Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

RAND MINING LIMITED Interim / Quarterly Report 2013

Jan 24, 2013

65721_rns_2013-01-24_d8153957-bd4e-4061-8dd0-894470b5e2ee.pdf

Interim / Quarterly Report

Open in viewer

Opens in your device viewer

==> picture [379 x 135] intentionally omitted <==

January 25, 2013

The Listing Manager Australian Securities Exchange Level 4 20 Bridge Street SYDNEY NSW 2000

Quarterly Report for December 2012

Highlights

  • During the quarter, 62,018 tonnes of EKJV ore were processed and 22,468 oz of gold and 4,785 oz of silver were credited to Rand and Tribune Bullion Accounts. (Rand’s share is 25%)

  • At the end of the quarter

approximately 18,000 tonnes of Raleigh ore at an estimated grade of 15.4 g/t remain as a Bed Blend Stockpile on the ROM pad at the Raleigh Mine (Rand’s entitlement is 12.5%)

approximately 8,000 tonnes of Rubicon ore at an estimated grade of 8.5 g/t remain as a Bed Blend Stockpile on the ROM pad at the Rubicon Mine (Rand’s entitlement is 12.25%)

approximately 6,000 tonnes of Raleigh ore at an estimated grade of 14.6 g/t remain on the ROM pad at the Greenfields Plant (Rand’s share is 25%)

approximately 10,800 tonnes of Rubicon ore at an estimated grade of 9.7 g/t remain on the ROM pad at the Greenfields Plant (Rand’s share is 25%)

the difference of the Gold in Circuit at the start and end of Campaign 23 has been agreed and the amount, 1,685.885 oz, will been transferred to Rand and Tribune Bullion Accounts by the end of January. (Rand’s share is 25%)

GEOLOGY AND MINING

EAST KUNDANA JOINT VENTURE

Raleigh Underground Mine Production

Stope production from the 5915, 5898, 5881, 5864, 5847, 5830, 5812, 5795, 5778, 5761, 5744, 5722, 5705, 5688, 5671 and 5654 levels continued during the quarter.

Contained gold in stope development and stope ore mined during the quarter, estimated by grade control face chip sampling, is tabulated below:

5722, 5705, 5688, 5671 and 5654 levels continued during the quarter.
Contained gold in stope development and stope ore mined during the quarter, estimated
grade control face chip sampling, is tabulated below:
5722, 5705, 5688, 5671 and 5654 levels continued during the quarter.
Contained gold in stope development and stope ore mined during the quarter, estimated
grade control face chip sampling, is tabulated below:
5722, 5705, 5688, 5671 and 5654 levels continued during the quarter.
Contained gold in stope development and stope ore mined during the quarter, estimated
grade control face chip sampling, is tabulated below:
5722, 5705, 5688, 5671 and 5654 levels continued during the quarter.
Contained gold in stope development and stope ore mined during the quarter, estimated
grade control face chip sampling, is tabulated below:
RALEIGH UNDERGROUND GRADE CONTROL ESTIMATES
Month Tonnes Grade Ounces
t g/t troy oz
October 17,972 10.02 5,240
November 12,706 14.59 5,960
December 17,191 16.26 8,987
December 12Q 47,869 13.4 20,737
September 12Q 55,668 13.2 23,649

Rand’s Entitlements (12.5%)

December 12Q 5,984 13.4 2,592
September 12Q 6,959 13.2 2,956

Approximately 18,000 tonnes remain as a Bed Blend Stockpile on the ROM pad at the Raleigh Mine and will be hauled in early January.

Raleigh Underground Mine Development

At the end of the quarter, the bottom of the Raleigh Decline is at 5618 m RL, 727 m from the surface.

Development has finished.

RALEIGH UNDERGROUND DEVELOPMENT
Month Capital Operating
Decline
(m)
Secondary
(m)
Waste
(m)
Ore
(m)
Paste Fill
(m)
October 0.0 0.0 0.0 0.0 30.0
November 0.0 0.0 0.0 0.0 40.0
December 0.0 0.0 0.0 0.0 45.0
December 12Q 0.0 0.0 0.0 0.0 115.0
September 12Q 0.0 0.0 0.0 107.3 125.0

The diagrams below show the status of the mine at the end of each month of the quarter.

