Belle Plant and 57,586 tonnes of EKJV ore was processed.

Toll Processing
During the month, 6,805 tonnes (wet) of Raleigh ore and 54,582 tonnes (wet) of Rubicon ore were
hauled to the Kanowna Belle Plant and 57,586 tonnes of EKJV ore was processed.
Toll Processing
During the month, 6,805 tonnes (wet) of Raleigh ore and 54,582 tonnes (wet) of Rubicon ore were
hauled to the Kanowna Belle Plant and 57,586 tonnes of EKJV ore was processed.
Toll Processing
During the month, 6,805 tonnes (wet) of Raleigh ore and 54,582 tonnes (wet) of Rubicon ore were
hauled to the Kanowna Belle Plant and 57,586 tonnes of EKJV ore was processed.
Toll Processing
During the month, 6,805 tonnes (wet) of Raleigh ore and 54,582 tonnes (wet) of Rubicon ore were
hauled to the Kanowna Belle Plant and 57,586 tonnes of EKJV ore was processed.
Bullion accredited to RAND and TRIBUNE Accounts from Kanowna Belle
Month Gold(oz) Silver(oz) Rand’s sharegold
November 14 10,699.134 2,806.185 2,674.784
October 14 8,266.176 2,034.682 2,066.543