==> picture [312 x 11] intentionally omitted <==

----- Start of picture text -----

October 12 Green indicates new development at Raleigh
----- End of picture text -----

==> picture [451 x 192] intentionally omitted <==

November 12 Green indicates new development at Raleigh

==> picture [451 x 193] intentionally omitted <==

December 12 Green indicates new development at Raleigh

==> picture [451 x 192] intentionally omitted <==

Mine operating costs incurred during the December 2012 Quarter were $206 per tonne mined or $475 per ounce mined compared with the September 2012 Quarter costs of $202 and $475 respectively.

Rubicon Underground Mine Production

During the quarter, development of the Rubicon ore body progressed on the 6075 level and the Hornet ore body on the 6225, 6205, 6185, 6165, 6145, 6125, 6105, 6085, 6065 and 6065 levels. Stope production from the Rubicon 6175, 6135, 6115 and 6095 levels and Hornet 6145 and 6125 levels continued during the quarter.

Contained gold in stope development mined during the quarter, estimated by grade control face chip sampling, is tabulated below:

chip sampling, is tabulated below: chip sampling, is tabulated below: chip sampling, is tabulated below: chip sampling, is tabulated below:
RUBICON UNDERGROUND GRADE CONTROL ESTIMATES
Month Tonnes Grade Ounces
t g/t troy oz
October 25,709 13.56 11,206
November 18,738 9.68 5,832
December 22,261 11.61 8,310
December 12Q 66,708 11.8 25,348
September 12Q 64,846 8.7 18,097

Rand’s Entitlements (12.25%)

December 12Q 8,172 11.8 3,105
September 12Q 7,944 8.7 2,217

Approximately 8,000 tonnes remain as a Bed Blend Stockpile on the ROM pad at the Rubicon Mine and will be hauled in early January.

Rubicon Underground Mine Development

At the end of the quarter, the bottom of the Rubicon Decline is at 6067 m RL, 276 m from the surface, the bottom of the Hornet Decline is at 6013 m RL, 330 m from the surface and the top of the Hornet Incline is at 6242 m RL, 101 m from the surface.

RUBICON UNDERGROUND DEVELOPMENT
Month Capital Operating
Decline
(m)
Secondary
(m)
Waste
(m)
Ore
(m)
Paste Fill
(m)
October 145.4 89.9 26.4 277.8 5.0
November 78.8 95.1 17.4 194.0 15.0
December 171.8 93.2 8.8 255.6 10.0
December 12Q 396.0 278.2 52.6 727.4 30.0
September 12Q 489.4 387.5 88.2 726.5 5.0

The diagrams below show the status of the mine at the end of each month of the quarter.

==> picture [316 x 11] intentionally omitted <==

----- Start of picture text -----

October 12 Green indicates new development at Rubicon
----- End of picture text -----

==> picture [437 x 152] intentionally omitted <==

November 12 Green indicates new development at Rubicon

==> picture [438 x 156] intentionally omitted <==

December 12 Green indicates new development at Rubicon

==> picture [437 x 165] intentionally omitted <==

Mine operating costs incurred during the December 2012 Quarter were $129 per tonne mined or $340 per ounce mined compared with the September 2012 Quarter costs of $107 and $382 respectively.

Toll Processing

During the quarter, 24,784 tonnes (wet) of Raleigh ore and 32,394 tonnes (wet) of Rubicon ore were hauled to the Greenfields Plant. The twenty fourth toll treatment campaign at the Greenfields Plant, which started on October 17, 2012, finished on November 20, 2012. During the quarter, 62,018 tonnes of EKJV ore were processed. At the end of the quarter, approximately 6,200 tonnes (wet) of Raleigh ore and 11,000 (wet) tonnes of Rubicon ore remain on the ROM pad at the Greenfields Plant.

approximately 6,200 tonnes (wet) of Raleigh ore and 11,000 (wet) tonnes of
on the ROM pad at the Greenfields Plant.
approximately 6,200 tonnes (wet) of Raleigh ore and 11,000 (wet) tonnes of
on the ROM pad at the Greenfields Plant.
approximately 6,200 tonnes (wet) of Raleigh ore and 11,000 (wet) tonnes of
on the ROM pad at the Greenfields Plant.
approximately 6,200 tonnes (wet) of Raleigh ore and 11,000 (wet) tonnes of
on the ROM pad at the Greenfields Plant.
Bullion accredited to RAND and TRIBUNE
Quarter Gold(oz) Silver(oz) Rand’s sharegold
December 12 22,468.286 4,785.890 5,617.069
September 12 29,577.935 5,058.677 7,394.480

EKJV Exploration

The Quarterly Report of the EKJV exploration activities is expected shortly and will be released to the ASX when received.

OTHER EXPLORATION

Wongan Hills (Rand’s Interest 100%)

A drilling programme to test previously reported anomalies has been planned and will start when a drill rig is available.

Seven Mile Hill Joint Venture (Rand’s Interest 50%)

Discussions to farm out the Seven Mile Hill tenements are continuing.

Tapeta Iron Ore Project, Liberia, West Africa

Construction of the camp on the lease has finished. Drilling will start when the wet season has finished.

Appendix 5B Mining exploration entity quarterly report

Rule 5.3

Appendix 5B

Mining exploration entity quarterly report

Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001, 01/06/10.

Name of entity

Rand Mining Ltd

ABN
41 004 669 658
Consolidated statement of cash flows
Quarter ended (“current quarter”)
31 December 2012
Quarter ended (“current quarter”)
31 December 2012
31 December 2012
Cash flows related to operating activities
1.1
Receipts from product sales and related debtors
1.2
Payments for
(a) exploration & evaluation
(b) development
(c) production
(d) administration
1.3
Dividends received
1.4
Interest and other items of a similar nature
received
1.5
Interest and other costs of finance paid
1.6
Income taxes paid
1.7
Other (provide details if material)
Net Operating Cash Flows
Current quarter
$A’000
Year to date
(6 months)
$A’000
7,613
(609)
(777)
(2,811)
(1,330)

22
(80)
(1,025)
14,755
(1,157)
(1,716)
(5,406)
(2,192)

38
(174)
(1,632)
1,003 2,516
Cash flows related to investing activities
1.8
Payment for purchases of: (a) prospects
(b) equity investments
(c) other fixed assets
1.9
Proceeds from sale of:
(a) prospects
(b) equity investments
(c) other fixed assets
1.10
Loans to other entities
1.11
Loans repaid to other entities
1.12
Loans from other entities
Net investing cash flows
1.13
Total operating and investing cash flows (carried
forward)


(240)







(392)





(240) (392)
763 2,124
  • See chapter 19 for defined terms.

Appendix 5B Page 1

30/9/2001

Appendix 5B Mining exploration entity quarterly report

Appendix 5B
Mining exploration entity quarterly report
1.13
Total operating and investing cash flows (brought
forward)
763 2,124
Cash flows related to financing activities
1.14
Proceeds from issues of shares, options, etc.
1.15
Proceeds from sale of forfeited shares
1.16
Proceeds from borrowings
1.17
Repayment of borrowings
1.18
Dividends paid
1.19
Other (provide details if material)
Net financing cash flows



(812)




(1,500)

(812) (1,500)
Net increase (decrease) in cash held
1.20
Cash at beginning of quarter/year to date
1.21
Exchange rate adjustments to item 1.20
1.22
Cash at end ofquarter
(49)
2,358
624
1,685
2,309 2,309

Payments to directors of the entity and associates of the directors

Payments to related entities of the entity and associates of the related entities

1.23
1.24
Aggregate amount of payments to the parties included in item 1.2
Aggregate amount of loans to the parties included in item 1.10
Current quarter
$A'000
(40)
1.25 Explanation necessaryfor an understandingof the transactions
Directors fees and superannuation (included in administration 1.2(d)) (32)
Royalty payment (included in production 1.2(c)) (8)

Non‐cash financing and investing activities

  • 2.1 Details of financing and investing transactions which have had a material effect on consolidated assets and liabilities but did not involve cash flows

Not applicable

  • 2.2 Details of outlays made by other entities to establish or increase their share in projects in which the reporting entity has an interest

Not applicable

  • See chapter 19 for defined terms.

Appendix 5B Page 2

30/9/2001

Appendix 5B Mining exploration entity quarterly report

Financing facilities available

Add notes as necessary for an understanding of the position.

Financing facilities available
Add notes as necessary for an understanding of the position.
3.1
Loan facilities
3.2
Credit standby arrangements
Amount available
$A’000


Amount used
$A’000

5,000

Estimated cash outflows for next quarter

4.1
Exploration and evaluation
4.2
Development
4.3
Production
4.4
Administration
$A’000
500
600
500
500
Total 2,100

Reconciliation of cash

Reconciliation of cash
Reconciliation of cash at the end of the quarter (as Current quarter Previous quarter
shown in the consolidated statement of cash flows) to $A’000 $A’000
the related items in the accounts is as follows.
5.1
Cash on hand and at bank
2,124 2,173
5.2
Deposits at call
185 185
5.3
Bank overdraft
5.4
Other (provide details)
Total: cash at end of quarter(item 1.22) 2,309 2,358

Changes in interests in mining tenements

6.1
Interests in mining
tenements relinquished,
reduced or lapsed
Tenement
reference
Nature of interest
(note (2))
Interest at
beginning
ofquarter
Interest at
end of
quarter
  • See chapter 19 for defined terms.

Appendix 5B Page 3

30/9/2001

Appendix 5B Mining exploration entity quarterly report

6.2 Interests in mining
tenements acquired or
increased

Issued and quoted securities at end of current quarter

Description includes rate of interest and any redemption or conversion rights together with prices and dates.

Total number Number quoted Issue price per
security (see note
3) (cents)
Amount paid up per
security (see note 3)
(cents)
7.1
Preference
+securities
(description)
7.2
Changes during
quarter
(a) Increases
through issues
(b) Decreases
through returns
of capital, buy‐
backs,
redemptions
7.3
+Ordinary
securities
7.4
Changes during
quarter
(a) Increases
through issues
(b) Decreases
through returns
of capital, buy‐
backs
60,841,209 60,841,209
7.5
+Convertible
debt securities
(description)
7.6
Changes during
quarter
(a) Increases
through issues
(b) Decreases
through
securities
matured,
converted
7.7
Options
(description and
conversion
factor)
7.8
Issued during
quarter
7.9
Exercised during
quarter
  • See chapter 19 for defined terms.

Appendix 5B Page 4

30/9/2001

Appendix 5B Mining exploration entity quarterly report

7.10
Expired during
quarter
4,000,000 Exercise price
$0.60
Expiry date
26 October 2012
7.11
Debentures
(totals only)
7.12
Unsecured
notes(totals
only)

Compliance statement

  • 1 This statement has been prepared under accounting policies which comply with accounting standards as defined in the Corporations Act or other standards acceptable to ASX (see note 4).

  • 2 This statement does give a true and fair view of the matters disclosed.

==> picture [79 x 39] intentionally omitted <==

Sign here: ............................................................ Date: 25 January 2013 (Director/Company secretary)

Print name: Anthony Billis

Notes

  • 1 The quarterly report provides a basis for informing the market how the entity’s activities have been financed for the past quarter and the effect on its cash position. An entity wanting to disclose additional information is encouraged to do so, in a note or notes attached to this report.

  • 2 The “Nature of interest” (items 6.1 and 6.2) includes options in respect of interests in mining tenements acquired, exercised or lapsed during the reporting period. If the entity is involved in a joint venture agreement and there are conditions precedent which will change its percentage interest in a mining tenement, it should disclose the change of percentage interest and conditions precedent in the list required for items 6.1 and 6.2.

  • 3 Issued and quoted securities The issue price and amount paid up is not required in items 7.1 and 7.3 for fully paid securities .

  • 4 The definitions in, and provisions of, AASB 1022: Accounting for Extractive Industries and AASB 1026: Statement of Cash Flows apply to this report.

  • 5 Accounting Standards ASX will accept, for example, the use of International Accounting Standards for foreign entities. If the standards used do not address a topic, the Australian standard on that topic (if any) must be complied with.

== == == == ==

  • See chapter 19 for defined terms.

Appendix 5B Page 5

30/9/2001